Loading...
HomeMy WebLinkAboutContract 56583-FP1AC Coded 02.21.23 Vendor Name: S J Louis Construction of Texas LTD VendorID# 0000007647 Release retainage-$196,497.97 FID 56020-206000-103505-RETAIN FORTWORTH CSC No. 56583-FP1 -ww"r- WATER DEPARTMENT ENGINEERING AND FISCAL SERVICES NOTICE OF PROJECT COMPLETION 56002-103505 CS 56583 Regarding contract 56583 for Northpoint 24-inch Water Transmission main (N4-1A) as required by the Water Department as approved by City Council on 1-14-2003 through M&C C-19420 the Director of the Water Department, upon the recommendation of the Sr. Capital Projects Officer, Capital Projects Delivery, Water Department, has accepted the project as complete. Original Contract Prices: Amount of Approved Change Orders: Revised Contract Amount: Total Cost Work Completed: Less Deductions: Liquidated Damages: Other Deductions(see comments): Total Deduction Amount: Total Cost Work Completed: Less Previous Payments: Final Payment Due b Al J /h Recommended for Acceptance Assistant Director, Water Department l �/�tdi,G7LQiL ,� Christopher Hard (Feb 21, 202368:04 CST) Accepted Director, Water Department �'bIq [�Gl�GIGIG�O� Dana Burghdoff (Fe1521, 20231 :43 CST) City Manager $3,940,000.43 $79,124.49 Ns 4 $4,019,124.92 $4,004,152.52 0 Days @ $630.00/ Day $3,709.64 $3,709.64 $4,000,442.88 $3,803,944.91 $196,497.97 2 /- Date Date Date Project Name: Northpoint 24-inch Water Transmission main (N4-1A) DOE. Ns: Comments: Work Order Number 22-71306 for the amount of $3,709.64, Fort Worth Water Department Special Billing. Contractor cut 24" water main causing break. this billing for water loss was calculated using SCADA. City Project Numbers 103505 Contract Name Northpoint 24-Inch Water Transmission Main (N4-IA) Contract Limits Council Dristrict Project Type Water Project Funding Project Manager Argomaniz Inspectors Johnson / Drake Contractor S.J. LOUIS CONSTRUCTION OF TEXAS, LTD P.O. BOX 834 MANSFIELD, TX 76063-0834 56002-103505 CS 56583 DOE Number 0011 Estimate Number 14 Payment Number 14 For Period Ending 1/15/2023 City Secretary Contract Number 56583 Contract Date 10/19/2021 Contract Time 345 CD Days Charged to Date 289 CD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $4,004,152.52 Less 0 % Retained $0.00 Net Earned $4,004,152.52 Earned This Period $200,207.63 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $3,803,944.89 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $200,207.63 Friday, February 17, 2023 Page 5 of 5 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name Northpoint 24-Inch Water Transmission Main (N4-IA) Contract Limits Council Dristrict Project Type Water City Project Numbers 103505 DOE Number 0011 Estimate Number 14 Payment Number 14 For Period Ending City Secretary Contract Number 56583 Contract Date 10/19/2021 Project Manager Argomaniz Contractor S.J. LOUIS CONSTRUCTION OF TEXAS, LTD P.O. BOX 834 MANSFIELD, TX 76063-0834 Inspectors Johnson / Drake 1/15/2023 CD Contract Time 346D Days Charged to Date 289 Contract is 100.00 Complete Friday, February 17, 2023 Page 1 of 5 City Project Numbers 103505 Contract Name Northpoint 24-Inch Water Transmission Main (N4-IA) Contract Limits Council Dristrict Project Type Water Project Funding Water Item Description of Items No. ----------------- IA* 3311.0651 24" DIP Water 1B* 3311.0671 24" Steel AWWA C200 Water 1C* 3311.0681 24" Concrete AWWA C303 Wa (CO#2) 2A* 3311.0652 24" DIP Water, CSS Backfr 2B* 3311.0672 24" Steel AWWA C200 Water 2C* 3311.0682 24" Concrete AWWA C303 Wa (CO#2) 3A* 3311.0654 24" DIP Water (Restrained 3B* 3311.0674 24" Steel AWWA C200 Water 3C* 3311.0684 24" Concrete AWWA C3 03 Wa (CO#2) 4A* 3311.0655 24" DIP Water, CSS Backfi 4B* 3311.0675 24" Steel AWWA C200 Water 4C* 3311.0685 24" Concrete AWWA C303 Wa (CO#2) 5A* 3311.0001 Ductile Iron Water Fittin 5B* 3311.0011 Steel Fittings 5C* 3311.0021 C303 Fittings 6 3305.2007 24" Water Carrier Pipe (CO#2) 7 3305.1202 42" Casing/Tunnel Liner P (CO#2) 8 3311.0241 8" Water Pipe 9 3311.0001 Ductile Iron Water Fittin 10 3312.3008 24" Gate Valve w/ Vault (CO#2) 11 3312.3003 8" Gate Valve 12 3312.6003 8" Blow Off Valve 13 3312.1004 4" Combination Air Valve 14 3312.0108 Connection to Existing 24 15 3312.0117 Connection to Existing 4" 16 3304.0002 Cathodic Protection 17 9999.0001 Soil Corrosivity Investig 18 0171.0101 Construction Staking 19 0171.0102 As -Built Survey 20 0241.1019 Remove 24" Water Line 21 3125.0101 SWPPP > 1 acre DOE Number 0011 Estimate Number 14 Payment Number 14 For Period Ending 1/15/2023 Estimated Unit Unit Cost Estimated Completed Completed Quanity Total Quanity Total - - - - 3424 LF - - - - - - - - - - - - - - - 3424 LF 3367 LF $268.00 $902,356.00 3367 $902,356.00 1223 LF 1223 LF 1219 LF $447.00 $544,893.00 1219 $544,893.00 2032 LF 2032 LF 2029 LF $296.00 $600,584.00 2029 $600,584.00 1901 LF 1901 LF 2013 LF $474.00 $954,162.00 2013 $954,162.00 23 TO 1 LS 1 LS $1.00 $1.00 1 $1.00 132 LF $324.00 $42,768.00 132 $42,768.00 132 LF $1,133.00 $149,556.00 132 $149,556.00 163 LF $142.00 $23,146.00 163 $23,146.00 1 TO $1.00 $1.00 1 $1.00 9 EA $35,200.00 $316,800.00 9 $316,800.00 5 EA $1,400.00 $7,000.00 5 $7,000.00 6 EA $16,300.00 $97,800.00 6 $97,800.00 5 EA $22,100.00 $110,500.00 5 $110,500.00 1 EA $7,300.00 $7,300.00 1 $7,300.00 2 EA $2,800.00 $5,600.00 2 $5,600.00 1 LS $44,000.00 $44,000.00 1 $44,000.00 1 LS $10,000.00 $10,000.00 1 $10,000.00 1 LS $27,000.00 $27,000.00 1 $27,000.00 1 LS $3,000.00 $3,000.00 1 $3,000.00 29 LF $10.00 $290.00 29 $290.00 1 LS $21,000.00 $21,000.00 1 $21,000.00 Friday, February 17, 2023 Page 2 of 5 City Project Numbers 103505 DOE Number 0011 Contract Name Northpoint 24-Inch Water Transmission Main (N4-lA) Estimate Number 14 Contract Limits Council Dristrict Payment Number 14 Project Type Water For Period Ending 1/15/2023 Project Funding 22 3201.0614 Conc Pvmt Repair, Residen (CO#2) 248 SY $120.00 $29,760.00 142.93 $17,151.60 23 3201.0616 Conc Pvmt Repair, Arteria 289 SY $130.00 $37,570.00 289 $37,570.00 24 3291.0100 Topsoil 29 CY $30.00 $870.00 25 3292.0400 Seeding, Hydromulch 508 SY $2.00 $1,016.00 26 3305.0103 Exploratory Excavation of 14 EA $700.00 $9,800.00 14 $9,800.00 27 3305.0109 Trench Safety (CO#2) 8791 LF $0.01 $87.91 8791 $87.91 28 3305.0110 Utility Markers I LS $1,000.00 $1,000.00 0.522 $522.00 29 9999.0001 Contingency (CO#2) 0 LS $100,000.00 $0.00 30 Tree Removal (CO#4) 1 LS $14,432.50 $14,432.50 1 $14,432.50 1 Labor and Equipment (CO#1) 1 LS $3,689.78 $3,689.78 1 $3,689.78 2 Equipment (CO#1) 1 LS $8,079.21 $8,079.21 1 $8,079.21 3 Additional Pipe for Conflict 0+00 (CO#1) 1 LS $42,187.29 $42,187.29 1 $42,187.29 4 Concrete Blocking for Additional Bends 0+00 1 LS $967.15 $967.15 1 $967.15 (CO# 1) 5 Manhole Demolition and Salvage STA 0+00 (CO#1) 1 LS $575.00 $575.00 1 $575.00 6 -------------------------------------- Re -Work Charge for Conflict 8+64 (CO#1) 1 LS $1,333.08 $1,333.08 1 $1,333.08 -------------------------------------- Sub-Total of Previous Unit $4,019,124.92 $4,004,152.52 Friday, February 17, 2023 Page 3 of 5 City Project Numbers 103505. Contract Name Norihpoint 24-Inch Water Transmission Main (N4-IA) Contract Limits Council Drislrict Project Type Water Project Funding Contract Information Summary Original Contract Amount ChanLe Orders Change Order Number 1 Cliange Order Number 2 ChangeOrdcrNumber 3 Change Order Number 4 Date yJ Contractor %� �— Inspection Supervisor . _.._A�Date Project Mana er �� < ��- o G) Date Z f /?/Z3 Asst. Direclor[PIW- W N tr a„ke �444,� Date Director / Contracting Department . DOE Number 0011 Estimate Number 14 Payment Number 14 For Period Ending 1/15/2023 $3,940,000.43 $56,831.51 $7,860.48 $0.00 $14,432.50 Total Contract Price $4,019,124.92 Total Cost of Work Completed $4,004,152.52 Less 0 % Retained $0.00 Net Earned $4,004,152.52 Earned This Period $200,207.63 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $3,803,944.89 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $200,207.63 Friday, February 17, 2023 Page 4 of 5 E v z M z 0 E c � a 3 O R � N � CJ N U U O O m am U 3 In o a W K o m O U m a z0 > Z w O d m OJ J w N 0 m p ¢ m 0 o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m 0 rn ai d o 0 o d o 0 o d o ¢i N N N O 0 A fl u U W N a J a J O LL F U w Q U m U• a� Z ¢ w U (7 Z O Fr- Z _ zo ¢ m CY i 1 i � 1 1 � 1 H — 1 I 1 1 1 1 1 1 z 1 O 1 �a I � 1 1 I U N I W U � 1 1 W F- j > 0 r M 0 r M H O U F O U N N O N r N V N m O M N N r M 0 m w m Q Z w O z F p F ~q m0 g z O UO z m U ¢ O w Q m O ¢ w 1 1 1 1 F_ 1 1 1 Ffr 1 m w 0 z z z 1 0 1 U �_ w w w Z¢ W 1 1 w> a w a Z Z I 1 QrZ N w O U 1 U a. ¢ y 1 y m I � I -------------------------J [--<O'-z m O V r 00mO 0 0 O Ci 0 0 6 01 0i 0 0 0 0.N 0 41 N t9 to to fA M �A �9 - - - f9 e9 wvmvm Q � O ? to r N tf3 O R t9 r N eR fn ¢ M ¢ in O r O = I- ,",00'�� I- j w z m z O O w U a U C] z z F- o a m a W O O p ¢ Z O O r 0 0 0 0 O O O O O 0 0 O O 0 0 O O N 0 0 O p O O m N 6 Cl O 6 0 0 0 C1 0 0 CI O O m � 4f f9 M � Uf f9 N4>b9 fA MBA W t9 (A Ul tAM M M M M qOm m �n u� m inmMMM in inrn rn O m < f9 M f9 f9 fA fA f9 (9 (fl f9 f9 f9 to 44 t9 fR M fA � O U) � N � H Z w O r M a _ a w � H Z W m m o N N M o 0 N D O w W of Y C L' Y m a a a w W w 1¢ wawY 2C)w WWUU� U U U mw W¢¢ p 0 0�aaaUUmm=I- FORTWORTH rev 03/05/07 WATER ENGINEERING & FISCAL SERVICES FINAL STATEMENT OF CONTRACT TIME FINAL STATEMENT NO. 14 NAME OF PROJECT: Northpointe 24-inchWater Transmission Main (N4-IA) PROJECT NO.: 103505 CONTRACTOR: S.J . Louis CITY PROJECT CO1468 PERIOD FROM 11/01/22 TO: 01/15/23 FINAL INSPECTION DATE: 11/29/2022 WORK ORDER EFFECTIVE 12/612021 CONTRACT TIME 270 O WD O CD DAY OF DAYS CHARGED REASON FOR DAYS DAY OF DAYS REASON FOR DAYS MONTH DURING CREDITED MONTH CHARGED CREDITED DURING 1. 1 16. 1 2. 1 17. 1 3. 1 18. 1 4• 1 19. 1 5. 1 20. 1 6. 1 21. 1 7. 1 22. 1 8. 1 23. 1 9. 1 24. 1 10. 1 25. 1 11. 1 26. 1 12. 1 27. 1 13. 1 28. 1 14. 1 29. 1 15. 1 30. 1 31. 1 SAT, SUN, RAIN, TOO WET, UTILITIES DAYS TOTAL & HOLIDAYS & TOO COLD RELOCATIONS OTHERS* CHARGED DAYS THIS PERIOD 19 19 PREVIOUS PERIOD 270 270 TOTALS TO DATE .4T TlR I T1/tom 289 289 Substanial work has been completed Stop Time la�t-dav removal of street Barricades as of 9/20/21. t ()KY DATE INSI?) e`TOi " / , , DATE Capital Projects Delivery, Water Department The Cfi7� of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 4477 • Fax: (817) 392 - 8460 FORT WORTH WATER ENGINEERING & FISCAL SERVICES PIPE REPORT FOR: PROJECT NAME: Northpointe 24- inch Water Transmission Main PROJECT NUMBER: CPN 103505 DOE NUMBER: 11 WATER PIPE LAID SIZE TYPE OF PIPE LF Concrete 24 Water 5393 PVC 8 Water 163 FIRE HYDRANTS: VALVES (16" OR LARGER) 9 PIPE ABANDONED SIZE TYPE OF PIPE LF PVC 24 29 DENSITIES: Passed for the entire project NEW SERVICES: yes SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: PASSED NEW SERVICES: WATER ENGINEERING & FISCAL SERVICES The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 4477 • Fax: (817) 392 - 8460 FORTWORTHREV: 02/22/07 Capital Projects Delivery, Water Department CONTRACTOR'S EVALUATION OF CITY 1) PROJECT INFORMATION Date: 17-Feb-23 Name ojContractor Project Maine SJ Louis Northpoint 24-inch Water Transmission Main Water Engineering Inspector Project Manager Carmen Drake - Suzanne Abbe DOE Number Project Difficulty Type ojContract 56583 Q Simple QQ Routine Q Complex ❑✓ Water ❑ Waste Water ❑ Storm Drainage ❑ Pavement Initial Contract Amount Final Contact Aurount $3,940,000.43 $4,019,124.92 II) PERFORMANCE EVALUATION 0 - Inadequate 1 -Deficient 2 - Standard 3 - Good 4 - Excellent ELEMENT RATING (0 - 4) ELEMENT RATING (0 - 4) INSPECTION EVALUATION PLANS & SPECIFICATIONS I Availability of Inspector 3 1 Accuracy of Plans to Existing Conditions 2- 2 Knowledge of Inspector 3 2 Clarity & Sufficiency of Details 3 Accuracy of Measured Quantities 3 3 Applicability of Specifications 3 4 Display Of Professionalism 3 4 Accuracy of Plan Quantities 3 5 Citizen Complaint Resolution PROJECT MANAGER EVALUATION 6 Performance -Setting up Valve Crews, Labs 1 Knowled e And/Or Problem Resolution 3 ADMINISTRATION 12 Availability of Project Manager 3 1 Change Order Processing Time 13 Communication 3 2 Timliness of Contractor Payments 3 4 Resolution of Utility Conflicts 3 3 Bid Opening to Pre -Con Meeting Timeframe 3 III) COMMENTS & SIGNATURES COMMENTS Signature Contractor Signature Inspector Signature Inspector's Supervisor INSPECTOR'S COMMENTS Capital Projects Delivery, )`(cater Department The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 4477 • Fax-. (817) 392 - 8460 FORT WORTH Capital Projects Delivery, Water Department PERFORMANCE EVALUATION OF CONTRACTOR I) CONTRACTOR & PROJECT DATA REV: 02/20/07 Nance of Contractor Project Name S.J . Louis North ointe Water Engineering Inspectpr DOG Number Carmen Drake CPN 103505 Neater Engineering Inspector Project Xfonager O Water ❑ Waste Water ❑ Storm Drainage ❑ Pavement Suzanne Abbe Initial Contract Amount Project Difficulty $3,940,000.43 OO Simple O Routine O Complex Final Contract Amount Date $4,019,124.92 10/ 19/2021 11) PERFORMANCE EVALUATION 10 - Inadequate 1 - Deficient 2 - Standard 3 - Gond 4 - FXrellent ELEMENT WEIGHT (X) APPLICABLE (Y / N) RATING (0 - 4) MAX SCORE SCORE 1 Submission of Documents 2 Y 3 8 6 2 Public Notifications 5 Y 3 20 15 3 Plans on Site 5 Y 3 20 15 4 Field Supervision 15 Y 3 60 45 5 Work Performed 15 Y 3 60 45 6 Finished Product 15 Y 3 60 45 7 Job Site Safety 15 Y 3 60 45 8 Traffic Control Maintenance 15 Y 3 60 45 9 Daily Clean Up 5 Y 3 20 15 10 Citizen's Complaint Resolution 5 Y 3 20 15 III Property Restoration 5 Y 3 _ 20 15 12 After Hours Response 5 Y 3 20 15 13 Project Completion 5 Y 3 20 15 TOTAL ELEMENT SCORE (A) 336 BONUS POINTS (25 Maximum) (B) III) CONTRACTOR'S RATING TOTAL SCORE (TS) 336 Maximum Score (MS) = 448 or sum of applicable element score maximums which = 448 Rating (ITS / MSJ ° 100%) 336 / 448 = 75% Performance Category Good <20% = Inadequate 20% to < l0% = Deficient 0% to <60% = Standard 60% to <80% = Good >_80% = Excellent Inspector's Comments (INCLUDING EXPLANATION OF BONUS POINTS AWARDED) 1 J Signature Inspector I?- Signature Contractor Signature Inspector's Supervisor!. CONTRACTOR'S COMMENTS Capital Projects Delivery, Water Department The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 4477 • Fax: (817) 392 - 8460 City of Fort Worth Inspector's Estimate Worksheet City Project Numbers 103505 Contract Name Northpoint 24-Inch Water Transmission Main (N4-1A) DOE Number 0011 Contract Limits: Council Dristrict Estimate Number 14 Project Type Water Payment Number 14 Control Number 00111 For Period Ending Contract: 56583 Contract Date: 10/19/2021 Inspectors Johnson / Drake Date Prepared by Inspector / / I /a3 ---------------------- Construction ID: 14079 Contract Time 270 CD Days Charged to Date CD Contract isX—O % Complete Item Description of Items Estimated Uni Unit Cost Previous Quanity Completed Total Cost No. Quanity Quanity for Month Quanity Water 1A* 3311.0651 24" DIP Water 3424 LF 1 B* 3311.0671 24" Steel AWWA 3424 LF C200 Water 1 C* 3311.0681 24" Concrete AWWA 3367 LF $268.00 C303 Wa (CO#2) 2A* 3311.0652 24" DIP Water, CSS 1223 LF Backfi 213* 3311.0672 24" Steel AWWA 1223 LF C200 Water 2C* 3311.0682 24" Concrete AWWA 1219 LF $447.00 C303 Wa (CO#2) 3A* 3311.0654 24" DIP Water 2032 LF (Restrained 3B* 3311.0674 24" Steel AWWA 2032 LF C200 Water 3C* 3311.0684 24" Concrete AWWA 2029 LF $296.00 C303 Wa (CO#2) 4A* 3311.0655 24" DIP Water, CSS 1901 LF Backfi 4B* 3311.0675 24" Steel AWWA 1901 LF C200 Water 4C* 3311.0685 24" Concrete AWWA 2013 LF $474.00 C303 Wa (CO#2) 5A* 3311.0001 Ductile Iron Water Fittin 23 TO 5B* 3311.0011 Steel Fittings 1 LS KSI-rl 1219 2029 2013 Thursday, November 3, 2022 Page 1 City of Fort Worth Inspector's Estimate Worksheet City Project Numbers 103505 Contract Name Northpoint 24-Inch Water Transmission Main (N4-1A) DOE Number 0011 Contract Limits: Council Dristrict Estimate Number 14 Project Type Water Payment Number 14 5C" 3311.0021 C303 Fittings 1 LS $1.00 1 6 3305.2007 24" Water Carrier Pipe 132 LF $324.00 132 (CO#2) 7 3305.1202 42" Casing/Tunnel 132 LF $1,133.00 132 Liner P (CO#2) 8 3311.0241 8" Water Pipe 163 LF $142.00 163 9 3311.0001 Ductile Iron Water Fittin 1 TO $1.00 1 10 3312.3008 24" Gate Valve w/ 9 EA $35,200.00 9 Vault (CO#2) 11 3312.3003 8" Gate Valve 5 EA $1,400.00 5 12 3312.6003 8" Blow Off Valve 6 EA $16,300.00 6 13 3312.1004 4" Combination Air 5 EA $22,100.00 5 Valve 14 3312.0108 Connection to Existing 1 EA $7,300.00 1 24 15 3312.0117 Connection to Existing 2 EA $2,800.00 2 4" 16 3304.0002 Cathodic Protection 1 LS $44,000.00 1 17 9999.0001 Soil Corrosivity Investig 1 LS $10,000.00 1 18 0171.0101 Construction Staking 1 LS $27,000.00 1 19 0171.0102 As -Built Survey 1 LS $3,000.00 1 20 0241.1019 Remove 24" Water 29 LF $10.00 29 Line 21 3125.0101 SWPPP >_ 1 acre 1 LS $21,000.00 1 22 3201.0614 Conc Pvmt Repair, 248 SY $120.00 142.93 Residen (CO#2) 23 3201.0616 Conc Pvmt Repair, 289 SY $130.00 289 Arteria 24 3291.0100 Topsoil 29 CY $30.00 25 3292.0400 Seeding, Hydromulch 508 SY $2.00 26 3305.0103 Exploratory Excavation 14 EA $700.00 14 of Thursday, November 3, 2022 Page 2 City of Fort Worth Inspector's Estimate Worksheet City Project Numbers 103505 Contract Name North point 24-Inch Water Transmission Main (N4-1A) DOE Number 0011 Contract Limits: Council Dristrict Estimate Number 14 Project Type Water Payment Number 14 27 3305.0109 Trench Safety (CO#2) 8791 LF $0.01 8791 28 3305.0110 Utility Markers 1 LS $1,000.00 0.522 29 9999.0001 Contingency (CO#2) 0 LS 100,000.00 30 Tree Removal (CO#2) 1 LS $14,432.50 1 1 Labor and Equipment (CO#1) 1 LS $3,689.78 1 2 Equipment (CO#1) 1 LS $8,079.21 1 3 Additional Pipe for Conflict 0+00 1 LS $42,187.29 1 (CO#1) 4 Concrete Blocking for Additional 1 LS $967.15 1 Bends 0+00 (CO#1) 5 Manhole Demolition and Salvage 1 LS $575.00 1 STA 0+00 (CO#1) 6 Re -Work Charge for Conflict 8+64 1 LS $1,333.08 1 (CO#1) T,stimated Total This Unit $4,019,124.92 Completed Total This Unit $4,004,152.52 r Total Itemized Amount (Including Change Order $4,019,124.92 DATEI Total Cos of Completed nspect Less % Retained Net Earned L�I Previous Payment $3,803,944.89 GJW Material on Hand 15% i - �/� Balance Due This Payment /may ' (��C�JJ Thursday, November 3, 2022 Page 3 .ly N N N N N N N N N N N N N N N N N N N N N u a a ON a o, rn ON rn ON Cs C, CN ON CN ON ON cs ON as C, m mV O O O O O C. O O O O O O O O O O O O O O O o O O o 0 0 o O C. 0 0 0 o O o 0 o O O o o p; U U A A A A A A A A t A W W W W W w W W W �- CD�o 00 v O1 U A W N O �C 00 -.1 ON U A w N LT u 0 00 ON C) m a (� by a C� Cd W IQ N N F-` O V 1 iF !F dF iF iF M iF iF K �iF �M aiF iF � aiF � W w w W W w w w w W w w W w w w W W W w w 1..1 W W W W W W W W w W W W W W W W W W W W W f9 _ O O N N U U � W W O O N CD CD CDO CD CD CD CD CD CD CD CD CDO CDC11 O CD CDN N O O O O O1 m m m m m C\ 01 m C1 C1 01 O O O A O CDN 00 _a U W J U 00 v U 00 U w 00 .-� N �l .- .�- a cn Ln cn A A A N N N 00 N tj 00 A N (') Cn d N N N N N N N N N N N N p A A A A A A ci W= n d cc) y o C o' 0 R R r° to < w a CD a � a a a a CD a a a a C Cl r- i? �f CZ n ti n C� a ` o tz a o a o a o O a o o p w A' CD 03 Co O 0 O N y �+ N rON-. b l0 O O O N N N W A A w N N w W to., N N 10 w w J .N�. CD o. A O v d a a o m m o m sy w 60 ci �P IJ 69 w Fig 69 69 69 O O 69 N W ? E�9 (71 e4 ;A J 00 O O O O O O O O O O O p O O O O O O O O O O O y r^l- 1 O C � 'S7 A N N w r* CD CD ClN ON N N .-. W N � � V W b9 vi 69 ON LA vi H v w N A O ? CD O 00 'A 00 fJ CD O G�9 QAi � a, I N :A W U C O O O O O O O O O O O 0 0 0 Cl 0 0 0 0 0 0 o m 'z] N N N N N N N N N N N N N N N N N N N N N N N N 01 01 01 01 01 01 O1 01 01 01 01 01 01 01 01 01 O1 O1 O1 01 O1 m 01 O1 00 00 00 00 00 00 O O O O O O O O O O O O O O O O O O A A A A A w O O O O O O O O O O O O O O O O O O O O O O O l0 01 01 m 01 m 01 O\ 01 O1 Ol LA LA N U U LA A W N o 1D 10 oo -t O\ U A W N O �o 00 --1 m U A w N w N N N N N N N N N N O 10 00 -4 O1 N A w N — O 10 00 �1 01 N A W N 4 O 1p W W W N N N N W N N � O O O 10 1D O O N A -1 �1 1D O a. n .�-r ,D• O 10 U N N N �- r r-� U i-+ .- �+ �p o o a o0 o O o OA o ao1 Qo o c o 0 0 0 o O o 0 .- o 0 0 0 0 o O o O C.01 a �D N N �1 0o A w C, o •- o .,, at; •a('� � o v o, 'y c�i cOi ^3 � CO y p. o o C� lb o CZ .. ? O m aro �ro ro ro o Ero w M x I V C o vo ty �' �°�' S O Zm- y a O C7 y n p .a 'O O G G CD O O o. w W R K m m ]. m' UQ H rn n o ^ n C° w •t- N < O �! O+ CD w o O O C] O N 00 �l LAN N N N vi 69 b9 N 69 N 69 A 69 69 N 69 H3 69 N � W A O � 69 69 69 '"'• N 10 �-+ O Q1 , O O �1 69 �--� O �I O\ 00 -] 00 W O O 69 O 69 W W N O O o O O O O O O O O O CD CD CD CD O CD CDO O O CD CDO CD O CDU 1D �+ 00 C. CD CDi--� O O O C. O O O O O O O O O O Cl o � 69 69 w o 69 bs N oho 69 LA 10 H J O 01 A N 69 oo J 1oo � N N v O o ;-- N � in o �o o C. (.Ao oo O O O A N N 00 10 N �o W i-+ 10 r--. — .� W N 69 N 69 69 cA O �l U o N O O O O 01 w tli oo �l O 10 0 CD CDO O CDo O 0 0 0 0 0 0 0 0 0 0 0 Cl D\ O O C. C O Cl O CD O O O CD O O CD CD CD CD O O O O rCD R R A m n "O 0 m A'7 CD o. A k3 'i7 N O\ 00 O Or ON CD d O A � "S m ao rn 0 C� 0 o' C7 O a y y � y e / CD a � � d ro c ,fl m .may Q 00 °C C. 469 69 w 69 .p N N oo O c~y O O O O O O W O A 69 (D O O lV N O W 0 0 J O J ..AP. N W 0 W C. W �o N W This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. Libel Liberty Mutual Insurance Company 1VIu1uala The Ohio Casualty Insurance Company Certificate No: $208081-190003 SURETY West American Insurance Company POWER OF ATTORNEY KNOWN ALL PERSONS BY THESE PRESENTS: That The Ohio Casualty Insurance Company is a corporation duly organized under the laws of the State of New Hampshire, that Liberty Mutual Insurance Company is a corporation duly organized under the laws of the State of Massachusetts, and West American Insurance Company is a corporation duly organized under the laws of the State of Indiana (herein collectively called the °Companies), pursuant to and by authority herein set forth, does hereby name, constitute and appoint, Blake S. Bohlig; Brian D. Carpenter, Craig Olmstead; Erik T. Gunkel; Heather R- Goedtel; Jessica Hoff; Kelly Nicole Enghauser, Laurie Pflug, Megan Scott; Michelle Halter, Michelle Ward; Nicole Langer all of the city of _ Bloomington state of MN each individually if there be more than one named, its true and lawful attorney4ri-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents and shall be as binding upon the Companies as if they have been duly signed by the president and attested by the secretary of the Companies in their own proper persons. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Companies and the corporate seals of the Companies have been affixed thereto this 24th day of May 2022 liberty Mutual Insurance Company P� INSu� P'11 INS& INSUR9 The Ohio Casualty Insurance Company °o+�OR,, yc, 5� �o�°R,,�y vt' `osw°Ra> ti� West American Insurance Company � 3 Fo m �Q 3 `°o m � 3 `0o a+ 1912c/ n o 21919 o a 1991 0 dVl S'SACHl7`�"HAMP`��� a �kD]AHP L jl N U _ 67) * ?� �yl * ��a SUM * 1`'a By: co co to David M. Carey, Assistant Secretary a ca State of PENNSYLVANIA i County of MONTGOMERY ss a a (D On this 24th day of May 2022 before me personally appeared David M. Carey, who acknowledged himself to be the Assistant Secretary of liberty Mutual Insurance m ca Company, The Ohio Casualty Company, and West American Insurance Company, and that he, as such, being authorized so to do, execute the foregoing instrument for the purposes ? therein contained by signing on behalf of the corporations by himself as a duly authorized officer. @� i� IN WITNESS WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at 1Gng of Prussia, Pennsylvania, on the day and year first above written. SN PAS2 Q� `F�pNW F� Commonwealth of Pennsylvania - Notary Seal Teresa PastMontgomery Counotaryty Public � OF � Montgomery County My commission expires March 28, 2026 By- '0� �P Commission number 1126044 41 rNyyL'i G Member. Pwnsylvania Association of Notaries Teresa Pastella, Notary Public �qRY P� This Power of Attorney is made and executed pursuant to and by authority of the following By-laws and Authorizations of The Ohio Casualty Insurance Company, Liberty Mutual Insurance Company, and West American Insurance Company which resolutions are now in full force and effect reading as follows: ARTICLE IV -OFFICERS: Section 12. Power of Attorney. Any officer or other official of the Corporation authorized for that purpose in writing by the Chairman or the President, and subject to such limitation as the Chairman or the President may prescribe, shall appoint such attomeys-in-fact, as may be necessary to act in behalf of the Corporation to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attomeys4n-fact, subject to the limitations set forth in their respective powers of attomey, shall have full power to bind the Corporation by their signature and execution of any such instruments and to attach thereto the seal of the Corporation. When so executed, such instruments shall be as binding as if signed by the President and attested to by the Secretary. Any power or authority granted to any representative or attomey-in-fact under the provisions of this article may be revoked at any time by the Board, the Chairman, the President or by the officer or officers granting such power or authority. ARTICLE YdII - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such altomeys4n-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such adomeys-in-fact subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. Certificate of Designation -The President of the Company, acting pursuant to the Bylaws of the Company, authorizes David M. Carey, Assistant Secretary to appoint such adomeys-in- fact as may be necessary to act on behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Authorization - By unanimous consent of the Company's Board of Directors, the Company consents that facsimile or mechanically reproduced signature of any assistant secretary of the Company, wherever appearing upon a certified copy of any paver of attorney issued by the Company in connection with surety bonds, shall be valid and binding upon the Company with the same force and effect as though manually affixed. I, Renee C. Llewellyn, the undersigned, Assistant Secretary, The Ohio Casualty Insurance Company, liberty Mutual Insurance Company, and West American Insurance Company do hereby certify that the original paver of attorney of which the foregoing is a full, true and correct copy of the Power of Attorney executed by said Companies, is in full force and effect and has not been revoked. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed the seals of said Companies this 1 lth day of January , 2023 . PI INsu & P11Y INSINSUR9 J O�ro�'m QJr°o�oRpFo3°o�0& '4-n 1912 0 1919 1991,ly` : Al O Q O b�.�� gcH�g �aa3 2By 0� HnarS`'Q a rs vnlA>+P as Renee C. Llewellyn, Assistant Secretary LMS-12873 LMIC OCIC WAIC Multi Co 02121 FORT WORTH City of Fort Worth, TX CONSENT OF SURETY COMPANY TO FINAL PAYMENT Bond No_ 190048249 PROJECT: Northpointe 24-Inch Water Transmission Main (N4-IA) PROJECT NUMBER: OWNER:-Cityof Fort Worth Texas 103505 ONTRACTOR: J. Louis Construction of Texas, Ltd. 22108 ENGINEER: lKimley Horn The Surety Company, on bond of the Contractorlisted above for the referenced project, in accordance with the Contract Documents, hereby approves final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to the Owner under the terns of the Contract and as set forth in said Surety Company's bond. In witness whereof, the Surety Company has hereunto set its hand this 11th day of January 20 23. C , J 191; Mutual Insurance Corn Company By (:) �, Authorized Kepresentative Title Heather R. Goedtel, Attorney -in -Fact Address: 8400 Normandale Lake Blvd., Suite 1700 Bloomington, MN 55437 Attach Power of Attorney 1 �y a r-OF FORT WORTH City of Fort Worth, TX CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS PROJECT: Northpointe 24-Inch Water Transmission Main (N4-1A) PROJECT NUMBER: OWNER: City of Fort Worth, Texas 103505 CONTRACTOR: S.J. Louis Construction of Texas Ltd. 22108 ENGINEER: Kimley Horn The Contractor, in accordance with the Contract Documents, hereby certifies that, except as listed below, all obligations for all materials and equipment furnished, for all work labor, and services performed, and for all known indebtedness and claims against the Contractorfor damages arising in any mannerin connection with the performance of the Contract referenced above for which the Owner or his property might in any way be held responsible have been paid in full or have otherwise been satisfied in full. EXCEPTIONS: None (If none, write "NONE". The Contractorshall furnish a bond, acceptable to the Owner, for each exception.) CONTRACTOR S.J Louis Construction of Texas, Ltd. BY TITLE 41W p2E51"wr Subscribed and sworn o before e this 11th day of Janua Notary Public: My Commission Expires: Ott/ 5' 2023 . CSC No. 56583-COI IFORT%Ri'H City of Fort Worth Change Order Request Project Name: 1 Northpointe 24-Inch Water Transmission Main (N4-IA) City Sec No.: 1 56583 Project No.(s): 56020 0700430 5740010103505 001780 DOE No. N/A Cily Proj. No.: 103505 Project Description: 24-Inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor: S.J. Louis Construction of Texas, Ltd. Change Order II Dale: 2I18/2022 City Project Mgr.1 Suzanne Abbe City Inspector: I Carmen Drake Phone Number: 817-392-8209 Phone Number. 817-948-0081 Dept. Original Contract Amount Extras to Date Credits to Dale Pending Change Orders (in M&C Process) Contract Cost to Date Water Totals Contract Time (Calender days) $3,940,000.43 $3,940,000.43 270 $3,940,000.43 $3,940,000.43 Amount of Proposd Change Order $56,831.51 $56,831.51 010 Revised Contract Amount $3,996,831.94 Original Funds Available for Change Orders $157,600.57 Remaining Funds Available for this CO $157,600.57 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $3,996,831.94 280 $157,600.57 $157,600.57 1.44% $4,925,000.54 JUSTIFICATION (REASONS) FOR.CHANGE ORDER I Change Order No.1 provides for the following: • A change in alignment to avoid a storm drain at the tie In point that was not located as shown on the plans. • Manhole demolition and valve salvage of a valve at the tie in point that was not located as shown on the plans. • A change In aligmenl to address a 6-inch gas line crossing that was not shown on the plans. Staff recommends ten (10) days be added to contract time to cover the additional work. It is understood and agreed [hat the the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or Incidental to, the above Change Order. ConlractoesCompanyName ConfractorName Co ctorS_ig Are gatF S.J. Louis Construction of Texas, Ltd. I Adam Lunsford j u, Inspector Date ProjectWanager V Date Carmen Drake Lfti ,f ? t° ,Z - 2,4-zZ Suzanne Abbe 2/1812021 Director Water Dept) Date Construction superv' or (Water Dept) Date . Chris Mar 3, 2022 David Johnson AssistanttCltyAttorney Date _Asslstant_Cily_Manager _ _ gate DougBlaclr. Mar3,2022 Dana Burghdoff,7-- ,.,ia' Mar 3,2022 _ .'PoAngIl Action (If_Regulred) M&C Number NIA M&C Date Approved N/A ]FORT'WORTM City of Fort Worth Change Order Additions Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) I City Sec No.: 56583 Project No.(s): 56020 0700430 5740010103505 001780 DOE No. N/A City Proj. No.: 103505 Project Description [24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor S.J. Louis Construction of Texas, Ltd. Change Order:= Date: 211812022 City Project Mgr. Suzanne Abbe City Inspector FcarmenDrake ADDITIONS FOR-r WORTH City of Fort Worth . Change Order Deletions Project Name Northpoinle 24-Inch Water Transmission Main (N4-1A) City Sec No.: 56583 Project No.(s): 56020 0700430 5740010103505 001780 DOE No. N/A City Proj. No.: 103505 Project Description I 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway Contractor S.J. Louis Construction of Texas, Ltd. Change Order: FT] Date 2/18/2022 City Project Mgr. Suzanne Abbe City Inspector: FCarmen Drake DELETIONS M/WBE Breakdown for this Chance nrdrar Previous Chanae Orders Page 4 of 4 .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 4�L Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title ATTEST: SC-d,I1«,,,420„0,, s., Jannette Goodall City Secretary 2/18/2022 CPN 103505 Northpointe 24" Water Transmission Main (N4-IA) Change Request 1 Notes Contract Modification Request No. 1 is attached. Six additional hours of labor and equipment were approved forthe installation of additional fittings, manhole demolition, and valve salvage. The contractor provided a quote from the manufacturer for the cost of additional fittings and lay schedule rework. The added time is for the added work involved with the alignment changes with will include additional tunneling. Time was not added to account for lead time of additional materials. The expectation is that contractor can work on other areas while waiting for new materials. Request for Proposal I Superseded. See Rev. 3 Project Name C.M.R. -Proposal No. Date Northpointe 24- Inch Transmission Main (N4-1A) North Transmission Main, Phase I 1 February 1, 2022 City of Fort Worth Water Department Response Required By Transmitted By Mrs. Suzanne Abbe Ronald Etter 200 Texas Street Project Manager Fort Worth, Texas 76102 Signature Via Email cc: Mr. William Weidman- Kimley Horn, Via Email Ra",at 1. Eftes- cc: Mr. Josh Kercho- Kimley Horn, Via Email Description of Worlr change proposal is for the pipe revisions near Sta. 0+00 to avoid conflicts with the existing storm drain manhole and associated ,This piping, removal of existing 24" gate valve and manhole and supplying a new 24" gate valve and manhole near Sta. 0+38. This proposal covers the additional cost assicated with the material changes, removal of existing 24" gate valve and manhole including all labor, equipment, fuel, ect to complete thed work in accordance with the plans dated. 12/14/21. This proposal also includes the cost from Thompson pipe to re -work some pipe that had been fabricated previously near Sta. 8+91 based on conflicts in the field with a gas main not shown on the plans. Thompson was able to salvage and switch pieces aroudn to minimize the cost impact on gas conflict. Breakdown of Proposal North ointe 24- Inch Transmission Main 44A) Pipe revisions at Sta. 0+00 and manhole removal and additonal cost for price re -work for gas line conflict near Sta. 8+91 Item Description Quantity Unit Price Extention New - I Additional cost associated with pipe revisions and removal of existing 24" gate valve and vault per plans dated 12/14/21. Lump Sum 1 $79,228.56 $79,228.56 10 24" Gate Valve wNault EA 1 $35,200.00 $35,200.00 $0.00 Net Change: $114,428.56 Additional Calendar Days: 60 If acceptable, please provide an authorization signature below and return one (1) copy to our office. .J. Louis Construction Action XTT J. Louis Project No. 22108 S.J. Louis Constritction of Texas Ltd 520 S. 6th Avenue Mansfield, Texas 76063 (817) 477-0320 Office (817) 477-0552 Fax Superseded. See Rev. 3 f A I e I c I n Resin., Haurs Worked Rarr ilmrc �S—S1.--z�T—za--s— rw..r �.... u..��.. w...ue.. .,.,.. ...n i otai r labor Rare 7 2 J q 5 s oral Haurs Total Hours Ram 1 2 q 6 Tow Total Ho I 13 Iitc I Ove head I ABC D 00 54,745.00 0 ����� fi�JiaEiLifl�r�xls•rmr7�. - E�•zrwr.�iY3�E7�����i16�E�r�r�. �M IRE1��������E'iC4Yir1 tE�Yi3�iF3�E� EUME lgagn pgmzmmmmmmi - Eilzrsr>• $19.905.30 I Overhead I A-8 Total Cost For 75°F, TOLI OuanOty Materials 1 36,684.EI Overhead Aa6 S5.502.69 I 542,18 . 1S950.00 I 5142.50 I SI,09ZW 0 3 . 7 Ys-oo 541,793.80 I I I $6,095.19 I $46,729.79 Grand Total Cost 579,228.6E Request for Proposal Project Name C.M.R. -Proposal No. Date Northpointe 24- Inch Transmission Main (N4-IA) North Transmission Main, Phase I 1 rev. 3 February 21, 2022 City of Fort Worth Water Department Response Required By Transmitted By Mrs. Suzanne Abbe Ronald Etter 200 Texas Street Project Manager Fort Worth, Texas 76102 Signature Via Email cc: Mr. William Weidman- Kimley Horn, Via Email Effer cc: Mr. Josh Kercho- Kimley Horn, Via Email Description of Work This change proposal is for the pipe revisions near Sta. 0+00 to avoid conflicts with the existing storm drain manhole and associated piping, removal of existing 24" gate valve and manhole and supplying a new 24" gate valve and manhole near Sta. 0+38. This proposal covers the additional cost assicated with the material changes, removal of existing 24" gate valve and manhole including all labor, equipment, fuel, ect to complete thed work in accordance with the plans dated. 12/14/21. This proposal also includes the cost from Thompson pipe to re -work some pipe that had been fabricated previously near Sta. 8+91 based on conflicts in the field with a gas main not shown on the plans. Thompson was able to salvage and switch pieces around to minimize the cost impact on gas conflict. The additional 24" Gate Valve for this change will be billed under bid item 10 of the contract documents. Breakdown of Proposal North ointe 24- Inch Transmission Main (N4-1A Pipe revisions at Sta. 0+00 and manhole removal and additonal cost for price re -work for gas line conflict near Sta. 8+91 Item Description Quantity Unit Price Extention New - I Additional cost associated with pipe revisions and removal of existing 24" gate valve and vault per plans dated 12/14/21. Lump Sum 1 $56,831.51 $56,831.51 $0.00 Net Change: $56,831.51 Additional Calendar Days: 10 If acceptable, please provide an authorization signature below and return one (1) copy to our office. .J. Louis Construction Action xc: S. J. Louis Project No. 22108 S.J. Louis Construction of Texas Ltd 520 S. 6th Avenue Mansfield, Texas 76063 (817) 477-0320 Office (817) 477-0552 Fax A B I C D I RaRegular Hours Worked I Rate Time. _ __ _ _ lures55%I 1 r Labor te 1 2 3 Totai HoursTotal Hours Rate 1 2 1 3 1 4 15 1 .6 A 7 Total Total Hours I Benefits I Overhead I A+S+C+D I Su rintendent $75.00 6.00 6.0 $450.00 ma*0 50,00 5247.50 $104.63 $802.13 Fnrtvnan $55.00 6.00 600 $330.00 MfkM a 50.00 5181.50 576.73 $588.23 LcadHoe Operator SZ9.00 6 6.0 5174.0D AYl#!p 0 50.00 595.70 $40.46 5310.16 Tall He. O rater $27.00 6 6.0 $162.0D #✓1✓pMp' 0 50.00 $89.10 S37.fi7 5288.77 Loader O rater $26.00 6 6,0 $155.00 #ppYpp- 0 $0600 $85.80 536.27 5278.07 Dozer O valor 525.00 6 6.0 $150.00 inNHfKp' 0 $0.00 $82.50 $34.88 $267.38 PI La er 525.00 1 5 6.0 5150.00 sauaau 0 $DAD 582.50 $34.88 $267.38 TOP Man $24.00 1 6 6.0 5144.00 0 50.00 579.20 533.48 5256.68 Pl Le arHel r $21.00 6 6.0 5126.00 #gptprlt' 0 50.00 569.30 529.30 $224.60 Lobarer 1 Lee - $19.00 eta nn i 6 a 6.1 c 0 $114 00 $114.00 #p71,YKp' 0 50.00 562.70 526.51 $203.21 i I_. $2,070.00 A le I Imes -1 qutpmenl atew ue eta ours Total Hours 297.75 1 6.01. 0 1 6.0116.0Do 93tepoZC�=C 9.60 6. 6.0 83 .609.60 6.0 60 $41 .60 i 1 6.0.BD Icku Truck (Superintendent) Picku Truck (Foreman "0 111.78 enerator 6.0 33.3 ewer 3.3 9, 8 a n er awls 4 $7,025.40 I $39,184.80 I $0.00 I $1,138.50 I $481.28 I $3.689.78 B YA ou Overhead A+B I $1,053.81 I $8�079.21 B 1- Total Overhead A+B 5,502.69 9 5V3.88 1,333.08 120.15 $967.15 SD.DD $0.00 $5,877.72 $46,06252 Grand Total Cost s6r,,831.61 January 17, 2022 SJ Louis Mansfield 520 S. 6th Ave Mansfield TX, 76063 Attention: Adam Lunsford eQi1''Llj tU11 L E�6�.. r I P E G R o U P Pr�EssUrE- RE: Thompson Project Number: 210051 NORTHPOINTE 24-INCH WATER TRANSMISSION MAIN (N4-1A) Fort Worth, TX Change Order Number 2 Dear: Adam Due to changes in the project scope, we are sending you this Change Order for immediate action so that these changes can be released for procurement an/or fabrication as soon as possible. Please return a signed copy of this Change Order to us promptly to assure that you receive these materials in a timely manner. ITEMS LISTED BELOW CANNOT BE MANUFACTURED AND/OR SHIPPED UNTIL THIS FORM IS SIGNED AND RETURNED TO THOMPSON PIPE GROUP Quantity UOM Item Description Unit Price Extended Price 0 LF 24" AW WA C303 Bar Wrapped Concrete Cylinder Pipe 4 EA 24" Short $3,310.06 $3,310.06 1 EA 24" Butt Strap Closure (Pieces AO, BSOA, A2) $7.633.88 $7,633.88 2 EA 24" CL E Flg Adapter w/ 2" Thrd Outlet $9,560.57 $9,560.57 3 EA 24" 23*A5° Bend $13,752.98 $13,752.98 6 EA 24" Snap Ring Restrained Joint $2,427.10 $2,427.10 Total $36,684.60 Delivery estimate = Approx. 8-9 weeks Freight: If special shipments are required or shipment for this project has been completed, any additional freight charges which are incurred will be added to the above total. For additional information, please contact: David Nunez Thompson Pipe Group - Pressure Phone: (469) 313-2501 Email: david.nunezOthomosonpip egroup com ACCEPTANCE: I/We hereby accept the above and all terms and conditions specified on the Purchase Order and subscribing my/our signature hereto constitutes a contract with Thompson Pipe Group - Pressure. Firm: Signature: Printed Name: Title: Date: Thank you for your prompt action regarding this matter January 31, 2022 SJ Louis Mansfield �( F i F E G R o Li520 S. 6th Ave \ � F _9 SURE Mansfield TX, 76063 Attention: Adam Lunsford RE: Thompson Project Number: 210051 NORTHPOINTE 24-INCH WATER TRANSMISSION MAIN (N4-1A) Fort Worth, TX Change Order Number 3 Dear: Adam Due to changes in the project scope, we are sending you this Change Order for immediate action so that these changes can be released for procurement an/or fabrication as soon as possible. Please return a signed copy of this Change Order to us promptly to assure that you receive these materials in a timely manner. ITEMS LISTED BELOW CANNOT BE MANUFACTURED AND/OR SHIPPED UNTIL THIS FORM IS SIGNED AND RETURNED TO THOMPSON PIPE GROUP Quantity UOM Item Description Unit Price Extended Price 1 EA A41: REWORK CHARGE: COMPLETED @ 4.37' LL / REV TO 2.01' LL $1,159.20 $1,159.20 Total $1,159.20 Delivery estimate = No Affect Freight: If special shipments are required or shipment for this project has been completed, any additional freight charges which are incurred will be added to the above total. For additional information, please contact: David Nunez Thompson Pipe Group - Pressure Phone: (469)313-2501 Email: david.nun ez(a)thompsonpipeoroup com ACCEPTANCE: ][We hereby accept the above and all terms and conditions specified on the Purchase Order and subscribing my/our signature hereto constitutes a contract with Thompson Pipe Group - Pressure. Firm: Signature: Printed Name: Title: Date: Thank you for your prompt action regarding this matter CSC No. 56583-CO2 (FORT VETO RTH City of Fort Worth Change Order Request Project Name: 1 Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: F56583 Project No.(s):l 56020 0700430 5740010103505 001780 DOE No. N/A CityProj.No.:l 103505 Project Description: 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor: S.J. Louis Construction of Texas, Ltd. Change Order# 0 Date: 1 8/22/2022 City Project Mgr.1 Suzanne Abbe City Inspector: I Carmen Drake Phone Number: 1 817-392-8209 Phone Number: 817-948-0081 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Water Totals Contract Time (Calender days) $3,940,000.43 $3,940,000.43 270 $56,831.51 $56,831.51 010 $3,996,831.94 $3,996,831.94 280 Amount of Proposed Change Order $7,860.48 $7,860.48 Revised Contract Amount $4,004,692.42 Original Funds Available for Change Orders $157,600.57 Remaining Funds Available for this CO $100,769.06 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,004,692.42 280 $157;600.57 $100,769.06 1.64% $4,925,000.54 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 2 provides for the following: • Additional quantity of 24-inch concrete pipe with CSS backfill that is necessary for the project • The extension of a casing and carrier pipe to clear a gas main conflict. • The installation of a 24-inch gate valve to facilitate testing of the water main. • Additional concrete paving repair. • Pay item for tree removal that was not included at the time of bid opening. • Deletion of pay item quantities that are no longer needed on the project. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name CcAtraelor Sigaure Dat . ouis Construction of Texas, Ltd. Adam Lunsford Kir' $ 2.3 ZZ Ins Wtor Date, Project Mana er Date irector to ept) Date Con truction Supervisor(Water Dept) Date �h`ircorGrev h`a��cv T s, Aug 25, 2022 Senioe Assistant City Attorney'' Date Assistant City Manager Date Aug 26, 2022 gna Bur�Adof Aug 26, 2022 Council Action (If Required) M&C Number N/A M&C Date Approved A FC>y?,-r A2%740a-rM City of Fort Worth Change Order Additions Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) I City Sec No.: 1 56583 ProjectNo.(s): 56020 0700430 5740010103505 001780 .�� DOE No. N/A City Proj. No.: 103505 Project Description 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor S.J. Louis Construction of Texas, Ltd. --------JChange Order:= Date: City Project Mgr. Suzanne Abbe City Inspector CarmenDrake ADDITIONS MET E �4T QUQCdt`t Total 4C 3311.0685 24" Concrete AWWA C303 Water Pipe, CSS Backfill (Restrained Joints) Water 112.00 LF $474.00 $53.088.00 - 6 3305.2007 24" Water Carrier Pipe Water 12.00 LF $324.00 $3,888.00 7 3305.1202 42" CasingrFunnel Liner Plate By Other Than Open Cut Water 12.00 LF $1,133.00 $13,596.00 10 13312.3008 24" Gate Valve wl Vault Water 1-00JEA $35,200.00 $35,200.00 22 3201,0614 Conc Pvmt Repair, Residential Water 167.00 SY $120.00 $20,040.00 27 3305.0109 Trench Safety Water 48.00 LF $0.01 $0.48 30 Tree Removal Water 1.00 LS $14,432.50 $14,432.50 Page 2 of 4 Water $125,812.48 JAdditions Sub Total $125,812.481 FORT WORTH City of Fort Worth Change Order Deletions Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: 56583 Project No.(s): 56020 0700430 5740010103505 001780 DOE No. N/A City Proj. No.: 103505 Project Description 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor S.J. Louis Construction of Texas, Ltd. Change Order: F2 ] Date 1 8122/2022 City Project Mgr. Suzanne Abbe City Inspector: Earmen Drake DELETIONS (?ITEM DESCRIFTIONy�.c... DEPfT Qty;"Unit Unit,Cost (,Total, _W..::::; 1C 3311.0681 24" Concrete AWWA C303 Water Pipe Water 57.00 LF $268.00 $15,276.00 2C 3311.0682 24" Concrete AWWA C303 Water Pipe, CSS Backfill Water 4.00 LF $447.00 $1,788.00 3C 3311.0684 24" Concrete AWWA C303 Water Pipe (Restrained Joints) Water 3.00 LF $296.00 $888.00 29 9999.0001 Contingency Water 1.00 LS $100,000.00 $100,000.00 Water $117,952.00 FSub Total 1$117,952.00 rage n or 4 MMBE Breakdown for this Chanae Order � WSTypec Total Previous Change Orders Total Page 4 of 4 8/22/2022 CPN 103505 Northpointe 24" Water Transmission Main (N4-IA) Change Request 2 Notes Change Order No. 2 covers the following quantity changes: 1. Adjustment in pipe quantities by backfill and restraint type to reflect design intent. 2. A 12-foot extension of tunnel liner plate and carrier pipe (see attached sheet 9B). The extension the tunnel was necessary because a gas line that was not shown in the bid documents was located in the proposed bore pit. 2. An extra 24" butterfly valve and vault at the beginning of the project. The valve was added to avoid having to test existing water pipe. 3. Additional paving that was not included in the original bid documents. 4. An adjustment in trench safety based on the total length of the project. 5. A tree removal item was not included in the bid proposal. The contractor cleared approximately 1.09 acres of trees based on aerial photos of the project area. The contractor submitted a request of $23,666.91 based on 3.4 acres cleared. A reduced price of $14,432.50 was agreed upon based on the cost of mulching and hauling the trees with a 15% mark-up. The negotiated price is in line with TxDOT 3-month average low bid prices published in July ($14,000/acre statewide and $18,000 for Forth Worth). .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title ATTEST: Jannette S. Goodall (Aug 26, 2022 16:33 CDT) Jannette Goodall City Secretary CSC No. 56583-0O3 Fc-> P,- ' VV" FZT H City of Fort worth Change Order Request Project Name: I Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: F56583 Project No.(s):l 56020 0700430 5740010 103505 001780 DOE No. N/A CityProj.No.:l 103505 Project Description: 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway, Contractor: S.J. Louis Construction of Texas, Ltd. Change Order # Date: 1 1/19/2022 City Project Mgr.1 Suzanne Abbe City Inspector: I Carmen Drake Phone Number: 817-392-8209 Phone Number: 817-948-0081 Dept. Water Totals Contract Time (Calender days) Original Contract Amount $3,940,000.43 $3,940,000.43 270 Extras to Date $56,831.51 $56,831.51 010 Credits to Date $7,860.00 $7,860.00 Pending Change Orders (in M&C Process) Contract Cost to Date $3,988,971.94 $3,988,971.94 280 Amount of Proposed Change Order $0.00 $0.00 065 Revised Contract Amount $3,988,971.94 $3,988,971.94 345 Original Funds Available for Change Orders $157,600.57 $157,600.57 $108,629.06 Remaining Funds Available for this CO $108,629.06 Additional Funding (if necessary) 1.24% CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,925,000.54 JUSTIFICATION Change Order No. 3 provides for 65 additional calendar days. Staff recommends the additional contract time to cover: • Clearing 1.1 acres of trees that the developer was supposed to have cleared; • Paving three street crossings; • Additional tunneling to avoid conflict with an existing gas line; • Unanticipated conflicts with sewer stub -out, gas line, water line, and other utilities that took time to clear; and • Delays resulting from not being able to flush on certain days during the summer due to high water demands. It is understood and aoreed that the accentance of this Channe Order by the nnntractnr cnnstitutes an acmrd and satisfactinn and ranresants payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor s Company Name Contractor Name _yContract9Y signature Date -S.J. Louis Construction of Texas, Ltd. Adam Lunsford / Z3 I ector Dat6 Project Manager Date � tl23/z3 Director W t t DaEe Co struction Supervisor(Water Dept) Date Jan 26, 2023 ;" 3 Senior Assistant . City Attorney Date Assistant CiY Manager Date Jan 27, 2023 Jan 27 2023 Council Action If Required) M&C Number N/A M&C Date Approved NIA ��RT�RT 1E City of Fort Worth - —4 --- Change Order Additions Project Name I Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: 56583 Project No.(s): 1 56020 0700430 5740010103505 001780 DOE No. N/A City Proj. No.: 103505 Project Description 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor S.J. Louis Construction of Texas, Ltd. Change Order:=3 Date: 1119/2022 City Project Mgr. Suzanne Abbe CityInspector Carmen Drake ADDITIONS� p D�CRTPTf(Oi DEPT Qty Unit Unit Cost Total Water Page 2 of 4 Additions Sub Total FQ RT Wo RT H City of Fort Worth Change Order Deletions Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: 1 56583 Project No.(s): 56020 0700430 5740010103505 001780 DOE No. N/A City Proj. No.: 103505 Project Description 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor S.J. Louis Construction of Texas, Ltd. Change Order: F3 I Date 1 1/19/2022 City Project Mgr. Suzanne Abbe City Inspector: Carmen Drake DELETIONS rage 6 Or 4 Previous Change Orders Page 4 of 4 1/19/2023 CPN 103505 Northpointe 24-Inch Water Transmission Main (N4-IA) Change Order 3 Notes Staff considers the additional calendar days to be fair and reasonable for the identified items. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title ATTEST: Jannette Goodall City Secretary CSC No. 56583-CO4 FORT «O RT kj City of Fort worth Change Order Request Project Name: Northpointe 24-Inch Water Transmission Main (N4-IA) CitySec No.: 1 56583 Project No.(s):l 56020 0700430 5740010103505 001780 DOE No. N/A CityProj.No.:1 103505 Project Description:) 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor: S.J. Louis Construction of Texas, Ltd. City Project Mgr.1 Suzanne Abbe Phone Number: 817-392-8209 Change Order # ® Date: 2/9/2023 City Inspector: I Carmen Drake Phone Number: 817 948-0081 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Water Totals Contract Time (Calender days) $3,940,000.43 $3,940,000.43 270 $64,691.99 $64,691.99 075 $4,004,692.42 $4,004,692.42 280 Amount of Proposed Change Order $14,432.50 $14,432.50 Revised Contract Amount $4,019,124.92 Original Funds Available for Change Orders $157,600.57 Remaining Funds Available for this CO $92,908.58 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%) $4,019,124.92 345 $157,600.57 $92,908.58 2.01 % $4,925,000.54 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 4 provides funding for pay item no. 30 (Tree Removal). The pay item for tree removal was included in Change Order No. 2 but the cost was not reflected in the total amount of the proposed change order. This change order provides the necessary funding. _—C, aFlu agieeu a idt ale du:ePidnce w inis mange Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to. the above Change Order Contractors company Name Contractor Name 22ritractoLkignature Da Le S.J. Louis Construction of Texas, Ltd. Adam Lunsford y t I pector Date Project Manager ' Date fL—=i�L G/$/L/gl�2r �lLoil��i—/U a3 `� — •:."t��� _ \ . l `i �i; �L�' Director Eater Dept) Date Cons ction Su ervisor(Water Dept Date - eb 10, 2023 -3 Senior Assistant City Attorney Date Assi ant CityManager Date - Feb 13, 2023 , n:61_Y _17f _ _ Feb 14, 2023 Council Action If Required M&C Number N/A M&C Date Approved FORT WC3RTH City of Fort Worth Change Order Additions Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) I City Sec No.: 56583 Project No.(s): 56020 0700430 5740010103505 001780 DOE No. N/A City Proj. No.: 103505 Project Description 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace Parkway. Contractor S.J. Louis Construction of Texas, Ltd. Change Order:= Date: 2/9/2023 CityProject Mgr. Suzanne Abbe City Inspector FCarmen Drake ADDITIONS Fc3 P T WORTH City of Fort Worth Change Order Deletions Project Name Northpointe 24-Inch Water Transmission Main (N4-1A) City Sec No.: F56583 Project No.(s): 56020 0700430 5740010103505 001780 DOE No. =1 City Proj. No.: 103505 Project Descri tion 24-inch water transmission main extends from Park Drive to Business Highway 287 along Heritage Trace 1 p _.. Contractor S.J. Louis Construction of Texas, Ltd. Change Order: ED Date 2/9/2023 City Project Mgr. Suzanne Abbe City Inspector: I Carmen Drake DELETIONS f aSC 1 UI 1 Page 1 of 1 2/10/2023 Northpointe 24-Inch Water Transmission Main (N4-IA) CSC: 53066 CPN:103505 Change Order 4 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Suzanne Abbe Name of Employee Senior Engineer, Capital Project Delivery Title ATTEST: Jannette Goodall City Secretary FORTWORTH, February 17, 2023 SJ Louis Construction of Texas P.O. Box 834 Mansfield, TX 76063 Re: Acceptance Letter Project Name: Northpoint 24-inch Water Transmission Main (N4-1A) Project Type: Water Project Ns: 103505 DOE. Ns: N/A Contract Ns: 56583 Gentleman: Dated: 2/17/2023 On November 29, 2022 a final inspection was made on the subject project There were punch list items identified at the time. The punch list items were completed on November 29, 2022. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on November 29, 2024, which is the date of punch list completion and will extend for (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at (817) 392-6054 Yours Truly, 70 �� s� 0 /,., /', Tony Sholola, P.E., Assistant Director, Water Department TS / cc: Chris Harder, P.E., Director, Water Department Laura Wilson, P.E., Deputy Director, Water Department Captain Michael Skains, Fire Department Luke Coffman, Sanitary Sewer Systems Superintendent, Water Department Cesar Zavala, Water Systems Superintendent, Water Department Suzanne Abbe, Project Manager, Water Department Capital Projects Delivery David R Johnson, Inspection Supervisor, Water Department Capital Projects Delivery Carmen Drake, Inspector, Water Department Capital Projects Delivery William Weidman PE, Consultant Adam Lunsford, Contractor File Fort Worth NI-AmedcaChy WATER DEPARTMENT 1 I I I I THE CITY OF FORT WORTH * 200 TEXAS STREET * FORT WORTH, TEXAS 76102 817-392-8240 * FAX 817-392-8195 1964. 1993 •2011 C. Printed on recycled paper