Loading...
HomeMy WebLinkAboutContract 59013CSC No. 59013 FORT WORTH CONTRACT FOR THE CONSTRUCTION OF Marine Creek Ranch Park and Trail City Project No. 102225 Mattie Parker David Cooke Mayor City Manager Dave Lewis Acting Director, Park & Recreation Department Prepared for: The City of Fort Worth Park & Recreation Department 2022 Prepared by: The Landscape Alliance 951 W. Pipeline Rd., #410 Hurst, TX 76053 (817) 589-8909 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH, City of Fort Worth Standard Construction Specification Documents Adopted September 2011 000000-1 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions Page 1 of 3 00 05 10 Mayor and Council Communication 12/13/2022 0005 15 Addenda 00 11 13 Invitation to Bidders 07/19/2021 0021 13 Instructions to Bidders 11/02/2021 0035 13 Conflict of Interest Affidavit 02/24/2020 00 41 00 Bid Form 09/30/2021 00 42 43 Proposal Form Unit Price 09/30/2021 00 43 13 Bid Bond 09/11/2017 00 43 37 Vendor Compliance to State Law Nonresident Bidder 09/30/2021 nn� Bidders n .o alig .ations nQ non 00 45 12 Prequalification Statement 09/30/2021 nn� n..o,,, alif,.ation A..plie.6en nQn�21 00 45 26 Contractor Compliance with Workers' Compensation Law 07/01/2011 00 45 40 Business Equity Goal 10/27/2021 00 52 43 Agreement 08/22/2022 0061 13 Performance Bond 07/01/2011 0061 14 Payment Bond 07/01/2011 0061 19 Maintenance Bond 07/01/2011 00 61 25 Certificate of Insurance 07/01/2011 00 72 00 General Conditions 08/23/2021 00 73 00 Supplementary Conditions 03/09/2020 Division 01- General Requirements 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 07/01/2011 01 31 19 Preconstruction Meeting 08/17/2012 013120 Project Meetings 07/01/2011 01 32 16 Construction Schedule 08/13/2021 01 32 33 Preconstruction Video 07/01/2011 01 33 00 Submittals 12/20/2012 01 35 13 Special Project Procedures 03/11/2022 01 45 23 Testing and Inspection Services 03/09/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 55 26 Street Use Permit and Modifications to Traffic Control 03/22/2021 01 57 13 Storm Water Pollution Prevention Plan 07/01/2011 0158 13 Temporary Project Signage 07/01/2011 01 60 00 Product Requirements 03/09/2020 01 66 00 Product Storage and Handling Requirements 07/01/2011 01 70 00 Mobilization and Remobilization 11/22/2016 01 71 23 Construction Staking and Survey 02/14/2018 01 74 23 Cleaning 07/01/2011 01 77 19 Closeout Requirements 03/22/2021 01 78 23 Operation and Maintenance Data 12/20/2012 01 78 39 Project Record Documents 07/01/2011 CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project #102225 Revised March 11, 2022 000000-2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 3 Division 02 - Existing Conditions 0241 13 Selective Site Demolition 0241 15 Paving Removal Division 03 — Concrete 03 1000 Concrete Formwork and Accessories - Bridge 03 20 00 Concrete Reinforcement - Bridge 03 30 00 Cast -in -Place Concrete - Bridge 03 30 01 Cast -In -Place Concrete 03 63 29 Drilled Piers - Bridge Division 05 — Metals 1050500 1 Common Work Results for Electrical Division 11— Furnishings 1166 13 Site Underdrains 1167 13 Site Furnishings 1168 14 Playground Equipment 1169 15 Wood Fiber Playground Surfacing Division 26 — Electrical 1260500 1 Common Work Results for Electrical Division 31 - Earthwork 31 1000 Site Clearing 3123 16 Unclassified Excavation 31 24 00 Embankments 31 25 00 Erosion and Sediment Control 313700, Division 32 - Exterior Improvements 3201291 Concrete Paving Repair 32 01 90 Preservation + Protection of Plant Materials 32 13 13 Concrete Paving 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 32 1373 Concrete Paving Joint Sealants 32 1723 Paving Markings 32 80 00 Site Irrigation System 3291 19 Topsoil Placement 13292 13 Hydro -Mulching, Seeding, and Sodding 1329343 Trees and Shrubs Division 33 - Utilities 33 04 30 Temporary Water Services 3305 10 Utility Trench Excavation, Embedment, and Backfill 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 33 05 30 Location of Existing Utilities CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project#102225 Revised March 11, 2022 000000-3 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 3 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 33 49 40 Storm Drainage Headwalls and Wingwalls GC-6.02 Geotechnical Investigation (CNJ, Report No. 1451-21-04) GC-6.03 Minority and Women Owned Business Enterprise Compliance GC-6.04 Wage Rates GC-6.06 Weather Table END OF SECTION CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project#102225 Revised March 11, 2022 City of Fort Worth, Texas Mayor and Council Communication DATE: 12/13/22 M&C FILE NUMBER: M&C 22-1065 LOG NAME: 80MARINE CREEK RANCH SUBJECT (CD 2) Authorize Execution of a Contract with 2L Construction LLC, in the Amount of $2,816,947.50 for the Construction of the Marine Creek Ranch Project, Adopt Appropriation Ordinance and Amend the Fiscal Years 2023-2027 Capital Improvement Program (2018 Bond Program) RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of a contract with 2L Construction, LLC, in the amount of $2,816,947.50 for construction of the Marine Creek Ranch project; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the PARD Dedication Fees in the amount of $430,000.00, from available funds, for the purpose of funding the Marine Creek Ranch project (City Project No. 102225); and 3. Amend the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize execution of a contract with 2L Construction LLC, in the amount of $2,816,947.50, for the construction of the Marine Creek Ranch project. On October 11, 2019 the City of Fort Worth administratively executed an engineering contract with Gary Paul Kutilek d/b/a The Landscape Alliance, in the amount of $81,827.00 for master planning and design services associated with the development of capital improvements at Marine Creek Ranch. This contract was subsequently amended to include final design documents, and additional hydrologic and hydraulic study (M&C 20- 0775), bringing the total contract amount to $379,889.00. The project was posted on the city purchasing website on September 7, 2022 and advertised in the Fort Worth Star -Telegram on September 8 & 15, 2022. A pre -bid conference was held on September 29, 2022. The following bids were received on October 6, 2022. Contractor Base Bid Unit Base Bid Unit AlternateBid Total Bid 2L Construction, LLC $1,056,469.70 $1,312,587.50 $447,890.40 =1 $2,816,947.60 MSB Constructors, Inc. 11$958,942.24 11 $1,590,269.52 $370,323.36 $2,919,535.12 The Fain Group, Inc. $1,167,532.00 $1,469,524.00 $333,320.00 $2,970,376.00 RJM Contractors, Inc. Cole Construction, Inc. $1,081,264.80 $1,612,841.89 $1,654,845.60 J $1,738,925.62 jl$376,593.63 $499,509.84 $3,325,620.24 $3,728,361.14 LJ Design & Construction, LLC $1,388,843.26 $2,139,498.03 $464,121.15 $3,992,462.44 North Rock Construction, LLC $1,749,824.39 $1,875,300.00 $572,654.21 1 1$4,197,778.591 Base Bid Unit I improvements include: site preparation and the installation of concrete loop trail, culvert, and parking lot addition. Base Bid Unit II improvements include: site preparation and the installation of concrete trail with 2 pedestrian bridges, and concrete boardwalk. Alternative Bid items include: the installation of basketball court with connecting bleacher, trail kiosk, playground backstop, additional site lighting, concrete walks, pavilion with slab, benches, picnic tables and trees. Construction of this project is anticipated to begin in February 2023 and completed in February 2024. Marine Creek Ranch Park is estimated to increase the department's annual maintenance cost by $70,520.00 beginning in FY2025. As of October 31, 2022, the cumulative total of all previously approved M&Cs increased the department's estimated annual maintenance cost by $197,855.00 beginning in FY2024. This project was included in the 2018 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No 23209-05-2018) and subsequent actions taken by the Mayor and Council. Compliance with the City's Business Equity Ordinance has been achieved by the following method: 2L Construction LLC, is in compliance with the City's Business Equity Ordinance by committing to 14% Business Equity participation on this project. The City's Business Equity goal on this project is 10%. Marine Creek Ranch is located in COUNCIL DISTRICT 2. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Community Park 18 and Community Park 20 projects within the PARD Dedication Fees Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the 2018 Bond Program Fund and PARD Dedication Fees Fund for the Marine Creek Ranch project. Prior to any expenditure being incurred, the Park & Recreation Department has the responsibility to validate the availability of funds. Submitted for City Manager's Office by: Jesica L. McEachern 5804 Originating Business Unit Head: Dave Lewis 5717 Additional Information Contact: Joel McElhany 5745 SEPTEMBER 21, 2022 Prospective Bidders Addendum #1 Marine Creek Ranch Park, CPN: 102225 TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify explain or correct the original drawings and/or project manual. PROJECT MANUAL REFER TO SECTION 00 21 13, item 17.4 The 35% work percentage is a required element. End of Addendum #1 Bid Opening Date: October 6,2022 Acknowledge the receipt of this Addendum on your Proposal. By: 11&�V U. 11&V3 Park Planner (817) 392-7372 helen.florez@fortworthgov.org Gary Kutilek The Landscape Alliance (817) 589-8909 gkutilek(a�thelandscapealliance.com Release Date: September 22,2022 SEPTEMBER 28, 2022 Prospective Bidders Addendum #2 Marine Creek Ranch Park, CPN: 102225 TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify explain or correct the original drawings and/or project manual. PROJECT MANUAL REFER TO SECTION 00 42 43 DELETE Section 00 42 43 Proposal Form section from the Spec Book. REPLACE with attach Section 00 42 43 section in the Spec Book (Bid Line item description and quantities for Marine Creek Ranch Park have changed). End of Addendum #2 Bid Opening Date: October 6, 2022 Acknowledge the receipt of this Addendum on your Proposal. By: 111&&V. 0. Alay. Park Planner (817) 392-7372 helen.florez@fortworthgov.org Gary Kutilek The Landscape Alliance (817) 589-8909 gkutilek(a�thelandscapealliance.com Release Date: September 28, 2022 UNIT PRICE BID SECTION 00 42 43 PROPOSAL FORM - BID UNIT I Project Item Information 00 42 43 BID PROPOSAL Page 1 of 1 Bidder's Application Bidder's Proposal Bidlist Item No 1 2 3 4 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 1 13 1 14 1 15 1 16 1 17 1 18 1 19 1 20 1 21 1 22 1 23 24 Description I Construction Staking and Survey I Mobilization I Temporary Construction Sign I Tree Removal Stabilized Construction Entrance (Install) I Stabilized Construction Entrance (Remove) I Temporary Sediment Control Fence (Install) I Temporary Sediment Control Fence (Remove) I Concrete Wash Out (Install & Remove) I Storm Water Pollution Prevention Plan I Site Grading I Parking Lot Demolition I Parking Lot Addition I Parking Lot Light Relocation I Temporary Parking Lot Fencing I Signs and Markings 18' Concrete Trail 16' Concrete Trail / Sidewalk I Playground W/Concrete Perimeter Walk I Culvert M-4 (18" RCP) I Dual 18" TXDOT CH-FW-0 Headwall (includes riprap) Grass Sodding I Grass Seeding Temporary Irrigation Specification Section No. I 01 7123 I 01 70 00 I 01 58 13 31 00 00 31 2500 I 31 25 00 I 31 25 00 I 31 25 00 31 25 00 I 01 57 13 I 3123 16 I 0241 13 I 31 13 13 I 26 05 00 I per dwg I 32 1723 32 13 13 I 32 13 13 I per dwg I 33 41 00 33 49 40 32 92 23 I 3292 13 32 80 00 Unit of Measure I LS LS Bid Quantity I 1 1 Unit Price Bid Value EA LS SY I SY I LF I LF SF I LS I LS I LS I LS I LS I LS I LS SF I SF I LS LF EA SF I SF LS 1 I 1 340 I 340 I 100 I 100 I 100 I 1 I 1 I 1 I 1 1 1 I 1 I 17,824 I 5,364 I 1 I 30 I 2 8,000 1480,000 1 Base Bid Total Unit I Unit 1 - Alternates 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8 1 9 1 10 1 11 1 12 13 Clearing, Grading, Restoration in NE Section of Park I Baskeball Court W/Connecting Walk, Bleacher, Goals I Pavilion W/ Slab I Trail Kiosk I Tree Planting I Permanent Irrigation I Playground Backstop I New Site Lighting 14 FT Concrete Walks Along Street 18 FT Concrete Walks To Pavilion I Benches on Pads at Playground 16' Picnic Tables in Pavilion 8' ADA Picnic Table in Pavilion per dwg I per dwg I per dwg I per dwg I 32 93 43 I 32 80 00 per dwg I 26 05 00 I 32 13 13 I 32 13 13 I 11 67 13 I 11 67 13 1167 13 LS I LS I LS I LS I LS LS LS LS I SF I SF I EA EA 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 836 I 536 I 3 2 EA 1 Alternate Total Bid Unit 1 CITY OF FORT WORTH Marine Creek Ranch Park and Trail Project STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS #102225 Revised 9/30/2021 UNIT PRICE BID SECTION 00 42 43 PROPOSAL FORM - BID UNIT II Project Item Information 00 42 43 BID PROPOSAL Page 1 of 1 Bidder's Application Bidder's Proposal Bidlist Item No 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 I 20 I 21 22 1 23 24 25 26 27 28 29 30 I 31 32 33 34 35 Description I Construction Staking and Survey I Mobilization (10% Max of Bid) I Temporary Construction Sign I ROW Preparation (Clear & Grub.) I Tree Protection I Tree Removal I Fence Removal I Stabilized Construction Entrance (Install) I Stabilized Construction Entrance (Remove) Temporary Sediment Control Fence (Install) I Temporary Sediment Control Fence (Remove) I Concrete Wash Out (Install & Remove) I Rock Dam Filter (Install & Remove) I Storm Water Pollution Prevention Plan I Excavation I Embankment Material Haul Off I Concrete Trail (6") (includes sub -grade prep) Prefabricated Concrete Boardwalk (includes all components necessary for a complete and functioning system) 30' X 10 Prefabricated Low -Water Crossing 70' X 14' Prefabricated Pedestrian Bridge 118" Drilled Shafts 1 24" Drilled Shafts I Concrete Abutment (CL C) I Concrete Approach Slab I Stone Rip -Rap Culvert M-1 (18" RCP) Culvert M-2 (18" RCP) I Culvert M-3 (Dual 18" RCP) 118" TXDOT CH-FW-0 Headwall Fine Grading I Block Sodding I Revegetation of Temporary Access on EMSISD Property Revegetation of Construction Easement Temp. Watering, Maintenance & Establishment (3 Specification Section No. I 01 7123 I 01 70 00 I 01 58 13 31 00 00 32 01 90 I 31 00 00 I 31 00 00 I 31 25 00 31 25 00 31 25 00 I 31 25 00 I 31 25 00 31 25 00 I 01 57 13 3123 16 I 31 24 00 31 00 00 I 32 13 13 Per Wings I Per drawings I Per drawings 03 63 29 03 63 29 03 30 00 I 32 13 13 31 3700 3341 10 33 41 00 33 41 00 33 49 40 I Per drawings I 3292 13 I 3292 13 3292 13 3293 13 Unit of Measure I LS I LS I EA STA LF I LS I LF I SY SY LF I EA I SF EA I LS LS I LS CY I SY SF I LS I LS I LF LF I CY I SY I CY LF LF LF EA I LS SY I SY SY LS Bid Quantity I 1 I 1 I 1 I 46.83 I 4875 I 1 I 28 I 340 I 340 2740 I 2740 I 50 I 2 I 1 I 1 I 1 511 I 5330 1600 1 1 80 Unit Price Bid Value 80 I 22.34 I 54 I 215 23 I 27 I 23 6 1 I 6500 I 3400 9600 1 Base Bid Total Unit II - CITY OF FORT WORTH Marine Creek Ranch Park and Trail Project STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS #102225 Revised 9/30/2021 SEPTEMBER 30, 2022 Prospective Bidders Addendum #3 Marine Creek Ranch Park, CPN: 102225 TO ALL BIDDERS: Please attach to your specifications. This addendum is hereby made a part of the Contract Documents and is issued to modify explain or correct the original drawings and/or project manual. General Information & Clarifications (apalies to Bid Units 1 & 21 A copy of the sign in sheet is attached. A copy of the plan holders list is attached The geotechnical report has been added to the City's resource site for this project for bidder review and reference. City of Ft. Worth does not allow negotiations or changes in contract amounts due to material cost escalation after the bid is awarded. SECTION 00 45 00 — Bidders Prequalification's Delete this section in its entirety. Bidder prequalification is not required for this project. Bid Unit 1 Plan Sheets Sheet L1.01: The note related to removal of existing islands states "sawcut and remove existing islands and adjacent pavement as shown. Replace with 15" pavement pr details. Match/adjust grade." Replaced pavement depth shall be 6" depth per notes on 1-1.02 and paving details. Sheet L1.09: Picnic tables referenced by Model Numbers no longer in stock. Picnic tables shall be as follows: 1. 2 — P238-P6 UltraCoat 6' tables, surface mount, Brown seat and frame by Ultraplay paula@cunninghamrec.com 2. 1- P238HP8 UltraCoat Accessible 8' Table, surface mount, Brown seat and frame by Ultra Play. Sheet L1.13: Bleacher Model referenced on this sheet is no longer available. Bleacher shall be 1. Belson BP-0309, 9' — 3 row aluminum with treated wood sill per manufacturers detail. Belson.com 800-323-5664. Bid Unit 2 Project Manual SECTION 00 42 43 — Proposal Form — Bid Unit H Replace Bid Unit II proposal form with revised Bid Unit II Proposal Form attached hereto. 1. Line -item number 20 revised to: "Pedestrian Bridge #2 -30' x 12' Prefabricated Pedestrian Bridge". Unit of measure and bid quantity do not change. 2. Line -item number 21 revised to: "Pedestrian Bridge #1 - 70' x 12' Prefabricated Pedestrian Bridge". Unit of measure and bid quantity do not change. SECTION 32 40 00 - Pedestrian Bridges 1. Item 2.5, C.: Bollards shall be model 'Single Post (LPHDHB)' as manufactured by Traffic Guard, www.trafficquard.net, or approved equal. Bollards shall be mounted to and centered on the abutment per the manufacturer's recommendations. 2. Approved pedestrian bridge manufacturers include: • Wheeler Bridges, Contact: Andrew Messer, (817) 320-2452 • True North Steel, Contact: Daylen Borders, (902) 363-8504 • Contech Engineered Solution, Contact: Brian Lopas, (214) 316-3954 • Wagner CFT, Contact: Anthony Mauro, (817) 470-7821 Plan Sheets Sheet C14 — Plan Profile Sta 15+00 to 20+00: Change note that reads "30' Low Water Crossing" to "30' Pedestrian Bridge" Sheet C50 — Pedestrian Bridge Layout: Delete this sheet and replace with sheet C50 Pedestrian Bridge #1 Layout, attached hereto. The width of the pedestrian bridge has been changed to 12'. Sheet C51— Low Water Crossing: Delete this sheet and replace with sheet C51 Pedestrian Bridge #2 Layout, attached hereto. The low water crossing has been replaced with a pedestrian bridge. End ofAddendum #3 Bid Opening Date: October 6,2022 Acknowledge the receipt of this Addendum on your Proposal. By: /1&11VL U. Atay. . Park Planner (817) 392-7372 helen.florez@fortworthgov.org Gary Kutilek The Landscape Alliance (817) 589-8909 gkutilek anthelandscapealliance.com Henry Parker Parkhill (817) 633-0422 hparker(@Parkhill.com Release Date: September 30, 2022 UNIT PRICE BID SECTION 00 42 43 PROPOSAL FORM - BID UNIT II Project Item Information 00 42 43 BID PROPOSAL Page 1 of 1 Bidder's Application Bidder's Proposal Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 1 11 1 12 13 14 15 16 17 18 19 20 I 21 1 22 1 23 1 24 1 25 1 26 1 27 1 28 1 29 1 30 31 1 32 1 33 1 34 35 Description I Construction Staking and Survey Mobilization (10% Max of Bid) I Temporary Construction Sign I ROW Preparation (Clear & Grub.) I Tree Protection I Tree Removal Fence Removal I Stabilized Construction Entrance (Install) I Stabilized Construction Entrance (Remove) I Temporary Sediment Control Fence (Install) I Temporary Sediment Control Fence (Remove) I Concrete Wash Out (Install & Remove) I Rock Dam Filter (Install & Remove) I Storm Water Pollution Prevention Plan I Excavation I Embankment I Material Haul Off I Concrete Trail (6") (includes sub -grade prep) Prefabricated Concrete Boardwalk (includes all components necessary for a complete and functioning system) Pedestrian Bridge #2 - 30' X 12' Prefabricated Pedestrian Bridge Pedestrian Bridge #1 - 70' X 12' Prefabricated Pedestrian Bridge 18" Drilled Shafts 124" Drilled Shafts I Concrete Abutment (CL C) I Concrete Approach Slab I Stone Rip -Rap I Culvert M-1 (18" RCP) I Culvert M-2 (18" RCP) Culvert M-3 (Dual 18" RCP) 118" TXDOT CH-FW-0 Headwall Fine Grading I Block Sodding I Revegetation of Temporary Access on EMSISD Property I Revegetation of Construction Easement Temp. Watering, Maintenance & Establishment (3 Specification Section No. 01 7123 01 7000 I 01 58 13 I 31 00 00 I 3201 90 I 31 00 00 31 00 00 I 31 2500 I 31 25 00 I 31 25 00 I 31 25 00 31 25 00 31 25 00 I 01 57 13 I 3123 16 I 31 24 00 I 31 00 00 I 32 13 13 Per Wings Per drawings I Per drawings 03 63 29 I 03 63 29 I 03 30 00 32 13 13 31 3700 I 3341 10 I 33 41 00 33 41 00 I 33 49 40 Per drawings I 3292 13 I 3292 13 I 3292 13 3293 13 Unit of Measure LS LS I EA I STA LF I LS LF I SY I SY I LF I EA SF EA I LS I LS I LS CY I SY SF LS I LS LF I LF I CY SY CY LF I LF LF EA LS I SY I SY I SY LS Bid Quantity I 1 1 I 1 I 46.83 I 4875 I 1 28 I 340 I 340 I 2740 I 2740 I 50 I 2 I 1 I 1 I 1 I 511 I 5330 1600 1 1 80 I 80 I 22.34 I 54 I 215 I 23 I 27 23 I 6 1 I 6500 I 3400 I 9600 1 Unit Price Bid Value Base Bid Total Unit II - CITY OF FORT WORTH Marine Creek Ranch Park and Trail Project STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS #102225 Revised 9/30/2021 ------- ------- ------- / / ------------------------ ! ! / � � � � \ - ! ; / ; / . E ! ; f ! | K : \ - | E ` -Ri I I I 1 ! . ■ |! § | § ■ ■ - � ) \ § § E ; E � � ■ \ ! ; a j\\ /( 4|: §; | | | | | | § | ! § -l---- ! ( ■ |` | ~i ( ------ ■| 02 - !| } }° \ \ _ ]§ , | ! _& 2§ . Z. _0 m§ §)/ z \) \) ) ) { \ \ \ § | ! SVXA1 'Hsaonn saoA O Ladd HONVU N-_HO _NIHVn o �iurglb �dea5pmLn a Ol S1N3W3AOadINI = = w U a 0 / s e x� po o a p� w� €_� I loWw .� $ $ oose+sz vls o 0 39-8 aN3 - - a3 ` aava.�dodd w$z o0 1 aa`� w. o�` 3 `w� o 3N21 b'W y 3 w aQN w< ey a a a ioa DOL SOS � 00'84+BZ tl1S ` SO[ O�y � � 3•Jali18 NI•J33 - " SOL707 00�i. o <o<s s 8 o> o� Now oQw ~I �F a aLLw =o aw o 0 0 0 L' / w�m�Ae o�ea>wL.wMa �� f_`�bso SVXAT 'H-Laonn i aoA Q �iurglb �deacptn �lli� Ln '' betl Ol S1N3W3AOadINI w U 0 r'A L 1 Kp p= Ctl[ �f332f� k RNAVvgV 10 _] o wt Op O� QK 6a EW� Zm N �O O¢ O u Ow G� u p x Z 3 08'ff+SL tl1S � 1131tlM MOl ON3 _ _ O _ 5 � <Z2 _ p Wi I ry Id M31tlM MOl NIp3S �o �d ro� o o 0011 13 INVITATION TO BIDDERS Pagel of 2 SECTION 00 11 13 INVITATION TO BIDDERS RECEIPT OF BIDS Sealed bids for the construction of Marine Creek Ranch Park and Trail, project # ("Project") will be received by the City of Fort Worth Purchasing Office until 1:30 P.M. CST, Thursday, September 15, 2022, as further described below: City of Fort Worth Purchasing Division 200 Texas Street Fort Worth, Texas 76102 Bids will be accepted by: US Mail, Courier, FedEx or hand delivery at the address above; Bids will be opened publicly and read aloud at 2:00 PM CST in the City Council Chambers. GENERAL DESCRIPTION OF WORK The major work will consist of the following: Bid Unit I consists of all work associated with the construction of park improvements including demolition, tree removal, grading, parking additions, walks, trail, playground, basketball court, lighting, site furnishings, irrigation, seeding, tree planting and related improvements as shown in the construction documents. Bid Unit II consists of all work associated with the construction of the concrete trail including demolition, tree removal, grading, paving, pedestrian bridge, boardwalk, culverts, sodding and seeding. etc., as shown in the construction documents. PREQUALIFICATION Certain improvements included in this project must be performed by a contractor or designated subcontractor who is pre -qualified by the City at the time of bid opening. The procedures for qualification and pre -qualification are outlined in the Section 3 of 00 21 13 — INSTRUCTIONS TO BIDDERS. The Bidding and Contract Documents may be examined or obtained on-line by visiting the City of Fort Worth's Purchasing Division website at http://www.fortworthtexas.gov/purchasing_/ and clicking on the link to the advertised project folders on the City's electronic document management and collaboration system site. The Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised 7/19/2021 00 11 13 INVITATION TO BIDDERS Page 2 of 2 If a prebid conference is held, the presentation and any questions and answers provided at the prebid conference will be issued as an Addendum to the call for bids. If a prebid conference is not being held, prospective bidders can e-mail questions or comments in accordance with Section 6 of the Instructions to Bidders referenced above to the project manager(s) at the e-mail addresses listed below. Emailed questions will suffice as "questions in writing." If necessary, Addenda will be issued pursuant to the Instructions to Bidders. CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or reject any or all bids. AWARD City will award a contract to the Bidder presenting the lowest price, qualifications and competencies considered. FUNDING Any Contract awarded under this INVITATION TO BIDDERS is expected to be funded from revenues generated from the 2018 Bond Program and Park Dedication Funds and reserved by the City for the Project. INQUIRIES All inquiries relative to this procurement should be addressed to the following: Attn: Helen Florez, Park & Recreation Department Email: helen.florez@fortworthtexas.gov Phone: (817) 392-7372 ADVERTISEMENT DATES 1st date for advertisement: September 8, 2022 2nd date for advertisement: Septemberl5, 2022 END OF SECTION CITY OF FORT WORTH Marine Creek Ranch Park STANDARD CONSTRUCTION SPECIFICATION DOCUMENT City Project No. 102225 Revised 7/19/2021 0021 13 INSTRUCTIONS TO BIDDERS SECTION 00 21 13 INSTRUCTIONS TO BIDDERS 1. Defined Terms Page 1 of 9 1.1. Capitalized terms used in these INSTRUCTIONS TO BIDDERS are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof. 1.2.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 1.2.2. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to whomCity (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 2.2. City and Engineer in making copies of Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 3. Prequalification of Bidders (Prime Contractors and Subcontractors) 3.1. Bidders or their designated subcontractors are required to be prequalified for the work types requiring prequalification as per Sections 00 45 11 BIDDERS PREQUALIFICATIONS and 00 45 12 PREQUALIFICATION STATEMENT. Firms seeking pre -qualification, must submit the documentation identified in Section 00 4511 on Section 00 45 13 PREQUALIFICATION APPLICATION at least seven (7) calendar days prior to Bid opening for review and, if qualified, acceptance. The subcontractors listed by a Bidder on 00 45 12 must be prequalified for the appropriate work types. Subcontractors must follow the same timelines as Bidders for obtaining prequalification review. Bidders or Subcontractors who are not prequalified at the time bids are opened and reviewed may cause the bid to be rejected. Prequalification requirement work types and documentation are available by accessing all required files through the City's website at: https://apps.fortworthtexas. og v/ProjectResources/ CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 2 of 9 3.2. Each Bidder, unless currently prequalified, must submit to City at least seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 45 11, BIDDERS PREQUALIFICATIONS. 3.2.1. Submission of and/or questions related to prequalification should be addressed to the City contact as provided in Paragraph 6.1. 3.3. The City reserves the right to require any pre -qualified contractor who is the apparent low bidder for a project to submit such additional information as the City, in its sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, and construction schedule to assist the City in evaluating and assessing the ability of the apparent low bidder to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the additional information, if requested, may be grounds for rejecting the apparent low bidder as non -responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 3.4. In addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents. 4. Examination of Bidding and Contract Documents, Other Related Data, and Site 4.1. Before submitting a Bid, each Bidder: 4.1.1. Shall examine and carefully study the Contract Documents and other related data identified in the Bidding Documents (including "technical data" referred to in Paragraph 4.2. below). No information given by City or any representative of the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.2. Should visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.1.3. Shall consider federal, state and local Laws and Regulations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. Be advised that, City, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally -assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, minority business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration of award. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 3 of 9 4.1.5. Shall study all: (i) reports of explorations and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) that have been identified in the Contract Documents as containing reliable "technical data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, at the Site that have been identified in the Contract Documents as containing reliable "technical data." 4.1.6. Is advised that the Contract Documents on file with the City shall constitute all of the information which the City will furnish. All additional information and data which the City will supply after promulgation of the formal Contract Documents shall be issued in the form of written addenda and shall become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other than that contained in the Contract Documents and officially promulgated addenda thereto, shall be binding upon the City. 4.1.7. Should perform independent research, investigations, tests, borings, and such other means as may be necessary to gain a complete knowledge of the conditions which will be encountered during the construction of the project. For projects with restricted access, upon request, City may provide each Bidder access to the site to conduct such examinations, investigations, explorations, tests and studies as each Bidder deems necessary for submission of a Bid. Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests and studies. 4.1.8. Shall determine the difficulties of the Work and all attending circumstances affecting the cost of doing the Work, time required for its completion, and obtain all information required to make a proposal. Bidders shall rely exclusively and solely upon their own estimates, investigation, research, tests, explorations, and other data which are necessary for full and complete information upon which the proposal is to be based. It is understood that the submission of a proposal or bid is prima -facie evidence that the Bidder has made the investigations, examinations and tests herein required. 4.1.9. Shall promptly notify City of all conflicts, errors, ambiguities or discrepancies in or between the Contract Documents and such other related documents. The Contractor shall not take advantage of any gross error or omission in the Contract Documents, and the City shall be permitted to make such corrections or interpretations as may be deemed necessary for fulfillment of the intent of the Contract Documents. 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of. 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to the site which have been utilized by City in preparation of the Contract Documents. The logs of Soil Borings, if any, on the plans are for general information only. Neither the City nor the Engineer guarantee that the data shown is representative of conditions which actually exist. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 4 of 9 4.2.2. those drawings of physical conditions in or relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by City in preparation of the Contract Documents. 4.2.3. copies of such reports and drawings will be made available by City to any Bidder on request. Those reports and drawings may not be part of the Contract Documents, but the "technical data" contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.02. of the General Conditions has been identified and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any "technical data" or any other data, interpretations, opinions or information. 4.2.4. Standard insurance requirements, coverages and limits. 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder: (i) that Bidder has complied with every requirement of this Paragraph 4, (ii) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (iii) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work. 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by Paragraph 4.06. of the General Conditions, unless specifically identified in the Contract Documents. 5. Availability of Lands for Work, Etc. 5.1. The lands upon which the Work is to be performed, rights -of -way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional lands and access thereto required for temporary construction facilities, construction equipment or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by Contractor. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by City unless otherwise provided in the Contract Documents. 5.2.Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed in Paragraph SC 4.01 of the Supplementary Conditions. In the event the necessary right- of-way, easements, and/or permits are not obtained, the City reserves the right to cancel the award of contract at any time before the Bidder begins any construction work on the project. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 5 of 9 5.3. The Bidder shall be prepared to commence construction without all executed right-of- way, easements, and/or permits, and shall submit a schedule to the City of how construction will proceed in the other areas of the project that do not require permits and/or easements. 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded by City as having received the Bidding Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Address questions to: City of Fort Worth Park & Recreation Department 4200 South Fwy St. #2200 Fort Worth, TX 76115 Attn: Helen Florez, City of Fort Worth Email: Helen.Florez(a�fortworthtexas.gov Phone: 817-392-7372 6.2. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 6.3. Addenda or clarifications may be posted via the City's electronic document management and collaboration system at <Insert Link to Documents>. 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective. 7. Bid Security 7.1. Each Bid must be accompanied by a Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price, on the form attached or equivalent, issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 6 of 9 7.2. The Bid Bonds provided by a Bidder will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and return the Contract Documents within 14 days after the Notice of Award conveying same, City may consider Bidder to be in default, rescind the Notice of Award and act on the Bid Bond. Such action shall be City's exclusive remedy in the event Bidder is deemed to have defaulted. 8. Contract Times The number of days within which, or the dates by which, Milestones are to be achieved in accordance with the General Requirements and the Work is to be completed and readyfor Final Acceptance is set forth in the Agreement or incorporated therein by reference to the attached Bid Form. 9. Liquidated Damages Provisions for liquidated damages are set forth in the Agreement. 10. Substitute and "Or -Equal" Items The Contract, if awarded, will be on the basis of materials and equipment described in the Bidding Documents without consideration of possible substitute or "or -equal" items. Whenever it is indicated or specified in the Bidding Documents that a "substitute" or "or - equal" item of material or equipment may be furnished or used by Contractor if acceptable to City, application for such acceptance will not be considered by City until after the Effective Date of the Agreement. The procedure for submission of any such application by Contractor and consideration by City is set forth in Paragraphs 6.05A., 6.05B. and 6.05C. of the General Conditions and is supplemented in Section 0125 00 of the General Requirements. 11. Subcontractors, Suppliers and Others 11.1. In accordance with the City's Business Equity Ordinance No.25165-10-2021 the City has goals for the participation of minority business and/or women business enterprises in City contracts $100,000 or greater. See Section 00 45 40 for the M/WBE Project Goals and additional requirements. Failure to comply shall render the Bidder as non -responsive. Business Equity Ordinance No.25165-10-2021, as amended (replacing Ordinance No. 24534-11-2020), codified at: hops://codelibrga.amlegal.com/codes/ftworth/latest/ftworth_tx/0-0-0-22593 11.2. No Contractor shall be required to employ any Subcontractor, Supplier, otherperson or organization against whom Contractor or City has reasonable objection. 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents; additional copies maybe obtained from the City. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 7 of 9 12.2. All blanks on the Bid Form must be completed and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices for which the Bidder proposes to do the work contemplated or furnish materials required. All entries shall be legible. 12.3. Bids by corporations shall be executed in the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sign. The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership name and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies shall be executed in the name of the firm by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. Bids by individuals shall show the Bidder's name and official address. 12.7. Bids by joint ventures shall be executed by each joint venture in the mannerindicated on the Bid Form. The official address of the joint venture shall be shown. 12.8. All names shall be typed or printed in ink below the signature. 12.9. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance to State Law Non Resident Bidder. 13. Submission of Bids Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, at the time and place indicated in the Advertisement or INVITATION TO BIDDERS, addressed to Purchasing Manager of the City, and shall be enclosed in an opaque sealed envelope, marked with the City Project Number, Project title, the name and address of Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 14. Withdrawal of Bids CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 8 of 9 14.1. Bids addressed to the Purchasing Manager and filed with the Purchasing Office may be withdrawn prior to the time set for bid opening. A request for withdrawal must be made in writing and delivered to the Purchasing Office to receive a time stamp prior to the opening of Bids. A timely withdrawn bid will be returned to the Bidder or, if the request is within one hour of bid opening, will not be read aloud and will thereafter be returned unopened. 14.2. In the event any Bid for which a withdrawal request has been timely filed has been inadvertently opened, said Bid and any record thereof will subsequently be marked "Withdrawn" and will be given no further consideration for the award of contract. 15. Opening of Bids Bids will be opened and read aloud publicly. An abstract of the amounts of the base Bids and major alternates (if any) will be made available to Bidders after the opening of Bids. 16. Bids to Remain Subject to Acceptance All Bids will remain subject to acceptance for a minimum of 90 days or the time period specified for Notice of Award and execution and delivery of a complete Agreement by Successful Bidder. City may, at City's sole discretion, release any Bid and nullify the Bid security prior to that date. 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder. City reserves the right to waive informalities not involving price, contract time or changes in the Work and award a contract to such Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 17.1.1. Any or all bids will be rejected if City has reason to believe that collusion exists among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. In addition to Bidder's relevant prequalification requirements, City may considerthe qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work where the identity of such Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised/Updated November 2, 2021 0021 13 INSTRUCTIONS TO BIDDERS Page 9 of 9 17.3. City may conduct such investigations as City deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to City's satisfaction within the prescribed time. 17.4. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contract award, a Notice of Award will be issued by the City. 17.7.1. The contractor is required to fill out and sign the Certificate of Interested Parties Form 1295 and the form must be submitted to the Project Manager before the contract will be presented to the City Council. The form can be obtained at https://www.ethics.state.tx.us/data/forms/1295/1295.pdf 17.8. Failure or refusal to comply with the requirements may result in rejection ofBid. 18. Signing of Agreement 18.1. When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Project Manual. Within 14 days thereafter, Contractor shall sign and deliver the required number of counterparts of the Project Manual to City with the required Bonds, Certificates of Insurance, and all other required documentation. 18.2. City shall thereafter deliver one fully signed counterpart to Contractor. END OF SECTION CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENT Project #102225 Revised/Updated November 2, 2021 00 35 13 CONFLICT OF INTEREST STATEMENT Page 1 of 1 SECTION 00 35 13 CONFLICT OF INTEREST STATEMENT Each bidder, offeror or respondent to a City of Fort Worth procurement is required to complete a Conflict of Interest Questionnaire or certify that one is current and on file with the City Secretary's Office pursuant to state law. If a member of the Fort Worth City Council, any one or more of the City Manager or Assistant City Managers, or an agent of the City who exercise discretion in the planning, recommending, selecting or contracting with a bidder, offeror or respondent is affiliated with your company, then a Local Government Officer Conflicts Disclosure Statement (CIS) may be required. You are urged to consult with counsel regarding the applicability of these forms and Local Government Code Chapter 176 to your company. The referenced forms may be downloaded from the links provided below. Form CIQ (Conflict of Interest Questionnaire) (state.tx.us) https://www.ethics.state.tx.us/data/forms/conflict/CISpdf ❑ CIQ Form does not apply 0 CIQ Form is on file with City Secretary ❑ CIQ Form is being provided to the City Secretary ❑ CIS Form does not apply ❑ CIS Form is on File with City Secretary ❑ CIS Form is being provided to the City Secretary BIDDER: 2L Construction LLC PO Box 397 Rhome, TX 76078 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised February 24, 2020 By: Harmon 9. Fisher III z Signature: Title: President 00 41 00 Bid Proposal Workbook Unit I 0041 00 BID FORM Page 1 of 3 SECTION 00 41 00 BID FORM TO: The Purchasing Manager c/o: The Purchasing Division 200 Texas Street City of Fort Worth, Texas 76102 FOR: Marine Creek Ranch Park and Trail City Project No.: 102225 Units/Sections: Unit 1 Unit 1 Alternate Unit 2 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without the knowledge of City, a purpose of which is to establish Bid prices at artificial, non- competitive levels. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook Unit I 0041 00 BID FORM Page 2 of 3 d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: 4. Time of Completion 4.1. The Work will be complete for Final Acceptance within 275 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones) within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 `If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook Unit I 0041 00 BID FORM Page 3 of 3 6. Total Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposal and then totaling all of the extended amounts. 6.3. Unit 1 - Unit 1 Alternate - Unit 2 - Total Bid 7. Bid Submittal This Bid is submitted on $1,056,469.60 $447,890.40 $1,312,587.50 October 6th, 2022 by the entity named below. Respectfully sub 'tt By: a C (Signa(ure) Harmon R. Fisher III (Printed Name) Title: President Company: 2L Construction LLC Address: PO Box 397 Rhome, TX 76078 State of Incorporation: Texas Email: chip@2Lconstruction.com Phone: 940-433-2670 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 Receipt is acknowledged of the Initial following Addenda: Addendum No. 1: Addendum No. 2: Addendum No. 3: Addendum No. 4: Corporate Seal: 00 41 00 Bid Proposal Workbook Unit I 00 42 43 BID PROPOSAL Page 1 of 1 UNIT PRICE BID SECTION 00 42 43 PROPOSAL FORM - BID UNIT I Project Item Information Bidder's Application Bidders Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value 1 Construction Staking and Survey 01 71 23 LS 1 25000 $25,000.00 2 Mobilization 01 70 00 LS 1 $90,000.00 $90,000.00 3 Temporary Construction Sign 01 58 13 EA 1 _ $1,000.00 $1,000.00 4 Tree Removal 31 00 00 LS 1 $115,000.00 $115,000.00 5 Stabilized Construction Entrance(Install) 31 25 00 SY 340 $28.00 $9,520.00 6 Stabilized Construction Entrance(Remove) 31 25 00 SY 340 $_16.00 _ $5,440.00 7 Temporary Sediment Control Fence(Install) 31 25 00 LF 100 $2.00 $200.00 8 Temporary Sediment Control Fence(Remove) 31 25 00 LF 100 A� $1.00_ $100.00 9 Concrete Wash Out Install & Remove) 31 25 00 SF 100 $20.00 $2,000.00 10 Storm Water Pollution Prevention Plan 01 57 13 LS 1 $6,000.00 $6,000.00 11 Site Grading 3123 16 LS 1 $105,000.00 $105,000.00 12 Parking Lot Demolition 0241 13 LS 1 i $14,500.00 13 Parking Lot Addition 31 1313 LS 1 _$14,500.00 _ $155,000.00 �$155,000.00 14 Parking Lot Light Relocation 26 05 00 LS 1 $24,000.00 $24,000.00 15 Tem orary Parking Lot Fencing per dwg LS 1 �$3,000.00 $3,000.00 16 Signs and Markings 32 17 23 LS 1 $4,500.00 $_4,500.00 17 8' Concrete Trail 3213 13 SF 17,824 _ $7.40 $131,8_97.60 18 6' Concrete Trail / Sidewalk 3213 13 SF 5,364 _ $8.00 $42,912.0_0 19 Playground W/Concrete Perimeter Walk per dwg LS 1 $220,000.00 $220,000.00 20 Culvert M-4 18" RCP) 33 41 00 1 LF 30 $140.00 $4,200.00 21 Dual 18" TXDOT CH-FW-0 Headwall includes ri ra) 33 49 40 EA 2 $3,500.00 $7,000.00 22 Grass Sodding 32 92 23 SF 8,000 _ $5,600.00 23 Grass Seeding32 92 13 SF 480,000 __$0.70 _ $0.07 _ $33,600.00 24 Temporary Irrigation 32 80 00 IS I 1 1 $51,000.00 $51,000.00 1 - Alternates 1 Clearin , Grading, Restoration in NE Section of Park per dwg LS 1 $110,000.00 $110,000.00 2 Baskeball Court W/Connecting Walk, Bleacher, Goalsper dwg LS 1 $80,000.00 $80,000.00 3 Pavilion W/ Slab per dwg LS 1 $68,000.00 $68,000.00 4 Trail Kiosk per dwg LS 1 $2_9,000.00 $29,000.00 5 Tree Planting32 93 43 LS 1 �$38,000.00 $38,000.00 6 Permanent Irrigation 32 80 00 LS 1 $17,000.00 _ $17,000.00 7 Playground Backstop per dwg LS 1 _ $12,000.00 $12,000.00 8 New Site Lighting 26 05 00 LS 1 $64_,000.00 $64,000.00 9 4 FT Concrete Walks Along Street 3213 13 SF 836 $9.00 _ $7,524.00 10 8 FT Concrete Walks To Pavilion 3213 13 SF 536 __ $7.40 $3,966.40 11 Benches on Pads at Playground 1167 13 EA 3 $3,600.00 $10,800.00 12 6' Picnic Tables in Pavilion 11 67 13 1 EA 2 $2,500.00 _ $5,000.00 13 8' ADA Picnic Table in Pavilion 11 67 13 EA 1 $2,600.00 $2,600.00 Alternate Total Bid Unit 1 CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 $447,890.40 00 4100 Bid Proposal Workbook Unit I 00 42 43 BID PROPOSAL Page 1 of 1 UNIT PRICE BID SECTION 00 42 43 PROPOSAL FORM - BID UNIT II Project Item Information Bidder's Application Bidders Proposal Bidlist Item No. Description Specification Section No. Unit of Measure Bid Quantity Unit Price Bid Value 1 Construction Staking and Survey 01 71 23 LS 1 27500 $27,500.00 2 Mobilization 10% Max of Bid) 01 70 00 LS 1 $100,000.00 $100,000.00 3 Temporary Construction Sign 01 58 13 EA 1 $1,000.00 $1,000.00 4 ROW Preparation Clear & Grub.) 31 00 00 STA 46.83 $1,000.00 $46,830.00 5 Tree Protection 32 01 90 LF 4875 $2.50 _ $12,187.50 6 Tree Removal 31 00 00 LS 1 $53,000.00 $53,000.00 7 Fence Removal 31 00 00 LF 28 $10.00 _ $280.00 8 Stabilized Construction Entrance (Install) 31 25 00 SY 340 _ $28.00 _ $9,520.00 9 Stabilized Construction Entrance (Remove) 31 25 00 SY 340 ___ $16.00 _ $5,440.00 10 Temporary Sediment Control Fence (Install) 31 25 00 LF 2740 $2.00 $5,480.00 11 Temporary Sediment Control Fence(Remove) 31 25 00 EA 2740 $1.00 $2,740.00 12 Concrete Wash Out stall & Remove) 31 25 00 SF 50 $20.00 _ $1,000.00 13 Rock Dam Filter stall & Remove 31 25 00 EA 2 $1,500.00 _ $3,000.00 14 Storm Water Pollution Prevention Plan 01 57 13 LS 1 $6,000.00 $6,000.00 15 Excavation 31 23 16 LS 1 $25,000.00 _ $25,000.00 16 Embankment 31 24 00 LS 1 $15,000.00 $15,000.00 17 Material Haul Off 31 00 00 CY 511 $25.00 $12,775.00 18 Concrete Trail 6" includes sub -grade re) 3213 13 SY 5330 $70.00 $373,100.00_ 19 Prefabricated Concrete Boardwalk (includes all components necessary for a complete and functioning s Stem Per drawings SF 1600 $224,000.00 20 Pedestrian Bridge #2 - 30' X 12' Prefabricated Pedestrian Bride Per drawings LS 1 _ _$140.00 $60,000.00 $60,000.00 21 Pedestrian Bridge #1 - 70' X 12' Prefabricated Pedestrian Bride Per drawings LS 1 $114,000.00 $114,000.00 22 18" Drilled Shafts 03 63 29 LF 80 $80.00 $6,400.00 23 24" Drilled Shafts 03 63 29 LF 80 `^ $9,600.00 24 Concrete Abutment CL C 03 30 00 CY 22.34 _$120.00 $33,510.00 25 Concrete Approach Slab 3213 13 SY 54 _�$1,500.00 $110.00 _ _ $5,940.00 26 Stone Rip -Rap 31 37 00 CY 215 $125.00 $26,875.00 27 Culvert M-1 18" RCP 3341 10 LF 23 $140.00 $3,220.00 28 Culvert M-2 18" RCP) 33 41 00 LF 27 $140.00 $3,780.00 29 Culvert M-3(Dual 18" RCP 33 41 00 LF 23 $270.00 $6,210.00 30 18" TXDOT CH-FW-0 Headwall 33 49 40 EA 6 $3,300.00 $19_,800.00 31 Fine Grading Per drawings LS 1 $25,000.00 $25,000.00 32 Block Sodding 32 92 13 SY 6500 $5.40 _ $35,100.00 33 Reve etation of Temporary Access on EMSISD Property 32 92 13 SY 3400 _ $1.10 $3,740.00 34 Reve etation of Construction Easement 32 92 13 SY 9600 $1.10 _ Y $10,560.00 35 Temp. Watering, Maintenance & Establishment 3 3293 13 LS 1 $25,000.00 _ $25,000.00 Base Bid Total Unit H - $1312 587.50 Base Bid Grand Total Unit I & II - $2 69 057.10 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/302021 00 4100 Bid Proposal Workbook Unit n SECTION 00 43 13 BID BOND KNOW ALL BY THESE PRESENTS: 00 43 13 BID BOND Page 1 of 2 That we, 2L Construction, LLC known as "Bidder" herein and _U S.SSpecialty Insumgce Cot and—_ —__ -------------_ a corporate surety duly authorized to do business in the State of Texas, known as "Surety" herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal sum of five percent (5%) of Bidder's maximum bid price, in lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has submitted a bid or proposal to perform Work for the following project designated as Marine Creek Ranch Park and Trail Bid #102225 NOW, THEREFORE, the condition of this obligation is such that if the City shall award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the City in accordance with the terms of such same, then this obligation shall be and become null and void. If, however, the Principal fails to execute such Contract in accordance with the terms of same or fails to satisfy all requirements and conditions required for the execution of the Contract, this bond shall become the property of the City, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate City for the difference between Principal's total bid amount and the next selected bidder's total bid amount. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the _6th day of October 2022. ATTEST: Witness as to Principal CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICECOND UMENTS Folm Revised 20171109 PRINCIPAL: 2L Construction. LLC BY: it '�1� Signature 010b K - � Q� Name and Title Marine Creek Ranch Park and Trail Project #102225 a&l 1AYLA kb&L Witness as t6 Surety stal Langhorn, Witness Attach Power of Attorney (Surety) for Attomey-in-Fact Address: 200 Boyd Business Plcwy Boyd, TX 76023 SURETY: U.S. Specialty Insurance Company BY: S ignature Elena Sells, Attomey-in-Fact Name and Title Address: 13403 Northwest Freeway Houston, TX 77040 Telephone Number: (713) 462-1000 00 43 13 BID BOND Page 2 of 2 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATIONDOCUMENTS Marine Creek Ranch Park and Trail Fofm Revised 20171109 Project #102225 IIII of ll l'J Itl Ili ll I,II'I' Millllll (IIIIIIII` lll0Il0ll i11I I I II IIIII10I IIIiIIIII!!'' o 111 IIIII III II I III !IIIPIQ II Illl'llll �IIIllllil�jlll!I!I',I. IIIIIIIIIII!II'lll IIIII II°III III �IIIIII I II III'iillilllllllllllll IIIIIII'Illllli' II I p: III I I.,Illijlll, llllilili!ilii!II IIIIII!;I�II,I I IIIIIIIIIIIIIIIIIIIIII IIIIIgIiIliilillll IIIIIIIIII I'' 'I�IIVII^„II;I!' II Ilu!IJ.. I I, TOKIO MARI NE HCC MY = A1_®RACTORS FHEIVITI_£Pfi TEXAS BiDVOALI UDS SURETY COAIPiALTY INSURA€EilY V -= KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a Maryland corporation ILpIIIIII(II'IIQIIuIIIIIIII,IIIuJIII IIlII'II,I L l 0IIIp1IIIIIIIl�IIIIlI'IlVIIllIIIl�IIlII, l IIIIlIIII�dII'IiIllIIaIlaIIIlJp,I'IIIlVIIJIInn„'IllII,IIIiIlI„llIIIddIIl'' llIII� IIIU.SSpecialItIIyII) IIIJIInIIIIIIIIIs, ,unr, IIIaIIIlI.,IIII,nIVIIIc'IllIeIIIIIIIIplC..IIoIIIIIIll 1lill pIVIIIIIIUI!III III,lpllIlI'IIIIi„ lITexacorporation III IIIII III'IlIIlI l'Ic' oII(IllIlllell I IIIIIIIiIIIvI' IIIIIIIIIeI'Iy, IIIIIIIIIIIIIII.IIIIIPe. I "Companies"), IIIIPIIII,IId�IIhU aoI by II,Ith•eIIl'�IsSRIIoVlpf r +sIaelprontp.s make, constitu te Inyll ill lI�doint: Iii �IIPaul Frede�ILan hoiWwI �n6 aPp Gralpevine Texas I I IIIIIIIIi I IIII I iIIdlllllliiilla 'I Io ,�i I I', PII I.6dIl I JIJI IIIIQII'llilllil aI,I,IIIIIIIIp,,I IIItlI'I IIIIIII�IIIIIIIIiI IIIIIIIIIIIIIIIIIIII aIIIIIItl' Illilllll'!Illll` 'IIIIIIIiIIIIIIIpI- IIIII III I ISr ,,, ' its true and lawful Attomey(s)-in-fact, each in their separate capacity if more than one is named above, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or _other instruments or contracts of suretyship to include riders, amendments, and consents of surety, priding the bond_penance e o exceed _ — = — t*-Fifteen Million*_—' Dollars _ "F I5.000.000 6Iw,' g. Aw&ponyeeii#_tomey shalrxWbiW to*riddion on Jar r 2 2 T % Power of Att ea is tented under ari tt_ t _f t"llowing resoi a�o�_ th- ards of Direc &"f fe C rsrr an Be it Resolved, that 6 Vice - President, any Vice -President, any As President, any Secretary or army Assistant Secretary shall be and is hen —fie y vested with full power -and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attomey-in-Fact may be men full power and for and in the name of an ,Ilan r,m, J acknowledge and deliver, any ' and behalf ofthe Company, to execute pl II plpl'III'III IIIIIIIaIr I'd all bonds re nlza9ces I Icont�' 'ct II Ial, reements or In em� t n'' llothek co'n Irtr' al or obli ato u�,d,ertaki s, inlcludi"i'll ' i and all consents 'I IIIII I, J )IIV' l l l„i n IIII yII 9 I �l 'I u I I'^n9'I II u l l 91 I' I' y al 'irh ,II' M I nl• d II I Im dm, I111mIllu �IIIIII Idpl1 w ,llll'pI, allll I�ullu, IIVIIIIIIp IIIIIu11 oI p IIII III . IoIIL IbIVIII, II IIb III) I I%rlllt'„e release ofll ret I, ed l l r'a s d/or final estl dates on IeI i ee �nd construction co s a d a ll n Ia�l o�aces and doc ments Iulllrt IIIII! III! llollllllh IIII r IIIIIIII gII, sIl 91a ��}} „I vat, IIIII' IIIII Jla.� lip . Iuet4 aI IIIII ,IIIVIIoI IIIII �VI��aJJII Iull�unll'III' IIIIIII,In �I.I IIIIIIII IhgIIIL,aIIlul, Iliglll,'l'IIuI:'III� lu,lm.II,JIJ I"ill,,�tldllll� . i1llill' !II�u,Iur II'IiIIIoI: ;JIIII a°I IIII IIII I l III II W II Q ;PIP. 1!III;!I!P calhcelin or4ermina}'I Lthel Co, a „yJs I'Ia�",� thereunder an gguc 'llhs,'r' m its so executed b Ian,. J suchI �ttorne n-FI c�Ishall be bindin I %J 'on l I'' IIII IIo11lI111 III I'arl,I" g pllllllllll911 ullll'I'Illdllu 6p IIJI II 'IIIr'lu ,l Y lillll III' yl lllllu w'I II Ill 'prP., Iou',I II y I'I L�II'I 'II'd I' Ilu y I1� ollllllllillb•• gull A Q'ull II IIp, IIIIIIIIII II the Company as ifsrgln',ed bylth'e Prels'ident andsealed and efIe, led �yllti" G�olrporate Secretary. �IIIIIIIIIIIIIIIVI hlllllll,ll LtlJI VUIIIII,IuI Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. �_ITNESS WH€R�� n nos have caused t i€issnr iddt�e�gned and ttW �p see's� hereto affixes _ _— — day of Septerr,2 -_ = =- __ — — �_— _ _= n == iffFME•MIChA CONTRACTORSMEM COIFl F Y TEXAS BOPI Cif ANC UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANGECOMPANY State of California 'llpll ll I I' Il IIIII °ounty of Los Angeles IIIII I I By: mIIIIIIIIIIIIII 1111IIIdlll'lll'Illllllu 'IIIIIIII' II' II I I III IIIIIllllllll i (,IIII .r �4.� ,� II �� . ,r II (IIIII IIII II IIIIIII'"� w'FoII e !I '� dr• IIIII'Illl'I I II II IIIII ,IIIIIIIIIP llll4dlllu� dIIIIIIII IIIIIIIIII III, II Il�ll�lll I I,HII hen HHI I I IV I I �� � I��, III Illlllfif��r ,nv�" IIIIII�IIIIIIt alllllllll�ll Jdlanlielll; �IIdIIAgluilall�;ll Vice IIII 'lllll'lllu" IIIII;IIIIII'I' IIIIIIII,III I II dIII'lIIlllllll II�II61,II- 'I IIIIIVd Notary Pu66cllllloltIloth'ellulllpm Ircr eII l'I�IIl, lcII o'lllmlllllllllPlllllllletn this certr!f'IIIIIiaIIIII� Ie I lIIIIII'I ��IIIeIIIIIIsI" IlIIIIPIIIIII IIIII 11411I11111111"ll IhlIJulJIlIl'lllllllll'lllllllll lI• .IIlIIIlIIPh' INolllll"l'lsIII r!gIIIIInI IIPIeYllllldlllw° the d which this certifice is attached, and not the truthfulness, accuracy, or validity of that document On this 23rd day of September, 2021, before me, D. Littlefield, a notary public, personally appeared Daniel P. Aguilar, Vice President of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty ksurance Company who oveqkto on the basis of safisfact�o r evide Wo be the person whos"ame scribed to the within n he exec ms ment and acknowl e� rye _mat ed ie a thorized c a n b h signature oo tl s��rument the pew tfn behalf of whn€tiersmnotcecuted the irre _ — I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. 0.lrMEPI D WITNESS my hand and oRm,14W . I Z�'avi'� - Notary:auelix - cavfem,a I,u II II IIIIIII'IIIIIL IIIIIIF�Ta SelestouIr ml 'Illlllllllllllll'i ,IIIIIIIIII IIIII III III III o lI' III I I ll I II �i, rd o+r N 2320307 IIII I I',I I I �°�II Ip I'III IllIIIII III IIIIIIII dull III •IIIII IIIllllllm uu. oIIIIIIIM I,.,, I� �.lat1-11,.2GY Ili III Iilllli III (I'll IIIIi IIII IIIIIIII �IIII„Ili Iil�IiII PP II'illl IIIII I III Il lI Sl nature mlu'u'- IIII IIIII I II Il II Ills II ,I,I ,IIlil I', !lil'll 'IIII II l I .IIII ' II.,.g I � I II' I I I IIIII � II I' 1' I u'" I I II lI III I V 141IlIUIIIiIII ol{IIIIIIIIIP !I Illllll. .Illllllll IIIII I PIIIIIII IIIII l IIIIIIIIIIIIIIIIIu II ,III'. IIIII II IU II .IIII Idll@ 'I � 'IIII UI IIIII IV Illllo 'III�, IIJ�III,III l III Il Illl�lb IIII oIIIVI Ill,q�,ol ul IIV ,u, I IIIIIIIIIIIIIIIII I�IIIIIIIi II III�II I I IIIIII�IJI,IIIIIIII � IIIIIIIIII IIIIIIII Illull��llill loll IIII,II�IIII . IIIIIIIVI Illllllul� IVUIIIIIV Ill Ill„IIII�III III�III�I Illllll ul III IIIIII � IIII IIII I III. I, Kio Lo, Assist i II� Se' fd ary o American Contrac o, s lnde pity Company, Texas Bo�," ing Company, United States- Sillrlety Company and U.S. Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; furthermore, the resolutions of the .Boards of Directors, set out in the Power of Attorney are in full force and effect. IM i Hess Whew __ eye "et my�iand-Ea t sea of said C a m=ate � _s, Cal>fornjhh day oas Corporate SeaIST 3tie�cTo a o Npipc c s suR r r� , Bond No. IIIIIIII II I!III�'1'' °;Ilq,geney No IIIII{ I �u'I IIII IIII I I I I I II I I II I I I IN I I I II I I I I I I II I 1 I I IIIIIIII�IIIIIIII Il lill'lII lI IIIII II (IIIIIIIIII 18799 allulll uuulluu dIIIIIIIIIIIIPI II III IIII I I I I IIIIIIIIII111III I�Illllll II I ll,.. ' I�Ip .III IIIII II I IIIIIIIII�II Illllllllllllllll IIIIIIIIIIIIIIIII�IIII Illllllll) IIIIIIIIIIIIIII � e •••-..yov _n IS c� NAP v` r� r e'y r '•' u N T ' f KSecretary nrllnnnw�� R>= nr� ��� * � ' 'iU, IIIIIIII II- ' I� I , ,IIIII Ilil'i' °jIIIIaIIIIJp IIIIPII wll I� I I I I III I I n l i I I�I I I I I I I II I I I I I I I I 1 I I III I IIII I, II II �� 1 I II .III I II I � I � IIII II I II II I l I I II I II I I I I I III II I — I II III I I I � I III, I I a II .III III I I I L IIII II I I, � I � IIII I �II �I� IIII I� III IIIIIIIIII II I I II IIIII ,lll�llll - (IIIIIIII IIIIIIIIIIVII IIIuIILIIIJI'II IIlIlIlllllIl I � IIIIIIIIII �! 11I1I,Il,lIIlIlLlll , IIIIIIIIIII�III.:; . !LII HccsnArPoon, o2i Plll'aua visit (IIV IIIII tmhcc.com/surety for more informatnp; U.S. Specialty Insurance Company TEXAS COMPLAINT NOTICE IMPORTANT NOTICE To obtain information or make a complaint: 2. You may contact your agent. 3. You may call the company's toll free telephone number for information or to make a complaint at: 1-800-486-6695 4. You may also write to the company at: 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 5. You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 6. You may write to the Texas Department of Insurance at: Consumer Protection (I I I-1 A) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: htti)://www.tdi.texas.�4ov E-mail: ConsumerProtection(a),tdi.texas.�4ov 7. PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. 8. ATTACH THIS NOTICE TO YOUR POLICY This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o para someter una que j a: Puede comunicarse con su agente. Usted puede llamar al numero de telefono gratis de la compania's para informacion o para someter una queja al: 1-800-486-6695 Usted tambien puede escribir a la compania: 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos, o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas al: Consumer Protection (I I 1-IA) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: htti)://www.tdi.state.tx.us E-mail: ConsumerProtection(a,tdi.texas.aov_ DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o la compania primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA Esta aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. HCCSTXM0008/10 00 43 37 VENDOR COMPLIANCE TO STATE LA Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of are not required to underbid resident bidders. , our principal place of business, B. The principal place of business of our company or our parent company or majority owner is in the State of Texas. P� BIDDER: 2L Construction LLC By: Harmon R. Fisher III PO Box 397 (Signature) Rhome, TX 76078 Title: President Date: 10/6/2022 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 9/30/2021 00 41 00 Bid Proposal Workbook Unit I 004512 PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type I Contractor/Subcontractor Company Name I Prequalification Exairation Date N/A The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: 2L Construction LLC PO Box 397 Rhome, TX 76078 END OF SECTION By: armon R. Fisher III r (Signat e) Title: President Date: 10-6--2 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 09/30/2021 00 41 00 Bid Proposal Workbook Unit I 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of I 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 44073. Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 CONTRACTPR: u� l� ✓� L G By: elf lnn 5i�!1I e1 Company �(Please Print) PG) � ay- 3I 1j Signature: Address A / -} QL,Iy�e'li—v n 1��� l Title: City/State/Zip (Please Print) THE STATE OF TEXAS § COUNTY OFTARRANT § BEFORE ME, the undersigned authority, on this day personally appeared _M c,rUrQh R - 9-,<6 -=:- known to me to be the person whose name is subscribed to the foregoing /instrument, and acknowledged to me that he/she executed the same as the act and deed of AL IL C for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this b day of (DL�Qlb c r 20 RETT ALAN SEARS NOTM►rmC-6TA'M0F fJd 101131780536 cow. E:r. io��-zozz Notary �ulic n and for the State of Texas END OF SECTION CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project #102225 Revised July 1,2011 00 45 40 - 1 Business Equity Goal Page 1 of 2 1 SECTION 00 45 40 2 Business Equity Goal 3 If the total dollar value of the contract is $100,000 or more, then a Business Equity goal is applicable. 4 A Business Equity Firm refers to certified Minority-, and/or Women-, owned Business Enterprises 5 (M/WBEs). 6 7 POLICY STATEMENT 8 It is the policy of the City of Fort Worth to ensure the full and equitable participation of Business Equity 9 Firms when applicable, in the procurement of all goods and services. All requirements and regulations 10 stated in the City's Business Equity Ordinance No.25165-10-2021, (replacing Ordinance No. 24534-11- 11 2020 (codified at: https://codelibrga.amleizal.com/codes/ftworth/latest/ftworth_tx/0-0-0-22593) apply to 12 this bid. 13 14 BUSINESS EQUITY PROJECT GOAL 15 The City's Business Equity goal on this project is 10% of the total bid value of the contract (Base bid 16 applies to Parks and Community Services). 17 18 METHODS TO COMPLY WITH THE GOAL 19 On City contracts where a Business Equity Goal is applied, offerors are required to comply with the City's 20 Business Equity Ordinance by meeting or exceeding the above stated goal or otherwise comply with the 21 ordinance through one of the following methods: 1. Commercially useful services performed by a 22 Business Equity prime contractor, 2. Business Equity subcontracting participation, 3. Combination 23 of Business Equity prime services and Business Equity subcontracting participation, 4. Business 24 Equity Joint Venture/Mentor-Protege participation, 5. Good Faith Effort documentation, or 6. 25 Prime contractor Waiver documentation. 26 27 SUBMITTAL OF REQUIRED DOCUMENTATION 28 Applicable documents (listed below) must be received by the Purchasing Division, OR the offeror shall 29 EMAIL the Business Equity documentation to the assigned City of Fort Worth Project Manager or 30 Department Designee. Documents are to be received no later than 2:00 p.m., on the third City 31 business day after the bid opening date, exclusive of the bid opening date. 32 33 The Offeror must submit one or more of the following documents: 34 1. Utilization Form and Letter(s) of Intent, if the goal is met or exceeded; 35 2. Good Faith Effort Form and Utilization Form, including supporting documentation, if 36 participation is less than stated goal, or no Business Equity participation is accomplished; 37 3. Prime Contractor Waiver Form, including supporting documentation, if the Offeror will perform 38 all subcontracting/supplier opportunities; or 39 4. Joint Venture/Mentor-Protege Form, if goal is met or exceeded with a Joint Venture or Mentor- 40 Protege participation. 41 42 These forms can be found at: 43 Business Equity Utilization Form and Letter of Intent 44 htt2s:Hqpps.fortworthtexas.gov/ProjectResources/ResourcesP/60 - MW E/Business Equity Utilization 45 Form_DVIN 2022 220324.12df 46 47 Letter of Intent CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project #10222 Revised October 27, 2021 004540-2 Business Equity Goal Page 2 of 2 1 https:Happs.fortworthtexas. og v/ProjectResources/ResourcesP/60 - MWBE/Letter of Intent_DVIN 2 2021.pdf 3 4 Business Equity Good Faith Effort Form 5 htips:Hgpps.fortworthtexas. og v/ProjectResources/ResourcesP/60 - MWBE/Good Faith Effort 6 Form _DVIN2022.pdf 7 8 Business Equity Prime Contractor Waiver Form 9 hit2s:Hqpps.fortworthtexas.gov/ProjectResources/ResourcesP/60 - MWBE/MWBE Prime Contractor 10 Waiver-220313.pdf 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Business Equity Joint Venture Form https://apps.fortworthtexas.zo�jectResources/ResourcesP/60 - MWBE/MWBE Joint Venture_220225.pdf FAILURE TO ACHIEVE THE GOAL OR OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BIDDER/OFFEROR BEING DECLARED NON -RESPONSIVE AND THE BID REJECTED. FAILURE TO SUBMIT THE REQUIRED BUSINESS EQUTY DOCUMENTATION OR OTHERWISE COMPLY WITH THE ORDINANCE WILL RESULT IN THE BID BEING DECLARED NON- RESPONSIVE, THE BID REJECTED AND MAY SUBJECT THE BIDDER/OFFEROR TO SANCTIONS AS DESCRIBED IN SEC. 20-373 OF THE ORDINANCE. For Questions, Please Contact The Business Equity Division of the Department of Diversity and Inclusion at (817) 392-2674. END OF SECTION CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project #10222 Revised October 27, 2021 00 52 43 - I Agreement Page 1 of 6 SECTION 00 52 43 AGREEMENT THIS AGREEMENT, authorized on 12/13/22, is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and 2L Construction LLC, authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"). City and Contractor may jointly be referred to as Parties. City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: Article 1. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Marine Creel{ Ranch Park and Trail No. 102225 Article 3. CONTRACT PRICE City agrees to pay Contractor for performance of the Work in accordance with the Contract Documents an amount, in current funds, of two million, eight hundred sixteen thousand, nine hundred forty seven dollars and fifty cents Dollars ($ 2,816,947.50 ). Contract price may be adjusted by change orders duly authorized by the Parties. Article 4. CONTRACT TIME 4.1 Final Acceptance. The Work shall be complete for Final Acceptance within 275 days after the date when the Contract Time commences to run, as provided in Paragraph 2.02 of the General Conditions, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. 4.2 Liquidated Damages Contractor recognizes that tune is of the essence for completion of Milestones, if any, and to achieve Final Acceptance of the Work and City and the public will suffer from loss of use if the Work is not completed within the time(s) specified in Paragraph 4.1 above. The Contractor also recognizes the delays, expense and difficulties involved in proving in a legal proceeding, the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, Contractor agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Six Hundred and Fifty Dollars ($650.00) for each day that expires after the time specified in Paragraph 4.1 for Final Acceptance until the City issues the Final Letter of Acceptance. Article 5. CONTRACT DOCUMENTS 5.1 CONTENTS: A.The Contract Documents which comprise the entire agreement between City and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised 8/22/2022 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Marine Creek Ranch Park and Trail Project # 102225 005243-2 Agreement Page 2 of 6 1) Proposal Form 2) Vendor Compliance to State Law Non -Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specific) b. Current Prevailing Wage Rate Table c. Insurance ACORD Form(s) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MBE and/or SBE Utilization Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. Article 6. INDEMNIFICATION 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by any act, omission or negligence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project # 102225 Revised 8/22/2022 005243-3 Agreement Page 3 of 6 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specifically intended to operate and be effective even if it is alleged or proven that all or some of the damages being sought were caused, in whole or in part, by any act, omission or nealiaence of the city. Article 7. MISCELLANEOUS 7.1 Terms. Terms used in this Agreement which are defined in Article 1 of the General Conditions will have the meanings indicated in the General Conditions. 7.2 Assignment of Contract. This Agreement, including all of the Contract Documents may not be assigned by the Contractor without the advanced express written consent of the City. 7.3 Successors and Assigns. City and Contractor each binds itself, its partners, successors, assigns and legal representatives to the other party hereto, in respect to all covenants, agreements and obligations contained in the Contract Documents. 7.4 Severability/Non-Waiver of Claims. Any provision or pant of the Contract Documents held to be unconstitutional, void or unenforceable by a court of competent jurisdiction shall be deemed stricken, and all remaining provisions shall continue to be valid and binding upon City and Contractor. The failure of City or Contractor to insist upon the performance of any term or provision of this Agreement or to exercise any right granted herein shall not constitute a waiver of City's or Contractor's respective right to insist upon appropriate performance or to assert any such right on any future occasion. 7.5 Governing Law and Venue. This Agreement, including all of the Contract Documents is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the Northern District of Texas, Fort Worth Division. 7.6 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement if signed by someone other than the duly authorized signatory of the Contractor. 7.7 Non -appropriation of Funds. In the event no funds or insufficient funds are appropriated by City in any fiscal period for any payments due hereunder, City will notify Vendor of such occurrence and this Agreement shall terminate on the last day of the fiscal period for which appropriations were received without penalty or expense to City of any kind whatsoever, except as to the portions of the payments herein agreed upon for which funds have been appropriated. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project # 102225 Revised 8/22/2022 00 52 43 - 4 Agreement Page 4 of 6 7.8 Prohibition On Contracts With Companies Boycotting Israel. Contractor, unless a sole proprietor, acknowledges that in accordance with Chapter 2271 of the Texas Government Code, if Contractor has 10 or more full time -employees and the contract value is $100,000 or more, the City is prohibited from entering into a contract with a company for goods or services unless the contract contains a written verification from the company that it: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel" and "company" shall have the meanings ascribed to those terms in Section 808.001 of the Texas Government Code. By signing this contract, Contractor certifies that Contractor's signature provides written verification to the City that if Chapter 2271, Texas Government Code applies, Contractor: (1) does not boycott Israel; and (2) will not boycott Israel during the term of the contract. 7.9 Prohibition on Boycotting Energy Companies. Contractor acknowledges that in accordance with Chapter 2274 of the Texas Government Code -(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of the contract. The terms "boycott energy company" and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not boycott energy companies; and (2) will not boycott energy companies during the term of this Agreement. 7.10 Prohibition on Discrimination Against Firearm and Ammunition Industries. Contractor acknowledges that except as otherwise provided by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is prohibited from entering into a contract for goods or services that has a value of $100,000 or more which will be paid wholly or partly from public funds of the City, with a company (with 10 or more full-time employees) unless the contract contains a written verification from the company that it: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate during the term of the contract against a firearm entity or firearm trade association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to this Agreement, by signing this Agreement, Contractor certifies that Contractor's signature provides written verification to the City that Contractor: (1) does not have a practice, policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and (2) will not discriminate against a firearm entity or firearm trade association during the term of this Agreement. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project # 102225 Revised 8/22/2022 005243-5 Agreement Page 5 of 6 7.11 Immigration Nationality Act. Contractor shall verify the identity and employment eligibility of its employees who perform work under this Agreement, including completing the Employment Eligibility Verification Form (I-9). Upon request by City, Contractor shall provide City with copies of all I-9 forms and supporting eligibility documentation for each employee who performs work under this Agreement. Contractor shall adhere to all Federal and State laws as well as establish appropriate procedures and controls so that no services will be performed by any Contractor employee who is not legally eligible to perform such services. CONTRACTOR SHALL INDEMNIFY CITY AND HOLD CITY HARMLESS FROM ANY PENALTIES, LIABILITIES, OR LOSSES DUE TO VIOLATIONS OF THIS PARAGRAPH BY CONTRACTOR, CONTRACTOR'S EMPLOYEES, SUBCONTRACTORS, AGENTS, OR LICENSEES. City, upon written notice to Contractor, shall have the right to immediately terminate this Agreement f'or violations of this provision by Contractor. 7.12 No Third -Party Beneficiaries. This Agreement gives no rights or benefits to anyone other than the City and the Contractor and there are no third -party beneficiaries. 7.13 No Cause of Action Against Engineer. Contractor, its subcontractors and equipment and materials suppliers on the PROJECT or their sureties, shall maintain no direct action against the Engineer, its officers, employees, and subcontractors, for any claim arising out of, in connection with, or resulting from the engineering services performed. Only the City will be the beneficiary of any undertaking by the Engineer. The presence or duties of the Engineer's personnel at a construction site, whether as on -site representatives or otherwise, do not make the Engineer or its personnel in any way responsible f'or those duties that belong to the City and/or the City's construction contractors or other entities, and do not relieve the construction contractors or any other entity of their obligations, duties, and responsibilities, including, but not limited to, all construction methods, means, techniques, sequences, and procedures necessary for coordinating and completing all portions of the construction work in accordance with the Contract Documents and any health or safety precautions required by such construction work. The Engineer and its personnel have no authority to exercise any control over any construction contractor or other entity or their employees in connection with their work or any health or safety precautions. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project # 102225 Revised 8/22/2022 00 52,13 - 6 Agreement Pago 6 of 6 IN WITNESS WHEREOF, City and Contractor have each executed this Agreement to be effective as of the date subscribed by the City's designated Assistant City Manager ("Effective Date"). Contractor: City of Fort Worth By. By. ,s Chip Flshcr(Feb13,202300:d2CST) �' 1 Signature Jesica McEachern, Harmon R. Fisher, III Assistant City Manager (Printed Name) Mar 7, 2023 President un ate FORT°nC Title Attest; WII 200 Boyd Business Parkway aabnXaga4p U Address Jannette Goodall, City Secretary Boyd, TX 76023 City/State/Zip (Seal) Feb 13, 2023 M&C:22-1065 Date Date: 12/13/22 Form 1295 No.: 2022-947207 Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Helen D. Florez, Park Plann r Approved as to Form and Legality: Jeremy Anato-Ivlensah Assistant City Attorney I APPROVAL RECOMMENDED: 'Y Dave Lewis, Acting Director _SP Park & Recreation Department SP Jh� CrfY OP FORT WORTI'I Marine Creek Ranch Purk and Trnil STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Proiecl1)102225 Revised 8/2212022 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 0061 13- 1 PERFORMANCE BOND Pagel of 2 Bond## 1001189922 I SECTION 00 61 13 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT 7 That we,_2L Construction, LLC , known as 8 "Principal" herein and U.S. Specialty Insurance Company a corporate 9 surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 1 1 municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal 12 sum ofTw. wri. Eight Hundred Sixteen Thousand Ninal-lundred Forty-seven and 50/100 Dollars 13 ($ 2 816.947.50 ), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas for the payment of which sum well and truly to be made, we bind 15 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 16 firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City 18 awarded the 2011 day of December , 20 22 , which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 20 labor and other accessories defined by law, in the prosecution of the Work, including any Change 21 Orders, as provided for in said Contract designated as Wig. Creek Ranch Park sand lgau 22 # 1 tl„ 2225, 23 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 24 shall faithfully perform it obligations under the Contract and shall in all respects duly and 25 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 26 specifications, and contract documents therein referred to, and as well during any period of 27 extension of the Contract that may be granted on the part of the City, then this obligation shall be 28 and become null and void, otherwise to remain in full force and effect. 