Project Name: Ridglea Country Club Dr. Water Line Improvements City Sec No.: 1 53066
Project No.(s): 56002-06004350-CO1780 1 DOE No. N/A CityProj.No.:l 01690
Project Description:
Instillation of 12-Inch Water Main to Provide redundancy in Ridglea Country Club area
Contractor: I Venus Construction Company Change Order # �.J Date: 2/6/2023
City Project Mgr.1 John Kasavich City Inspector: I Carmen Drake
Phone Number: 817-392-8480 Phone Number: 817-392-8347
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Water
Paving
Improvements
Totals
Contract Time
(Calender days)
$749,727.50
$73,693.00
$823,420.50
180
$749,727.50
$73,693.00
$823,420.50
180
Amount of Proposed Change Order
$32.31
$0.00
$32.31
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
$749,759.81
$73,693.00
$823,452.81
180
$78,741.00
$12,631.00
$91,372.00
$78,741.00
$12,631.00
$91,372.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25916)
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 1 provides for the following:
• Additional water pipe support hangers on the project.
• Removal of existing concrete bridge diaphrams for the 12-inch water main.
• 2-inch water service and meter reconnect.
• Installation for access device.
• The deletion of pay item quantities that are no longer needed on the project.
0.00%
$1,029,275.63
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name
Contractor Name
Contractor Signature
I Date
Venus Construction Compan
Mike Plunk
' Div
, — . Z 3
I cto
Da
Project Manager
Date
�^ 4 � �z�
2 �� Z3
Director Wat
Yate
Constr ction Supervisor Water Dept
Date
Feb 10, 2023
Assistant City Attorney
Date
Assistant City Manager
Date
'
Feb 13, 2023
ba4a g—j4dff —
Feb 14, 2023
Council Action If Required)
M&C Number N/A M&C Date Approved N A
FORT WORTH
City of Fort Worth
Change Order Additions
Project Name Ridglea Country Club Dr. Water Line Improvements City Sec No.: 53066
Project No.(s): 56002-06004350-CO1780 DOE No. N/A City Proj. No.: 01690
Project
Description
Instillation of 12-Inch Water Main to Provide redundancy in Ridglea Country Club area
Contractor Venus Construction Company Change Order:= Date: 2/6I2023
City Project Mgr. John Kasavich City Inspector Carmen Drake
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
6
Water Pipe Support Hanger
Water
6.00
$6,200.00
$37,200.00
44
Remove Existing Concrete Bridge Diaphrams for 12-inch Water
Water
1.00
$11,358.82
$11,358.82
45
1 1/2-Inch Water service and meter reconnect
Water
1.00
$2,700.00
$2,700.00
46
2-inch Water service and meter reconnect
Water
3.00
$4,300.00
$12,900.00
47
Remove and Salvage existing 4-inch gate valve
Water
1.00
$250.00
$250.00
48
6-Inch DR-14 PVC water Pipe
Water
87.00
$65.00
$5,655.00
49
Remove and Salvage existing fire hydrants
Water
2.00
$350.00
$700.00
50
Remove and Salvage existing 6-inch gate valves
Water
1.00
$350.00
$350.00
51
Remove and Salvage existing 16-inch gate valve
Water
1.00
$1,107.13
$1,107.13
52
Installation for access device/manhole at Station 36+35.59 for WI-2
Water
1.00
$8,928.59
$8,928.59
53
Abandon existing 1-Inch ARV vault at 37oo Streamwood Dr.
Water
1.00
1$3,304.77
$3,304.77
Page 2 of 4
Water
$84,454.31
Paving Improvements
Additions Sub Total
$84,454.31
F" 12T WO 12T H City of Fort Worth
Change Order Deletions
Project Name Ridglea Country Club Dr. Water Line Improvements
Project No.(s): 56002-06004350-CO1780 DOE No. R
Project Description
Instillation of 12-Inch Water Main to Provide redundancy in Ridglea Country Club area
City Sec No
City Proj. No
53066
01690
Contractor
Venus Construction Company
Change Order.
[ Date 2/6/2023
City Project Mgr.
John Kasavich
City Inspector;
Carmen Drake
DELETIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
11
Unclassified Excavation by Plan
Water
10.00
CY
$230.00
$2,300.00
14
Asphalt PymntRepair beyond defined width
Water
546,00
SY
$107.00
$58,422.00
18
Utility Service Surface Restoration
Water
100.00
SY
$16.00
$1,600.00
30
16' x 12" Tapping Sleeve and Vault
Water
1.00
EA
$22,100.00
$22,100.00
Page 3 of 4
Water
$84,422.00
Paving Improvements
Deletions Sub Total
$84,422.00
MIWBE Breakdown for this Change Order
Page 4 of 4
2/6/2023
Ridglea Country Club Dr. Water Line Improvements
CSC: 53066
CPN: 01690
Change Order 1 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring a]1 performance and reporting requirements.
12
Signature
John R. Kasavich
Name of Employee
Engineering Manager
Title
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY