HomeMy WebLinkAboutContract 58812FoRTWORTH
CONTRACT
FOR
THE CONSTRUCTION OF
CSC No. 58812
LAKE WORTH TRAIL PHASE 1B
City Project No. C01920
Mattie Parker David Cooke
Mayor City Manager
Richard Zavala
Director, Park & Recreation Department
���,pNDSCgpF
W COyIS
N%9r 2964 +Q�
Prepared for:
The City of Fort Worth
Park & Recreation Department
2022
Prepared by:
FREESE
91111 MICHOLS
FREESE AND NICHOLS, INC.
4055 International Plaza, Suite 200
Fort Worth, TX 76109
(817)735-7300
Texas Registered Engineering Firm F-2144
OF
DAN BADALUTA
f98489`O r
r
N
04XJ j
05/25/2022
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
05/25/2022
FORT WORTH.
"I'll
City of Fort Worth
Standard Construction Specification
Documents
Adopted September 2011
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Pagel of 4
SECTION 00 00 00
TABLE OF CONTENTS
Division 00 - General Conditions Last Revised
00 05 10
Mayor and Council Communication
07/01/2011
0005 15
Addenda
07/01/2011
0011 13
Invitation to Bidders
07/19/2021
0021 13
Instructions to Bidders
11/02/2021
0035 13
Conflict of Interest Statement
02/24/2020
00 41 00
Bid Form
09/30/2021
00 42 43
Proposal Form Unit Price
01/20/2012
0043 13
Bid Bond
09/11/2017
00 43 37
Vendor Compliance to State Law Nonresident Bidder
06/27/2011
00 nc i i
�z
09/13O i
�z
,
00 n c i �
�z
09/30�02z
,
004
n4i z
00 45 26
Contractor Compliance with Workers' Compensation Law
07/01/2011
00 45 40
Business Equity Goal
10/27/2021
00 52 43
Agreement
08/22/2022
0061 13
Performance Bond
07/01/2011
0061 14
Pa ment Bond
07/01/2011
0061 19
Maintenance Bond
07/01/2011
00 61 25
Certificate of Insurance
07/01/2011
00 72 00
General Conditions
08/23/2021
00 73 00
Supplementary Conditions
03/09/2020
Division 01- General Requirements
Last Revised
01 1100
Summary of Work
12/20/2012
01 25 00
Substitution Procedures
07/01/2011
01 31 19
Preconstruction Meeting
08/17/2012
01 31 20
Project Meetings
07/01/2011
0132 16
Construction Schedule
08/13/2021
01 32 33
Preconstruction Video
07/01/2011
01 33 00
Submittals
12/20/2012
01 35 13
Special Project Procedures
03/11/2022
01 45 23
Testing and Inspection Services
03/09/2020
01 50 00
Temporary Facilities and Controls
07/01/2011
01 5526
Street Use Permit and Modifications to Traffic Control
03/22/2021
01 57 13
Storm Water Pollution Prevention Plan
07/01/2011
01 58 13
Temporary Project Si na e
07/01/2011
01 60 00
Product Requirements
03/09/2020
01 66 00
Product Storage and Handling Requirements
07/01/2011
01 70 00
Mobilization and Remobilization
11/22/2016
01 71 23
Construction Staking and Survey
02/14/2018
01 74 23
Cleaning
07/01/2011
01 77 19
Closeout Requirements
03/22/2021
01 78 23
Operation and Maintenance Data
12/20/2012
01 78 39
Project Record Documents
07/01/2011
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised December 9, 2022
Lake Worth Trail Phase I
1920
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 4
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
Division 02 - Existing Conditions
Date
Modified
0241 13
Selective Site Demolition
0241 14
Utility Removal/Abandonment
0241 15
Paving Removal
Division 03 - Concrete
03 1000
Concrete Formwork and Accessories - Bride (Structural -Goer)
03 20 00
Concrete Reinforcement - Bride (Structural -Go "er)
03 30 00
Cast -in -Place Concrete - Bride (Structural -Goer)
03 34 13
Cast -In -Place Concrete
03 34 16
Drilled Piers - Bridge
03 80 00
Modifications to Existing Concrete Structures
Division 05 — Metals
05 50 00 1 Miscellaneous Metals (Freese and Nichols)
Division 10 — Specialties
10 43 00 1 Site Si a e (Freese and Nichols)
Division 12 — Furnishings
1167 13 1 Site Furnishings
Division 31- Earthwork
31 1000
Site Clearing
3123 16
Unclassified Excavation
31 23 23
Borrow
31 24 00
Embankments
31 25 00
Erosion and Sediment Control
31 37 00
Ri ra
Division 32 - Exterior Improvements
3201 17
Permanent Asphalt Paving Repair
3201 18
Temporary Asphalt Paving Repair
32 01 29
Concrete Paving Repair
32 01 90
Preservation + Protection of Plant Materials (Freese and Nichols)
32 1216
Asphalt Paving
32 13 13
Concrete Paving
32 1373
Concrete Paving Joint Sealants
32 31 29
Wood Fences and Gates
3291 19
Topsoil Placement and Finishing of Parkways
32 92 13
Hydro -Mulching, Seeding, and Sodding
Division 33 - Utilities
CITY OF FORT WORTH Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised December 9, 2022
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 4
33 04 30
Temporary Water Services
3305 10
Utility Trench Excavation, Embedment, and Backfill
3305 14
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to
Grade
33 05 30
Location of Existing Utilities
33 11 12
Polyvinyl Chloride PVC Pressure Pipe
33 1210
Water Services 1-inch to 2-inch
33 1225
Connection to Existing Water Mains
3341 10
Reinforced Concrete Storm Sewer Pipe/Culverts
3341 11
High Density Polyethylene HDPE Pipe for Storm Drain
3341 12
Reinforced Polyethylene SRPE Pipe
33 49 40
Storm Drainage Headwalls and Wingwalls
Division 34 - Transportation
3471 13 1 Traffic Control
Appendix
TxDOT SPECIFICATIONS:
500 — Miscellaneous Construction
529 Concrete Curb, Gutter, and Combined Gutter
540 Metal Beam Guard Fence
600 - Lighting, Signing, Markings, and Signals
644 Small Roadside Sign Assemblies
666 Retro reflectorized Pavement Markings
GC-4.01
Geotechnical Investigation (Gorrondona Associates, Report No. FNI1317.00)
GC-6.03
Minority and Women Owned Business Enterprise Compliance
GC-6.04
Wage Rates
GC-6.06
Weather Table
END OF SECTION
CITY OF FORT WORTH Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised December 9, 2022
City of Fort Worth,
Mayor and
Texas
Council Communication
DATE: 11/29/22 M&C FILE NUMBER: M&C 22-0942
LOG NAME: 80LAKE WORTH TRAIL PHASE 1 B COLE
SUBJECT
(CD 7) Authorize Execution of a Contract with Cole Construction, Inc., in the Amount of $1,821,821.56 for the Construction of the Lake Worth Trail
Phase 1 B Project
RECOMMENDATION:
It is recommended that the City Council authorize execution of a contract with Cole Construction, Inc., in the amount of $1,821,821.56 for the
construction of the Lake Worth Trail Phase 1 B project (City Project No. C01920).
DISCUSSION:
The purpose of this Mayor and Council Communication (M&C) is to authorize the execution of a contract with Cole Construction, Inc., in the amount
of $1,821,821.56 for the construction of the Lake Worth Trail Phase 1 B project.
The project was posted on the City purchasing website on July 7, 2022, and advertised in the Fort Worth Star -Telegram on July 7, 2022, & July 14,
2022. The following bids were received on August 4, 2022.
BIDDER
BASE BID
ALTERNATES
(Line Items 3,
5, & 9)
TOTAL
Cole Construction, Inc
$1,756,821.56
$65,000.00
$1,821,821.56
L.J. Design &
$1,786,924.00
$65,000.00
$1,851,924.00
Construction, LLC
2L Constr
1$1,878,037.001
$65,000.00
$1,943,037.00
Northstar Construction,
LLC
$1,919,777.00
$65,000.00
$1,984,777.00
North Rock
Construction LLC
$2,029,728.26
$65,000.00
$2,094,728.26
Cte
Concreures
Structaucto LLC
$2,055,239.00
$65,000.00
$2,120,239.00
Klutz Construction,
LLC
$2,384,340.90
$65,000.00
$2,449,340.90
Improvements for this contract include installation of concrete trail, one pedestrian bridge, retaining walls, fencing, signage, drinking fountain,
security lighting, benches and a trash receptacle. All selected Alternates (Line Item Numbers 3, 5 & 9) are construction allowances.
Construction of this project is anticipated to begin in December 2022 and be completed in September 2023. Funding for this project is budgeted
in the Lake Worth Gas Lease Capital Legacy Fund in the Lake Worth Trail Phase 1 B project.
Lake Worth Trail Phase 1 B is estimated to increase the Department's annual maintenance by $31,630.00 beginning in Fiscal Year (FY) 2024. As
of September 30, 2022, the cumulative total of all previously approved M&C's increased the Department's estimated annual maintenance by
$193,603.00 beginning in FY2024.
Compliance with the City's Business Equity Ordinance has been achieved by the following method: Cole Construction, Inc., is in compliance with
the City's Business Equity Ordinance by committing to 18% Business Equity participation on this project. The City's Business Equity goal for this
project is 13%.
The Lake Worth Trail Phase 1 B project is located in COUNCIL DISTRICT 7.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Lake Worth Gas Lse Cap
Legacy Fund for the Lake Worth Trail - Phase 1 project to support the approval of the above recommendation and execution of the contract. Prior
to any expenditure being incurred, the Park and Recreation Department has the responsibility to validate the availability of funds.
Submitted for City Manager's Office by: Jesica McEachern 5804
Originating Business Unit Head: Dave Lewis 5717
Additional Information Contact: Joel McElhany 5745
Carlos Gonzalez 5734
ADDENDUM #1
Lake Worth Trail Phase 1 B
August 01, 2022
TO ALL BIDDERS:
Please attach to your specifications. This addendum is hereby made a part of the
Contract Documents and is issued to modify explain or correct the original drawings
and/or project manual.
