HomeMy WebLinkAboutContract 57939-CO1For,-r W"P rH City of Fort Worth CSC No. 57939-COI ' Change Order Request Project Name: Clear Fork Lift Station City Sec No.: 57939 Project No.(s): 56020/0600430/001680 DOE No. N/A City Proj, No.: 100996 Project Description:) Lift Station wetwell piping and appurtenances; Three 10,500 gpm submersible sewage pumps; An electrical building and electrical and controls improvements, 750 kW standby generator, yard piping, vaults and site work, etc. Contractor; I Eagle Contracting, LLC Change Order # Date: 1 2/13/2023 City Project Mgr.1 Liam Conlon I City Inspector: Ronnie Cardenas Phone Number; 1 817-392-6824—Phone Number (817) 392-5928 Dept. Original Contract Amount Extras to Date Credits to Dale Pending Change Orders (in M&C Process) Contract Cost to Date Water Sewer Totals Contract Time (Calender (lays) $12,969,865.00 $12,969,865.00 480 $12,969,865.00 $12,969,865.00 480 Amount of Proposed Change Order $0.00 $0,00 Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $12,969,865.00 $12,969,865.00 480 $419,860.00 $419,860.00 $419,860.00 $419,860.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 0.00% $16,212,331.25 I JUSTIFICATION (REASONS) FOR CHANGE ORDER I Change Order No. 1 provides for the following: • Raising the majority of the structures on the site by 1-foot to accomodate anticipated future 100-year floodplain levels in accordance with the current stormwater criteria. A more robust coating system to mitigate potential corrosion on the wetwell piping. • The installation of wall penetration sleeves to accomodate three lift station discharge pipes. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name Contractor Signature I Date Eagle Contracting, LLC Daniel Vargas I ark f'/ereoe 1 211 23 dns e6or Date Project Wnager Date Director Water Dept Date Conyuction Su ervjsor Da e CLP%fto�Gl2�ff�Y�l2� Feb 24, 2023 Senior Assistant City Attorney Date Assistant City Manager Date Feb 28, 2023 oana BuryhaaFf Feb 28, 2023 Council Action If Required OFFICIAL RECORD M&C Number NIA M&C Date Approved CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth Change Order Additions Project Name Clear Fork Lift Station City Sec No.: 1 57939 Project No.(s): 56020 10600430 1001680 DOE No. = City Proj. No.: 100996 Project Description Lift Station wetwell piping and appurtenances; Three 10,500 gpm submersible sewage pumps; An electrical building and electrical and controls improvements, 750 M standby generator, yard piping, vaults and site work, etc. Contractor Eagle Contracting, LLC Change Order:= Dale: 2/1312023 City Project Mgr. Liam Conlon City Inspector FRonnieCardenas ADDITIONS FORT WORTH City of Fort Worth Change Order Deletions Project Name Clear Fork Lift Station City Sec No.: 57939 Project No.(s): 56020 / 0600430 / 001680 DOE No. N/A City Proj. No.: 100996 Project Description Lift Station wetwell piping and appurtenances; Three 10,500 gpm submersible sewage pumps; An electrical building and electrical and controls improvements, 750 kW standby generator, yard piping, vaults and site work, Contractor Eagle Contracting, LLC Change Order: F —I] Date 2/13/2023 City Project Mgr, Liam Conlon City Inspector: I Ronnie Cardenas DELETIONS ITEM IDESCRIPTION I DEPT I Qty JUnit I Unit Cost Total 41 9999.0016 - CONTINGENCY IWATER 10.45681911 LS 1 $100,000.00 $45,681.91 81.91 Sewer Page 3 of 4 (Deletions Sub Total 1$45,681.91 Previous Change Orders Page 4 of 4 2/13/2023 Clear Fork Lift Station CSC: 57939 CPN:100996 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. lX ` 61�' Signature Liam Conlon Name of Employee Project Manager Title a EORTo oo9dd do ATTEST: o$o oz� '� ° o ° *d tEXAsob �naa000 Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX