HomeMy WebLinkAboutContract 58866Received Date: 2/14/2023
Received Time: 11:05 a.m.
Developer and Project Information Cover Sheet:
Developer Company Name: Timothy Derek Carson
Address, State, Zip Code: 600 West 6th Street, Suite 300, Fort Worth, TX 76102
Phone & Email:
817-877-2850; dcarson(a,canteyhan e
Authorized Signatory, Title:
Timothy Derek Carson, Owner
Willard Trails
Water, Sewer, Paving, Storm Drain, and Street Lights
Project Name:
Brief Description:
Project Location:
6310 & 6312 Willard Road
Plat Case Number:
PP-21-042
Plat Name:
Handley Heights South Addition
Mapsco:
Not Provided
Council District:
5
CFA Number:
21-0148
City Project Number:
CPN 1036111 IPRC21-0101
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Page 1 of 16
Standard Community Facilities Agreement
Rev. 9/21
City Contract Number: 58866
STANDARD COMMUNITY FACILITIES AGREEMENT
This COMMUNITY FACILITIES AGREEMENT ("Agreement") is made and entered into by
and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of Texas,
acting by and through its duly authorized Assistant City Manager, and Timothy Derek Carson, an
individual ("Developer"), acting by and through its duly authorized representative. City and Developer are
referred to herein individually as a "party" and collectively as the "parties."
WHEREAS, Developer is constructing private improvements or subdividing land within the
corporate limits of Fort Worth, Texas or its extraterritorial jurisdiction, for a project known as Willard Trails
("Project"); and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure and that the public infrastructure is constructed according to City standards; and
WHEREAS, as a condition of approval of the Project, Developer is required to bear a portion of
the costs of municipal infrastructure by constructing the public infrastructure necessary for the Project as
described in this Agreement ("Community Facilities" or "Improvements"); and
WHEREAS, as a condition of approval of the Project, Developer is required to meet the additional
obligations contained in this Agreement, and Developer may be required to make dedications of land, pay
fees or construction costs, or meet other obligations that are not a part of this Agreement; and
WHEREAS, the City is not participating in the cost of the Improvements or Project; and
WHEREAS, the Developer and the City desire to enter into this Agreement in connection with
the collective Improvements for the Project;
NOW, THEREFORE, for and in consideration of the covenants and conditions contained herein,
the City and the Developer do hereby agree as follows:
1.
CFA Ordinance
The Community Facilities Agreements Ordinance ("CFA Ordinance"), as amended, is incorporated
into this Agreement by reference, as if it was fully set out herein. Developer agrees to comply with all
provisions of the CFA Ordinance in the performance of Developer's duties and obligations pursuant to this
Agreement and to cause all contractors hired by Developer to comply with the CFA Ordinance in
connection with the work performed by the contractors. If a conflict exists between the terms and conditions
of this Agreement and the CFA Ordinance, the CFA Ordinance shall control.
City of Fort Worth, Texas Page 2 of 16
Standard Community Facilities Agreement
Rev. 9/21
2.
Incorporation of Engineering Plans
The engineering plans for the Improvements that have been approved by the City ("Engineering
Plans") are incorporated into this Agreement by reference as if fully set out herein. Developer shall provide
at its expense, unless otherwise agreed to by City, all engineering drawings and documents necessary to
construct the Improvements required by this Agreement.
3.
Description of Improvements; Exhibits and Attachments
The following exhibits describe the general location, nature and extent of the Improvements that
are the subject of this Agreement and are attached hereto and incorporated herein by reference:
E
Exhibit A: Water
E
Exhibit Al: Sewer
E
Exhibit B: Paving
E
Exhibit B 1: Storm Drain
E
Exhibit C: Street Lights & Signs
The Location Map and Cost Estimates are also attached hereto and incorporated herein by
reference. To the extent that Exhibits A, Al, B, B1, C, the Location Map, or the Cost Estimates conflict
with the Engineering Plans, the Engineering Plans shall control. If applicable, Attachment 1 — Changes
to Standard Community Facilities Agreement, Attachment 2 — Phased CFA Provisions, and Attachment
3 — Concurrent CFA Provisions, are attached hereto and incorporated herein for all purposes.
4.
Construction of Improvements
Developer agrees to cause the construction of the Improvements contemplated by this Agreement
and that said construction shall be completed in a good and workmanlike manner and in accordance with
all City standards and specifications, the Engineering Plans, the Cost Estimates provided for the
Improvements, and this Agreement. Developer acknowledges that City will not accept the Improvements
until the City receives affidavits and lien releases signed by Developer's contractors verifying that the
contractors, and all subcontractors and material suppliers, have been paid in full for constructing the
Improvements, and consent of the surety on payment and performance bonds provided for the
Improvements.
5.
Financial Guarantee
Developer has provided the City with a financial guarantee in the form and amounts set forth in
this Agreement which guarantees the construction of the Improvements and payment by Developer of
all contractors, subcontractors, and material suppliers for the Improvements ("Financial Guarantee").
Developer shall keep the Financial Guarantee in full force and effect until released by the City and shall
not reduce the amount of the Financial Guarantee unless authorized by the City in accordance with the
CFA Ordinance. City agrees that: (1) upon completion of the construction of the Improvements located
outside the boundaries of the plat for which Developer has provided a cash escrow as the financial
guarantee ("Off -Site Improvements"); (2) verification from the City's inspectors that the Off -Site
City of Fort Worth, Texas Page 3 of 16
Standard Community Facilities Agreement
Rev. 9/21
Improvements are complete; and (3) delivery of an affidavit and unconditional lien releases from
Developer's contractors for the Off -site Improvements, Developer shall be entitled to a reduction in the
financial guarantee for the CFA in the form of the City refunding to the Developer the cash deposits
provided as the financial guarantee for the Off -Site Improvements.
6.
Completion Deadline; Extension Periods
This Agreement shall be effective on the date this Agreement is executed by the City's Assistant
City Manager ("Effective Date"). Developer shall complete construction of the Improvements and
obtain the City's acceptance of the Improvements within two (2) years of the Effective Date ("Term").
If construction of the Improvements has started during the Term, the Developer may request that this
Agreement be extended for an additional period of time ("Extension Period"). All Extension Periods shall
be agreed to in writing by the City and the Developer as set forth in a written amendment to this Agreement.
In no event shall the Term of this Agreement plus any Extension Periods be for more than three years.
7.
Failure to Construct the Improvements
(a) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements if at the end of the Term, and any Extension Periods, the
Improvements have not been completed and accepted by the City.
(b) The City may utilize the Developer's Financial Guarantee to cause the completion of the
construction of the Improvements or to cause the payment of costs for construction of the
Improvements before the expiration of the Term, and any Extension Period, if the Developer
breaches this Agreement, becomes insolvent, or fails to pay costs of construction.
(c) If the Financial Guarantee is a Completion Agreement and the Developer's contractors or suppliers
are not paid for construction costs or materials supplied for the Improvements the contractors and
suppliers may place a lien upon any property which the City does not have an ownership interest
that is the subject of the Completion Agreement.
(d) Nothing contained herein is intended to limit the Developer's obligations under the CFA
Ordinance, this Agreement, the Financial Guarantee, Developer's agreements with Developer's
contractors, or other related agreements.
8.
Termination
If Developer desires to terminate this Agreement before Developer's contractors begin
constructing the Improvements, Developer agrees to the following:
(a) that Developer and City must execute a termination of this Agreement in writing;
(b) that Developer will vacate any final plats that have been filed with the county where the Project
is located; and
(c) to pay to the City all costs incurred by the City in connection with this Agreement, including
time spent by the City's inspectors at preconstruction meetings.
City of Fort Worth, Texas Page 4 of 16
Standard Community Facilities Agreement
Rev. 9/21
9.
