HomeMy WebLinkAboutContract 57873-A1Date Received: Feb 19, 2023
Time Received: 8:00 a m
City Secretary
Contract No.: 57873-A1
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 57873
A COMMUNITY FACILITIES AGREEMENT AND COMPLETION AGREEMENT
BETWEEN THE CITY OF FORT WORTH AND HT HWY 114 DEVELOPMENT, LP
This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 57873
("First Amendment") is made and entered into by and between the City of Fort Worth ("City"),
a home -rule municipal corporation of the state of Texas, and HT Hwy 114 Development, LP
("Developer"), a Texas limited partnership.
WHEREAS, the City and Developer entered into a Community Facilities Agreement for
the construction of public infrastructure improvements for a Project known as Tradition Central
Phase 2C, City Project Number 103188; and
WHEREAS, City and Developer executed a Completion Agreement as the financial
guarantee for the CFA ("Completion Agreement"); and
WHEREAS, the CFA and the Completion Agreement are filed with the City Secretary as
City Secretary Contract Number 57873; and
WHEREAS, Developer has not begun construction of the Improvements pursuant to the
CFA; and
WHEREAS, Developer desires to amend the CFA and the Completion Agreement to
reflect that Developer has hired a new contractor to construct a portion of the Improvements;
NOW THEREFORE, City and Developer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends City Secretary No.
57873:
Section 36 of the CFA is amended in its entirety to be and read as set forth in Exhibit A of
this First Amendment
2.
The Cost Estimates in the CFA for the water, sewer paving and storm drain Improvements for
the CFA are amended in their entirety to be and read as set forth in Exhibit B of this First Amendment.
3.
Section 2 of the Completion Agreement is amended in its entirety to be and read as follows:
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57873
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
2. The Completion Amount. The City and the Developer agree that the Hard Costs (as
shown on Exhibit "B") required to complete the Community Facilities in the aggregate should
not exceed the sum of Six Million Five Hundred Sixty -One Thousand Five Hundred Forty -
Eight Dollars and Fifteen Cents ($6,561,548.15) hereinafter called the "Completion
Amount". Notwithstanding the foregoing, it is acknowledged that the actual costs of
completion of the Community Facilities may vary as a result of change orders agreed to by the
Parties, but such variances for the purposes of this Agreement shall not affect the Completion
Amount as used herein. City hereby waives the requirement for developer to deposit a financial
guarantee of 100% of the Hard Costs under the CFA Policy.
4.
Exhibit B of the Completion Agreement is amended in its entirety to be and read as set forth
in Attachment 1 of this First Amendment.
5.
a. All other provisions of City Secretary Contract No. 57873 which are not expressly
amended herein, shall remain in full force and effect.
b. All terms in this First Amendment that are capitalized, but not defined, shall have the
meanings ascribed to those terms in City Secretary Contract No. 57873.
[SIGNATURES ON FOLLOWING PAGE]
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57873
IN TESTIMONY WHEREOF, the City and Developer have executed this First
Amendment to be effective on the date signed by the City's Assistant City Manager.
CITY OF FORT WORTH DEVELOPER
HT HWY 114 DEVELOPMENT LP, a
oq/q &��Lde Texas limited partnership
Dana Burghdoff (Fe 17, 202 0 :31 CST)
Dana Burghdoff By: HT Hwy 114 Development LLC, a
Assistant City Manager Delaware limited liability company, its
general partner
Date: Feb 17, 2023
Recommended by:
ofim
Dwayne Hollars (Feb 15, 202316:43 CST)
Dwayne Hollars
Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
-9�
Richard A. McCracken (Feb 16, 2023 15:15 CST)
Richard A. McCracken
Sr. Assistant City Attorney
M&C No. N/A
Form 1295: N/A
gdg4UUQ��
,0
�o�.,°o�
ATTEST:
d
dva a=d
°PQ*
o o°
aaa
Jannette S. Goodall
City Secretary
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57873
By: HT Hwy 114 LP, a Delaware limited
Partnership, its sole member
By: Hines Hwy 114 LLC, a Delaware
limited liability company, its general partner
By: Hines Hwy 114 Associates LP, a Texas
limited partnership, its sole member
By: Hines Investment Management
Holdings Limited Partnership, a Texas
limited partnership, its general partner
By:
161X6.t-Gl'11-1 UIZI&
Robert W. Witte (Feb 15, 2023 16:13 CST)
Robert W. Witte
Senior Managing Director
Date: Feb 15, 2023
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including all
performance and reporting requirements.
