HomeMy WebLinkAboutContract 57193-CO2CSC No. 57193-CO2 F wi- otrri-l= City of Fort Worth Change Order Request Project Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193 Client Project #(s) 1101591 Project Description Improvements include a multi -lane roundabout, minor storm drain improvements and pedestrian facilities such as sidewalks and American Disability (ADA) ramps. Contractor Rebcon, Inc. Change Order # 2 Date 1 /4/2023 City Project Mgr. I Brendan McInnes City Inspector Habte Taezaz, Ariel Durate Dept Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW I I I Totals I Contract 1.30 0.06 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) ,291.30 ,010.06 0.34% $2,903,641.25 A sanitary sewer line called out in the plans to be replaced is in conflict with a franchise utility line as well as an existing waterline where a sanitary sewer manhole is proposed to be installed. The engineer has reviewed the conflicts and provided two alternatives to resolve the conflicts. One alternative is to use cast -in -place pipe (CIPP) to line the existing pipe in place to remove the need for the added manhole and the other option is to completely move the proposed sewer line to the other side of the road. Currently 190 LF of the 300 LF of the new line has been installed per plan before the conflict was identified. Use of CIPP is least impactful to the project schedule and budget but requires a CCTV video of the existing pipe conditions to verify adequacy of the existing line that will remain and a point repair to be conducted at the temporary intersection of the existing clay pipe and the new pvc pipe. Contractor has submitted prices for the added work of cleaning the line, performing a permanent point repair and videoing the line for existing conditions. Typical methods for comparing unit costs were not available and were not considered adequate for this work. Instead, the Contractor has submitted invoices and breakdowns of the time and materials for the added work. The breakdown has been reviewed and deemed to be fair and reasonable for the work being conducted. The documentation has been attached to this change order. After the CCTV video is conducted it will be reviewed to determine if CIPP is an option. If it is, CIPP will be change ordered into the contract, otherwise the relocation option will be used. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Name rontractor Name Contract Si natur Rebcon Inc. Danny Krieg ax Date Jan 31, 2023 Ins ector/Ins ection Supervisor Date Project and Contract Compliance Manager Date Jan 31, 2023 e Feb 1, 2023 Progrgm i Date Senior Capital Project Officer 9W Date Feb 2, 2023 ZDI&Ll, Feb 3, 2023 t Date Director, Contracting Department (Dept) Date Feb 4, 2023 Feb 4, 2023 Assistant City Attorney Date JAssistant City Manager Date AMOK Feb 6, 2023 Feb 7, 2023 AL d ion if require M&C Number I M&C Date Approved ATTEST: A -&' Jannette Goodall, City Secretary p444e0eTn44 P�� F000e000,o�Yo9�d Oro -0d OV8 8=A 1444",... o" d 4nRaoa� OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth Change Order Additions Project Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193 Client Project # 101591 Contractor Rebcon, Inc. PM Brendan McInnes Inspector® Change Order Submittal # 0 Date 114/2023 ADDITIONS Ft1141 HIII City of Fort Worth Change Order Deletions Project Name Normandale Street and Las Vegas Trail Intersection Improvements City Sec # 57193 Client Project # 101591 Contractor Rebcon, Inc. PM Brendan McInnes Inspector® Change Order Submittal # O2 Date 11412023 DELETIONS ITEM DESCRIPTION ULF, I Qty Unit Unit Cost Total TPW $0.00 Sub Total Deletions 0. 00 Change Order Deletions Page 3 of 4 M/SBE for this Change Order Previous Change Orders CO # DATE AMOUNT 1 12/5/2022 $281.24 Total $281.24 M-Co Construction Inc. P 0 Box 489 Springtown, TX 76082 Normandale Street and Las Vegas Trail improvements Point Repair for Sewer Main L-6134 Point Repair at temporary connection quarorrn� T61 Free 1-877-644-4892 Fax Tall Free 1-877-248-4892 DESCRIPTION - — — - 140 Foreman Mike 140 operator R/T Miguel 14.0 Utility Laborer RIT Saul 14.0 Common Laborer RIT Edson Equipment 14 Charge for Vehicles (Foreman's pickup) 14 Kubota Excavtor 14 Loader - Volvo L-60 Material 1 Material - Embedment sand and rock, pipe and fittings DATE 1211912023 PROJECT CODE NO - UNIT !� Hourly Rate W insurance and taxes 42,000 PER HR 58-38 20.000 PER HR 2780 17 000 PER HR 2363 16.000 PER HR 2224 Daily Rate DAILY 1921. DAILY 63.48 DAILY 49-51 AMOUNT 817,32 389,20 330.82 311.36 268,94 888.72 693.14 Lump Sum 465.25 465.25 I SUBTOTAL ' 4,164.75 OVERHEADICOST PROFIT 10% 115.25' TOTAL y4,280.00 REBCON, INC. 1868 W. Northwest Highway Dallas, Texas 75220 972 444-8230 Project: Location: Description: Date: Sanitary Sewer Investi4ation Normandale and Las Vegas Trail Roundabout Fort Worth, Texas Work to determine condition of existing SS pipe 12/16/2022 ITEM DESCRIPTION UNIT QTY UNIT PRICE TOTAL EXISTING ITEMS NEW ITEMS CO2-1 TV Inspection and Cleaning, Point Repair LS 1 $7,672.97 $7,672.97 $0.00 $0.00 Total Mr, McInnes, This pricing proposal is for performing work necessary to determine the condition of the existing sanitary sewer line at the Normandale and Las Vegas Roundabout. This pricing does not include any repair work. Total Calendar Days Requested: 1 Please contact me with any questions. Thanks, ,T,1,a47 /`�, � Danny Krieg Rebcon, Inc. Encl: N/A Rebcon, Inc. Page 1 of 1 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 0 0 00 0 0 0 g o 0 0, o 09 0 0 0 0 0 0 0 0 0 0 0 69 0 69 0 (A 0 0 0 IA 0 0 0 0 0 0 0 0 0 0 0 0 0 0 (A 0 0 09 0 V9 0 to 0 0 0 6% 00 0 09 C 0 E V .0 a a U m f e c •- a O o aU a v � m m ccA C ~ J V-� V) 0 to� 69� C 9 M I M M M M M M m O O O O O O O O ig 00 0 0 0 Fo- v 0 0 0 N N N M F- a z O H 0 2 O) am, a m O v `m H J m N O Q W C D LLXJ Z A UU.I m f0 c (° O 11 Y E J m c 0 y E J G y d c m y > CO a 0 O U SC O to O 0 yO O > a O u m p Z 3 J � 0 o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 000000000 Q 0 0 0 �nov ro 0 0 000 0 m fA lA lA (� f9 a: `o Y C O 7 0 a= 0 0 U m Ew c .. O W m a aU+ a m o, o �> o m CL m c C m Q W O O m O C wR ITcc a W Ln N o H U Fo c'9 U u0. U Pi I I I I IWO 10- M-Co Construction, Inc. REQUEST FOR INFORMATION No. 4 TITLE: CCTV and point repair for Sewer Main L-6134 DATE: 12/16/2022 Rebcon PROJECT: Normandale street and Las Vagas Trail RESPONSE REQUIRED BY: 12/23/2022 OWNER PROJECT: City of Fort Worth CSJ# TO: Jim Schumann WORK IMPACT:F 71YES =NO SCHEDULE IMPACT:EX YES =NO COST IMPACT: X]YES =NO The Sewer Main will need CCTV and a point repair at the temporary connection to assest condition of pipe. The temporary connection has a Tee and 90 degree bend. These will need to be removed and the pipe moved in alignment with the existing pipe before the CCTV can be completed. Attachements —I Recommendation: Point repair $4,280.00 CCTV inspection with cleaning of existing clay pipe $2,310.00 REQUESTED BY: Alford Main Exclusions: Same as existing project exclusions. Page 1 RFI form Magnum Manhole and Underground Company 428 N. First St. Garland, Texas 75040 Phone 972-276-2048 Fax 972-276-5318 Project: S Normandale CCTV 8 Inch Sewer FT Worth, TX Customer: M-Co Construction Comments or Special Instructions: Quotation Manhole Company Prepared by: Date: December 14, 2022 SALESPERSON P.O. NUMBER SHIP DATE SHIP VIA F.O.B. POINT TERMS THANK YOU FOR YOUR BUSINESSI M-Co Construction Inc. P 0 Box 489 Springtown, TX 76082 Normandale Street and Las Vegas Trail improvements Point Repair for Sewer Main L-6134 Point Repair at temporary connection quarorrn� T61 Free 1-877-644-4892 Fax Tall Free 1-877-248-4892 DESCRIPTION - — — - 140 Foreman Mike 140 operator R/T Miguel 14.0 Utility Laborer RIT Saul 14.0 Common Laborer RIT Edson Equipment 14 Charge for Vehicles (Foreman's pickup) 14 Kubota Excavtor 14 Loader - Volvo L-60 Material 1 Material - Embedment sand and rock, pipe and fittings DATE 1211912023 PROJECT CODE NO - UNIT !� Hourly Rate W insurance and taxes 42,000 PER HR 58-38 20.000 PER HR 2780 17 000 PER HR 2363 16.000 PER HR 2224 Daily Rate DAILY 1921. DAILY 63.48 DAILY 49-51 AMOUNT 817,32 389,20 330.82 311.36 268,94 888.72 693.14 Lump Sum 465.25 465.25 I SUBTOTAL ' 4,164.75 OVERHEADICOST PROFIT 10% 115.25' TOTAL y4,280.00 From: McInnes. Brendan To: Jim Schumann Subject: RE: Camera For Sewer Date: Tuesday, January 3, 2023 3:18:00 PM If we pay for a point repair, there will be no further compensation to repair it again if the CIPP option is used so they need to make sure it is done correctly at that time. I will work on the change order language and note it as such in the verbiage as we cannot pay for a repair twice. Thanks, Brendan McInnes, P.E. Project Manager Office: (817) 392-2817 From: Jim Schumann <Jim@rebcon.com> Sent: Tuesday, January 3, 2023 3:10 PM To: McInnes, Brendan <Brendan.MCI nnes@fortworthtexas.gov> Subject: Camera For Sewer CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. Brendan, They used a 90-degree bend and a Tee. The only thing they can do is camera from the manhole down and that won't show them much. To do the point repair they will dig it up and try to bend it over to make it line up better. Thank You, Jim Schumann 972-965-3681 Rebcon, LLC. McInnes, Brendan From: Kasavich, John Sent: Wednesday, December 7, 2022 1:46 PM To: McInnes, Brendan Cc: Sholola, Tony; Mainord, Mike; Tierce, Thomas; Gair, Cody Dale; Ruiz, Antonio; Pratt, Hayden; Coffman, Luke; Jim Schumann; Allen, Chad A; King, Daphne Subject: RE: [EXT] RE: 101591 Sanitary Sewer Field Change Discussion Attachments: Normandale plan review comments 12-7-22.pdf Follow Up Flag: Follow up Flag Status: Completed Brendan, attached are comments as both options need work. Option 2 calling for CIPP requires a prequalified contractor for CIPP, so this will need a new contractor. Also, the pre -CCTV needs to be reviewed by TPW and Field Ops to determine any point repair locations to address possible sags in the line. Option 3 needs a pothole on the existing connection point to see if this is feasible. Manholes are needed in both options due to change in grade and/or direction. Thanks. John Kasavich. From: McInnes, Brendan Sent: Monday, December 05, 2022 8:14 AM To: Kasavich, John <John.Kasavich @fortworthtexas.gov> Cc: Sholola, Tony <Anthony.Sholola@fortworthtexas.gov>; Mainord, Mike <Michael.Mainord@fortworthtexas.gov>; Tierce, Thomas <Thomas.Tierce@fortworthtexas.gov>; Gair, Cody Dale <Cody.Gair@fortworthtexas.gov>; Ruiz, Antonio <Antonio.Ruiz@fortworthtexas.gov>; Pratt, Hayden <hpratt@geiconsultants.com>; Coffman, Luke <Luke.Coffman @fortworthtexas.gov>; Jim Schumann <Jim@rebcon.com>; Allen, Chad A <Chad.Allen@fortworthtexas.gov>; King, Daphne <dking@geiconsultants.com> Subject: RE: [EXT] RE: 101591 Sanitary Sewer Field Change Discussion Importance: High John, I wanted to follow up with you on options 2 & 3 since Option 1 seems to be off the table. Is it possible to have some direction back no later than COB tomorrow? Once we know what options are possible that you all will accept we will work on the revised sheets for approval. Currently or contractor is on hold on his pavement until we know the direction that we need to go. Thanks, Brendan McInnes, P.E. Project Manager Office: (817) 392-2817 From: King, Daphne <dking@geiconsultants.com> Sent: Friday, December 2, 2022 10:49 AM To: McInnes, Brendan <Brendan.McInnes@fortworthtexas.gov> Cc: Kasavich, John <John.Kasavich @fortworthtexas.gov>; Sholola, Tony <Anthony.Sholola@fortworthtexas.gov>; Mainord, Mike <Michael.Mai nord@fortworthtexas.gov>; Tierce, Thomas <Thomas.Tierce@fortworthtexas.gov>; Gair, Cody Dale <Cody.Gair@fortworthtexas.gov>; Ruiz, Antonio <Antonio.Ruiz@fortworthtexas.gov>; Pratt, Hayden <hpratt@geiconsultants.com>; Coffman, Luke <Luke.Coffman @fortworthtexas.gov>; Jim Schumann <Jim@rebcon.com>; Allen, Chad A <Chad.Allen@fortworthtexas.gov> Subject: Re: [EXT) RE: 101591 Sanitary Sewer Field Change Discussion CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. Hi Brendan, The 13' lengths result in about 1.5 degree of deflection which is slightly outside of tolerance. I apologize for my oversight in relaying that detail. Please let me know if you have additional questions. Thanks! GEI DAPHNE KING, PE Branch Manager 214.753.8107 1 cell: 972.322.2079 5646 Milton Street, Suite 500, Dallas, TX 75206 @fVin0= Please Note: We will no longer be using @haydenconsultants.com for email and will be converting to @geiconsultants.com On Dec 2, 2022, at 8:24 AM, McInnes, Brendan <Brendan.McInnes@fortworthtexas.gov> wrote: Daphne, I am assuming that no revision on the 30th meant that 13' sticks would not work. John, What are your thoughts on options 2 & 3 so we can get this issue pushed into a resolution. Thanks, Brendan McInnes, P.E. Project Manager Office: (817) 392-2817 From: King, Daphne <dking@geiconsultants.com> Sent: Tuesday, November 29, 2022 7:09 PM To: McInnes, Brendan <Brendan.McInnes@fortworthtexas.gov>; Kasavich, John <John. Kasavich @fortworthtexas.gov> Cc: Sholola, Tony <Anthony.Sholola@fortworthtexas.gov>; Mainord, Mike <Michael.Mainord@fortworthtexas.gov>; Tierce, Thomas <Thomas.Tierce@fortworthtexas.gov>; Gair, Cody Dale <Cody.Gair@fortworthtexas.gov>; Ruiz, Antonio <Antonio.Ruiz@fortworthtexas.gov>; Pratt, Hayden <hPratt @geiconsultants.com>; Coffman, Luke <Luke.Coffman @fortworthtexas.gov>; Jim Schumann <Jim@rebcon.com>; Allen, Chad A <Chad.Allen@fortworthtexas.gov> Subject: RE: 101591 Sanitary Sewer Field Change Discussion CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. Additional discussion is required to ensure we have confirmed the relocation/placement before this level of detail is added to the sheets. I had a quick chat with Jim last week late Tuesday afternoon 11/22 before the holiday and have attached two additional options discussed for your consideration. The issue with my suggestion (Option 01) is the mechanical joints identified since we are not recommending using ductile iron pipe/fittings. We will take another look to see if we can use the 13 ft pipe lengths and get the 1-degree deflection with bell and spigot. If so, we will provide the detail requested and return to you by 11/30. However, we were advised during out chat with Jim that our recommendation of a drop manhole will conflict with the 900 pair AT&T line at San Marcos, so they will have to pull/shift their line. Additional Options, see attached and summarized below: 1. Option 2: Use cured in place pipe to maintain the existing pipe configuration. This will address the deflection and material concerns but not TCEQ horizontal spacing, so we would need a design variance for this short length of pipe. 2. Option 3: Reroute the pipe for flow coming in from the north of San Marcos into a manhole located on the opposite side of the roadway and connect to a new manhole near Normandale along the existing 10" sanitary main. We could connect the existing services to the line already in place and place a clean out at the end. Please advise on desired path forward and we can provide the sheet details requested. Thanks! DAPHNE KING, PE Gr I Branch Manager C 214.753.8107 cell:972.322.2079 5646 Milton Street, Suite 500, Dallas, TX 75206 @f0inP= From: McInnes, Brendan <Brendan.McInnes@fortworthtexas.gov> Sent: Tuesday, November 22, 2022 1:48 PM To: King, Daphne <dking@geiconsultants.com>; Kasavich, John <John.Kasavich@fortworthtexas.gov> Cc: Sholola, Tony <Anthony.Sholola@fortworthtexas.gov>; Mainord, Mike <Michael.Mainord@fortworthtexas.gov>; Tierce, Thomas <Thomas.Tierce@fortworthtexas.gov>; Gair, Cody Dale <Cody.Gair@fortworthtexas.gov>; Ruiz, Antonio <Antonio.Ruiz@fortworthtexas.gov>; Pratt, Hayden <hPratt @geiconsultants.com>; Coffman, Luke <Luke.Coffman @fortworthtexas.gov>; Jim Schumann <Jim@rebcon.com>; Allen, Chad A <Chad.Allen@fortworthtexas.gov> Subject: [EXT] RE: 101591 Sanitary Sewer Field Change Discussion John, Thanks for the quick response and the information. Daphne, Can you have these revisions made by end of day 11/30 or earlier? I want to make sure we can get these approved ASAP and contractor back to moving. Currently M-Co is doing the work and is listed as the preapproved list provided by John. Thanks, Brendan McInnes, P.E. Project Manager Office: (817) 392-2817 From: Kasavich, John <John.Kasavich@fortworthtexas.gov> Sent: Tuesday, November 22, 2022 8:28 AM To: King, Daphne <dking@geiconsultants.com>; McInnes, Brendan <Brendan.McInnes@fortworthtexas.gov>; Coffman, Luke <Luke.Coffman @fortworthtexas.gov>; Jim Schumann <Jim@rebcon.com>; Pratt, Hayden <hpratt@geiconsultants.com>; Allen, Chad A <Chad.Al len @fortworthtexas.gov> Cc: Sholola, Tony <Anthony.Sholola@fortworthtexas.gov>; Mainord, Mike <Michael.Mainord@fortworthtexas.gov>; Tierce, Thomas <Thomas.Tierce@fortworthtexas.gov>; Gair, Cody Dale <Cody.Gair@fortworthtexas.gov>; Ruiz, Antonio <Antonio.Ruiz@fortworthtexas.gov> Subject: RE: 101591 Sanitary Sewer Field Change Discussion Daphne, the plans will need to be revised to clearly indicate the type of pipe (and specification) proposed and the trench details (embedment, backfill, surface restoration) called out on the profile view, used for this replacement (see attached guide if trench details were not developed). The drop manhole notes needs to be revised to call out manhole liner — Warren or Chesterton coating. The contractor needs to provide the prequalified contractor that will install this liner. See attached active list if the contractor does not have one on board. This appears to have 2 types of pipe — PVC SDR 26 (note for approved equal should be removed), and MJ pressure pipe (DI with Protecto 401 coating). Plans will need to be revised to call out the specification for the pipe called out. I am assuming the contractor will provide the shop drawings for this pipe in accordance with the specs attached. Contractor will need to submit all GPS data per the bid item for construction redline survey on both the main line, service line connections, and manholes per specs so this can be properly as -built. Thanks. John Kasavich. From: King, Daphne [mailto:dking@geiconsultants.com] Sent: Monday, November 21, 2022 6:26 PM To: McInnes, Brendan <Brendan.McInnes@fortworthtexas.gov>; Kasavich, John <John.Kasavich@fortworthtexas.gov>; Coffman, Luke <Luke.Coffman@fortworthtexas.gov>; Jim Schumann <Jim@rebcon.com>; Pratt, Hayden <hpratt@geiconsultants.com> Cc: Sholola, Tony <Anthony.Sholola@fortworthtexas.gov>; Mainord, Mike <Michael.Mainord@fortworthtexas.gov>; Tierce, Thomas <Thomas.Tierce@fortworthtexas.gov>; Gair, Cody Dale <Cody.Gair@fortworthtexas.gov>; Ruiz, Antonio <Antonio.Ruiz@fortworthtexas.gov>; Allen, Chad A <Chad.Allen@fortworthtexas.gov> Subject: RE: 101591 Sanitary Sewer Field Change Discussion CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments unless you recognize the sender and know the content is safe. Attached is the revised drawing. Based on what I could find for a bell to spigot connection with 20' pipe lengths the max deflection is 1 degree. If we could use mechanical joints the max deflection is 3 degrees. I've attached the revised .pdf, as requested. Thanks! DAPHNE KING, PE Gr I Branch Manager C 214.753.8107 cell:972.322.2079 5646 Milton Street, Suite 500, Dallas, TX 75206 <image001.jpg> 8 8 8 8 8 -----Original Appointment ----- From: McInnes, Brendan <Brendan.McInnes@fortworthtexas.gov> Sent: Wednesday, November 16, 2022 2:47 PM To: McInnes, Brendan; Kasavich, John; Coffman, Luke; Jim Schumann; Pratt, Hayden; King, Daphne Cc: Sholola, Tony; Mainord, Mike; Tierce, Thomas; Gair, Cody Dale; Ruiz, Antonio; Allen, Chad A Subject: 101591 Sanitary Sewer Field Change Discussion When: Thursday, November 17, 2022 3:30 PM-4:15 PM (UTC-06:00) Central Time (US & Canada). Where: Microsoft Teams Meeting Meeting to discuss consultants proposed solution or alternatives from the group. As discussed, I'm providing a more concise summary of the issue and my recommendation. 1. The proposed 8" sanitary sewer is in the same trench as the existing sanitary sewer. 2. The proposed manhole at station 0+00 and about 125LF of 8" sanitary sewer gravity has been constructed 3. The remaining —175LF of 8" sanitary sewer and proposed manhole at station 2+00 conflict with an AT&T line that was previously impacted by construction 1. The proposed manhole at station 2+00 is not replacing an existing manhole and is included for a pipe directional change. After a closer look, there appears to be an existing sanitary sewer vertical grade change at this proposed manhole. 2. The existing water main is less than 6' from the proposed sanitary sewer main, which requires at least 150 psi pressure pipe per TCEQ guidelines. 4. My recommendation is to install the remaining 8" sanitary sewer pipe in the same trench as the existing sewer main without a proposed manhole at station 2+00. The proposed pressure pipe can be installed with minimal horizontal deflection to the proposed new manhole at station 3+00 replacing the existing manhole. However, the proposed manhole at station 3+00 must be a drop manhole to accommodate the vertical grade change at station 2+00. 1 have attached a sketch to depict this recommendation. Please let me know when you would like to discuss further to determine how the city would like to proceed. I'm generally available the remainder of this week and early next week to discuss/resolve. Thanks! DAPHNE KING, PE Gr I Branch Manager C 214.753.8107 cell:972.322.2079 5646 Milton Street, Suite 500, Dallas, TX 75206 Microsoft Teams meeting Join on your computer, mobile app or room device Click here to join the meeting Meeting ID: 268 763 842 435 Passcode: 8w23LN Download Teams I Join on the web Or call in (audio only) +1 832-680-2579„666796252# United States, Houston Phone Conference ID: 666 796 252# Find a local number I Reset PIN <image010.jpg> Learn More I Meeting options <01591_NORMANDALE LAS VEGAS_Sht C4.08_Opt 03.pdf> <01591_NORMANDALE & LAS VEGAS_Sht C4.08_Opt 02.pdf> <01591_NORMANDALE & LAS VEGAS_Sht C4.08_Opt 01.pdf> M100I, 'ON 103rONd )UI0 :Z 1NVd E6'ON lOVN1NOO - N0I1V11119VH3N N31VM I � I �wwi 0 d VOWOh \ nl0 O O J, zuh-j \ LU 2 a ` �'>I�UW_W_u1W C U W b N \ g2ti22 "I WO�00 G�ih U3UU24i 3 ,� W I � rvNj W N U OW I K o u o � _ ~ W S $ . k'� o_ � = z >U Q �y^ o� a o W O W aJ N K Z ¢ m ZLL3 3 LL O ¢ WC7> v, oN z z <zmuQ oo w Z` o p �._ a } Q> 0 K~ W w W N OY o _-Z <wwb �F 907�RmQeQ� m o ° U Q Q fA a z a m�3myo `uzw`u o w3 > m- bwa�p� 8�:6a'o�8p z,1z� 66ac <'' F., F� Z W W555 F Z Q F = 20 V m 'mo wow o an = w O U w Oaz W >ULL = Z Z Z U - Inl� / —¢UUUU0w O ww, j d Z CLL /) a _ U) z z JUUtnZ Q Q < F OaWaN u~i z O—x ?Qaaw / II� I I lax I I � I II I II II a I I III I I I Iil I I, G l p Z z 0CD I' Lu a Q O w In (D)� 3 goo I W W (D Z uj U O �Jp' HO II �UU 3UU2 O MV4jW3 XQ m Z ------- _ ~� W ZQu J . ~"� K 11 tiw p ¢ W �F-U W 3 w=ww� a LU W MUx�U�00 h0 Wj QO I-'.� �7 W M��oW W`nro i I oh W � Wm 1 1 I Y g2 �22`mON v�i2�3�U UU 2W 3,,9 RI 4= � IW �� o Jo I y -i I1I I ii g Iw Moe �� Q� II �__ i 01 ZvQ4i 2�N <LU Z Z Z QU W Q -It LU O h I I F = Z Q W 0 3a — 700a ZU LU W a. �UF- SZ'bbL 65'£bL CL M�3 ooM Z Z U Z OOU� ( U-FJ--0 v�',o� m<e W- ZU w LU o cam= o" ZUU� U Z W 7 U Q d' U I I eo'� �' £S'£bL I I ZZ'£bL Z U 4\4 w R I I U UI,'K M I W x W chi^ � b T11 pW Uiv � W I 4 8 bL h pl jJ o w Oo 4 I I IO cn �? o II I I J bL h l x+ I I N II bSl b'1 L9-7 L 2l 7/j 6a'Lb Nl7 NVIN MO b 1 do2ld W& H1IM Noo w - L w �o n w W 0 � I do W bZ'ISL aW uj O� wZb£19-7 8 'L L 1n0 „17/1�11 w' S£! - 16Zl2 NI , b']70S 3L 8 7/ !9'bSL eoNOO '1SIX3 H1IWI?J M -77 !f oo+£ V1S 19'b92 U N W - Z N U FODW 2 W(DWw 9 z CD Z Q N O Z HXUF N Z W p (n n 2QQW z U)U) U) W w ON/I o 03SodoMd 7NI 0 MIST 3 nn gn ram". n MICIM 'ON 1OWONd )UI0 :Z 1NVd E6'ON iWdiNOO - N0I1ViIIIGVH3N N31VM Pm k _ mrRo d w W E rcop o z z <zmu3 _- e U o d o p <�wb z O <J =1`=p�� �x W O~ w < x W n hanm w¢�IL =ow E o e0O U 3�wao O JLLfn O r > W WXpH J 20L)7 = JUzQ(n 0O wQa oIL w W¢ z O LL Z > z �¢ <nILITo o w Q �LL1 X U' IL>W 0 W XU) Y�1 2Wtn❑ n n �agILoJ°w i n IL?W> QKO1 ¢F Pz o I'\� ;J ozUzx a z z23 XLn Ox ¢MX mm— U°ILWU DX o Hw ww, U ww, ^> z WOF — (n U Z L)X O W m 2 O z mezzo 20 ILU 'X---WuON 00Om O m ZU JN W Z n N F - z OU °p W O W> �UH M¢2Q co I I II o N W IJo II O F Q F F Q I IryI ¢ I �Jro-Q� I "IIi 11 ~ UzO� UWOU I�� �pc WO 03U^ oxFw WII Wzzw �UOO¢ 2 2LL0��. �QILo¢w ILO O� J sow�z 0E-�W �woowo- p so �o�Z W W f n U Q 3w W G D) w O z 2 h FUD,O `^ IY Z W I. W cc ui rn Z 2Qao M v4jW3 III I I WOOU o¢a3 �I 0` w �wwi O d J�v�W WNv�j \ UWUZ �'>ti UW_W_u1W ¢pW bN \ g2ti22 "� WO^00 �R U3UU24i 3 1� W -- 00 W N U Oti I W Z �o > I, O ha W 2 +^p ^ r2 -------- -- h J z�=w I I _��I ¢O�=W oLLOZLL WOz00 g 2 v, 3` 2� xw m I � O O I I -w02a LL(9 F 7 Ocn2U ��WaOZ III � WLLd) n J� o=O -• JW I-- m 3 - v, ^ wWao^ hO Mk�U~OO W +i�UW W�nm _ c �h III m W Y s=�==�N IQ� W O^ 0 0 31.s'sr� 4 U Oj y W O IL �nRU3UU 2W RI I 3W I III I i Q O __ _MOtl � 3 h2 I 2 IR NMI mom M,m i 2 � 2�N - �ao 3�ry I I l Q d I W O Z z DE ¢ U z JiO 3 "Qo zzU LuCOy w U, aI I JJZ WI I II I I �z� z5X L w ~ z J (` s w ~ w x f :wsg❑ r O ¢ o a w o m �x�,{<sy w O W aJa Q — °FF fp? ¢ u w 3 <<� K � 2 Z raw z LL3a O O F wQw dF Zwz " o Q awo 2W LU U a <QM x WU) 0 = S 2 Q o z 3 F = F OC Z Q � =o v m mmw : x W � oou W WI N MSS U OO^ I Qc~i3 ooro £S'£ O WR I �rll I M e WSW x chi^ I �b pW pw 4 8' NI 19 v� 9'P9Z w 0 LL WO ZxJJ� mwOOLLQJ� uj aZ¢oLzu W,0 ZoJZ�O IL W Q o F" o Z Q o— �2ZU2NU0� D�Qw0Ow22 o0 ZILILZ�O 2,2 zc/)O zUZ �Wz OUFa000 j doad L b wlb �VIN H1IM FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Normandale Street and Las Vegas Trail Improvements Change Order 02 M&C: CPN: 105191 CSO: 57193 DOC#: 1 Date: To: Name Department Initials Date Out 1. Misty Monique -Davila— BSP TPW - initial MM Jan 31, 2023 2. Danny Krieg - Contractor Rebcon - signature DK Jan 31, 2023 3. Habte Taezaz — Inspector TPW - signature �.r Jan 31, 2023 4. Brendan McInnes — Project Manager TPW - signature sM Feb 1, 2023 5. Chad Allen — Interim Program Mngr TPW - signature 7 Feb 2, 2023 6. Lissette Acevedo - Interim Snr CPO TPW - signature Feb 3, 2023 7. Michael Owen — Interim Asst. Director TPW - signature Mo Feb 4, 2023 8. Lauren Prieur — Interim Director TPW - signatures Feb 4, 2023 9. Doug Black Legal - signature wb Feb 6, 2023 10. William Johnson CMO -signature Al W, Feb 7, 2023 11. Jannette Goodall CSO - signature Gs' Feb 7, 2023 12. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: [—]YES ®No SAME DAY: ❑YES [—]No NEXT DAY: [—]YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts0fortworthtexas.gov, for pick up when completed; list "Please call Brendan ext # 2817 for questions. Thank you. " Updated 08.22.2022, mdhm