Award of Construction Contracts
(a) Developer will award all contracts for the construction of the Improvements and cause the
Improvements to be constructed in accordance with the CFA Ordinance.
(b) Developer will employ construction contractors who meet the requirements of the City to construct
the Improvements including, but not limited, to being prequalified, insured, licensed and bonded to
construct the Improvements in the City.
(c) Developer will require Developer's contractors to provide the City with payment and performance
bonds naming the City and the Developer as dual obligees, in the amount of one hundred percent
(100%) of the cost of the Improvements as required by the CFA Ordinance. The payment and
performance bonds shall guarantee construction of the Improvements and payment of all
subcontractors and material suppliers. Developer agrees to require Developer's contractors to
provide the City with a maintenance bond naming the City as an obligee, in the amount of one
hundred percent (100%) of the cost of the Improvements, that guarantees correction of defects in
materials and workmanship for the Improvements by the contractor and surety for a period of two
(2) years after completion and final acceptance of the Improvements by the City. All bonds must
be provided to the City before construction begins and must meet the requirements of the City's
Standard Conditions, Chapter 2253 of the Texas Government Code, and the Texas Insurance Code.
(d) Developer will require Developer's contractors to provide the City with insurance equal to or in
excess of the amounts required by the City's standard specifications and contract documents for
developer -awarded infrastructure construction contracts. The City must be named as an additional
insured on all insurance policies. The Developer must provide the City with a Certificate of
Insurance (ACORD or form approved by the State of Texas), supplied by each contractor's
insurance provider, which shall be made a part of the Project Manual.
(e) Developer will require the Developer's contractors to give forty-eight (48) hours' advance notice
of their intent to commence construction of the Improvements to the City's Construction Services
Division so that City inspection personnel will be available. Developer will require Developer's
contractors to allow construction of the Improvements to be subject to inspection at any and all
times by the City's inspectors. Developer will require Developer's contractors to not install or
relocate any sanitary sewer, storm drain, or water pipe unless a City inspector is present and gives
consent to proceed, and to allow such laboratory tests as may be required by the City.
(f) Developer will not allow Developer's contractors to begin construction of the Improvements until
a notice to proceed to construction is issued by the City.
(g) Developer will not allow Developer's contractors to connect buildings to service lines of sewer and
water mains constructed pursuant to this Agreement, if any, until said sewer, water mains and
service lines have been completed to the satisfaction of the City.
10.
Utilities
Developer shall cause the installation or adjustment of utilities required to: (1) serve the Project;
and (2) to construct the Improvements required herein. City shall not be responsible for payment of any
City of Fort Worth, Texas Page 5 of 16
Standard Community Facilities Agreement
Rev. 9/21
costs that may be incurred by Developer in the relocation of any utilities that are or may be in conflict with
any of the Improvements to be constructed pursuant to this Agreement.
11.
Easements and Rights -of -Way
Developer agrees to provide, at its expense, all necessary rights -of -way and easements required for
the construction and dedication to the City of the Improvements provided for by this Agreement.
12.
Liability and Indemnification
(a) DEVELOPER HEREBY RELEASES AND AGREES TO INDEMNIFY, DEFEND AND
HOLD THE CITY HARMLESS FOR ANY INADEQUACIES IN THE PRELIMINARY
PLANS, SPECIFICATIONS, ENGINEERING PLANS, AND COST ESTIMATES
SUPPLIED BY THE DEVELOPER FOR THIS AGREEMENT.
(b) THE DEVELOPER COVENANTS AND AGREES TO, AND BY THESE PRESENTS DOES
HEREBY FULLY INDEMNIFY, HOLD HARMLESS AND DEFEND THE CITY, ITS
OFFICERS, AGENTS AND EMPLOYEES FROM ALL SUITS, ACTIONS OR CLAIMS OF
ANY CHARACTER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ONACCOUNT
OFANYINJURIES OR DAMAGES SUSTAINED BYANYPERSONS, INCLUDINGDEATH,
OR TO ANY PROPERTY, RESULTING FROM OR IN CONNECTION WITH THE
CONSTRUCTION, DESIGN, PERFORMANCE OR COMPLETION OF ANY WORK TO BE
PERFORMED BY SAID DEVELOPER, ITS CONTRACTORS, SUBCONTRACTORS,
OFFICERS, AGENTS OR EMPLOYEES, OR IN CONSEQUENCE OF ANY FAILURE TO
PROPERLY SAFEGUARD THE WORK, OR ONACCOUNT OFANYACT, INTENTIONAL
OR OTHERWISE, NEGLECT OR MISCONDUCT OF SAID DEVELOPER, ITS
CONTRACTORS, SUB -CONTRACTORS, OFFICERS, AGENTS OR EMPLOYEES,
WHETHER OR NOT SUCHINJURIES, DEATH OR DAMAGESARE CAUSED, IN WHOLE
OR IN PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES.
(c) DEVELOPER WILL REQUIRE ITS CONTRACTORS TO INDEMNIFY, DEFEND AND
HOLD HARMLESS THE CITY, ITS OFFICERS, AGENTS AND EMPLOYEES FROM
AND AGAINST ANY AND ALL CLAIMS, SUITS OR CAUSES OF ACTION OF ANY
NATURE WHATSOEVER, WHETHER REAL OR ASSERTED, BROUGHT FOR OR ON
ACCOUNT OF ANY INJURIES OR DAMAGES TO PERSONS OR PROPERTY,
INCLUDING DEATH, RESULTING FROM, OR INANY WAY CONNECTED WITH, THE
CONSTRUCTION OF THE IMPROVEMENTS CONTEMPLATED HEREIN, WHETHER
OR NOT SUCH INJURIES, DEATH OR DAMAGES ARE CAUSED, IN WHOLE OR IN
PART, BY THE ALLEGED NEGLIGENCE OF THE CITY OF FORT WORTH, ITS
OFFICERS, SERVANTS, OR EMPLOYEES. FURTHER, DEVELOPER WILL REQUIRE
ITS CONTRACTORS TO INDEMNIFY, DEFEND, AND HOLD HARMLESS THE CITY
FOR ANY LOSSES, DAMAGES, COSTS OR EXPENSES SUFFERED BY THE CITY OR
CAUSED AS A RESULT OF SAID CONTRACTORS' FAILURE TO COMPLETE THE
WORK AND CONSTRUCT THE IMPROVEMENTS IN A GOOD AND WORKMANLIKE
MANNER, FREE FROM DEFECTS, IN CONFORMANCE WITH THE CFA ORDINANCE,
AND IN ACCORDANCE WITH ALL PLANS AND SPECIFICATIONS.
City of Fort Worth, Texas Page 6 of 16
Standard Community Facilities Agreement
Rev. 9/21
13.
Right to Enforce Contracts
Upon completion of all work associated with the construction of the Improvements, Developer will
assign to the City a non-exclusive right to enforce the contracts entered into by Developer with its
contractors, along with an assignment of all warranties given by the contractors, whether express or implied.
Further, Developer agrees that all contracts with any contractor shall include provisions granting to the City
the right to enforce such contracts as an express intended third party beneficiary of such contracts.
14.
Estimated Fees Paid by Developer; Reconciliation
Prior to execution of this Agreement, Developer has paid to the City the estimated cost of
administrative material testing service fees, construction inspection service fees, and water testing lab fees
in the amounts set forth in the Cost Summary section of this Agreement. Upon completion of the
construction of the Improvements, the City will reconcile the actual cost of administrative material testing
service fees, construction inspection service fees, and water testing lab fees with the estimated fees paid
by Developer. If the actual costs of the fees are more than the estimated payments made by the Developer,
the Developer must pay the difference to the City before the Improvements will be accepted by the City. If
the actual costs of the fees are less than the estimated payments made by the Developer, the City will refund
the difference to the Developer. If the difference between the actual costs and the estimated payments made
by the Developer is less than fifty dollars ($50.00), the City will not issue a refund and the Developer will
not be responsible for paying the difference. The financial guarantee will not be released by the City or
returned to the Developer until reconciliation has been completed by the City and any fees owed to the City
have been paid by the Developer.
15.
Material Testing
The City maintains a list of pre -approved material testing laboratories. The Developer must
contract with material testing laboratories on the City's list. Material testing laboratories will provide copies
of all test results directly to the City and the Developer. If the Improvements being constructed fail a test,
the Developer must correct or replace the Improvements until the Improvements pass all retests. The
Developer must pay the material testing laboratories directly for all material testing and retesting. The City
will obtain proof from the material testing laboratories that the material testing laboratories have been
paid in full by the Developer before the City will accept the Improvements.
16.
Notices
All notices required or permitted under this Agreement may be given to a party by hand -
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY:
Development Coordination Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
City of Fort Worth, Texas
Standard Community Facilities Agreement
Rev. 9/21
DEVELOPER:
Timothy Derek Carson
600 West 6th Street, Suite 300
Fort Worth, TX 76102
Page 7 of 16
With copies to:
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Or to such other address one party may hereafter designate by notice in writing addressed and
mailed or delivered to the other party hereto.
17.
Right to Audit
Developer agrees that, until the expiration of three (3) years after acceptance by the City of the
Improvements constructed pursuant to this Agreement, that the City shall have access to and the right to
examine any directly pertinent books, documents, papers and records of the Developer involving
transactions relating to this Agreement. Developer agrees that the City shall have access during normal
working hours to all necessary Developer facilities and shall be provided adequate and appropriate
workspace in order to conduct audits in compliance with the provisions of this section. The City shall give
Developer reasonable advance notice of intended audits.
Developer further agrees to include in all contracts with Developer's contractors for the
Improvements a provision to the effect that the contractor agrees that the City shall, until the expiration of
three (3) years after final payment under the contract, have access to and the right to examine any directly
pertinent books, documents, papers and records of such contractor, involving transactions to the contract,
and further, that City shall have access during normal working hours to all of the contractor's facilities, and
shall be provided adequate and appropriate work space in order to conduct audits in compliance with the
provisions of this section. City shall give Developer's contractors reasonable advance notice of intended
audits.
18.
Independent Contractor
It is expressly understood and agreed that Developer and its employees, representative, agents,
servants, officers, contractors, subcontractors, and volunteers shall operate as independent contractors as to
all rights and privileges and work performed under this Agreement, and not as agents, representatives or
employees of the City. Subject to and in accordance with the conditions and provisions of this Agreement,
Developer shall have the exclusive right to control the details of its operations and activities and be solely
responsible for the acts and omissions of its employees, representatives, agents, servants, officers,
contractors, subcontractors, and volunteers. Developer acknowledges that the doctrine of respondeat
City of Fort Worth, Texas Page 8 of 16
Standard Community Facilities Agreement
Rev. 9/21
superior shall not apply as between the City and its officers, representatives, agents, servants and
employees, and Developer and its employees, representatives, agents, servants, officers, contractors,
subcontractors, and volunteers. Developer further agrees that nothing herein shall be construed as the
creation of a partnership or joint enterprise between City and Developer. It is further understood that the
City shall in no way be considered a co -employer or a joint employer of Developer or any employees,
representatives, agents, servants, officers, contractors, subcontractors, and volunteers of Developer.
Neither Developer, nor any officers, agents, servants, employees or subcontractors of Developer shall be
entitled to any employment benefits from the City. Developer shall be responsible and liable for any and
all payment and reporting of taxes on behalf of itself, and any of employees, representatives, agents,
servants, officers, contractors, subcontractors, and volunteers.
The City, through its authorized representatives and employees, shall have the sole and exclusive
right to exercise jurisdiction and control over City employees.
19.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
20.
Non -Waiver
The failure of the City to insist upon the performance of any term or provision of this Agreement
or to exercise any right herein conferred shall not be construed as a waiver or relinquishment to any extent
of City's right to assert or rely on any such term or right on any future occasion.
21.
Governmental Powers and Immunities.
It is understood that by execution of this Agreement, the City does not waive or surrender
any of its governmental powers or immunities.
22.
Headings
The paragraph headings contained herein are for the convenience in reference and are not intended
to define or limit the scope of any provision of this Agreement.
23.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of the
remaining provisions hereof.
24.
Review of Counsel
City of Fort Worth, Texas Page 9 of 16
Standard Community Facilities Agreement
Rev. 9/21
City and Developer, and if they so choose, their attorneys, have had the opportunity to review
and comment on this document; therefore any rule of contract construction or interpretation that would
normally call for the document to be interpreted as against the drafting party shall not apply in
interpretation of this Agreement, and each section, portion, and provision of this Agreement shall be
construed solely on the basis of the language contained therein, regardless of who authored such
language.
25.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government Code.
To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this Agreement.
26.
Prohibition on Boycotting Energy Companies
Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code, as
added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2, the City is prohibited from entering into a contract for
goods or services that has a value of $100,000 or more that is to be paid wholly or partly from public funds
of the City with a company with 10 or more full-time employees unless the contract contains a written
verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott
energy companies during the term of the contract. The terms "boycott energy company" and "company"
have the meanings ascribed to those terms by Chapter 2274 of the Texas Government Code, as added by
Acts 2021, 87th Leg., R.S., S.B. 13, § 2. To the extent that Chapter 2274 of the Government Code is
applicable to this Agreement, by signing this Agreement, Developer certifies that Developer's signature
provides written verification to the City that Developer: (1) does not boycott energy companies; and (2)
will not boycott energy companies during the term of this Agreement.
27.
Prohibition on Discrimination Against Firearm and Ammunition Industries
Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1, the City is prohibited from entering
into a contract for goods or services that has a value of $100,000 or more that is to be paid wholly or partly
from public funds of the City with a company with 10 or more full-time employees unless the contract
contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate
during the term of the contract against a firearm entity or firearm trade association. The terms
"discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms
by Chapter 2274 of the Texas Government Code, as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1. To
the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this
Agreement, Developer certifies that Developer's signature provides written verification to the City that
City of Fort Worth, Texas Page 10 of 16
Standard Community Facilities Agreement
Rev. 9/21
Developer: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm
entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade
association during the term of this Agreement.
28.
Immigration and Nationality Act
Developer shall verify the identity and employment eligibility of its employees who perform work
under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon
request by City, Developer shall provide City with copies of all I-9 forms and supporting eligibility
documentation for each employee who performs work under this Agreement. Developer shall adhere to all
Federal and State laws as well as establish appropriate procedures and controls so that no services will be
performed by any Developer employee who is not legally eligible to perform such services. DEVELOPER
SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES,
LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY DEVELOPER,
DEVELOPER'SEMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written
notice to Developer, shall have the right to immediately terminate this Agreement for violations of this
provision by Developer.
29.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
30.
Assignment and Successors
Developer shall not assign or subcontract all or any part of its rights, privileges, or duties under this
Agreement without the prior written consent of City. Any attempted assignment or subcontract without the
City's prior written approval shall be void and constitute a breach of this Agreement.
31.
No Third -Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
32.
Compliance with Laws, Ordinances, Rules and Regulations
Developer, its officers, agents, servants, employees, and contractors, shall abide by and comply
with all laws, federal, state and local, including all ordinances, rules and regulations of City. It is agreed
and understood that, if City calls to the attention of Developer any such violation on the part of Developer
or any of its officers, agents, servants, employees, or subcontractors, then Developer shall immediately
desist from and correct such violation.
33.
City of Fort Worth, Texas Page 11 of 16
Standard Community Facilities Agreement
Rev. 9/21
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully entitled
to rely on this warranty and representation in entering into this Agreement.
34.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
35.
Entire Agreement
This written instrument, together with any attachments, exhibits, and appendices, constitutes the
entire understanding between the City and Developer concerning the work to be performed hereunder, and
any prior or contemporaneous, oral or written agreement that purports to vary from the terms hereof shall
be void.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth, Texas Page 12 of 16
Standard Community Facilities Agreement
Rev. 9/21
36.
Cost Summary Sheet
Project Name: Willard Trails
CFA No.: 21-0148 City Project No.: 103611 IPRC No.: 21-0101
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Estimated Construction Fees:
C. Construction Inspection Service Fee
D. Administrative Material Testing Service Fee
E. Water Testing Lab Fee
Total Estimated Construction Fees:
Financial Guarantee Ontions. choose one
Developer's Cost
$ 130,921.72
$ 59,279.51
$ 190,201.23
$
250,427.38
$
41,894.50
$
39,615.91
$
331,937.79
$ 522,139.02
$59,500.00
$1,813.00
$240.00
$ 61,553.00
Choice
Amount !Mark one)
Bond = 100%
Completion Agreement = 100% / Holds Plat
$ 465,278.41
X
Cash Escrow Water/Sanitary Sewer= 125%
$ 39,911.81
X
Cash Escrow Paving/Storm Drain = 125%
$ 31,163.95
X
Letter of Credit = 125%
Escrow Pledge Agreement = 125%
City of Fort Worth, Texas
Standard Community Facilities Agreement
Rev. 9/21
Page 13 of 16
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH
alga &W/
Dana Burghdoff (Fe 14, 202 0 :56 CST)
Dana Burghdoff
Assistant City Manager
Date: Feb 14, 2023
Recommended by:
Bichson Nguyen (Feb 14, 20 9:0 ST)
Dwayne Hollars/Bichson Nguyen
Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
4K-2,,
Richard A. McCracken (Feb 14, 2023 09:54 CST)
Richard A. McCracken
Sr. Assistant City Attorney
M&C No.
Date: Feb 14, 2023
Form 1295:
ATTEST:
A J&�
Jannette S. Goodall
City Secretary
�,o�obvpp��
ooF foRTad
d
per° oo
v°
oo
° o=A
°�cd
d
Pp� d uEa0000 o d
DEVELOPER
DernK Carson
Derek Carson (Feb 14, 2023 09:01 CST)
Timothy Derek Carson,
Owner
Date: Feb 14, 2023
Contract Compliance Manager:
By signing, I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Rebecca Diane Owen (Feb 14, 2023 09:37 CST)
Rebecca D. Owen
Development Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Page 14 of 16
Standard Community Facilities Agreement
Rev. 9/21
The following attachments are incorporated into this Agreement. To the extent a
conflict exists between the main body of this Agreement and the following attachments, the
language in the main body of this Agreement shall be controlling.
Included Attachment
❑X Attachment 1 - Changes to Standard Community Facilities Agreement
❑ Attachment 2 — Phased CFA Provisions
❑ Attachment 3 — Concurrent CFA Provisions
®
Location Map
®
Exhibit A: Water Improvements
®
Exhibit Al: Sewer Improvements
®
Exhibit B: Paving Improvements
®
Exhibit B 1: Storm Drain Improvements
®
Exhibit C: Street Lights and Signs Improvements
®
Cost Estimates
(Remainder of Page Intentionally Left Blank)
City of Fort Worth, Texas Page 15 of 16
Standard Community Facilities Agreement
Rev. 9/21
ATTACHMENT "I"
Changes to Standard Community Facilities Agreement
City Project No. 103611
Negotiated changes are contained in the body of the Agreement
City of Fort Worth, Texas Page 16 of 16
Standard Community Facilities Agreement
Rev. 9/21
MSEDALE ST
WRLARD RD
—
PROJECT LOCATION
ro
�
a
LAKE
ARLINGTON
EASTLAND ST
N
W ® E
S
0 1000 2000 4000
1 inch = 2000 ft.
LOCATION MAP
1 " = 2000'
WILLARD TRAILS
City Project No. 103611
MAPSCO NO. TAR-080S
CITY COUNCIL DISTRICT NO. 5
OWNER / DEVELOPER
Derek Carson
600 West 6th Street
Suite 300
Fort Worth, Texas 76102
Telephone: (817) 877-2850
LVSENGIPIARSNEERIN�
YINL
3575 Lone S-Circle. Suite— . orl Worth. T% 76177 • 972.622.00:
TBPENo P-2121 • TILIS --0-1 Do www.aplareeng.com
Tyler B.—, P. E. • ryler.Demenfaspiarsengineering com
Drawing: G:\2021 JOBS\21-059 6312 Willard\21-059 Wllard CFA-dwg Saved By: Tba—tt Save Tme: 1/7/2022 10:05:18 AM Plotted by: tbarnett Plot Date: 8/19/2022 2:56 PM
WILLARD ROAD
(EA5TM6)
—WA1ER PRO IMT N0. PW63-010530173M x-11919
9ETIM PROJECT Na x-21���
W — W W -V
KBORN JANES W. At KBORN GLENDA D.
LOT B, BLOCK 2
HANDIEY HEIGHTS SOUTH ADDITION
VOL 13914 PAGE 299
D.RT.C.T.
w w w
W — w MALLARD ROAD
m m a
Proposed FH r
Proposed V Water I
Serv. & Meter
NN1= R7011S
3RIR1 A9p901 1
I
I
Proposed V Water
Serv. & Meter
Proposed &' Water Main
\ /- Proposed FH
Proposed V Water
Serv. & Meter
W* E
1 50 100 200
1/
PART OF LOT 11, BLOCK 2
HANDLEY HEIGHTS SOUTH
1 I 2 1 3 1 1 4 1 51
E19IRt
O ADDUION
94-0047
0. 1P-0107
57-048024-00 X-1M90.3
94-013021-M X-10993-27013
tat19t 17R 1/R &' Water Main
HENGO POE (F.1uv 11w
1
24
I 21 22
I
I
LOT 10. BLOCK 2
HAWLEY HEIGHTS SOUTH
I
I
EXHIBIT A
City Project No. 103611
WATER IMPROVEMENTS
OWNER / DEVELOPER
Derek Carson
600 West 6th Street WILLARD LVSPIARS
Suite 300
Fort Worth, Texas 76102 TRAILS ss °nesar ENGINEERING1h,TX7URVEYING
Telephone: (817) 877-2850 TBPENOFz'z're' 003°°T.e,, 972.422.0077
Tyler narnaJJ.PE_ 'ryier earnett(�spiarsengineering.c°m
wing_ G_\2021 JOBS\21-059 6312 Wi11ard\21-059 Willard CFAdwg Saved By. Tbamett Save Time 1/7/2022 10.05.18 AM Plotted by: tbarnett Plot Date: 8/19/2022 2:55 PM
WILLARD ROAD
(EXISTING)
WATER PROJECT NO. PW63-06053017=30 X-11919
SEWER PROJECT NO. X-21
9LBORN JAPES W. & WILBORN GLENDA D. i
LOT a BLOCK 2
HANDLEY HEIGHTS SOUTH ADDITION
VOL 13866. PAGE 299
D.I T.C.T.
PART OF LOT 11, BLOCK 2
HANDLEY HEIGHTS SOUTH ,
W * E
,0 200
-WW—WW—
2
CPN 1440 _ WfILLAW ROAD
WW WW
2 3
L
II
LOT 9-A BUXK 2
HANDLEY HOM
SOUTH ADomoN
4 51
HENCO ADDITION
NO. 84-0047
FILE NO. W-0407
WATER PROJECT NO. 57-048024-00 X-102963
SEWER PROJECT NO. 54-013021-00 X-10293
X-27063
16R
20R IN18R 17R
Existing 8" Sewer
rn
_
5q_013021-00-
272
0_60 aL-6642�X'
,
II
24
23
Proposed 6' Sewer
I
PART OF LOT 11, BLOCK 2
HANDLEY HEIGHTS SOUTH
EXHIBIT Al
City Project No. 103611
SEWER IMPROVEMENTS
OWNER / DEVELOPER
Derek Carson
600 West 6th Street WILLARD
Suite 300
Fort Worth, Texas 76102 TRAILS
Telephone: (817) 877-2850
LOT 10, BLOCK 2
HANDLEY HEIGHTS SOUTH
SEWER LEGEND
BL Sewer Lne
Prop. Sewer Main
IVSIPIARSENGNEERIN�
YING
3575 Lone Star C"rcie. Suite a • x
Tyyll, Barna P.E. • tvo y barnetcQa sp g e g m
)rawing: G:\2021 JOBS\21-059 6312 Willard\21-059 Wllard CFAdwg Saved By: Jhuneycutt Save 7me: 1/7/2022 10:05:18 AM Plotted by: tbarnett Plot Date: 8/19/2022 2:44 PM
MLLARD ROAD
(EXISTING)
WATER PRO.ECT NO. PW53-OW530175530 X-11919
SEWER PROJECT NO, X-21383 S-16W )
NLBOIMI JAAES 13 11111.110111111 GLDDA D.
LOT 86 KOW 2 �� I
HAIDIEY HOWTS SOUTH ADD171011
VOL 139M PACE M
OAT.O.T.
I
I
PART OF LOT 11, mm 2
HANDLEY WEIGHTS SOUTH
N
W ® E
S
0 50 100 200
1 inch = 100ft.
MALLARD ROAD
9 I 1 2 3 4 5
I
10T 9-4 SM 2
911111M NO
SM ADO a
HENGO ADDITION
NO. 84-OD47
FILE NO. W-0407
WATER PROJECT NO. 87-04OD24-W X-102083
SEWER PROJECT NO, 54-013021-00 X-10263
X-27053
20R IOR I JOR 17R IOR
I 21
2W 13-8 Prop
Concrete Pavement
—W Public Drainage Eemt
I I
I I
� 1
PART OF LOT 11, ROM 2
HANDLEY WEIGHTS SOUTH
L
1
24
12n2
LOT 106 am 2
KAMM HEIGHTS SOUTH
5' Wide Conc, Sidewalk
6" Conc, Paving
EXHIBIT B
City Project No. 103611
PAVING IMPROVEMENTS
OWNER / DEVELOPER
Derek Carson
600 West 6th Street WILLARD LVSPIARS
Suite 300 ENGINEERING & SURVEYING
Fort Worth, Texas 76102 TRAILS ° ° x
Telephone: (817) 877-2850 > e°.°°,.PE
Ping_ G_\2021 JOBS\21-059 6312 Wi11ard\21-059 Willard CFAdwg Saved By Jhuneycutt Save Time: 1/7/2022 1005:18 AM Plotted by: tbamett Plot Date: 8/19/2022 2:41 PM
MLLARD ROAD
(E STING)
—W I R PROJECT N0. P053-011MM75M X-11YIY—
SEWER PROJECT Na X-21383 $-15555
�f
W U.W ROAD
� a
Q PropoeM 18" RCP
Drfv culvert I 1 2 3 4 5
CWAj/
WwAva�Er M
z mm A
z HENCO ADDITION
NO. 54-0047
O I FILE NO. W-0407
WATER PROJECT NO. 57-045024-M X-102063
SEWER PROJECT NO. 54-013021-00 X-10293
w X-27093
G1 MIR
W — � 201t 19R tSR 17R
a
O L
IMIJIM JA1ES W. a NIOM OLEMDA► 0. ; C4
LOT e, 111AM( 2 a
HANDLEY H MITS SMITH ADDITION I HgNCO DRIVE faemw)
VOL 130K PAGE 209
D.RT.C.L
I
BLOCK 1
I I '
I I U \
23 24
21 2/2
I
I
III �
III
I I i
I PropowA 21"
RCP Storm Pipe
I
30' Public Drainage E9mt
I
LOT 14 111 Mc 2
HANDLEY 11119011115 SOUTH
III I
5' ELECTRICAL EASEMENT
I D178081850 0
D.R.T.C.T. I I I
75' TEMPORARY CONSTRUCTION EASEMENT
0220203854 30' SANITARY
D.R.T.C.T. SEWER EASEMENT
D220203853
D.R.T.C.T.
10' UTLITY EASEMENT
014803250E / I 30' SANITARY SEWER
P.R.T.CT. -------- EASEMENT AS IT APPEARS
ON CITY ASBUILTS X-18017
I I I (NO DOCUMENT FOUND)
- - - - - - - - - - - - - - - - ------------_ — ---- -- - ---------- — -- - - - - - -
---PART OF LOT 11, K= 2------ ----------- PART OF LOT 11, M= 2•--------- --------------------------
HANDLEY HEIGHTS SMITH HANDLEY HIM SMITH
------------------------------------------------------ --------
EXHIBIT B 1
W ® E City Project No. 103611
STORM DRAIN IMPROVEMENTS
S OWNER / DEVELOPER
Derek Carson
0 50 100 200
600 West 6th Street WILLARD LVSPIARS
Suite 300 ENGINEERING & SURVEYING
Fort Worth, Texas 76102 TRAILS e6 Fla`.=�.rx..1 • '..22°°••
Telephone: (817) 877-2850 sra"s"° ` °1° b., '
1 inch = 100ft. > a°.°°n'PE ' 'ry�°.e°.n°�,�=p s 9° 9 m
)rowing_ G_\2021 JOBS\21-059 6312 Wi11ard\21-059 Willard CFAdwg Saved By Jhuneycutt Save Time: 1/7/2022 1005:18 AM Plotted by: tbarnett Plot Date: 8/19/2022 2:42 PM
WILLARD ROAD
(EX15T1NG)
WATER PROJECT NO. PW53-060530175530 X-11019 /ter
SEWER PROJECT NO. X-21383 SAWN
WORN JAMES 1L R WORN GLENDA D.
LOT 8, BLOCK 2
HANDLEY HMO SOUTH ADDITION
VOL 136K PAGE 299
D.RTC.T. .
WIU.A" ROAD
1 2 3 4 5
LOT M BISOI 2
A
HENCO ADDITION
N0. N-OW7
FILE NO. W-0407
WA-ZZ
PROJECTN0. 57-W5024-M X-102053
SEPROJECT NO. 54-013021-M X-10293
X-27083
20IR 18R 17R ,�
HENCO DRIVE (munNo
I.BLOCK 1
I
I
PART OF LOT 11, BLOCK 2 PART OF LOT 11, BLOCK 2
HANDLEY HEIGHTS SOUTH HANDLEY HEIGHTS SOUTH
N EXHIBIT C
City Project No. 103611
W ® E STREET LIGHTS & SIGN IMPROVEMENTS
S OWNER / DEVELOPER
Derek Carson
I 21
d22
23 24
I
I
I
LEGEND
APROPOSED STREET NAME SIGNS
OPROPOSED STREET LIGHTS
0 50 100 200 600 West 6th Street WILLARD LVSPIARS
Suite 300
Fort Worth, Texas 76102 TRAILS 35 ENGINEERING TXSURVEYING
5 spa B,ar G 1434 . n G ,
Telephone: (817) 877-2850 Ty-B—a-a No-m043mo
Tyler Barnett, P.E. • ryler barnen@sp
1 inch = 100ft. = 9 a 9
,wing: G_\2021 JOBS\21-059 6312 Willard\21-059 Willard CFA.dwg Saved By Jh... y-tt Save Time_ 1/7/2022 1005:18 AM Plotted by: tbarnett Plot Date: 8/19/2022 2:42 PM
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 1 of 7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Item No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT I: WATER IMPROVEMENTS INSIDE ROW
1
3305.0109 Trench Safety
3311.0241 8" Water Pipe
3312.0117 Connection to Existing 4"-12" Water Main
3312.3003 8" Gate Valve
3201.0111 4' Wide Asphalt Pvmt Repair, Residential
33 05 10
LF
36
$0.25
$9.00
2
33 11 10,33 11
LF
36
$83.82
$2,817.70
3
33 12 25
EA
2
$9,615.00
$19,230.00
4
33 12 20
EA
2
$1,980.00
$3,960.00
5
3201 17
LF
25
$40.001
$1,000.00
6
10241.1100 Remove Asphalt Pvmt
10241 15
SY
11.1
$90.00
$1,000.00
7
TOTAL UNIT I: WATER
IMPROVEMENTS INSIDE RO
$28,016.70
UNIT I: WATER IMPROVEMENTS OUTSIDE ROW
1
3305.0109 Trench Safety
33 05 10
3311 11
33 11 10, 33
LF
758
$0.25
$189.50
2
3311.0001 Ductile Iron Water Fittings w/ Restraint
3311.0241 8" Water Pipe
3312.0001 Fire Hydrant
LS
1
$2,400.00
$2,400.00
3
LF
758
$83.82
$63,539.27
4
33 12 40
EA
2
$6,210.00
$12,420.00
5
3312.2003 1" Water Service
33 12 10
EA
4
$2,890.00
$11,560.00
6
3312.3003 8" Gate Valve
3471.0001 Traffic Control
3305.0003 8" Waterline Lowering
0241.1514 Salvage 2" Water Meter
33 12 20
EA
2
$1,980.00
$3,960.00
7
3471 13
MO
1
$4,000.00
$4,000.00
8
33 05 12
EA
1
$3,876.25
$3,876.25
9
0241 14
EA
1
$760.00
$760.00
10
TOTAL UNIT I: WATER
IMPROVEMENTS
OUTSIDE RO
$102,705.02
1
2
3
4
5
6
7
8
9
10
11
12
13
_
14
TOTAL
UNIT I: WATER IMPROVEMENT
$130,721.72
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
Bid Proposal - Willard Trails
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 2 of 7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Item No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT III: SANITARY SEWER IMPROVEMENTS
INSIDE ROW
1
3301.0002 Post -CCTV Inspection
3305.0109 Trench Safety
3331.4115 8" Sewer Pipe
3201.0614 Conc Pvmt Repair, Residential
9999.0001 Connect to Sewer Main
33 0j31
LF
13
$9.50
$123.50
2
330
LF
13
$0.25
$3.25
3
33113120
LF
13
$62.00
$806.00
4
32 0
SY
5
1
$40.00
$200.00
5
EA
$2,780.001
$2,780.00
6
TOTAL UNIT III: SANITARY SEWER IMPROVEMENTS
INSIDE RO
$3,912.75
UNIT III: SANITARY SEWER IMPROVEMENTS
OUTSIDE
ROW
1
0241.2011 Remove 4" Sewer Line
3301.0002 Post -CCTV Inspection
3301.0101 Manhole Vacuum Testing
3305.0109 Trench Safety
3331.3101 4" Sewer Service
3331.4115 8" Sewer Pipe
3339.0001 Epoxy Manhole Liner
3339.1001 4' Manhole
0241 14
33 01 31
LF
40
$49.93
$1,997.00
2
LF
368
$9.50
$3,496.00
3
3301 30
EA
3
$174.87
$524.61
4
33 05 10
LF
368
$0.25
$92.00
5
3331 50
EA
4
$1,103.74
$4,414.95
6
331110,333120
LF
312
$62.00
$19,344.00
7
33 39 60
VF
19
$207.80
$3,948.20
8
9
333910, 333920
EA
3
$7,250.00
$21,750.00
TOTAL UNIT III: SANITARY SEWER
IMPROVEMENTS
OUTSIDE
RO
$55,566.76
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
TOTAL UNIT III: SANITARY SEWER IMPROVEMENT
$59,479.51
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
Bid Proposal - Willard Trails
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 3 of 7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Item No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT IV: DRAINAGE IMPROVEMENTS
INSIDE
ROW
1
3137.0104 Medium Stone Riprap, dry
3341.0202 18" RCP, Class IV
3349.2002 18" Parallel Headwall, 1 pipe
31 3700
SY
18
$229.00
$4,122.00
2
3341 10
LF
55
$85.00
$4,675.00
3
33 49 40
EA
2
$2,860.00
$5,720.00
4
TOTAL UNIT IV: DRAINAGE
IMPROVEMENTS
INSIDE RO
$14,517.00
UNIT IV: DRAINAGE IMPROVEMENTS
OUTSIDE
ROW
1
3137.0104 Medium Stone Riprap, dry
3341.0201 21" RCP, Class III
3349.3002 21"Straight Headwall, 1 pipe
3349.5001 15' Curb Inlet
3305.0109 Trench Safety
31 3700
SY
43
22
$229.00
$92.00
$9,847.00
$2,024.00
2
3341 10
LF
3
4
33 49 40
EA
1
$2,860.00
$2,860.00
33 49 20
EA
1
$12,300.00
$12,300.00
5
33 05 10
LF
77
$4.50
$346.50
6
TOTAL UNIT IV: DRAINAGE
IMPROVEMENTS
OUTSIDE RO
$27,377.50
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
TOTAL UNIT
IV: DRAINAGE IMPIROVLEMENTO
$41,894.50
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
Bid Proposal - Willard Trails
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 4 of 7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Item No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT VI: PAVING IMPROVEMENTS INSIDE
ROW
1
3211.0400 Hydrated Lime
3211.0501 6" Lime Treatment
3211 29
TN
1
$154.15
$154.15
2
3211 29
SY
77
$2.92
$224.84
3
3213.0101 6" Conc Pvmt
3471.0001 Traffic Control
32 13 13
SY
77
$32.45
$2,498.65
4
3471 13
MO
2
$3,768.26
$7,536.52
5
TOTAL UNIT VI: PAVING
IMPROVEMENTS INSIDE RO
$10,414.16
UNIT VI: PAVING IMPROVEMENTS
OUTSIDE
ROW
1
3211.0400 Hydrated Lime
3211.0501 6" Lime Treatment
3213.0101 6" Conc Pvmt
3213.0301 4" Conc Sidewalk
3291.0100 Topsoil
3211 29
3211 29
TN
29
$154.15
$4,470.35
2
SY
1886
$2.92
$5,507.12
3
32 13 13
SY
1886
$32.45
$61,200.70
4
32 13 20
SF
1699
$5.41
$9,191.59
5
3291 19
SY
6080
$22.66
$137,772.80
6
3292.0100 Block Sod Placement
32 92 13
SY
1130
$5.85
$6,610.50
7
3292.0400 Seeding, Hydromulch
32 92 13
SY
4950
$3.00
$14,850.00
8
3441.4003 Furnish/Install Alum Sign Ground Mount
34 41 30
EA
1
$410.16
$410.16
9
TOTAL UNIT VI: PAVING IMPROVEMENTS
OUTSIDE RO
$240,013.22
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
TOTAL UNIT VI: PAVING IMPROVEMENTS
OUTSIDE RO
$250,427.38
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
Bid Proposal - Willard Trails
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 5 of 7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Item No.
Description
Specification
Section No.
Unit of
Measure
Bid
Quantity
Unit Price
Bid Value
UNIT VIII: STREET LIGHTING
IMPROVEMENTS
1
2605.3118 Furnish/Install Conduit -Schedule 80 PVC 2
26 05 33
LF
606
$28.41
$17,216.46
2
3441.1408 NO 6 Insulated Elec Condr
3441 10
LF
606
$4.35
$2,636.10
3
3441.1501 Ground Box Type B
3441 10
EA
3
$401.13
$1,203.39
4
3441.1638 Install Type 33 B Arm
34 41 20
EA
3
$654.33
$1,962.99
5
3441.3050 Furnish/Install LED Lighting Fixture (70 watt
3441 20
EA
3
$457.46
$1,372.38
6
3441.3301 Rdwy Ilium Foundation TY 1,2, and 4
34 41 20
EA
3
$1,031.09
$3,093.27
7
3441.3351 Furnish/Install Rdway Ilium TY 11 Pole
34 41 20
EA
3
$2,210.44
$6,631.32
11
3441.1771 Furnish/Install 120-240 Volt Single Phase
3441 20
EA
1
$5,500.00
$5,500.00
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
TOTAL UNIT VIII: STREET
LIGHTING
IMPROVEMENTS
$39,615.91
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
Bid Proposal - Willard Trails
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP- RID PROPOSAI.
Page 6of7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Description
Specification
Unit of
Bid
Unit Price
Bid Value
Item No.
Section No.
Measure
Quantity
UNIT VIII: TRAFFIC SIGNAL IMPROVEMENTS
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
Bid Proposal - Willard Trails
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
00 42 43
DAP - BID PROPOSAL
Page 7 of 7
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
Specification
Unit of
Bid
Item No.
Description
Section No.
Measure
Quantity
Unit Price
Bid Value
Bid Summary
UNIT I: WATER IMPROVEMENTS INSIDE ROW
$28,016.70
UNIT I: WATER IMPROVEMENTS OUTSIDE ROW
$102,705.02
UNIT III: SANITARY SEWER IMPROVEMENTS INSIDE ROW
$3,912.75
UNIT III: SANITARY SEWER IMPROVEMENTS OUTSIDE ROW
$55,566.76
UNIT IV: DRAINAGE IMPROVEMENTS INSIDE ROW
$14,517.00
UNIT IV: DRAINAGE IMPROVEMENTS OUTSIDE ROW
$27,377.50
UNIT VI: PAVING IMPROVEMENTS INSIDE ROW
$10,414.161
UNIT VI: PAVING IMPROVEMENTS OUTSIDE ROW
$240,013.22
UNIT Vill: STREET LIGHTING IMPROVEMENTS
$39,615.91
Total Construction Bid
$522,139.02
This Bid is submitted by the entity named below:
BIDDER:
DIG Contracting
2800 Yeager St
Fort Worth, TX 76112
Contractor agrees to complete WORK for FINAL ACCEPTANCE within
CONTRACT commences to run as provided in the General Conditions.
BY: Dante Williams
"71ti: k;&=
TITLE: Owner
DATE: 1/23/2023
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version May 22, 2019
120 working days after the date when the
Bid Proposal - Willard Trails
COMPLETION AGREEMENT — SELF FUNDED
This Completion Agreement ("Agreement"), is made and entered into by and between the
City of Fort Worth, ("City") and Timothy Derek Carson, an individual ("Developer"), effective as
of the last date executed by a Party hereto. The City and the Developer may collectively be called
the "Parties".
WITNESSETH:
WHEREAS, the Developer owns that certain tract of real property that contains
approximately 4.44 acres of land located in the City, the legal description of which tract of real
property is marked Exhibit "A" — Legal Description, attached hereto and incorporated herein for
all purposes, ("Property"); and
WHEREAS, the Developer intends to develop the Property as an addition to the City
through plat PP-21-042; and
WHEREAS, the Developer and the City have entered into a Community Facilities
Agreement relating to the development, Willard Trails for Water, Sewer, Storm Drain, Paving and
Street Lights ("Improvements"); and
WHEREAS, the City has required certain assurances that the Developer will cause to be
constructed to City standards the Improvements pursuant to the Community Facilities Agreement;
and
WHEREAS, the Parties desire to set forth the terms and conditions of such
accommodations as are described above.
NOW, THEREFORE, for and in consideration of the mutual covenants and agreements
hereinafter set forth, it is hereby agreed by and between City and Developer as follows:
1. Recitals. The foregoing recitals are true, correct and complete and constitute the basis for
this Agreement and they are incorporated into this Agreement for all purposes.
2. The Completion Amount. The City and the Developer agree that the Hard Costs (as shown
on Exhibit `B") required to complete the On -Site Community Facilities in the aggregate
should not exceed the sum of four hundred sixty-five thousand two hundred seven -eight
dollars and forty-one cents ($465,278.41), hereinafter called the "Completion Amount".
Notwithstanding the foregoing, it is acknowledged that the actual costs of completion of
City of Fort Worth, Texas
Standard Completion Agreement — Self -Funded Revised 08.18.2022 DH
CFA Official Release Date: 07.01.2015
Page 1 of 9
the On -Site Community Facilities may vary as a result of change orders agreed to by the
Parties, but such variances for the purposes of this Agreement shall not affect the
Completion Amount as used herein. City hereby waives the requirement for developer to
deposit a financial guarantee of 100% of the Hard Costs under the CFA Policy.
3. Completion by the Developer. The Developer agrees to complete the Community Facilities
and pay all Hard Costs in accordance with City standards, the CFA, the Plat, and the Plans
as approved by the City. For the purposes of this Agreement, the development of the
Property shall be deemed complete upon acceptance by the City of the Community
Facilities pursuant to Section 6, hereof.
4. Satisfaction of the City Requirements. The City agrees that the assurances and covenants
contained in this Agreement satisfy all requirements of the City with respect to Developer's
Financial Guarantee, as described in the CFA Policy, or other requirements for security in
connection with the development of the Property and the completion of the On -Site
Community Facilities that are contained in the CFA or in any other agreement relating
thereto, and the City hereby accepts the assurances and covenants contained herein in lieu
thereof. To the extent the CFA irreconcilably conflicts with this Agreement, the provisions
of this Agreement shall control.
5. Termination. This Agreement shall terminate upon the earlier to occur of the following:
(a) acceptance by the City of the Community Facilities; or (b) mutual written agreement of
the Parties.
6. Final Plat. The Parties acknowledge and agree that the City shall hold the final plat of the
Property until the Community Facilities are completed and accepted by the City and all
Hard Costs contractors have been paid, less retainage. Upon acceptance by the City and
receipt of evidence from the Developer showing that all Hard Costs contractors have been
paid, including but not necessarily limited to lien waivers and bills paid affidavits, the City
shall within a reasonable time file the final plat for the Property in the Plat Records of the
county where the Property is located. The purpose of the City retaining the final plat of
the Property as provided herein is to guarantee the Developer's obligations under the CFA
are completed.
City of Fort Worth, Texas
Standard Completion Agreement — Self -Funded Revised 08.18.2022 DH
CFA Official Release Date: 07.01.2015
Page 2 of 9
7. Construction Contracts. Developer agrees to include in each Construction contract that it
enters into for the completion of the Community Facilities the following:
A. A statement that the City is not holding any security to guarantee any payment for work
performed on the Community Facilities;
B. A statement that the Property is private property and that same may be subject to
mechanic's and materialman's liens;
C. A requirement that each contractor contracting with the Developer release the City
from any claim that is related to the Property; and
D. A requirement that each contractor contracting with the Developer include in each
subcontract the statements contained in (a), (b) and (c) above.
8. Miscellaneous.
A. Non -Assignment of Agreement. This Agreement may not be assigned by any of the
Parties without the prior written consent of all the other Parties.
B. Notice. Any notice required or permitted to be delivered under this Agreement shall
be deemed received on actual receipt by the appropriate party at the following
addresses:
(i) Notice to the City shall be addressed and delivered as follows:
City of Fort Worth
Planning & Development Department
200 Texas Street
Fort Worth, Texas 76102
Attention: CFA Division
Rebecca Owen, Development Manager
Email: Rebecca. Owen (d),fortworthtexas. gov
Confirmation Number: 817-392-7810
and/or
CFA Division
Email: CFAkfortworthtexas.gov
Confirmation Number: 817-392-2025
With a copy thereof addressed and delivered as follows:
City of Fort Worth, Texas
Standard Completion Agreement — Self -Funded Revised 08.18.2022 DH
CFA Official Release Date: 07.01.2015
Page 3 of 9
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Attention: Richard A. McCracken
Sr. Assistant City Attorney
Confirmation Number: 817-392-7611
(ii) Notice to the Developer shall be addressed and delivered as follows:
Derek Carson
600 West 6th Street, Suite 300
Fort Worth, TX 76102
A party may change its address for notice upon prior written notice to the other parties
pursuant to the terms hereof.
C. Texas Law to Apply. This Agreement shall be construed under and in accordance with
the laws of the State of Texas.
D. Parties Bound. This Agreement shall be binding upon and inure to the benefit of the
Parties and their respective legal representatives, successors and assigns.
E. Legal Construction. In case any one or more of the provisions contained in this
Agreement shall for any reason is held to be invalid, illegal, or unenforceable in any
respect, such invalidity, illegality, or unenforceability shall not affect any other
provision of this Agreement, and this Agreement shall be construed as if such invalid,
illegal, or unenforceable provision had never been contained in this Agreement.
F. Prior Agreements Superseded. This Agreement constitutes the sole and only agreement
of the Parties with respect to the subject matter hereof and supersedes any prior
understandings or written or oral agreements among the Parties concerning the subject
matter hereof.
G. Amendment. This Agreement may only be amended by a written instrument executed
by all of the Parties to this Agreement.
H. Headings. The headings that are used in this Agreement are used for reference and
convenience purposes only and do not constitute substantive matters to be considered
in construing the terms and provisions of this Agreement.
City of Fort Worth, Texas
Standard Completion Agreement — Self -Funded Revised 08.18.2022 DH
CFA Official Release Date: 07.01.2015
Page 4 of 9
Executed in each entity's respective name by its duly authorized signatories effective as of the
date executed by the City's City Manager or his/her designee.
CITY OF FORT WORTH:
Dana Burghdoff (Fe 14, 2023rA56 CST)
Dana Burghdoff
Assistant City Manager
Date: Feb 14, 2023
Approved as to Form & Legality:
Richard A. McCracken (Feb 14, 2023 09:54 CST)
Richard A. McCracken
Senior Assistant City Attorney
M&C:
Date: Feb 14, 2023
ATTEST:
Jannette Goodall
City Secretary
DEVELOPER:
Derek Carson
Derek Carson (Feb 14, 2023 09:01 CST)
Timothy Derek Carson,
Owner
Date: Feb 14, 2023
City of Fort Worth, Texas
Standard Completion Agreement — Self -Funded Revised 08.18.2022 DH
CFA Official Release Date: 07.01.2015
Page 5 of 9
LIST OF EXHIBITS
ATTACHMENT "1 "- CHANGES TO STANDARD AGREEMENT
EXHIBIT A - LEGAL DESCRIPTION
EXHIBIT B - APPROVED BUDGET
City of Fort Worth, Texas
Standard Completion Agreement — Self -Funded Revised 08.18.2022 DH
CFA Official Release Date: 07.01.2015
Page 6 of 9
ATTACHMENT "1"
Changes to Standard Agreement
Self -Funded Completion Agreement
None.
City of Fort Worth, Texas
Standard Completion Agreement — Self -Funded Revised 08.18.2022 DH
CFA Official Release Date: 07.01.2015
Page 7 of 9
D221060556
EXHIBIT A
LEGAL DESCRIPTION
GF# 6000182000733
EXHIBIT "A"
LEGAL DESCRIPTION
BEING a portion of Lot 9, Block 2 of the Handley Heights South Addition situated in Tarrant County, Texas
as described in the dead to Community Missionary Baptist Church, recorded in Instrument Number
D20533.1251 of the Deed Records of Tarrant County, Texas (D.R.T.C.T.) and being a portion of Lot 9,
Block 2 as noted in Volume 388-11), Page 199 of the Plat Records of Tarrant County, Texas (P.R.T.C.T.)
and more particularly described by metes and bounds as follows:
BEGINNING at a 5/8" iron rod set with plastic cap stamped "DEOTTE 4673" for the northwest corner of
said portion of Lot 9, and the northeast comer of Lot 8, Block 2 of said Handley Heights South Addition,
also being in the south line of Willard Road (a 60' right and from which a 114" iron rod bears S
69"27'35" W, a distance of 310.96 feet, and also from which a 5/8" iron rod found bears N 89"27'36" E, a
distance of 362.53 feet.
THENCE N89"27'36" E, along the common line of said portion of Lot 9, and Willard Road, a distance of
201.00 feet to a 5/8" Iron rod set with plastic cap stamped "DECTTE 4673';
THENCE S 00"25'47" E, departing the common line of said portion of Lot 9, and Willard Road and along
an east line of said portion of Lot 9, and the west line of Lot 9-A, Block 2 Handley Heights South Addition
as described in 0178001194 (P.R.T.C.T.), a distance of 221.26 feet to a 518" iron rod set with plastic cap
stamped "DECTTE 4673';
THENCE N 89" 3507" E. along the South line of said Lot 9-A and In a north line of said portion of Lot 9, a
distance of 11C.0C feet to a 518" iron rod set with plastic cap stamped "DEOTTE 4673" in the common line
of said portion of Lot 9, and the west line of the Hence Addition as described in D185027064 (P,R,T.C.T.);
THENCE S 00°26'46" E, along the common line of said portion of Lot 9, and the west line of said Henco
Addition, a distance of 479.00 feet to a 518" iron rod setwiih plastic cap stamped "DEOTTE 4673";
THENCE S 69'33'14" W. along the common line of said portion of Lot 9, and a part of Lot 11, Block 2
Handley Heights Addition as described in D210205134 (D.R.T,C.T.), a distance of 311.00 feet to a 518"
iron rod set with plastic cap stamped "DECTTE 4673";
THENCE N 00°26'46" W, along the common line of said portion of Lot 9, and Lot 8, a distance of 700,00
feet to the POINT OF BEGINNING and containing 193,426 square feet or 4.44 acres, more or less.
NOTE: COMPANY DCES NOT REPRESENT THAT THE ABOVE ACREAGE ANWOR SQUARE
FOOTAGE CALCULATIONS ARE CORRECT.
AT22_1,11-0281706 Page 3 of
Page 3 of 6
City of Fort Worth, Texas
Standard Completion Agreement — Self -Funded Revised 08.18.2022 DH
CFA Official Release Date: 07.01.2015
Page 8 of 9
Section I
Water
Sewer
Sub -total
Section II
Interior Streets
Storm Drains
Sub -total
Section III
Street Lights
Sub -total
TOTAL
EXHIBIT B
APPROVED BUDGET
$102,905.02
$55,366.76
$158,271.78
$240,013.22
$27,377.50
$267,390.72
$39,615.91
$39,615.91
$465,278.41
City of Fort Worth, Texas
Standard Completion Agreement — Self -Funded Revised 08.18.2022 DH
CFA Official Release Date: 07.01.2015
Page 9 of 9