HomeMy WebLinkAboutContract 57657-A1Date Received: Mar 1, 2023 Time Received: 3:13 p.m. (2/28/23) City Secretary Contract No.: 57657-A1 FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 57657 A COMMUNITY FACILITIES AGREEMENT BETWEEN THE CITY OF FORT WORTH AND ORCHARD FARMS VENTURES, LLC This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 57657 ("First Amendment") is made and entered into by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the state of Texas, and Orchard Farms Ventures, LLC ("Developer"), a Florida limited liability company. WHEREAS, the City and Developer entered into a Community Facilities Agreement for the construction of public infrastructure Improvements for a Project known as Orchard Village Phase IA, City Project Number 101759, City Secretary Contract No. 57657 ("CFA"); and WHEREAS, prior to proceeding to construction pursuant to the CFA Developer has hired a new contractor to construct the Improvements; and WHEREAS, City and Developer desire to amend the CFA to reflect the new contractor, the revisions to the project cost and estimated fees for the project, and the increase in the financial guarantee; NOW THEREFORE, City and Developer, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends City Secretary No. 57657: Section 36 of the CFA is amended in its entirety to be and read as set forth in Exhibit A of this First Amendment. 2. The Cost Estimates in the CFA are amended in their entirety to be and read as set forth in Exhibit B of this First Amendment. 3. Section 5 of the CFA is amended to add the following sentence after the first paragraph: In connection with hiring a new contractor to construct the Improvements and the associated increase in cost for the Improvements, Developer has provided the City with a bond rider to increase the development bond provided for the CFA to $4,209,316.00. City of Fort Worth, Texas First Amendment to City Secretary Contract No. 57657 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 4. Section 14 of the CFA is amended to add the following sentence after the first paragraph: In connection with hiring a new contractor to construct the Improvements and the associated increase in construction inspection service fees, Developer has paid to the City an additional $10,750.00 in construction inspection service fees. 5. a. All other provisions of City Secretary Contract No. 57657 which are not expressly amended herein, shall remain in full force and effect. b. All terms in this First Amendment that are capitalized, but not defined, shall have the meanings ascribed to those terms in City Secretary Contract No. 57657. [SIGNATURES ON FOLLOWING PAGE] City of Fort Worth, Texas First Amendment to City Secretary Contract No. 57657 IN TESTIMONY WHEREOF, the City and Developer have executed this First Amendment to be effective on the date signed by the City's Assistant City Manager. CITY OF FORT WORTH ��q �I�GILIG�Oi� Dana Burghdoff (Fe 27, 202 1 :53 CST) Dana Burghdoff Assistant City Manager Date: Feb 27, 2023 Recommended by: Dwayne Hollars (Feb 27, 202314:24 CST) Dwayne Hollars Contract Compliance Specialist Development Services Approved as to Form & Legality: 4r2, - Richard A. McCracken (Feb 27, 2023 14:27 CST) Richard A. McCracken Sr. Assistant City Attorney M&C No. N/A Form 1295: N/A 2 ATTEST: %00 V DOS T� ?� 000000ao a n� AiXA?z�o, Jannette S. Goodall City Secretary DEVELOPER Orchard Farms Ventures, LLC J Boyce (Feb 27, 29 15:19 EST) James Boyce Authorized Signatory Date: Feb 27, 2023 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including all performance and reporting requirements. M,,&\ Rebecca Diane Owen (Feb 27, 2023 14:25 CST) Name: Rebecca Diane Owen Title: Development Manager OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas First Amendment to City Secretary Contract No. 57657 EXHIBIT A 36. Cost Summary Sheet Project Name: Orchard Village Phase IA CFA No.: CFA18-0147 City Project No.: 101759 IPRC No.: IPRC18-0045 Items A. Water and Sewer Construction 1. Water Construction 2. Sewer Construction Water and Sewer Construction Total B. TPW Construction 1. Street 2. Storm Drain 3. Street Lights Installed by Developer 4. Signals TPW Construction Cost Total Total Construction Cost (excluding the fees) Estimated Construction Fees: C. Construction Inspection Service Fee D. Administrative Material Testing Service Fee E. Water Testing Lab Fee Total Estimated Construction Fees: Financial (4uarantPP (7ntinnc chnncP nnP Developer's Cost $ 841,309.00 $ 737,784.00 $ 1,579,093.00 $ 1,864,038.00 $ 567,050.00 $ 199,135.00 $ 2,630,223.00 $ 4,209,316.00 $68,750.00 $21, 315.00 $1, 290.00 $ 91,355.00 Choice dmnunt Mark nnPI Bond = 100% $ 4,209,316.00 Completion Agreement = 100% / Holds Plat $ 4,209,316.00 X Cash Escrow Water/Sanitary Sewer= 125% $ 1,973,866.25 Cash Escrow Paving/Storm Drain = 125% $ 3,287,778.75 Letter of Credit = 125% $ 5,261,645.00 City of Fort Worth, Texas First Amendment to City Secretary Contract No. 57657 EXHIBIT B SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Orchard Village Phase IA City Project 101759 UNIT PRICE BID Bidder's Application Project Item Inf'onnation Bidders Proposal Bidlist Item No. Description Specification Section No. I Unit of I Bid I Measure Quarn Unit Pnce Bid Value UNIT k WATER IMPROVEMENTS 1 3311.0261 W PVC Water Pipe 3311 10 3311 12 LF 1 4,736 1 $54.001 $255,744.00 2 33123003 8" Gate Valve & Valve Box 33 12 20 EA 1 23 $1,500.00' $34,500.00 3 3311.0341 10" PVC Water Pipe 33 11 10 3311 12 LF 1.955 $68.001 $132,940.00 4 33123004 10" Gate Valve & Valve Box 33 12 20 EA 5 $2,200.00 $11 000.00 5 3312.0001 Std. Fire Hydrant Assembly wl 5' Gate Valve & Valve F 33 12 40 EA 8 $48.00 $354.00 6 3311.0001 Ductile Iron Water Fittings wJ Restraint 3311 11 TON 1.4 $15.000.00 $21.000.05 7 3305.0109 Trench Safety 33 05 10 LF 6 691 $1.00 $6,691.00 8 13312.2003 1" Domestic Water Services 33 12 10 EA 225 $1,150.00 $258.750.00 9 33122003 1" Irrigation Water Services 33 12 10 EA 1 $1.500.00 $1 500.00 10 3312.4113 16"x 1 (Y'Tappina Sleeve & Valve 33 12 25 EA 1 $9 500.00 $9 500.00 11 3305.0003 8" Waterline Lowering 33 05 12 1 EA 5 $3.500.00 $17.500.00 12 %99.0001 16' Ebsbn Waterline Lowering33 05 12 EA 1 $55,300.00 $55,300.00 13 3312 3006 16" Gate Valve w/ Vault 33 1220 1 EA 1 1 $36 500.00 $36.500 00 TOTAL UNIT I: WATER IMPROVEMENTS $941,309,00 tIN1T II: SANITARY 5EWER IMPROVEMENTS 14 3331.4115 8" SDR-26 PVC Sewer Pipe 33 11 10, 33 31 12, 33 31 20 LF 5,660 $62.00 $350,920.00 15 3331.3101 SDR-26 4" Sewer Services 33 31 50 EA 225 $850.00 $191,250.00 16 3339.1001 4' Std. Dia. Manhoe 33 39 10 33 39 20 EA 25 $4,500.00 $112,500.00 17 3339.1003 Extra Depth for 4' Dia. Manhole 33 39 10 33 39 20 LF 38 $225.00 $8,550.00 18 3331.4116 8" PVC Sanitary Sewer Pipe w! CSS Backfill JS 3120 LF 418 $72.00 $30,096.00 19 3305.0109 Trench Safety 33 05 10 LF 6.078 $2.00 $12,156.00 20 3301.0002 Post -CCTV Inspection 33 01 31 LF 6 078 $4.00 $24,312.00 21 9999.0002 Connect to 8" Sewer in Phase 2 00 00 00 EA 2 $7,500.00 $3,000.00 22 3301.0101 Vacuum Test Manholes 3301 30 EA 1 25 $200.00 $5,000.00 TOTAL UNIT I: SANITARY SEWER IMPROVEMENTS $737 784.00 UNIT IN: STORM DRAIN MPROVEMENTS 23 3349.5001 10' Curb Inlet 33 49 20 1 EA 14 $3.800.001 $53,200.00 24 3349.5002 16 Curb Inlet 334920 EA 2 $000.00 $9,600.00 25 3349.5003 29 Curb Inlet 334920 EA 3 $5.800.001 $17,400.00 26 3341.0201 21" Class III R.C.P. 3341 10 1 LF 550 $72.00 $39,600.00 27 3341.0205 24" Class III R.C.P. 3341 10 LF 997 $82.00 $81.754.00 28 3341.0302 30" Class III R.C.P. 3341 10 LF 308 $110.00 $33,880.00 29 3341.0402 42" Class III R.C.P. 333 10 LF 248 $160.00 $39,680.00 30 9999.0003 5' x 2' Box Culvert 33 41 10 LF 1 289 1 $330.00 $95 370.00 31 3341.1302 6' x 3' Box Culvert 3341 10 LF 1 131 $420.00 $55,020.00 32 3349.4104 21" Class III R.C.P. Sbped End Headwall 334940 EA 1 $3,000.00 $3,000.00 33 3349.4204 Double 21" Class III R.C.P. Sloped End Headwall 334940 EA 2 $5,500.00 $11,000.00 34 9999.0004 5'x2'Soped End Headwall 36 49 40 EA 1 $5,000.00 $5 000.00 35 9999.0005 6' x 3' Sbped End Headwall 364940 EA 2 $7,500.00 $15,000.00 36 3349.0001 4 x 4' Sbryn Junction Box 334910 EA 5 $5 500.00 $27 500.00 37 19999.0006 6 x 4' Storm Junction Box 34 49 10 EA 1 $7,500.00 $7,500.00 38 9999.0007 7 x 4' Storm Junction Bolt 34 49 10 EA 2 $8,500.00 $17,000.00 39 3305.0109 Trench Wet 330510 LF 2,523 $2.00 $5,046.00 40 3305.0112 Concrete Collar 330517 EA 3 $1.000.00 $3,000.00 41 3137.0104 Medium Stone Ri ra . d 31 3700 SY 380 $125.00 $47 500.00 TOTAL UNIT III: STORM DRAIN IMPROVEMENTS SW7,050.00 City of Fort Worth, Texas First Amendment to City Secretary Contract No. 57657 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Orchard Village Phase 1A City Projccf 101759 UNIT PRICE BID Bidder's Application Project Item Infommtion Bidder's Proposal Bidlist Description Specification Section No. Unit of Bid I Unit Price Bid Value Item No. Measure Quantity UNIT IV: PAVING IMPROVEMENTS 42 3213-0101 6" Concrete Pavement (Residential 32 13 13 SY 22 619 $48.00 $1,085,712.00 43 3213.0101 6" Concrete Pavement (Alley) 32 13 13 SY 5.95E $52.00 $309.712.00 44 3211.0501 6" Lime Treated Su rade (Residential) 32 11 29 SY 30 546 $4.00 $122,184.00 45 3211.0400 Hydrated Lime 36 lbs./S.Y. Residential 32 11 29 TON 550.0 $245,00 $134,750.00 46 3213.0501 R-1 Ramp 32 1320 EA 17 $2,200.00 $37,400.00 47 3213.0506 P-1 Ramp 32 1320 EA 50 $2,000.00 $100,000 00 48 13213.0302 5' Concrete Sidewalk 32 12 20 LF 1 1,676 $20.00 $33,520.00 49 9999.0008 End of Road Barricade 00 00 00 EA 4 $800.00 $3,200.00 50 9999.0009 Concrete Header 00 00 00 LF 116 $25,00 $2,900.00 51 9999.0010 Sav,cut & Dispose of Concrete Curb & Gutter 00 00 00 LF 69 $30.00 $2,070.00 52 9999.00010 St Sign w/Stop Sin 00 00 DO EA 17 $850.00 $14,450.00 53 9999.0011 St Marker Blade 00 00 00 EA 34 $250.00 $8.500.00 54 3291.0100 Topsoil 32 91 19 CY 78 $28.00 $2,184.00 55 3292.0100 Block Sod Placement 32 92 13 SY 1 932 $8.00 $7 456.00 TOTAL UNIT IV: PAVING IMPROVEMENTS $1,864,038.D0 Bid Summary UNIT I: WATER IMPROVEMENTS $841.309.00 UNIT 11: SANITARY SEWER IMPROVEMENTS $737,784.00 UNIT III: STORM DRAIN IMPROVEMENTS $567,050.00 UNIT IV: PAVING IMPROVEMENTS $1 864 038.00 This bid is submitted by the entity listed below Conatser Construction TX, L.P. By: Brock Huggins 5327 Wichita Street t Ft. Worth, TX 76119 817-534-1743 SignAKrW Title: President Date: 12/30/2022 Contractor agrees to complete WORK fur FINAL ACCEPTANCE wltbin 220 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END ON' SECTION City of Fort Worth, Texas First Amendment to City Secretary Contract No. 57657 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Orchard Village Phase to City Projecl ID1754 UNIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Bidlisl Description Specification Section No. Unit of Bid Unit Price Bid Value Item No, Measure Quantity UN V: STREET LIGHTING IMPROVEMENTS 55 3441.3201 LED Lighting Fixture 34 41 20 EA 27 $750.00 $20,250.00 56 2605.3011 2" Conduit PVC SCH 40 T 26 05 33 LF 2 165 $14.00 $30,310.00 57 3441.1408 No. 6 Insulated Elec Condr 34 4112 LF 6,495 $5.00 $32,475.00 58 3441.3301 Rd Illumination Foundation T 1 34 41 2O EA 27 $1,200.00 $32,400.00 59 3441.3341 Rdwy Illumuminabon Pole Type 11 3441 10 1 EA 1 27 $3 100.00 $83,700.00 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $199.135.00 This bid is submitted by the entity listed below: Conatser Construction TX, L.P By: Brock Huggins 5327 Wichita Street Ft Worth, TX 76119 817-534-1743 r Sig Title: President Date: 12/30/2022 Contractor agrees to complete WORK for FINAL ACCEPTANCE within 30 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION City of Fort Worth, Texas First Amendment to City Secretary Contract No. 57657