29 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 30 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 31 Worth Division. 32 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 33 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 34 accordance with the provisions of said statue. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project #102225 Revised July 1, 2011 0061 13-2 PERFORMANCE BOND Page 2 of 2 I IN WITNESS W REOF, the Principal and the Surety have SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the 22nd day of 3 December , 20 22 4 5 6 7 8 9 r 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 PRINCIPAL: 2L Construction, LLC BY: ' Signature ATTEST: _LS(1rmpri Z r-iskeyo11i PrestdmW (Principal) Secretary Name and Title Address: 200 Boyd Business Pkwy Boyd, TX 76023 ts) Witness A to Principal SURETY: U.S. Specialty Insurance Company 33 Lnj2( w J-kIA;tbt L 34 Witness as to Surety Crystal Langhom 35 36 37 BY: TTA_ Signature Steven W. Lewis, Attorney -in -Fact Name and Title Address: 13403 Northwest Freeway Houston, TX 77040 Telephone Number:,(713) 462-1000 38 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 39 from the by-laws showing that this person has authority to sign such obligation. If 40 Surety's physical address is different from its mailing address, both must be provided. 41 The date of the bond shall not be prior to the date the Contract is awarded. 42 Crry OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 Marine Creek Ranch Park and Trail Project #102225 0061 14 - 1 PAYMENT BOND Page I of 2 Bond # 10011B9922 1 SECTION 00 61 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, 2L Construction, LLC known as 8 "Principal" herein, and_U.S. Specialty Insurance Company a 9 corporate surety (sureties), duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 11 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, 12 in the penal sum of Two Million Eight Hundred Sixteen Thousand Nine Hundred Forty-seven and 501100 Dollars 13 ($_2,816.947.50 ), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, 15 our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these 16 presents: 17 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 18 20th day of December 2012 which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 20 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 21 said Contract and designated as Marine Creek_ Ranch Park and- Trail #I 110„ZZ� 22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 24 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 25 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 26 force and effect. 27 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 28 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 29 accordance with the provisions of said statute. 30 CITY OF FORT WORTH Marine Creek Ranch Park and Tmil STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project d102225 Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 lL 0061 14 - 2 PAYMENTBOND Page 2 or2 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by duly authorized agents and officers on this the 22nd day of December . 20 22 PRINCIPAL: 2L Construction, LLC ATTEST: BY: �4(= 1E, Signature (Principal) Secretary Witness ag to Principal ATTEST: (Surety) Secretary YtOI�_ Witness as to Surety Crystal Langhom Name and Title Address: 200 Boyd Business Pkwy Boyd, TX 76023 SURETY: U.S. Specialty Insurance BY: ,a,(, L Signature Steven W. Lewis, Attorney -in -Fact Name and Title Address: 13403 Northwest Freeway Houston, TX 77040 Telephone Number: (713) 462-1000 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1,2011 Marine Creek Ranch Park and Trail Project #102225 0061 19- 1 MAINTENANCE BOND Page I or3 Bond # 1001189922 I SECTION 00 61 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we_21- Consiruction, LLC known as 8 "Principal" herein and U.S. Specialty Insurance Company a corporate surety 9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a 11 municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, 12 In the Sum Of Two Million Eight Hundred Sixteen Thousand Nine Hundred Forty-seven and 5W100 DOI Iars 13 ($_2,816,947.50 ), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its 15 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 16 and severally, firmly by these presents. 17 18 WHEREAS, the Principal has entered into a certain written contract with the City awarded 19 the 20th day of December , 20 2? , which Contract is hereby 20 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 21 materials, equipment labor and other accessories as defined by law, in the prosecution of the 22 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 23 the "Work") as provided for in said contract and designated as 24 Marine Creek Park Ranch and Trail 4 102225 and 25 26 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 27 accordance with the plans, specifications and Contract Documents that the Work is and will 28 remain free from defects in materials or workmanship for and during the period of two (2) years 29 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 30 31 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 32 upon receiving notice from the City of the need therefor at any time within the Maintenance 33 Period. 34 CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project 4102225 Revised July 1, 2011 0061 19-2 MAINTENANCE BOND Page 2 of 3 1 NOW THEREFORE, the condition of this obligation is such that if Principal shall 2 remedy any defective Work, for which timely notice was provided by City, to a completion 3 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 4 full force and effect. 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely noticed defective Work, it is agreed that the City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division; and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hereon for successive breaches. CITY OF FORT WORTH Marine Creek Ranch Park and Trad STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project #102225 Revised July 1, 2011 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREO , the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 22n d day of 3 Decem ber 7022 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 ATTEST: (Principal) Secretary Flo- t9 Witness as to Principal ATTEST: N/A (Surety) Secretary Witness as to Surety Crystal Langhom PRINCIPAL: 2L Cons tructiorL4C BY: 74 Signature kkilr oy% V. 11AIyT11t __ Rtc:a[s,�i Name and Title Address:_200 Boy Bus Hess Pkwy Boy cXX 76023 SURETY: U.S. Specialty Insurance Company BY: Signature Steven W. Lewis 41torney Fact Name and Title Address: 13403 Northwes Freeway Hous tonT;C 77040 Telephone —Number: (713) 462-1000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH Marine Creek Ranch Park and Trail STANDARD CONSTRUCTION SPECIFICATION DOCUM E N 1 S Project # 102225 Revised July 1, 2011 TOKIOMARINE HCC POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS: That American Contractors indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a Maryland corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the "Companies"), do by these presents make, constitute and appoint: Paul Fredette, Lanny Land, Crystal Langhom, Steven W. Lewis, Elena Sells or Adam Syswerda of Grapevine, Texas its true and lawful Attomey(s)-in-fact, each in their separate capacity if more than one is named above, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyshlp to include riders, amendments, and consents of surety, providing the bond penalty does not exceed _ "—Fifteen Million-*... Dollars ('--15.000,000.00--- ), This Power of Attomey shall expire without further action on January 313', 2024. This Power of Attorney is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be It Resolved, that the President, any Vice -President, any Assistant Vice -President any Secretary or any Assistant Secretary shall be and Is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in Fact to represent and act for and on behalf of the Company subject to the following provisions Attomey-in-Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder and any such instruments so executed by any such Attomey-in-Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seat of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 23nd day of September, 2021. AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY State of California County of Los Angeles r x�\!�i/1 ,\� . ' a '� By: t ~— Daniel P. Aguilar, Vice President A Notary Public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validitj of that document On this 23rd day of September, 2021, before me, D. Littlefield, a notary public, personally appeared Daniel P. Aguilar, Vice President of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. D. LMUFIFLD WITNESS my hand and offi ' i t seal. rb� Ante4ftc�lfw1,, f 1 J nty corn MU10n 0 2320307 Signature r K• - — (seal) MyC*flft „An11.=4 IN I, Kio Lo, Assistant Secretary o American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney executed by said Companies, which is still in full force and effect; furthermore, the resolutions of the Boards of Directors set out in the Power of Attorney are in full force and effect. Wi ss Whereo have h reunto set myL halt and affi>?ed ;t a seat& of said Companies at Los Angeles, California this day of Corporate Seals t I ro�t""� �~"g OF 'voBond No. _190}_1.�_�� g;i� + ; artntiw �7`�� J� I" ifs' `,- g aY Agency No. _18799 °:tira��►"`roF� (+rt� ��� Kio Lo Ass�i tart Secretary HCCSMANPOAM021 visit tmhcc.com/sure'� + )r.r;ore information .31 2. 3. 4 U.S. Specialty Insurance Company TEXAS COMPLAINT NOTICE IMPORTANT NOTICE To obtain information or make a complaint: You may contact your agent. You may call the company's toll free telephone number for information or to make a complaint at: 1-800-486-6695 You may also write to the company at: 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 5. You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 6. You may write to the Texas Department of Insurance at: Consumer Protection (1 I I A A) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtectionetdi.texas.gov 7. PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department oflnsurance. 8. ATTACH THIS NOTICE TO YOUR POLICY This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o para someter una queja: Puede comunicarse con su agente. Usted puede Ilamar al numero de telefono gratis de la compania's para informacion o para someter una queja al: 1-800-486-6695 Usted tambien puede escribir a la compaftia: 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos, o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas al: Consumer Protection (111-1A) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection(@tdi.texas.eov DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o la compania primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA Esta aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. HCCSTWO008110 /