HomeMy WebLinkAboutContract 56500-A1AMENDMENT No.l
TO CITY SECRETARY CONTRACT No. 56500
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and
Associates, Inc., (ENGINEER) made and entered into City Secretary
Contract No. 56500, (the CONTRACT) which was authorized by M&C 21-0697 on
the 21st day of September, 2021 in the amount of $ $520,000; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
2022 Transportation Impact Fee Study Update, CPN 103247; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $71,030.11. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $591,030.11.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas 2022 Transportation Impact Fee Study Update
Prof Services Agreement Amendment Template 103247
Revision Date: November 23, 2021
Page 1 of 4
APPROVED:
City of Fort Worth
Dana Burghdoff (Feb 14, 20 10:01 CST
Dana Burghdoff
Assistant City Manager
DATE:
APPROVAL RECOMMENDED:
DJ Harrell (Feb 13, 2023 09:06 CST)
ENGINEER
Kimley-Horn and Associates, Inc.
Scott R. Arnold, P.E.
Vice President
DATE:
D.J. Harrell
Director, Development Services Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
J fifer Ro�bc s (Feb 13, 2023 09:01 CST)
Jennifer Roberts, P.E.
Assistant Director, Development Services Department
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas 2022 T ansportation Impact Fee Study Update
Prof Services Agreement Amendment Template 103247
Revision Date: November 23, 2021
Page 2 of 4
APPROVED AS TO FORM AND LEGALITY:
Mack (Feb 13, 2023 20:50 CST)
Douglas W. Black
Sr. Assistant City Attorney
Jannette Goodall
City Secretary
M&C: N/A
Date:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 3 of 4
2022 T ansportation Impact Fee Study Update
103247
FUNDING BREAKDOWN SHEET
City Secretary No. 56500
Amendment No. 1
Department I Fund -Account -Center I Amount
DSD
30100-0060419-4910100-103427-002310
$ 70,227.40
DSD
39008-0060419-5330500-103427-002310
$ 132.71
DSD
30108-0060419-5330500-103427-002310
$ 670.00
Total:
$ 71,030.11
City of Fort Worth, Texas 2022 Transportation Impact Fee Study Update
Prof Services Agreement Amendment Template 103247
Revision Date: November 23, 2021
Page 4 of 4
FORT WORTH:,
ATTACHMENT "A"
Transportation Impact Fee Study On -Call Support
PROJECT UNDERSTANDING
The goal of this project is to perform minor amendments to the existing Transportation
Impact Fee Study dated October 25, 2022 as annexations occur. This scope of services will
provide the CITY with professional services required by Chapter 395 of the Texas Local
Government Code to amend the Land Use Assumptions, Capital Improvement Plan for
Impact Fees, and the maximum transportation impact fee that may be assessed due to
annexations on an as -needed basis when requested by the CITY. The ENGINEER will also
assist the CITY at various presentations required during the public hearing and adoption
process.
SCOPE OF SERVICES
If services beyond those defined in this scope are required, the Parties shall attempt to
negotiate a written amendment to this Agreement. ENGINEER shall not proceed with work
on any additional services prior to the Parties executing a written amendment. The Scope
of Services consists the following primary tasks:
Task 1 — Project Management and Coordination
Task 2 — Annexation Amendments
Task 3 — Impact Fee Program Administration Support
Task 1 — Project Management and Coordination
• The ENGINEER will prepare and submit monthly invoices, in accordance with
Attachment B to this Standard Agreement, in the format requested by the CITY.
• The ENGINEER will participate in meetings with CITY staff as requested. These
meetings will be held on specific days and times as agreed to by the CITY. A
maximum of three hours will be anticipated for each meeting and may include up
to two members of the ENGINEER's team. The ENGINEER shall prepare
meeting notes from each meeting.
Task 2 — Annexation Amendments
The ENGINEER will amend the Land Use Assumptions, Transportation
Improvements Plan, and Maximum Assessable Impact Fee upon request from the
CITY when annexations occur. The amendment(s) will apply only to the
Transportation Impact Fee Service area where a change in the Service Area
boundary, Land Use Assumptions, or Transportation Improvements Plan is
anticipated.
The ENGINEER will provide a PDF copy of the amended Transportation Impact
Fee Study report including the amended Land Use Assumptions, Transportation
Improvements Plan, and Maximum Assessable Fee.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 2
FORT WORTH
• The ENGINEER will amend the Transportation Impact Fee Estimator once each
time the Transportation Impact Fee is amended.
Task 3 — Impact Fee Program Administration Support
• The ENGINEER will assist in reviewing requests for Transportation Impact Fee
Calculation Estimates as requested.
The ENGINEER will prepare for and attend Capital Improvements Advisory
Committee Meetings as requested.
• The ENGINEER will prepare for and attend City Council meetings as requested.
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existing Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Evaluations outside the city limits.
• Additional meetings beyond those identified in the scope of services.
• Negotiation of easements or property acquisition.
• Services related to development of the CITY's project financing and/or budget.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
CITY of Fort Worth, Texas Page 2 of 2
Attachment A
PMO Release Date: 02.06.2015
Page 2 of 2
ATTACHMENT B
COMPENSATION
Professional Services for
Transportation Impact Fee Study On -Call Support
City Project No. 103247
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated in an hourly amount not -to -exceed
$71,030.11 for personnel time, non -labor expenses, and subcontract expenses in
performing services enumerated in Attachment A as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work.
Labor Category Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
Rate
$/hour
Senior Project Manager / Project Director
$280
Senior Professional / Senior Project Engineer
$260
Project Manager
$220
Professional / Project Engineer
$185
Analyst III / EIT III
$165
Analyst II / EIT II
$155
Analyst I / EIT 1
$150
Administrative
$105
Intern
$90
Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 4
Is
ATTACHMENT B
COMPENSATION
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 4
B-2
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm
Primary Responsibility
Fee Amount
%
Prime Consultant
Kimley-Horn and
Associates, Inc.
Project Management, Impact
Fee Analysis and Support
$61,030.11
84.6%
Proposed MBE/SBE Sub -Consultants
Non-MBE/SBE Consultants
Newgen Strategies &
Solutions, LLC
Financial Analysis
$10,000.00
16.4%
TOTAL
$71,030.11
100%
Project Number & Name
Total Fee
MWBE Fee
MWBE %
103427 Transportation Impact
$71,030.11
$0
o
0 /o
Fee Study On -Call Support
City MBE/SBE Goal = 0% Consultant Committed Goal = 0%
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 4
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
M
to
E
E
7
cn
W
a
MU
Cm
010
N
LL
m
O
d a`
O O Y
aa5
d
E
Z
d
N
T
U
0
d -0.
'F U N
r - X
E O rLL
dm
d�
�o
U �
a >,
d -
U �
O
> .O_
C >
y
w a`
� c
2 a
0 N
a
a
0 0 �
r C_ O
J
o a
U
dC
C C d
O O
N
¢ate
C _
O C
0
O o
�
E Q
Q
� C
4) O
O
`1 £
A
�a
a
c
i+
Q
r
L
(%
O
j
m
�
01
-
0
U
N
O
Q
D
L
O
m
LL
U
Q
C
0
O
V.
r
O
n
m
F
0
N
�,
c.acaao.a
T T
T T
T
N
r r
r r
r r
r
N
o
: :
: o
mmmmom