CLARIFICATIONS
1) The Business Equity Project Goal on the project is 13%
2) Lock+Load Retaining Wall Systems are an acceptable product for the RediRock
Retaining wall system. The design shall conform with the contract document
design needs and performance requirements.
3) SOL UP2 by Sunna Design is an acceptable solar light product as long as the
fixtures provide matching warranty and performance standards of the fixture
shown on the plans.
4) The water source for the drinking fountain will be provided by the City at a meter,
1 ". Anticipate 40' of pipe needed to make this connection nearby the ROW.
5) The headwall for the pipe outfalls will be designed by the retaining wall
manufacturer to fit into their retaining wall products.
6) Handrail installation on top of retaining walls shall be per wall block
manufacturer's standard detailing and design.
7) Pavement Marking pay item #22 is the same as Crosswalk Item. Remove
Pavement Marking.
8) For the sign posts use the City standard 2" square.
9) Mobilization is subsidiary to the various bid items.
10)Adjust Traffic Control bid item to 9 months. A new bid form is provided.
11)Refer to Geotech report for information regarding lime stabilization under the 6"
trail. Use this in place of compacted subgrade referred to in construction details.
CONSTRUCTION DRAWINGS
REFER TO SHEET L1.01
ADD the following description information for 40 LF Link Pedestrian Contech Bridge
Span
1. Rail Option: Vertical Picket/Pipe Handrail
2. Decking: Wood
3. Finish: Dark Green Painted Steel, Submit colors for selection.
PROJECT MANUAL
REFER TO SECTION TABLE OF CONTENTS
1. REMOVE and REPLACE with updated version.
REFER TO SECTION 00 42 43 PROPOSAL FORM
1. REMOVE and REPLACE with updated version.
REFER TO SECTION 01 55 26 STREET USE PERMIT
1. ADD this spec section to the manual
REFER TO SECTION 01 70 00 MOBILIZATION AND REMOBILIZATION
1. REMOVE and REPLACE section 1.02 price and payment procedures.
REFER TO SECTION 02 41 15 PAVING REMOVAL
1. ADD this spec section to the manual
REFER TO SECTION 32 01 29 CONCRETE PAVING REPAIR
1. ADD this spec section to the manual
REFER TO SECTION 32 11 29 LIME TREATED BASE COURSE
1. ADD this spec section to the manual
REFER TO SECTION 32 92 13 SODDING
1. ADD this spec section to the manual
REFER TO SECTION 33 11 12 POLYVINYL CHLORIDE (PVC) PRESSURE PIPE
1. ADD this spec section to the manual
REFER TO SECTION 34 71 13 TRAFFIC CONTROL
1. REMOVE and REPLACE section 1.5 submittals
END OF ADDENDUM #1
Bid Opening Date: August 01, 2022
Acknowledge the receipt of this Addendum on your Proposal.
Digitally signed by
a2541862-72e1-448b-
a92f-5dda7701 fcd2
Date: 2022.08.01 10:50:34-05'00'
Carlos M Gonzalez, Project Manager
Release Date: August 01, 2022
ADDENDUM #2
Lake Worth Trail Phase 1 B
August 02, 2022
TO ALL BIDDERS:
Please attach to your specifications. This addendum is hereby made a part of the
Contract Documents and is issued to modify explain or correct the original drawings
and/or project manual.
CLARIFICATIONS
1) In reference to required concrete pavement 28-day testing strength, refer to
Geotech report. 4000 PSI.
END OF ADDENDUM #2
Bid Opening Date: August 04, 2022
Acknowledge the receipt of this Addendum on your Proposal.
0
Digitally signed by a2541862-72e1-448b-
C a92f-5dda7701fcd2
Date: 2022.08.02 11:33:15-05'00'
Carlos M Gonzalez, Project Manager
Release Date: August 02, 2022
00 11 13
INVITATION TO BIDDERS
Pagel of 2
SECTION 00 1113
INVITATION TO BIDDERS
RECEIPT OF BIDS
Sealed bids for the construction of Lake Worth Trails Phase 1B — Marion Sansom Park
("Project") will be received by the City of Fort Worth Purchasing Office until 1:30 P.M. CST,
Thursday, August 4, 2022 as further described below:
City of Fort Worth
Purchasing Division
200 Texas Street
Fort Worth, Texas 76102
Bids will be accepted by: US Mail, Courier, FedEx or hand delivery at the address above;
Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers.
C!�&I1017107 1119i 7171Yto) 0Ell AY,1117N
The major work will consist of the (approximate) following: The Base bid will include the
construction of approx. 3,580 LF of 10' wide concrete trail, related markings, retaining walls,
signage, trailhead and (1) one pedestrian bridge along the northeaster edge of Lake Worth. This
base bid segment lies between Quebec St on the west and Roberts Cut off Rd on the east.
QUALIFICATION
The improvements included in this project must be performed by a contractor who is qualified by
the City. The procedures for qualification are outlined in the Section 00 21 13 —
INSTRUCTIONS TO BIDDERS.
DOCUMENT EXAMINATION AND PROCUREMENTS
The Bidding and Contract Documents may be examined or obtained on-line by visiting the City
of Fort Worth's Purchasing Division website at http://www.fortworthtexas.gov/purchasing/ and
clicking on the link to the advertised project folders on the City's electronic document
management and collaboration system site. The Contract Documents may be downloaded,
viewed, and printed by interested contractors and/or suppliers.
EXPRESSION OF INTERSEST
To ensure potential bidders are kept up to date of any new information pertinent to this project, all
interested parties are requested to email Expressions of Interest in this procurement to the City
Project Manager and the Design Engineer. The email should include the company's name,
contact person and that individual's email address and phone number. All Addenda will be
distributed directly to those who have expressed an interest in the procurement and will also be
posted in the City of Fort Worth's purchasing website at http://fortworthtexas.gov/purchasing/
PREBID CONFERENCE — Web Conference
A prebid conference will be held as discussed in Section 00 21 13 - INSTRUCTIONS TO
BIDDERS at the following date, and time via a web conferencing application:
DATE: July 27, 2022
TIME: 10:00 am
CITY OF FORT WORTH Lake Worth Trail Phase IB
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT C01920
Revised 7/19/2021
00 11 13
INVITATION TO BIDDERS
Page 2 of 2
Invitations with links to the web conferencing application will be distributed directly to those
who have submitted an Expression of Interest.
If a prebid conference is held, the presentation and any questions and answers provided at the
prebid conference will be issued as an Addendum to the call for bids. If a prebid conference is not
being held, prospective bidders can e-mail questions or comments in accordance with Section 6
of the Instructions to Bidders referenced above to the project manager(s) at the e-mail addresses
listed below. Emailed questions will suffice as "questions in writing." If necessary, Addenda will
be issued pursuant to the Instructions to Bidders.
CITY'S RIGHT TO ACCEPT OR REJECT BIDS
City reserves the right to waive irregularities and to accept or reject any or all bids.
AWARD
City will award a contract to the Bidder presenting the lowest price, qualifications and
competencies considered.
FUNDING
Any Contract awarded under this INVITATION TO BIDDERS is expected to be funded from
revenues generated from Resolution of Lake Worth Gas Lease Capital Funds and reserved by the
City for the Project.
INQUIRIES
All inquiries relative to this procurement should be addressed to the following:
Attn: Carlos Gonzalez, City of Fort Worth
Email: carlos.gonzalez@fortworthtexas.gov
Phone: 817-392-5734
AND/OR
Attn: Seth Henry, PLA, ASLA, Freese and Nichols, Inc.
Email: Seth.Henry@freese.com
Phone: 214-217-2200
ADVERTISEMENT DATES
1 st Advertisement July 7, 2022
2°d Advertisement July 14, 2022
END OF SECTION
CITY OF FORT WORTH Lake Worth Trail Phase IB
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT C01920
Revised 7/19/2021
0021 13
INSTRUCTIONS TO BIDDERS
SECTION 00 2113
INSTRUCTIONS TO BIDDERS
1. Defined Terms
Page 1 of 9
1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section
00 72 00 - GENERAL CONDITIONS.
1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the
meanings indicated below which are applicable to both the singular and plural thereof.
1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting
directly through a duly authorized representative, submitting a bid for performing
the work contemplated under the Contract Documents.
1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or
corporation acting directly through a duly authorized representative, submitting a
bid for performing the work contemplated under the Contract Documents whose
principal place of business is not in the State of Texas.
1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City
(on the basis of City's evaluation as hereinafter provided) makes an award.
2. Copies of Bidding Documents
2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations
resulting from the Bidders use of incomplete sets of Bidding Documents.
2.2. City and Engineer in making copies of Bidding Documents available do so only for the
purpose of obtaining Bids for the Work and do not authorize or confer a license or grant
for any other use.
3. Prequalification of Bidders (Prime Contractors and Subcontractors)
3.1. Bidders or their designated subcontractors are required to be prequalified for the work
types requiring prequalification as per Sections 00 45 11 BIDDERS
PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. Firms
seeking pre -qualification, must submit the documentation identified in Section 00 45 11
on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven (7)
calendar days prior to Bid opening for review and, if qualified, acceptance. The
subcontractors listed by a Bidder on 00 45 12 must be prequalified for the appropriate
work types. Subcontractors must follow the same timelines as Bidders for obtaining
prequalification review. Bidders or Subcontractors who are not prequalified at the time
bids are opened and reviewed may cause the bid to be rejected.
Prequalification requirement work types and documentation are available by accessing all
required files through the City's website at:
https://apps.fortworthtexas. og v/ProjectResources/
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 1920
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 2 of 9
3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7)
calendar days prior to Bid opening, the documentation identified in Section 00 45 11,
BIDDERS PREQUALIFICATIONS.
3.2.1. Submission of and/or questions related to prequalification should be addressed to
the City contact as provided in Paragraph 6.1.
3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low
bidder for a project to submit such additional information as the City, in its sole
discretion may require, including but not limited to manpower and equipment records,
information about key personnel to be assigned to the project, and construction schedule
to assist the City in evaluating and assessing the ability of the apparent low bidder to
deliver a quality product and successfully complete projects for the amount bid within
the stipulated time frame. Based upon the City's assessment of the submitted
information, a recommendation regarding the award of a contract will be made to the
City Council. Failure to submit the additional information, if requested, may be grounds
for rejecting the apparent low bidder as non -responsive. Affected contractors will be
notified in writing of a recommendation to the City Council.
3.4. In addition to prequalification, additional requirements for qualification may be required
within various sections of the Contract Documents.
4. Examination of Bidding and Contract Documents, Other Related Data, and Site
4.1. Before submitting a Bid, each Bidder:
4.1.1. Shall examine and carefully study the Contract Documents and other related data
identified in the Bidding Documents (including "technical data" referred to in
Paragraph 4.2. below). No information given by City or any representative of the
City other than that contained in the Contract Documents and officially
promulgated addenda thereto, shall be binding upon the City.
4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general,
local and site conditions that may affect cost, progress, performance or furnishing
of the Work.
4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost,
progress, performance or furnishing of the Work.
4.1.4. Be advised that, City, in accordance with Title VI of the Civil Rights Act of 1964,
78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal
Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part
21, Nondiscrimination in Federally -assisted programs of the Department of
Transportation issued pursuant to such Act, hereby notifies all bidders that it will
affirmatively insure that in any contract entered into pursuant to this advertisement,
minority business enterprises will be afforded full opportunity to submit bids in
response to this invitation and will not be discriminated against on the grounds of
race, color, or national origin in consideration of award.
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 1920
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 3 of 9
4.1.5. Shall study all: (i) reports of explorations and tests of subsurface conditions at or
contiguous to the Site and all drawings of physical conditions relating to existing
surface or subsurface structures at the Site (except Underground Facilities) that
have been identified in the Contract Documents as containing reliable "technical
data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any,
at the Site that have been identified in the Contract Documents as containing
reliable "technical data."
4.1.6. Is advised that the Contract Documents on file with the City shall constitute all of
the information which the City will furnish. All additional information and data
which the City will supply after promulgation of the formal Contract Documents
shall be issued in the form of written addenda and shall become part of the Contract
Documents just as though such addenda were actually written into the original
Contract Documents. No information given by the City other than that contained in
the Contract Documents and officially promulgated addenda thereto, shall be
binding upon the City.
4.1.7. Should perform independent research, investigations, tests, borings, and such other
means as may be necessary to gain a complete knowledge of the conditions which
will be encountered during the construction of the project. For projects with
restricted access, upon request, City may provide each Bidder access to the site to
conduct such examinations, investigations, explorations, tests and studies as each
Bidder deems necessary for submission of a Bid. Bidder must fill all holes and
clean up and restore the site to its former conditions upon completion of such
explorations, investigations, tests and studies.
4.1.8. Shall determine the difficulties of the Work and all attending circumstances
affecting the cost of doing the Work, time required for its completion, and obtain all
information required to make a proposal. Bidders shall rely exclusively and solely
upon their own estimates, investigation, research, tests, explorations, and other data
which are necessary for full and complete information upon which the proposal is
to be based. It is understood that the submission of a proposal or bid is prima -facie
evidence that the Bidder has made the investigations, examinations and tests herein
required.
4.1.9. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or
between the Contract Documents and such other related documents. The Contractor
shall not take advantage of any gross error or omission in the Contract Documents,
and the City shall be permitted to make such corrections or interpretations as may
be deemed necessary for fulfillment of the intent of the Contract Documents.
4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of:
4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to
the site which have been utilized by City in preparation of the Contract Documents.
The logs of Soil Borings, if any, on the plans are for general information only.
Neither the City nor the Engineer guarantee that the data shown is representative of
conditions which actually exist.
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 1920
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 4 of 9
4.2.2. those drawings of physical conditions in or relating to existing surface and
subsurface structures (except Underground Facilities) which are at or contiguous to
the site that have been utilized by City in preparation of the Contract Documents.
4.2.3. copies of such reports and drawings will be made available by City to any Bidder
on request. Those reports and drawings may not be part of the Contract
Documents, but the "technical data" contained therein upon which Bidder is entitled
to rely as provided in Paragraph 4.02. of the General Conditions has been identified
and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is
responsible for any interpretation or conclusion drawn from any "technical data" or
any other data, interpretations, opinions or information.
4.2.4. Standard insurance requirements, coverages and limits.
4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i)
that Bidder has complied with every requirement of this Paragraph 4, (ii) that without
exception the Bid is premised upon performing and furnishing the Work required by the
Contract Documents and applying the specific means, methods, techniques, sequences or
procedures of construction (if any) that may be shown or indicated or expressly required
by the Contract Documents, (iii) that Bidder has given City written notice of all
conflicts, errors, ambiguities and discrepancies in the Contract Documents and the
written resolutions thereof by City are acceptable to Bidder, and when said conflicts,
etc., have not been resolved through the interpretations by City as described in
Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate
and convey understanding of all terms and conditions for performing and furnishing the
Work.
4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated
biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by
Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract
Documents.
5. Availability of Lands for Work, Etc.
5.1. The lands upon which the Work is to be performed, rights -of -way and easements for
access thereto and other lands designated for use by Contractor in performing the Work
are identified in the Contract Documents. All additional lands and access thereto
required for temporary construction facilities, construction equipment or storage of
materials and equipment to be incorporated in the Work are to be obtained and paid for
by Contractor. Easements for permanent structures or permanent changes in existing
facilities are to be obtained and paid for by City unless otherwise provided in the
Contract Documents.
5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed
in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right-
of-way, easements, and/or permits are not obtained, the City reserves the right to cancel
the award of contract at any time before the Bidder begins any construction work on the
project.
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 1920
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 5 of 9
5.3. The Bidder shall be prepared to commence construction without all executed right-of-
way, easements, and/or permits, and shall submit a schedule to the City of how
construction will proceed in the other areas of the project that do not require permits
and/or easements.
6. Interpretations and Addenda
6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to
City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions
received after this day may not be responded to. Interpretations or clarifications
considered necessary by City in response to such questions will be issued by Addenda
delivered to all parties recorded by City as having received the Bidding Documents.
Only questions answered by formal written Addenda will be binding. Oral and other
interpretations or clarifications will be without legal effect.
Address questions to:
City of Fort Worth Park & Recreation Department
4200 South Fwy St. #2200
Fort Worth, TX 76115
Attn: Carlos Gonzalez, City of Fort Worth
Fax: 817-392-5724
Email: carlos.gonzalez@fortworthtexas.gov
Phone: 817-392-5734
6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by
City.
6.3. Addenda or clarifications may be posted via the City's electronic document management
and collaboration system at <Insert Link to Documents>.
6.4. A prebid conference may be held at the time and place indicated in the Advertisement or
INVITATION TO BIDDERS. Representatives of City will be present to discuss the
Project. Bidders are encouraged to attend and participate in the conference. City will
transmit to all prospective Bidders of record such Addenda as City considers necessary
in response to questions arising at the conference. Oral statements may not be relied
upon and will not be binding or legally effective.
7. Bid Security
7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five
(5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued
by a surety meeting the requirements of Paragraph 5.01 of the General Conditions.
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 1920
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 6 of 9
7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of
Award have been satisfied. If the Successful Bidder fails to execute and return the
Contract Documents within 14 days after the Notice of Award conveying same, City
may consider Bidder to be in default, rescind the Notice of Award and act on the Bid
Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to
have defaulted.
8. Contract Times
The number of days within which, or the dates by which, Milestones are to be achieved in
accordance with the General Requirements and the Work is to be completed and ready for
Final Acceptance is set forth in the Agreement or incorporated therein by reference to the
attached Bid Form.
9. Liquidated Damages
Provisions for liquidated damages are set forth in the Agreement.
10. Substitute and "Or -Equal" Items
The Contract, if awarded, will be on the basis of materials and equipment described in the
Bidding Documents without consideration of possible substitute or "or -equal" items.
Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or -
equal" item of material or equipment may be furnished or used by Contractor if acceptable to
City, application for such acceptance will not be considered by City until after the Effective
Date of the Agreement. The procedure for submission of any such application by Contractor
and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General
Conditions and is supplemented in Section 0125 00 of the General Requirements.
11. Subcontractors, Suppliers and Others
11.1. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City
has goals for the participation of minority business and/or women business
enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the
M/WBE Project Goals and additional requirements. Failure to comply shall render
the Bidder as non -responsive.
Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance
No. 24534-11-2020), codified at:
https://codelibrga.amleaal.com/codes/ftworth/latest/ftworth tx/0-0-0-22593
11.2. No Contractor shall be required to employ any Subcontractor, Supplier, other person
or organization against whom Contractor or City has reasonable objection.
12. Bid Form
12.1. The Bid Form is included with the Bidding Documents; additional copies may be
obtained from the City.
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 1920
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 7 of 9
12.2. All blanks on the Bid Form must be completed and the Bid Form signed in ink.
Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A
Bid price shall be indicated for each Bid item, alternative, and unit price item listed
therein. In the case of optional alternatives, the words "No Bid," "No Change," or
"Not Applicable" may be entered. Bidder shall state the prices for which the Bidder
proposes to do the work contemplated or furnish materials required. All entries shall
be legible.
12.3. Bids by corporations shall be executed in the corporate name by the president or a
vice-president or other corporate officer accompanied by evidence of authority to
sign. The corporate seal shall be affixed. The corporate address and state of
incorporation shall be shown below the signature.
12.4. Bids by partnerships shall be executed in the partnership name and signed by a
partner, whose title must appear under the signature accompanied by evidence of
authority to sign. The official address of the partnership shall be shown below the
signature.
12.5. Bids by limited liability companies shall be executed in the name of the firm by a
member and accompanied by evidence of authority to sign. The state of formation of
the firm and the official address of the firm shall be shown.
12.6. Bids by individuals shall show the Bidder's name and official address.
12.7. Bids by joint ventures shall be executed by each joint venture in the manner indicated
on the Bid Form. The official address of the joint venture shall be shown.
12.8. All names shall be typed or printed in ink below the signature.
12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of
which shall be filled in on the Bid Form.
12.10. Postal and e-mail addresses and telephone number for communications regarding the
Bid shall be shown.
12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of
Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance
to State Law Non Resident Bidder.
13. Submission of Bids
Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents,
at the time and place indicated in the Advertisement or INVITATION TO BIDDERS,
addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed
envelope, marked with the City Project Number, Project title, the name and address of
Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent
through the mail or other delivery system, the sealed envelope shall be enclosed in a separate
envelope with the notation "BID ENCLOSED" on the face of it.
14. Withdrawal of Bids
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 1920
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 8 of 9
14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office may
be withdrawn prior to the time set for bid opening. A request for withdrawal must be
made in writing and delivered to the Purchasing Office to receive a time stamp prior
to the opening of Bids. A timely withdrawn bid will be returned to the Bidder or, if
the request is within one hour of bid opening, will not be read aloud and will
thereafter be returned unopened.
14.2. In the event any Bid for which a withdrawal request has been timely filed has been
inadvertently opened, said Bid and any record thereof will subsequently be marked
"Withdrawn" and will be given no further consideration for the award of contract.
15. Opening of Bids
Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and
major alternates (if any) will be made available to Bidders after the opening of Bids.
16. Bids to Remain Subject to Acceptance
All Bids will remain subject to acceptance for a minimum of 90 days or the time period
specified for Notice of Award and execution and delivery of a complete Agreement by
Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid
security prior to that date.
17. Evaluation of Bids and Award of Contract
17.1. City reserves the right to reject any or all Bids, including without limitation the rights
to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids
and to reject the Bid of any Bidder if City believes that it would not be in the best
interest of the Project to make an award to that Bidder. City reserves the right to
waive informalities not involving price, contract time or changes in the Work and
award a contract to such Bidder. Discrepancies between the multiplication of units of
Work and unit prices will be resolved in favor of the unit prices. Discrepancies
between the indicated sum of any column of figures and the correct sum thereof will
be resolved in favor of the correct sum. Discrepancies between words and figures
will be resolved in favor of the words.
17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists
among the Bidders, Bidder is an interested party to any litigation against City,
City or Bidder may have a claim against the other or be engaged in litigation,
Bidder is in arrears on any existing contract or has defaulted on a previous
contract, Bidder has performed a prior contract in an unsatisfactory manner, or
Bidder has uncompleted work which in the judgment of the City will prevent or
hinder the prompt completion of additional work if awarded.
17.2. In addition to Bidder's relevant prequalification requirements, City may consider the
qualifications and experience of Subcontractors, Suppliers, and other persons and
organizations proposed for those portions of the Work where the identity of such
Subcontractors, Suppliers, and other persons and organizations must be submitted as
provided in the Contract Documents or upon the request of the City. City also may
consider the operating costs, maintenance requirements, performance data and
guarantees of major items of materials and equipment proposed for incorporation in
the Work when such data is required to be submitted prior to the Notice of Award.
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 1920
Revised/Updated November 2, 2021
0021 13
INSTRUCTIONS TO BIDDERS
Page 9 of 9
17.3. City may conduct such investigations as City deems necessary to assist in the
evaluation of any Bid and to establish the responsibility, qualifications, and financial
ability of Bidders, proposed Subcontractors, Suppliers and other persons and
organizations to perform and furnish the Work in accordance with the Contract
Documents to City's satisfaction within the prescribed time.
17.4. Contractor shall perform with his own organization, work of a value not less than
35% of the value embraced on the Contract, unless otherwise approved by the City.
17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and
responsive Bidder whose evaluation by City indicates that the award will be in the
best interests of the City.
17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award
contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than
the lowest bid submitted by a responsible Texas Bidder by the same amount that a
Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a
comparable contract in the state in which the nonresident's principal place of
business is located.
17.7. A contract is not awarded until formal City Council authorization. If the Contract is
to be awarded, City will award the Contract within 90 days after the day of the Bid
opening unless extended in writing. No other act of City or others will constitute
acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by
the City.
17.7.1. The contractor is required to fill out and sign the Certificate of Interested
Parties Form 1295 and the form must be submitted to the Project Manager
before the contract will be presented to the City Council. The form can be
obtained at httys://www.ethics.state.tx.us/data/forms/1295/1295.pdf
17.8. Failure or refusal to comply with the requirements may result in rejection of Bid.
18. Signing of Agreement
18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied
by the required number of unsigned counterparts of the Project Manual. Within 14
days thereafter, Contractor shall sign and deliver the required number of counterparts
of the Project Manual to City with the required Bonds, Certificates of Insurance, and
all other required documentation.
18.2. City shall thereafter deliver one fully signed counterpart to Contractor.
I Biel ZII OM XQ111130
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENT 1920
Revised/Updated November 2, 2021
003513
BID FORM
Page 1 of 1
SECTION 00 35 13
CONFLICT OF INTEREST STATEMENT
Each bidder, offeror or respondent (hereinafter referred to as "You") to a City of Fort Worth
procurement may be required to complete a Conflict of Interest Questionnaire (the attached CIO
Form) and/or a Local Government Officer Conflicts Disclosure Statement (the attached CIS Form)
pursuant to state law. You are urged to consult with counsel regarding the applicability of these forms
to your company.
The referenced forms may be downloaded from the links provided below.
http://www.ethics.state.tx.us/form s/CIQ. pdf
http://www.ethics.state.tx.us/forms/CIS.pdf
CIO Form does not apply
❑ CIO Form is on file with City Secretary
❑ CIO Form is being provided to the City Secretary
❑ CIS Form does not apply
❑ CIS Form is on File with City Secretary
❑ CIS Form is being provided to the City Secretary
BIDDER:
0 By:
0 Signature:
0
0 Title:
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20200224 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook
0041 00
BID FORM
Page 1 of 3
TO: The Purchasing Manager
c/o: The Purchasing Division
1000 Throckmorton Street
City of Fort Worth, Texas 76102
FOR:
City Project No.: C01920
SECTION 00 41 00
BID FORM
Lake Worth Trail - Phase 1 B
Cahoba Dr to Marion Sansom Park
Units/Sections: UNIT 1 BASE BID ITEM - General
UNIT 2 BASE BID ITEM - Erosion Control
UNIT 3 BASE BID ITEM - Trail
UNIT 4 BASE BID ITEM - Miscellaneous Improvements
UNIT 5 BASE BID ITEM - Structural Improvements
UNIT 1 ALTERNATE BID ITEM - Allowance
1. Enter Into Agreement
The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form
included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents
for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and
conditions of the Contract Documents.
2. BIDDER Acknowledgements and Certification
2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and
INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond.
2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will
provide a valid insurance certificate meeting all requirements within 14 days of notification of award.
2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed
individual or entity and is not submitted in conformity with any collusive agreement or rules of any group,
association, organization, or corporation.
2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding.
2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract.
For the purposes of this Paragraph:
a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to
influence the action of a public official in the bidding process.
b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the
bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive
levels, or (c) to deprive City of the benefits of free and open competition.
c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20210930 00 41 00 00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook
0041 00
BID FORM
Page 2 of 3
without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-
competitive levels.
d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their
property to influence their participation in the bidding process or affect the execution of the
Contract.
3. Qualification
The Bidder acknowledges that the following work types must be performed only by qualified contractors and
subcontractors:
a. Concrete Paving Construction/Reconstruction (less than 15,000 sq yards)
b. Roadway and Pedestrian Lighting
c. Water and Sewer Improvements (Water)
d.
4. Time of Completion
4.1. The Work will be complete for Final Acceptance within 275 days days after the date when the
the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions.
4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete
the Work {and/or achievement of Milestones} within the times specified in the Agreement.
5. Attached to this Bid
The following documents are attached to and made a part of this Bid:
a. This Bid Form, Section 00 41 00
b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph
5.01 of the General Conditions.
c. Proposal Form, Section 00 42 43
d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37
e. MWBE Forms (optional at time of bid)
f. Prequalification Statement, Section 00 45 12
g. Conflict of Interest Affidavit, Section 00 35 13
*If necessary, CIQ or CIS forms are to be provided directly to City Secretary
h. Any additional documents that may be required by Section 12 of the Instructions to Bidders
6. Total Bid Amount
6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In
the space provided below, please enter the total bid amount for this project. Only this figure will be read
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20210930 00 41 00 00 43 13_00 42 43 00 43 37_00 45 12_00 35 13_Bid Proposal Workbook
0041 00
BID FORM
Page 3 of 3
publicly by the City at the bid opening.
6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is
subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective
estimated quantities shown in this proposal and then totaling all of the extended amounts.
6.3. Evaluation of Alternate Bid Items
Total Base Bid
Alternate Bid
Total Bid
7. Bid Submittal
This Bid is submitted on
Respectfully sub
Bv:
r (SigWure)
2'1 /-;� ThUrr�
(Printed Name)
$136,000.00
,#/� gn Z/ e Z1.5 %
by the entity named below.
Title: A iv��
Company:
Address: /Q%� '14—�,[i%!!��
State of Incorporation:
Email: 4h Z)
Phone: 0,j �_ 6 - 5
END OF SECTION
Receipt is acknowledged of the
following Addenda:
Initial
Addendum No. 1:
Addendum No. 2:
Addendum No. 3:
Addendum No. 4:
Corporate Seal:
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20 21093 0 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook
00 42 43
BID PROPOSAL
Page 1 of 2
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
Specification
Unit of
Bid
Description
Unit Price
Bid Value
No.
Section No.
Measure
Quantity
BASE BID
Unit 1 General
1
Construction Staking and Survey
01 71 23
LS
1
$17,960.55
$17,960.55
2
Temporary Project Sign
01 58 13
EA
2
$679.51
$1,359.02
3
Traffic Control
3471 13
Month
9
$3,993.24
$35,939.16
4
Tree Protection (as shown in drawings)
3201 90
LS
1
$4.88
$4.88
5
Temporary watering
33 04 30
LS
1
$9,483.77
$9,483.77
6
Miscellaneos Demo
31 0000
LS
1
$9,399.97
$9,399.97
7
Clearing and Grubbing
31 0000
LS
1
$60,403.12
$60,403.12
Unit 2 Erosion Control
8
Stone Sediment Outlet Traps
31 3700
EA
2
$2,377.10
$4,754.20
9
12" Diameter Filter Soxx
31 2500
LF
3180
$6.11
$19,429.80
10
Sodding
3292 13
SF
82,744
$0.60
$49,646.40
Unit 3 Trail
11
Removal Concrete Sidewalk
SF
1000
$7.07
$7,070.00
12
Miscellaneous Saw Cutting
0241 15
LS
1
$1,416.85
$1,416.85
13
Detectable Warnings
TxDOT 529
EA
2
$1,246.77
$2,493.54
14
5" Thick Concrete Pad (Trailhead)
32 13 13
SF
225
$9.85
$2,216.25
15
Trail Excavation
31 1000
CY
7,200
$26.35
$189,720.00
16
Trail Embankment
31 2400
CY
2,354
$28.24
$66,476.96
17
Material Haul Off and Rock Disposal
CY
4,846
$28.40
$137,626.40
18
Concrete Trail 10' Wide (Including Subgrade Prep)
32 13 13
SF
35,416
$9.50
$336,452.00
19
Finish Grading on Sides of Trail
LS
1
$67,573.65
$67,573.65
20
Trail Marker Stamp
See Drawing
EA
3
$136.001
$408.00
Unit 4 Miscellaneous Improvements
21
Metal Rail \ Beam Fencing
3231 29
LF
900
$173.43
$156,087.00
22
48" RCP
3341 10
LF
16
$209.68
$3,354.88
23
48" Headwall
33 49 40
EA
2
$2,508.63
$5,017.26
24
24" RCP
3341 10
LF
40
$132.76
$5,310.40
25
Y inlet
See Drawings,EA
2
$2,507.65
$5,015.30
26
24" Headwall
33 49 40
EA
2
$1,860.66
$3,721.32
27
Rip Rap
See Drawings
SY
288
$118.02
$33,989.76
28
2'x2'x5' Cut Limestone Boulders
See Drawing
EA
11
$1,273.48
$14,008.28
29
Plaza pavement (6" Thick, Sawcut Grid Pattern)
32 13 13
SF
385
$9.95
$3,830.75
30
6' Bench (Including Installation)
11 67 13
EA
1
$2,529.131
$2,529.13
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20120120 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook
00 42 43
BID PROPOSAL
Page 2 of 2
SECTION 00 42 43
PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist Item
No
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
31
Drinking Fountain (Including Installation and Sump)
11 67 13
EA
1
$6,512.09
$6,512.09
32
1" Water Line
33 12 10
LF
40
$70.48
$2,819.20
33
Water Main Tap
33 1225
EA
1
$1,996.62
$1,996.62
34
Trash Receptacle (Including Installation)
11 6713
EA
1
$1,617.83
$1,617.83
35
Solar Light
See Drawing
EA
1
$15,919.05
$15,919.05
36
Crosswalk
EA
1
$3,136.64
$3,136.64
37
Small Signs
See Drawing
EA
6
$329.54
$1,977.24
38
1 Split Rail Fence
See Drawing
LF
20
$34.951
$699.00
Units 5 Structural Improvements
41
Pedestrian Bride
See Drawing
EA
1
$103,499.27
$103,499.27
42
Bridge Abutments
03 30 00S
Cy
7
$2,605.90
$18,241.30
43
Drilled Shafts
03 63 29S
LF
45
$285.79
$12,860.55
44
Segmental Block Retaining Wall (including Cap)
See Drawings
SF
8354
$29.51
$246,526.54
45
Retaining Wall Drainage
See Drawing
LS
1
$88,317.63
$88,317.63
BASE BID TOTALI $1,756,821.56
ALTERNATE BIDS
Units 1 Allowance
1
Allowance No. 1
NA
LS
1
$1,000.00
$1,000.00
2
Allowance No. 2
NA
LS
1
$2,500.00
$2,500.00
3
Allowance No. 3
NA
LS
1
$5,000.00
$5,000.00
4
Allowance No. 4
NA
LS
1
$7,500.00
$7,500.00
5
Allowance No. 5
NA
LS
1
$10,000.00
$10,000.00
6
Allowance No. 6
NA
LS
1
$15,000.00
$15,000.00
7
Allowance No. 7
NA
LS
1
$20,000.00
$20,000.00
8
Allowance No. 8
NA
LS
1
$25,000.00
$25,000.00
g
Allowance No. 9
NA
LS
1
$50,000.00
$50,000.00
ALTERNATE BID TOTAL 1 $136,000.00
BID SUMMARY
BASE BID $1,756,821.56
ALTERNATE BIDS 1 $136,000.00
ALTERNATE BID TOTALI $1,892,821.56
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Re%ised 20120120 00 41 00_00 43 I3_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook
Bid Bond
CONTRACTOR:
(,'Janie, legal status and addrecti)
Cole Construction, Inc.
10315 Alta Vista Road
Keller, TX 76248
OWNER:
IXantc, legal status and address)
City of Fort Worth
200 Texas St.
Fort Worth, TX 76102
Document A310 TM - 2010
Conforms with The American Institute of Architects AIA Document 310
SURETY:
(Newre, legal status mtd prirrcipul place of hresinevs)
RLI Insurance Company
9025 N. Lindbergh Drive
Peoria, IL 61615
BOND AMOUNT: 5 5% Five Percent of Amount Bid
PROJECT:
(,'dame, location or address andl)toojectnumber. ijaulj
Lake Worth Trails Phase 1 B
Trail Improvements
This document has important
legal consequences. Consultation
with an attorney is encouraged
with respect to its completion or
modification.
Any singular reference to
Contractor, Surety, Owner or
other party shall be considered
plural where applicable.
The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind
themselves. their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this
Bond arc such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or % ithin such dine period
as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Or'llcr in accordance with
the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted in
the jurisdiction of the Project and otherrnise acceptable to the Owner, for the faithful performance of such Contract and for the prompt
paynient of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the dit3crcnce, not to exceed the amount of
this Bond, between tine amount specified in said bid and such larger amount for which the Owner may in good faith contract with another
party to perlonn the work covered by said bid, then this obligation shall be null and void, otherwise to remain in 1'611 lorce and elTect. The
Surety hereby waives any notice olan agreement between [lie Owner and Contractor to extend the dine to vvillch the Owner may accept the
bid. lraiver olnotice by the Surely shall not apply to any extension exceeding sixty (60) days in the aggregate beyond the time for
acceptance olbids specified in the bid docun)enuL and the O% ner and Contractor shall obtain the Surety's consent for an extension beyond
sixty (60) days.
If this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be
Subcontractor and the term Owner shall be deemed to be Contractor.
%�9ien this Bond has been lumislied to comply with a slatulon• or other legal requirement in the location of the Project, any provision in
this Bond conflicting % ilh timid statutory or legal requirement shall be deemed deleted herelrom and provisions conibmiing to such
statutor;• or other IeLal requirement shall be deemed incorporated herein. When so 1'umished, the intent is that this Bond shall be construed
as a statutory bond and not as a common law bond.
Siancd and scaled this 4th day of August, 2022
Cole Construction, Inc.
(Principal) al)
!V irn=)
JOOO
By:
(Title) Or
c
(!T'idres�y
RLI Insuran a Company
(S ) (Senn)
y:
(Till • une g Attorney -in Fact
S-00541AS 8110
POWER OF ATTORNEY
RLI Insurance Company
Contractors Bonding and Insurance Company
9025 N. Lindbergh Dr. Peoria, IL 61615
Phone: 800-645-2402
Know All Men by These Presents:
That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the
approving officer if desired.
That RLI Insurance Company and/or Contractors Bonding and Insurance Company, each an Illinois corporation, (separately and
together, the "Company") do hereby make, constitute and appoint:
Steven R. Foster. Jack M. Crowiev, Deborah English. Luke J. Nolan Jr.. Danhne Massey, Teuta Luri. JulieyL Dccker. Joshua Sanford,
Laurie Pflug,1ointly or severally
in the City of Dallas . State of Texas its true and lawful Agent(s) and Attomey(s) in Fact, with
full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, in general, any and all
bonds and undertakings in an amount not to exceed Twentv Five Million Dollars
( S25.000.000.00 ) for any single obligation.
The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon the Company as if such bond had been
executed and acknowledged by the regularly elected officers of the Company.
RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have each further certified that the
following is a true and exact copy of a Resolution adopted by the Board of Directors of each such corporation, and is now in force, to -wit:
"All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the corporate name of
the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board
of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint
Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Company. The corporate
seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The
signature of any such officer and the corporate seal may be printed by facsimile."
IN WITNESS WHEREOF, the RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have
caused these presents to be executed by its respective Vice President with its corporate seal affixed this 8th day of
January 2020
RLI Insurance Company
0e AND J�MCE co. Contractors Bonding and Insurance Company
•n= _ • iV
SEAL if I I . SEAL . �- By:
F= Barton W. Davis Vice President �J,
State of Illinois ILL�"5
SS
County of Peoria CERTIFICATE
On this 8th day of January 202 before me, a Notary Public, I, the undersigned officer of RLI Insurance Company and/or
personally appeared Barton W. Davis who being by me duly swom, Contractors Bonding and Insurance Company, do hereby certify
acknowledged that he signed the above Power of Attorney as the aforesaid that the attached Power of Attorney is in full force and effect and is
officer of the RLI Insurance Company and/or Contractors Bonding and irrevocable; and furthermore. that the Resolution of the Company as
Insurance Company and acknowledged said instrument to be the voluntary set forth in the Power of Attorney, is now in force. In testimony
act and deed of said corporation. whereof, I have hereunto set my hand and the seal of the RLI
Insurance Company and/or Contractors Bondi ng022 d Insurance
Company this : 4th day of August 22
By: t LEllirlk� d, V 1&
Gretchen L. Johnigk I Notary Public
PUBLIC
'OFFICIAL SEAL'
STATE C1
IroF
My '�
.........................
May 26, �'
... ..i
RLI Insurance Company
Contractors Bonding and Insurance Company
By: 10
Jeffrey DCYicku V V Corporate Secretary
4224953020212 A0058D 19
00 43 37
VENDOR COMPLIANCE TO STATE LAW
Page 1 of 1
SECTION 00 43 37
VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER
Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This
law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors
whose corporate offices or principal place of business are outside the State of Texas) bid projects for
construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident
bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in
order to obtain a comparable contract in the State which the nonresident's principal place of business is located.
The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet
specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident
bidders must check the box in Section B.
A. Nonresident bidders in the State of , our principal place of business,
are required to be percent lower than resident bidders by State Law. A copy of the
statute is attached.
Nonresident bidders in the State of our principal place of business,
are not required to underbid resident bidders.
B. The principal place of business of our company or our parent company or majority owner is
in the State of Texas.
BIDDER:
■❑
END OF SECTION
Title: 0.
Date: ^��Z
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Form Revised 20110627 00 41 00_00 43 13_00 42 43_00 43 37_00 45 12_00 35 13_Bid Proposal Workbook
00 45 26 - 1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page I of 1
1 SECTION 00 45 26
2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
4 provides worker's compensation insurance coverage for all of its employees employed on City
5 Project No. 44073. Contractor further certifies that, pursuant to Texas Labor Code, Section
6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with
7 worker's compensation coverage.
9 CONTRACTOR:
10
11 Company
12
13 1�,J,Cm`i�& 1zw
14 Address15
/L(/
16
17 City/State/Zip
18
19
20 THE STATE OF TEXAS §
21
22 COUNTY OF TARRANT §
23
By: of n�A �ha�n Cr
(Please P
Signature:
Title: pr-! 51 de n 1
(Please Print)
24 BEFPRE ME, thp under ' ne authority, on this day personally appeared
25 p p , known to me to be the person whose name is
26 subscribed to the foregoipg instrument and acknowledged to me that he/she executed the same as
27 the act and deed of d&UQZ--1 4C 414U for the purposes and
28 consideration therein expressed and in the capacity therein stated.
29
30 GIV/(EN UNDER . MY HAND AND SEAL OF OFFICE this day of
31 T Q�'L�m,P�l� , 20
32
33
34 1aRY Pie EILEEN BANKE
35 Notary ID #125765901 Notary Public -en and for the State of Texas
NP My Commission Expires
36 'TFCFi� April 14, 2023
37 END OF SECTION
CITY OF FORT WORTH Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised July 1, 2011
00 45 40 - 1
Business Equity Goal
Page 1 of 2
1 SECTION 00 45 40
2 Business Equity Goal
3 APPLICATION OF POLICY
4 If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable.
5 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises
6 (M/WBEs).
7
8 POLICY STATEMENT
9 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity
10 Firms when applicable, in the procurement of all goods and services. All requirements and regulations
11 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11-
12 2020 (codified at: https:HcodelibrM.amleaal.com/codes/ftworth/latest/ftworth_tx/0-0-0-22593) apply to
13 this bid.
14
15 BUSINESS EQUITY PROJECT GOAL
16 The City's Business Equity goal on this project is 13% of the total bid value of the contract (Base bid
17 applies to Parks and Community Services).
18
19 METHODS TO COMPLY WITH THE GOAL
20 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's
21 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the
22 ordinance through one of the following methods: 1. Commercially useful services performed by a
23 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination
24 of Business Equity prime services and Business Equity subcontracting participation, 4. Business
25 Equity Joint Venture/Mentor-Protege participation, 5. Good Faith Effort documentation, or 6.
26 Prime contractor Waiver documentation.
27
28 SUBMITTAL OF REQUIRED DOCUMENTATION
29 Applicable documents (listed below) must be received by the Purchasing Division, OR the offeror shall
30 EMAIL the Business Equity documentation to the assigned City of Fort Worth Project Manager or
31 Department Designee. Documents are to be received no later than 2:00 p.m., on the third City
32 business day after the bid opening date, exclusive of the bid opening date.
33
34 The Offeror must submit one or more of the following documents:
35 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded;
36 2. Good Faith Effort Form and Utilization Form, including supporting documentation, if
37 participation is less than stated goal, or no Business Equity participation is accomplished;
38 3. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform
39 all subcontracting/supplier opportunities; or
40 4. Joint Venture/Mentor-Protege Form, if goal is met or exceeded with a Joint Venture or Mentor-
41 Protege participation.
42
43 These forms can be found at:
44 Business Equity Utilization Form and Letter of Intent
45 https:Hgpps.fortworthtexas. og v/ProjectResources/ResourcesP/60 - MW E/Business Equity Utilization
46 Form_DVIN 2022 220324.pdf
47
48
49
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised October 27, 2021
004540-2
Business Equity Goal
Page 2 of 2
1 Letter of Intent
2 https://apps.fortworthtexas. o�jectResources/ResourcesP/60 - MWBE/Letter of Intent_DVIN
3 2021.pdf
4
5 Business Equity Good Faith Effort Form
6 htips://apps.fortworthtexas..ov�/ProjectResources/ResourcesP/60 - MWBE/Good Faith Effort
7 Form _DVIN2022.pdf
8
9 Business Equity Prime Contractor Waiver Form
10 hLtps:Hgpps.fortworthtexas.gov/ProjectResources/ResourcesP/60 - MWBE/MWBE Prime Contractor
11 Waiver-220313.pdf
12
13 Business Equity Joint Venture Form
14 hLtps:Hqpps.fortworthtexas.gov/ProjectResources/ResourcesP/60 - MWBE/MWBE Joint
15 Venture_220225.pdf
16
17
18 FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORDINANCE WILL
19 RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON -RESPONSIVE AND THE BID
20 REJECTED.
21
22
23 FAILURE TO SUBMIT THE REOUIRED BUSINESS EOUTY DOCUMENTATION OR OTHERWISE
24 COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING DECLARED NON-
25 RESPONSIVE, THE BID REJECTED AND MAY SUBJECT THE BIDDER/OFFEROR TO SANCTIONS
26 AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE.
27
28 For Questions, Please Contact The Business Equity Division of the Department of Diversity and
29 Inclusion at (817) 392-2674.
30 END OF SECTION
31
CITY OF FORT WORTH Lake Worth Trail Phase 1B
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised October 27, 2021
00 52 43 - 1
Agreement
Page 1 of 6
SECTION 00 52 43
AGREEMENT
THIS AGREEMENT, authorized on November 29, 2022, is made by and between the City of
Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City
Manager, ("City"), and Cole Construction Inc., authorized to do business in Texas, acting by and
through its duly authorized representative, ("Contractor"). City and Contractor may jointly be
referred to as Parties.
City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as
follows:
Article 1. WORK
Contractor shall complete all Work as specified or indicated in the Contract Documents for the
Project identified herein.
Article 2. PROJECT
The project for which the Work under the Contract Documents may be the whole or only a part is
generally described as follows:
Lake Worth Trails Phase IB
Proiect No. C01920
Article 3. CONTRACT PRICE
City agrees to pay Contractor for performance of the Work in accordance with the Contract
Documents an amount, in current funds, of One million eight hundred twenty-one thousand
eight hundred twenty-one dollars and fifty-six cents ($1,821,821.56). Contract price may be
adjusted by change orders duly authorized by the Parties.
Article 4. CONTRACT TIME
4.1 Final Acceptance.
The Work shall be complete for Final Acceptance within 225 days Two Hundred and
Twenty -Five Calendar Days after the date when the Contract Time commences to run, as
provided in Paragraph 2.02 of the General Conditions, plus any extension thereof allowed
in accordance with Article 12 of the General Conditions.
4.2 Liquidated Damages
Contractor recognizes that time is of the essence for completion of Milestones, if any, and
to achieve Final Acceptance of the Work and City and the public will suffer from loss of
use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The
Contractor also recognizes the delays, expense and difficulties involved in proving in a
legal proceeding, the actual loss suffered by the City if the Work is not completed on
time. Accordingly, instead of requiring any such proof, Contractor agrees that as
liquidated damages for delay (but not as a penalty), Contractor shall pay City Six
Hundred and Fifty Dollars ($650.00) for each day that expires after the time specified
in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of
Acceptance.
OFFICIAL RECORD
CITY OF FORT WORTH CITY SECRETARY Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS FT. WORTH, TX 1920
Revised 8/22/2022
005243-2
Agreement
Page 2 of 6
Article 5. CONTRACT DOCUMENTS
5.1 CONTENTS:
A. The Contract Documents which comprise the entire agreement between City and
Contractor concerning the Work consist of the following:
1. This Agreement.
2. Attachments to this Agreement:
a. Bid Form
1) Proposal Form
2) Vendor Compliance to State Law Non -Resident Bidder
3) Prequalification Statement
4) State and Federal documents (project specific)
b. Current Prevailing Wage Rate Table
c. Insurance ACORD Form(s)
d. Payment Bond
e. Performance Bond
f. Maintenance Bond
g. Power of Attorney for the Bonds
h. Worker's Compensation Affidavit
i. MBE and/or SBE Utilization Form
3. General Conditions.
4. Supplementary Conditions.
5. Specifications specifically made a part of the Contract Documents by attachment
or, if not attached, as incorporated by reference and described in the Table of
Contents of the Project's Contract Documents.
6. Drawings.
7. Addenda.
8. Documentation submitted by Contractor prior to Notice of Award.
The following which may be delivered or issued after the Effective Date of the
Agreement and, if issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
Article 6. INDEMNIFICATION
6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own
expense, the city, its officers, servants and employees, from and against any and all
claims arising out of, or alleged to arise out of, the work and services to be performed
by the contractor, its officers, agents, employees, subcontractors, licenses or invitees
under this contract. This indemnification provision is specifically intended to operate
and be effective even if it is alleged or proven that all or some of the damages being
sought were caused, in whole or in part, by any act, omission or negligence of the city.
This indemnity provision is intended to include, without limitation, indemnity for
costs, expenses and legal fees incurred by the city in defending against such claims and
causes of actions.
CITY OF FORT WORTH Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised 8/22/2022
005243-3
Agreement
Page 3 of 6
6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense,
the city, its officers, servants and employees, from and against any and all loss, damage
or destruction of property of the city, arising out of, or alleged to arise out of, the work
and services to be performed by the contractor, its officers, agents, employees,
subcontractors, licensees or invitees under this contract. This indemnification
provision is specifically intended to operate and be effective even if it is alleged or
proven that all or some of the damages being sought were caused, in whole or in part,
by any act, omission or negligence of the city.
Article 7. MISCELLANEOUS
7.1 Terms.
Terms used in this Agreement which are defined in Article 1 of the General Conditions will
have the meanings indicated in the General Conditions.
7.2 Assignment of Contract.
This Agreement, including all of the Contract Documents may not be assigned by the
Contractor without the advanced express written consent of the City.
7.3 Successors and Assigns.
City and Contractor each binds itself, its partners, successors, assigns and legal
representatives to the other parry hereto, in respect to all covenants, agreements and
obligations contained in the Contract Documents.
7.4 Severability/Non-Waiver of Claims.
Any provision or part of the Contract Documents held to be unconstitutional, void or
unenforceable by a court of competent jurisdiction shall be deemed stricken, and all
remaining provisions shall continue to be valid and binding upon City and Contractor.
The failure of City or Contractor to insist upon the performance of any term or provision of
this Agreement or to exercise any right granted herein shall not constitute a waiver of City's
or Contractor's respective right to insist upon appropriate performance or to assert any such
right on any future occasion.
7.5 Governing Law and Venue.
This Agreement, including all of the Contract Documents is performable in the State of
Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the
Northern District of Texas, Fort Worth Division.
7.6 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement if signed by someone other
than the duly authorized signatory of the Contractor.
7.7 Non -appropriation of Funds.
In the event no funds or insufficient funds are appropriated by City in any fiscal period for
any payments due hereunder, City will notify Vendor of such occurrence and this
Agreement shall terminate on the last day of the fiscal period for which appropriations were
received without penalty or expense to City of any kind whatsoever, except as to the
portions of the payments herein agreed upon for which funds have been appropriated.
CITY OF FORT WORTH Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised 8/22/2022
00 52 43 - 4
Agreement
Page 4 of 6
7.8 Prohibition On Contracts With Companies Boycotting Israel.
Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of
the Texas Government Code, if Contractor has 10 or more full time -employees and the
contract value is $100,000 or more, the City is prohibited from entering into a contract with
a company for goods or services unless the contract contains a written verification from the
company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term
of the contract. The terms "boycott Israel" and "company" shall have the meanings
ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this
contract, Contractor certifies that Contractor's signature provides written
verification to the City that if Chapter 2271, Texas Government Code applies,
Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term
of the contract.
7.9 Prohibition on Boycotting Energy Companies.
Contractor acknowledges that in accordance with Chapter 2274 of the Texas Government
Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from
entering into a contract for goods or services that has a value of $100,000 or more, which
will be paid wholly or partly from public funds of the City, with a company (with 10 or
more full-time employees) unless the contract contains a written verification from the
company that it: (1) does not boycott energy companies; and (2) will not boycott energy
companies during the term of the contract. The terms "boycott energy company" and
"company" have the meaning ascribed to those terms by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent
that Chapter 2274 of the Government Code is applicable to this Agreement, by
signing this Agreement, Contractor certifies that Contractor's signature provides
written verification to the City that Contractor: (1) does not boycott energy
companies; and (2) will not boycott energy companies during the term of this
Agreement.
7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries.
Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is
prohibited from entering into a contract for goods or services that has a value of $100,000
or more which will be paid wholly or partly from public funds of the City, with a company
(with 10 or more full-time employees) unless the contract contains a written verification
from the company that it: (1) does not have a practice, policy, guidance, or directive that
discriminates against a firearm entity or firearm trade association; and (2) will not
discriminate during the term of the contract against a firearm entity or firearm trade
association. The terms "discriminate," "firearm entity" and "firearm trade association"
have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code
(as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274
of the Government Code is applicable to this Agreement, by signing this Agreement,
Contractor certifies that Contractor's signature provides written verification to the
City that Contractor: (1) does not have a practice, policy, guidance, or directive that
discriminates against a firearm entity or firearm trade association; and (2) will not
discriminate against a firearm entity or firearm trade association during the term of
this Agreement.
CITY OF FORT WORTH Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised 8/22/2022
005243-5
Agreement
Page 5 of 6
7.11 Immigration Nationality Act.
Contractor shall verify the identity and employment eligibility of its employees who
perform work under this Agreement, including completing the Employment Eligibility
Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of
all I-9 forms and supporting eligibility documentation for each employee who performs
work under this Agreement. Contractor shall adhere to all Federal and State laws as well as
establish appropriate procedures and controls so that no services will be performed by any
Contractor employee who is not legally eligible to perform such services.
CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS
FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF
THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES,
SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to
Contractor, shall have the right to immediately terminate this Agreement for violations of
this provision by Contractor.
7.12 No Third -Party Beneficiaries.
This Agreement gives no rights or benefits to anyone other than the City and the Contractor
and there are no third -party beneficiaries.
7.13 No Cause of Action Against Engineer.
Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their
sureties, shall maintain no direct action against the Engineer, its officers, employees, and
subcontractors, for any claim arising out of, in connection with, or resulting from the
engineering services performed. Only the City will be the beneficiary of any undertaking by
the Engineer. The presence or duties of the Engineer's personnel at a construction site,
whether as on -site representatives or otherwise, do not make the Engineer or its personnel
in any way responsible for those duties that belong to the City and/or the City's construction
contractors or other entities, and do not relieve the construction contractors or any other
entity of their obligations, duties, and responsibilities, including, but not limited to, all
construction methods, means, techniques, sequences, and procedures necessary for
coordinating and completing all portions of the construction work in accordance with the
Contract Documents and any health or safety precautions required by such construction
work. The Engineer and its personnel have no authority to exercise any control over any
construction contractor or other entity or their employees in connection with their work or
any health or safety precautions.
CITY OF FORT WORTH Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised 8/22/2022
005243-6
Agreement
Page 6 of 6
IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be
effective as of the date subscribed by the City's designated Assistant City Manager ("Effective
Date").
Contractor:
�,;
0 �//Signature
Kenneth Thorne
(Printed Name) NN//
Title
10315 Alta Vista Road
Address
Fort Worth, Tx. 76244
City/State/Zip
/, hd
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
By:
Jesica L. McEachern
Assistant City Manager
Jan 27, 2023
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised 8/22/2022
dp60pn
�b q�
Date � cF fORTkad
o°' O
v_o o-+o
Attest:
U a4CnnEXASoo d v v"�'Li1-� "1
Jannette Goodall, City Secretary
(Seal)
M&C: 22-0942
Date: 11/29/2022
Form 1295 No.: 2022-933934
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Carlos MGonzalez
Park Planner
ApproAv/ed as to Form and Legality:
Jeremy Anato Mensah
Sr. Assistant City Attorney
APPROVAL RECOMMENDED:
)got fa-,4-
Dave Lewis, Acting Director, SP
Park & Recreation Department sP
JY
Lake Worth Trail Phase I
1920
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
Bond #RCB0043740
SECTION 00 61 13
PERFORMANCE BOND
0061 13- 1
PERFORMANCE BOND
Page 1 of 2
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we, Cole Construction, Inc. , known as
"Principal" herein and _ RLI Insurance Company , a corporate
surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as
"Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a
municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal
sum of, One million eight hundred twenty-one thousand eight hundred twenty-one dollars and
fifty-six cents ($1,821,821.56), lawful money of the United States, to be paid in Fort Worth,
Tarrant County, Texas for the payment of which sum well and truly to be made, we bind
ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City
awarded the 29_ day of November , 2022_, which Contract is hereby referred to and
made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment
labor and other accessories defined by law, in the prosecution of the Work, including any Change
Orders, as provided for in said Contract designated as LAKE WORTH TRAIL PHASE 1B
#1920
NOW, THEREFORE, the condition of this obligation is such that if the said Principal
shall faithfully perform it obligations under the Contract and shall in all respects duly and
faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
specifications, and contract documents therein referred to, and as well during any period of
extension of the Contract that may be granted on the part of the City, then this obligation shall be
and become null and void, otherwise to remain in full force and effect.
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division.
This bond is made and executed in compliance with the provisions of Chapter 2253 of the
Texas Government Code, as amended, and all liabilities on this bond shall be determined in
accordance with the provisions of said statue.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
Lake Worth Trail Phase 1B
1920
0061 13 - 2
PERFORMANCE BOND
Page 2 of 2
1 IN WITNESS WHEREOF, the Principal and the Surety have SIGNNED and SEALED
2 th
is
*instrument by duly authorized agents and officers on this the . l �`�day of
3 4A
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
Val
) Secretary
fitness as eo Principal
IL
Witn ss as to Surety
PRINCIPAL:
Cole Construction, Inc. 10
BY:
Signature
I r 011/0'0 Of "141
Address: 10315 Alta Vista Road
Fort Worth, TX 76244
SURETY:
RLI Insurance Company
Holly Clevenger, Attorney -in -Fact
Name and Title
Address: 9025 N. Lindbergh Drive
Peoria, IL 61615
Telephone_Number. 309-692-1000,
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised July 1, 2011
0061 14-1
PAYMENT BOND
Page 1 of 2
Bond #RCB0043740
1 SECTION 00 61 14
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, _Cole Construction, Inc. known as "Principal" herein,
8 and RLI Insurance Company , a
9 corporate surety (sureties), duly authorized to do business in the State of Texas, known as
10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a
11 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein,
12 in the penal sum of One million eight hundred twenty-one thousand eight hundred twenty
13 hundred dollars and fifty-six cents ($1,821,821.56), lawful money of the United States, to be paid
14 in Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made, we
15 bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally,
16 firmly by these presents:
17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the
18 _29 day of _November , 2022, which Contract is hereby referred to and
19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment,
20 labor and other accessories as defined by law, in the prosecution of the Work as provided for in
21 said Contract and designated as LAKE WORTH TRAIL PHASE 111 #1920
22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
24 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
25 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
26 force and effect.
27 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
28 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
29 accordance with the provisions of said statute.
30
CITY OF FORT WORTH Lake Worth Trail Phase 113
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised July 1, 2011
0061 14 - 2
PAYMENTBOND
Page 2 of 2
1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
2 this instrument by duly authorized agents and officers on this the day of
3 P.tsl� 20,
4
ATTE
(Princ' al) Secretary
Wit ss as to Pri a
ATTEST:
(Sue ) a XXJ I e s s
Witness as to Sur
i
5
PRINCIPAL:
Cole Construction, Inc.
BY.
Signature
Name and Title
Address: 10315 Alta Vista Road
Fort Worth, TX 76244
SURETY:
RLI Insurance Company
Holly Clevenger, Attorney -in -Fact
Name and Title
Address: 9025 N. Lindbergh Drive
Peoria. IL 61615
Telephone Number. 309-692-1000
6 Note: If signed by an officer of the Surety, there must be on file a certified extract from the
7 bylaws showing that this person has authority to sign such obligation. If Surety's physical
8 address is different from its mailing address, both must be provided.
9
10 The date of the bond shall not be prior to the date the Contract is awarded.
11 END OF SECTION
12
CITY OF FORT WORTH Lake Worth Trail Phase I
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised July 1, 2011
0061 19 - 1
MAINTENANCE BOND
Page 1 of 3
Bond #RCB0043740
1 SECTION 00 6119
2 MAINTENANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we _Cole Construction, Inc. , known as "Principal" herein
8 and _ RLI Insurance Company , a corporate surety (sureties, if
9 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein
10 (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal
11 corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the sum
12 of One million eight hundred twenty-one thousand eight hundred twenty-one dollars and fifty-six
13 cents ($1,821,821.56), lawful money of the United States, to be paid in Fort Worth, Tarrant
14 County, Texas, for payment of which sum well and truly be made unto the City and its
15 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
16 and severally, firmly by these presents.
17
18 WHEREAS, the Principal has entered into a certain written contract with the City awarded
19 the_29_ day of November , 2022 which Contract is hereby referred to and a made part
20 hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and
21 other accessories as defined by law, in the prosecution of the Work, including any Work resulting
22 from a duly authorized Change Order (collectively herein, the "Work") as provided for in said
23 contract and designated as LAKE WORTH TRAIL PHASE 1B #1920 and
24
25 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
26 accordance with the plans, specifications and Contract Documents that the Work is and will
27 remain free from defects in materials or workmanship for and during the period of two (2) years
28 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
29
30 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
31 upon receiving notice from the City of the need therefor at any time within the Maintenance
32 Period.
33
CITY OF FORT WORTH Lake Worth Trail Phase 113
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS 1920
Revised July 1, 2011
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
006119-2
MAINTENANCE BOND
Page 2 of 3
NOW THEREFORE, the condition of this obligation is such that if Principal shall
remedy any defective Work, for which timely notice was provided by City, to a completion
satisfactory to the City, then this obligation shall become null and void; otherwise to remain in
full force and effect.
PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
noticed defective Work, it is agreed that the City may cause any and all such defective Work to
be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and
the Surety under this Maintenance bond; and
PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
Worth Division; and
PROVIDED FURTHER, that this obligation shall be continuous in nature and
successive recoveries may be had hereon for successive breaches.
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
Lake Worth Trail Phase 113
1920
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
006119-3
MAINTENANCE BOND
Page 3 of 3
IN WITNESS WHEREOF, the Principal and the Surety have each SIGyyNEED and SEALED this
irAtrument by duly authorized agents and officers on this the rday of
20�
/its as t rincipal
PRINCIPAL:
Cole Construction, Inc.
1 n r ePre,51d�fl-�
Name and Title
Address: 10315 Alta Vista Road
Fort Worth, TX 76244
SURETY:
RLI Insurance Company
BY: VA a(
Sign re
Holly Clevenger, Attorney -in -Fact
Name and Title
Address: 9025 N. Lindbergh Drive
Peoria, IL 61615
Telephone_Number: 309-692-1000
*Note: If signed by an officer of the Surety Company, there must be on file a certified extract
from the by-laws showing that this person has authority to sign such obligation. If
Surety's physical address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
CrrY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Revised July 1, 2011
Lake Worth Trail Phase 113
1920
POWER OF ATTORNEY
RLI Insurance Company
Contractors Bonding and Insurance Company
9025 N. Lindbergh Dr. Peoria, IL 61615
Phone: 800-645-2402
Know All Men by These Presents:
That this Power of Attorney is not valid or in effect unless attached to the bond which it authorizes executed, but may be detached by the
approving officer if desired.
That RLI Insurance Company and/or Contractors Bonding and Insurance Company, each an Illinois corporation, (separately and
together, the "Company") do hereby make, constitute and appoint:
Jack M. Crowley, Deborah English Luke J. Nolan Jr Daphne Massey, Julie M. Decker Joshua Sanford Brendan Fletcher Laurie Pflug
Holly Clevenger, jointly or severally
in the City of Dallas , State of Texas its true and lawful Agent(s) and Attorney(s) in Fact, with
full power and authority hereby conferred, to sign, execute, acknowledge and deliver for and on its behalf as Surety, in general, any and all
bonds and undertakings in an amount not to exceed Twenty Five Million Dollars
( $25,000,000.00 1 for any single obligation.
The acknowledgment and execution of such bond by the said Attorney in Fact shall be as binding upon the Company as if such bond had been
executed and acknowledged by the regularly elected officers of the Company.
RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have each further certified that the
following is a true and exact copy of a Resolution adopted by the Board of Directors of each such corporation, and is now in force, to -wit:
"All bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation shall be executed in the corporate name of
the Company by the President, Secretary, any Assistant Secretary, Treasurer, or any Vice President, or by such other officers as the Board
of Directors may authorize. The President, any Vice President, Secretary, any Assistant Secretary, or the Treasurer may appoint
Attorneys in Fact or Agents who shall have authority to issue bonds, policies or undertakings in the name of the Company. The corporate
seal is not necessary for the validity of any bonds, policies, undertakings, Powers of Attorney or other obligations of the corporation. The
signature of any such officer and the corporate seal may be printed by facsimile."
IN WITNESS WHEREOF, the RLI Insurance Company and/or Contractors Bonding and Insurance Company, as applicable, have
caused these presents to be executed by its respective Vice President with its corporate seal affixed this 19th day of
September , 2022 .
.. NG AND
SEAL 0 - SEAL
y°u • � er:
State of Illinois ",, ;L"Noss �° �, L t N 0A5
SS
County of Peoria
On this 19th day of September . 2022 before me, a Notary
Public, personally appeared Barton W. Davis who being by me duly
sworn, acknowledged that he signed the above Power of Attorney as the
aforesaid officer of the RLI Insurance Company and/or Contractors
Bonding and Insurance Company and acknowledged said instrument to be
the voluntary act and deed of said corporation.
By: ootj� , � , lam- `cax.+
Catherine D. Glover Notary Public
CATHERINE D. GLOVER .
OFFICIAL SEAL
VNotary Pudic - Shts a Iwnw.
u . My CommissionExprn
March 2� P024
RLI Insurance Company
Contractors Bonding and Insurance Company
By. yli s✓ .I
Barton W. Davis X Vice President
CERTIFICATE
I, the undersigned officer of RLI Insurance Company and/or
Contractors Bonding and Insurance Company, do hereby certify
that the attached Power of Attorney is in full force and effect and is
irrevocable; and furthermore, that the Resolution of the Company as
set forth in the Power of Attorney, is now in force. In testimony
whereof, I have hereunto set my hand and the seal of the RLI
Insurance Company and/or Contractors Bonding and Insurance
Company this day of
RLI Insurance Company
Contractors Bonding and Insurance Company
By: 44n�A
Jeffrey ick V v Corporate Secretary
4224953020212
A0058D19
RL I ® RLIInsurance Company
P.O.P.OBox 3967 Peoria, II, 61612-3967
Phone:309-692-1000 Fax:309-683-1610
TEXAS
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call RLI Insurance Company's toll free telephone
number for information or to make a complaint at 800-645-2402.
You may also write to RLI Insurance Company at:
9025 N. Lindbergh Drive
Peoria,11, 61615
FAX # 309-683-1610
You may contact the Texas Department of Insurance to obtain
information on companies, coverages, rights or complaints at
1-800-252-3439
You may also write the Texas Department of Insurance:
P.O. Box 149104
Austin, TX 78714-9104
Fax Number: (512) 490-1007
Web: www.tdi.texas.gov
E-mail: ConsumerProtection a tdi.texas.gov
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or about a
claim, you should contact the agent first. If the dispute is not
resolved, you may contact the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not become a part or
condition of the attached document.
Texas Policyholder Notice
TEXAS
AVISO IMPORTANTE
Para obtener informacion o para presentar una queja:
Usted puede llamar at numero de telefono gratuito de RLI
Insurance Company para obtener informacion o para presentar
una queja at 800-645-2402.
Usted tambien puede escribir a RLI Insurance Company:
9025 N. Lindbergh Drive
Peoria, IL 61615
FAX # 309-683-1610
Usted puede comunicarse con el Departamento de Seguros de
Texas para obtener informacion sobre companias, coberturas,
derechos o quejas at 1-800-252-3439
Usted puede escribir at Departamento de Seguros de Texas a:
P.O. Box 149104
Austin, TX 78714-9104
Fax Number: (512) 490-1007
Sitio web: www.tdi.texas.gov
E-mail: ConsumerProtection@tdi.texas.Qov
DISPUTAS POR PRIMAS DE SEGUROS O
RECLAMACIONES:
Si tiene una disputa relacionada con su prima de seguro o con
reclamacion, usted debe comunicarse con el agente primero. Si la
disputa no es resuelta, puede comunicarse con el Departamento de
Seguros de Texas.
ADJUNTE ESTE AVISO A SU POLIZA:
Este aviso es solamente para propositos informativos y no se
convierte en parte o en condicion del documento adjunto.
UW 1042-S (08/15) M4201815