Loading...
HomeMy WebLinkAboutContract 57128-FP3City Secretary 57128 Contract No. -FP3 FORTWORTH. Date Received 2/13/2023 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Morningstar- Section 10, Phase 1 City Project No 103488 Improvement Type(s): Water Original Contract Price: Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: Colton Tolle711- Colton Tollett (Feb 6, 202314:31 CST) Contractor DT Utility Contractors Inc Title V. P. Company Name StevM Wester (Feb 6 202314:56 CST) Project Inspector Liq Patrick MA1,V(Fe 0202311:19 CST) Project Manager f(b, Are Rebecca Diane Owen (Feb 12, 202308:59 CST) CFA Manager Lauren Pr'ieur (Feb 12, 2023 09.50 CST) Interim TPW Director William Johnson (Fe 13, 202313:18 CST) Asst. City Manager Sewer ❑x $244,583.80 $244,583.80 Feb 6, 2023 Date Feb 6, 2023 Date Feb 10, 2023 Date Feb 12, 2023 Date Feb 12, 2023 Date Feb 13, 2023 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Morningstar- Section 10, Phase 1 City Project No.: 103488 City's Attachments Final Pay Estimate 0 Change Order(s): ❑ Yes 0 N/A Pipe Report: 0 Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 120 WD Days Charged 187 Work Start Date 02/28/2022 Work Complete Date: 12/6/2022 Soil Lab Number of Tests 202 Water Number of Tests 4 Page 2 of 2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MORNINGSTAR -SECTION 10, PHASE 1 Contract Limits Project Type WATER & SEWER City Project Numbers 103488 DOE Number 3488 Estimate Number 1 Payment Number I City Secretary Contract Number Contract Date 1/6/2022 For Period Ending 12/15/2022 WD Contract Time 4WD Days Charged to Date 187 Project Manager NA Contractor D T UTILITY CONTRACTORS, INC. 2614 CAUSBIE RD WEATHERFORD , TX 76087 Inspectors OWEN, M / S. Wester Contract is 100.00 Complete Monday, December 19, 2022 Page 1 of 4 City Project Numbers 103488 Contract Name MORNINGSTAR - SECTION 10, PHASE 1 Contract Limits Project Type WATER & SEWER Project Funding UNIT I: WATER IMPROVEMENTS DOE Number 3488 Estimate Number i Payment Number I For Period Ending 12/15/2022 Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total - - 1 - - - - - - - - - - - - - - - 6" WATER PIPE - - - - - - 10 LF - - - $36.00 - - - - $360.00 - - - - 10 - $360.00 2 8" WATER PIPE 1323 LF $52.00 $68,796.00 1323 $68,796.00 3 6" GATE VALVE 2 EA $850.00 $1,700.00 2 $1,700.00 4 8" GATE VALVE 2 EA $2,000.00 $4,000.00 2 $4,000.00 5 CONNECT TO EXISTING 4"-12" WATER MAIN 3 EA $500.00 $1,500.00 3 $1,500.00 6 FIRE HYDRANT 2 EA $6,000.00 $12,000.00 2 $12,000.00 7 DUCTILE IRON WATER FITTINGS 2 TN $6,000.00 $12,000.00 2 $12,000.00 8 TRENCH SAFETY 1333 LF $1.00 $1,333.00 1333 $1,333.00 9 -------------------------------------- 1" WATER SERVICE 31 EA $1,200.00 $37,200.00 31 $37,200.00 Sub-Total of Previous Unit $138,889.00 $138,889.00 UNIT II: SANITARY SEWER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total - 1 - - - - - - - - - - - - - - 8" SEWER PIPE - - - - - - - 1108 LF - - $43.00 - - - - $47,644.00 - - - - 1108 - - - - - $47,644.00 2 8" SEWER PIPE W/CSB 20 LF $85.00 $1,700.00 20 $1,700.00 3 4' MANHOLE 6 EA $3,800.00 $22,800.00 6 $22,800.00 4 4' EXTRA DEPTH MANHOLE 14 VF $175.00 $2,450.00 14 $2,450.00 5 4" SEWER SERVICE, TWO-WAY CLOSEOUT 31 EA $825.00 $25,575.00 31 $25,575.00 6 POST -CCTV INSPECTION 1128 LF $3.10 $3,496.80 1128 $3,496.80 7 MANHOLE VACUUM TESTING 6 EA $150.00 $900.00 6 $900.00 8 TRENCH SAFETY 1128 LF $1.00 $1,128.00 1128 $1,128.00 9 CONNECT TO EXISTING SANITARY SEWER MAIN 1 EA $1.00 $1.00 1 $1.00 -------------------------------------- Sub-Total of Previous Unit $105,694.80 $105,694.80 Monday, December 19, 2022 Page 2 of 4 City Project Numbers 103488 Contract Name MORNINGSTAR - SECTION 10, PHASE 1 Contract Limits Project Type WATER & SEWER Project Funding Contract Information Summary Original Contract Amount Change Orders Total Contract Price DOE Number 3488 Estimate Number 1 Payment Number 1 For Period Ending 12/15/2022 $244,583.80 $244,583.80 Total Cost of Work Completed $244,583.80 Less % Retained $0.00 Net Earned $244,583.80 Earned This Period $244,583.80 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $244,583.80 Monday, December 19, 2022 Page 3 of 4 City Project Numbers 103488 Contract Name MORNINGSTAR - SECTION 10, PHASE I Contract Limits Project Type WATER & SEWER Project Funding Project Manager NA Inspectors OWEN, M / S. Wester Contractor D T UTILITY CONTRACTORS, INC. 2614 CAUSBIE RD WEATHERFORD, TX 76087 DOE Number 3488 Estimate Number 1 Payment Number I For Period Ending 12/15/2022 City Secretary Contract Number Contract Date 1/6/2022 Contract Time 45 WD Days Charged to Date 187 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded --------------------------------- Total Cost of Work Completed $244,583.80 Less % Retained $0.00 Net Earned $244,583.80 Earned This Period $244,583.80 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $244,583.80 Monday, December 19, 2022 Page 4 of 4 FORS' WORTH' TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Morningstar - section 10, Phase 1 CITY PROJECT NUMBER: 103488 WATER PIPE LAID SIZE TYPE OF PIPE LF PVC 6 C900 10 PVC 8 C900 1323 FIRE HYDRANTS: 2 VALVES (16" OR LARGER) N/A PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: Yes All Passed NEW SERVICES: 1" Copper pipe 645 SEWER PIPE LAID SIZE TYPE OF PIPE LF PVC 8" SDR 26 1128 PIPE ABANDONED SIZE TYPE OF PIPE LF N/A DENSITIES: Yes All Passed NEW SERVICES: 4" SDR 26 920 TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 FORT WORTH, TRANSPORTATION AND PUBLIC WORKS December 15, 2022 DT Utility Contractors, Inc. 2614 Causbie Road Weatherford, TX 76087 RE: Acceptance Letter Project Name: Morningstar- Section 10, Phase 1 Project Type: Sewer, Water, Storm Drain City Project No.: 103488 To Whom It May Concern: On December 15, 2022 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on December 15, 2022, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7872. Sincerely, Patrick c dey (Fe Q, 2023 11:19 CST) Khal Jaafari, P.E. , Project Manager Cc: Steven Wester, Inspector Don Watson, Inspection Supervisor Joe Rogers, Senior Inspector Kiran Konduru, P.E. , Program Manager Welch Engineering, Inc. , Consultant DT Utility Contractors, Inc, Contractor FG Aledo Development, LLC, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 AFFIDAVIT STATE OF TEXAS COUNTY OF TARRANT Before me, the undersigned authority, a notary public in the state and county aforesaid, on this day personally appeared Colton Tollett, Vice President Of D.T.Utility Contractors, Inc., known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations, or other organizations furnishing labor and/or materials have been paid in full; That the wage scale established by the City Council in the City of Fort Worth has been paid in full; That there are no claims pending for personal injury and/or property damages; On Contract described as; Morningstar Sec 10 Ph 1 CPN4 103488 Tarrant County, Texas. BY Colton Tollett, Vice President of D.T. Utility Contractors, Inc. 4)"� Subscribed and sworn before me on this date 6,st-of February, 2023. J Notary Public State of Texas MTANYA DAVISNOTARY PUBLIC STATE OF TEXASID # 576914-4 09-2&-2D25 CONSENT OF SURETY TO FINAL PAYMENT AIA Document G707 Bond No. SUR0005547 TO OWNER: !Name a,rd a(kirm) FG Aledo Development, LLC 3045 Lackland Road Ft. Worth, TX 76116 PROJECT: (Name and adltimm) Morningstar -Section 10, Phase 1 Water & Sewer OWNER ARCHITECT CONTRACTOR SURETY OTHER ARCHITECT'S PROJECT NO.: NIA CONTRACT FOR: Morningstar - Section 10, Phase 1 Water & Sewer CONTRACT DATED: Not Dated in accordance with the provisions of [he Contract hetwixii the Owner anti the Contractor as inditatetl above, the On.,en ruurre rrnrl rrrGln'.tiy o(SLreh9 Frankenmuth Mutual Insurance Company One Mutual Avenue Frankenmuth. MI 48787 , SURETY, on bond of lbtcert ,tame and addin'N of Currt+ucror) D.T. Utility Contractors, Inc. 2614 Causbie Road Weatherford, TX 76087 . CONTRACTOR, hereby approves of the final payment to the Contractor, and :Igf-CCS that final payment to the C:untrac Itrr shall not relieve the Surety of any of its obligations to !lnaerY runny and rrrlrlrc:[. of Ouvrrr} FG Aledo Development, LLC 3045 Lackland Road Ft. Worth, TX 76116 , OWNER, as set forth in said Surety's bond. IN WTTNFSS WHEREOF, the Surety has hereunto set its hand on this elate: January 26, 2023 (Ar-art it, arid,!{ the mo,Nb followed N' The nroNerk date and! tie w ) Frankenmuth Mutual Insurance Com an (1rr,!!19 Lsi rrdnm n%untix,rizca! �1R'SNntrrtfrY'I Attest: (Seal): Yamillec R os, r ess Russ Frenzel, Attorney -in -Fact (t'rijiled rrom, and title) CAUTION: You should sign an original AIA document that has this caution printed in red. An l j original assures that changes will not be obscured as may occur when documents are reproduced. See Instruction Sheet for Limited License for Reproduction of this document. AIA DOCUMENT CtM • CONSENTOF SL`W. Y TO F1NA1. PAYMH1% I' • ItV4 P. MON • ALA VON • 'n IF AMERICAN 1NSITt7 PCF. OF ARCti[T IRCTS, 1735 NGW YORK AVENUE, NW, WAN I- INGTON. D.C. 20006-5292 • WARNING: Unitcensetf photocopying violates U.S. copy- right laws and will subject the violator to legal prosecution. G707-1994 FRANKENMUTH INSURANCE COMPANY POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS, that Frankenmuth Insurance Company (the "Company"), a corporation duly organized and existing under the laws of the State of Michigan, having its principal office at I Mutual Avenue, Frankenmuth, Michigan 48787, does hereby nominate, constitute and appoint: Brady K. Cox, Brock Baldwin, Russ Frenzel, Keith Rogers, Blaine Allen, Brent Baldwin, Sam Freireich, John Aboumrad, Cynthia Alford, William D. Baldwin, Neira Hernandez, Lorena Gutierrez, Veronica Ramos Kirsten Ortiz, Yamillec Ramos Their true and lawful attorneys) -in -fact, each in their separate capacity if more than one is named above, to make, execute, seal, acknowledge and deliver any and all bonds, contracts and undertakings of suretyship, with the exception of Financial Guaranty Insurance, provided, however, that the penal sum of any one such instrument shall not exceed the sum of; Fifty Million and 00/100 Dollars ($50,000,000) This Power of Attorney is granted pursuant to the following Resolution duly adopted at a meeting of the Board of Directors of Frankenmuth Insurance Company: "RESOLVED, that the President, Senior Vice President or Vice President and each of them under their respective designations, hereby is authorized to execute powers of attorney, and such authority can be executed by use of facsimile signature, which may be attested or acknowledged by any officer of the Company, qualifying the attorney(s) named in the given power of attorney, to execute on behalf of, and acknowledge as the act and deed of Frankenmuth Insurance Company an all bonds, contracts and undertakings of suretyship, and to affix the corporate seal thereto." IN WITNESS WHEREOF, the Company has caused these presents to be signed and attested by its appropriate officers and its corporate seal heretMto'4Ui ed this 15th day of December, 2022. Frankenmuth Insurance Company Frederick A. Edmvnd,lr., President and Chief Executive Officer V' ) W ) ss: Sworn to before me, a Notary Public in the State of Michigan, by Frederick A. Edmond, Jr., to me personally known to be the individual and officer described in, and who executed the preceding instrument, deposed and said the Corporate Seal and his signa``�5o were affixed and subscribed to said instrument by the authority of the Company. IN TESTIMONY WHEREOF, I have set my hand, and affixed my Official Seal this 1.5.th day of December, 2_ 02 Z' = r (Seal) )• Susan L. Fresorger, Notary Pu lic Saginaw County, State of Michigan ZdO,y ti ` My Commission Expires: April 3, 2028 I, the undersigned, Executive Vice President of Frankenmuth Insurance Company, do hereby certify that the foregoing is a true, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not been revoked or rescinded and is in full force and effect as of this date. IN WITNESS WHEREOF, I have set my hand and affixed the Seal of the Company, this 25th day of January 2023 Andrew H. Knudsen, Executive Vice President, Chief Operating Officer and Secretary ALL CORRESPONDENCE RELATED TO BOND VALIDATION AND/OR A CLAIM SHOULD BE DIRECTED TO VP SURETY, 701 U.S. ROUTE ONE, SUITE 1, YARMOUTH, ME 04096