171L"&\
Rebecca Diane Owen (Feb 15, 2023 16:53 CST)
Name: Rebecca Diane Owen
Title: Development Manager
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57873
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
EXHIBIT A
36.
Cost Summary Sheet
Project Name: Tradition Central Phase 2C
CFA No.: CFA21-0072 City Project No.: 103188 IPRC No.: IPRC21-0005
Items
A. Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer Construction Total
B. TPW Construction
1. Street
2. Storm Drain
3. Street Lights Installed by Developer
4. Signals
TPW Construction Cost Total
Total Construction Cost (excluding the fees):
Estimated Construction Fees:
C. Construction Inspection Service Fee
D. Administrative Material Testing Service Fee
E. Water Testing Lab Fee
Total Estimated Construction Fees:
Financial Guarantee Options. choose one
Developer's Cost
$ 736,102.00
$ 812,540.00
$ 1,548,642.00
$ 2,335,237.75
$ 2,521,041.00
$ 156,627.40
$ 5,012,906.15
$ 6,561,548.15
$65,750.00
$34,741.00
$990.00
$ 101,481.00
Choice
Amount (Mark one)
Bond = 100%
$ 6,561,548.15
Completion Agreement = 100% / Holds Plat
$ 6,561,548.15
X
Cash Escrow Water/Sanitary Sewer= 125%
$ 1,935,802.50
Cash Escrow Paving/Storm Drain = 125%
$ 6,266,132.69
Letter of Credit = 125%
$ 8,201,935.19
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57873
EXHIBIT B
SECTION 00 42 43
DevclopcT Awarded Projects - PROPOSAL FORM
Tradition, Phase 2C, City Project #103188
UNIT PRICE DID
Project Item Information Bidder's Proposal
Bidlist I Spcc -,,ion Unit of Bid
n No. Measure Quantity Unit Price Bid Value
Item Description Sectio
Water Facilities
1
10241,1118 4"-12" Pressure Plug
0241 14
FA
2
$481.00
$962.00
2
3305.0109 Trench Safety
33 05 10
LF
5.323
$1.00
$5,323.00
3
3311.0001 Ductile Iron Water Filtin s wl Restraint
33 11 11
TON
1.5
$31,326.00
$46.989.00
4
3311.0241 8" PVC Water Pipe
3311 12'33 11 12
LF
4,963
$53.00
$263,039.00
5
3311,0241 B" PVC Water Pipe, CSS Backfll
3311 10,
LF
360
$137.00
$49,320.00
6
3312.0001 Sid. Fire Hydrant Assembly wt 6" Gate Valve & Valve Box
33 12 40
FA
4
$8.125.00
$32,500.00
7
3312.0117 Connect to Existing 8' W.L. Stub -out
33 12 25
FA
3
$2,817.00
$8.451.00
8
3312.2003 1" Domestic Water Services
331210
EA
180
$1,617.D0
$291,060.00
9
3312.3003 8" Gate Valve & Valve Box
33 12 20
FA
14
$2,747.00
$38,458.00
Water Subtotal
Sanitary Sewer Facilities
1 $736.102.00�
10
0241.1118 4"-12" Pressure Plug
0241 14
EA
2
$169.00
$338.00
11
3137.0102 Large Stone Ri ra , dry
31 37 00
SY
56
$91.00
$5,096.00
12
3301.0002 Post -CCTV Inspection
3301 31
LF
5,812
$3.00
$17,436.00
13
3301.0101 Vacuum Test Manholes
3301 30
EA
25
$202.00
$5,050.00
14
3305.0109 Trench Safety
330510
LF
5.812
$1.00
$5.812.00
15
3305.0113 Trench Water Stops
33 05 15
FA
13
$1,894.00
$24.622.00
16
3331.3101 SDR-264" Sewer Services
33 31 50
EA
180
$1,142.00
$205.560.00
17
3331.4115 8" SDR-26 PVC Sewer Pipe
3331 12.
LF
5,113
$53,00
$270,989.00
18
3331.4116 6" PVC Sanitary Sewer Pipe wl CSS Backfll
3311 10.
3311 12
LF
442
$132.00
$58.344,00
19
3331.4208 12' PVC Sanitary Sewer Pipe
33 11 10, 33
31 12,3331
20
LF
257
$68.00
$17,476.00
20
3339.1001 4' Std. Dia. Manhole
33 39 10,
33 39 20
FA
23
$5,710.00
$131,330.00
21
3339.1003 4' Extra Depth Manhole
3339 10,
33 39 20
VF
91
$343.00
$31.213-00
22
3339.1001 5' Std. Dia. Manhole
33 39 10, 33
3920
EA
2
58,941.00
$17,882.00
23
3339,1103 5' Extra Depth Manhole
33 39 10, 33
3920
VF
t0
S477.00
$4,770.00
24
9999.0001 Connect to Existing 12" Sewer
00 00 00
EA
1
$3.118.00
$3,118.00
25
9999.0002 16"Stee[Casinq
00 00 00
LF
36
$237.00
$8.532.1
26
9999.0003 Manhole Corrosion Protection
00 00 00
EA
1
$4,972.DD
$4,972.00
Sanitary Sewer Subtotal
Storm Drain Facilities
$812,540.D0�
27
3137.0104 Medium Ri ra , dry
31 37 00
SY
464
$91.00
$42,224.00
28
3305.0109 Trench Safety
330510
LF
6,D65
$1.00
$6,065.00
29
3305.0112 Concrete Collar
330517
FA
1
5405.00
5405.00
30
3341.0201 21" RCP, Class III
3341 10
LF
2,372
S80.D0
$189.760.00
31
3341.0205 24" RCP, Class 111
3341 10
LF
1.405
$91.D0
$127,855.00
32
3341.0208 27" RCP, Class 111
3541 10
LF
477
5101.00
$4a,177.00
33
3341.0302 30" RCP, Class III
3541 10
LF
68
5115.00
$7.820.00
34
3341,0309 36" RCP, Class III
3541 10
LF
270
$156.D0
$42,120.00
35
3341.0402 42" RCP, Class III
3541 10
1 LF
219
$205.00
$44,895.00
36
13349.0001 4'Storm Junction Box
334910
FA
2
$8.569.00
$17,138.00
37
3349.0103 4' Manhole Riser
33 49 10
EA
4
$3.870.00
$15,480.00
38
3349-1000 24" Headwall
33 49 40
FA,
1
$3,397.00
$3.397.00
39
3349.1000 27" Headwall
34 49 40
FA
1
$4,043.00
$4,043.00
40
3349.1D00 6' x 4' Headwall, Box Culvert
35 49 40
CY
8
$1,217.00
$9,736.00
41
3349.1000 V x 4' Headwall, Box Culvert
36 49 40
CY
7
$1,217.00
$8.519.00
42
3349.1000 5 10' x 5' Headwall, Box Culvert
37 49 40
CY
54
$1,217.00
$65,718.D0
43
3349.5001 10'CurbInlet
334920
FA
16
$6.630.00
$106,080.00
44
3349.5002 16 Curb Inlet
33 49 20
FA
6
$8,585.00
$51.510.00
45
9999.D004 5' x 4' R.C.B.
00 00 00
LF
724
$418.00
$302,632.00
46
9999.DD05 6' x 4' R.C.B.
00 00 00
LF
530
$509.00
$269,770.00
47
9999.0006 5 IV x5'R.C.B.
000000
LF
201
55,025.00
$1,010.025.00
48
9999.0007 6' x 4' Storm Junction Box
00 00 00
FA
1
$9,722.00
$9,722,00
49
9999.0008 8' x 4' Storm Junction Box
00 00 00
FA
1
$11.242.00
$11,242.00
50
9999.0009 Concrete Apron
00 00 00
SY
120
$117.D0
$14.040.00
51
W99.010 Double Neenah R-210-LLM
00 00
EA
17
$3.529.02
$59,993.00
52
9999.011 Construct Drop Structure
00
00 00 00
CY
43
11.NO.
$52.675.00
Storm Drain Subtotal
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57873
1 $2,521,041.00
Water/Sanitary Sewer/Storm Drain Facilities Subtotal 54,069,683.00
Bid Summary
Total Bid
$4,069,683.00
Performance/Payment and 2-year Maintenance Bonds
$100,000.00
Grand Total
$4,169,683.00
This bid is submitted by the entity listed below
Acadia Services LLC
By. Brad Catt
6750 Blvd 26
Richland Hills, Tx. 76180
817-729-2581
Signature
Title: President
Date: 12/6/2022
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 160 working days after the data when the
CONTRACT commences to ram as provided in the General Conditions. ( 3 C
END OF SECTION 30 11 alQ I `
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57873
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Tradition, Phase 2C, City Project 9103188
Addendum No, 1
UNIT PRICE BID
Project Item Information
Bidder's Proposal
13i11„�
Description
Specification
Unit of
Bid
Unit Price
Bid Value
It ,
Section No.
Measure
Quanti
Pavinn FanililiPc
53
3211.0400 Hydrated Lime 0 36 lbs./S.Y. (Collector)
3211 29
TON
106.0
$225.00
$23,850.00
54
3211.0400 Hydrated Lime ft 30 lbs./S.Y. Residential
3211 29
TON
311.1
$225.00
$69 997.50
55
3211.0400 Hydrated Lime Q 30 lbs./S.Y. (Alleys)
3211 29
TON
137.9
$225.00
$31 027.50
56
57
3211.0501 6" Lime Treated Subgrade (Collector)
3211.0501 6" Lime Treated Subgrade Residential
32 11
SY
5,864
$3.00
$17 592.00
3211 29
SY
20,726
$3.00
$62.178.00
58
3211.0501 6" Lime Treated Subgrade (Alleys)
3211 29
SY
9,192
$3.00
$27,576.50
59
3213.0101 6" Concrete Pavement (Residential)
32 13 13
SY
19,389
$52.00
$1,008,228.00
60
13213.0101 6" Concrete Pavement (Alleys)
32 13 13
1 SY
8,599
1 $56.00
$481,544.00
61
3213.0102 7" Concrete Pavement Collector
32 13 13
1 SY
5,563
1 $54.25
$301,792.75
62
3213.0301 5' Conc Sidewalk
31 1320
SF
905
$7.25
$6,561.25
63
3213.0301 6' Conc Sidewalk
31 1320
SF
24,327
$7.25
$176,370.75
64
3213.0501 R-1 Ramp
32 13 20
EA
10
$2,150.00
$21.500.00
65
3213.0506 P-1 Ramp
32 13 20
EA
40
$2,150.00
$86,000.00
66
3441.4003 Furnish/Install Alum Sign Ground Mount City Std.
3441 30
EA
18
$250.00
$4.500.00
67
3741.0001 Traffic Control
3471 13
EA
1
$5,000.00
$5.000.00
68
19999.0012 Install End of Road Barricade
00 00 00
EA
1
$1,250.00
$1.250.00
69
9999.0013 Remove End of Road Barricade
00 00 00
EA
3
$500.00
$1,500.00
70
9999.0014 Concrete Header
00 00 00
LF
145
$30.00
$4.350.00
71
9999.0015 Connect to Existing Pavement
00 00 00
EA
2
$800.00
$1,600.00
72
9999.0016 RI-1 Stop Sin
00 00 00
EA
8
$82.50
$660.00
73
9999.0017 St Marker Blade
00 00 00
EA
72
$30.00
$2,160.00
raving suototai
Bid Summary
I azssa,zsr.ral
Total Bid
$2,335,237.75
Performance/Payment and 2-year Maintenance Bonds
$32,500.00
Grand Total
$2,367,737.751
This bid is submitted by the entity listed below:
Company: RPM xCONSTRUCTION,LLC
Street Address: 6208 Tennyson Pkwy, Ste 130
City, Slate, Zip Code: Plano, TX-75024
Phone: (214) 239.4722
Date: 12-6-2022
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 35 working days after the date when the
CONTRACT commences to run as prodded in the General Conditions. First Available Date Jan 1st, 2023
END OF SECTION
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57873
ATTACHMENT 1
EXHIBIT B
APPROVED BUDGET
Section I
Water $736,102.00
Sewer $812,540.00
Sub -total $1,548,642.00
Section II
Interior Streets $2,335,237.75
Storm Drains $2,521,041.00
Sub -total $4,856,278.75
Section III
Street Lights $156,627.40
Sub -total $156,627.40
TOTAL $6,561,548.15
City of Fort Worth, Texas
First Amendment to City Secretary Contract No. 57873