HomeMy WebLinkAboutContract 56583-CO4CSC No. 56583-004 FORT WC)RTI-I City of Fort Worth Change Order Request Project Name: Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: 56583 Project No.(s): 56020 0700430 5740010 103505 001780 DOE No. N/A City Proj. No.: 103505 Project Description: 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor: S.J. Louis Construction of Texas, Ltd. Change Order # ® Date: 2/9/2023 City Project Mgr.1 Suzanne Abbe City Inspector: I Carmen Drake Phone Number: 817-392-8209 Phone Number: 817-948-0081 Dept. Water Totals Contract Time (Calender days) Original Contract Amount $3,940,000.43 $3,940,000.43 270 Extras to Date $64,691.99 $64,691.99 075 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $4,004,692.42 $4,004,692.42 280 Amount of Proposed Change Order $14,432.50 $14,432.50 Revised Contract Amount $4,019,124.92 $4,019,124.92 345 Original Funds Available for Change Orders $157,600.57 $157,600.57 Remaining Funds Available for this CO $92,908.58 $92,908.58 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.01 % MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,925,000.54 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 4 provides funding for pay item no. 30 (Tree Removal). The pay item for tree removal was included in Change Order No. 2 but the cost was not reflected in the total amount of the proposed change order. This change order provides the necessary funding. It is understood and agreed that the acceptance of this Chanqe Order by the contractor constitutes an accord and satisfaction and represents oavment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name ntractor ignature Dat S.J. Louis Construction of Texas, Ltd. I Adam Lunsford - Z Z I pector Date Project Manager Date =oti —l(/ a-3 Director Water Dept) Date Cons ction Supervisor(Water Dept Date eb 10, 2023 3 Senior Assistant City AttorneyDate Assi ant CityManager Date Feb 13, 2023 Feb 14, 2023 Council Action If Required M&C Number N/A M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Fa Rr Wo Puy H City of Fort Worth Change Order Additions Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: 56583 Project No.(s): 56020 0700430 5740010 103505 001780 1 DOE No. N/A City Proj. No.: 103505 Project Description 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor S.J. Louis Construction of Texas, Ltd. Change Order:= Date: 219/2023 City Project Mgr. Suzanne Abbe I City Inspector FCarmen Drake ADDITIONS F_ (>R-F VVt) RT H City of Fort Worth Change Order Deletions Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: 56583 Project No.(s): 56020 0700430 5740010103505 001780 DOE No. N/A City Proj. No.: 103505 Project Description I 24 inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Contractor S.J. Louis Construction of Texas, Ltd. Change Order: F4 Date 2/9/2023 City Project Mgr. Suzanne Abbe City Inspector: Carmen Drake DELETIONS rage 1 ui 1 Page 1 of 1 2/10/2023 Northpointe 24-Inch Water Transmission Main (N4-IA) CSC: 53066 CPN:103505 Change Order 4 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX