HomeMy WebLinkAboutContract 44418 (2)4��! � SEVI�GI/'1��� 1�"�'� THIS COPY IS FOR:
COIdTRA►CT N�o �' CONTRACTOR
� CITY SECRETARY
T H E C I TY O F F O RT WO RT H T EXAS SPONSORING DEPT
f PROJECT MANAGER
TPW FILE COPY
Livestock Pen Exhaust Systems
for
Burnett, Richardson-Bass, & Moncrief Buildings
at
Will Rogers Memorial Center
TPW2013-04
�
,
r
,
�
�
{
�
� � � `'
_ �:�
BETSY PRICE
MAYOR
THOMAS HIGGINS
CITY MANAGER
Douglas W. Wiersig, PE
Director, Transportation & Public Works Department
Kirk Slaught�r
Director, Public Events Department
Summit Consultants, Inc.
Johnson Controls, Inc. (TXMAS)
April 2013
�ECEIVED ��1AY � 12�i�
, ���w�i,�� ��c�R�
� �M� ������
�. �►�a��, �xx
c;ty of Fo�t w��tn, ��x�s
Mayor and Council Communication
�^ _. _ __ ._.
__ _ COUNCIL ACT10N;: Approved on 4/2/2013 - Ordinance Na 20691-04-20'13
DATE: Tuesday, April 02, 2013
LOG FiA�YiE: 25EXHAUST SYSTttU WRMC
REFERENCE NO.: C-26189
SlJBJECT:
Adopt Ordinance Increasing Appropriations in the Culture and Tourism Fund in the Amount of
$1,954,000.00 and Decreasing the Assigned Culture and Tourism Fund Balance by the Same Amount,
Authorize Execution of a Contract with Johnson Controls, Inc., in the Amount of $1,753,584.00 for the
Renovation of the Livestock Pen Exhaust Systems for the Burnett, Richardson-Bass, and Moncrief
Buildings at the Will Rogers Memorial Center, Provide for Contingency and Staff Costs for a Total Project
Cost in the Amount of $1,954,000.00 (COUNCIL DISTRICT 7)
RECOMMENDATION:
It is recommended that the City Council:
1. Adopt the attached supplemental appropriation ordinance increasing appropriations in the Culture and
Tourism Fund in the amount of $1,954,000.00 and decreasing the assigned Culture and Tourism fund
balance by the same amount; and
2. Authorize the execution of a contract with Johnson Controls, Inc., in the amount of $1,753,584.00 using
a Texas Muftiple Award Schedule Cooperative Contract No. TXMAS-6-840160 for the renovation of the
I�vestock �en exh�ust systems for the B�rr!ett, RlCh?�dsor.-�ass, and Moncr�ef build�ngs a± the Wi!! Rogers
Memorial Center.
DISCUSSION:
The existing original exhaust systems for the livestock pens at these three buildings are 20-30 years old
and have exceeded their functional capacity. They require constant maintenance due to the normal wear
and tear. The new exhaust systems are essential for the health and comfort of the visitors, participants,
and livestock in the three buildings. The exhaust systems will also improve the overall indoor air quality in
these three buildings ai the Will Rogers �emorial Center.
PRICE ANALYSIS - The vendor prices were obtained using a Texas Multiple Award Schedule (TXMAS)
Cooperative Contract No. TXMAS-6-840160.
The overall project cost is expected to be:
Construction
Contingency, Staff
Total
$1,753,584.00
$ 200,416.00
$1,954,000.00
M/WBE Office: A waiver for the goal for MBE subcontracting requirements was requested by the
Transportation and Public Works Department and approved by the M/WBE Office because the purchase
of goods and services is from sources where subcontracting or supplier opportunities are negligible.
Logname: 25EXHAUST_SYSTEM WRMC Page 1 of 2
COC�PERATIVE PURCHASE - State law provides that a local government purchasing an item under a
cooperative purchasing Agreement satisfies State laws requiring that the local government seek
competitive bids for purchase of the item. TXMAS was established by the State of Texas to provide a list
of approved contracts that have been competitively bid and awarded by Federal, State or Local
Government entities to increase and simplify the purchasing power of governmental entities across the
State of Texas.
The project is physically located in COUNCIL DISTRICT 7, but will serve Fort Worth residents in ALL
COUNCIL DISTRICTS.
FISCAL INFORMATION / CERTIFICATION:
The Financial Management Services Director certifes that upon approval of the above recommendation
and adoption of the attached supplemental appropriation ordinance, funds will be available in the current
operating budget, as appropriated, of the Culture and Tourism Fund. Upon approval, the assigned fund
balance of the Culture and Tourism Fund will exceed the minimum reserve, as outlined in the Financial
Management Policy Statements.
FUND CENTERS:
TO Fund/Account/Centers
GG04 539120 0246000
FROM Fund/Account/Centers
$1.954,000.00 GG04 539120 0246000
CERTIFICATIONS:
Submitted for Citv Manaaer's Off�ce !�y
Oriqinatinq Department Head•
Additional Information Contact:
GG04 539120 0246000
Susan Alanis (8180)
Kirk Slaughter (250� 1
James Horner (2505)
_---_..__
- .T?':�:C!-LR^�RTS
1. 25EXHAUST SYSTEM VVRl1/►C �C � 3.cioc (�ublic)
2. Fund Balance 25Exhaust Svstem pdf (CFW Internal)
3• MWBE Waiver Exhaust SystemWRMC pdf (CFW Internal)
$1.954.000.00
$1, 753.584.00
Logname: 25EXHAUST_SYSTEM WRMC Page 2 of 2
TABLE OF CONTENTS
TABLE OF CONTENTS
INSTRUCTIONS TO OFFERORS
PROPOSAL
TEXAS SALES AND USE TAX EXEMPTION CERTIFICATE
WAGES RATES
WEATHER TABLE
GENERAL CONDITIONS
CONSTRUCTION CONTRACT
PAYMENT BOND
PERFORMANCE BOND
CERTIFICATE OF INSURANCE
CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (Apri12013)
Johnson Controls, Inc. (TXMAS)
INSTRUCTIONS TO OFFERORS
PROPOSAL REQUIREMENTS: This. contaci with Johnson Controls, Inc, is using a Texas
Multiple Award Schedule (TXMAS) Contract No. TXMAS-6-840160.
If any conflict arises among the provisions in the TXMAS Contract No. TXMAS-6-840160 or
the City's contract or the City's General Conditions, the terms of the TXMAS Contract No.
TXMAS-6-840160 shall control.
• In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority
from the United States Secretary of the Treasury to qualify as a surety on obligations permitted or
required under federal law; or (2) have obtained reinsurance for any liability in excess of
$100,000 from a reinsurer that is authorized and admitted as a reinsurer in the State of Texas
and is the holder of a certificate of authority from the United States Secretary of the Treasury to
qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of
any such reinsurance shall be provided to the City upon request. The City, in its sole discretion,
will determine the adequacy of the proof required herein.
2. MINORITY BUSINESS ENTERPRISE (MBE):
The MBE participation is waived for this project.
3. PAYMENT BOND AND PERFORMANCE BOND: For projects in excess of $25,000, the
successful bidder entering into a contract for the work wifl be required to give the City surety in a
sum equal to the amount of the contract awarded. The form of the bond shall be as herein
- provided and the surety shall be acceptable to the City. All bonds fumished hereunder shall meet
the requirements of Texas Government Code Section 2253, as amended.
In order for a surety to be acceptable to the City, the surety must (1) hold a certificate of authority
from the United States secretary of the treasury to qualify as a surety on obligations permitted or
required under federal law; or (2) have obtained reinsurance for any liability in excess of
$100,000 from a reinsurer that is authorized and admitted as a reinsurer iri the State of Texas
and is the holder of a certificate of authority from the United States Secretary of the Treasury to
qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of
any such reinsurance shall be provided to the City upon request. The City, in its sole discretion,
will determine the adequacy of the proof required herein.
No sureties will be accepted by the City that are at the time in default or delinquent on any bonds
or which are interested in any litigation against the City. Should any surety on the contract be
determined unsatisfactory at any time by the City, notice will be given to the contractor to fhat
effect and the contractor shall immediately provide a new surety satisfactory ta the City
If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump
sum. Payment shall not be made for a period of 45 calendar days from the date the work has
been competed and accepted by the City.
If the contract is in excess of $25,000, a Payment Bond shall be executed, in the amount of the
contract, solely for the protection of all claimants supplying labor and materials in the prosecution
of fhe work.
If the contract amount is in excess of $100,000, a Performance Bond shall also be provided, in
the amount of the contract, conditioned on the faithful performance of the work in accordance with
the plans, specification, and contract documents. Said bond shall be solely for the protection of
the City of Fort Worth.
4. PRE-BID SITE INVESTIGATION: Prior to filing a response, the bidder shall examine the site(s} of
the work and the details of the requirements set out in these specifications to satisfy itself as to
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
the conditions which will be encountered relating to the character, qua(ity, and quantity of the
work to be perFormed and materials and equipment required. The filing of a response by the
bidder shall be considered evidence that it has complied with these requiremenfs.
5 AMBIGUITY: In case of ambiguity or lack of clearness in stating prices.in the proposal, ihe City
reserves the right to adopt the most advantageous construction thereof to the City or to reject the
proposal.
6. WAGE RATES: Not less than the prevailing wage rates set forth in Contract Documents must be
paid on this project.
7. PROPOSED SUBCONTRACTORS: Acceptance of the bid in no way requires the City to accept
the qualifications of the subcontractors. The Subcontractor lists are for use by the City in
preparing recommendations for award of the contract. The Contractor must provide and use
subcontraciors listed unless the City agrees to allow a substitute.
8. DISCREPANCIES AND ADDENDA:
Should a Offeror find any discrepancies in the drawings and specifications, or should it be in
doubt as to their meaning, it shall notify the Cit�r at once. If required, the City will then prepare a
written addendum that will be available to all Offerors at the place designated for distribution of
Bid Documents by the Notice to Offerors. The Contractor is responsible for determining if
addenda are available and for securing copies prior to submitting a response to this request for
sealed bids. Oral instructions or decisions unless confirmed by written addenda will not be
considered valid, legal or binding. No extras will be authorized because of failure of the
contractor to include work called for in the addenda.
Offeror must acknowiedge addenda in the Proposal. Failure to acknowledge addenda may cause
the Proposal to be ruled non-responsive. It is the Contractor's responsibility to obtain Addenda
and include its information in the Proposal.
9. WORKERS COMPENSATION INSURANCE: Offerors will be required to demonstrate that
coverage is in effect at time of Award of Contract. Sample Certificate of Insurance, or other proof
that Workers Compensation Insurance will be obtained, must be submitted within �ve working
days of bid opening
10. TAXES: Equipment and materials not consumed by or incorporated into the work are subject to
State sales taxes under House Bill 11, enacted August 15, 1991.
11. PERMITS: Contractor shall apply for all City of Fort Worth Permits and for any other permits
required by this project. City of Fort Worth Building and Trade Permit fees are waived. Separate
permits may be required for each work location.
12. UTILITIES AND IMPACT FEES: The City will pay water and sewer utilities tap fees and impact
fees. Unless shown otherwise, the City will coordinate and pay for water and sewer taps and
meters to the property line. The Contractor will include all remaining fees from the electrical and
gas companies in the base bid. The Contractor will be responsible for coordinating with City and
utility companies for installation of utilities. Unless indicated otherwise on the plans, the
contractor will be responsible for costs and installations from the building side of the water meter
and sewer tap.
13. BID DOCUMENTS: Copies of bidding documents will be sent electronically by the Engineer. .
14. MANUFACTURER'S REFERENCE: Catalog, brand names, and manufacturer's references are
descriptive, not restrictive. Use of brands of like nature and quality will be considered. Upon
request of the architect or contractor, the contractor wilf submit a full sized sample and/or detailed
WRMC Exhaust Systems for Bumett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
information as required to allow the architect to determine the acceptability of proposed
substitutions. Where equipment has been listed as "no substitute accepted", the City will accept
no alternates to the specified equipment. Also refer to specification section 01630 Product
Options and Substitutions.
15. PROJECT SCHEDULE: The Project Schedule to be submitted with the proposal will, at the
minimum, include the following: quality control submittals and approvals, mobilization, site
preparation, under slab utilities, foundation work, structural erection, interior finish,
commissioning, and closeout. The Schedule may be submitted as a table or PERT diagram.
WRMC Exhaust Systems for Bumett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
i�:z•11•�-��
T0: MR. THOMAS HIGGINS
CITY MANAGER
ATTN: PURCHASING OFFICE
1000 THROCKMORTON
CITY OF FORT WORTH, TEXAS 76102
FOR: Livestock Pen Exhaust Systems
Burnett, Richardson-Bass, and Moncrief Buildings
Will Rogers Memorial Center
3401 West Lancaster Avenue
Fort Worth, Texas 76107
Projeci No. TPW2013-04
Pursuant to the foregoing "Instructions to Offerors," the undersigned has ihoroughly examined the plans,
specifications and the site, understands the amount of work to be done, and hereby proposes to do ali the
work and furnish all labor, equipment and materials necessary to fully complete all the work as provided
in the plans and specifications, and subject to the inspection and approval of the Director of
Transportation and Public Works of the City of Fort Worth.
Upon acceptance of this Proposal by the City Council, the bidder is bound to execute a contract and, if
the contract amount exceeds $25,000.00, furnish acceptable PerFormance and/or Payment Bonds
approved by the City of Fort Worth for performing and completing the Work within the time stated and for
the following sum, to wit:
DESCRIPTION OF ITEMS
Refer to the attached Johnson Controls, Inc. letter and documents for this project as follows:
Johnson Controls, Inc, letter dated February 22, 2013, subject: WRMC — Boiler Upgrade, 8 pages
(Attachment "A"); JCI TXMAS Cost Estimate for WRMC — Livestock Pen Exhaust Systems Proposal
dated February 22, 2013, 2 pages (Attachment "B"); Texas Multiple Award Schedule Contracts
Program, 5 pages (Attachment "C"), and Johnson Controls, Inc. Contract TXMAS-6-840160, 3 pages
(Attachment "D").
Total Proposal $1,753,584.00
Completion within 270 calendar days after date of Notice to Proceed.
The undersigned agrees to complete the Work within the calendar days specified above after the date of
Notice to Proceed. A Project Schedule will be submitted as required in the Instructions to Offeror.
The City reserves the right to accept or reject any and all bids or any combination thereof proposed for
the above work.
The undersigned assures that its employees and applicants for employment and those of any labor
organization, subcontractors or employment agency in either furnishing or referring employee applicants
to the undersigned are not discriminated against as prohibited by the terms of City Ordinance 7278 as
amended by City Ordinance 7400 (Fort Worth City Code Section 13A-21 through 13A-29).
Residency of Offerors: The 1985 Session of the Texas Legislature passed house Bill 620 relative to the
award of contracts to non-resident bidders. The law provides that, in order to be awarded a contract as
low bidder, non-resident bidders (out of state contractors whose corporate offices or principal place of
business are outside of the State of Texas) that bid projects for construction, improvements, supplies or
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that
Texas resident bidder would be required fo underbid a non-resident bidder in order to obtain a
comparable contract in the state in which the non-resident's principal place of business is located. The
appropriate blanks in Section A must be filled out by all non-resident bidders in order for your bid to meet
specifications. The failure of out of state or non-resident bidders Failure to complete the forms may
disqualify that bidder. Resident bidders must check the box in Section B.
A. �_� Non-resident vendors in (give state), our principal place of
business, are required to be percent lower than resident bidders
by state law.
I_I Non-resident vendors in (give state), are not required to
underbid resident bidders.
B. �X� Our principal place of business or corporate offices are in the State of
Texas.
Within ten (10) days of receipt of notice of acceptance of this bid, the successful bidder will execute the
formal contract and will deliver approved Performance and Payment Bonds for the faithful performance of
this contact.
Respectfully submitted,
By:
Address: 7461 Airport Freewav
Street
Richland Hills. Texas 76118
City Zip
Phone: (817) 480-6953
Fax: (817) 870-1902
Email: harry.romine(a�ici.com
P
1I '
�
r�
I
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
Michael J. Crowe Reqional VP & GM
Printed Name of Principal Title
�
� � � � �
- �£�� � ;�£�
r�
��,��; �
18`
,.� � i}�.�..
'�^`r�,i �'�
l ,
V
� � yt4
� �
viir�tiu�p .-
. _ � �' �•.�.
� ���
���tilSd�ltt � v��
�4t1�C��s
Johnson Controls, Inc.
Building Efficiency
7461 Airport Freeway
Richiand Hills, Texas 76118
Phone:817-870-2399
FAX: 817-870-1902
C�
3 �
WILL ROGERS MEMORIAL CENTER
LIVESTOCK PEN EXHAUST SYSTEMS PROPOSAL
To: City of Fort Worth Date: 2/22/2013
Transportation & Public Works Dept Projeci Name: WRMC — Livestock Pen Exhaust
401 West 13th Street Systems �
Fort Worth, Texas.76102
Atin: Mr. Jack Durham
Dear Mr. Durham,
Johnson Controls (JCI) is pleased to propose the following prices for the WRMC Livestock Pen E�chaust
Systems:
All prices are based on the following revised construction plans & specifications submitted by Summit
Consultants:
Construction & Specification Drawings
Facility Sco e of Work Summit Drawing Date
Burnett Building Livestock Pen Exhaust Systems M0. l, M2.1, M22, M23, 1/31/2013
M6.1, E0.1, E2.2
Richardson Bass Livestock Pen E�aust Systems . M0.1, M2.1, M2.2, M2.3, 1/31/2013
Building M6.1, E0.1, E1.1
Moncrief Buildin Livestock Pen Exhaust S stems M0.1, M2.1 1/31/2013
Moncrief Building Livestock Pen E�aust Systems E0.1, El.l 10/3/2012
1
��� �
.���n��� �� ��y�
��rt�r���
GENERAL TERMS
• Pricing is based on JCI-TXMAS Contract TXMAS-6-840160
• JCI will provide the City with the scope of work (Work) identified in this Proposal. JCI shall
supervise and direct the Work and shall be responsible for construction means, methods, techniques,
sequences, and procedures and for coordinating all portions of the Work. JCI shall be responsible to
pay for all labor, materials, equipment, tools, construction equipment and machinery, transportation,
and other facilities and services necessary for the proper execution and completion of the Work,
whether temporary or permanent and whether or not incorporated or to be incorporated in the Work.
Ail completed work will be fully functional and installed and inspected as in compliance with all
local governing codes.
� Coordination with City personnel to not interfere with complex scheduled events '
� One (1) year parts & labor warranty be� nning at the date of Substantial Completion
JOFINSON CONTROLS PROTECT IlVIPLEMENTATION
• Project management
• Field superintendent
• Project scheduling and coordination
• Sub-contractor scheduling and coordination
• JCWorksite online project management program
• Construction meetings
• Project submittals
• Control drawings & sequences of operation
• Project operation and maintenance manuals
• Project commissioning
• '�'esti�g, adjusti�g & b�aaciag (TAB)
• TAB reports
• As-built red line drawings
• Training for new HVAC systems and Metasys FMS upgrades
• Equipment warranty execution and repair
� Permits
• Payment and performance bonds
EXCLUSIONS
l. HAZARDOUS MATERIALS. Unless specifically noted in this Work, JCI's obligations expressly
exclude any work or services of any nature associated or connected with the identification, abatement,
cleanup, control; removai, or disposal of hazardous materials or substances, including but not limited
to asbestos or PCBs, in or on the premises.
2. Any structural modifications to existing equipment and infrastructure that is required due to
previously unknown deficient structural conditions
3_ City code upgrades for existing infrastructure and equipment scheduled to remain
4. Repair or replacement of defective mechanical or electrical equipment, except the equipment
described to be replaced in the Work (7CI will identify the location of defective equipment and notify
City personnel)
5. Overtime labor
6. State and local taxes
7. Fire alarm and security
8. Temporary utilities
9_ EJcisting system conditions not specified in the plans and specifications
10. City Ethemet wiring
�
,� �,�
.���r�5i�it � ���
C�s�t�€�Q.s
BURNETT BUIIJDING — LIVESTOCK PEN EXHAUST SYSTEMS
SCOPE OF WORK
1. Direct Drive Exhaust Fans
Ext. SP
Qty Ca acity (Ea) In. WG
- 45 10,000 CFM 03
a. Voltage 240/1/60
b. Propeller or tube axial upblast fan
c. Gravity backdraft damper with magnetic latches
d. Integral fused disconnect
e. Insulated factory aluminum roof curb
f. Aluminum bird screen
g. Totally enclosed fan motor
2. Direct Drive Su�plv Fans
Ext. SP
Qty Ca acity (Ea) In. VJG
44 9,000 CFM 03
a. Voltage 240/1/60
b. t�ropeller fan
c. Gravity backdraft damper
d. Inte�ral fused disconnect
e. Insulated factory aluminum roof curb
f. Alunainum bird screen
g. Totally enclosed fan motor
3. Mechanical
a. Demo and removal of one-hundred thirty-eight (138) e�sting supply fans and one-hundred thirty-
seven (137) existing exhaust fans
b. Disposal of fans
c. Install new supply & eJchaust systems
d. Instali weather/water tight galvanized steel caps on e�cisting roof openings not being utilized for
new fan installations
e. Crane and rigging equipment
4. Electrical
a. Demo of two-hundred and seventy-five (275) e�sting fan units
b. Demo all associated wiring back to control cabinets
c. Demo of existing 4 pole muiti speed contactors
d. Demo existing conduit back to zone to be reused
e. Install new conductors and conduit for new supply & e�aust systems (some existing conduit will
be re-used)
f. Re-use existing 2 pole breakers
g. Install new contactor for each fan
3
� *
s .,
h_ Lift equipment
5. Metasys Facility Mana�ement Svstem
a. Existing server, workstation, Metasys Network Controller & dib tal controllers will remain & be
utilized to implement all new systems and points
b. N2 communications
c. Low voltage control wiring
d. New point expansion modules and controllers
e. Start/stop control of thirty-two (32) fan groups. Each fan group will consist of two to three fans.
f. _ New analog inputs to monitor the status of each fan within each fan group
g. Fans b oups wiil be assib ed to four (4) control zones. Operator will be able to activate &
deactivate all fans in each control zone.
h. Dynamic graphics for new systems. Graphics will include display for each e�chausdsupply fan
location and allow user to enable/disable each control zone from the graphic.
RICHARDSON BASS BiJILDING — LIVESTOCK PEN EXF�AUST SYSTEMS
SCOPE OF WORK
l. Direct Drive Exhaust Fans
Ext. SP
Q Ca aci (Ea) In. WG
35 10,000 CFM 0_3
5 3,960 CFM 03
a. Voltage 240/1/60
b. . Propeller or tube axial upblast fan
c. Gravity backdraft damper with magnetic latches
d. Integral fused disconnect
e. Insulated factory aluminum roof curb
f. Aluminum bird screen
g. Totally enclosed fan motor
2. Direct Drive Su�pl�
E�. SP
Qty Ca acity (Ea) In. WG
35 9,000 CFM 0.3
5 3,960 CFM 0.3
a. Voltage 240/1/60
b. Propeller fan
c. Gravity backdraft damper
d. Integral fused disconnect
e. Insulated factory aluminum roof curb
f. Alumi.num bird screen
g. Totally enclosed fan motor
0
�# �
,�t��t15�t9i4 '��A�`��
�i3i�'��'f��5
3. Mechanical
a. Demo and removal of eighty-five (85) existing supply fans and eighty-five (85) existing exhaust
fans
b. Disposal of fans
c. Install new supply & e�chaust systems
d. Install weather/water tight galvanized steel caps on e�cisting roof openings not being utilized for
new fan installations
e. Crane and rigging equipment
4. Electrical
a. Demo of one-hundred and sevenry (170) e�sting fan units
b. Demo all associated wiring back to control cabinets
c. Demo of e�sting 4 pole multi speed contactors
d. Demo existing conduit.back to zone to be reused
e. Instail new conductors and conduit for new supply & exhaust systems (some existing conduit will
be re-used)
£ Re-use existing 2 pole breakers
g. Install new contactor for each fan
h. - Lift equipment
5. Metasys Facility Management System
a. E�sting server, workstation, Metasys Network Controller & digital controllers will remain & be
utilized to implement all new systems and points .
b. N2 communications
c. Low voltage control wiring
�. St�Jstop co�trol cf twenty-si:. (26) far� �oups. Each fa,-� �oup w:ll ccnsist of two to t�ree fans.
e. New analog. inputs to monitor the status of each fan within each fan group
£ Fans groups will be assigned to two (2) contr�l zones. Operator will be able to activate &
deactivate all fans in each control zone.
g. Dynamic graphics for new systems. Crraphics will include display for each exhaustlsupply fan
location and allow user to enable/disable each control zone from the �aphic.
MONCRIEF BUII.DING — LIVESTOCK PEN EXHAUST SYSTEMS
SCOPE OF WORK
l. Direct Drive E�aust Fans
Ext. SP
- Qty Ca acity (Ea) In. WG
3 7,500 CFM 0.65
a. Voltage 480/3/60
b. Propeller or tube axial upblast fan
c. Gravity backdraft damper with magnetic latches
d. Integral fused disconnect
e. Insulated factory alurr�num roof curb
f. Aluminum bird screen
g. Totally enclosed fan motor
h. VSD
x,� �'�
���'Eii�f3�'t `� ��>�
�tii'i�����
2. Belt Drive Su�plv Fan
Ext. SP
Q Ca acity (Ea) In. WG
1 15,000 CFM 0.5
a. Voltage 480/3/60
b. Centrifugal inline fan
c. Gravity backdraft damper
d. Integral disconnect
e. Totally enclosed fan motor
f_ VSD
g. Extended Iube lines
h: Factory vibration isolators
i_ Aluminum insect screen
3. Direct Drive Circulating Fans
Ext. SP
Q Ca aci (Ea) In. WG
4 4,000 CFM N/A
a_ Voltage 120/1/60
b. Totally enciosed.fan motor
c. Sidewail mounting nardware & accessories
d. Washdown rated
e. 3-speed fan control
4. One (1) Outside Air Hood
Qty Capacity (Ea)
1 20,000 CFM
a. Aluminum bird screen
b. Aluminum housing
c. Insulated factory roof curb
d. Gravity backdraft damper
5. Mechanical
a. Demo and removal of four (4) e�sting e7chaust fans
b. Disposal of fans
c. Install new supply, exhaust & circulating systems
d. Crane and rigging equipment
6. Electrical
a. Demo of four (4) e7cisting fan units
b. Install new conductors and conduit for new fan systems (some e�sting conduit & conductors will
be re-used)
c. Install four (4) new VSD units
:
�`� g��`�
�EA�iiSt3it �'��
�B7it'�Fi���
7. Metasys FacilityManagement System
a. EJcisting server, workstation, Metasys Network Controller & digital controllers will remain & be
utilized to implement all new systems and points
b. N2 communications
c. Low voltage control wiring
d. Start/stop & VSD control of three (3) new exhaust fans & one (1) new supply fan
e. New current sensors to monitor the operation of each fan circuit
f. New temperature sensor to control new supply fan
g. Dynamic graphics for new systems. Graphics will include display for eaeh e�aust fan location
and allow user to enable/disable each fan from the graphic.
We appreciate the opportunity to p�riner with the City to execute this work. If you have any questions,
please contact me at 817-480-6953.
Regards,
,
Harry Romine
Account Manager
Municipal Solutions Group
7
1C1 TXMAS Cost Estimate
WRMC - Livestock Pen Exhaust Systems Proposal
2/22/2013
� � �k � :
'� f
��{�jj�� - f § m}� p� y. p ( �t ��i ' i �7 t y��/I��} �y� '�,�j { �^ 9 t�ty' • ,t ts � 5 $ t' {# u 4 1 7 3 7 3 S r
Y3(/liY1����1�L`��D��g�� 7i:i�����Yll r��!■f��i1�J��w7���411� ����t+f{4�t£f f�4�tt t Sf�tif(�%r�t' ��tw4` �i£ 1 x � F�t��} ` �ck�? .� ,� � �: � 't �
FMSIN ltem Description Qty TXIIAAS Pnce Total
246-42-3 DX-9100-8454G DIGITAL CONTROLLERDX-9100-8454 1 $ 1,949.Z2 $ 1,949.22
246-42-3 DX-9100-8990. MTG.BASE X DIG.CONTR. 1 $ 213.07 $ 213.07
246-42-3 XP-9103-8304 EXPANSION MODULE, 8 DO 4 $ 145.01 $ 580.OZ
246-42-3 XP-9102-8304 EXPANSION MODULE, 6 AI 4 $ 25036 $ 1,001.42
246-42-3 XT-9100-8304 EXTENSION MODULE 3 $ 251.65 $ 754.96
246-42-3 BKT287-1R DIN RAIL MOUNTING KIT BRA 2 $ 251.65 $ 503.31
246-42-3 H921 CURRENT SENSOR LOOP 32 $ 48.66 $ 1,557.12
246-42-3 RIBUIC RIB 10AMP SPDT 1030 VACDC 32 $ 13.61 $ 435.65
246-42-3 Y65A21-0 TRANSFORMER UL CLA55 2 1 $ 20.47 $ 20.47
246-52 Program Manager Program Manager 80 $ 150.25 $ 12,020.30
246-52 Project Manager II lead Project Manager - Controis 48 $ 142.13 $ 6,822.33
246-52 Project Manager I Project Superintendent 184 $ 105.58 $ 19,427.40
246-52 Administration 5taff I Administration 16 $ 69.03 $ 1,104.48
246-51 Technical Resource Controls Technician 92 $ 139.28 $ 12,813.76
Open Mkt Electrical Controls Electrical Subcontractor- Controls 1 $ 17,225.00 $ 17,225.00
Open Mkt Electrical Power Electrical Subcontractor- Power 1 $ 79,153.75 $ 79,153.75
Open Mkt Commissioning Summit Consultants 1 $ 15,625.00 $ 15,625.00
Open Mkt Fans Supply & Exhaust Fans 1 $ 270,986_35 $ 270,986.35
Open Mkt Mechanical Mechanical Subcontractor 1 $ 364,645.30 $ 364,64530
Open Mkt Expenses 6eneral Conditions 1 $ 12,097.25 $ 12,097.25
Open Mkt Bond Performance & Payment Bond 1 $ 5,571.63� $ 5,571.63
Open Mkt Warranty Training & Warranty 1 $ 15,900.00 $ 15,900.00
Total $ 840,407.79
a � 16�5'`�' r.'aSE; �;�;ti�t��i .±.h'�;�s'�??�,,.. t�.�s+`,�a'�%�= .. t,,..t r�tt S r.,L"f}�l n-�u„ .e�! a�iiu4' ...:.in %u�u�;. tut��+ iXila., )at . �in,g��..5 �. a u, ,y _ +�; ? ,. `�
,���� ���Gl�ii�'Y�SQ `S�S��C'� ����i' ��C'�P.�pE'�B�S���S�. /,5�£� �'�.� � ���''��� `� 3��'" ��"p�l��' �rvt� ���`�;��Efi �n� }��, .��� } ��
,-�t�4.�;.�..�t,,.�v ,�m��s ,.�..�a�na.�. �„a,.�.�.�,�§a�.,�d ��n.nw..i,w..�a.rt.�x�n�a�a�_o.,<,�1,.� ��3��.��������`t�5�t�bEn.�. ����'x����Sm.�.'�'�'���3.3,a5�..�.��;,�������.��trc ����i'�',��vs
SIN �" `. Item Descripiion;, ` -° Qty' 7XMA5 Price Totai
246-42-3 DX-9100-8454G DIGITAL CONTROLLERDX-9100-8454 1 $ 1,949.22 $ 1,949.22
246-42-3 DX-9100-8990 MTG.BASE X DIG.CONTR. 1 $ 213.07 $ 213.07
246-42-3 XP-9103-8304 EXPANSION MODULE, 8 DO 3 $ 145.01 $ 435.02
246-42-3 XP=9102-8304 EXPANSION MODULE, 6 AI 3 $ 250.36 $ 751.07
246-42-3 XT-9100-8304 EXTENSION MODULE 2. $ 251.65 $ 50331
246-42-3 BKT287-1R DIN RAIL MOUNTING KIT BRA 2 $ 251.65 $ 503.31
246-42-3 H921 CURRENT SENSOR LOOP 26 $ 48.66 $ 1,265.16
246-42-3 RIBUIC RIB 10AMP SPDT 1030 VACDC 26 $ 13.61 $ 353.97
246-42-3 Y65A21-0 TRANSFORMER UL CLASS 2 1 $ 20.47 $ 20.4Z
246-52 Program Manager Program Manager 80 $ 150.Z5 $ 12,020.30
246-52 Project Manager II Lead Project Manager- Controls 48 $ 142.13 $ 6,822.33
246-52 Project Manager I Project Superintendent 184 $ 105.58 $ 19,427.40
246-52 Administration Staff I Administration 16 $ 69.03 $ 1,104.48
246-51 Technical Resource Controls Technician 86 $ 13928 $ 11,978.08
Open Mkt Electrical Controls Electrical Subcontractor- Controls 1 $ 14,575.00 $ 14,575.00
Open Mkt Electrical Power Electrical Subcontractor- Power 1 $ 75,087.50 $ 75,087.50
Open Mkt Commissioning Summit Consultants 1 $ 13,750.00 $ 13,750.00
Open M.kt Fans Supply & Exhaust Fans 1 $ 238,743.80 $ 238,743.80
Open Mkt Mechanical Mechanical Subcontractor 1 $ 325,626.70 $ 325,626.70
Open Mkt Expenses General Conditions 1 $ 11,858.75 $ 11,858.75
Open Mkt Bond Performance & Payment Bond 1 $ 4,99525 $ 4,995.25
Open Mkt Warranty Training & Warranty 1 $ 13,647.50 $ 13,647.50
Total $ 755,631.69
R
i4 I�t 7. �-� I tii ) i:�.�i� k,�l s i.-'. � \I • ar,.iyi:aAE iA1 3 "tj .I 1 y �i t 7 t{;h !t Y I i.,.
�%R�� , M�C1Crit'"�i � i �i ,�� a 3 �� vs`i +tr ,y+�ar ,:e c 4 r a,� �+� �fi� i � s i r�j,Y ��+ �
�,>-_. , �! .,��,.,, i,.�..��i��,.ciC�:ijie�S��C�C��ily�iC�Tc'��iS���(S'��5..>>>>::��,'�i���r„i�,vti�i�;� �,�,�3 ���;tt,.,�ni��,�;ri�,.�>ar�;'�� ���4;:t„ei.�+il,, i�.��a���i�.r�x st,?�
�, i
_ , . �. v� .. „f .� ..��... �., ..., _
51N ;:, . Item " Descriptiori Qty TXMAS Price Total
246-42-3 CSD-SA1E0-1 SLD/ADJ LED 1A W/0 RELAYSOLID CORE CURRENT 3 $ 35.96 $ 107.88
SWITCH, ADJUSTABIE SET POINT, 1.25-200A, W/0
RELAY
246-42-3 RIBUIC RIB 10AMP SPDT 1030 VACDC 4 $ 13.61 $ 54.46
246-42-3 PAKJ000016H0 FEC2621,24X36,DISPFEC2621-0 PNL IN A 24 X 36 2 $ 1,100.61 $ 2,201.22
X 6-5/8 ENCLOSURE, INTEGRAL DISPLAY
246-42-3 MS-IOM4711-0 IOM4711,IOM 17 POINT,UL17 PT IOM W/ 6 UI 2 2 $ 264.04 $ 528.08
BI 3 BO 2 AO 4 CO 24 VAC AND SA BUS W/MTG
BASE
246-42-3 TE-6314P-1. TEMP SENSOR; 1000 OHM, NI 1 $ 13.61 $ 13.61
246-42-3 CSD-SA1E0-1 SLD/AD1 LED 1A W/0 RELAYSOLID CORE CURRENT 4 $ 35.96 $ 143.84
SWITCH, ADJUSTABLE SET POINT, 1.25-200A, W/0
RELAY
246-42-2 VS005411A-N0000 BP 5HP 480V T1 N2 (Supply Fan) 1 $ 1,783_87 $ 1,783.87
246-42-2 VS002411A-N0000 BP 2HP 480V T1 N2 (Exhaust Fan) 3 $ 1,698.07 $ 5,094.21
246-42-2 VSSTART-SM4-5 START UP SMALL 4-SVSD 1 $ 1,580.14 $ 1;580.14
246-52 Program Manager Program Manager 24 $ 150.25 $ 3,606.09
246-52 Project Manager II Lea.dProject Manager- Controls 16 $ 142.13 $ 2,274.11
246-52 Project Managerl ProjectSuperihtendent 40 $ 105:58 $ 4,223.35
246-52 Administration Staff I Administration 8 $ 69.03 $ 552.Z4
246-51 Technical Resource Controls Technician 40 $ 139.28 $ 5,571.20
Open Mkt Electrical Controls Electrical Subcontractor- Controls 1 $ 3,975.00 $ 3,975.00
Open Mkt Electrical Power Electrical Subcontractor- Power 1 $ 25,328.75 $ 25,328.75
Open Mkt Commissioning Summit Consultants 1 $ 3,125.00 $ 3,125.00
Open Mkt Air Devices OA Hood 1
$ 339.20 $ 339.20
Open Mkt Fans Suppfy & Exhaust Fans 1 $ 29,968.85 $ 29,968.85
Open Mkt FOWHN-032X032 FD-1600 FIRE DAMPER, 32X32 1 $ 267_68 $ 267.68
Open Mkt Mechanical Mechanical Subcontractor 1 $ 62,029.88 $ 62,029.88
Open Mkt Expenses General Conditions 1 $ 1,669.50 $ 1,669.50
Open Mkt Bond Performance & Payment Bond 1 $ 853.04 $ 853.04
Open Mkt Warranty Training & Warranty 1 $ 2,252.50
$ 2,252.50
Tota I $ 157,543.70
�
♦ � �
.
.
2.8.1
Texas Multiple Awa.rd Schedule Contracts
PCC X
Introcluction
The Texas Multiple Award Schedule (TXMAS) Program adapts e�sting competitively awarded
government contracts to the procurement needs of the state of Texas. Unlike some other
purchasing methods, purchases made from TXMAS contracts do not require delegated authority
from TPASS to make purchases over $25;000 for commodities and $100,000 for seivices. To be
considered for the TXMAS Program, an existing contract must be:
• Awarded by the federal government or any other governmental entity in any state.
• Awarded using a competitive process.
� Adaptable to the laws of the state of Texas
Each TXMAS contractor is required to provide a TXMAS product catalog. Catalogs must
contain the following information:
• Item specifications.
° ��ei�g procedares.
• Invoicing procedures.
• Contact information for making purchases and for customer service.
Terms and Conditions: If any information is needed in reference to the Terms and Conditions,
please contact the contract holder or the TXMAS Coordinator at (512) 463-3421.
TXMAS contractor catalogs are available on the TXMAS Contracts Bv Schedule.
General Services Administration Federal Supply Service Contracts
The vast majority of TXMAS contracts are adapted from General Services Administration
Federal Supply Service (GSA) contracts. For this reason, it is common for a contractor's
TXMAS catalog to be nearly identical to its GSA catalog. For contracts adapted from GSA
contracts, the TXMAS prices must be identical to those on the GSA Schedule. These are the
"Most Favored Customer" (IV�C) prices and are the maYimum prices allowed. To learn about
negotiating lower prices for TXMAS contract items, please see the section entitled "Negotiating
Price wiih TXIVIAS Vendors" below.
Purchasing from TXMAS Contracts
Prior to purchasing the product or service from a TXMAS contract, follow applicable statutes, as
required, forpurchasing from the CCG, TIBH, TCI, the TxSmartBuy term or Managed term
contracts. '
To purchase outside an established TPASS term contract, conduct a search of all TPASS term
and TXMAS contracts for the product or service required. It is recommended that a comparison
be conducted between the contracts for best value and be based upon the exact product's
functional specifications or service requirements.
Purchase Orders a�ainst TXMAS Contracts must be entered through the TxSmartBuv on-
line ordering system.
Best Value Comnarison Documentation:
Price cannot be a factor to not purchase TIBH products. If the product desired is
available through TIBH, the purchase order must be issued through the TxSmartBuy
ordering system. Products available from TCI should be purchased when meeting the
functional specifications of the required product. Purchases for services or products available
through CCG contracts must be processed through those contracts.
1. For products or services other than those available through CCG, TIBH or TCI,
record the following information in the procurement file:
a. Description of the product or service
b. TPASS term contract number(s) and the TXMAS contract number(s) searched.
NOTE: If searching a new TXMAS contractor that does not have a listi.ng or link
to their catalog on the TXNI.AS Gantracts V�'eb Paae, request a catalog £+-om that
contractor with a copy of their TXM�S award notice.
c. Product manufacturer/brand and modeUproduct number
d. Pricing printed from the TPASS Term Contracts including any additional charges
as applicable (freight, inside delivery).
e. Include pricing from TXMAS contractors that provide the product or service from the
on-line catalogs or quotations. ff the quoted price is less than the price listed in the
contractor's TXMAS on-line catalog, make note that the lower pricing was confumed
and list the representative's name. If the quoted price is higher than the price listed on
the contractor's TXMAS on-line catalog, request that the contractor provide a new
quote with the published price.
Issuin� the Best Value Purchase Order
� Document the basis for the best value determination in the procurement file.
• If the TPASS term contract(s) provide the best value, the purchase order must be
processed through the TxSmartBuy ordering system, or if available from a Managed
Term Contract, issue an internal purchase order directly to the contractor.
If the TXMAS contract provides the best value, issue a purchase order to the contractor
through the TxSmartBuy ordering system or, if to a contractor's dealer, issue an intemal
purchase order directly to the dealer. The dealer must be listed on the TXMAS
contractor's contract page. A TXMAS contractor is not required to accept orders below
the min;mum order limit shown on its contract page. Orders between the minimum and
maxi.mum order limits listed on the contract page are subject to TXMAS catalog pricing.
For orders above the maximum li.mit, you are entitled to negotiate lower prices than those
listed in the TXMAS catalog.
TXIVIAS Purchases for Products or Services NOT Available through TPASS
established contracts:
T�:MAS P-rocurements of $5,000 and Below -
•"' Prior to purchasing the product or service from a TXMAS contract, follow applicable
statutes, as required, for purchasing from the TIBH, TCI, the TxSmartBuy term or
Managed term contracts. See Section 2.5, "Set-aside Purchases."
� Agencies are required to obtain the "best value" for expendiiures of agency funds by
obtaining multiple quotes (at least three) where possible and document their efforts in the
procurement file. The quotes may be obtained via telephone or by electronic transmission
• The agency shall issue a purchase order to the selected "best value" TXMAS contractor
through the TxSmartBuy orderi.ng system or, for contractor's dealers, issue an internal
purchase order using internal agency procedures and policies for purchases of $5,000 and
below.
TXMAS Procurements over $5,000
� Prior to purchasing the product or service from a TXMAS contract, follow applicable
statutes, as required, for purchasing from the CCG, TIBH, TCI, the TxSmartBuy term or
Mana.ged term contracts. See Section 2_5, "Set-aside Purchases."
• Reseazch the on-line catalog pricing and/or obtain a price quoie from as many TXMAS
conixactors as necessary to provide best value to the state. Document all price quotes in
the procurement file. If the TXMAS contractor's website is not shown on the TXMAS
Contracts Web Pa�e the contractor must include a copy of the TXMAS contract award
notice with its price quote.
• For all TXMAS purchase orders that exceed $25,000, the agency must post the Award
Notice on the ESBD (Electronic State Business Daily).
• A TXMAS contractor is not required to accept orders below the minimum order limit
shown on its contract page. Orders between the minimum and maximum order li.mits
listed on the contract page are subject to TXMAS catalog pricing. For orders above the
ma�mum li.mit, the purchaser is entitled to negotiate lower prices than those listed in the
TXMAS catalog.
• Proprietary TXMAS procurements:
If the proprietary product or service is available through a TXMAS Contract, prepare
documentation (letter or memo to the file) justifying the proprietary purchase in accordance with
__ Government Code 2155.067 and obtain the authorized signature of the appropriate agency's
personnel as identified in the agency's Procurement Plan. Retain this document in the
procurement file.
• Prices for the following may be negotiated with a TXMAS contractor:
l. Incidental, off-schedule items and services, installations, set up or inside delivery if
necessary for product wairanty, system integration or product completeness as
required to facilitate TXMAS contract purchases.
2. TXMAS contraci goods and services that the contractor is offering through a
promotional program.
3. TXMAS contract goods and services in an amount that exceeds the contract's
M�imum Order.
Incidental, off-schedule items and services, installation or inside delivery and set up, may
be purchased as "best value, open market" items provided that they are necessary for
product warranty, system in.tegration or product completeness. An agency is responsible
for ensuring that the quoted price for such incidental items is fair and reasonable. These
incidental items and services may be added to the purchase order if they are clearly
labeled as "open market, best value" items on the contractor's quote.
• Purchase orders must be processed through TxSmartBuy.
- • Some TXMAS contract items are loaded into the TxSmartBuy system for purchasing
directly from a contractor. Contract items can be searched and added to a shopping cart
to complete the purchase order through the system.
• TXMAS contracts provide items for purchase tbrough a quote process. These orders are
processed through the system as a single line item for the total amount of the quote. The
quote document can be attached to the purchase order in the system and will be sent to
the contractor with the purchase order.
• Intemal purchase orders following agency policies and procedures can be issued to
TXMAS contractor dealers. The dealer must be listed on the TXMAS Contractor's
conlract page.
The dealer will process the order and is to be paid directly by the customer. These orders
must contai.n the followi.ng documentation:
• TXMAS Contract number
• NIGP Code (Class and Item) for each purchased line item
� Agency number
• Best Value Determination
• Identification of any incidental, off-schedule items and services, installation, set up or
inside delivery charges. •
Proposin� New TXMAS Contracts
� _ . .: = , . ; THEN . . _ :. �. : . �: .. � AND: ` ; . _ . . : . '
You have a requirement Verify that the requested . Awarded by the federal
that could be met by a contract is not already government or any other
competitively awarded available as a TXMAS state governmental
government contract Contract entity
• Awarded using a
competitive process
• Adaptable to the laws of
the state of Texas
The potential contract contact the TXMAS Program
meets the above criteria at (512) 463-3421 to begin
the process for a TXMAS
contract award consideration
Texas Government Code §§ 2155.062, 2155.�02. 2155.�04, 2155_504(b) and Loca1 Government
Code §271.141
� ���� ����� ���� �,�"�4�'� u��� �, � �,-:� �� `�...�'�"�''�:' �" �.�.�.�,��. k:�
Seaxch TXMAS Coniracts
Search ;:
Rebates: Pursuant to Texas Government Code § 2155�.510(b), rebates generated from TXMAS contract
purchases made using federal funds must be reported to the federal funding agency for reporting and
reconciliation purchases. Each quarter of the State's fiscal year, TXMAS contractors rebate .75% of their
TXMAS sales to the State of Texas via the Texas Comptroller of Public Accounts (CPA). It is the
purchasing entity's responsibility to report the amount of rebate using the above percent based on the
total dollar value of the TXMAS purchase order..
Example: A purchasing entity receives and uses federal funds of $50,000 to purchase items/services on a
TXMAS contract. The purchasing entity must report to the federal fund-provider that a sales rebate of
$375 ($50,000 *.75% _$375) will be paid to the State of Texas by the TXMAS contractor.
�;�.
°� .
JOHNSON CONTROLS INC.
Contract TXIV�AS-6-840160
Dai-Liaie Cataio�/Order Pracessin�
TOTAL SOLUTIONS FOR LAW ENFORCEMENT, SECURITY FACILITIES
1VY�NAG�IVIENT, IFIRE, R�SCIT�, CLOTHYlvG, MAI�IN� CRA�'T AND
EMERGENCY/DISASTER RESPONSE
Coiporate Office:
JOHNSON CONTROLS,
INC.
507 EAST MICHIGAN
STREET
MILWAUKEE WI 53201
USA
Send PO to:
JOHNSON CONTROLS
INC.
507 EAST MICHIGAN
STREET
MILWAUKEE WI 53202
USA
Vendor ID: 15826641308
Invoice From:
JOHNSON CONTROLS
INC.
507 EAST MICHIGAN
- STREET
MILWAUKEE WI 53202
USA
Delivery: 30 DAYS, BASED ON AVAILABILITY
OVERI�TIG�iT AND 2-�AY DELIVERY ARE
AVAILABLE IF THE ITEMS ARE IN
STOCK
FOB Point: DESTINATION
Terms: NET 30 DAYS
Remit To: JOHNSON CONTROLS INC.
507 EAST MICHIGAN STREET
MILWAUKEE WI 53202
USA
Vendor ID:
VendorID: 15826641308
Business Large
Type:
DUNS#
Effective:
Expires:
100363840
7/27/2006
8/31 /2015
'��9�/.�..��11�'� tFi"�Pl
��x�a � ;uv t y
� �o �
�t�:��r"x��.�`��. �:���.��a—�r��a..��.#�.����;,��'�Gz�,.�"'�,:�rx:�
Vendor ID:
CONTACT: MARK MER]�2IMAN
Phone 512-973-3555
MARK. C.MERRI_MAN(�a,JCI. COM
Effeciive Date: This Texas Multiple Award Schedule (TXMAS) contract is effective beginning
7/27/2006 through 8/31/2015 and is automatically renewed on the date that the General Services
Adi�inistration (GSA) exercises the renewal option. All S�ate oi Texas terms and conditions will
continue and apply to all renewal periods by muival agreement. The contractor has certified that the
prices reflected in the coniractor's catalog are the same as the prices contained in the most current
modification to GSA Contract No. GS-07F-7823C.
Placement of Orders: Purchasing eritities must use both the instructions on the contractor's web page
and the terms and conditions in the federal supply schedule to place orders. Purchasing entities may use
a either a departmental purchase order or the contractor's on-line ordering system to place orders.
Purchasing enfiities may opt out of using the contractor's on-line ordering system if it is incompatible
with the enrity's purchasing procedures. The contractor is not required to accept orders below the
minimum listed below. Orders between the m;nimum and maxunum listed below are subject to GSA
preferred customer pricing. For orders above the maximum, purchasing entities are entitled to negotiate
for lower prices than those listed on the on-line federal supply schedule price list.
Order Limitation:
1V�linimum Order: $50
Maximum Order: $100,000 TO $200,000 DEPENDING ON SIN
Approved Products/Services: Only products or services listed in the CPA approved GSA contract
may be purchased from this TXM1�S contract, with one exception. Incidental, ofF schedule items may
be purchased as "best value, open market" items provided that they are necessary for product
integration or product completeness. The purchasing entity is responsible for ensuring that the quoted
price for such incidental items is fair and reasonable. These incidental items may be added to the
TXMAS purchase order if they are clearly labeled as "open market (OlV�, best value" iiems.
THIS TXMAS CONTRACT IS ALSO LISTED ON TXSMARTBUY. Unless this company has
TXMAS-authorized dealers (listed previously on this page), all purchasing entities wanting to
purchase items/services ava.ilable on this TXMAS contract must purchase through TxSmartBuy:
www.txsmartbuy.com. If this contract has TXMAS-authorized dealers, those dealers may coniinue to
�ccept purchase orders as they have been doing in their previous manner (fax, email, or hand carry). I;
you have any questions, please send an email to txmas(a�cpa.staie.f�.us or call (512-463-3421).
State Contracts: All Texas Council for Purchasing from People with Disabilities contracts and Texas
Correctional Industries (TCI) term contracts take precedence over this TXMAS contract. If similar
products or services are listed on this TXMAS contract and a CPA term contract, a determination
should be made that will result in a best value purchase.
Payment Due Date: Payment will be due on the thirtieth (30) calendar day after the later of: (a) the
date the State actually receives a proper invoice at the office designated in the applicable purchase
order to receive it; or (b) the date the State accepts the products or sexvices. The post mark date on the
envelope for the State warrant (State's equivalent to a check) or banking information showing when a
direct deposit transaction was received will be considered the date payment is made. Interest starts
accruing on the first day that payment is late. The rate of interest for late payments is set at one percent
per month.
Special Note: The State of Texas, including but not limited to its Agencies, cooperative purchasing
members and any local governmental entity authorized by law to use the Texas Multiple Award
Schedule method for purchasing is not obligated to procure any products or services from this TXMAS
contract. This schedule contract shall not be construed to prevent the State from purchasing products or
services using other procurement methods as authorized by law.
Keywords: fire alarm systems, access control systems, locking devices, facility management, perimeter
security, detection systems,
Contact Us
If you have any suggestions on how to improve TXMAS or this web site, please send an email to
txinas(a�cpa.state.tx.us ar call 512-463-342L
Texas.gov � Statewide Search fram the Texas State Library � State Link Poficy � Texas Home{and
Security
seasan Ccset�bs, i exas Comptroller • Windaw on State Government • Contact Us
Prfvacy and Secu�ity PoEicy i Accessibiiity Palicy ; Link Policy � Public Information Act ; Compact with
Texans
TEXAS SALES AND USE TAX EXEIIAPTlQH CERTIFiCATE
Name of Purchaser, Firm or Agency_ Cify of Fort Worth. Texas
Address (Street & Num6er, P_�. Box or Roufe Number): 1Q00 Throckmorton
Cify, Stafe, �ip Code: Fort Warth. Texas 76102
Telep�one: (817) 392-8360
I, the purchaser namzd above, claim an exemption from payment of sales and use
taxes for the purchase of taxable items described below or on the aiiached order or
invoice from:
All vendors
Description of the items to be purchased, or on the attached order or invoice:
All items exceqt motor vehicles as listed below --
Purchaser claims this exemption for the fo(lowing reason:
Governmental Entitv
I understand that I wilf be iiable for payment af sales or use taxes which may become
due for faiiure to comply with the pravisions of the siate, city, and/or meiropolitan fransit
authority sales and use tax laws and comptroller rules regarding exempt purchases.
Liabiliiy for tF�e tax wifl be determined 6y the price paid for ihe taxable items purchased
or the fair markei rental value for the period of time used.
I understand that it is a misdemeanor to gi�e an exemption certificate to the se(ler for
taxable iiems which I know, at the time of purchase, will be used in a manner other than
expressed in this certificate and that upon conviction I may be fined not more t(�an $500
per offense. � (�
Purchaser:
Ti#(e:
Date: February 1, 2007
Note: This cert�cate cannot be issued fior fhe purchase, lease or rental of a motor
vehic{e.
TH/S CERTIFICA�"E DOES NOT REQU/REA NUMBER TO BE VAUD
Sa(es and Use Tax "Exemption Numbers" or "Tax Exempt" Numbers do not exist.
This cerfificate should be furnished to the supplier. Do not send the campleted
certificate to the Comptroller of Public Accounts.
WRMC Exhaust Systems for Bumett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
PREVAILING WAGE RATES
AC Mechanic $25.92 $1.01 $0.19 $0.83 $27.91
AC Mechanic Helper 515.81 $0.00 $0.00 $0.30 $16.77
Acoustical Ceiling Mechanic $15.56 $0.57 $0.03 $0.12 $16.26
Acoustical Ceiling Helper $12.27 $0.19 $0.00 50.00 $12.46
Abestos Worker $0.00 $0.00 $0.00 50.00 $0.00
Bricktayer/Stone Mason $18.54 $0.24 $0.00 $0.00 $18.78
Bricklayer/Stone Mason Helper $10.39 $0.00 $0.00 $0.00 $10.39
Carpenter $17.08 $1.62 $0.17 $0.81 $19.69
Garpenter Hetpe� $13.45 $0.75 $0.08 $0.71 $14.99
Concrete Finisher $13.97 $0.41 $0.04 $0.14 $14.55
Concrete Finisher Helper $12.14 $0.43 $0.04 $0.11 512.72
Concrete Form Buitder $14.03 $0.67 $0.03 $0.15 $14.88
Concrete Form BuitderHelper $11.72 $0.54 $0.03 $0.10 $12.39
Drywall Mechanic $16.10 $0.56 $0.02 $0.30 $16.98
Drywall Hetper $12.43 $0.33 50.00 50.28 $13.05
Drywall Taper $15.00 $0.07 $0.00 $0.00 $15.07
DrywallTaperHetper $11.50 $0.07 $0.00 $0.00 $11.57
Etectrician (Journeyman) $21.77 $1.08 $0.05 $0.38 $23.29
Electrician Helper $15.32 $1.09 $0.05 $0.27 $16.73
Electronic Technician $20.00 $0.00 $0.00 $0.00 $20.00
Etectronic Technician Helper $0.00 $0.00 $0.00 $0.00 $0.00
Ftoor Layer(Carpet) $0.00 $0.00 $0.00 $0.00 $0.00
Ftoor Layer (Resilient) $18.00 $0.00 $0.00 $0.00 $18.00
Floor Layer Helper $10.00 $0.00 $0.00 $0.00 $10.00
Gtazier $18.53 $1.92 $0.38 $0.71 $21.54
Gtazier Hetper $13.49 $1.20 $0.10 $0.35 $15.13
insulator $1 6.59 $0.29 $0.12 $0.08 $17.08
Insulator Helper $11.21 $0.36 $0.11 $0.13 $11.81
Laborer Common $10.47 $0.70 $0.06 $0.08 $11.30
Laborer Skilled $13.24 $0.98 $0.06 $0.12 $14.41
WRMC Exhaust Systems for Bumett, Ricfiardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
Lather $17.00 $0.00 50.00 $0.00 $17.00
Lather Helper $15.00 $0.00 $0.00 $0.00 $15.00
Metat Building Assem bler $16.00 $1.56 $0.63 $0.00 518.19
Metal Buitding Assembler Hetper $12.00 $1.56 $0.63 $0.00 $14.19
Painter $12_57 $0_69 $0.02 $0_09 $13.37
Painter Helper $9.98 $0.61 $0.02 $0.09 $10.70
Pipefitter $21.14 $0.90 $0.13 $0.45 $22.59
Pipefitter Helper $14.92 $0.58 $0.11 $0.23 $15.82
Plasterer $17.24 $0.05 $0.00 $0.00 $17.30
Ptasterer Helper $12.85 $0.05 $0.12 $0.43 $12.90
Plumber $20.33 $0.69 $0.12 $0.43 $21.56
Ptumber Helper $14.95 $0.95 $0.11 $0.00 $16_42
Reinforcing SteetSetter $13.01 $0.36 $0.07 $0.23 $13.67
Reinforcing SteelSetter Helper $11.19 $0.25 $0.05 $0.16 $11.64
Roofer $16.78 $1_25 $0_23 $0.17 $18.43
Roofer Helper $12.33 $1.25 $0.23 $0.17 $13_98
Sheet Metal Worker $17.49 50.97 $0_10 $0.51 $19.06
Sheet Metal Worker Helper $14.16 $1.40 $0.17 $0.44 $16.15
Sprinkler System Installer $19.17 $1.68 $0.33 $0.33 $21.52
Sprinkler System Installer Hetper $14.15 $1.50 $0.00 $0.50 $16.07
Steet Worker Structural $19.28 $1.37 $0.55 $0.12 $21.32
Steel Worker Structural Hetper $13.74 $1.37 $0.39 $0.09 $15.59
Concrete Pump $18.50 $0.00 $0.00 $0.00 $18.50
Crane, Clamsheet, Backhoe, Derrick, D'Line
Shovel $17.81 $1.30 $0.12 $0.24 $19.48
Forklift $12.96 $0.42 $0.04 $0.08 $13.50
Foundation Dritt Operator $22.50 $0.00 $0.00 $0.00 $22.50
Front End Loader $13.21 $0.36 $0.06 $0.17 $13.79
Truck Driver $15.21 $0.65 $0.06 $0.19 $16.11
Welder $17.81 $0.92 $0.12 $0.30 $19.15
Wetder Helper $12.55 $0.75 $0.00 $0.33 $13.64
WRMC Exhaust Systems for Bumett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
WEATHER TABLE
Month Average Inches Snow/Ice
Days of of Pellets
Rain Rainfall
January 7 1.80 1
February 7 2.36 *
March 7 2.54 *
April 8 4.30 0
May 8 4.47 0
June 6 3.05 0
July 5 1.84 0
August 5 2.26 0
September 7 3.15 0
October 5 2.68 0
November 6 2.03 *
December 6 1.82 *
ANNUALLY 77 32.30 1
(1) Mean number of days rainfall, 0.01" or more
(2) Average normal precipitation, in inches
(3) M.ean number of days 1.0 inch or more
* Less than 0.5 inches
This table is based on information reported from Dallas-Fort Worth Regional Airport, Texas. Latitude 32
deg 54 min north, longitude 97 deg 02 min West, elevation (ground) 551 ft.
Average number of days of rain, snow, and ice are based on records covering 27 years. Precipitation is
based on record of 1941-1970 period
This table is to be used as a basis for calculation of excess rain or weather days for projects with duration
in calendar days. If the site records indicate that the Contractor was unable to carry out operations due to
weather, it is counted as a weather day. If the number of weather days exceeds the number of average
rain days plus the snow/ice-pellet days for a given month, the contract period will be adjusted by Change
Order.
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
City of Fort Worth, Texas
Transportation Public Works Department
Facilities Management Group/Architectural Services Division
GENERAL CONDITfONS OF THE CONTRACT FOR CONSTRUCTION
LUMP SUM CONTRACT
SECTION A
DEFINITIONS, PROCEDURES AND INTERPRETATIONS
A-1 CONTRACT DOCUMENTS: By the term Contract Documents is meanf all of the written and drawn documenfs setting
forth or affecting the righfs of the parties, including but not necessarily limited to, the Contracf, Notice to Bidders, Proposal, General
Conditions, Special Conditions, Specifications, Plans, Bonds and all Addenda, Amendments signed by all parties, Change Orders,
written Interpretations and any written Field Order for a minor change in the Work.
A-2 ENTIRE AGREEMENT: The Contract Documents represent the entire agreemenf between the Parties, and no prior or
contemporaneous, oral or written agreements, instrumenfs or negotiations shall be construed as altering the terms and effects of the
Contract Documents. After being executed, the Confract Documents can be changed only by a written Amendment signed by the
Confractor and the Owner, or Change Order, or by a written Field Order for a minor change.
A-3 WORK: By the term Work is meant all labor, supervision, materials and equipment necessary to be used or incorporated
in order to produce the construction required by Contract Documents.
A-4 EXECUTION OF THE CONTRACT DOCUMENTS: The Contract Documents shall be executed in six originals, with all
required attachments, including required bonds and insurance certificates, by the Contractor and the Owner in such form as may be
prescribed by law and retumed to the Owner within ten business days of notification to Contractor. Failure to execute confracts and
provide required enclosures will be grounds for revocation of award and taking of Bid Bond.
A-5 FAMILIARIN WITH PROPOSED WORK: Before filing a Proposal, the bidder shall examine carefu(ly the, plans,
specifications, special provisions, and the form of contract to be entered into for the work contemplated. He shall examine the site
of work and saiisfy himself as to the conditions ihat will be encountered relating to the character, quality and quantity of work to. be
performed and materials to be fumished. The filing of a bid by the bidder shall be considered evidence that he has complied with
these requirements and has accepted the site as suitable for the work.
Claims for additional compensation due to variations between conditions actually encountered in construction and as indicated by
the plans will not be allowed.
A-6 ONE UNIFIED CONTRACT: Insofar as possible, the Contract Documents will be bound together and executed as a
single unified Contract. The intention of the Contract Documents being to provide for all labor, supervision, materials, equipment and
other items necessary for the proper execution and completion of the Work. Words that have well-recognized technical or trade
meanings are used herein in accordance with such recognized meanings.
A-7 DIVISION OF WORK: The arrangement of Drawings and/or Specifications into Divisions, Sections, Articfes, or other
Subdivisions shall not be binding upon the Contractor in dividing the work among Subcontractors or Trades.
A-8 INTERPRETATIONS: The Architect will fumish such Interpretations of the Plans and Specifications as may be necessary
for the proper execution or progress of the work. Such Interpretations shall be fumished at the instance of the Architect or at the
request of the Contractor, or Owner, and will be issued with reasonable promptness and at such times and in accordance with such
schedule as may be agreed upon. Such Interpretations shall be consistent with the purposes and intent of the Plans and
Specifications and may be effected by Field Order. In the event of any dispute between any of the parties to the Contract and the
Architect or each other involving the inferpretation of the Contract Documents, the evaluation of work or materials performed or
fumished by the Architect Contractor, or any subcontractor or materialsman, or involving any question of fault or liability of any party,
the decision_of the Owner shall be final and binding.
In the event of inconsistency in the contract documents, the following sequence for interpretation shall be used in order of
precedence: Change Orders and/or Field Orders (by date of issuance); Addenda (by date of issuance); Drawings; Notes and
dimensions on Drawings; Technical Specifications; Special Provisions; Supplementary General Conditions; General Conditions;
and, Construction Contract.
A-9 COPIES OF WORKING DRAWINGS AND SPECIFICATIONS: The Architect will fumish to Contractor free of charge 15
sets of working Drawings and 15 sets of Specifications. Contractor shall pay the cost of reproduction for all other copies of
Drawings and Specifications furnished to him.
All Drawings, Specifications and copies thereof fumished by the Qwner or the Architect are and shall remain the properly of the
Owner. They are not to be used on any other project and, with the exception of one Contract set for each Party to the Contract, are
to be retumed to fhe Owner on request at the completion of the work.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 1 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
A-10 MINORITY BUSINESS ENTERPRISE (MBE) POLICY: As of June 1, 2012, The City of Fort Worth has implemented the
new Business Diversity Ordinance (BDO) to reflect the City's availability and disparity study findings and recommendations. During
this transition period, interested Offerors must obtain an MBE listing from the M/WBE Office at 817-212-2674. This will ensure that
the MBE listings reflect onlv those currenfly certified by the North Central Texas Regional Certification Agency (NCTRCA) located in
the six (61-countv geographic marketplace that have been accepted by the City. The City's geographic marketplace includes the
counties of: Tarrant, Dallas, Denton, Johnson, Parker and Wise. Offerors are stronqlv encouraqed to confirm that each MBE that it
intends to use is located in the geographic marketplace that wiil be counted towards the established goal.
The City of Fort Worth has goals for the participation of Minority Business Enterprises (MBE) in City contracts. Compliance with the
policies designed to meet these goals is mandatory in order to be considered a responsive bidder. The City policy and procedures
to be followed in submitting proposals are included.
The City of Fort Worth MBE Program will take precedence over other subcontractor utilization programs on Block Grant and other
federally funded Projects.
A-11 CORRELATION AND INTENT: In general, the drawings indicate dimension, locations, positions, quantities, and kinds of
construction; the specifications indicate the quality and construction procedures required. Worlc indicated on the drawings and not
specified of vice-versa, shail be furnished as though set forth in both. Work not detailed, marked or specified shall be the same as
similar parts that are detailed, marked or specified. If the drawings are in conflict or conflict with the specifications the better quality
or greater quantity or work or materiais shall be estimated and shall be furnished or inciuded. Dimensions on drawings shall take
precedence over small-scale drawings. Drawings showing locations of equipment, piping, ductwork, electricai apparatus, etc., are
diagrammatic and job conditions may not allow installation in the exact location shown. Relocation shall not occur without the
Architects approval.
A 12 AGE: In accordance with the policy ("Policy") of the Executive Branch of the federal government, Contractor covenants
that neither it nor any of its officers, members, agents, employees, program participants or subcontractors, while engaged in
performing this contract, shali, in connection with the employment, advancement or discharge of employees or in connection with
fhe terms, conditions or privileges of their employment, discriminate against persons because of their age except on the basis of a
bona fide occupationai qualification, retirement plan or statutory requirement.
Contractor further covenants that neither it nor its officers, members, agents, empioyees, subcontractors, program participants, or
persons acting on their behalf, shali specify, in solicitations or advertisements for employees to work on this contract, a maximum
age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification,
retirement plan or statutory equipment.
Contractor warrants it will fully compiy with the Policy and will defend, indemnify and hold City harmless against any claims or
ailegations asserted by third parties or subcontractor against City arising out of Contractor's and/or its subcontractors' alleged failure
to comply with the above referenced Policy conceming age discrimination in the performance of this agreement.
A-13 DISABILITY: In accordance with the provisions of the Americans With Disabilities Act of 1990 ("ADA"), Contractor
warrants that it and any and all of its subcontractors will not unlawFully discriminate on the basis of disability in the provision of
services to the general public, nor in the availability, terms and/or conditions of employment for applicants for employment with, or
employees of Contractor or any of its subcontractors. Contracto� warrants it will fully compiy wifh ADA provisions and any other
applicable federal, state and local laws concerning disability and will defend, indemnify and hold City harmless against any claims or
allegations asserted by third parties or subcontractors against City arising out of Contractor's and/or its subcontractors' alleged
failure to comply with the above-referenced laws concerning disability discrimina6on in the performance of this agreement
SECTION B
IDENTITY OF ARCHITECT
B-1 CONTRACT ADMINISTRATION: Where the term "ArchitecY' is used in the "General Conditions of the Contract for
Construction", it shail refer to the Director, Transportation and Pubiic Works or his designated Buiiding Construction Manager. The
Director, Transportation will designate a Project Manager and Building Construcfion Manager (BCM) to administer this contract and
perform the functions of the "ArchitecY' as indicated in the General Conditions. The design architect or engineer may aiso be
designated to perform the duties of "ArchitecY'. The term "City' and "Owner" are used interchangeably and refer to the City of Fort
Worth as represented by the Director of Transportation and Public Works or his designated representative.
B-2 TERMINATION AND SUSPENSION OF WORK: The Owner has the right to terminate the Project for any reason. If the
project is terminated, the Contractor shall:
a) Stop work under the Contract on the date and to the extent specified on the notice of termination.
b) Place no further orders or subcontracts except as may be necessary for the completion of the work not terminafed.
c) Terminate all orders and subcontracts to the extent that they relate to the performance of the work terminated by the
notice of termination.
After termination as above, the City will pay the Contractor a proportionate part of the contract price based on the work completed;
provided, however, that the amount of payment on terminaiion shall not exceed the total contract price as reduced by the portion
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 2 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Ine.) April 2013
thereof allocatable to the work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor
shall submit its claim for amounts due after termination as provided in this paragraph within 30 days after receipt of such ciaim. In
the event of any dispute or controversy as to the propriety or allowability of all or any portion of such claim under this paragraph,
such dispute or controversy shali be resoived and be decided by the City Council of the Cify of Fort Worth, and the decision by the
City Council of the Ciry of Fort Worth shall be final and binding upon aIl parties to fhis contract.
B-3 DUTIES OF THE ARCHITECT: As used herein, the term Architect means the Architect or his authorized representative.
Nothing confained in these Contract Documents shall create any privity of Contract befween the Architect and the Contractor.
B-4 ARCHITECT AS REPRESENTATIVE OF THE OWNER: The Building Construction Manager will provide general
administration of the Contract on behalf of the Owner and will have authority to act as the representative of the Owner to the extent
provided in the Contract Documents unless changed in writing by the Owner. The Architect wiil be available for conferences and
consultations with the Owner or the Confractor at all reasonable times.
B-5 ACCESS TO JOB SITES: The Architect shall at all times have access to the Work whenever it is in preparation and
progress. The Contractor shall provide facilities for such access so the Architect may perform its assigned functions under the
Contract Documents.
The Archifect will make periodic visits to the Site to tamiliarize himself with the progress and quality of the work and to determine if
the work is proceeding in accordance with the Contract documents. On the basis of on-site observations, the Architect will keep the
Owner informed of the progress of the Work and will endeavor to guard the Owner against defects and deficiencies in the Work of
the Contractor. Based upon such observations and the Contractor's applications for payments, the Building Construction Manager
will make determinations and recommendations concerning the amounts owing to the Contractor and will issue certificates for
payment amounts.
B-6 INTERPRETATIONS: The Architect will be, in the first instance, the interpreter of the requirements of the Plans and
Specifications and the judge of the performance thereunder by the Contractor, subject to the final decision of the Owner.
The ArchitecYs decisions in matters relating to artistic effect will be final if consisfent with the intent of the Contract Documents.
B-7 AUTHORITY TO. STOP WORK: The BCM will have authority to reject work that does not conform to the Pians and
Specifications. In addition, whenever, in its reasonabie opinion, the BCM considers it necessary or advisabie in order to insure the
proper realization of the intent of the Plans and Specifications, the BCM wiil have authority to require the Contractor to stop the
Work or any portion thereof, or to require special inspection or testing of the Work whether or not such Work be then fabricated,
instalied or completed.
B-8 MISCELLANEOUS DUTIES OF ARCHITECT
Shoo Drawinqs. The Architect will review Shop Drawings and Samples. Two copies of each approved Shop Drawing and submittal
will be provided to the Owner by the Architect. Three copies will be retumed to the Contractor.
ChanQe Orders. Change Orders and Field Orders for Minor Changes in the Work will be issued by the Owner
Guarantees. The Owner will receive all written guarantees and related documents required of the Contractor. Upon completion of
the project the Contractor shall provide the Owner five copies of each guarantee.
Inspections The Owner will conduct inspections for the purpose of determining and making his recommendations conceming the
dates of substanfial completion and final completion. The Architect will conduct the final acceptance inspection and issue the
Certificate of Completion.
Operation and Maintenance Manuals The Owner will receive six copies of all applicabie equipment installation, operation, and
maintenance brochures and manuals required of the Contractor.
B-9 TERMINATION OF THE ARCHfTECT: In case of the termination of the employment of the Architect by the Owner, the
Owner shall either assume the duties of the Architect through the Director of the Department of Transportation and Public Works, or
shall appoint a successor Architect against whom the Contractor makes no reasonable objection.
SECTION C
OWNER
C-1 IDENTIFICATION: By the term Owner is meant the City of Fort Worth acting herein by its duly authorized representatives
in the manner provided by law. Authorized representatives include the Cify Manager, Assistant City Manager, the Director and of
Transportation and Public Works Department and members of the Facilities Management Division. Generally speaking a
designated representative wiil be a Buiiding Construction Manager identified from within the Facilities Management Group to act as
a point of contact for day-to-day contract administration.
C-2 DUTIES OF THE OWNER: The Owner shall fumish surveys describing the physical characteristics, legal limits and utility
locations for the site of the Work; provided, however, that the Contractor hereby covenants that he has inspected the premises and
familiarized himself therewith and that the locations of utilities and other obstacles to the prosecution of the Work as shown on the
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 3 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, inc.) April 2013
Owners survey are for information only, are not binding upon the Owner, and the Owner shall not incur any liability for loss or
damage by virtue of any inaccuracies or deficiencies in such surveys. The Owner shall secure and pay for title to the site and aIl
necessary permanent or construction easements. The Owner will cooperate with the Contractor in the prosecution of the Work in
such manner and to such extent as may be reasonable and shall fumish information under its co�trol with reasonable promptness at
the request of the Contractor.
C-3 INSTRUCTIONS: The Owner shall issue all instructions to the Confractor through the BCM.
C-4 ACCESS TO JOB SITE: The Owner shall at all times have access to the Work whenever it is in preparation and
progress. The Contractor shall provide facilities for such access so the Owner may perform its assigned functions under the
Contract Documents.
G-5 PROGRESS INSPECTIONS: The Owner wiil make visits to the Site to familiarize themselves with the progress and
qua(ity of the Work and to determine if the work is proceeding in accordance with the Contract documents. On the basis of on-site
observations and reports concerning the progress and qualiry of the work, the Owner will approve and authorize the Contractor's
applications for payments.
C-6 AUTHOR(TY TO STOP WORK: The Owner wili have authority to reflect work that does not conform to the Plans and
- Specifications. Whenever, in its reasonable opinion, the Owner considers it necessary or advisabie in order to insure the proper
realization of the intent of the Plans and Specifications, the Owner will have authority to require the Contractor to stop the work or
any portion thereof, or to require the Contractor to stop the Work or any portion thereof, or to require special inspection or testing of
the Work whether or not such Work be then fabricated, installed or compieted.
C-7 SUBSTANTIAL COMPLETION INSPECTION: Upon agreement of the Contractor and Architect that the Work is
substantially complete, the Owner will schedule a Substantial Completion inspection to be conducted by the Architect and attended
by representatives of the Architect, Owner and Contractor. Items identified during this inspection as being incomplete, defective or
deficient shail be incorporated into a punch list and attached to the AIA document G704, which is to be prepared and signed by the
Contractor, and accepted, approved and signed by the Owner.
C-8 RIGHT TO AUDIT: Contractor agrees that the City shall, until the expiration of three years after finai payment under this
contract, have access to and the right to examine any direcUy pertinent books, documents, papers and records of the Contractor
involving transactions relating to this contract.
Contractor further agrees to include in ail his subcontracts hereunder a provision to the effect that the subcontractor agrees that the
City shall, until the expiration of three years after final payment under the subcontract, have access to and the right to examine any
directly pertinent books, documents, papers and records of such subcontractor, involving transactions to the subcontract. The term
"subcontract" as used herein includes purchase orders.
Contractor agrees to photocopy such documents as may be requested by the city. The city agrees to reimburse Contractor for the
cosfs of copies at the rate published in the Texas Administrative Code.
SECTION D
CONTRACTOR
D-1 IDENTIFICATION: The Contractor is the person or organization identified as such in the Contract. The term Contractor
means the Contractor or his authorized representative.
D-2 INDEPENDENT CONTRACTOR: Contractor shall perform ali work and services hereunder as an independent
contractor, not as agent, or employee of the City. Contractor shall have exclusive control of and the exclusive right to control the
details of the Work and services perFormed hereunder, and all persons performing same, and Contractor shall be solely responsible
for the acts of its officers, agents, and employees. Nothing herein shall be construed as creating a partnership orjoint enterprise
between City and the Contractor, its officers, agents and employees, and the doctrine of respondeat superior shall not apply.
D-3 SUBLETTING: It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet or
assigned to anyone else by said Contractor without the written consent of the Director of Transportation and Pubiic Works of the
City of Fort Worth.
D-4 REVIEW OF CONTRACT DOCUMENTS: The Contractor shall carefuily study and compare the Agreement, Conditions
of the Contract, Drawings, Specifications, Addenda and modifications and shall at once report to the Owner and to the Architect any
error, inconsisfency or omission he may discover. The Contractor shall do no work without Drawings, Specifications and
Interpretations.
D-5 SUPERVISION: The Contractor shall supervise and direct the Work, using his best skili and attention. He shall be solely
responsible for ail construction means, methods, safety, techniques, sequences and procedures and for coordinating ail portions of
the Work under the Contract Documents.
D-6 LABOR AND MATERIALS: Unless othenvise specifically nofed, the Contractor shall provide and pay for all labor,
materials, equipment, tools, construction equipment and machinery, water, heat, utilities, transportation and other facilifies and
services necessary for the proper execution and completion of the Work.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 4 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
The successful Iow bidder will use its reasonable best efforts to hire local laborers, workmen and materialmen. The general
condition is not to be constructed as limiting the right of any bidder to empioyee laborers, workmen or materialmen from outside
local area.
The Contractor shall at ail times enforce strict discipline and good order among his employees, and shall not employ on the Work
any unfit person or anyone not skilled in the task assigned to him.
D-7 COMPLIANCE WITH AND ENFORCEMENT OF PREVAILING WAGE RATE
Dutv to pav Prevailinp Wape Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code
(Chapter 2258), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the
prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these contract documents.
Penaltv for Violation. A confracfor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the
City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the
prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative
costs, pursuant to Texas Government Code 2258.023.
Comolainfs of �olations and Citv Determination of Good Cause. On receipt of information, including a complaint by a worker,
concerning an alleged violation of 2258.023, Texas Government Code, by a contractor or subcontractor, the City shall make an
initial determination, before the 31�` day after the date the City receives the information, as to whether good cause exists to believe
that the violation occurred. The City shall notify in writing the contractor or subcontractor and any affected worker of its initial
determination. Upon the City's determination that there is good cause to believe the contractor or subcontractor has violated
Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and
wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final
determination of the violation.
Arbitration Required if Violation Not Resoived. An issue relating to an alleged violation of Section 2258_023, Texas Govemment
Code, inciuding a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the
Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the contractor or subcontractor and any afFected worker do
not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to paragraph
(c) above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11 th day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the
arbitration. The decision and award of fhe arbitrator is final and binding on ail parties and may be enforced in any court of
competent jurisdiction.
Records to be Maintained. The Contractor and each subcontractor shall, for a period of three (3) years foliowing the date of
scceptance of the Work, maintain records that show (i) the name and occupation of each worker empioyed by the Contractor in the
construction of the V1/ork provided for in this contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall periain
to this inspection.
Pav Estimates. With each partial payment estimate or payroll period, whichever is less, the Contractor shall submit an affidavit
stating that the Contractor has complied with the requirements of Chapter 2258, Texas Govemment Code.
Postinq of Waqe Rates. The Contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all
times.
Subcontractor Comoliance. The Contractor shali include in its subcontracts and/or shall otherwise require all of its subcontractors to
comply with paragraphs (a) through (g) above.
On projects where special wage rates apply (e.g. Davis-Bacon) the Contractor agrees to meet all requirements of such programs.
D-8 WARRANTY: The Contractor warrants to the Owner and the Architect that ali materials and equipment fumished under
this Contract will be new unless otherwise specified, and that all work will be of good quality, free from faults and defects, and in
conformance with the Contract Documents. All work not so conforming to these standards may be considered defective. If required
by the Architect or the Owner, the Contractor shall fumish satisfactory evidence as to the kind and quality of materials and
equipment.
The warranty provided in this Secfion sha(I be in addition to and not in limitation of any other warranty or remedy provided by law or
the Contract Documents.
D-9 TAXES: The Contractor is exempt from State Sales iax on material incorporated inio the finished construction, Excise
and Use Tax. "
D-10 LICENSES. NOTICES AND FEES: The Contractor shali obtain ali Permits, Licenses, Certificates, and inspections,
whether permanent or temporary, required by law or these Contract Documents.
General Condifions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 5 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controis, Inc.) April 2013
The Contractor shali give all Notices and comply with all Laws, Ordinances, Rules, Regulations and Orders of any public authority
bearing on the performance of the Work. If the Contractor observes or becomes aware that any of the Contract Documents are at
variance therewith in any respect, he shail promptly notify the Architect Owner in writing and any necessary changes wili be made. If
the Contractor performs any Work knowing that it is in violation of, or contrary to, any of such Laws, Statutes, Charte�, Ordinances,
Orders or Directives, or Regulations without furnishing Notice to the Owner, the Contractor wiil assume fuil responsibility therefore
and bear ail costs attributable thereto.
D-11 CASH ALLOWANCES: The Contractor shall include in the Contract Sum all aliowances stated in the Contract
Documents. These aliowances shall cover the net cost of the materials and equipment delivered and unloaded at the site, and ail
applicable taxes. The Contractor's handling costs on the site, labor, installation costs, overhead, profit and ofher expenses
contemplated for the original allowance shall be included in the Contractor Sum and not in the allowance. The Contractor shall
cause the Work covered by these allowances to be performed for such amounts and by such persons as the Owner may direct, but
he will not be required to employ persons against whom he makes a reasonabie objection. If the cost, when determined, is more
fhan or less than the allowance, the Contract Sum shail be adjusted accordingly by Change Order which will include additionai
handling costs on the site, labor, instaliation costs, field overhead, profit and other direct expenses resulting to the Contractor from
any increase over the original aliowance.
D-12 SUPERINTENDENT: The Contractor shall employ a competent superintendent and necessary assistants who shall be in
attendance af the Project site during the progress of the Work. The superintendent shall be satisfactory to the Contractor and the
Owner. The superintendent shall represent the Contractor and all communications given to the superintendent shall be binding as if
given to the Contractor. Important communications will be confirmed in writing. Other communications will be so confirmed on
written request in each case.
_- D-13 RESPONSIBILITIES FOR EMPLOYEES AND SUB-CONTRACTORS: The Contractor shall be responsible to the Owner
for the acts and omissions of all his employees and all Sub-contractors, their agents and employees, and all other persons
performing any of the Work under a contract with the Contractor.
D-14 FAILURE TO COMMENCE WORK: Should the Contractor fail to begin the Work herein provided for within the time
herein fixed or to carry on and compiete the same according to the true meaning of the intent and tenns of said Plans, Specifications
and Contract Documents, then the Owner shall have the right to either demand the surety to take over the Work and compiete same
in accordance with the Contract Documents or to take charge of and complete the Work in such a manner as it may deem proper,
and if, in the compietion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and
specifications made a part hereof, the Contractor and/or its Surety shall pay said Ciry on demand in writing, setting forth and
specifying an itemized statement of the total cost thereof, said excess cost.
D-15 PROGRESS SCHEDULE: The Contractor, immediately after being awarded the contract, shall prepare and submit for
the ArchitecYs approval, an estimated progress schedule for the Work. The progress schedule shail be related to the entire Project.
This schedule shall indicate the dates for the starting and completion of the various states of construction and shall be revised as
required by the conditions of the Work, subject to the Architect's approval. It shail also indicate the dates for submission and
approvai of shop drawings and submiftals as well as the delivery schedule for major pieces of equipment and/or materials.
The Contractor shall submit an updated progress schedule the BCM at least monthly for approval along with the Contractor's
monthly progress payment requests. �
D-16 DRAWINGS AND SPECIFICATIONS AT THE SITE: The Contractor shall maintain at the site for the Owner one copy of
all Drawings, Specifications, Addenda, approved Shop Drawings, Change Orders, and other Changes and Amendments in good
order and marked to record all changes made during construction. These shall also be available to the Architect. The Drawings,
marked to record all changes made during construction, shall be delivered to the Owner upon compietion of the Work. The Architect
will prepare, and provide to the Owner, one complete set of reproducible record drawings of the Work.
D-17 SHOP DRAWINGS AND SAMPLES: Shop Drawings are drawings, diagrams, illustrations, schedules, performance
charts, brochures and other data whicfi are prepared by the Contractor or any Subcontractor, manufacturer, supplier or distributor,
and which illustrate some portion of the Work.
Samples are physical examples fumished by the Contractor to illustrate materials, equipment or workmanship, and to establish
standards by which the Work wil( be judged.
The Contractor shall review, stamp with his approval and submit, with reasonable promptness and in orderly sequence so as to
cause no delay in the Work or in the work of any other contractor, normally within the first 90 days of the work, six copies of all shop
Drawings and Samples required by the Contract Documents or subsequentiy by the Architect as covered by changes or
amendments. Shop Drawings and Sampies shall be properiy identified as specified, or as the Architect may require. At the time of
submission the Contractor shall inform the Architect in writing of any deviation in the Shop Drawings or Samples from the
requirements of the Contract Documents.
By approving and submitting Shop Drawings and Samples, the Contractor thereby represents that he has determined and verified
ali fieid measurements, field construction criteria, materials, catalog numbers and similar data, and that he has checked and
coordinated each shop drawing given in the Contract Documents. The ArchitecYs approval of a separate item shall not indicate
approval of an assembly in which the item functions.
General Conditions of the Contract for Gonstruction Lump Sum Contract (MBE, 06Dec12R) Page 6 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
The Architect will review and approve Shop Drawings and Samples with reasonable promptness so as to cause no delay, but only
for conformance with the design concept of the Project and with the information given in the Contract Documents. The ArchitecYs
approval of a separate item shall not indicate approval of an assembly in which the item functions.
The Contractor shali make any corrections required by the Architect and shall resubmit the required number of corrected copies of
Shop Drawings or new Samples until approved. The Contracfor shall direct specific attention in writing or on resubmitted Shop
Drawings to revisions other than the corrections requested by the Architect on previous submissions.
The Architect's approval of Shop Drawings or Samples shall not relieve the Contractor of responsibility for any deviation from the
requirements of the Contract Documents unless the Contractor has informed the Architect in writing of such deviation at the time of
submission and the Architect has given written approvai to fhe specific deviation. ArchifecYs approvai shall not relieve the
Contractor from responsibility for errors or omissions in the Shop Drawings or Samples.
No portion of the Work requiring a Shop Drawing or Sample submission shail be commenced until the Architect has approved the
submittal. All such portions of the Work shall be in accordance with approved Shop Drawings and Samples.
D-18 SITE USE: The Contractor shall confine operations at the site to areas permitted by law, ordinances, permits and the
Contract Documents and shall not unreasonably encumber the site with any materials or equipment. Until acceptance of the Work
by the City Council of the City of Fort Worth, the entire site of the Work shail be under the exclusive control, care and responsibility
of the Contractor. Contractor shall take every precaution against injury or damage to persons or property by the action of the
elements or from any other cause whatsoever. The Contractor shall rebuild, repair, restore and make good at his own expenses all
injuries or damages to any portions of the Work occasioned by any of the above, caused before acceptance.
D-19 CUTTING AND PATGHING OF WORK: The Contractor shall do ali cutting, fitting or patching of his Work that may
required to make its several parts fit together properly, and shall not endanger any Work by cutting, excavating or otherwise altering
the Work or any part of it.
D-20 CLEAN UP: The Contractor at all times shall keep the premises free from accumulation of waste materials or rubbish. At
the completion of the Work he shall remove all his waste materials and rubbish from and about the Project as well as ali his tools,
construction equipment, machinery and surplus materials, and shall clean all giass surFaces and leave the Work "Broom-clean" or its
equivalent, except at otherwise specified. In addition to removal of rubbish and leaving the buildings "broom-clean", Contractor shall
clean all glass, replace any broken glass, remove stains, spots, marks and dirt from decorated work, clean hardware, remove paint
spots and smears from aIl surfaces, clean fixtures and wash all concrete, tile and terraao floors.
If the Contractor fails to ciean up, the Owner may do so, and the cost thereof shall be charged to the Contractor.
D-21 COMMUNICATIONS: As a general rule, the Contractor shall forward all communications to the Owner through the BCM.
D-22 CONTRACTOR REQUIREMENTS ON FEDERAI_LY FUNDED PROJECTS: Contractor shall observe and comply with
the requirements of the City of Fort Worth Fiscal Departrnent, Intergovemmental Affairs and Grants Management as outlined in the
Suppiemental Conditions contained in the Projeci Manual.
SECTION E
SUBCONTRACTORS
E-1 DEFINITION: A Subcontractor is a person or organization that has a direct contract with the Contractor to perform any of
the Work at the site. The term Subcontractor is referred to throughout the Contract Documents as if singular in number and
masculine in gender and means a Subcontractor or his authorized representative.
Nothing contained in the Contract, Documents shall create any confractual relation between the Owner and the Architect and any
subcontractor or any of his sub-subcontractors or maferialmen.
E-2 AWARD OF SUBCONTRACTS: The bidder shall furnish a list of the names of the subcontractors or other persons or
organizations (including those who are to furnish materiais or equipment fabricated to a special design) proposed for such portions
of the Work as may be designated in the bidding requirements, or if none is so designated in the bidding requirements, the names of
the Subcontractors proposed for the principal portions of the Work. Prior to the award of the Contract, fhe Architect shail notify the
successful bidder in writing if either the Owner or Architect, after due investigation, has reasonable objection to any person or
organization on such list. Failure of the Owner and Architect to make an objection to any person or organization on the list prior to
the award of this Contract shall not constitute acceptance of such person or organization.
If, prior to the award of the Contract, the Owner or Architect has an objective to any person or organization on such list, and refuses
to accept such person or organization, the apparent low bidder may, prior to the award, withdraw his bid without forfeiture of bid
security. If such bidder submits an acceptable substitute, the Owner may, at its discretion, accept the bid or he may disqualify the
bid. If, after the award, the Owner or Architect objects in writing to any person or organization on such list, the Contractor shall
provide an acceptabie substitute.
The Contractor shall not make any substitution for any Subcontractor or person or organization that has been accepted by the
Owner and the Architect, unless the substitution is also acceptable to the Owner and the Architect.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 7 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass 8� Moncrief (TXMAS, Johnson Controls, Inc.} Aprii 2013
E-3 TERMS OF SUBCONTRACTS: All work performed for the Contractor by a Subcontractor shall be pursuant fo an
appropriate agreement between the Contractor and the Subcontractor (and where appropriate between Subcontractors and Sub-
subcontractors) which shall contain provisions that:
1. Preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be performed
under the subcontract so that the subcontracting thereof will not prejudice such rights;
2. Require that such Work be performed in accordance with the requirements of the Contract Documents;
3. Require submission to the Contractor of applications for payment under each subcontract to which the Contractor is a party, in
reasonable time to enable the Contractor to apply for payment;
4. Require that all claims for additional costs, extensions of time, damages for delays or otherwise with respect to subcontracted
portions of the Work shall be submitted to the Contractor (via any Subcontractor or Sub-subcontractor where appropriate) in
the manner provided in the Contract Documents for like claims by the Contractor upon the Owner;
5. Waive ail rights the contracting parties may have against one another for damages caused by fire or other perils covered by the
property insurance, except such rights, if any, as they may have to proceeds of such insurance held by the Owner, and,
6. Obligate each Subcontractor specifically to consent to the provisions of this Section
All of the provisions set out in this section shail be deemed to have been included in every subcontract, and every subcontract shall
be so construed and applied as to the Owner and the Architect, whether or not such provisions are physically inciuded in the sub-
contract.
E-4 •"``-�•MINORITY BUSINESS ENTERPRISE (MBE): Should the`base proposal be $50,000 or less, the requirements of this
section do not appiy.
General: As of June 1, 2012, The City of Fort Worth is implementing the new Business Diversity Ordinance (BDO) to reflect the
City's availability and disparity sYudy findings and recommendations. During this transition period, interested Offerors must obtain a
MBE listing from the M/WBE Office at 817-212-2674. This will ensure that MBE listings reflect onlv those currently certified by the
North Central Texas Regionai Certification Agency (NCTRCA) located in the six (6)-countv geographic marketplace that have been
accepted by the City. The City's geographic marketplace includes the counties of: Tarrant, Dalias, Denton, Johnson, Parker and
Wise. Offerors are stronqlv encouraged to confirm that each MBE that it intends to use is Iocated in the geographic marketpiace that
wiil be counted towards the established goal.
In accordance with City of Fort Worth Diversity Business Ordinance (BDO) No 20020-12-2011 (the "Ordinance"), the City of Fort
Worth sets goals for the participation of Minority Business Enterprises (MBE) in City contracts. Ordinance No 20020-12-2011 is
incorporated in these General Conditions by reference. A copy of the Ordinance may be obtained from the Office of the City
Secretary. Failure to comply with the Ordinance shall be a material breach of contract.
Prior to Award: The MBE documentation required by the procurement solicitation must be submitted within five city business days
after the proposals are opened. Failure to comply with the City's Business Diversity Ordinance, or to demonsfrate a"good faith
effort", shail result in a bid being considered non-responsive.
During Construction: Contractor shall provide copies of subcontracts or cosigned letters of intent with approved MBE
subcontractors and or suppiiers prior to issuance of the Notice to Proceed. Contractor shall also provide monthly reports on
utilization of the subcontractors to the MNVBE Office and the Construction Manager. Contractor must provide the City with compiete
and accurate information regarding actual work performed by an MBE on the contract and proof of payment thereof. Contractor
further agrees to pertnit an audit and/or examination of any books, records or files in iYs possession that will substantiate the actual
work performed by an MBE. The misrepresentation of facts and/or the commission of fraud by the Contractor will be grounds for
- termination of the contract and/or initiating action under appropriate federal, state, or local laws or ordinances relating to false
statement. An Offeror who intentionally and/or knowingly misrepresents materiai facts shall be determined to be an irresponsible
Offeror and barred from participating in City work for a period of time of not less than three (3) years. The failure of an Offeror to
comply with this ordinance where such non-compiiance constitutes a materiai breach of contract as stated herein, may result in the
Offeror being determined to be an irresponsible Offeror and barred from participating in City work for a period of time of not less
than one (1) year.
The Contractor may count toward the goal any tier of MBE subcontractors and/or suppliers. The Contractor may count toward its
goal a portion of the total dollar amount of the contract with a joint venture equai to the percentage of the MBE participation in the
joint venture for a cieariy defined portion of the work to be performed. All subcontractors used in meeting the goais must be certified
prior to the award of the Contract.
Change Orders: Whenever a change order affects the work of an MBE subcontractor or supplier, the MBE shall be given an
opportunity to perform the work. Whenever a change order is $50,000 or more, the M/WBE Office Coordinator shall determine the
goals applicable to the work to be performed under the change order.
During the term of the contract the Contractor shaii:
1. Make no unjustified changes or deletions in its MBE participation commitments submitted with the bid/proposal or during
negotiation, without prior submission of the proper documentation for review and approval by the M/V1/BE Office.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 8 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controis, inc.) April 2013
2. if substantial subcontracting and/or supplier opportunities arise during the term of any contract when the Contracfor
represented in its bid/proposal to the City that it alone wouid perform the subcontracting/supplier opportunity work, the
Contractor shall notify the City before subcontracts for work and/or supplies are awarded and shall be required to comply with
subsections of the OOrdinance, exclusive of the fime requirements stafed in such subsections.
3. The Contractor shall submit to the M/WBE Office for approval an MBE REQUEST FOR APPROVAL OF CHANGE FORM, if,
during the term of any contract, the Contractor wishes to change or delete one or more MBE subcontractors or suppliers.
Justification for change of subcontractors may be granted for the following:
1. An MBE's failure to provide Workers' Compensation Insurance evidence as required by state law; or
2. An MBE's-failure to provide evidence of general liability or other insurance under the same or similar terms as contained in the
Contract Documents with limits of coverage no greater than the lower of 1) the limits required of the Contractor by the City; or
2) the limits contained in the Contractor's standard subcontract or supply agreements used on other projects of similar size and
scope and within the Contractor's normal business pracYice with non-MBE subcontractors/subconsultant's or suppliers; or
3. An MBE's failure to execute the Contractor's standard subcontract form, if entering a subcontract is required by the Contractor
in its normal course of business, unless such failure is due to:
a) A change in the amount of the previously agreed to bid or scope of work; or
b) The contract presented provides for payment once a month or longer and the Contractor is receiving
- payment from the City twice a month; or
c) Any limitation being piaced on the ability of the MBE to report violations of the Ordinance or any other
ordinance or violations of any state or federal law or other improprieties to the Cify or to provide notice
of any claim to the Contractor's surety company or insurance company.
d) Mediation shall be a consideration before the request for change is approved.
4. An MBE defauits in the performance of the executed subcontract. In this event, the Contractor shall:
a) Request bids from all MBE subcontractors previously submitting bids for the work,
b) If reasonably practicable, request bids from previously non-bidding MBEs, and
c) Provide to the M/WBE Office documenta6on of compliance with (a) and (b) above.
5. Any reason found to be acceptable by the M/WBE Office in its sole discretion.
Within ten days after final payment from the Ciry the Contractor shall provide the M/WBE O�ce with documentation fo reflect finai
participation of each subcontractor and supplier, including non-MBEs, used on the project
E-5 PAYMENTS TO SUBCONTRACTORS: The Contractor shall pay each Subcontractor, upon receipt of payment from the
Owner, an amount equal to the percentage of completion allowed to the Contractor on account of such Subcontractor's Work. The
Contractor shall also require each Subcontractor fo make similar payments to his subcontractors..
If the Owner refuses to issue a Certificate for Payment for any cause which is the fault of tfie Contractor and not the fault of a
particular subcontractor, the Contractor shall pay that Subcontractor on demand, made at any time after the Certificate for Payment
wouid otherwise have been issued, for his Work to the extent completed, less the retained percentage.
The Contractor shall pay each Subcontractor a just share of any insurance monies received by the Contractor, and he shali require
each Subcontractor to make similar payments to his Subcontractors.
The Owner may, on request and at its discretion, fumish to any Subcontractor, if practicable, information regarding percentages of
completion certified to the Contractor on account of Work done by such Subcontractors.
Neither the Owner nor the Architect shall have any obligation to pay or to see to the payment of any monies to any Subcontractor.
E-6 SUBCONTRACTOR REQUIREMENTS FOR EDA FUNDED PROJECTS: The Contractor will cause appropriate
provisions to be inserted in all subcontracfs to bind subcontractors to FDA contract requirements as contained herein and to 15 CFR
24 or OMB Circular A-110, as appropriate.
Each subcontractor must agree to comply with all applicable Federal, State, and locai requirements in addition to those set forth in
fhis section.
No subcontractor will be empioyed on this Project, except as specificaily approved by the City, who is contained in the listing of
contractors debarred, ineligible, suspended or indebted to the United States from contractuai dealings with Federal government
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 9 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controis, inc.) April 2013
departments. The work performed by any such contractor or subcontractor will be ineligibie for reimbursement whoily or partially
from EDA grant fluids.
Ali subcontracts in excess of $10,000 shall include, or incorporate by reference, the equai opportunity clause of Executive Order
11246.
Ali subcontracts must contain a nondiscrimination clause.
Each subcontract must contain a requirement for compliance with the Davis-Bacon and related acts.
Each subcontractor must submit weekly each weekly payroil record and a weekly statement of compliance. These documents wili
be submitted to the prime contractor who wiil compi(e them and submit to the Ciry. The subcontractor can satisfy this requirement by
submitting a properly executed Department of Labor Form WH-347.
Each subcontract with every subcontractor must contain a ciause committing the subcontractor to empioyment of local labor to the
maximum extent possibie.
All subcontractors who employ more than 50 empioyees, and is a prime or first tier subcontractor, and has a subcontract or
purchase order of $50,000 or more must submit a completed Standard Form 100 (Compliance Report) by March 30 of each year.
Subcontractors perForming work in areas covered by published goals for minorities will be required to report monthly on Form CC-
257.
SECTION F
SEPARATE CONTRACTS
F-1 OWNER'S RIGHT: The Owner reserves the right to award separafe contracts in connection with other portions of the
Work. When separate contracts are awarded for other portions of the Work, "the Contractor" in the Contract Documents in each
case shall be the contractor who signs each separate contract.
F-2 MUTUAL RESPONSIBILITY OF CONTRACTORS: The Contractor shail afford other contractors reasonable opportunity
for the introduction and storage of their materiais and equipment and the execution of their work, and shall properly connect and
coordinate his work with theirs.
If any part of the Contractor's Work depends for proper execution or results upon the work of any other separate contractor, the
Contractor shall inspect and promptly report to the Owner any apparent discrepancies or defects in such work that render it
unsuitable for such proper execution and results. Failure of the Contractor to inspect and report shall wnstitute an acceptance of the
other contractor's work as fit and proper to receive his Work, except as to defects which may develop in the other separate
contractor's work after the execution of the Contractor's Work.
Shouid the Contractor cause damage to the work or property of any separate contractor on the site, the Contractor shall, upon due
notice, settie with such other contractor by agreement, if he will so settle. If such separate contractor sues the Owner on account of
any damage alleged to have been so sustained, the Owner shail notify the Contractor who shall defend against such suit at the
Contractor's expense, and if any judgment against the Owner arises therefrom, the Contractor shall pay or satisfy such judgment
and shall reimburse the Owner for all attomey's fees, court costs and expenses which the Owner has incurred in connection with
such suit.
F-3 CUTTING AND PATCHING UNDER SEPARATE CONTRACTS: The Contractor shall do ail cutting, fitting or patching of
his Work that may be required to fit it to receive or be received by the work of other contractors shown in the Contract Documents.
. The Contractor shall not endanger any work or any other contractors by cutting, excavating or othervvise altering any work and shall
not cut or alter the work of any other contractor except with the written consent of the Architect.
Any costs caused by defective or ill-timed work shali be bome by the party responsible therefor.
F-4 OWNER'S RIGHT TO CLEAN UP: If a dispute arises between the separate contractors as to their responsibility for
cleaning up, the Owner may clean up and charge the cost thereof to the several contractors as the Director of the Department of
Transportation and Public Works shall determine to be just.
SECTION G
MISCELLANEOUS PROVISIONS
G-1 CONFLICT OF LAWS: The law of the place where the site is located shail govem the Contract. The Contractor must
familiarize himself and strictiy compiy with all Federal, State, and County and City Laws, Statutes, Charter, Ordinances, Regulations,
or Directives controlling the action or operation of those engaged upon the work affecting the materials used. He shall indemnify and
save harmless the Ciry and all of its officers and agents against any claim or liability arising from or based on the violation of any
such Laws, Statutes, Charter, Ordinances, Regulations, or Directives, whether by himself, his employees, agents or subcontractors.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 10 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controis, Inc.) April 2013
G-2 GOVERNING LAWS: It is mutually agreed and understood that this agreement is made and entered into by the parties
hereto with reference to the existing Charter and Ordinances'of the City of Fort Worth and the laws of the State of Texas with
reference to and governing all matters affecting this Contract, and the Contractor agrees to fully compiy with all the provisions of the
same.
G-3 PERSONAL LIABILITY OF PUBLIC OFFICIALS: In perForming their du6es under the Statutes of the State of Texas and
the Charter and Ordinances of the City of Fort Worth in connection with this Contract, or in exercising any of the powers granted the
Owner herein, the o�cers, agents and employees of the City of Fort Worth are engaged in the performance of a govemmental
function and shali not incur any personal liability by virtue of such performance hereunder, except for gross negligence or willful
wrong.
G-4 COMPLIANCE WITH LAWS. Contractor agrees to comply with ali laws, Federal, state and local, including all ordinances,
rules and regulations of the City of Fort Worth, Texas. Materials incorporated into the finished Project are not subject to State Sales
Tax.
The Owner is responsible for obtaining the Building Permit. The Contractor and the appropriate subcontracfor are responsible for
obtaining all other construction permits from the governing agencies. Contractor shall schedule all code inspections with the Code
Inspection Division in accordance with the permit requirements and submit a copy of updated schedule to the Construction Manager
weekly. Building, plumbing, electrical and mechanical building permits are issued without charge. Water and sewer tap, impact &
access fees will be paid by the City. Any other permit fees are the responsibility of the Contractor.
G-5 INDEMNIFICATION: Contractor covenanfs and agrees to indemnify Cit�is engineer and architect, and their
personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, _>-
hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and
aIl claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise
out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors,
licensees or invitees, whefl�er or not anv such iniurtr, damaqe or deafh is caused, in wi►o% or in part, bv fi�e neqliaence or
a/leged neqliqence of Owner, iis offcers. servanfs, or emp/ovees. Contractor likewise covenants and agrees to indemnify
and hold harmless the Owner from and against any and all injuries to Owner's officers, servanfs and employees and any
damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions'of
this Contract, wheti►er or nof anv such iniunr or damaqe is caused in w/�o% or in parf by the neqliqence or a//eped
neqliqence of Owner, its o�cers, servants or emp/ovees.
In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final
payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim
has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability
insurance carrier that ihe claim has been referred to the insurance carrier.
The Director may, if he deems it appropriate, refuse to whom a claim for damages is outstanding as a result of work
performed under a City Contract.
G-6 SUCCESSORS AND ASSIGNS: Except as provided in Paragraph E-2, this contract shall be binding upon and insure to
the benefit of the parties hereto, their Successors or Assigns. Contractor shall not assign or sublet all or any part of this Contract or
his rights or duties hereunder without the prior written consent of the Owner. Any such purported assignment or subletting without
the prior written consenf of Owner shall be void.
G-7 WRITTEN NOTICE: Written Notice shall be deemed to have been duly served if delivered in person to the individual or
member of the firm or to an officer of the corporation for whom it was intended, or if delivered at or sent by registered or certified
mail to the last business address known to him who gives the notice.
G-8 SURETY BONDS: Surety Bonds are required on all City contracts in excess of $25,000. The Contractor agrees, on the
submittal of his Proposal to make, execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful
perFormance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished in
the prosecution of the Work, such bonds being as provided and required in Article 5160 of the Revised Civi! Statutes of Texas, as
amended, in the form included in the Contract Documents, and such bonds shall be 100 percent of the total contract price, and the
said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City
Council of the City of Fort Worth.
Bonds shall be made on the forms furnished by or otherwise acceptable to the City. Each bond shall be properly executed by both
the Contracfor and the Surety Company. Bonds required by the City shall be in compliance with all relevant local, state and federal
statutes.
To be an acceptable surety on the bond the name of the surety should be included on the current U. S. Treasury List of Acceptable
Securities [Circular 570], and must be authorized to do business in Texas. Sureties not listed in Circular 570 may write performance
and payment bonds on a project without reinsurance to the limit of 10 percent of its capital and surplus.
Such a su�ety must reinsure any obligation over 10 percent. The amount in excess of 10 percent must be reinsured by reinsurers
who are duly authorized, accredited, or trusteed to do business in the State of Texas.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 11 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
Should any surety for the contracted project be determined unsatisfactory at any time during same, the Contractor sha(I immediately
provide a new surety bond satisfactory to the City.
If the contract amount is less than $25,000, payment shall be made in one lump sum 30 calendar days after completion and
acceptance of the Work.
G-9 OWNER'S RIGHT TO CARRY OUT THE WORK: If the Contractor defaults or neglects to carry out the Work in
accordance with the Contract Documents or fails to perform any provision of the Contract, the Owner may, without prejudice to any
other remedy he may have, enter the site and make good such deficiencies. in such case an appropriate Change Order shall be
issued deducting from the payments then or thereafter due the Contractor the cost of correcting such deficiencies, inciuding the cost
of the Architect's additional services made necessary by such default, neglect or failure. If the payments then or thereafter due the
Contractor are not sufficient to cover such amount, the Contract shali pay the difference to the Owner.
G-10 ROYALTIES AND PATENTS: The Contractor shall pay all royalties and license fees. He shali defend all suits or ciaims
for infringement of any patent rights and shall save the Owner harmless from Ioss on account thereof and shall be responsibie for all
such loss when a particular design, process or the product of a particular manufacturer or manufacturers is specified; however, if the
Contractor has reason to believe that the design, process or product specified is an infringement of a patent, he shall be responsible
for such loss unless he promptly gives such information to Owner.
G-11 TESTS: If the Contract Documents, Laws, Ordinances, Rules, Regulations or Orders of any public authoriry having
jurisdiction require any Work to be inspected, tested o� approved, the Contractor shail give the Owner timely notice of its readiness
and the date arranged so the Architect may observe such inspection, testing or approval. The Owner shall bear ail costs of such
inspection, tests and approvals uniess otherwise provided.
If after the commencement of the Work, the Owner determines that any work requires special inspection, tes6ng or approval not
inciuded above, the Owner, upon written authorization from the Owner, wiil insfruct the Contractor to order such special inspection,
testing or approval, and the Contractor shall give notice as required in the preceding paragraph. If such special inspection or testing
reveals a failure of the Work to comply (1) wifh the requirements of the Contract Documents or (2) with respect to the performance
of the Work, with Laws, Statutes, Charter, O�dinances, Regulations or Orders of any public authority having jurisdiction, the
Contractor shall bear all costs thereof, including the ArchitecYs additional senrices made necessary by such costs; otherwise the
Owner shall bear such costs, and an appropriate Change Order shall be issued.
The Contractor shall secure certificate of inspection, testing or approval, and three copies will be promptiy delivered by him to the
Owner. The Architect wiil review the certificates and forward one copy of each with his recommendation(s) to the Owner.
If the Owner wishes to observe the inspections, tests or approvals required by this Section, they wili do so promptly and, where
practicabie, at the source of suppiy.
Neither the observations of the Architect or the Owner in their administration of the Construction Contract, nor inspections, tests or
approvals by persons other than the Contractor shall relieve the Contractor ftom his obiigations to perform the Work in accordance
with the Contract Documents.
G-12 INTERRUPTION OF EXISTING UTILITIES SERVICES: The Contractor shali perform the Work under this Confract with a
minimum of outage time for ail utilities. interruption shall be by approved sections of the utility. In some cases, the Contractor may
be required to perform the Work while the existing utility is in setvice. The existing utility service may be interrupted onfy when
approved by the Owner. When it is necessary to interrupt the existing utilities, the Contractor shall notify the Owner in writing at least
ten days in advance of the time that he desires the existing service to be interrupted. The interruption time shall be kept to a
minimum. Depending upon the activities at an existing facility that requires continuous service from the existing utility, an interruption
may not be subject to schedule at the time desired by the Contractor. In such cases, the interruption may have to be scheduled at a
time of minimum requirements of demand for the utility. The amount of time requested by the Contractor of existing utility services
shall be as approved by the Owner.
G-13 LAYING OUT. WORK: The Contractor shall verify dimensions and elevations indicated in layout of existing work.
Discrepancies befiveen Drawings, Specifications, and exisfing conditions shall be referced to Architect for adjustment before work
afFected is performed. Failure to make such notification shall place responsibility upon Contractor to carry out work in satisfactory
workmanlike manner at the Contractor's sole expense.
The Contractor shall be held responsibie for the location and elevation of all the construction contemplated by the Construc6on
Documents.
Prior to commencing work, the Contractor shall carefuily compare and check all Architectural, Structural, Mechanical an Electricai
drawings; each with the other that in any affects the locafions or elevation of the work to be executed by him, and shouid any
discrepancy be found, he shall immediately report the same to the Architect for verification and adjustment. Any duplication of work
made necessary by failure or neglect on his part to comply with this function shail be done at the Contractor's sole expense.
G-14 MEASUREMENTS: Before ordering any material or doing any work, the Contractor shall verify all measurements at the
site or at the building and shall be wholly responsible for the correctness of same.
No extra charge or compensation will be allowed on account of any difference between actual dimensions and dimensions indicated
on the drawings. Any difference that may be found shall be submitted to the Architect for consideration and adjustrnent before
proceeding with the project.
General Conditions of the Contract for Construction Lump Sum Confract (MBE, 06Dec12R) Page 12 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
G-15 EXISTING OVERHEAD OR UNDERGROUND WORK: The Contractor shall carefully check the site where the project is
to be erected and observe any existing overhead wires and equipment. Any such work shail be moved, replaced or protected, as
required, whether or not shown or specified at the Contractor's sole expense.
Attention is directed to the possible existence of pipe and other underground improvements that may or may not be shown on the
Drawings. All reasonable precautions shall be taken to preserve and protect any such improvements whether or not shown on the
Drawings.
Location of existing undergrourid lines, shown the Drawings are based on the best available sources, but are to be regarded as
approximate only. Exercise extreme care in locating and identifying these lines before excavation in adjacent areas.
G-16 ALIGNMENT OF JOINTS IN FINISH MATERIALS: It shall be the responsibility of the Contractor to make certain in the
instaliafion ofjointed floor, wall and ceiling materiais that:
1. Preserve and protect the rights of the Owner and the Architect under the Contract with respect to the Work to be performed
under the subcontract so that the subcontracting thereof will nof prejudice such rights;
2. Place joints to relate to all opening and breaks in the structure and be symmetricaily placed wherever possible. This includes
heating registers, light fixtures, equipment, etc.
If because of the non-related sizes of the various materials and locations of openings, etc., it is not possible to accompiish the
above, the Contractor shall request the Architect to determine the most satisfactory arrangement. The Contractor shall establish
cenferlines for all trades.
G-17 INTEGRATING EXISTING WORK: The Contractor shall protect ail ewsfing street and other improvements from
damages.
Contractor's operations shall be confined to the immediate vicinity of the new work and shall not in any interfere with or obstruct the
ingress or egress to and from existing adjacent faciliiies.
Where new site work is to be connected fo existing work, special care shall be exercised by the Confractor not to disturb or damage
the existing work more than necessary. AII damaged work shall be replaced, repaired and restored to its original condition at no cost
to ihe Owner.
G-18 HAZARDOUS MATERIA� CERTIFICATION: it is the intent of the contract documents, whether expressly stated or not,
that nothing containing hazardous materials, such as asbestos, shall be incorporated in to the project. The Contractor shall exercise
every reasonable precaution to ensure that asbesfos-containing materials are not incorporated into any portion of the project,
including advising all materials suppliers and subcontractors of this requirement. The Contractor shali verify that components
containing lead do not contact the potable water supply.
G-19 LOCATION OF EQUIPMENT AND PIPING: Drawing showing location of equipment, piping, ductwork, etc. are
diagrammatic and job conditions may not always permit their installation in the location shown. When this situation occurs, it shall be
brought to the ArchitecYs attention immediately and the relocation defermined in a joint conference. The Contractor will be held
responsible for the relocating of any items without first obtaining the ArchitecYs approval. He shall remove and relocate such items
at his own expense if so directed by the Architect. Where possibie, uniform margins are to be maintained between parallel lines
and/or adjacent wall, floor or ceiling surfaces.
G-20 OVERLOADING: The Contractor shall be responsible for loading of any part or parts of structures beyond their safe
carrying capacities by placing of materials, equipment, tools, machinery or any other item thereon. No loads shall be placed on
floors or roofs before tfiey have attained their permanent and safe strength.
G-21 MANUFACTURER'S INSTRUCTIONS: Where it is required in the Specifications that materials, products, processes,
equipment, or the like be installed or applied in accordance with manufacturer's instructions, direction or specifications, or words to
this effect, it shail be construed fo mean that said appiication or installation shall be in strict accordance wifh printed insfrucfions
fumished by the manufacturer of the material concerned for use under conditions similar or those at the job site. Six copies of such
instructions shall be furnished to the Architect and his approval thereof obtained before work is begun.
G-22 CLEANING UP: The Contractor shail keep the premises free from accumulation of waste material or rubbish caused by
empioyees or as a result of the Work.
At completion of work, the General Contractor shall, immediately prior to final inspection of complete building, execute the following
final cleaning work with trained janitorial personnel and with material methods recommended by the manufactures of installed
materials.
1. Sweep and buff resilient floors and base, and vacuum carpeUng.
2. Dust all metal and wood trim and similar finished materials.
3. Clean all cabinets and casework.
4. Dust all ceilings and walls.
Generai Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 13 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
5. Dust, and if necessary wash, all plumbing and elecfrical fixtures.
6. Wash ali glass and similar non-resilient materials.
7. Ail hardware and other unpainted metals shali be cleaned and polished and ali equipment and paint or decorated work shail be
cleaned and touched-up if necessary, and all temporary labeis, tags, and paper coverings removed throughout the buildings.
Surfaces that are waxed shail be polished.
8. The exterior of the building, the grounds, approaches, equipment, sidewalks, sfreets, etc. shall be cleaned similar to interior of
buildings and left in good order at the time of final acceptance. All paint surfaces shall be clean and unbroken, hardware shail
be clean and polished, all required repair work shaii be completed and dirt areas shall be scraped and cleared of weed growth.
9. Clean all glass surfaces and mirrors of putty, paint materials, etc., without scratching or injuring the giass and leave the work
6right, ciean and polished. Cost of this cieaning work shall be borne by Contractor.
10. Cleaning, polishing, scaling, waxing and all other finish opera#ions indicated on the Drawings or required in the Specifications
shall be taken fo indicate the required condifion at the time of acceptance of all work under the Contract.
11. Burning: Burning of rubbish on the premises will not be permitted.
G-23 DUST CONTROL: Precaution shail be exercised at ail times to control dust created as a result of any operations during
the construction period. If serious problems or compiaints arise due to air-borne dust, or when directed by the Architect, operations
causing such problems shall be temporarily discontinued and necessary steps taken to control the dust.
G-24 FIRE PROTECTION: The Contractor shail at all times maintain good housekeeping practices to reduce the risk of fire
damage or injury to workmen. Ali scrap materials, cubbish and trash shall be removed daily from in and about the building and shall
not be permitted to be scattered on adjacent property.
Suitable storage space shall be provided outside the immediate building area for storing flammable materials and paints; no storage
will be permitted in the building. Excess flammable liquids being used inside the building shall be kept in closed metal container and
removed from the building during unused periods.
A fire extinguisher shall be available at each location where cutting or welding is being performed. Where electric or gas welding or
cutting work is done, interposed shields of incombustible material shall be used to protect against fire damage due to sparks and hot
metal. When temporary heating devices are used, a watchman shali be present to cover periods when otherworkmen are not on the
premises.
The Contractor shall provide fire extinguishers in accordance with the recommendations and NFPA Bulietins Nos. 10 and 241.
However, in ail cases a minimum of two fire extinguishers shall be available for each floor of construction.
G-25 CUTTING AND PATCHING: Wherever cutting and removal of portions of fhe existing work is indicated, such work shall
be neatly sawed or cut by Contractor in a manner that will produce a neat straight line, paraliel to adjacent surfaces or piumb for
vertical surfaces. Care should be exercised not to damage any work that is to remain.
At no time shall any structural members be cut without written consent from the Architect.
G-26 PROJECT CLOSEOUT
Final Insaection, Record Drawinqs: Attention is calied to General Conditions Section entitled, "Substantial Completion and Final
Payment".
Maintenance Manual: Sheets shaii be 8%z" x 11 ", except puli out sheets may be neaUy folded to 8%z " x 11 ". Manuals shail be bound
in piastic covered, 3 ring, loose leaf binder with title of project lettered on front and shall contain:
1) Name, address and trade of all sub-contractors.
2) Compiete maintenance instructions; name, address, and telephone number of installing Contractor, manufacturer's local
representative, for each piece of operative equipment.
3) Catalog data on plumbing fixtures, valves, water heaters, heating and cooling equipment, temperature control, fan, electrical
panels, service entrance equipment and light fixtures.
4) Manufacturer's name, type, color designation for resilient floors, windows, doors, concrete block, paint, roofing, other materials.
Submit six copies of Maintenance Manuai, prior to request for finai payment.
Operationai Insoection"and Maintenance Instruction: The Contractor shali provide at his expense, competent manufacturer's
representafives to compfetely check out all mechanical and electrical systems and items covered by the Drawings and
Specifications. This requirement shall be scheduled just prior to and during the initial start up. After ali systems are functioning
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 14 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
properly the representatives shail instruct maintenance personnel of the Owner in the proper operation and maintenance of each
item.
G-27 GUARANTEE AND EXTENDED GUARANTEE: Upon completion of the Project, prior to final payment, guarantees
required by technical divisions of Specifications shall be properly executed in quadruplicate by subcontractors and submitted
through the Contractor fo Architect. Delivery of guarantees shail not relieve Contractor from any obligation assumed under Contract.
The Contractor shall guarantee the entire Project for one year. In addition, where separate guarantees, for certain portions of work,
are for longer periods, General Contractor's guarantee shall be extended to cover such longer periods. Manufacturer's extended
warrantees shall be included in this contract.
Guarantees shali become valid and operative and commence upon issuance of Certificate of Inspection and Acceptance by Owner.
Guarantees shall not apply to work where damage is result of abuse, neglect by Owner or his successor(s) in interest.
The Contractor agrees to warrant his work and materials provided in accordance with this contract and the terms of fhe Technical
Specificafions contained herein. Unless supplemented by the Technical Specifications or the manufacturers normal extended
warrantees, the Contractor shail warrant all work materials, and equipment against defects for a period of one year from the date of
final acceptance. The Contractor further agrees to bear all costs of making good all work that is found to be defective or not
provided in accordance with the Contract Documents. Additionally if the facility or contents are damaged due to defective materials
or workmanship of the Contractor, the Contractor further agrees to bear all cost of repairing and/or repiacing damaged items and
components to bring such items back to at least their original condition.
G-28 RECORD DRAWINGS: Upon completion of the Work and prior to application for final payment, one print of each of the
drawings accompanying this specification shall be neatly and clearly marked in red by the Contractor fo show variations befinreen the
construction actually provided and that indicated or specified in the Contract Documents. The annotated documents shall be
delivered to Architect. Where a choice of materials and/or methods is permitted herein and where variations in the scope or
character of the work from the entire work indicated or specified are permitted either by award of bidding items specified for that
purpose, or by subsequent change to the drawings, the record drawings shall define the construction actually provided. The
representation of such variations shall conform to standard drafting practice and shall include supplementary notes, (egends and
details which may be necessary for legibility and clear portrayal of the actual construction. The record drawings shall indicate, in
addition, the actual location of all sub-surface utility lines, average depth below the surFace and other appurtenances.
G-29 CONSTRUCTION FENCE: At the Contractor's option, he may provide a substantial chain-link construction fence around
all or a part of the site. The fences and gates must be maintained throughout the consfruction period. Remove the fences and gates
upon completion of the Project and restore the site to the required original or contract condition.
G-30 PRODUCT DELIVERY STORAGE HANDLING: The Contractor shall handle, store and protect materials and products,
including fabricated components, by methods and means which will prevent damage, deterioration and loss, including theft (and
resulting delays), thereby ensuring highest quality results as the work progresses. Control delivery schedules so as to minimize
unnecessary long-term storage at project site prior to installation.
G-31 REMOVAL OF SALVAGED MATERIAL: The Contractor shall remove salvaged material and equipment from the Project
site and dispose of it in accordance with the law. Equipment or material identified in the Specifications or Plans for Owner saivage
shall be carefully removed and delivered to the Owner at any location in within the City limits as directed by the City.
G-32 MANUFACTURER'S REFERENCE: Catalog, brand names, and manufacturer's references are descriptive, not
restricfive. Bids on brands of like nature and quality will be considered. Contractor shail inform the City of any substitutions intended
for the project within 5 business days of bid opening. Failure to inform the City of substitute projects will obligate the Contractor to
provide the specified material if awarded the contract. Within 14 days after bid opening and upon request of the Contractor, the
Contractor will submit a full sized sampie and/or detailed information as required to aliow the architect to determine the acceptabiliry
of proposed substitutions. Where equipment has been listed as "no substitute accepted", the City will accept no alternates to the
specified equipment.
SECTION H
CONTRACT TIME
H-1 DEFINITIONS
The Contract Time is the period of time allotted in the Contract Documents for completion of the Work and is the number of calendar
days elapsing befinreen the date of commencement and the dafe of substantial Compietion plus additional days assessed for failure
to complete punch list items from the Final Inspection in a timely manner
The Date of Commencement of the Work is the date established in the Notice to Proceed. If there is no notice to proceed, it shail be
the dafe of the Agreement or such other date as may be esfablished therein.
The Date of Substantial Comoletion of the Work or designated portion thereof is the Date certified by the Architect with the approval
of fhe Owner that construction is sufficiently complete, in accordance with the Contract Documents, so the Owner may occupy the
Work or designated portion thereof for the use for which it is intended. Final acceptance of the compieted work or any portion
thereof can be made only by the Assistant City Manager, and no other form of acceptance will be binding upon the Owner.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 15 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
A Calendar Dav constitutes 24 hours of time and is any one of the seven days of a week, inciuding Sunday, regardless of whether a
"Working Day" or not, and regardless of weather condifions or any situation which might delay construction. An extension of contract
time shail be in accordance with this Section. Extensions of time will be as recommended by the BCM with final approval by City of
Fort Worth.
A Workinq Dav is defined as a calendar day, not including Saturdays, Sundays, and legal holidays, in which weather or other
conditions not under the control of the Contractor permit the performance of work for a continuous period of not less than seven
hours between 7:00 a.m. and 6:00 p.m. However, nothing in these Contract Documents shail be construed as prohibiting the
Contractor from working on Saturdays if he so desires. Legal holidays are defined as being New Year's Day, Independence Day,
Labor Day, Thanksgiving Day, Christmas Day, Memorial Day, and Veteran's Day.
H-2 PROGRESS AND COMPLETION: All the time limits stated in the Contract Documents are of essence fo the Contract.
The Contractor shall begin the Work on the date of commencement as defined in this Section. He shall carry the Work forward
expeditiously with adequate forces and shail complete it within the Contract Time.
H-3 DELAYS AND EXTENSIONS OF TIME: If the Contractor is delayed at any time in the progress of the Work by any act or
neglect of the Owner or the Architect, or by any employee of the Owner, or by any separate contractor employed by the Owner, or
by any separate contractor employed by the Owner, or by changes ordered in the Work, or by labor disputes, fire, unusuai delay in
transportation, unavoidable casualties or any causes beyond the Contractor's controi, or by any cause which the Architect
determines may justify the delay, then the contract time may be extended by Change Order for such reasonable time as
recommended by the Architect and approved by the Owner. When the Contractor is delayed due to abnormal weather conditions,
the weather table provided: as WT-1 in these Contract Documenfs shall be used as the: basis for providing a fair and equitable
adjustment of the contract time.
All claims for extension of time shall be made in writing to the Architect no more than fifteen days after the occurrence of the delay;
othenvise they shail be waived.
If no schedule or agreement is made stating the dates upon which written interpretations shail be furnished, then no claim for delay
shall be allowed on account of failure to fumish such interpretation until fifteen days after demand is made for them, and not then
uniess such a ciaim is reasonable.
H-4 NO DAMAGE FOR DELAY: No payment, compensation or adjustment or any kind (other than the extensions of time
provided for) shall be made to the Contractor for damages because of hindrances or delays from an cause in the progress of the
work, whether such hindrances or delays be avoidable or unavoidabie, and the Contractor agrees that he will make no claim for
compensation, damages or mitigation of liquidated damages for any such delays, and wili accept in full satisfaction for such delays
said extension of time.
SECTION I
PAYMENTS AND COMPLETION
i-1 CONTRACT SUM: The Contract Sum is stated in the contract and is the total amount payable by the Owner to the
Contractor for the performance of the Work under the Contract Documents.
I-2 SCHEDULE OF VALUES: Before the first Applicable for Payment, the Contractor shall submit to the Architect a
Schedule of Values of the various portions of the Work, inciuding quantities if required by the Architect, aggregating the totai
Contract Sum, divided so as to facilitate payments to Sub-contractors, prepared in such form as specified or as the Architect and the
Contracfor may agree upon, and supported by such data to substantiate its correctness as the Architect may require. Each item in
the Schedule of Values shall include its proper share of overhead and profit. This Schedule, when approved by the Architect and the
Owner, shall be used as a basis for the Contractor's Applications for Payment.
I-3 ADJUSTMENT OF QUANTITIES (NOT USED)
I-4 PROGRESS PAYMENTS: On the first day of each month after the first month's work has been completed, the Contractor
will make current estimates in writing for review by the Architect of materials in place complete and the amount of work performed
during the preceding month or period and the value thereof at the prices contracted for as shown on the approved Schedule of
Values and Progress Schedule.
If payments are to be made on account of materiais or equipment not incorporated in the Work but delivered and suitably stored at
the site or in an independent, bonded warehouse such payments shall be conditioned upon submission by the Contractor of bills of
sale or such other procedures satisfactory to the Owner to establish the Owner's title to such materials or equipment or othervuise
protect the Owner's interest including applicable insurance and transportation to the site.
The Contractor warrants and guarantees that title to ail Work, materials and equipment covered by an Application for Payment,
whether incorporated in the Project or not, will pass to the Owner upon the receipt of such payment by the Contractor, free and c(ear
- of all liens, claims, security interests or encumbrances hereinafter referred to as "liens"; and that no Work, materials or equipment
covered by an Application for Payment will have been acquired by the Contractor, or by any other persons perForming the Work at
Generai Conditions of the Contract for Construction �ump Sum Contract (MBE, 06Dec12R) . Page 16 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) Aprii 2013
the site or furnishing materials and equipment for the Work, subject to an agreement under which an interest therein or an
encumbrance thereon is retained by the seller or othenvise imposed by the Contractor or such other person.
The Contractor shall prepare each application for payment on AIA Document G702, "Application and Certificate for PaymenY', a�d
attached thereto AIA Document G703, "Continuation Sheet", to indicate the progress made to date and the period or month for
which payment is requested for each item listed in the Schedule of Values. A copy of the revised monthiy work progress schedule
must be attached before the pay request can be accepted.
i-5 CERTIFICATES FOR PAYMENT: If the Contractor has made Application for Payment as above, the above, the Architect
will, with reasonable promptness but not more than seven days after the receipt of the Application, prepare a Certificate of Payment,
with a copy to the Contractor, for such amount determined to be properly due, or state in writing reasons for withholding a
Certificate.
The issuance of a Certificate for Payment will constitute a representation by the Owner, based on the BCM's observations at the site
and the data comprising the Application for Payment, that the Work has progressed to the point indicated; that the quality of the
Work is in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole upon Substantial
Completion, to the resuits of any subsequent tests required by the Contract Documents, to minor deviations from the Contract
Documents correctable prior to completion, and to any specific qualifications stated in the Certificate); and recommendations fo the
Owner that the Contractor be paid in the amount certified. In addition, the Architect's approval of final payment assures the Owner
fhat the conditions precedent to the Contractor's being entitied to final payment as set forth in this Section have been fulfilled.
After the Architect has issued a Certificate for Payment, the Owner shall approve or disapprove same within ten days after it has
been delivered to the Director of the Department of Transportation and Public Works. For contracts Iess than $400,000, Owner shall
pay 90% of the approved estimate to the Contractor within seven days after its approval, and the remaining 10% of each such.�:
estimate will be retained by the Owner until the finai estimate is approved and the Work is accepted by the Cify Council of the Cify of
Fort Worth. For contracts in excess of $400,000, the Owner will retain only 5% of each estimate until the final estimate is approved
and work accepted by the City Council of the City of Fort Worth.
No Certificate for a progress payment, nor any progress payment, nor any partial or entire use or occupancy of the Project by the
Owner, shall constitute an acceptance of any Work not in accordance with the Contract Documents, or relieve the Contractor of
liability in respect to any warranties or responsibility for faulty materials or workmanship. The Contractor shall promptly remedy any
defects in the Work and pay for any damage to other work resulting therefrom that shall appear within a period of one year from the
date of final accepfance of the Work uniess a longer period is specified.
I-6 PAYMENTS WITHHELD: The BCM may decline to approve an Application for Payment and may withhold his Certificate
in whole or in part if in his opinion he is unable to make the representations to the Owner as provided in this Section. The Architect
may also decline to approve any Applicafions for Payment or, because of subsequently discovered evidence or subsequent
inspections, may nullify the whole or any part of any Certificate fo� Payment previously issued to such extent as may be necessary
in his opinion to protect the Owner from loss because of:
1) Defective work not remedied;
2) Ciaims filed or reasonable evidence indicating probable filing of claims;
3) Failure of the Contractor to make payments properly to Subcontractors, or for labor, materials or equipment;
4) Reasonable doubt that the Work can be completed for the unpaid balance of the Contract Sum;
5) Damage to another contractor;
6) Reasonable indication that the Work will not be completed within the Contract Time; or
7) Unsatisfactory prosecution of the Work by the Contractor.
When such grounds for the refusal of payment are removed, payment shall be made for amounts withheld because of them. The
Owner reserves the right to withhold the payment of any monthiy estimate, without payment of interest, if the Contractor fails to
perForm the Work in accordance with the specifications.
1-7 NOT USED
I•8 LIQUIDATED DAMAGES: The deduction for liquidated damages shall be as follows:
Amount of Contract
$15,000 or less
$15,001 to $25,000
$25,001to $50,000
$50,001to $100,000
$100,000 to $500,000
$500,001 to $1,000,000
$1,000,001 to $2,000,000
$2,000,001 to $5,000,000
�iquidated Damages Per Day
$45
$63
$105
$154
$210
$315
$420
$630
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 17 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, inc.) April 2013
$5,000,001 to $10,000,000 $840
over $10,000,000 $980
I-9 FAILURE OF PAYMENT: If, without fault on the part of the Contractor, the BCM should fail to issue any Certificate for
Payment within seven days after receipt of the Contractor's Application for Payment, if the Contractor`s Application for Payment, or
if, without fauit on the part of the Contractor, the Owner should faii to approve such estimate or to pay to the Contractor 90% or 95%
(as applicabie) of the amount thereof within the period of time specified, then the Contractor may, upon seven (7) days additional
written notice to the Owner and to the Architect, stop the Work until payment of the amount owing has been received.
1-10 SUBSTANTIAL COMPLETION AND FINAL PAYMENT: Prior to the request for final payment, the Contractor must meet
all provisions for Project Closeout.
When the Contractor determines that the Work is substantially compiete, the Construction Manager shall inspect the project with the
Contractor and prepare a"Preliminary Punch LisY'.
When the Architect, on the basis of a subsequent inspection, determines that the Work is substantially complete, he then will
prepare a Certificate of Substantial Completion (G704) which, when approved by the Owner, shail al�ow the Contractor to request a
Certificate of Occupancy which will establish the Date of Substantial Completion. The Certificate of Final Completion shall state fhe
responsibilities of the Owner and the Cbntractor for maintenance, heat, utilities, and insurance, shali set forth the remaining work as
a"final punch IisY'. The Contractor shall compiete the remaining work listed therein within 60 calendar days. When the Certificate of
Occupancy has been issued, the retainage will be reduced to 4%.
.. Upon complefion of the work listed on the final>punch list to the satisfaction of the City of Fort Worth, the retainage may be reduced
to 2.5%.
Should the Contractor fail to complete all contractuai requirements of the contract, including submittals and final pay request within
the fixed time, the contract time wili again commence. Should the Contractor fail to complete the work within the contract duration,
liquidated damages will be assessed
Upon receipt of written notice that the Work is ready for final inspection, the City will conduct a joint inspection and certify compietion
of the final punch list by cosigning it with the Contractor.
The Contractor shaii submit the following items to the City prior to requesting finai payment:
1) Contractor's A�davit of Payment of Debts and Claims (G706) stating that all payrolis, bilis for materials and equipment, and
other indebtedness connected with the Work for which the Owner or his property might in any way be responsible, have been
paid or othenvise satisfied,
2) Consent of Surety to Final Payment (G707), if any, to final payment,
3) Contractor's Affidavit of Release of Liens (G706A), and,
4) Other data establishing payment or satisfaction of all such obligations, such as receipts, releases, and waivers of liens arising
out of the Contract, to the extent and in such form as may be designated by the Owner.
5) Contractor's Warranty
6) Statement that all outstanding work has been completed
7) Issuance of the Final Certificate of Substantial Compietion
8) Final acceptance by the City of Fort Worth.
If any Subcontractor, materialman or laborer refuses to furnish a Contractor's A�davit of Release of Liens, the Contractor may, at
the election of the Owner, fumish a bond satisfactory to the Owner to indemnify him against any right, claim or lien which might be
asserted by such Subcontractor, materialman or laborer. If any such right, claim or lien remains unsatisfied after all payments are
made. The Contractor shall refund to the Owner all monies that the latter may be compelled to pay to discharging such right, ciaim
or lien, including all costs and reasonable attorney's fees.
The Contractor may then request final payment. The acceptance of final payment shall constitute a waiver of all claims by the
Contractor except those previously made in writing and still unsettled.
The Contractors one-year warranty will commence upon final acceptance of the Project by the City of Fort Worth.
The designated representative of the City Councii of the City of Fort Worth will make final acceptance and no other form of
acceptance will be binding upon the Owner. Final payment and release of the retainage amount will become due within fifteen days
following acceptance.
I-11 FINAL PAYMENT FOR UN-BONDED PROJECTS: Final payment will not be made for a period of 30 calendar days and
until all requirements have been met, with the exception of Consent of Surety for Final Payment.
SECTION J .
PROTECTION OF PERSONS AND PROPERTY
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 18 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
J-1 SAFETY PRECAUTIONS AND PROGRAMS: The Contractor shall be responsibie for initiating, maintaining and
supervising all safety precautions and programs in connection with the Work. The Contractor shall designate a responsible member
of his organization at the site whose duty shall be the prevention of accidents. This person shall be the Contractor's superintendent
unless otherwise designated in writing by the Contractor to the Architect.
J-2 SAFETY OF PERSONS AND PROPERTY: The Contractor shall take all reasonabie precautions for the safety of, and
shall provide all reasonabie protection to prevent damage, injury or loss to:
(1) Ali employees on the Work and all other persons who may be affected thereby;
(2) All the Work and all materials and equipment to be incorporated therein, whetfier in storage on or-off the site, under the care,
custody or control of the Contractor or any of his Subcontractors or Sub-contractors; and
(3) Other property at the site or adjacent thereto, inciuding trees, shrubs, lawns, walks, pavements, roadways, sfructures and
utilities not designated for removal, relocation or replacement in the course of construction.
Untii acceptance of the Work, it shall be under the charge and care of the Contractor, and he shail take every precaution against
injury or damsge to the Work by the action of the elements or from any other cause whatsoever, whether arising from the execution
or from the non-execution of the Work. The Contractor shall rebuild, repair, restore and make good, at his own expense, all injuries
or damages to any portion of the Work occasioned by any of the above, caused before its completion and acceptance.
The Contractor shall comply with all applicabie Laws, Ordinances, Rules, Regulations and Orders of any public authority having
jurisdiction for the safety of persons or property or to protect them from damage, injury or Ioss. He shall erect and maintain, as
required by existing conditions and progress of the Work, all reasonable safeguards for safety and protection, inciuding posting
danger signs and other wamings against hazards, promulgating safery regulations _and: notifying owners and users of adjacent
utilities.
When the use or storage of explosives or other hazardous materials or equipment is necessary for the execution of the Work, the
Contractor shail exercise the utmost care and shall carry on such activities under the supervision of properly qualified personnel.
AII damage or Ioss to any property referred to in the preceding paragraphs caused in whole or in part by the Contractor, any
Subcontractor, or anyone directly or indirectly employed by any of them, or by anyone for whose acts any of them may be liable,
shail be remedied by the Contractor, including damage or loss attribufable to faulty Drawings or Specifications and acts or omissions
of the Architect or anyone employed by him or for whose acts he may be liable, and not attributable to the fault or neg(igence of the
Contractor or anyone claiming through the Contractor for such damage or loss.
The Contractor shali not load or permit any part of the Work to be loaded so as to endanger its safety.
J-3 HARD HATS; Hard Hats will be required at all construction sites included in this Contract from start to completion of
work. Each Contractor, employee and visitor at any construction site included in the Contract will be required to wear a hard hat.
The Contractor shall enforce the wearing of hard hats by Contractor, employees and visitors. Contractor shall provide ten hard hats
for use by the consuiting Architects and Engineers and visitors.
J-4 EMERGENCIES: In any emergency affecting the safety of persons or property, the Contractor shall act at his discretion
to prevent threatened damage, injury or loss. Any addifional compensation or extension of time claimed by the Contractor on
account of emergency work shall be determined as provided in Changes in the Work.
J-5 SAFE WORK PRACTICES: The Contractor shall emp(oy safe practices in handling materials and equipment used in
performing required work so as to insure the safety of his workmen, City empioyees and the public. The Contractor shall keep the
premise free at all times from accumulation of waste materia(s or rubbish. At the completion of the work, the Confractor shail
remove all his wastes and rubbish from and about the work area, as well as his tools, equipment and surpius materiais and shall
leave the area as clean and free of spot, stains, efc., as before the work was undertaken.
J-6 TRENCH SAFETY: The Contractor shall be responsible for all design and implementation of trench shoring and
stabilization to meet regulatory requirements. if the Proposal requires, the Contractor shall include a per-unit cost for trench safety
measures in his bid. If not included in the Proposal, the Contractor shall inciude a cost for trench safety measures for ail trenches
over 5 feet in depth in his Schedule of Values.
SECTION K - INSURANCE
K-1 INSURANCE REQUIRED: The Contractor shall not commence work under this Contract until he has obtained all
insurance required under this Section and such insurance has been approved by the City of Fort Worth, nor shall the Contractor
allow any Subcontractor to commence work to be performed under this Contract until all similar insurance of the Subcontractor has
been so obtained and approved. The Ciry of Fort Worth wil! be listed as an "additional insured" on ail policies except Worker's
Compensation.
K-2 WORKERS' COMPENSATION INSURANCE
1) General
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 19 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
a) Contractor's Worker's Compensation Insurance. Contractor agrees to provide to the Owner (City) a certificate showing
that it has obtained a policy of workers compensation insurance covering each of its empioyees empioyed on the project
in compliance witFi state law. No Notice to Proceed will be issued until the Contractor has compiied with this section. .
b) Subcontracfor's Worker's Compensation Insurance. Contractor agrees to require each and every subcontractor who will
perform work on the project to provide to it a certificate from such subconfractor stating that the subcontractor has a policy
of workers compensation insurance covering each employee employed on the project. Contractor will not permit any
subconfractor to perform work on the projecf until such certificate has been acquired. Contractor shall provide a copy of
ail such certificates to the Owner (City).
c) By signing this Contract o� providing or causing to be provided a certificate of coverage, the Contractor is representing to
the City that all employees of the Contractor who will provide services on the project will be covered by worker's
compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification
codes and payroll amounts, and that ali coverage agreements will be filed with the appropriate insurance carrier or, in the
case of a self-insured, with the Texas Worker's Compensation Commission's Division of Self-Insurance Regulation.
- Providing faise or misleading information may subject the Contractor to administrative penalties, criminai penalties, civil
penalties or other civil actions.
d) The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entiUes the
City to declare the contract void if,the Contractor does not remedy the breach within ten days after receipt of notice of
breach from the City.
2) Definitions:
a) Certificate of Coverage ("certificate"). A copy of a certificate of insurance, a certificate of authority to self-insure issued by :
• the Texas Workers' Compensation Commission, or a coverage agreement (TWCC-81, TWCC-82, TWCG83, or 7WGC-
84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing
services on a project, for the duration of the project.
b) Duration of the Project. Includes the time from the beginning of the work on the project until the Contractor's/person's
work on the project has been compieted and accepted by the City.
c) Persons providing services on the project ("subcontractor" in section 406.096)-includes all persons or entities performing
all or part of the services the Contractor has undertaken to perform on the project, regardless of whether that person
contracted directiy with the Contractor and regardless of whether that person has employees. This includes, without
limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of
any such entity, or employees of any entity which fumishes persons to provide services on the project. "Services" include,
without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other
services related to a project. "Services" does not inciude activities unrelated to the project, sucfi as food/beverage
vendors, office supply deliveries, and delivery of portable toilets.
3) Requirements
a) The Contractor shail provide coverage, based on proper reporting of classification codes and payroll amounts and filing of
any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all
employees of the Contractor providing services of the project, for the duration of the project.
b) The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract.
c) If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the project,
the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the Cify showing that
coverage has been extended.
d) The Contractor shall obtain from each person providing services on a project, and provide to the City:
i) a certificate of coverage, prior to that person beginning work on the project, so the governmental entity wiil have on
file certificates of coverage showing coverage for all persons providing services on the project; and
ii) no later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of
coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project.
e) The Contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter.
fl The Contractor shali notify the City in writing by certified mail or personal delivery, within ten (10) days after the Contractor
knew or should have known, of any change that materially affecfs the provision of coverage of any person providing
services on the project.
g) The Contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Worker's
Compensation Commission, informing all persons providing services on the project that they are required to be covered,
and stating how a person may verify coverage and report lack of coverage.
h) The Contractor shall contractually require each person with whom it contracts to provide services on a project, to:
i) provide coverage, based on proper reporting on the classification codes and payroll amounts and filing of any
coverage agreements, which meets the statutory requirements of Texas labor Code, Section 401.011(44) for all of its
employees providing services on the project, for the dura6on of the project;
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 20 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
ii) provide to the Contractor, prior to that person beginning work on the project, a certificate of coverage showing that
coverage is being provided for alI employees of the person providing services on the project, for the duration of the
project;
iii) provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of
coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project;
iv) obtain from each other person with whom it contracts, and provide to the Contractor:
(1) a certificate of coverage, prior to the other person beginning work on the project; and
(2) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the
coverage period shown on the current certificate of coverage ends during the duration of the project;
v) retain all required certificates of coverage on file for the duration of the project and for one year fhereafter.
vi) notify the City in writing by certified mail or personal delivery, within ten (10) days after the person knew or should
have known, of any change thaf materially affects the provision of coverage of any person providing services on the
project; and
vii) contractualiy require each person with whom it contracts, to perform as required by paragraphs h-i) - vii), with the
certificates of coverage to be provided to the person for whom they are providing services.
4) Posting of Required Worker's Compensation Coverage
a) The Contractor shall post a notice on each project site informing all persons providing services on the project that they are
required fo be covered, and stating how a person may verify current coverage and report failure to provide coverage. This
notice does not satisfy other posting req.uirements imposed by the Texas Worker's Compensation Act or other Texas
Worker's Compensation Commission rules. This notice must be printed with a title in at least 30 point boid type and text
in at least 19-point normal type, and shail be in both English and Spanish and any other Ianguage common to the worker
population. The text for the notices shall be the following text, without any additional words or changes:
°REQUIRED WORKER'S COMPENSATION COVERAGE
The law requires that each person working on this site or providing services related to this construction project
must be covered by worker's compensation insurance. This includes persons providing, hauling, or delivering
equipment or materials, or providing labor or transportation or other service related to the project, regardless of
the identity of their employer or status as an employee".
Call the Texas Worker's Compensation Commission at 512-440-3789 to receive information on the legai
requirement for coverage, to verify whether your employer has provided the required coverage, or to report an
employer's failure to provide coverage."
K-3 LIABILITY INSURANCE: The Contractor shall procure and maintain during the term of this Contract such Liability
Insurance as shall protect him, the City of Fort Worth and any Subcontractor perForming work covered by this Contract, from claims
of damage which may arise from operations under this Contract, including blasting, when blas6ng is done on, or in connection with
the Work of the Project, whether such operations be by himself or by any Subcontractor or by anyone directly or indirectly employed
by either of them and the limits of such insurance shall be not less than the foliowing:
1) Automobile Liability: $1,000,000 each accident or reasonably equivalent split limits for bodily injury and property damage.
Coverage shall be on "any auto" including leased, hired, owned, non-owned and borrowed vehicies used in connection with
this Contract.
2) Commercial General Liability: $1,000,000 each occurrence. Coverage under the po(icy shall be as comprehensive as that
provided in a current Insurance Services Office (ISO) policy form approved for use in Texas and the po(icy shall have no
exclusions by endorsement unless such are approved by the City.
3) Asbestos Abatement Liability Insurance: When the Project specifically requires the removal of Asbestos Containing Maieriais,
the Contractor, or subcontractor performing the removal, shali be required to maintain Asbestos Abatement Liability Insurance
as follows: $1,000,000 per occurrence; $2,000,000 aggregate limit. The coverage shall inciude any pollution exposure,
including environmental impairment liability, associated with the services and operations perFormed under this contract in
addition to sudden and accidental contamination or pollution Iiability for gradual emissions and clean-up costs.
K-4 BUILDER'S RISK INSURANCE: Unless stated otherwise in the Proposal or Invitation, fhe Contractor shall procure, pay
for and maintain at all times during the term of this Contract, Builder's Risk Insurance against the perils of fire, lightning, windstorm,
hurricane, hail, riot, explosion, civic commotion, smoke, aircraft, land vehicles, vandalism, and malicious mischief, at a limit equai to
100% of the Contract Sum.
The policy shall include coverage for materia(s and suppiies while in fransit and while being stored on or off site. If specifically
required in the Instructions to Bidders, the poficy shall include coverage for flood and earthquake. Different sub-limits for these
coverages must be approved by the City.
Consequential damage due ta faulty workmanship and/or design performed by the Contractor or his agents shall be covered.
Upon completion of the Work, the Contractor shali notify the City of Fort Worth in writing before terminating this insurance.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, O6Dec12R) Page 21 of 26
WRMC Exhaust Systems for Bumett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
K-5 PROOF OF CARRIAGE OF INSURANCE: The Contractor shall provide a certificate of insurance documenting the
Transportation and Public Works Department, City of Fort Worth as a"Certificate Holder", and noting the specific project(s) covered
by the Contractor's insurance as documented on the certificate of insurance. More than one certificate may be required of the
Contractor depending upon the agents and/or insurers for the Contracior's insurance coverages specified for the project(s).
K-6 OTHER INSURANCE RELATED REQUIREMENTS
1) The City of Fort Worth shall be an additional insured, by endorsement, on all applicable insurance policies.
2) Appiicable insurance policies shall each be endorsed with a waiver of subrogation in favor of the City of Fort Worth.
3) Insurers of policies maintained by Contractor and its subcontractor(s), if applicable, shall be authorized to do business in the
State of Texas, or otherv✓ise approved by the City of Fort Worth, and such shall be acceptable to the City of Fort Worth insofar
as their financial strength and solvency are concerned. Any company through which the insurance is piaced must have a
rating of at least A:Vil�.:as stated in current edition of A. M. Best's Key Rating Guide. At the City's sole discretion, a Iess
favorable rate may be accepted by the City.
4) Deductible limits on insurance policies and/or seif-insured retentions exceeding $10,000 require approval of the City of Fort
Worth as respects this Contract.
5) The City of Fort Worth shail be notified in writing a minimum of thirty days prior to an insurer's action in the event of
cancellation, non-renewal or material change in coverage regarding any policy providing insurance coverage required in this
Contract.
6) Full limits of insurance shall be available for claims arising out of this Contract with the City of Fort Worth.
7) The Contractor shall provide certificates of insurance to the City prior to commencement of operations pursuant to this
Contract. Any failure on part of the City of Fort Worth to request such documentation shall not be construed as a waiver of
insurance requirements specified herein.
8) The City of Fort Worth shail be entitled, upon request and without incurring expense, to review the insurance policies including
endorsements thereto and, at its discretion, to require proof of payment for policy premiums.
9) The City of Fort Worth shall not be responsible for paying the cost of insurance coverages required herein.
10) Notice of any actual or potential claim and/or litigation that would affect insurance coverages required herein shall be provided
to the City in a timely manner.
11) "Other insurance" as referenced in any policy of insurance providing coverages required herein shall not apply to any insurance
policy or program maintained by the City of Fort Worth.
12) Contractor shall agree to either require its subcontractors to maintain the same insurance coverages and limits thereof as
specified herein or the Contractor shall provide such coverage on the Contractor's subcontractors.
SECTION L
CHANGES IN THE WORK
L-1 CHANGE ORDER: The Owner, without invalidating the Contract, may order Changes in the Work within the general
scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and the Contract Time being adjusted
accordingly. All Such Changes in the Work shall be authorized by Change Order, and shall be executed under the appiicable
conditions of the Contract Documents.
A Change Order is a written order to the Contractor signed by the Contractor, Owner and the Architect, issued after the execution of
the Contract, authorizing a Change in the Work or adjustment in the Contract Sum or the Contract Time. The Contract Sum and the
Contract Time may be changed only by Change Order.
Any changes in work required due to changed or unforeseen conditions, or by request of either the Contractor or the City, shall be
coordinated with the Director, Department of Transportation and Public Works. A change order must be written and duly negotiated
and executed prior to performing changed work.
The cost or credit to the Owner resulting from a Change in the work shall be determined in one or more of the following ways:
1) by mutual acceptance of a lump sum property itemized, including the allowance to Contractor for overhead and profit stipulated
in the originai contract proposal;
2) by unit prices stated in the Contract Documents or subsequently agreed upon; or
3) by cost and a mutually acceptable fixed or percentage fee.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 22 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
If none of the methods set forth herein above is agreed upon, the Contractor, provided he receives a Change Order, shali promptly
proceed with the Work involved. The cost of such work shail then be determined on the basis of the Contractor's reasonable
expenditures and savings, including a reasonabie allowance for overhead and profit as indicted in the original contract proposal. In
such cases, the Contractor shall keep and present, in such form as the Architect shali prescribe, an itemized accounting together
with appropriate supporting data. Pending final determination of cost to the Owner, payments on account shall be made on the
ArchitecYs Certificate of Payment as approved by the Owner.
If after the Contract has been executed, the Architect, requests a price proposal from the Contractor for a proposed change in scope
of the work, Contractor shall process such proposal within seven days of receipt and return the price quote to the Architect in writing.
The Architect shail review the price quotation and if approval is recommended, forward the proposed change order request and
price proposal to the Owner for approval. If approval is not recommended, the Architect wili attempt to negotiate with Contractor to
revise the proposal to a figure which is fair and reasonable and forward it on to the Owner for approval. If the negotiations do not
result in an equitable solution, the Architect shall prepare a cost-pius type Change Order with a price-not-to-exceed figure for
approval by the City and require specific documentation to be provided by Contractor in accordance with the paragraph above.
Contractor is advised that according to City of Fort Worth Charter, that, the City Council must approve all Change Orders and Work
Orders which results in an increase in cost of the contract amount by over $25,000. Normai processing time for the City Staff to
obtain City Council approval, once the recommended change order has been received at the City, is approximately thirry days.
Owner and Contractor shall endeavor to identify Change Order items as eariy in the Construction process as possible to minimize
their impact on the construction schedule.
If unit prices are stafed in the Contract Documents or subsequently agreed upon, and if the quantifies originally confemplated are so
changed in a proposed Change Order that application of the agreed unit prices to the quantities of Work proposed will create a
hardship on the Owner or the Contractor, the applicabie unit prices shall be equifably adjusted to prevent such hardship.
If the Contractor claims that additional cost or time is involved because of (1) any written interpretation issued pursuant to Section A,
(2) any order by the Architect or Owner to stop the Work pursuant to Section B, where the Contract was not at fauit, or (3) any
written order for a minor change in the Work, the Confractor shaii make such claim.
L-2 CLAIMS FOR ADDITIONAL COST OR TIME: If the Contractor wishes to make a claim for an increase in the Contract
Sum or an extension in the Contract Time, he shall give the Architect written notice thereof within a reasonabie time after the
occurrence of the event that gave rise to such claim. This notice shall be given by the Contractor before proceeding to execute the
Work, except in an emergency endangering life or property in which case the Contractor shail proceed in accordance with Section J.
No such claim shall be valid unless so made. Any change in the Contract Sum or Contract Time resuiting from such claim, if
approved by the Owner, shall be authorized by Change Order.
L-3 OVEt2HEAD AL�OWANCES FOR CHANGES: Shoufd any change in the work or extra work be ordered, the following
applicable percentage shall be added to Material and �abor costs to cover overhead and profit:
1. Allowance to the Contractor for overhead and profit for extra work performed by the Contractor's own forces shall not exceed
fifteen percent 15% .
2. Ailowance to the Contractor for overhead and profit for extra work performed by a Subcontractor and supervised by the
Contractor shall not exceed ten percent 10% .
L-4 MINOR CHANGES IN THE WORK: The Architect shall have authority to order minor changes in the Work not involving
an adjustrnent in the Contract Sum or an extension of the Contract Time and not inconsistent with the intent of the Contract
Documents. Such changes may be effected by Fieid Order or by other written order. Such changes shaii be confirmed in writing by
the Architect and shall be binding on the Owner and Yhe Contractor.
L-5 FIELD ORDERS: The Architect may issue written Field Orders which interpret the Contract Documents, or which order
minor changes in the Work without change in Contract Sum or Contract Time. The Contractor shall carry out such Field Orders
promptly.
SECTION M
UNCOVERING AND CORRECTION OF WORK
M-1 UNCOVERING OF WORK: If any Work shouid be covered contrary to the request of the Owner, it must be uncovered for
observation and replaced, at the Contractor's expense.
If any other work has been covered which the Owner has not specificaily requested to observe prior to being covered, the Architect
or the Owner may request to see such work and it shall be uncovered by the Contractor. If such Work be found in accordance with
the Pians and Specifications, the cost of uncovering and replacement shail, by appropriate Change Order, be charged to the Owner.
If such work be found not in accordance with the Plans and Specifications, the Contractor shall pay such costs unless it is found that
this condi6on was caused by a separate contractor employed by the Owner.
M-2 CORRECTION OF WORK: The Contractor shall promptiy correct all work rejected by the Owner as defective or as failing
to conform to the Plans and Specifications whether observed before or after Substantial Compietion and whether or not fabricated,
installed or completed. The Contractor shall bear all costs of correcting such rejected Work, including the cost of the ArchitecYs
additional service thereby made necessary.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, O6Dec12R) Page 23 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) Aprii 2013
If, within one year after the Date of Substantial Completion or within such longer period of time as may be prescribed by law or by
the terms of any applicabie special guarantee required by the Contract Documents, any of the work is found to be defective or not in
accordance with the Contract Documents, the Contractor shall correct it promptly after receipt of a written notice from the Owner to
do so, unless the Owner has previously given the Contractor a written acceptance of such condition, describing same specifically
and not generally. The Owner shall give such notice promptly after discovery of the condition.
All such defective or non-conforming work under the preceding paragraphs shall be removed from the site where necessary and the
work shall be corrected to comply with the Contract Documents without cost to the Owner.
The Confractor shali bear the cost of making good all work of separate contractors destroyed or damaged by such removal or
correction.
If the Contractor does not remove such defective or non-conforming work within a reasonable time fixed by written notice from the
Owner, the Owner may remove it and may store the materials or equipment at the expense of the Contractor. If the Contracfor does
not pay the cost of such removal and storage within ten days thereafter, the Owner may upon ten additionai days' written notice sell
such work at auction or at private sale and shall account for the net proceeds thereof, after deducting all the costs that should have
been borne by the Contractor including compensation for additional architectural services. If such proceeds of sale do not cover aIl
costs that the Contractor should have bome, the difference shall be charged to the Contractor and an appropriate Change Order
shall be issued. If the paymenfs then or thereafter due the Contractor are not su�cient to cover such amount, the Contractor shall
pay the difference to the Owner.
If the Contractor fails to correct such defective or non-conforming work, the Owner may correct it in accordance with Section G.
The obligation of the Contractor under this Section shall be in addition to and not in limitation of any obligations imposed upon him
by special guarantees required by the Contract Documents or otherwise prescribed by law.
M-3 ACCEPTANCE OF DEFECTIVE OR NON-CONFORMING WORK: If the Owner prefers to accept defective or non-
conforming work, he may do so instead of requiring its removal and correction, in which case a Change Order will be issued to
reflect an appropriafe reduction in the Contract Sum, or, if the amount is determined after final payment, it shail be paid by the
Contractor.
SECTION N
TERMINATION OF THE CONTRACT
N-1 ' TERMINATION BY THE CONTRACTOR: If the work is stopped for a period of 30 days under an order or any court or
other public authority having jurisdiction, through no act or fault of the Contractor or a Subcontractor or their agents or employees or
any other persons performing any of the work under a contract with the Contractor, or if the work should be stopped for a period of
30 days by the Contractor for the Owner's failure to make payment thereon as provided in Section I, then the Contractor may after
, the end of such period of 30 days and upon seven additional days' written notice to the Owner , terminate the Contract.
N-2 TERMINATION BY THE OWNER: If the Contractor is adjudged as bankrupt, or if he makes a general assignment for the
benefit of his creditors, or if a receiver is appointed on account of his insolvency, of if the Contractor refuses, except in cases for
which extension of time is provided, to supply enough properly skilled workmen or proper materiais, or if he fails to make prompt
payment to Subcontractors or for materials or labor, or fails to comply with al Laws, Statutes, Charter, Ordinances, Regulafions or
Orders of any public authority having jurisdiction, or othenroise is guilty of a substantial violation of a provision of the Contract
Documents, then the Owner, on its own initiative that sufficient cause exists to justify such action, may, without prejudice to any
rights or remedy and after giving the Contractor and his surety, if any, seven (7) days' written notice, terminate the employment of
the Contractor and take possession of the site and ofall materials, equipment, tools, construction equipment and machinery thereon
owned by the Contractor and may finish the work by whatever method he may deem e�edient. In such case the Contractor shall
not be entitled to receive any further payment until the Work is finished.
If the costs of finishing the Work, including compensation for the Architect's additional services. exceed the unpaid balance of the
Contract, the Contractor shali pay the difference to the Owner.
The City of Fort Worth may terminate this contract in whole, or ftom time to time, in part, whenever such termination is in the best
interest of the City. Termination will be effecfed by delivering to the Contractor a notice of termination specifying to what extent
performance of the work of the wntract is being terminated and the effective date of termination. After receipt of termination the
Contracfor shall:
a) Stop work under the Contract on the date and to the extent specified on the notice of termination.
b) Place no further orders or subcontracts except as may be necessary for the comple6on of the work not terminated.
c) Terminate ali orders and subcontracts to the extent that they relate to the performance of the work terminated by the notice of
term ination.
After termination as above, the City will pay the Contractor a proportionate part of the contract price based on the work completed;
provided, however, that the amount of payment on termination shaii not exceed the total contract price as reduced by the portion
General Conditions of the Confract for Construction Lump Sum Contract (MBE, O6Dec12R) Page 24 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, fnc.) April 2013
thereof allocatable to the work not completed and further reduced by the amount of payments, if, any otherwise made. Contractor
shall submit its claim for amounts due after termination as provided in this paragraph within 30 days after receipt of such claim. In
the event of any dispute or controversy as to the propriety or allowabilify of all or any portion of such claim under this paragraph,
such dispute or controversy shall be resolved and be decided by the City Council of the City of Fort Worth, and the decision by the
City Council of the City of Fort Worth shall be final and binding upon all parties to this contrect.
SECTION O
SIGNS
The Contractor shall construct and install the project designation sign as required in the Contract Documenfs and in strict
accordance with the Specifications for "Project Designation Signs." This sign shaii be a part of this Contract and shall be inciuded in
the Contractor's Base Bid for the Projecf.
SECTION P
TEMPORARY FACILITIES
P-1 SCOPE: The Contractor shall furnish, erect, and maintain facilities and perform temporary work required in the
performance of this Contract, including those shown and specified.
P-2 USE OF TEMPORARY FACILITIES: All temporary facilities shall be made available for use by ail workmen and
subcontractors employed on the project, subject to reasonable directions by the Contractor as to their proper and most efficient
utilization.
P-3 MAINTENANCE AND REMOVAL: The Contractor shall maintain temporary facilities in a proper, safe operating and
sanitary condition for the duration of the Contract. Upon completion of the Contract, ail such temporary work and facilifies shall be
removed from the premises and disposed of unless otherwise directed or specified hereunder.
P-4 FIELD OFFICES AND SHED: The Contractor is not required to provide a temporary field office or telephone for projects
under $1,000,000. Contractor shall equip the Project Superintendent with a pager and provide 24hour contacts to the City.
The Contractor shall provide a temporary field office building for himself, his subcontractors and use by the Architect. For
construction contracts w�th a bid price in excess of $1,000,000.00, the Contractor shall provide a separate field office for the City's
field representative (but the separate office may be in the same structure). The buildings shall afford protection against the weather,
and each office shali have a lockabie door, at least one window, adequate electrical outlets and lighting, and a sheif large enough to
accommodate perusal of the project drawings. Openings shall have suitable locks. Field offices shall be maintained for the fuii time
during the operation of the work of the Contract. During cold weather months, the field offices shall be suitably insulated and
equipped with a heating device to maintain 70 degree Fahrenheit temperature during the workday. During warm weather the offices
shall be equipped with an air conditioning device to maintain temperature below 75 degrees F. Upon completion of the work of the
Contraci, the Confractor shall remove the buiiding from the premises. in addition to the drawing shelf, provide for the City field
representatives office: one deck, four chairs, plan rack and a four drawer filing cabinet (with lock). Each office shail contain not Iess
than 120 square feet of floor space.
The Contractor shall provide and maintain storage sheds other temporary buildings or trailers on the project site as required for his
use. Location of sheds and trailers shall be as approved by the Owner. Remove sheds when work is completed, or as directed.
P-5 TELEPHONE: The Contractor shall provide and pay for telephone installatiori and service to the field offices described
above. Service shall be maintained for the duration of operations under this contract. The Contractor shall provide for and pay for an
automatic telephone-answering device at the site office for the duration of the project. Contractor will install separate fax lines and
instruments for the City and the Contractor.
P-6 TOILET FACILITIES: The Contractor shall provide proper, sanitary and adequate toilet facilities for the use of all
workmen and subcontractors employed on the project.
P-7 UTILITIES: Contractor shall make all necessary arrangements and provide for temporary water and electricity required
during the construction. Contractor shall provide and install temporary utility meters during the contract construction period. These
meters will be read and the Contractor wiil be bilied on this actual use. The Contractor shall provide aIl labor and materials required
to tap into the utilifies. The Contractor shall make the connections and extend the service lines to the construction area for use of ail
trades. Upon completion of the work all utility lines shall be removed and repairs made to the existing lines. Only utilities at existing
voltages, pressures, frequencies, etc. will be available to the Contractor.
Water. Provide an ample supply of potable water for all purposes of construction at a point convenient to the project or as shown on
the Drawings. Pipe water from the source of supply to all points where water will be required.
Provide sufficient hose to carry water to every required part of the construction and allow the use of water facilities to subcontractors
engaged on the work. Provide pumps, tanks and compressors as may be required to produce required pressures.
Electric Service. Provide adequate electric service for power and lighting to all points where required. Temporary, electric service
shail be of sufficient capacity and characteristics to supply proper current for various types of construction tools, motors, welding
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 25 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
machines, lights, heating plant, air conditioning system, pumps, and other work required. Provide su�cient number of electric outlets
so that 50 foot long extension cords wili reach ail work requiring light o� power.
Li9htinq. Supply and maintain temporary lighting so that work of all trades may be properly and safely performed, in such areas and
at such time that day-lighting is inadequate. Provide at least 0.75 watts of incandescent lighting per squqr4e foot and maintain a
socket voitage of at least 110 volts. Use af least 100-watt lamps. In any event, the lighting intensity shall not be less than 5 foot
candles in the vicinity of work and traffic areas.
P-8 HEATING: Heating devices required under this paragraph shali not be electric. The Contractor shall provide heat,
ventilation, fuel and services as required to protect all work and materials and to keep the humidity down to the extent required to
prevent corrosion of any metal and to prevent dampness or miidew which is potentially damaging to materials and finishes. Ali such
heafing, ventilation and services shall be provided and maintained until final acceptance of all work. In addition, the Contractor shall
provide heat ventilation prior and during the following work operations as follows:
a) At ali times during the placing, setting and curing of concrete provide sufficient heat to insure the heating of the spaces
involved to not less than 40 F.
b) From the beginning of the application of drywall and during the setting and curing period, provide sufficient heat to produce a
temperature in the spaces involved of not less than 55 F.
c) For a period of seven (7) days previous to the placing of interior finish materials and throughout the placing of finish painting,
decorating and Iaying of resilient flooring materiafs, provide su�cient heat to produce a temperature of not less than 60 F.
P-9 TEMPORARY CONSTRUCTION EQUIPMENT AND PROTECTION: The Contractor shall provide, maintain, and
remove upon completion of the work all temporary rigging, scaffoiding, hoisting equipment, rubbish chutes, ladders to roof,
barricades around openings, and all other temporary work as required to complete all work of the Contract. Contractor shall
coordinate the use and furnishing of scaffolds with his sub-contractors.
The Contractor shall provide, maintain, and remove upon completion of the work, or sooner, if authorized by the Owner, all fences,
barricades, lights, shoring, pedestrian waikways, temporary fire escapes, and other protective structures or devices necessary for
the safety of workmen, City empioyees, equipment, the public and property.
All temporary construction and equipment shall conform to all regulations, ordinances, laws and other requirements of the
authorities having jurisdiction, including insurance companies, with regards to safety precautions, operation and fire hazard.
The Contractor shall provide and maintain pumping facilities, including power, for keeping the site, all times, whether from
underground seepage, rainfall, drainage of broken lines.
The Contractor shall maintain provision for closing and locking the building at such time as possible to do so. If this is not feasible,
maintain a night
The Contractor shall provide and maintain all barricades or enciosures, required to protect the work in progress from outside
elements, dusts, and other disturbances as a resuit of work under this Contract. Such protection shall be positive, shall meet the
approval of the Owner and shali be maintained for the duration of the construction period or as required to provide for the protection
as specified.
P-10 PROJECT BULLETIN BOARD: The Contractor shall fumish, install and maintain during the life of the project a weather-
tight bullefin board approximately 3 feet high by 5 feet wide having not less than two hinged or sliding glass doors with provisions for
locking. The bulletin board shall be mounted where and as approved by the Owner, in a prominent place accessible to empioyees
_ of the Contractor and sub-contractors, and to applicants for employment. The bulletin board shall remain the property of the
Contractor and shall be removed by him upon comple6on of the Contract work. The following information which will be fumished by
the City to the Contractor shall be posted on the bulietin board and shall be maintained by the Contractor in easily readable
condition at all times for the duration of the Contract.
a. The Equal Opportunity Poster and Notice Nondiscrimination of Employment (Standard Form 38).
b. Wage Rate information Poster (Form SOL 155), with the Contract Schedule of minimum wage rates as required by the
Davis-Bacon Act.
c. Safety Posters.
SECTION Q
VENUE
Should any action arise out of the terms and conditions of this contract, venue tor said action shall lie in Tarcant County, Texas.
General Conditions of the Contract for Construction Lump Sum Contract (MBE, 06Dec12R) Page 26 of 26
WRMC Exhaust Systems for Burnett, Richardson-Bass & Moncrief (TXMAS, Johnson Controls, Inc.) April 2013
CITY OF FORT WORTH, TEXAS
CONSTRUCTION CONTRACT
THE STATE OF TEXAS
COUNTY OF TARRANT
KNOW ALL BY THESE PRESENTS:
This agreement made and entered into this the 2nd day of A ril A.D., 2013, by and between the
CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and
existing under and by virtue of a special charter adopted by the qualified voters within said City
on the 11th day of December, A.D. 1924, under the authority (vested in said voters by the
"Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly
passed at a regular meeting of the City Council of said city, hereinafter called OWNER, and
Johnson Controls. Inc. of the City of Richland Hills, County of Tarrant, State of Texas,
hereinafter called CONTRACTOR.
WITNESSETH: That for and in consideration of the payments and agreements hereinafter
mentioned to be made and performed by the Owner, and under the conditions expressed in the
bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to
commence and complete the construction of certain improvements described as follows:
Livestock Pen Exhaust Systems
Burnett, Richardson-Bass, and Moncrief Buildings
Will Rogers Memorial Center
3401 West Lancaster Avenue
Fort Worth, Texas 76107
Project No. TPW2013-04
That the work herein contemplated shall consist of furnishing as an independent contractor all
labor, tools, appliances and materials necessary for the construction and completion of said
project in accordance with the Plans and Specifications and Contract Documents adopted by
the City Council of the City of Fort Worth, which Plans and Specifications and Contract
Documents are hereto attached and made a part of this contract the same as if written herein.
The Contractor hereby agrees and binds himself to commence the construction of said work
within ten (10) days after being notified in writing to do so by the Owner.
City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the
aforesaid work, and for stated additions thereto or deductions therefrom, the price shown on the
Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment
will be made in monthly installments upon actual work completed by contractor and accepted by
the Owner and receipt of invoice from the Contractor.
The agreed upon total contract amount shall be One Million and Seven Hundred Fiftv-Three
Thousand and Five Hundred Eiqhtv-Four pollars and No Cents ($1,753 584 00).
Contractor agrees to complete the project, suitable for occupancy and beneficial use, within 270
calendar days. Attachments "A". "B", "C", and "D" are attached hereto and made a part of
this construction contract.
Insurance Requirements:
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
The Contractor shall not commence work under this contract until it has obtained all
insurance required under the Contract Documents, and such insurance has been
approved by the Owner. The Contractor shall be responsible for delivering to the Owner
the sub-contractors' certificates of insurance for approval. The Contractor shall indicate
on its certificate of insurance included in the documents for execution whether or not its
insurance covers subcontractors. It is the intention of the Owner that the insurance
coverage required herein shall include the coverage of all subcontractors
a. WORKER'S COMPENSATION INSURANCE:
• Statutory limits
• Employer's liability
- • $100,000 disease each employee
• $500,000 disease policy limit
• $100,000 each accident
b. COMMERCIAL GENERAL LIABILITY INSURANCE: The Contractor shall
procure and shall maintain during the life of this contract public liability insurance
coverage in the form of a Commercial General Liability insurance policy to cover bodily
injury, including death, and property damage at the following limits: $1,000,000 each
occurrence and $2,000,000 aggregate limit.
• The insurance shall be provided on a project specific basis and shall be
endorsed accordingly.
� • The insurance shall include, but not be limited to, contingent liability for
independent contractors, XCU coverage, and contractual liability.
c: BUSINESS AUTOMOBILE LIABILITY:
• $1,000,000 each accident
• The policy shall cover any auto used in the course of the project
d: BUILDER'S RISK OR INSTALLATION FLOATER:
This insurance shall be applicable according to the property risks associated with
the project and commensurate with the contractual obligations specified in the
contract documents.
e. EXCESS LIABILITY UMBRELLA
• $1,000,000 each occurrence; $2,000,000 aggregate limit.
• This insurance shall provide excess coverage over each line of liability
insurance required herein. The policy shall follow the form(s) of the
underlying policies.
f. SCOPE OF INSURANCE AND SPECIAL HAZARD: The insurance required
under the above paragraphs shall provide adequate protection for the Contractor and its
subcontractors, respectively, against damage claims which may arise from operations
under this contract, whether such operations be by the insured or by anyone directly or
indirectly employed by it, against any insurable hazards which may be encountered in
the perFormance of the Contract.
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
g. PROOF OF CARRIAGE OF INSURANCE: The Contractor shall furnish the owner
with satisfactory proof of coverage by insurance required in these Contract Documents
in the amounts and by insurance carriers satisfactory to the Owner. The form to be used
shail be the current Accord certificate of insurance form or such other form as the Owner
may in its sole discretion deem acceptable. All insurance requirements made upon the
Contractor shall apply to the sub-contractors, should the Contractor's insurance not
cover the subcontractor's work operations performed in the course of this contracted
project.
ADDITIONAL INSURANCE REQUIREMENTS:
a. The Owner, its officers, employees and servants shall be endorsed as an
additional insured on Contractor's insurance policies excepting employer's liability
insurance coverage under Contractor's workers' compensation insurance policy.
b. Certificates of insurance shall be delivered to the City of Fort Worth, contract
administrator in the respective department as specified in the bid documents, 1000
Throckmorton Street, Fort Worth, TX 76102, prior to commencement of work on the
contracted project.
c. Any failure on part of the Owner to request required insurance documentation
shall not constitute a waiver of the insurance requirements specified herein.
d. Each insurance policy shall be endorsed to provide the Owner a minimum thirty
days notice of cancellation, non-renewal, and/or material change in policy terms or
coverage. A ten days notice shall be acceptable in the event of non-payment of
premium.
e. Insurers must be authorized to do business in the State of Texas and have a
current A.M. Best rating of A:VII or equivalent measure of financial strength and
solvency.
f. Deductible limits, or self-funded retention limits, on each policy must not exceed
$10,000. per occurrence unless otherwise approved by the Owner.
g. In lieu of traditional insurance, Owner may consider alternative coverage or risk
treatment measures through insurance pools or risk retention groups. The Owner must
approve in writing any alternative coverage.
h. Workers' compensation insurance policy(s) covering employees employed on the
project shall be endorsed with a waiver of subrogation providing rights of recovery in
favor of the Owner.
i. Owner shall not be responsible for the direct payment of insurance premium
costs for contractor's insurance.
j. Contractor's insurance policies shall each be endorsed to provide that such
insurance is primary protection and any self-funded or commercial coverage maintained
by Owner shall not be called upon to contribute to loss recovery.
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
k. In the course of the project, Contractor shall report, in a timely manner, to
Owner's officially designated contract administrator any known loss occurrence which
could give rise to a liability claim or lawsuit or which could result in a property loss.
I. Contractor's liability shall not be limited to the specified amounts of insurance
required herein.
m. Upon the request of Owner, Contractor shall provide complete copies of all
insurance policies required by these contract documents.
If this Contract is in excess of $25,000, the Contractor shall provide a Payment Bond in the full
amount of the contract. If the contract is in excess of $100,000 Contractor shall provide both
Payment and Performance Bonds for the full amount of the contract. Contractor shall apply for
all City of Fort Worth Permits and for any other permits required by this project. City of Fort
Worth Permit fees are waived. Separate permits will be required for each facility.
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and
Contract Documents within the time so stipulated, plus any additional time allowed as provided
in the General Conditions, there shall be deducted from any monies due or which may
thereafter become due him, the liquidated damages outlined in the General Conditions, not as a
penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for
such deficiency.
. The remainder of this page is intentionally left blank
�=
��
,�__ ._ . ., .. _
�
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
IN WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in four
counterparts in its name and on its behalf by the City Manager and attested by its Secretary,
with the corporate seal of the City of Fort Worth attached. The Contractor has executed this
instrument through its duly authorized officers in four counterparts with its corporate seal
attached.
Done in Fort Worth, Texas, this the �_day of A.D., 2013.
JOHNSON CONTROLS, INC.
�
sy:
Michael Crowe
Regional VP Solutions
APPROVED:
CITY OF FORT WORTH
By: «
Fernando Costa
Assistant City Manager
APPROVAL RECOMMENDED:
� �
,
,
By: �--/`-` � � • '� t.��
�'� Douglas�,W. Wiersig, PE ;
Director ��
Transportation and Public Works Department
APPROVED AS TO FORM AND LEGALITY:
By: ij'1� �te (�t� Ivt - 1G � ��
. k �» r�h � ( r�-, . /� �c �--
Assistant City Attorney
RECORDED:
�� �
By: '
Mary J. Ka��s/9 r y;
City Secret�ry .y�
y�d
�,�►•�'
� {.'g`
M&C C-26189 A ril 2 2
Contract Authorization °
�I�.�'
OFFI�IAB� itE���
'�1'Tb' SE��TARY
�'� �06�t��!!9 �
�
WRMC Exhaust Systems for Burnett, Richardso °- as�crief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
Bond # 8? �0-2 �-42
PAYMENT BOhfD
iHE STATE OF TEXAS §
§ KNOW A�L BY zHES� PRESEN7S:
COUNTY OF TARRANT §
7hat w2, Johrtsan Confrols, lnc.,*known as "PrltlCip�1" here�n, and Federal Insurance Company
15 Mountain View Road; Warren, NJ 07059 a
corpQrate surety (sureties), duly authorized to do business in fhe State af Texas, knawn as "Suref�'
herein (whether one or more), are held and firmly bound unto tne City ot For� Worth, a municipai
corporation created pursuant to the la�vs af the State of Texas, known as "City" hereir, in the penal sum
of One Million and Seven Hundred FiftY-Three Thousand and Five Hundred Eiqhtv-Four potlars
and No Cents t$7,753,584.Oa}, lawfui money of the United States, to be paid in Fort Worth, Tarrant
County, Texas, for the payment of wi�ich sum well and truly be made, we bind ourselves, our heirs,
executors, administrators, successors and assigns, jointfy and severally, firmly by these presents:
WHEREAS, Principaf has entered info a certain written Contract with Gify, awarded the 2nd day
� of April, 2��3, which Cantract is hereby referred to and made a part hereaf for a!I purposes as if fuily s�t
forih herein, fo fumish all materiais, equipmenf, labar and other accessories as defined by law, in �he
prosecutian of the :Work as provided for in said Confrac� and designated as Livestock Pen Exhaust
Syst�ms for Burn��t, REchardson-Bass, and Moncriaf Buifdinqs a� Wi11 Roqers Memarial Center
located at 3449 West Lancaster Avenue FarE Warth Texas Pro'ect I�o. TPW2a13-04 .
fiIOW, THER�FORE, TNE CONDIzlO�l OF THIS OgLIGATIOf� is such that if Principal shal( pay
a(f rnonies owing to any {and alf) payment bond beneficiary (as defned in Chapter 22�3 of the Texas
Government Code, as amencied} in the prosecufion of the Work under the Contract, then this obligation
- shall be and become nulE and void; otherwise to remain in full force and e�fect.
This bond is made and executed in compliance with the provisions of Chapter 2253 of tfne iexas
GQverrment Code, as amended, and all liabilities on this bond shaEl be determ9ned in accordartce with the
�rovisions of said sta�ute.
"`Comorate Address: 5757 North Green Bay Avenue; Milwaukee, WI 53209
WRMC Exhaust SysEems {or Bume�t, Richardson-Bass, & Moncrief Buildings (April 20� 3)
Johnson Controls, Inc. (TXMAS)
BOND N[JMBER: 8230-23-42
�
IM1! WITNESS WHEREOF, the PrincEpal and Surety have each SIGNED and SEALED this
instnrment by duly authorized agents and officers on this the 8th day of April „_; 2013.
PRW CIPAL:
70HNSON CONTROLS, INC.
BY � G�'
Signature
ATTEST:
SEE ATTACHED DELEGATION OF AUTHORITY
(Principal} Secretary
Lucy A. Hantzscli; Attoiney-In-Fact
Name and Title
Add1'ess: 5757 North Green Bay Avenue
Milwaukee, WI 5.i20)
�%y!. ki�Gd+CJ�,c,
Witness as to Principal
SURETY:
FEDERAL INSURANCE COMPANY
: ! .�. . \ �� !T
..
Cathy Hutson; Attomey-In-Fact
�tarne and 3itle
Addres5: 15 Mountain View Road
-- � �� C ��C'''�����
Witness a Surety
�
�
�-
Warren. NJ 070�9
ielephone Number: 414-290-�SR3
Note: If signed by an o�ficer of the Surety, there must be on file a rertified extract from the bylawS
showing that this person has authority to sign such obiigation. If Sure��s physical address is different
fram its mailing address, both must be provided,
The date of the bond shall not be prior ta the date the Contrac# is awarded.
� WRMC Exhaust Systems for BurneEt, Richardson-2ass, & Moncrief Buildings (April 269 3)
Johnson Controls, Inc. (TXMAS)
Bond # 8230-23-42
PERFORMANC� �OND
THE STATE OF TEXAS §
§ KNaW ALL BY THESE PRESFKTS:
COUNTY C}F TARRANT §
That we, Johnson ControEs. Inc.* known as "PrincipaP' herein and Federal Insurance Company
15 Mountain View Road; Warren, NJ 07059 , a
corporate surety (sureties, if more fhan one) dufy a�tE�orized to clo business in the State of Texas, known
- as "Surety" herein (whether ane or more), are held and firrrtly bound unto the City of Fort 'JVorth, a
municipal corporafion created pursuant to the laws of Texas, kr�awn as °City' �erein, in the penal sum of,
One Miflion and Seven Hundred Fifty-Three ihousand and Five Hundred Eiq�stv-Faur pollars and
No Certts (�1,7�3,�84.00), lawfu€ money of the United States, to be Daid in Fort Worth, ?aRant Cau�ty,
Texas far the �aymeni of which sum well and truly fo be made, we bind ourseEves, our heirs, executors,
administrators, successors and assigns, joitttly and severally, firmly by these presents.
WHEREAS, the Principal has entered into a certain written contract with the City awarded the
2nd day of Aprit, 2013, which Gontract is hereby referred to and mada a par� hereofifor all purposes as if
fully set forth herein, to fumish a(I materials, equipment iabor and ot�er accessories defined by law, in the
prosecufion of fhe Work, including a�y Ch2nge �rders, as provided far in said Gontr�ct designated as
Lives�ock P�n Exhaus'E Svstems for Burneti, Richardson-Bass, and Monerief Ruildings at Will
Roqers Memoria) Genter (ocated at 340� West Lancaster Avenue Fort Worth, Texas (Proiect No.
TPW2013-OA�}.
NOW, THEREFORE, the condition af this obligation is such that if the said Principal shall faithfutly
perform it obligations under the Cantract and shal( in a€E respects duly and faithfully perForm the WorEc,
including Change Orders, under ti�e Cont�act, according tQ the plans, sp�cifications, and contract
documents therein referred to, and as well during any period of extensian of the Confract that may be
granfed on the part of the City, tnen this obligation sha11 be and become null a�d void, oinen,vise to
remain in fuJl force and effect.
PRQVfpED FURTNER, that if any legal action be filed on this Bond, venue shall lie in Tarrant
Count}r, Texas or the United States District Cau�t far the Northern District of Texas, Fort bVorth Division.
ihis bond is made and executed in compliance wi#h the provisions of Chapter 22�3 of �he Texas
Govemment Cade, as amended, and all liabilities on this bond shai3 be determined in accordance with the
provisians of said statue.
WRMC Exhaust Systems for Bumett, Richardson-Sass, &. Moncrief Bvildings {April 2Q13)
Johnson Controls, lnc. (TXMAS}
*Corporate Address: 5757 North Green Bay Avenue; Milwaukee, WI 53209
BOND NUMBER: 8230-2 �-42
IN WITNESS WHEREOF, the Principal and the Surety f�ave SIGNED and SEALED this
instrument by duly authorized ager�ts and officers on this the �tll day of
April , 2fl13.
PRINCIPAL:
JOHNSON CONTROLS. INC.
BY: C�l LC. • �
Signature
AT7ES7:
SEE ATTACHED DELEGATION OF AUTHORITY
{Principal) Secretary
Lucy A. Hantzsch; Attorney-In-Fact
Name and �itle
Atidt'eSS: ���� Norfll Green Bay Avenue
Milwaukee, WI 53209
r�l��ee�
Witness as to Principal
�
Witness a o Surety
SURETY:
FEDERAL INSURANCE COMPANY
B :
Signature
Cadiy Hutson ;Attomey-In-Fact
Name and Title
Add�eSs: 1� Mountain View Road
Warren, NJ 07059
i"elephone Nurnber: 414-290-;58 �
'�Note: If signed by an officer of the Surety Compar�y, there must be an ?ife a certified exiract from the
by-laws showing that fhis person has autharity to sign such obligation. [f Surety's physical adciress is
� different from its mailing address, both must be provided. The date of #he bond shafl not be prior to the
I date the Contract is awarded.
�
�^
�
I
Vti'RMC Ex6ayst Systams for Bumett, Richardson-Bass, & Moncrief Buildings �Apri[ 2093)
Johnson Controls, lnc. {iXMAS}
C
Johnson Controls, Inc.
5757 N. Green Bay Avenue
Milwaukee, WI 53209
/ ,
lahnsQn ''� �'
Controls
DELEGATION OF AUTHORITY
The undersigned, President of Johnson Controls, Inc., a Wisconsin corporation (ihe "Company"),
pursttan.t to the authorify vested in him by a certain resolution adopted by the Board of Directors of
the Company on January 23, 1980, hereby authorizes:
Lucy A. Hantzsch
Hays Companies
1200 N. Mayfair Road, Suite 100
Milwaukee, WI 53226
to perform, on behalf of the Company, the acts described below:
� To execute, seal and deliver, as attorney-in-fact for the Company, surety bonds
forwarded to Hays Companies by a Company authorized surety that do not exceed
Two Million Dollars ($2,000,000.00) that are necessary and proper in carrying on
the business of the Company.
� This authority shall remain in full force and effect for six (6) months from the date of issue.
Signed at Milwaukee, Wisconsin, this � day of �ph � � l�
.�litest:
I.,�'' f
,.. i i�/ o
� !�f � �/
_._� ��_/�.1_.�..t�
J�rorn�; {.).�f:
% %
1
. � � _ .���.�Z�
�-��� �����f���t
— i� Q� � � ��1
�� . � `��,,j �
j �; �a�y��Q���f,+~•�;,,�!'i
ll�; °- 1
`�1��•� �.1�����-� 'e�i
�,�.��,;�. �:}y:,��_
�: -���i��:�.,
��` `^`a'�
��
;
_ 'C? . -y�c�.,-�"
Ste� ��n �1. RoeIl, President
POWER Federal Insurance Company Attn: Surety Department
Chubb OF Vigilant Insurance Company 15 Mountain View Road
Surety ATTORNEY pacific Indemnity Company Warren, NJ 07059
CH�.1BB
VIGILANT INSURANCE
Know All by These Presents, That
COMPANY, a New York corporation, an
appoint Kathleen A. Crary Cathy Ht
and Lisa M. Slakes of Mi�waukee,l
FEDERAL INSURANCE
n,
COMPANY, an Indiana corporation,
MPANY, a Wisconsin corporation, do each hereby constitute and
:ki, Tracy K, Matthews, Wendy S. Miller, Daniel J. Sapiro
--------------------
each as their true and Iawiui Attomey- in- Fact to execule under such designatlon in their names and to affix thelr corparate seals to and deliver for and on their behalf as surery
thereon or otherwfse, bonds and undertakings and other writings obligatory in the nature thereof (other than bail bonds) glven or executed in the course of buslness, and any
Instruments amending or altering the same, and consents to the modification or alteration of any instrument reierred to in said bonds or obligations.
In Witness Whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY have each executed and attested
these presents and affixed their corporate seals on this 24ti1 day of JU�j►� 2�0%
Kenneth . Wen el, Assistent Secretary
� �� �
� �.(yJ� / fi
D' . Norris, Jr., Vice P ident
STATE OF NEW JERSEY ss.
County of Somerset
On this 24th day of JU�j/, 2�07 before me, a Notary Pu611c ol NewJersey, personally came Kenneth C. Wendel, to me
known to be Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPAfVY, the companies which
executed the foregoing Power af Attomey, and the said Kenneth C. Wendel, befng by me duly swom, did depose and say that he Is Assistant Secretary oi FEDERAL
INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY and knows the corporate seais thereof, that the seais affixed lo the
toregoing Power of Altomey are such corporate seais and were thereto affixed by authority of the By- Laws of said Companies; and that he signed said Power of Attomey as
Assistant Secretary of said Companies 6y like authoriry; and that he is acquainted with David B. Norris, Jr., and knows him to be Vice President oF said Companies; and that the
signature of David B. Norris, Jr., subscribed to said Power of Attomey is in the genuine handwriting of David B. Norris, Jr., and was thereto subscribed by authority of said By-
laws and in deponenPs presenca.
Notarial Seal
�Q�EN B. g��
� �.;,'rAa y a
'�1� -'� �E:�..��_� �
`v �,��� 5�
y`TEpF1EN B. BRADT
tdolary Public, State of New 1erseY
No. 2321097
Commission Expires Oct. 25. 2��4
CERTIFICATION
�, ? ` ►,
��_�..._ �.
�/ � cP
Extract irom the By- Laws of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY:
"All powers of attomey for and on behalf of ihe Company may and shall be executed in the name and on behalf of lhe Company, eiiher by the Chairman or [he
President or a Vice President or an Assista nnt 'd o P thod a YhednTh signature of each of lhe ollowing o�cerrs Chairman tPres dent any Vica IPresident any
signature of such officers may be engraved, p' 9 P
Assistant Vice Presiden[, any Secretary, any Asststant Secretary and the seal of the Company may be aftlxed by facsimtle to any power of attomey or to any
certificate relating [hereto appointing Assistant Secretarles or Attomeys- in- Fact for purposes only of executing and attesting bonds and undertakings and other
wrltings obligatory in the nature thereof, and any such power of atlomey or certificate hearing such facsimile signature or facsimile seal shall be aalid and binding
upon the Company and any such power so executed and ceAified by such tacsimile signature and facsimile seal shall be valid and binding upon the Company
wilh respect to any bond or undertaking to whlch it Is attached."
I, Kenneth C. Wendel, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY
(the "Companies") do hereby certlfy that
(i) the foregoing extract of the By- Laws of the Companles Is true and correct,
(li) the Companies are duly licensed and authorized to transact surety business in all 50 of the United States of America and the Dislrict of Columbia and are
authorized by the U.S. Treawry Departmerrt; fuAher, Federal and Vigilant are licensed In Puerto Rico and the U.S. Virgin Islands, and Federal is licensed in
American Samoa, Guam, and each of the Provinces of Canada except Prince Edward Island; and
(iii) the foregoing Power of Attomey is true, correct and in tull force and en t•I �, �O �
/L _
Given under my hand and seals ot said Companies at Warren, NJ this %���]
. �� `�yaww�F
� �o
� ci �l��b � a //
� � ; � t � E s .( Z�� L� �.� �!
. /j
�Y t' i� If � ��{' �" /A ti' ���.. !!
�apNr ��i w� '� Kenneth C. Wende , Assistant Secretary
IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM, VERIFY THE AUTHENTICITY OF rHIS BOND OR NOTIFY US OF ANY OTHER
MATTER, PLEASE CONTACT US AT ADDRESS LISTED ABOVE, OR BY^ Telephone (908) 903- 3493 Fax (908) 9D3- 3656
�
�.-
Form 15-10- U225B- U(Ed. 5- 03) CONSENT
' .%""'_
/"�
F i a �a
Factory Mutual Insurance Company
300 S. Northwest Highway
Park Ridge, Illinois
60068
United States of America
Tel: (1) 847 430-7000
FaY: (1) 847 430-7599
CERTIFICATE OF INSURANCE
This document is issued as a matter of information only and confers no rights upon the document holder. This certificate does not amend, extend,
or alter the coverage, terms, exclusions, conditions, or other provisions afforded by the policy. We hereby certify that insurance coverage is now
in force with our Company as outlinedbelow.
Policy No.: FD662 Policy Term
Account No.: 1-0201.i Effective Date: O1 October 2012
Expiration Date: O1 October 2013
NAMED INSURED:
JOHNSON CONTROLS, INC.
DESCRIPTION AND LOCATION OF PROPERTY COVERED:
Personal Properry Location No.:
INSL
U.S. Installation Floater BE
Miscellaneous Unnamed Locations INDEX No.:
VARIOUS, USA 000920.00
COVERAGE IN FORCE: (subject to limits of liability, deductibles and conditions in the Policy)
Insurance Provided: Peril: Limit Of Liability:
Property Damage All Risk USD 1,75�,584
ADDITIONAL INTERESTS:
Additional interests as detailed below are covered in accordance with Certificates of Insurance issued to such interests and on file with
this Company. Loss, if any, shall be payable to such additional interests, as their interests may appear, and in accordance with loss
payment provisions of the Policy.
CERTIFICATE TERM: Effective: O1 October 2012
Expires: Ol October 2013
INTEREST TYPE:
Loss Payee in accordance with the Additional Interest clause stated above.
CITY OF FORT WORTH 3PYL-0001
401 WEST 13th STREET
FORT WORTH, Texas 76102, USA
As Respects Personai Properiy consisting of Eachaust Fans and Miscellaneous Control Parts
situated at the following Location:
3401 West Lancaster Avenue
Fort Worth, TX
Certificate No: 00129-001
/5;,,.,ba..� G. F,�
CITY OF FORT WORTH
ATTN: PROPERTY INSURANCE DEPARTMENT
401 WEST 13th STREET
FORT WORTH, Texas 76102, USA
Authorized Si�ature / Issue Date
Kimberly L. Foster/ 09 April 2013
For questions, contact: Timothy Kelly
7420 (6/12) LDI COI 286067-1 06 12 Page 1 of 2
Account No.: 1-02013
Policy No.: FD662
Effective Date: April 2, 2013
Estimated Completion Date: December 31, 2013
Certificate No:
00129-001
7420 (6/12) LDI COI 286067-1 06 12 Page 2 of 2
CERTIFICATE OF INSURANCE
[Assemb/er.� For Contract Document executron, remove this page and replace w�th standard
ACORD Certificate of Insurance form.J
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)
Ts� �.r ��u a:-::c's� : sr ; x
�' `� r i ;�" , '•,; - �,
��` �- z ,.,, .., ,. �
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
provides worker's compensation insurance coverage for all of its employees employed on
Proiect No. TPW2013-04 for Livestock Pen Exhaust Svstems for Burnett Richardson
Bass, and M_oncrief Buildinas at Will Roqers Memorial Center located at 3401 West
Lancaster Avenue, Fort Worth Texas. Contractor further certifies that, pursuant to Texas
Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's
certificates of compliance with worker's compensation coverage.
CONTRACTOR:
.�.� ` _ _y��[+ �
. ..
`1 � �-t�
Address
� �a.r� � \1s T TX �lnl I �
City/State/Zip
THE STATE OF TEXAS
COUNTY OF TARRANT
�
�
By: 1" 41
(PI� e
Signature:
Title: �
lease Print)
BEFORE ME, the undersigned authority, on this day personally appeared
9`�11C' I�('i P ��IQ
known to me to be the
person whose name is subscribed to the foregoing instrument, and acknowledged to me that
he/she executed the same as the act and deed of _�U��� �' �j(��-{��S �C'
�
for the purposes and consideration
therein expressed and in the capacity therein stated.
GIVEN UNDER MY HAND AND SEAL OF OFFICE this �day of ( j I���
2013. '
�.,,,,.r.,
Kimberly Case
��haY P�l� Pi01iYy PubtlC.
�"`�' s,� Q Staos of Texas
�`} Comrt+ ExP OS 21-15
���N���N���� ��
tary Public in and o the State of Texas
WRMC Exhaust Systems for Burnett, Richardson-Bass, & Moncrief Buildings (April 2013)
Johnson Controls, Inc. (TXMAS)