HomeMy WebLinkAboutContract 56583-CO4CSC No. 56583-004
FORT WC)RTI-I City of Fort Worth
Change Order Request
Project Name: Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: 56583
Project No.(s): 56020 0700430 5740010 103505 001780 DOE No. N/A City Proj. No.: 103505
Project Description: 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway.
Contractor: S.J. Louis Construction of Texas, Ltd. Change Order # ® Date: 2/9/2023
City Project Mgr.1 Suzanne Abbe City Inspector: I Carmen Drake
Phone Number: 817-392-8209 Phone Number: 817-948-0081
Dept. Water Totals Contract Time
(Calender days)
Original Contract Amount $3,940,000.43 $3,940,000.43 270
Extras to Date $64,691.99 $64,691.99 075
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $4,004,692.42 $4,004,692.42 280
Amount of Proposed Change Order $14,432.50 $14,432.50
Revised Contract Amount $4,019,124.92 $4,019,124.92 345
Original Funds Available for Change Orders $157,600.57 $157,600.57
Remaining Funds Available for this CO $92,908.58 $92,908.58
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.01 %
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,925,000.54
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 4 provides funding for pay item no. 30 (Tree Removal). The pay item for tree removal was included in Change Order No. 2
but the cost was not reflected in the total amount of the proposed change order. This change order provides the necessary funding.
It is understood and agreed that the acceptance of this Chanqe Order by the contractor constitutes an accord and satisfaction and represents oavment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name
Contractor Name
ntractor ignature
Dat
S.J. Louis Construction of Texas, Ltd.
I Adam Lunsford
-
Z Z
I pector
Date
Project Manager
Date
=oti
—l(/ a-3
Director Water Dept)
Date
Cons ction Supervisor(Water
Dept
Date
eb 10, 2023
3
Senior Assistant City AttorneyDate
Assi ant CityManager
Date
Feb 13, 2023
Feb 14, 2023
Council Action If Required
M&C Number N/A
M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Fa Rr Wo Puy H City of Fort Worth
Change Order Additions
Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: 56583
Project No.(s): 56020 0700430 5740010 103505 001780 1 DOE No. N/A City Proj. No.: 103505
Project
Description
24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway.
Contractor S.J. Louis Construction of Texas, Ltd. Change Order:= Date: 219/2023
City Project Mgr. Suzanne Abbe I City Inspector FCarmen Drake
ADDITIONS
F_ (>R-F VVt) RT H City of Fort Worth
Change Order Deletions
Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: 56583
Project No.(s): 56020 0700430 5740010103505 001780 DOE No. N/A City Proj. No.: 103505
Project Description I 24 inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace
Contractor S.J. Louis Construction of Texas, Ltd. Change Order: F4 Date 2/9/2023
City Project Mgr. Suzanne Abbe City Inspector: Carmen Drake
DELETIONS
rage 1 ui 1
Page 1 of 1
2/10/2023
Northpointe 24-Inch Water Transmission Main (N4-IA)
CSC: 53066
CPN:103505
Change Order 4 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery