HomeMy WebLinkAboutContract 45317 (2)���� ����� C1i'Y SEC[�ETA�� ,; � . �ONTRp�CT �10. PROJECT MANUAL FOR THE CONSTRUCTION OF WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM S WILLIS AVENUE from Old Benbrook R�. to Southwest Blvd. City Project No. 01372 Water No. P253-603170137283 Sewer No. P258-703170137283 DOE No. 4057 Betsy Price Mayor S. Frank Crumb, P.E. Director, Water Department Prepar�d for The City of Fort Worth Water Department 2013 ---------- - � OFFiC1AL RECOR� CITY SECRETARY F'T. WiORTH, TX ��C�i���3 JAN � 9 2014 Tom Higgins City Manager �.,. �v � 000000-1 TABLE OF COATTENTS Page 1 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 SECTION 00 00 00 TABLE OF CONTENTS Division 00 - General Conditions 00 OS 10 Mayor and Council Communication 00 OS 15 Addenda 00 11 13 Invitation to Bidders 00 21 13 Instructions to Bidders 00 35 13 Conflict of Interest Affidavit 00 41 00 Bid Form 00 42 43 Proposal Form Unit Price 00 43 13 Bid Bond 00 43 37 Vendor Compliance to State Law Nonresident Bidder 00 45 11 Bidders Prequalifications 00 45 12 Prequalif'ication Statement 00 45 13 Bidder Prequalification Application 00 45 26 Contractor Compliance with Workers' Compensation Law 00 45 40 Minority Business Enterprise Goa1 00 52 43 Agreement 00 61 13 Performance Bond 00 61 14 Payment Bond 00 61 19 Maintenance Bond 00 61 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary Conditions Division Ol - General Requirements O1 11 00 Summary of Work Ol 25 00 Substitution Procedures O l 31 19 Preconstruction Meeting Ol 31 20 Project Meetings Ol 32 16 Construction Progress Schedule O1 32 33 Preconstruction Video O1 33 00 Submittals Ol 35 13 Special Project Procedures Ol 45 23 Testing and Inspection Services Ol 50 00 Temporary Facilities and Controls Ol 55 26 Street Use Permit and Modifications to Traffic Control Ol 5'7 13 Storm Water Pollution Prevention Plan Ol 58 13 Temporary Project Signage Ol 60 00 Product Requirements Ol 66 00 Product Storage and Handling Requirements Ol 70 00 Mobilization and Remobilization O1 71 23 Construction Staking and Survey O1 74 23 Cleaning • Ol 77 19 Closeout Requirements Ol 78 23 Operation and Maintenance Data O1 78 39 Project Record Documents CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Project No. 01372 000000-3 TABLE OF CONTENTS Page 3 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 32 13 20 32 13 73 32 14 16 32 16 13 32 91 19 32 92 13 Concrete Sidewalks, Driveways and Barrier Free Ramps Concrete Paving Joint Sealants Brick Unit Paving Concrete Curb and Gutters and Valley Gutters Topsoil Placement and Finishing of Parkways Hydro-Mulching, Seeding, and Sodding Division 33 - Utilities 33 Ol 30 Sewer and Manhole Testing 33 Ol 31 Closed Circuit Television (CCTV) Inspection 33 04 30 Temporary Water Services 33 04 40 Cleaning and Acceptance Testing of Water Mains 33 04 50 Cleaning of Sewer Mains 33 OS 10 Utility Trench Excavation, Embedment, and Backfill 33 OS 12 Water Line Lowering 33 OS 13 Frame, Cover and Grade Rings 33 OS 16 Concrete Water Vaults 33 OS 17 Concrete Collars 33 OS 20 Auger Boring 33 OS 21 Tunnel Liner Plate 33 OS 22 Steel Casing Pipe 33 OS 23 Hand Tunneling 33 OS 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 33 OS 26 Utility Markers/Locators 33 OS 30 Location of Existing Utilities 33 11 OS Bolts, Nuts, and Gaskets 33 11 10 Ductile Iron Pipe 33 11 11 Ductile Iron Fittings 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 33 11 13 Concrete Pressure Pipe, Bar-Wrapped, Steel Cylinder Type 33 12 10 Water Services 1-inch to 2-inch 33 12 20 Resilient Seated Gate Valve 33 12 25 Connection to E�sting Water Mains 33 12 30 Combination Air Va1ve Assemblies for Potable Water Systems 33 12 40 Fire Hydrants 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 33 31 50 Sanitary Sewer Service Connections and Service Line 33 39 10 Cast-in-Place Concrete Manholes 33 39 20 Precast Concrete Manholes Division 34 - Transportation 34 71 13 Traffic Control Append'uc GC-6.06.D Minority and Women Owned Business Enterprise Compliance GC-6.07 Wage Rates GC-6.09 Permits and Utilities CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised December 20, 2012 City Project No. 01372 00o510-i MAYOR AND COUNCIL COMMUNICATION (M&C) Page 1 of 1 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 SECTION 00 OS 10 MAYOR AND COUNCIL COMMUNICATION (M&C) END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 2011 City Project No. 013�2 M&C Review CITY COUNCIL AGENDA Official site of the City of Fort Worth, Texas FORT �'�'ORTH �`"r`� COUNCIL ACTION: Approved on 1/14/2014 - Ordinance Nos. 21098-01-2014 8� 21099-01-2014 DATE: 1/14/2014 REFERENCE NO.: C-26643 CODE: C TYPE: NON- CONSENT LOG NAME: PUBLIC HEARING: 6003STMB- CONATSER NO SUBJECT: Authorize Execution of a Contract with Conatser Construction TX, LP, in the Amount of $1,149,334.00 for Water and Sanitary Sewer Replacement Contract 2003, STM-B on Willis Avenue from Old Benbrook Road to Southwest Boulevard, Provide for Project Costs and Contingencies for a Project Total in the Amount of $1,243,306.00 and Adopt Appropriation Ordinances (COUNCIL DISTRICT 3) RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $1,243,306.00 from the Water and Sewer Operating Fund to the Water Capital Projects Fund in the amount of $1,109,354.00 and to the Sewer Capital Projects Fund in the amount of $133,952.00 2. Adopt the attached appropriation ordinances increasing estimated receipts and appropriations in the Water Capital Projects Fund in the amount of $1,109,354.00 and the Sewer Capital Projects Fund in the amount of $133,952.00 from available funds; and 3. Authorize the execution of a contract with Conatser Construction TX, LP, in the amount of $1,149,334.00 for the Water and Sanitary Sewer Contract 2003, STM-B. DISCUSSION: This Mayor and Council Communication is to authorize a construction contract for the replacement of the severely deteriorated water and sanitary sewer mains on Willis Avenue from Old Benbrook Road to Southwest Boulevard. The project was advertised for bid on October 3, 2013 and October 10, 2013, in the Fort Worth Star- Teleqram. On November 14, 2013, the following bids were received: Bidders Gra-Tex Utilities, Inc.* Conatser Construction TX, LP M.E. Burns Construction, Inc. Jackson Construction, Ltd. Woody Contractors, Inc. Ark Contracting Services, LLC William J Schultz, Inc. d/b/a Circle "C" Construction S.J. Louis Construction of Texas, Ltd. Atkins Brothers Equipment Co., Inc. Amount $1, 047, 546.00 $1,149,334.00 $1,219,633.00 $1, 324, 383.40 $1, 326,462.00 $1,452,760.00 $1,463,818.00 $1, 522,481.20 $1,821,726.00 Page 1 of 3 Time of Completion 210 Calendar Days *Gra-Tex Utilities, Inc., has been determined to be non-responsive to the specifications and contract documents due to the fact that the Company is not pre-qualified to install water pipe in excess of 12- inch diameter which is included in this project. Therefore, Staff recommends that the contract be awarded to the lowest responsive and responsible bidder, Conatser Construction TX, LP. M/WBE Office — Conatser Construction TX, LP, is in compliance with the City's BDE Ordinance by committing to 10 percent MBE participation on this project. The City's MBE goal on this project is 10 percent. In addition to the contract amount, $57,000.00 (water: $46,000.00; sewer: $11,000.00) is required for construction survey, project management, material testing, inspection, mapping and as-built drawings � http://apps. cfwnet.org/council�acket/mc_review.asp?ID=193 82&councildate=l / 1... 1/15/2014 M&C Review and $36,972.00 (water: $30,972.00; sewer: $6,000.00) is provided for project contingencies. This project is located in COUNCIL DISTRICT 3, Mapsco 73Z and 74W. Page 2 of 3 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinances, funds will be available in the current capital budgets, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund. TO Fund/Account/Centers �� $1.109,354.00 P253 476045 6031701372ZZ �� $133,952.00 P258 476045 7031701372ZZ � $10,000.00 P253 531350 603170137252 � $5,000.00 P253 511010 603170137280 � $1,063,354.00 P253 541200 603170137283 � 3 000.00 P253 531350 603170137284 � $5,000.00 P253 531200 603170137284 � $20,000.00 P253 531350 603170137285 � $1, 000.00 P253 511010 603170137292 � $1, 000.00 P253 511010 603170137293 � $1.000.00 P253 531350 603170137294 � $1.500.00 P258 531350 703170137252 � $1.000.00 P258 511010 703170137280 � $122.952.00 P258 541200 703170137283 � 1 000.00 P258 531350 703170137284 � $1.500.00 P258 531200 703170137284 � $3.000.00 P258 531350 703170137285 � 1 000.00 P258 511010 703170137292 � $1.000.00 P258 511010 703170137293 � $1,000.00 P258 531350 703170137294 Submitted for Citv IVlanaqer's Office bv: FROM Fund/Account/Centers 1) PE45 538040 0609020 $1.109,354.00 1) PE45 538040 0709020 $133.952.00 � $1,032,382.00 P253 541200 603170137283 � $116.952.00 P258 541200 703170137283 Fernando Costa (6122) http://apps.cfwnet.org/council�acket/mc review.asp?ID=19382&councildate=l/1... 1/15/2014 . M&C Review Oriqinatinq Department Head: Additional Information Contact: S. Frank Crumb (8207) J. Chris Underwood (2629) ATTACHMENTS 60 03STMB-CONATSER P253 AO(rev1.02.14).docx 60 03STMB-CONATSER P258 AO(rev1.02.14).docx 6003STMB-CONATSER MAP.pdf Page 3 of 3 http://apps.cfwnet. org/council�acket/mc_review.asp?ID=193 82&councildate=l /1... 1 /15/2014 000sls-i ADDENDA Page 1 of 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 SECTION 00 OS 15 ADDENDA END OF SECTION CiTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July i, 2011 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B WILLIS AVENUE City Project No. 01372 CITY OF FORT WORTH WATER DEPARTMENT ENGINEERING SERVICES DIVISION ADDENDUM NO. 1 WATER AND SANITAR�' SEWER REPLACEMENT CONTRA.CT 2003 STM-B WILLIS AVENUE TPW / DOE NO. 4057 CITY PROJECT NO. 01372 RELEASE DATE: October 28, 2013 INFORMATION TO BIDDERS: The Specifications and Contract Documents for the above mentioned project are revised and amended as follows: 1. In SECTION 00 11 13 INVITATION TO BIDDERS, the first para�aph specifies that sealed proposals "will be received at the Purchasing Office until 1:30 p.m., Thursday October 31, 2013 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers." The INVITATIOI�T TO BIDDERS sha11 be REVISED in that sealed proposals "will be received at the Purchasing Office until 1:30 p.m., THURSDAY NOVEMBER 14, 2013 and then publicly opened and read aloud at 2:00 p.m. in the Council Chambers." Please aclalowled�e receipf of the Addendum in the bid proposal and on the outside of the sealed envelope. RECEII'T ACKNOWLEDGED: �� S. FRANK CRUMB, P.E. ,(� C��,-352� 4�('��p�t -�- DIRECTOR, WATER DEPARTMENT By: �� t ; f � J Deeter, P.E. Water Department Engineering Services �OV-�4-2013 MON 11�11 AM CFW DOE DESIGN SERVICES FAX NO, 8173922527 P, 02/02 �7T`Y" iJF rORT W QP�T.I�i WATER DEPARTMENT ENGINEBR;II�TG SER�ICES J�IVISIC�N I_� r� �7 �n ic� . �: WAT:ER ANLI SANITAR.Y SEW.�R REPLA.CEMENT CONTR.ACT �003 BTR�I-Ii VS'IL�I�S ,A.V�NUE �.�p'W / b0� N'{). �4057 CITY �'RO.TECT NO. 01372 RLI,LASL ]�A1`L: Novenzbcr =�, 2013 1Nl ORMATlOi� TO 13tI717EF2S: The Specificatio�s asxd'Contr�.ct Uncuments for t1�e above men�ioned. project are revised ancl arnei�rIed a„s fol]ows: l. Tu clflrif�; in S�C1"TO1�T 00 42 431'ROPdSAi ][+OI�.1V1, Line Item 42 Trai'fi� Co�trol is .f.or ihe Tra.ff.cc �oncrfll rmplement�cion, TnstallAtion Mainten�noe, Adjustments, Replacaments aa�d Reiu�va] as specified in S�C�"IOl� 34 71 131'I2AT+'Y+TC CON'TRO'L' . An flddi�io�1 "Line Ytem � Tr�.f�c ControI Details is requu�ed to inclucle Preparin� ttle Trrz�'io Controll'1nn Deta.ils, AcUlerence ta Ciry and Teaas Manual on. Unifori� Tra.fftc Conxrol Devices (TMUTCD}, Qbcai�iri� the si�nat,ure ancl seal of a].icensed Texas Prnfessional Engu�eer. and Incor1�orazian af City comrnents as s,pecified in. STCTTClN 3� 7l �3 TI2.4F'FiC C4NTROL. 2. In tl�e propasal S�CTION A— WATER IMI'ROVT,M�NTS PAG� 5 or 7 AUl� T'ay Ytem No 44 c� r.eA�l: • P1c�sr ticl�iowlcd�6 rBbClj.1'L bL L"11C ACIC�CIIfILLlIl lIl II1C tJ1CI �3i4�70S11 :1IIC� 6II T�ZC �LII51S�e Of L'}i� 9CE1.1G'C� CIIVZI4�:7Z. RL-CLI't''1" ACICNOWLLDG�D; �� S. .F.RANK CRUI�+TB P.E. eV o��.-t�e ��f.�S,��P�� T�TRFCTQR, W.A.T�R D�PARTA�ENT ��a�%�. ny: - � � J" 1��ter. P.�. Wat�r .T��partmei�t �11g3Aee�Alg Seiti�lces �uv-u�-�ui� rKl oz:��� Yrl CFW DOE DESIGN SERVICES FAX I��. 8173922527 P, 02�03 � �ITY QF FQRT Wt��.T�-I , �WAT�R DEPARTM�NT �NGINEEF�LrtG SEPLVICES L1IVI�ION ADDEI�fDITM NO. 3 �A'I'�Z2 AN.I� SAT�]71CA���.' S�'4�4'IE.C� Yt�FLAC�IVIENT CONTRACT 20U3 STll�-� �'IL�.,ZS A��+ NUE T�W I Dt�� Nt�. 405'7 CITY PROJECT N0. 01378 - I{.E.T.FASF .DAT.E: Novamiser R, ?(i7.3 INI-'�RMA.TIQN T4 I�IDDE.RS: Tt1e Speciticatious a.nd Cozitract laocumeti.0 far tl�e a.bove menti�»ed p.r.ojeci: are .re��ised and a»ended �s fo.iJaws: 1. Pursuant to Sta��dard Detai133 11 0-D132 Ve.i�t:ical Ti.e�Taouna E3loci4���� nt�te 8. V�RTICA�. TI�-DQViTN �I.00K,LNG FC3R .LiN�S t C�" :4� LARGER SITAL.i. BE TaES1GNFT� FQR TT�E SPECIFTC �,pC,ATIQN AN1� ST30WN QI�T T%T� TaRAW.I.NCS, ihe £ailo�ri��g engine�red detail c�f the Vertical Tie Doum Blocl�ng �l�aJl be ADDT'D for tt�� ?4-iiich vertica.l. be�ids o.i� sheets 4 a�ar? 8. P1c.1sc aclaiawlcdgc r�ccipt of chc Addcndum iu tl1c: bid proposal and on ilic outside of the seflled cnvelc�pe. It�CEII'T AC�fN01�JL�DCrED: � S. IR.A.NK CRLT�F3, P.�. `( �(�,D �.�{�'jSC� Oyi�' DIR&CTOR, WA.T�R D.EPARTM�NT i3y:— rt ` ! �,� un cetcr, i� 1;. � — ---- � Wflter ]7ep�rcment Lngincerin� Services DIMENSIONS �OR TIE-DOWN B�OCKII�G SIZE ANGLE THRUST "A" "B" "C" "D" "E" "F" "G" BARS CO�1C. TOf�S & SIZE C.Y. 24" 45° 25.97 8' S' 8.�' 2.75' 2.5' 2.5' 1.25' S-�5 12.82 i F ��' � � 4 REBAR 6" C/C �TN U��AYS � VERTICA� TIE-DOWI� B�OCK y � 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 001113-i INVITATION TO BIDDERS Page 1 of 2 SECTION 00 11 13 INVITATION TO BIDDERS RECEIPT OF BIDS Sealed bicls for the construction of WATER AND SANITA.RY SEWER REPLACEMENT COlVTRACT 2003 STM-S WII�LIS AVENUE; CITY PROJECT NO. 01372 will be received by the City of Fort Worth Purchasing Office: City of Fort Worth Purchasing Division 1000 Throckmorton Street ��� �� Fort Worth, Texas 76102 I�OJ !�' '�- until 1:30 PM CST, Thursday OctofjQr-3'�'2013, and bids will be opened publicly and read aloud at 2:00 PM CST in the Council Chambers. GENERAL DESCRIPTION OF WORK The maj or work will consist of the (approximate) following: Water Line Improvements: 3,067 LF 24-inch Water Line by Open Cut 162 LF 24-inch Water Line by Other than Open Cut 1,220 LF 12-inch Water Line by Open Cut 162 LF 12-inch Water Line by Other than Open Cut 1,966 LF S-inch Water Line by Open Cut Sewer Line Improvements: 1,038 LF 8-inch Sewer Line by Open Cut PREQUALIFICATION The improvements included in this project must be performed by a contractor who is pre- qualified by the City at the time of bid opening. The procedures for qualification and pre- qualification are outlined in the Section 00 21 13 — INSTRUCTIONS TO BIDDERS. DOCUMENT EXAlVIINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or obtained on-line by visiting the City of Fort Worth's Purchasing Division website at http://w«�u�.fortworth�ov.ora/purchasin�i' and clicking on the Buzzsaw li.nk to the advertised project folders on the City's Buzzsaw site. The Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. Copies of the Bidding and Contract Documents inay be obtained from J. Chris Underwood Water Department, Desibn Services 927 Taylor Street Fort Worth, Texas 76102 The cost of Bidding and Contract Documents is: Set ofBidding and Contract Documents with full size drawings: No Cost Set of Bidding and Contract Documents with half size (if available) drawings: No Cost CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 2011 City Project No. 01372 00 11 13 - 2 INVTTATION TO BIDDERS Page 2 of 2 1 2 3 4 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 CITY'S RIGHT TO ACCEPT OR REJECT BIDS City reserves the right to waive irregularities and to accept or rej ect bids. INQUIlZ�S All inquiries relative to this procurement should be addressed to the following: Attn: J. Chris Underwood, City of Fort Worth Water Department Email: john.undenvood@fortworthtexas.gov Phone: (817) 392-2629 Fax: (817) 392-2527 AND/OR Attn: Jim Deeter, P.E., City of Fort Worth Water Department Email: ji.m.deeter@fortworthtexas.gov , Phone: (817) 392-7803 • ' Fax: (817) 392-2527 ADVERTISEMENT DATES October 3, 2013 October 10, 2013 20 END OF SECTION CiTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE - Revised July l, 2011 � City Project No. 01372 002113-1 INSTRUCTIONS TO BIDDERS Page 1 of 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 SECTION 00 21 13 INSTRUCTIONS TO BIDDERS 1. Defined Terms 1.l . Terms used in these INSTRUCTIONS TO BIDDERS, which are defined in Section 00 72 00 - GENERAL CONDTTIONS. 1.2. Certain additional terms used in these INSTRUCTIONS TO BIDDERS have the meanings indicated below which are applicable to both the singular and plural thereof. 12.1. Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative, submitting a bid for performing the work contemplated under the Contract Documents. 122. Nonresident Bidder: Any person, firm, partnership, company, association, or corporation acting directly through a duly authorized representative; submitting a bid for performing the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 12.3. Successful Bidder: The lowest responsible and responsive Bidder to whom City (on the basis of City's evaluation as hereinafter provided) makes an award. 2. Copies of Bidding Documents 2.1. Neither City nor Engineer shall assume any responsibility for errors or misinterpretations resulting from the Bidders use of incomplete sets of Bidding Documents. 22. City and Engineer in making copies of Bidding Documents available do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license or grant for any other use. 3. Prequalification of Bidders (Prime Contractors and Subconfractors) 3.1. All Bidders and their subcontractors are required to be prequalified for the work types requiring prequalification at the time of bidding. Bids received from contractors who are not prequalified (even if inadvertently opened) shall not be considered. Prequalification requirement work types and documentation are as follows: 3.1.1. Water and Sanitary Sewer— Requirements document located at; https:/� proj ectpoint.buzzsaw. comi fortworth�ov,Resources;'02%20- %2QConstruction%20DocumentslContractor%20Prequalification/Water%20and%Z OSanitarv%20Se���er%20Contracior%20Prec�ualification%ZOProb am/WSS%20�re �ual%20require�ents.doc? up blic 3.2. Each Bidder unless currently prequalified, must be prepared to submit to City within seven (7) calendar days prior to Bid opening, the documentation identified in Section 00 45 1l, BIDDERS PREQUALIFICATIONS. CiTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised November 27, 2012 City Proj ect No. 01372 00 21 13 - 2 INSTRUCTIONS TO BIDDERS Page 2 of 9 1 3.2.1. Submission of and/or questions related to prequalification should be addressed to 2 the City contact as provided in Parab aph 6.1 _ 3 4 5 3.3. The City reserves the right to require any pre-qualified contractor who is the apparent low 6 bidder(s) for a project to submit such additional information as the City, in its sole 7 discretion may require, including but not limited to manpower and equipment records, 8 information about key personnel to be assigned to the project, and construction schedule, 9 to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to 10 deliver a quality product and successfully complete projects for the amount bid within 11 the stipulated time frame. Based upon the City's assessment of the submitted 12 information, a recommendation regarding the award of a contract will be made to the 13 City Council. Failure to submit the additional information, if requested, may be grounds 14 for rejecting the apparent low bidder as non-responsive. Affected contractors will be 15 notified in writing of a recommendation to the City Council. 16 17 18 19 20 21 22 4. 23 3.4. In addition to prequalification, additional requirements for qualification may be required within various sections of the Contract Documents. 3.5. Not Used Egamination of Bidding and Contract Documents, Other Related Data, and Site 24 4.1. Before submitting a Bid, each Bidder shall: 25 26 4.1.1. Examine and carefully study the Contract Documents and other related data 27 identified in the Bidding Documents (including "technical data" referred to in 28 Parab aph 4.2. below). No information b ven by City or any representative of the 29 City other than that contained in the Contract Documents and officially 30 promulgated addenda thereto, shall be binding upon the City. 31 32 33 34 35 36 37 38 39 40 4.1.2. Visit the site to become familiar with and satisfy Bidder as to the general, local and site conditions that may affect cost, progress, performance or furnishing of the Work. 4.13. Consider federal, state and local Laws and Reb lations that may affect cost, progress, performance or furnishing of the Work. 4.1.4. Not Used 41 4.1.5. Study all: (i) reports of explorations and tests of subsurface conditions at or 42 contib ous to the Site. and all drawings of physical conditions relating to e�sting 43 surface or subsurface structures at the Site (except Underground Facilities) that 44 have been identified in the Contract Documents as containing reliable "technical 45 data" and (ii) reports and drawings of Hazardous Environmental Conditions, if any, 46 at the Site that have been identified in the Contract Documents as containing 47 reliable "technical data." 48 CiTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENLTE Revised November 27, 2012 City Proj ect No. 013'72 00 21 13 - 3 INSTRUCTIONS TO BIDDERS Page 3 of 9 1 4.1.6. Be advised that the Contract Documents on file with the City shall constitute all of 2 the information which the City will furnish. All additional information and data 3 which the City will supply after promulgation of the formal Contract Documents 4 shall be issued in the form of written addenda and shall become part of the Contract 5 Documents just as though such addenda were actually written into the original 6 Contract Documents. No i_nformation given by the City other than that contained in 7 the Contract Documents and officially promulgated addenda thereto, shall be 8 binding upon the City. 9 10 4.1.7. Perform independent research, investigations, tests, borings, and such other means 11 as may be necessary to gain a complete knowledge of the conditions which will be 12 encountered during the construction of the proj ect. On request, City may provide 13 each Bidder access to the site to conduct such examinations, investigations, 14 explorations, tests and studies as each Bidder deems necessary for submission of a 15 Bid. Bidder must fill all holes and clean up and restore the site to its former 16 conditions upon completion of such explorations, investigations, tests and studies. 17 18 4.1.8. Detennine the difficulties of the Work and all attending circumstances affecting the 19 cost of doing the Work, time required for its completion, and obtain a11 information 20 required to make a proposal. Bidders shall rely exclusively and solely upon their 21 own estimates, investigation, research, tests, explorations, and other data which are 22 necessary for full and complete information upon which the proposal is to be based. 23 It is understood that the submission of a proposal is prima-facie evidence that the 24 Bidder has made the investigation, examinations and tests herein required. Claims 25 for additional compensation due to variations between conditions actually 26 encountered in construction and as indicated in the Contract Documents will not be 27 allowed. 28 29 4.1.9. Promptly notify City of all conflicts, errors, ambiguities or discrepancies in or 30 between the Contract Documents and such other related documents. The Contractor 31 shall not take advantage of any gross error or omission in the Contract Documents, 32 and the City shall be permitted to make such corrections or interpretations as may 33 be deemed necessary for fulfillment of the intent of the Contract Documents. 34 35 4.2. Reference is made to Section 00 73 00 — Supplementary Conditions for identification of: 36 37 4.2.1. those reports of explorations and tests of subsurface conditions at or contiguous to 38 the site which have been utilized by City in preparation of the Contract Documents. 39 The logs of Soil Borings, if any, on the plans are for general information only. 40 Neither the City nor the Engineer guarantee that the data shown is representative of 41 conditions which actually e�st. 42 43 422. those drawings of physical conditions in or relating to existing surface and 44 subsurface structures (except Underground Facilities) which are at or contiguous to 45 the site that have been utilized by City in preparation of the Contract Documents. 46 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised November 27, 2012 City Project No. 01372 00 21 13 - 4 INSTRUCTIONS TO BIDDERS Page 4 of 9 1 4.2.3. copies of such reports and drawings will be made available by City to any Bidder 2 on request. Those reports and drawings may not be part of the Contract 3 Documents, but the "technical data" contained therein upon which Bidder is entitled 4 to rely as provided in Parab aph 4.02. of the General Conditions has been identified 5 and established in Paragraph SC 4.02 of the Supplementary Conditions. Bidder is 6 responsible for any interpretation or conclusion drawn from any "technical data" or 7 any other data, interpretations, opinions or information. 8 10 11 12 13 14 15 16 17 18 19 20 21 4.3. The submission of a Bid will constitute an incontrovertible representation by Bidder (i) that Bidder has complied with every requirement of this Parab aph 4, (u) that without exception the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences or procedures of construction (if any) that may be shown or indicated or expressly required by the Contract Documents, (ai) that Bidder has given City written notice of all conflicts, errors, ambiguities and discrepancies in the Contract Documents and the written resolutions thereof by City are acceptable to Bidder, and when said conflicts, etc., have not been resolved through the interpretations by City as described in Paragraph 6., and (iv) that the Contract Documents are generally sufficient to indicate and convey understanding of a11 terms and conditions for performing and furnishing the Work. 22 4.4. The provisions of this Paragraph 4, inclusive, do not apply to Asbestos, Polychlorinated 23 biphenyls (PCBs), Petroleum, Hazardous Waste or Radioactive Material covered by 24 Parab aph 4.06. of the General Conditions, unless specifically identified in the Contract 25 Documents. 26 27 5. Availability of Lands for Work, Etc. 28 29 5.1. The lands upon which the Work is to be performed, rights-of-way and easements for 30 access thereto and other lands designated for use by Contractor in performing the Work 31 are identified in the Contract Documents. All additional lands and access thereto 32 required for temporary construction facilities, construction equipment or storage of 33 materials and equipment to be incorporated in the Work are to be obtained and paid for 34 by Contractor. Easements for permanent structures or permanent changes in e�sting 35 facilities are to be obtained and paid for by City unless otherwise provided in the 36 Contract Documents. 37 38 5.2. Outstanding right-of-way, easements, and/or permits to be acquired by the City are listed 39 in Parab aph SC 4.01 of the Supplementary Conditions. In the event the necessary right- 40 of-way, easements, and/or permits are not obtained, the City reserves the right to cancel 41 the award of contract at any time before the Bidder begins any construction work on the 42 proj ect. 43 44 5.3. The Bidder shall be prepared to commence construction without all executed right-of- 45 way, easements, and/or permits, and shall submit a schedule to the City of how 46 construction will proceed in the other areas of the project that do not require permits 47 and/or easements. 48 49 50 CTI"Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised November 27, 2012 City Project No. 013�2 00 21 13 - 5 INSTRUCTIONS TO BIDDERS Page 5 of 9 1 � 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 3'7 38 39 40 41 42 43 44 45 46 47 48 6. Interpretations and Addenda 6.1. All questions about the meaning or intent of the Bidding Documents are to be directed to City in writing on or before 2 p.m., the Monday prior to the Bid opening. Questions received after this day may not be responded to. Interpretations or clarifications considered necessary by City in response to such questions will be issued by Addenda delivered to all parties recorded by City as having received the Bidciing Documents. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect. Address questions to: City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Attn: J. Chris Underwood, City of Fort Worth Water Department Fax: (817) 392-2527 Email: john.underwood@fortworthtexas.gov Phone: (817) 392-2629 62. Addenda may also be issued to modify the Bidding Documents as deemed advisable by City. 63. Addenda or clarifications may be posted via Buzzsaw at <�sert Link to Documents>. https://pro'Lectpoint.buzzsaw.com/client/fort��orth�ovfInfrastructure Proiects;01372 - W and SS Replacement Contract 2003 STM-BBid Packa� 6.4. A prebid conference may be held at the time and place indicated in the Advertisement or INVITATION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will transmit to all prospective Bidders of record such Addenda as City considers necessary in response to questions arising at the conference. Ora1 statements may not be relied upon and will not be binding or legally effective. 7. Bid Security 7.1. Each Bid must be accompanied by Bid Bond made payable to City in an amount of five (5) percent of Bidder's maximum Bid price on form attached, issued by a surety meeting the requirements of Paragraphs 5.01 of the General Conditions. 7.2. The Bid Bond of all Bidders will be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder fails to execute and deliver the complete Agreement within I O days after the Notice of Award, City may consider Bidder to be in default, rescind the Notice of Award, and the Bid Bond of that Bidder will be forfeited. Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all other Bidders whom City believes to have a reasonable chance of receiving the award will be retained by City until final contract execution. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised November 27, 2012 City Project No. 01372 00 21 13 - 6 INSTRUCTIONS TO BIDDERS Page 6 of 9 1 8. Contract Times 2 The number of days within which, or the dates by which, Milestones are to be achieved in 3 accordance with the General Requirements and the Work is to be completed and ready for 4 Final Acceptance is set forth in the Ab eement or incorporated therein by reference to the 5 attached Bid Form. 7 9. Liquidated Damages 8 Provisions for liquidated damages are set forth in the Agreement. 10 10. Substitute and "Or-Equal" Items 11 The Contract, if awarded, will be on the basis of materials and equipment described in the 12 Bidding Documents without consideration of possible substitute or "or-equal" items. 13 Whenever it is indicated or specified in the Bidding Documents that a"substitute" or "or- 14 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 15 City, application for such acceptance will not be considered by City until after the Effective 16 Date of the Ab eement. The procedure for submission of any such application by Contractor 17 and consideration by City is set forth in Parab aphs 6.OSA., 6.OSB. and 6.OSC. of the General 18 Conditions and is supplemented in Section O l 25 00 of the General Requirements. 19 20 11. Subcontractors, Suppliers and Others 21 22 23 24 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 11.1. In accordance with the City's Business Diversity Enterprise Ordinance No. 20020- 12-ZO11 (as amended), the City has goals for the participation of minority business and/or small business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office of the City Secretary_ The Bidder shall submit the MBE and SBE Utilization Form, Subcontractor/Supplier Utilization Form, Prime Contractor Waiver Form and/or Good Faith Effort Form with documentation and/or Joint Venture Fo�m as appropriate. The Forms including documentation must be received by the City no later than 5:00 P.M_ CST, five (5) City business days after the bid opening date. The Bidder shall obtain a receipt from the City as evidence the documentation was received. Failure to comply shall render the bid as non- responsive. - 11 _2. No Contractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Contractor has reasonable objection. 12. Bid Form 12.1. The Bid Form is included with the Bidding Documents; additional copies may be obtained from the City. 12.2. All blanks on the Bid Form must be completed by printing in ink and the Bid Form signed in ink. Erasures or alterations shall be initialed in ink by the person si�ning the Bid Form. A Bid price shall be indicated for each Bid item, alternative, and unit price item listed therein. In the case of optional altematives, the words "No Bid," "No Change," ar"Not Applicable" may be entered. Bidder shall state the prices, written in ink in both words and numerals, for which the Bidder proposes to do the work contemplated or fumish materials required. All prices shall be written legibly. In case of discrepancy between price in written words and the price in written numerals, the price in written words shall govern. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCITMENTS CONTRACT 2003 STM-S WII.LIS AVENUE Revised November 27, 2012 , City Project No. 01372 00 21 13 - 7 INSTRUCTIONS TO BIDDERS Page 7 of 9 i 2 3 4 5 6 7 8 9 10 l.l 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 12.3. Bids by corporations shall be executed i.n the corporate name by the president or a vice-president or other corporate officer accompanied by evidence of authority to sib . The corporate seal shall be affixed. The corporate address and state of incorporation shall be shown below the signature. 12.4. Bids by partnerships shall be executed in the partnership nasne and signed by a partner, whose title must appear under the signature accompanied by evidence of authority to sign. The official address of the partnership shall be shown below the signature. 12.5. Bids by limited liability companies sha11 be executed in the name of the fum by a member and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown. 12.6. 12.7. 12.8. 12.9. Bids by individuals shall show the Bidder's name and official address. Bids by joint ventures shall be executed by each joint venturer in the manner indicated on the Bid Form. The o�cial address of the joint venture shall be shown. A11 names shall be typed or printed in ink below the signature. The Bid shall contain an acknowledgement of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid sha11 be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance with Section 00 43 37 — Vendor Compliance to State Law Non Resident Bidder. 13. Submission of Bids Bids shall be submitted on the prescribed Bid Form, provided with the Bidding Documents, at the time and place indicated in the Advertisement or INVTTATION TO BIDDERS, addressed to City Manager of the City, and shall be enclosed in an opaque sealed envelope, marked with the City Project Number, Project title, the name and address of Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery�system, the sealed envelope shall be enclosed in a separate envelope with the notation "BID ENCLOSED" on the face of it. 14. Modification and Withdrawal of Bids 14.1. Bids addressed to the City Manager and filed with the Purchasing Office cannot be withdrawn prior to the time set for bid opening. A request for withdrawal must be made in writing by an appropriate document duly executed in the manner that a Bid must be executed and delivered to the place where Bids are to be submitted at any time prior to the openi.ng of Bids. After a11 Bids not requested for withdrawal are opened and publicly read aloud, the Bids for which a withdrawal request has been properly filed may, at the option of the City, be returned unopened. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised November 27, 2012 City Project No. 01372 00 21 13 - 8 INSTRUCTIONS TO BIDDERS Page 8 of 9 1 14.2. Bidders may modify their Bid by electronic communication at any time prior to the 2 time set for the closing of Bid receipt. 4 15. Opening of Bids 5 Bids will be opened and read aloud publicly at the place where Bids are to be submitted. An 6 abstract of the amounts of the base Bids and major alternates (if any) will be made available 7 to Bidders after the opening of Bids. 8 9 16. Bids to Remain Subject to Acceptance 10 All Bids will remain subject to acceptance for the time period specified for Notice of Award 11 and execution and delivery of a complete Ab eement by Successful Bidder. City may, at 12 City's sole discretion, release any Bid and nullify the Bid security prior to that date. 13 14 15 16 17 18 19 20 21 ?2 23 24 25 26 ?� ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 17. Evaluation of Bids and Award of Contract 17.1. City reserves the right to reject any or all Bids, including without limitation the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if City believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsive or the Bidder is unqualifieci or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by City. City also reserves the right to waive informalities not involving price, contract time or changes in the Work with the Successful Bidder. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. Discrepancies between words and figures will be resolved in favor of the words. 17.1.1. Any or a11 bids will be rejected if City has reason to believe that collusion e�sts among the Bidders, Bidder is an interested party to any litigation against City, City or Bidder may have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uncompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. City may consider the qualifications and experience of Subcontractors, Suppliers, and other persons and organizations proposed for those porEions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award. 46 173. City may conduct such investigations as City deems necessary to assist in the 47 evaluation of any Bid and to establish the responsibility, qualifications, and fmancial 48 ability of Bidders, proposed Subcontractors, Suppliers and other persons and 49 organizations to perform and furnish the Work in accordance with the Contract 50 Documents to City's satisfaction within the prescribed time. 51 C1TY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII..LIS AVENUE Revised November 27, 2012 City Proj ect No. 01372 00 21 13 - 9 INSTRUCTIONS TO BIDDERS Page 9 of 9 1 2 3 4 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 17.4. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. 17.5. If the Contract is to be awarded, it will be awarded to lowest responsible and responsive Bidder whose evaluation by City indicates that the award will be in the best interests of the City. 17.6. Pursuant to Texas Government Code Chapter 2252.001, the City will not award contract to a Nonresident Bidder unless the Nonresident Bidder's bid is lower than the lowest bid submitted by a responsible Texas Bidder by the same amount that a Texas resident bidder would be required to underbid a Nonresident Bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located. 17.7. A contract is not awarded until formal City Council authorization. If the Contract is to be awarded, City will award the Contract within 90 days after the day of the Bid opening unless extended in writing. No other act of City or others will constitute acceptance of a Bid. Upon the contractor award a Notice of Award will be issued by the City. 17.8. Failure or refusal to comply with the requirements may result in rejection of Bid. 18. Signing of Agreement When City issues a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counteiparts of the Agreement. Within 14 days thereafter Contractor shall sign and deliver the required number of counterparts of the Ab eement to City with the required Bonds, Certificates of Insurance, and all other required documentation. City shall thereafter deliver one fully si�ed counterpart to Contractor. END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised November 27, 2012 City Project No. 01372 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 003513-1 CONFLICT OF INTEREST AFFIDAVIT Page 1 of 1 SECTION 00 35 13 CONFLICT OF INTEREST AFFIDAVIT Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also referred to as "City") procurement are required to complete Conflict of Interest Questionnaire (the attached CIQ Form) and Local Government Officer Conflicts Disclosure Statement (the attached CIS Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may be downloaded from the website links provided below. http://«�uTw. ethics. state.tx.us/forms/CIQ.pdf httt�: i%u� ww. ethics. state.tx.us,%forrns/CIS .pdf � CIQ Form is on file with City Secretary � CIQ Form is being provided to the City Secretary � CIS Form is on File with City Secretary 0 CIS Form is being provided to the City Secretary BIDDER: i t'Y�[.-�S-Q 1�n5 -�'(� U.t�i i rM � By: c.i � �!'t Company �� • �0 X � "'�J Li' �-%� Signature: Address (%'� Prini) �� � W � 'X � [ � Title: �i �25 �! q� ��,-�-- d �—(� d -- City/State/Zip (Please Print) END OF SECTION 0 CTfY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 27, 2012 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B WILLIS AVENtTE City Project No. 01372 �t� �����- c�� s -r���s-r c��iEs-�-�� ���� FQr vencior or v�6�er person doing busir�ess �nrith tocaE goverrt�enfiaE enti�y This questionnaire reflects ehanges made to the 6aw by }�l.B. 1491, 80fh Leg., Regular Session. ! ' " , �' OFFICE USE OM1[LY This quesiionnaire is being filed in accordance with Chapter 176, Local Government Code Date Received by a person who has a business relationship as defined by Section 176.001(1-a} with a local governmenta! entity and the person meets requirecrtenfs under Section 176.006(a). By lawihis questionnaire must be filed with the records administrator ofthe lacaf govemmenial entity noi later than the 7fih business day after the date the person becomes aware of facts tnat require thestatement to be filed. See Section 176.046, Local Government Code. A person commits an offense if the person knowingly violates Section 176.006, Local Government Code. An ofFense under this section is a Class C misdemeanor. 0�ame af person who has a busEness relationship wiih foca! governmentai entiiy. ❑ Check this box if you are filing an update �o a previously �led qu�stionnaire. (The law requires thaf you file an updated completed questionnaire with the appropriate filing authority not later than the 7th business day affer the date the originally filed questionnaire becomes incomplete or inaccurate.) htame af iocal government afficer with wham fiier has employrrient or business relationship. Name of Qffiicer This section (item 3 including subparts A, B, C& D) must be completed for each afficer with whom the filer has an emplayment or other business relationship as defined by Section 176.001(1-a), Local Govemment Code. Attach additional pages to this Form CIQ as necessary. A. Is the iocal government officer named in this section receiving or likely to receive taxable income, other than investment income, from fhe filer of the questionnaire? � Yes � No B. Is the filsr of the questionnaire receiving or likely to receive taxable income, other than investment income, from or at the direction of the loca! government officer named in this section AND the taxable incame is not received from the lacal governmental entity? � Yes � No C. !s the filer of this questiannaire employed by a corporation or other business entity with respect to which the local government officer serves as an officer. or director, or holds an ownership of 10 percent or more? � Yes � No D. Describe each employment or business relationship with the local government officer named in this section. Signature of person daing business with the governmental entity Date Adopfed 06(29/2007 l.,.�� � ���/�� � � ��{�� ��� � �� �����s ��������� ���,�� � � (! nstruciions for complefiing and filing this farm are provided on the next page.} Tftis questionnaire reflects changes made to the iaw by H.B. '[491, 80th Leg., Regular Session. ����(;E ��E O��Y This is the notice to the appropriate local governmental entity that the following local government afficer has become aware of facts that require the afficer ta file this statement Date Received in accordance with Chapter 176, Local Government Code. 1 Name of Locat Government Officer 2 OfFice Held 3 �lame of person descriBed by Seciions 176.042(aj and 176.003(a), Local Government Cade 4 [3escription af the nature and extent of employment or other business re[atianship with person named in 'rtem 3 5 List gifis accepted by the tocaE gavemment afficer and any famity member, exclud'€ng gifts described by Section 'i76.003(a-1), if aggregate value of the gifts accepted from person named in item 3 exceed $250 during the 12-manth period describeci by Section 176.003(a}{2)(B} Date Gift Accepted Description of Gift Date GiftAccepted Qescription of Gift Date GiftAccepted Description of Gift (attach additional forms as necessary} 6 AFFIDAVIT I swear under penalty of perjury that the above statement is true and correct. I acknowledge that the disclosure applies to a family member (as defined by Section 176.d01(2), Local Govemment Code) of fhis local government officer. I also acknawledge that this statement covers the 12-month period described by Section 176.003(a), Local Governmenf Code. Signature ofi Loca[ Government O�cer AFFiX NOTARY STAM? ! SEAL ABOVE � Swom to and subscribed before me, by the said , this the day of , 20 , to certify which, witness my hand and seaf of office. Signature of officer administering oath Printed name of officer administering oath Title of o�cer administering oath Rdopted 06/29/2007 LOCAL GO!/ERNMENT OFFICER CONF�ICTS DISCLOSURE STATEMENT Section 176.003 of the Local Government Code requires certain local government officers to file this form. A "local government officer" is defined as a member of the governing body of a local governmental entity; a director, superintendent, administrator, president, or other person designated as the executive officer of the local governmental entity; or an employee of a local governmental entity with respect to whom the local governmentai entity has, in accordance with Section 176.005, extended the requirements of Sections 176.003 and 176.004. This form is required to be filed with the records administrator of the local governmental entity not later than 5 p.m. on the seventh business day after the date on which the officer becomes aware of the facts that require the filing of this statement. A local government officer commits an offense if the officer knowingly violates Section 176.003, Local Government Code. An offense under this section is a Ciass C misdemeanor. Please referto chapter 176 of the Local Government Code for detailed information regarding the requirement to file this form. � ` � . #, . , � . The fol%wing numbers correspond to the numbered boxes on the other side. 1. Name of Local Government Officer. Enterthe name ofthe local government officerfiling this statement. 2. Office Held. Enter the name of the office held by the local government officer filing this statement. 3. Name of person described by Sections 176.002(a) and 176.003(a), Local Government Code. Enter the name of the person described by Section 176.002, Local Government Code with whom the officer has an employment or other business relationship as described by Section 176.003(a), Local Government Code. 4. Description of the nature and extent of employment or business relationship with person named in item 3. Describe the nature and extent of the employment or other business relationship with the person in item 3 as described by Section 176.003(a), Local Government Code. 5. List gifts accepted, excluding gifts described by Section 176.003(a-1), if aggregate value of the gifts accepted from person named in item 3 exceed $250. List gifts accepted during the 12-month period (described by Section 176.003(a), �ocal Government Code) by the local government officer orfamily member of the officer, excluding gifts described by Section 176.003(a-1), from the person named in item 3 that in the aggregate exceed $250 in value. 6. Affidavit. Signature of local government officer. Adopted 06(29l2007 00 41 00 BID FORM Page 1 of 3 SECTION 00 41 00 BID FORM TO: The City Manager c/o: The Purchasing Department 1000 Throckmorton Street City of F.ort Worth, Texas 76102 FOR: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B Willis Avenue from Old Benbrook Rd. to Southwest Blvd. (S.H. 183) City Project No.: 01372 Units/Sections: SECTION A: Water Improvements SECTION B: Sanitary Sewer Improvements 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documenfs. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts all of the terms and conditions of the INVfTATION TO BIDDERS and INSTRUCTIONS TO BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2•2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will nrovide a valid insurance certificate meetinn all re�uirements within 14 days nf notificatinn nf award_ 2.3. Bidder certifies thaf this Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2.5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" rrieans the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public official in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made (a) to influence the bidding process to the detriment of City (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive City of the benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between iwo or more Bidders, with or without the knowledge of City, a purpose of which is io establish Bid prices at artificial, non- competitive levels. d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their prope,rty to influence their participation in the bidding process or affect fhe execution of the Contract. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Form Revised 20120327 City Project No. 01372 00 41 00 BID FORM Page 2 of 3 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Water Improvements b. Sanitary Sewer Improvements 4. Time of Completion 4.1. The Work wiil be complete for Final Acceptance within 210 days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones} within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optional at time of bid) f. Prequalification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 *If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 12 of the Instructions to Bidders 6. Total Bid Amount 6.1: Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 62. It is understood and agreed by the Bidder in signing this proposal that the total bid amount entered below is subject to verification and/or modification by multiplying the unit bid prices for each pay item by the respective estimated quantities shown in this proposai and then totaling all of the extended amounts. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Form Revised 20120327' City Project No. 01372 00 41 00 BID FORM Page 3 of 3 6.3. Totai Bid Amount: SECTION A: Water Improvements Bid $ i',�,�_o� D SECTION B: Saniiary Sewer Improvements Bid $ I��s��� �� Total Bid $ f � 1-j t� 3 7. Bid Submittal This Bid is submitted on ��'"t �-% "�13 by the entity named below. (Date) Respectfully submitted Receipt is acknowledged of the �nitial following Addenda: By_ Addendum No. 1:✓ ` (Signature) Addendum No. 2:'� \ �Y�� � ��$� Addendum No. 3. �� Addendum No. 4: (Printed Name) Title: �i�'� ) �`e 1/l'{� . Cornpany: ��-�S`Q ��b�l S'�U L'�a UYl � 1..�0 Address� � . � �--�� �a-- � �r �„ � X `-� q�� State of Incorporation: � -Q iC�tS Email: �� �� � Q� COY1G1.-�,�if?`C'• �0�✓l ' Phone: C�6i'`t� 53�i--1��-k-3 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120327 Corporate Seal: WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B WILLIS AVENUE City Project No. 01372 00 42 43 BID PROPOSAL Page 1 of 7 SECTION 00 42 43 PROPOSALFORM ITNIT P12ICE BID Bidder's Application Project Item Informauon Bidder s Proposal Pay Item Bid List Item SpeciScation B�d Quantity Unit of � Description Unit Price Bid Vaiue No. SecrionNo. Measuremeat SECTION A: WATER IMPROVEMENTS * CONTRACTOR TO PROVIDE UNIT PRICE/BID FOR ONLY ONE OF THE PIPE MATERIAL ALTERNATIVES FOR ITEMS 1 AND 2 DO NOT PROVIDE UNIT PRICE/BID POR EACH ALTERNATiVE 1A* 3311.0661 33 11 12 3,067 LF 24-inch PVC C905 Water Pipe N f,'�1C�� Dollars ' N O Cents �� � c�,'% (� �3D DO 16* 3311.0651 33 11 10 3,067 LF 24-inch Ductile iron Water Pipe N � 1.� )� Dollars N(� � 1 C�. Cents 1 C* 3311.0681 33 11 13 3,067 LF 24-inch Concrete AWWA C303 Water Pipe � � \� ) � Dollars � (' � � � Cents 1D* 3311.0671 33 11 14 3,067 LF 24-inch Steei AWWA C200 Water Pipe � � i✓ � c� Doilars � �j ` Cents � 1� J � 2A* 3305.2007 33 05 24 162 LF 24-inch Water Carrier Pipe 33 11 10 Ductile Iron w/Casing Spacers c. � oy f Dollars Cents ��5�� r%�'�� 2B' 3305.2007 33 05 24 162 LF 24-inch Water Carrier Pipe 33 11 13 Concrete C303 w/Casing Spacers __ i\� _; � 1� 3� Doilars Cents � � ) 2C' 3305.2007 33 05 24 162 LF 24-inch Water Carrier Pipe 33 11 14 Steei C200 w/Casing Spacers , ,��� � Doliars � t � � ^l Cents .�\/ L.�y 3 3311.0141 3311 10 21 LF 6-inch WaterPipe 33 11 12 � • �� Dollars � / �D , D � Cents C.P 4 3311.0241 33 11 10 1,966 LF 8-inch Water Pipe 33 11 12 1'r����� Doilars ?-�.D� LP� �ic�.d0 Cents c_�5 5 3311.0441 33 11 10 1,220 LF 12-inch WaterPipe 33 11 12 O V 1�Q. Dollars ��+5 ��j jp�-D� i Cents CITY OF FORT WORTH WATER AND SANITARY SEWER REP�ACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Form Revised 20120120 City Project No. 01372 00 42 43 BID PROPOSAL Page 2 of 7 SECTION 00 42 43 PROPOSAL FORM iJ1VIT PRICE BID Bidder's Application Project Item Information Bidders Proposal Pay Item B�d List Item Specification gid Quantity Unit of Desaiption Unit Price Bid Va1ue No. Secvon No. Measurement 6 3305.2004 33 05 24 162 LF 12-inch Water Carrier Pipe w/Casing Spacers �'is�e��l �J�- Dollars ��•(�� �� pb 7�J Cents D- � 3305.1107 33 05 22 162 LF 42-inch Casing Pipe by Other than Open Cut v�X �LP� � Dollars n � ��'Q� (.� Cents � 8 3305.1104 33 05 22 162 LF 24inch Casing Pipe by Other than Open Cut ��fn�li3�c.1t�Q��-i��''`I Dollars *� ��y�, , Cents � a� / �(.¢J �� "` CONTRACTOR TO PROVIDE ONLY UNIT PRICE/BID TO MATCH THE PIPE MATERIAL ALTERNATIVES BID ITEMS 1 AND 2 9A** 3311.0001 33 11 11 4 Tons Ductile fron Water Fittings w/Restraint >_ 24-inch �� T� 1� �- IQ, � 1�P�1 Doilars )� �,,y, �y-,� � � Cents CP��%'vb� a��w`�'� 96*" 3311.0021 33 11 13 1 LS C303 Water Pipe Fittings �`' O +J 1� Dollars � O � � � Cents 9C** 3311.0�11 33 11 14 1 LS Steel Water Pipe Fittings ' " " U � �� Dollars � � B � —1 Cents � � 10 3311.0001 33 11 11 1.2 Tons Ductile Iron Water Fittings w/Restraint <_ 12-inch �-% 1 i� ��i� ►�lCa Dollars OD Ov Cents ���• - !ta�D- 11 3312.3008 33 12 20 4 EA 24-inch Gate Valve w/Concrete V uIt �,qe n4yT��C� e, ��t rG'� � �%�. b�Lt�Y�Ql� Dollars !�J Cents ^at3�pD� ���OD0,00 12 3312.3002 33 12 20 2 EA 6-inch Gate Valve �'7��.i�u�C�.C4 Dollars q�UD � Oi�� v0 U Cents ! B 13 3312.3003 33 12 20 5 EA 8-inch Gate Valve �� Qv{�1�1 T�i� �'C� Dollars � J 5W .d� Cents � s � � � ' CITY OF FORT WORTH WATER AND SANITARY SEWER REPtACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Form Revised 20120120 City Project No. 01372 00 42 43 BID PROPOSAL Page 3 of 7 SECTION 00 42 43 PROPOSAL FORM UNIT PRICE��ID Bidder's Application Projea Item Information Biddds Proposal PaY ijem Bid List Item SpeciScation gid Quantity Unit of Desaiptioa Unit Price Bid Value No. Section No. Meuuremrnt 14 3312.3005 33 12 20 5 EA 12-inch Gate Valve � co t��Du� � a i� DCents �e�� � l �a ODD.O 15 3312.3105 33 12 20 1 EA 12-inch Cut-in Gate Valve �u Y" � �u ���-+' Doliars � �QD� 2�� `� ,� N Cents t � 16 0241.1302 02 41 14 1 EA Remove 6-inch Water Valve VN�Q, 1-jUNC2'�� Doilars �DD � � �� Cents OD• 17 0241.1303 02 41 14 5 EA Remove 8-inch Water Valve �i '�C �`� Dollars �( v NC7 Cents ��� `�•0 18 0241.1305 02 41 14 5 EA Remove 12-inch Water Valve �---- � D u r� Doilars ��� � /yy� (� Cents LI�� ' 19 0241.1354 02 41 14 1 EA Salvage 24-inch Water Valve � Dollars � (� �� Cents 20 0241.1602 02 41 14 2 EA Remove Concrete Water Vault i � ��P� U��Q Dollars ,-/, /� (�v Cents � � � W� ' 21 3312.1002 33 12 30 2 EA 2-inch Comb. Air Valve Assembly for Waterw/Concrete Vault ��e ���� 1'� Cents l.W� � ��� �O o 22 3312.002 33 12 40 2 EA Fire Hydrant � � �~� - cv 1v �- �,1 ollars � f� Cents �' �fv" 23 0241.1510 02 41 14 2 EA Salvage Fire Hydrant �l ��- �{�i�Q Dollars �F�,�j� /„oo Qd %U Cents �-�l Vl CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B WILLIS AVENUE City Project No. 01372 00 42 43 BID PROPOSA� Page 4 of 7 SECTION 00 42 43 PROPOSAL FORM ITNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Pay Item Bid List Item Specificatioa Bid Quantity Unit oF Desaiption Unit Price Bid Value No. Sectioallo. Measurtment 24 3312.0108 33 12 25 4 EA Connection to Existing 24inch Water main �Pe�+ (M�YIU Cents 3��� � ��C�^-� �Ci 25 3312.0117 33 12 25 13 EA Connection to Existing 4-inch to 12-inch Water Main �Ne, IC1�Y1� Doliars G� 2 Q.�� Cents � 1 �a � `� l� 26 0241.1218 02 41 14 5 EA 4-inch to 12-inch Water Abandonment Piug ��� ��� Doilars � Cents � � �� � 27 0241.1209 OZ 41 14 2 EA 24-inch Water Abandonment �� �� �� � � ��Y� Dollars �v M� C"J� Cents � �•�� 28 0241.1001 02 41 14 32 CY W ater Line Grouting �� Dollars `1� w / e � jy1.�� Cents �`1•�.� l.{/ `.cE.N/ 29 3312.2003 33 12 10 75 EA 1-inch Water Service ��`�}CE�iJ �u���Dollars l ,1/Y�D� � � J�^fj �� Cents B�7W ���`'� 30 3312.2001 33 12 10 75 EA 1-inch WaterService, Meter Reconnection � 1V C���t�L-1�� Doilars ry.�� --'j �xPti Uv Cents l� t ��'�� 31 3312.2004 33 12 10 20 LF 1-inch Private WaterService, Relocatio U n ,� ' v �� Dollars ��� �rDG�• Cents 32 3304.0101 33 04 30 1 LS Temporary Water Services �JU ��� � Dollars ��1�� � ����� Cents 33 3305.0110 33 05 26 1 LS Utility Markers ,;�{� QQ V��J � UN� � � Dollars a�lQ' Cents �� CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B N/ILLIS AVENUE Form Revised 20120120 City Project No. 01372 00 42 43 BID PROPOSAL Page 5 of 7 SECTION 00 42 43 PROPOSAL FORM T7NIT PRICE SID Bidder's Application �� ��� Project Item Information Bidda's Proposal �� � Pay Item Bid List Item Specification B.d Qu�� Unit of Description Unit Pricc Bid Value No. SecnonNo. Measurement 34 3201.0400 32 01 18 6,650 LF Temporary Asphalt Paviement Repair 4 �," Dollars �./-� � / / �--,�h �D Cents V ' te(�����J 35 3201.0114 32 01 17 60 LF 7-foo Wide Asphalt Pavement Repair, Residential �� X� � Dollars %�f'� �• Cents � �� "'— 36 3201.0614 32 01 29 70 SY Concrete Pavement Repair, Residentiai T 1 r pollars �D� �� � 3v Cents 37 3216.0301 32 16 '13 35 SY 9-inch Concrete Vailey Gutter, Residential 1— 9���' �� �� Dollars c�� ���� - Cents ��' 38 3216.0102 32 16 13 20 LF 7-inch Concrete Curb and Gutter ��"e� P ✓1 v � Dollars �j�� Cents ��� �-�`„� � 39 3291.0100 32 91 19 27 CY Topsoil ��Doilars q� 0 Cents � v � ���� 40 3292.0100 32 92 13 95 SY Block Sod Placement t V C1 Dollars �Qti ��`75 (,v Cents d 41 3305.0109 33 OS 10 4,200 Lf Trench Safety � tJ�Jb Doilars Qb Q/�j}� tJ" Cents � • v it--��' 42 3471.001 34 71 13 7 MO Traffic Controi �,�%� Ti �� ` � Doliars �,,/^y� Db u �, D!7 Cents CS1t-�/' I � 43 3125.0101 31 25 00 1 LS SWPPP > 1 Acre ����u� i Dollars � �/"�� �i Cents ` �-}"'`"� Section A: Water Improvements Bid Subtotal (, 03 � a ��3'�• D� • '��e Pay �id List Sp�cification �id Unit of a�r U�� Item Item No. Sectlon No. Quant) Measurement Descri tion Unit I'rice Bid Value �+�2,� 4A� 34i1.0003 3� 71 13 1 ER "('rafffcControi Detaiis (�U` '�}' � f2 � Dallars 2�n � ��� (7 Cents �3•v' `'" CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WI�LIS AVENUE Form Revised 20120120 City Project No. 01372 00 42 43 BID PROPOSAL Page 6 of 7 SECTION 00 42 43 PROPOSALFORM UNIT PRICE BID Bidder's Application Project Item Information Bidda's Proposal Pay ltem Bid List Item SpeciScarion gid Quantity Unit of Descriprioa Unit Price Bid Value No. SectionNo. Measurement SEWER IMPROVEMENTS BASE BID � 3331.4115 33 11 10 1,038 LF 8-inch Sewer Pipe 33 31 20 'S � ` Dollars �/� y.j Cents c.7✓� �� � � `D � 2 3339.1001 33 39 10 S EA 4-foot Manhole 33 39 20 .1 [�� Ql`� J c��ii ��� Doilars � Ci� a�,�' .� Cents ��� 3 3339.1003 33 39 10 0.1 VF 4-foot Manhole, Extra Depth 33 39 20 '��1. �i �l',� Doilars � [� � � Cents 4 3301.0101 33 01 30 8 EA Manho e Vacuum Testing � ���L � Doliars ��O ot} e �h,�� Cents l Vi/ 5 3305.0112 33 05 17 8 EA Concrete Collar �e ������ Doilars �Q L,�%� � Cents ��' �1 / �" � 6 0241.2201 02 41 14 2 EA Remove 4-foot Sewer Manhole 1--.� � � Dollars �/� Q � Cents �/ � �� D 7 3331.3101 33 31 50 27 EA 4inch Sewer Service i �'1.� � � CieMs �� °b aa ��o � 8 3331.3311 33 31 50 27 EA 4inch Sewer Service, Reconnection �1�1 `i� Dollars �Ob � � �� Cents 9 3301.0002 33 01 31 1,038 LF Post-Construction CCN Inspection � Dollars 5� � ��� DD � Cents 10 3305.0109 33 05 10 1,100 LF Trench Safety ��� Doliars �('1D �l' �� �� Cents • �� CITI' OF FORT WORTH - WATER ANO SANITARY SEWER REPLACEMENT _ STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WI�LIS AVENUE Fortn Revised 20120120 City Project No. 01372 00 42 43 BID PROPOSAL Page 7 of 7 SECTION 00 42 43 PROPOSALFORM IT1vIT PRICE SID Bidder's Application Project Item Iafoimation Bidder's Proposal PayItem Bid List Item Specification gid Quanrity Unit of Descripaon � linit Price Bid Value No. SectionNo. Measurement 11 3201.0400 32 01 18 1,400 LF Temporary Asphalt Paving Repair � �" Doliars � I'1 � � r I `� •�v Cents V 7 (�-� 12 3291.0100 32 91 19 14 CY Topsoil �, l� Dollars � 'j � Cents � � O� � 13 3292.0100 32 92 13 60 SY Block Sod Placement " �� � � � � � Doilars vD � /�1, v- Cents �.�` "' 14 3213.0401 32 13 20 675 SF 6-inch Concrete Driveway /� � �� DClents �O•�� C.Y� !'7V O� 15 3216.0102 32 16 13 135 LF 7-inch Concrete Curb and Gutter , �� 1�� Dollars bQ �j Cents ��' '—s ��� CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised 20120120 Section S: Sewer Improvements Sid Subtotal (� lSJ t`!. �. D O WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B WILLIS AVENUE City Project No. 01372 004313 BID BOND Page 1 of 1 SECTION 00 43 13 BID BOND KNOW ALL BY THESE PRESENTS: That we, (Bidder Name) hereinafter called the Principal, and (Surety Name) a corporation or firm duly authorized to transact surety business in the State of Texas, hereinafter called the Surety, are held and firmly bound unto the City, hereinafter called the Obiigee, in the sum of and No/900 Dollars ($ .00), the payment of which sum will be well and truly made and the said Principal and the said Surety, bind ourseives, our heirs, executors, administrators, successors and assigns, jointly and severally, firm by these presents. WHEREAS, the Principal has submitted a proposal to perform work for the following project of the Obligee, identified as WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B Wiilis Avenue from Old Benbrook Rd. to Southwest Blvd. (S.H. 183) NOW, THEREFORE, if the Obligee shali award the Contract for the foregoing project to the Principal, and the Principal shall satisfy all requirements and conditions required for the execution of the Contract and shall enter into the Contract in writing with the Obligee in accordance with the terms of such proposal, then this bond shall be null and void. If the Principal fails to execute such Contract in accordance with the terms of such proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal or fails to satisfy all requirements and conditions required for the execution of the Contract in accordance with the proposal, this bond shall become the property of the Obligee, without recourse of the Principal and/or Surety, not to exceed the penalty hereof, and shall be used to compensate Obligee for the difference between Principal's Total Bid Amount and the next selected Bidder's Total Bid Amount. SIGNED this day of By: , 20_ (Signature and Title of Principai) *By. (Signature of Attorney-of-F '�Attach Power of Attorney (Surety) for Attorney-in-Fact END OF SECTION Impressed Surety Seal Only CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Form Revised 20110627 City Project No. 01372 � 00 43 37 VENDOR COMPLIANCE TO STATE LAW Page 1 of 1 SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal place of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an .amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresident's principal place of business. is located. The appropriate blanks in Section A must be filled out by ali nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of , our principal place of business, are required to be percent lower than resident bidders by State Law. A copy of the statute is aftached. Nonresident bidders in the State of are not required to underbi�esident bidders. , our principal place of business, � The principai place of business of our company or our parent company or majority owner is in the State of Texas. BIDDER: io�s�a � � �'��Y�S�—�''LtC�tlUfl`�/� , � �d• 1 By: �� `� � �..� � �.��'� Signature) Title: �6�S,�.l�i'� 7— Date: 0 � — � � �, c,.� END OF SECTION CITYOF FORT WORTH WATERAND SANITARYSEWER REPLACEMENT - STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Form Revised 20110627 City Project No. 01372 00 45 11 - 1 BIDDERS PREQUALIFICATIONS Page 1 of 3 SECTION 00 4511 2 BIDDERS PREQUALIFICATIONS 4 l. Summary. All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31 st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Eanungs 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Reb lations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer ldentification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas TaYpayer ldentification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxpermit/ and fill out the 30 application to apply for your Texas tax ID. 3.1 (2) The fizm's e-mail address and fax number. 32 (3) The fum's DUNS number as issued by Dun & Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DLTNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the pri.nciples of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements. Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH WATER AND SANTfARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTR.ACT 2003 STM-B WII,LIS AVENUE Revised July 1, 2011 City Project No. 01372 00 45 11 - 2 BIDDERS PREQUALIFICATIONS Page Z of 3 i (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or reb stered with the Texas State 6 Board of Public Accountancy_ 7 (3) The accounting firm should state in the audit report or review whether g the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opiruon, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Parab aph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is detexmined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 2g prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b_ Bidder Ps�equalifzcation Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by fums wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 , contractor to demonstrate acceptable financial ability or performance. 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 2011 City Project No. 01372 1 2 3 4 5 6 7 8 � 00 45 11 - 3 BIDDERS PREQUALIFICATIONS Page 3 of 3 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid the prequalified work types until the expiration date stated in the letter. END OF SECTION CITY OF FORT WORTI� WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 2011 City Project No. 01372 004512-1 PREQUALIFICATION STATEMENT Page I of 1 1 SECTION 00 45 12 2 PREQUALIFICATION STATEMENT 3 Each Bidder for a City procurement is required to complete the information below by 4 identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the 5 maj or work type(s) listed. 6 Major Work Contractor/Subcontractor Company Name Prequalification T e Ex iration Date Water Improvements f' nr,r,►�S�r �'n�.S-�- n a r;%i t�"�.1 I� ����� c�..� 1� Sanitary Sewer r 1 � . - s 9 The undersigned hereby certifies that the contractors and/or subcontractors described in 10 the table above are currently prequalified for the work types listed. 11 12 BIDDER: 13 /� �4 �� P r 1�"�'�Lcr i�� � By: 15 Company 16 9` lo��� '� L-�- � O Si�s b 18 Address 20 `� � /� � i I Title: �%�,`1(�'� �'� 21 City/State/Zip (Please Print) 22 23 Date: I�� l y-�� 24 25 END OF SECTION 26 C1TY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 � }�� �F �, 004513-1 BIDDER PREQUALIFICATION APPLICATION Page 1 OF 8 SECTION 00 4513 BIDDER PREQUALIFICATION APPLICATION Date of Balance Sheet Name under which you wish to qualify Post Office Box Street Address (required) Telephone City City Fax Mark only one: Individual Limited Partnership General Partnership Corporation Limited Liability Company State State Email Zip Code Zip Code Texas Taxpayer ldentification No. Federal Employers Identification No. DITNS No. (if applicable) MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 1000 THROCKMORTON STREET FORT WORTH, TEXAS 76102-6311 AND MARK THE ENVELOPE: `BIDDER PREQUALIFICATION APPLICATION" CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 00 45 13 - 2 BIDDER PREQUALIFICATION APPLICATION Page 2 of 8 BUSINESS CLASSIF'ICATION The following should be completed in order that we may properly classify your firm: (Check the block(s) which are applicable — Block 3 is to be left blank if Block 1 andlor Block 2 is checked) � Has fewer than 100 employees and/or � Has less than $6,000,000.00 in annual gross receipts OR � Does not meet the criteria for being desib ated a small business as provided in Section 2006.001 of the Texas Government Code. The classification of your firm as a small or large business is not a factor in determin;ng eligibility to become prequalified. MAJOR WORK CATEGORIES Water Department Augur Boring - 24-inch diameter casing and less Augur Boring - Greater than 24-inch diameter casing and b eater Tunneling — 36-Inches — 60 —inches, and 350 LF or less Tunneling - 36-Inches — 60 —inches, and greater than 350 LF Tunneling — 66" and greater, 350 LF and greater Tunneling — 66" and b eater, 350 LF or Less Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller Water Distribution, Urban and Renewal, 8-inch diameter and smaller Water Distribution, Development, 12-inch diameter and smaller Water Distribution, Urban and Renewal, 12-inch diameter and smaller Water Transmission, Development, 24-inches and smaller Water Transmission, Urban/Renewal, 24-inches and smaller Water Transmission, Development, 42-inches and smaller Water Transmission, Urban/Renewa.l, 42-inches and smaller Water Transmission, Development, All Sizes Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches Sewer Bypass Pumping 42-inches and larger CCTV, 8-inches and smaller CCTV, 12-inches and smaller CCTV, 18-inches and smaller CCTV, 24-inches and smaller CCTV, 42-inches and smaller CCTV, 48-inches and smaller C1TY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Proj ect No. 01372 00 45 13 - 3 BIDDER PREQUALIFICATION APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED Sewer CIPP, 12-inches and smaller Sewer CIPP, 24-inches and smaller Sewer CIPP, 42-inches and smaller Sewer CIPP, All Sizes Sewer Collection System, Development, 8-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller _ Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer Interceptors, Urban/Renewal, 48-inches and smaller � Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes Sewer Cleaning , 24-inches and smaller Sewer Cleaning , 42-inches and smaller Sewer Cleaning , All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons A11 Sizes Transportation Public Works Asphalt Paving Construction/Reconstruction (LESS THAN 10,000 square yards) Asphalt Paving Construction/Reconstruction (10,000 square yards and GREATER) Asphalt Paving Heavy Maintenance (UNDER $1,000,000) Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction (LESS THAN 10,000 square yards) Concrete Paving Construction/Reconstruction (10,000 square yards and GREATER) Roadway and Pedestrian Lighting CTTY Ofi FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised December 20, 2012 City Project No. 01372 00 45 I3 - 4 BIDDER PREQUALIFICATION APPLICATION Page 4 of 8 List equipment you do not own but which is available by renting DESCRIPTION OF EQUIl'MENT NAME.AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? List previous business names: 3. How many years of experience in construction work has your organization had: (a) As a General Contractor: (b) As a Sub-Contractor: 4. *What protects has vour orQanization completed in Texas and elsewhere? CLASS LOCATION NAME AND DETAII.,ED CONTRACT OF DATE CITY-COUNTY- ADDRESS OF OFFICIAL TO AMOUNT WORK COMPLETED STATE WHOM YOU REFER '�If requalifying only show work performed since last statement. S.Have you ever failed to complete any work awarded to you?_ If so, where and why� 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a contract? If so, state the name of the individual, other organization and reason. 7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual, name of owner and reason. CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 004513-5 BIDDER PREQUALIFICATION APPLICATION Page 5 of 8 8. In what other lines of business are you financially interested?, 9. Have you ever performed any work for the City? If so, when and to whom do you refer? 10. State names and detailed addresses of all producers from whom you have purchased principal materials during the last three years. NAME OF FIRM OR COMPANY DETAII.,ED ADDRESS 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organization? PRESENT MAGNITUDE POSITION OR YEARS OF AND TYPE OF IN WHAT NAME OFFICE EXPERIENCE WORK CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 00 45 13 - 6 BIDDER PREQUALIFICATION APPLICATION Page 6 of 8 CORPORATION BLOCK PARTNERSHIP BLOCK If a corporation: If a partnership: Date of Incorporation State of Organization Charter/File No. Date of organization President Is partnership general, limited, or registered limited liability partnership? Vice Presidents File No. (if Limited Partnership) General Partners/Officers Secretary Limited Partners (if applicable) Treasurer LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Individuals authorized to sign for Partnership Officers or Managers (with titles, if any) Egcept for limited partners, the individuals listed in the blocks above are presumeci to nave iull signature authority for your firm uniess otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants this authority. CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December Z0, 2012 City Project No. 01372 14. Equipment 004513-7 SIDDER PREQUALIFICATION APPLICATION Page 7 of 8 $ TOTAL BALANCESHEET ITEM QUANTITY ITEM DESCRIPTION VALUE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various- TOTAL Similar types ot equipment may be lumped together. If your firm has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all your equipment. The equipment list is a representation of equipment under the control of the firm and which is related to the type of work for which the firm is seeking qualification. In the description include, the manufacturer, model, and general common description of each. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.,LIS AVENUE Revised December 20, 2012 City Project No. 01372 004513-8 BIDDER PREQUALIFICATION APPLICATION Page 8 of 8 BIDDER PREQUALIFICATION AFFIDAVIT STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized ta supply each party with any information, while this statement is in force, necessary to verify said statement. , being duly sworn, deposes and says that he/she is the of , the entity described in and which executed the foregoing statement that he/she is familiar with the books of the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affidavit. Firm Name: Signature: Sworn to before me this day of _ Notary Public Notary Public must not be an officer, director, or stockholder or relative thereof. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVb�NUE Revised December 20, 2012 City Project No. 01372 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 3'7 38 � 40 004526-1 CONTRACTOR COMPLIANCE WITA WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTR.ACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 01372. Contractor further certifies that, p.ursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: .-- �a—�c-i-S�Pr' �rt�r'u,L�J� ( �; L�By Company ��� l� ��I � S�c Address �� � � � �� Title: �t�j ) G� �9'1 �" City/State/Zip (Please Print) THE STATE OF TEXA.S § COUNTY OF TARRANT § BEFORE ME, the undersigned authority, on this day personally appeared Y t� D� Y,t-�S�Q � , known to me to be the person whose name is subscn' d o the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of �j �;�-�pY' �° ��-�YLLQ�[i8r-i'�: � L� for the purposes and consideration therein expressed and in the capacity therein stated. G�IVtEN UNDER MY HAND AND SEAL OF OFFICE N�� 2Ye�1�J� r' , 201� ��pYP��� VICKI L. 06SON � _��°�'� B°�= Notary Pubiic, State of Texas " =s:��.,c My Commission Expires ='''� 4*:-' November 12, 2017 '%�; ���.: END O]F SECTION the:State of Texas CTI"Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 20ll City Project No. 01372 004540-1 MINORITY AND WOMEN BUSINESS ENTERPRISE GOAL Page 1 of 1 i SECTION 00 45 40 2 MINORITY BUSINESS ENTERPRISE GOAL 4 APPLICATION OF POLICY 5 If the total dollar value of the contract is greater than $50,000, then the MBE subcontracting goal 6 may be applicable. If the total dollar value of the contract is $50,000 or less, the MBE 7 subcontracting goal is not applicable. 8 9 POLICY STATEMENT 10 It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority 11 Business Enterprises (MBE) in the procurement of all goods and services. All requirements and 12 regulations stated in the City's current Business Diversity Enterprise Ordinance apply to this bid. 13 14 MBE PROJECT GOAL 15 The City's MBE goal on this project is 10% of the total bid (Base bid applies to Parks and 16 Community Services). Note: If both MBE and SBE subcontracting goals are established for this 17 project, then an Offeror must submit both a MBE Utilization Form and a SBE Utilization Form to be 18 deemed responsive. 19 20 21 22 23 24 25 26 27 28 29 30 COMPLIANCE TO BID SPECIFICATIONS On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders axe required to comply with the intent of the City's Business Diversity Ordinance by one of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or 3. Good Faith Effort documentation, or; 4. Waiver documentation. Failure to comply with the City's M/WBE Ordinance, shall result in the Bid being considered non- responsive. Any questions, please contact the M/WBE Office at (817) 392-6104. 31 SUBMITTAL OF REQUIRED DOCUMENTATION 32 The applicable documents must be received by the Managing Department, within the following 33 times allocated, in order for the entire bid to be considered responsive to the specifications. The 34 Offeror.. shall deliver the MBE documentation in :person to the appropriate emp.loyee of the Managing 35 Department and obtain a da.te/time receipt: Sucli receipt shall be evidence tliat the City received the 36 documentation in the time allocated. A faxed co y will not be acce ted. 1. Subcontractor Utilization Form, if goal is met received by 5:00 p.m., five (5) City business days after or exceeded: the bid o ening date, exclusive of the bid o ening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form, if participation is less than the bid opening date, exclusive of the bid opening date. stated goal: 3. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after Utilization Form, if no MBE partici ation: the bid o ening date, exclusive of the bid o ening date. 4. Prime Contractor Waiver Form, if firm will received by 5:00 p.m., five (5) City business days after erform all subcontracting/su lier work: the bid o ening date, exclusive of the bid o ening date. 5. Joint Venture Form, if utilizing a joint venture received by 5:00 p.m., five (5) City business days after to meet or exceed goal. the bid opening date, exclusive of the bid openina date. 37 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 00�243-1 A�reement Pa�e 1 of 4 i ? � � 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 SEC'I'IOl� 00 52 43 AGREEMENT THIS AGREEMENT, authorized on January 14, 2014 is made by and between the City of Fort Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, ("City"), and Conatser Construction TX, LP, authorized to do business in Texas, acting by and through its duly authorized representative, ("Contractor"). City and Contractor, in consideration of the mutual covenants hereinafter set forth, ab ee as follows: Article l. WORK Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: Water and Sanitary Sewer Replacement Contract 2003 STM-B Willis Avenue Citv Proiect No. 01372, DOE No. 4057 Article 3. CONTRACT TIME 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. ����� 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 210 days after the date when the 24 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 25 33 Liquidated damages 26 Contractor recob izes that tiine is of the essence of this Ab eement and that City will 27 suffer financial loss if the Work is not completed within the times specified in Parab aph 28 3.2 above, plus any extension thereof allowed in accordance with Article 12 of the 29 General Conditions. The Contractor also recob izes the delays, expense and difficulties 30 involved in proving in a legal proceeding the actualloss suffered by the City if the Work 31 is not completed on time. Accordingly, instead of requiring any such proof , Contractor 32 agrees that as liquidated damages for delay (but not as a penalty), Contractor shall pay 33 City Six Hundred — Fifty & 00/100 Dollars $6( 50•QO) for each day that expires after the 34 time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter 35 of Acceptance. CITY OF FORT WORTH WATER AND SANITAFZY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 00 �2 43 - 2 A�reement Pa�e 2 of 4 �����K�]►�111.7_tif1�17 �7.�[�1 �1 2 City ab ees to pay Contractor for performance of the Work in accordance with the Contract 3 Documents an amount in current funds of One Million, One Hundred Fortv-Nine Thousand, 4 Three Hundred Thirtv-Four and 00/100 --------------- Dollars ($ 1,149,334.00 ). 5 Article 5. CONTRACT DOCUMENTS 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ?? ?; 24 25 26 ?� ?g 29 30 31 32 33 34 35 36 37 38 6 5.1 CONTENTS: A. The Contract Documents which comprise the entire ab eement between City and Contractor concerning the Work consist of the following: l. This Ab eement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non-Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specific) b. Current Prevailing Wage Rate Table c. Insurance ACORD Form(s) d. Payment Bond e. Performance Bond £ Maintenance Bond g. Power of Attorney for the Bonds h. Warker's Compensation Affidavit i. MWBE Commitment Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. CITY OP FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 00 52 43 - 3 Agreement Page 3 of 4 1 Article 6. INDEMNIFICATION 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 1.2 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under ihis contract. This indemnification provision is specificallv intended to operate and be effective even if it is alleaed or proven that all or some of the damaaes bein� sou�ht were caused, in whole or in part, bv anv act, omission or negliaence of the city. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specificallv intended to operate and be effective even if it is alleged or proven that all or some of the damaaes being sought were caused, in whole or in part, bv anv aci, omission or negli�ence of the city. Article 7. MISCELLANEOUS 23 7.1 Terms. 24 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 25 have the meanings indicated in the General Conditions. 26 7.2 Assignment of Contract. 27 This Agreement, including a11 of the Contract Documents may not be assigned by the 28 Contractor without the advanced express written consent of the City. 29 7.3 Successors and Assigns. 30 City and Contractor each binds itself, its partners, successors, assigns and legal 31 representatives to the other party hereto, in respect to all covenants, agreements and 32 obligations contained in the Contract Documents. 33 7.4 Severability. 34 Any provision or part of the Contract Documents held to be unconstitutional, void or 35 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 36 remaining provisions shall continue to be valid and binding upon CTTY and 37 CONTRACTOR. 38 7.5 Governing Law and Venue. 39 This Agreement, including all of the Contract Documents is performable in the State of 40 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 41 Northern District of Texas, Fort Worth Division. CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLJMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Project No. 01372 00 52 43 - 4 Agreement Page 4 of 4 1 7.6 Other Provisions. 2 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 3 classifed, promulgated and set out by the City, a copy of which is attached hereto and 4 made a part hereof the same as if it were copied verbatim herein. 5 7.7 Authority to Sign. 6 7 8 9 10 11 12 13 Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WITNESS WHEREOF, City and Contractor have executed this Ab eement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties ("Effective Date") Contractor: Co1v�TSER City of Fort Worth CONSTRl�CTION TZ, LP � �/ �� By:. �T�Q�III�a---� Fernando Costa By: Assistant City Manager (Sign "�e) � ' Date ��.28�� --� �� �E �-R-'S W NA�' S Etit. Attest: (Printed Name) Jerry Conatser, Presidcnt of Conatser Mana,ement Group, Ine G.P. (Seal) Title: 1�dC�TeSS: P�O. Box 15448 Fort Worth, TX 76119 M&c C 2�(043 Date: JAN 14 ?_�l4 „ � ��1 ' �` �y �'1 � ���Q �� � �GG O ��_ � o� o,� m �' % o �9 �- � `� ° 0 0� � $o � /���, ��y � O VD �����0000'-`�°�� �°��� , City/State/Zip: Approved as to Form and Legality: Date 14 15 16 17 is 19 20 21 22 23 �F�ICIAL RECORf� C�"6"V SECREi'ARY (F1'. WORTH, TX � �t Y1/L — • rY�,� C �n t� m - �rt�� Assistant City Attorney APPROV RECOMMENDED: ,, 1 �? � �'" S. Frank Crumb, P.E. Director, Water Department CITY OF FORT WORTH WATER AND SANTTARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Project No. 01372 006113-1 PERFORIvi.�'CE BOND Pa�e 1 of 2 Bond No: TXC605727 1 � 3 4 � 6 7 8 9 10 Il 12 13 14 l� 16 17 THE STATE OF TEXAS COUNTY OF TA.RRANT SECTION 00 bl 13 PERFOR.MANCE BOND . KI\'OW ALL BY THESE PRESENTS: That we, (;onarse .onGrnu�tion TX LP , known as "Principal" herein and Merchants Bonding Companv (i�h�.tual) , a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City' herein, in the penal One Million, One Hundred Forty-Nine Thousand, sum of, Three Hundred Thirty-Four and 00/100 ----- Dollars ($ 1,149,334.00 ), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bi�Zd ourselves, our heirs, executors, admiuistrators, successors and assigns, jointly and severally, fimzly by these presents. 18 VVHEREAS, the Principal has entered into a certain written contract with the City 19 awarded the �� day of ciAJ�1U�.(Z�( , 20�, which Contract is hereby referred to and 20 made a part hereof far all purposes as if fully set forth herein, to furnish all materials, equipment 21 labor and other accessories defined by law, in the prosecution of the Worl�, including any Change 22 Orders, as provided for in said Contract designated as Water and Sanitary Se�Fer Replacement 23 Contract 2003 STM-S �Villis Avenue; Citv Proiect No. 01372 24 NO��, THEREFORE, the condition of this obligation is such that if the said Principal 25 shall faithfully perform it obligations under the Contract and shall in all respects duly and 26 faithfully perform the Work, including Chan�e Orders, under the Contract, according to the plans, 27 specifications, and contract documents therein referred to, and as well during any period of 28 extension of the Contract that may be b anted on the part of the City, then this obligation shall be 29 and become null and void, otherwise to remain in full force and effect. 30 PROVIDED FURTHER, that if any le�al action be filed on this Bond, venue shall Iie in 31. Tarrant County, Texas or the United States District Court for the Northem District of Texas, Fort 32 Worth Division. CITY OF FORT WORTH WATER A.ND SAI�'ITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July I, 2011 City project No. 01372 006113-2 PERFORMANCE BOND Page Z of 2 ` I� � 1 ? 3 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all Iiabilities on this bond shall be determined in accordance with the provisions of said statue. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the ��'� day of 6 JAt�UARY , ?o�. � 8 9 10 11 12 13 14 15 16 17 18 19 20 �1 �� 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 ATTEST: (Principal) Secretary �.�� ��� Witness as to Principal � ��6����rl� Witness as to Surety Nikki L. Adams PRINCIPAL: Conatser Const tion TX LP / BY: , Si�nature y Jerry Conatser, President of Conatser Management Group,Inc., GP Name and Title Address: P. 0. Box 15448 Fort Worth. TX 76119 SURETY: Nlerchants Bonding CoQroany iMutual) BY: S i�nature Glenna S. Davis Attorney—in—Fact Name and Title Address: 2100 Fleur Ilrive Des Moines, Iowa 50321 Telephone Number: 80o-678-8171 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City project No. 01372 00 61 14 - I PAYMENTBOND Pa�e 1 of 2 1 � 3 4 5 6 8 9 10 11 12 13 14 15 16 17 THE STATE OF TEKAS COUNTY OF TARRANT �/ SECTION 00 61 14 PAYI�ZENT B OI�'D . Bond No: 'TXC605727 K1�TOW AI.,L BY THESE PRESENTS: That w�e, Conatser Construction TX, LP , known as "Principal" herein, and Merchants Bonding C_Kpanv (Mutual) , a corporate surety (sureties), duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and fzrmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of the State of Texas, known as "Cit�' herein, One Million, One Hundred Forty—Nine Thousand, in the penal sum of Th P u,mc�rPd Thirty Four and 00/100 ----- Dollars (� 1,149,334.00 ), lawful money of the United States, to be paid in Fort ��orth, Tarrant County, Texas, for the payment of which sum well and truly be made, we bind ourselves, our heirs, executors, adnvnistrators, successors and assions, jointly and severally, firmly by these presents: 18 ���REAS, Principal has entered into a certain written Contract with City, awarded the 19 l4� day of J�tt�Ul�t{Z`� , 20�, which Contract is hereby referred to and 20 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 21 labor and other accessories as defined by law, in the prosecution af the Work as provided for in 22 said Contract and desi�nated as Water and Sanitary Sewer Replacement Contract 2003 23 STM-B Willis Avenue; Citv Proiect No. 01372 24 25 26 ?� ?g I�'OW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shali pay all monies owing to any (and alI) payment bond beneficiary (as defined in Chapter 22�3 of the Texas Government Code, as amended) in the prosecution of the VJork under the Contract, then this obligation shaII be and become null and void; otherc��ise to remain in fu11 force and effect. 29 This bond is made and executed in compliance ���ith the provisions of Chapter 22�3 of the �0 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 31 accordance with the provisions of said statute. � CITY OF FORT WORTH WATER AND 5.42�'ITARY SE�VER REPLACEMENT S7'ANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised Iuly I, 201 I City Project No. 01372 00 61 14 - 2 PAYMEIv'T BOND Pa�e 2 of2 �� 1 IN WTTI\TESS �VHEREOF, the Principal and Surety have each SIGI�'ED and SEALED 2 this instrument by duly authorized agents and officers on this the � day of � �iA1,U��.�i , 20�. 4 ATTEST: (Principal) Secretary �h� �(,��- Witness as to Principal ATTEST: (Surety) Secretary `�� �%����-- � Witness as to Surety Nikki L. Adams � 6 7 8 9 10 PRINCIPAL: Conatser Construction TX, I.P BY: � i ature Jerry Conatser, President of Conatser Management Group, Inc., GP Name and Title Address: P. 0. Box 15448 Fort Worth, � 76119 SURETY: Merchants Bondintr Cc�any (Mutual) BY: � Si�na re Glenna S. Davis Attorney-in Fact I�Tame and Title Address: 2100 Fleur Drive Des Moines, Iowa 50321 Telephone I�Tumber: 8��g-8171 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to si�n such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. 11 END OF SECTION 12 CITY OF FORT WORTH WATER A.�'D SANITARY SEWER REPLACENIE;vT STA.'�DARD CONSTRliCTION SPECIFICATION DOCLJMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised Ju]y 1, 201 I City Project No. 01372 006119-I MAIi�iTENANCE BOND Page 1 of 3 1 � 3 4 � 6 7 8 9 10 il 12 13 14 1J 16 17 18 19 20 21 ?2 23 24 ?� 26 ?� ?g 29 30 31 32 33 34 THE STATE OF TEXAS COITNTY OF TA]E2RANT SECTION 00 61 19 �d No: TXC605727 MAINTENANCE BOND § § h'1\'OW ALL BY THESE PRESENTS: § That we Conatser Construction TX, LP , known as "pI'lT1CIpd1" herein and _�r�hanr� p,�,nr�;n�o- r�i �n� (1�hlft�al ) , a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, kno«n as "Surety" herein (whether one or mare), are held and firmly bound unto the City of Fort �TJorth, a municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the sum of �� �'llion, One Hundred Forty-Nine Thousand, ThrFP H,m�lr�r� 'Ph;,-ty-�'our and 00/]00 ---- Dollars ($ 1,149,334.00 ), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, fu�mly by these presents. `�HEREAS, the Principal has entered into a certain written contract with the City awarded the�� day of JAt�UQRY , 20�, which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to fumish all materials, equipment labor and other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the "��ork") as provided for in said contract and designated as Water and Sanitary Se�ver Replacement Contract 2003 STM-B ��illis Avenue• Citv Proiect No 0137�; and WHEREAS, Principal binds itself to use such materials and to so construct the Work in aceordance with the plans, specifications and Contract Documents that the Work is and «�i11 remain free from defects in materials or workmanship for and during the period of t-��o (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and WHEREAS, Principal binds itself to repair or reconstruct the ��Jork in whole or in part upon receiving notice from the City of the need therefor at any tune within the Maintenance Period. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STAlv'DARD CONSTRUCTION SPECIFICATION DOCUMEi�ITS CONTRACT 2003 STM-B WILLIS AVENiJE Revised July I, 2011 City Project No. 01372 00 61 19 - 2 MAINTEi�IANCE BOND Pace 2 of 3 1 ? NOW THEREFORE, the condition of this obligation is such that if Principal shall 3 remedy any defective ��ork, for which timely notice was provided by City, to a completion 4 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in � full force and effect. � 6 7 PROVIDED, HO��EVER, if Principal shall fail so to repair or reconstruct any timely 8 noticed defective �T�ork, it is aQreed that the City may cause any and all such defective Work to 9 be repaired and/or reconstructed with all associated costs thereof bein� bome by the Principal and 10 the Surety under this Maintenance bond; and 11 12 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 13 Tarrant County, Texas or the United States District Court for the I�Torthern District of Texas, Fort 14 Worth Division; and l� I6 PROVIDED FURTfiER, that this obli�ation shall be continuous in nature and 17 successice recoveries may be had hereon for successive breaches. 18 19 CITY OF FORT WORTH WATER P„\rD SANITARY SEWER REPLACEMENT STA.�TDARD CONSTRUCTION SPECIFICATION DOCLME;�'TS CONTR.ACT 2UO3 STM-B WILLIS AVENLE Revised July 1, 2011 City Project No. 01372 00 61 19 - 3 MAI'�'TENANCE BOND Page 3 of 3 � 41 � � ` I'�i T�VITl\TESS �VHEREOF, the Principal and the Surety have each SIGI�TED and SEALED this instrument by duly authorized agents and officers on this the �� day of JAr�u�c�Y , �o�- 1 2 ; 4 ATTEST: (Principal) Secretary ���hc� n�.�c,�- Witness as to Principal ATTEST: PRINCIPAL: Conatser Construction 1X, LP BY: _ i;n ture Jerry Conatser President of Conatser Management Group, Inc. GP Name and Title Address: P. 0. Box 15448 Fort Worth, TX 76119 SURETY: Mercharits Bonding Company (Nhitual) BY: � �gnature Glenna S. Da�is, Attorney-in-Fact I`Tame and Title Address: 2100 Fleur I?rive (Surety) Secretary Des Moines, IA 50321 ��'-e��-� �� ���J Witness as to Surery Telephone Number: 800-678-8171 Nikki L. Adams "Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showin� that this person has authority to sign such obli�ation. If Surety's physical address is different from its mailin� address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. � 6 7 8 9 10 11 12 13 14 1� 16 17 18 19 20 21 ?2 23 24 ?� 26 ?'7 ?g 29 30 31 32 33 34 35 36 37 38 39 40 CITY OF FORT WORTH WATER AND SANITARY SEWER REPL.4CEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMEIvTS CONTRACT 2003 STM-B WII.LIS AVEIv'iJE Revised 7uly 1, ZO11 City Project No. 01372 �ViERC�-�ANT�S� BONDING COMPANY� POWER OF ATTORNEY Know Ali Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations duly organized under the laws of the State of lowa (herein coilectivety called the "Companies"), and that the Companies do hereby make, constitute and appoint, individually, Carolyn Maples; Glenna S Davis; John R Wiison of Fort Worth and State of Texas their true and lawfui Attomey-in-Fact, with fuii power and authority hereby conferred in their name, place and stead, to sign, execute, acknowledge and deliver in their behaif as surety --- any and ali bonds, undertakings, recognizances or other written obiigations in the nature thereof, subject to the limitation that any such instrument shali not exceed the amount of: SEVEN MILLION FIVE HUNDRED THOUSAND ($7,500,000.00) DOLLARS and to bind the Companies thereby as fully and to the same extent as if such bond or undertaking was signed by the duly authorized officers of the Companies, and all the acts of said Attorney-in-Fact, pursuant to the authority herein given, are hereby ratified and confirmed. This Power-of-Attorney is made and executed pursuant to and by authority of the foliowing By-Laws adopted by the Board of Directors of the Merchants Bonding Company (Mutual} on April 23, 2011 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 24, 2011. "The President, Secretary, Treasurer, or any Assistant Treasurer or any Assistant Secretary or any �ce President shail have - power and authority to appoint Attomeys-in-Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, coniracts of indemnity and other writings obiigatory in the nature thereof. The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attomey or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seai when so used shall have the same force and effect as though manually fixed:' In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 4th day of OCtober , 2013 . STATE OF IOWA COUNTY OF POLK ss. .,�*-� toia,�� •-. �g��`0� ��Q�:+���' Z��` 2 1�3 �'.c�? J�.�yn� • . . ���,�� �: .._ .�Y• �,• ... .•---•. . • o�N� co�•., : ���?O� P � R A9 •� ; V '�j,.:�i �1-y-:? -O- ��.�� 2: : ,3• 'a� 1933 •c' �•yJ�; • •;�� :� . .��• • � •''`1 : .� . '••...••� MERCHANTS BONDING COMPANY (MUTUAL) MERCHANTS NATIONAL BONDING, INC. By �� President On this 4th day of October , 2013, before me appeared Larry Taylor, to me personally known, who being by me duly swom did say that he is President of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAI BONDING, INC.; and that the seals affixed to the foregoing instrument is the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. In Tes6mony Whereof, I have hereunto set my hand and affixed my Official Seal at the City of Des Moines, lowa, the day and year first above written. ; MARANDA GREENWALT � �`t �� +�,, �,���,�. : ��,�1 G�:��� _�� Commission Number 770312 � � My Commission Expires OM1' October 28, 2014 Notary Public, Polk County, lowa STATE OF IOWA COUNTY OF POLK ss. I, William Warner, Jr., Secretary of the MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER-OF-ATTORNEY executed by said Companies, which is still in full force and effect and has not been amended or revoked. In Witness Whereof, I have hereunto set my hand a�d affixed the seal of the Companies on this'��f{� day of Jb��bQ� �� � . " 1 �,... ��,�, POA 0014 (11/11) �,•�a*,-� 10 N,�� �•, ,�.°�•'.4Q� DRQ� ��' . �:'`` _0- `�:L '�'• 2i:v3 �.n ;J����.��. �:�;`� ;d .. �t �� ,. .. �...... . �' G C ' ��N .. O,y�•. ;�o; ORP09 •:°9' . • 'G 9�•y<: :►y-��' -o- o; : : y 1933 .� c: � J'•. . ��:� .••d��y � `�a. .� •...... "�iG����A c/ G✓!� .��'-��; Secretary MERC�-�ANT�S� BONDING COMPANY�, MERCHANTS BONDING COMPANY (MUTUAL} • MERCHANTS NATIONAL BONDING. INC. 2100 FLEUR DR[VE • DES MOINES. IOWA 50321-1158 �(800) 678-8171 �(515) 243-3854 FAX IMPORTANT NOTICE To obtain information or make a complaint: You may contact your insurance agent at the telephone number provided by your insurance agent. You may call Merchants Bonding Company (Mutual) toll-free telephone number for information or to make a complaint afi 1-800-678-8171 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance at: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http=//www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state.tx.us PREMIUM AND CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. SUP 0032 TX (5/12) . __. 1 2 3 4 5 6 7 S 9 10 11 12 I3 14 15 16 17 18 19 20 21 22 23 006125-1 CERTffICATE OF INSURANCE Page 1 of i SECTION 00 61 25 CERTIFICATE OF INSUR:ANCE END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 WATER AND SANITARY SEWER REPLACEMENT CONTR.ACT 2003 STM-B WILLIS AVENUE City Project No. 01372 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT CIT'Y OF FORT WORTTi STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS Revision: Decanba21,2012 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1— Definitions and Terminology ..............................................................................: ...............�---........1 1.01 Defined Terms.....-� ...................................................................•�----�--�--��-----....................---��-------•--1 1.02 Terminology .................��--�-----�-�---...............................................--•---�---�-------.........................---�---6 Article2— Preliminary Matters ...................�----........................--------.............-----�-�-•---��----................------•-��------. 7 2.01 Copies ofDocuments-------�--�----��--�---...---� ................••----...............-�--�---�-�-------...---•--..........-•-.•�--�----� 2.02 Commencement of Contract Time; Notice to Proceed ................................................................ 7 2.03 Starting the Work .............................�--�--••-�---�-�-�-�--....._..----�-��------..................----�--•------��---............ 8 2.04 BeforeStartingConstxuction .......................................•-•--�---------..._.......................---�---�---............8 2.05 Preconstruction Conference ...........................................•---•--�---�----........................-•-----�---•�----...... 8 2.06 PublicMeeting ...............................................................•�-------............................----�--...................8 2.07 Initial Acceptance of Schedules ..........................------�-------..............----...-------.....-----...................... 8 Article 3— Contract Documents: Intent, Amending, Reuse .....................................................•----................... 8 3.01 Intent ................................•---•------•--��--�-�--��---��-----�----------�--�-•-•--.......-�---......---�---�---------.........-•-•-�---. 8 3.02 Reference Standards.......----�-------�---�------------•�-•---�•-------------------------•-�------��-----•--�------.............-----�---9 3.03 Reporting and Resolving Discrepancies .................................•----.......-•--.---.....--•-••----.--.---.._.........9 3.04 Amending and Supplementing Contract Documents .............................................:...................10 3.05 Reuse ofDocuments .-------•---.....-•-----• ......................................•-�--��----��---��-----..........--�-��--�----�---..10 3.06 Electronic Data ......................••-----.....-•-------�------�-------------------•�----..........................-�---•--•--.......----11 Article 4— Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points ......................•-•-----••------...--��---��---•--............................----..._...............11 4.01 Availability of Lands ......................................:................�-�----•--..........................-•----.................11 4.02 Subsurface and Physical Conditions ---------------------------------------------•----••---•-••----------.........---....---..12 4.03 Differing Subsurface or Physical Conditions ..............................................................:..............12 4.04 Under�ound Facilities .---• ......................................................�--•---........................----.................13 4.05 Reference Points ...............................................�---......---...........................--•---...----..............-•----.14 4.06 Hazardous Environmental Condition at Site---------• ............................•---.---------...............-.-----....14 Article 5— Bonds and Insurance -� .....................................•-•�---•--•-�---�---�--------............................---.........---------16 5.01 Licensed Sureties and Insurers ........................................•---•-----.......................--�----.............-•---.16 5.02 Performance, Payment, and Maintenance Bonds .........................•-----••-----.---.............................16 5.03 Certificates of Insurance ......................................................................................................•--•---16 5.04 Contractor's Insurance .................................�-----�-�-��---�-�----................----•--.........---....._..-•-----.......18 5.05 Acceptance of Bonds and Insurance; Option to Replace ...........................................................19 Article 6 — Contractor's Responsibilities ...--�-�----• ...........................................................................................19 6.01 Supervision and Superintendence.--�-�--�� .........................................•--�---------..........---..................19 CiTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 6.02 Labor; Working Hours ................................................................................................................20 6.03 Services, Materials, and Equipment ...........................................................................................20 6.04 Project Schedule ..........................................................................................................................21 6.05 Substitutes and "Or-Equals" ........................................................................................--••----.......21 6.06 Concerning Subcontractors, Suppliers, and Others ..........:.........................................................24 6.07 Wage Rates .........................................................................................�--�-•�-•------�---••--�-•�----••---•---.25 6.08 Patent Fees and Royalties ..................................................•---.......-----.............................:...........26 6.09 Permits and Utilities .............................�----..................................................................................27 6.10 Laws and Regulations .................................................................................................................27 6.11 TaYes ...............................................................•-•--.......................................................................28 6.12 Use of Site and Other Areas .....................:.................................................................................28 6.13 Record Documents ......................................................................................................................29 6.14 Safety and Protection .................................................................................................................. 29 6.15 Safety Representative...........-�-�---• ......................�-----.............---...-----�--•--.....................................30 6.16 Hazard Communication Programs .............................................................................................30 6.17 Emergencies and/or Rectification ..................�---•----.........-•--•-••-•-�-----.............---.......----...............30 6.18 Submittals ...............................�----.............................---.....................-----�-----.......-�-----......-----••-�---31 6.19 Continuing the Work ......................••---.................................................................................-•---.. 32 6.20 Contractor's General Warranty and Guarantee ..........................................................................32 6.21 Indemnification ...................................•---..................................................................................33 6.22 Delegation of Professional Design Services ..............................................................................34 6.23 Right to Audit ........................................�---.........................-•---....................................................34 624 Nondiscriinination ......................................................................•-----...........................................35 Article 7- Other Work at the Site ...........................................•--......._............--•-�---............._.......---�--..............35 7.01 Related Work at Site ..........:.................................................................................•----..................35 7.02 Coordination :...............................................................................................................................36 Article 8 - City's Responsibilities ...........................................................................•----.............................------36 8.01 Communications to Contractor .............:........................................�--.......:..................................36 8.02 Ftunish Data ........................................................................................................�-•----..................36 8.03 Pay When Due ...................................................�--•---.......----•---..._...............................................36 8.04 Lands and Easements; Reports and Tests ...................................................................................36 8.05 Change Orders ...................................................................••-•--�--�•---............................................36 8.06 Inspections, Tests, andApprovals ..............................................................................................36 8.07 Limitations on City's Responsibilities ................................................................:......................37 8.08 Undisclosed Hazardous Environmental Condition .............:......................................................37 8.09 Compliance with Safety Program ............................................................................................... 37 Article 9- City's Observation Status During Construction ........................................................................... 37 9.01 City's Project Representative ........................�---.........................................................................37 9.02 Visits to Site .............................................................................:.................................................. 37 9.03 Authorized Variations in Work ..............:...................................................................................38 9.04 Rejecting Defective Work ..........................................................................................................38 9.05 Determi.nations for Work Performed ..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38 CIT'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 Article 10 - Changes in the Work; Clai.ms; Extra Work ................................................................................38 10.01 Authorized Changes in the Work .------� .......................:•---..............-�---�------•--•--..........-----------�--...38 10.02 Unauthorized Changes in the Work ...........................................................................................39 10.03 Execution of Change Orders .........................�•--�--........................_........................-----.................39 10.04 Extra Work .............................................�--.............................-�-�---.....-----•---------•---.........-•----------.39 10.05 Notificationto Surety ......................................................................................•---�------............--�--39 10.06 Contract Claims Process ....-� .....................•----�-----�---..................-•---.........---�----....-------......-•--------40 Article 11- Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement ...................... 41 11.01 Cost of the Work.........-� ...............................................•-------�----......--------................_...................41 11.02 Allowances-�--� ..................................•----•---............................--�----.....-----------................----...........43 11.03 Unit Price Work ..................................�----.....................---•-�-�--.................................---�--..........---44 11.04 Plans QuantityMeasurement-----� .................�-�-�-�--�--��-•----........................--------�-��---..........----�-�---45 Article 12 - Change of Contract Price; Change of Contract Time .................................................................46 12.01 Change of Contract Price ...............�--••--�-�----..........................-�----.......-------....................-�----.......46 12.02 Change of Contract Time ..........................�--.................:...-----�-�--.........------..............-�-----•--.........47 12.03 Delays........-� ......................................�---------.....................-------.............-----..................................47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 48 13.01 Notice of Defects ......................................�--......,............-•-•-•----�--....-•---�---.................-----............48 13.02 Access to Work.........-• .......................��------.................--�------�--......----.................--�•---�--...............48 13.03 Testsandlnspections ...........................�--�-•�---.......................--�-----...--•------•----......................_......48 13.04 Uncovering Work-� ...............................................�---�-��----.............----.............-------•---............----..49 13.05 City May Stop the Work .........................................•------------..........-----................-------.................49 13.06 Correction or Removal of Defective Work .............................................................................:.. 5.0 13.07 Con-ectionPeriod ................................•--•-�--..........................------......-•-----..................---..............50 13.08 Acceptance ofDefective Work......-----� .....................................................................�------...._......51 13.09 City May Correct Defective Work ......................�-��--------............----...............................-•-----�-•-- 51 Article 14 - Payments to Contractor and Completion ..................................•.---....-•---------------.........-.-.-----......52 14.01 Schedule of Values .............•-•----.............................................--�-��---........-•-�------...............-----•--...52 14.02 Progress Payments ----.....---� .................................................................•----�--...............-�--------.......52 14.03 Contractor's Warranty of Title --� ........................�-----�---............................--•-•----�---._.....-----�•----...54 14.04 PartialUtilization ..........................�----�--.............---......--------.........---.............--•--------........-•-�--�---..55 14.05 FinalInspection.-•----�----...--•-�---� ....................•---�•--•-•�-----............................-•-•-•-•---..........----•--......55 14.06 Fina1 Acceptance ............................•-----...........-•---�--•-•----...............................--•----._......_..-•----•---..55 14.07 Final Payment......-----� ..............�-------..........................--•---..............................--�--.........................56 14.08 Final Completion Delayed and Partial Retaivage Release ......................................................... 56 14.09 Waiver of Claims ..................:..................................................................•----•--........:--------..........57 Article 15 - Suspension of Work and Termination .:......................................................................................57 15.01 City May Suspend Work .......................•-�-�---....................---............----.._...............---..................57 - 15.02 City May Terminate for Cause ................................................................................................... 58 15.03 City May Terminate For Convenience ....................................................................................... 60 Article16 - Dispute Resolution .....................................�----...................--�---.........--�--.._........---••---.........---....:.61 16.01 MethodsandProcedures ..............•-••---...............--------------.........-•---.............................................61 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUNIENTS Revision: Decemba2l, 2012 Article 17 — Miscellaneous ................................................................ 17.01 Giving Notice .............................................................•-- 17.02 Computation of Times .................................................. 17.03 Cumulative Remedies ................................................... 17.04 Survival of Obligations ................................................. 17.45 Headings ........................................................................ CTTI' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanber2l, 2012 ............................................................. 62 .............................................. ............... 62 ............................................................. 62 ............................................................. 62 ............................�-•-••---........................ 63 ............................................................. 63 00 �� oo - i GENERAL CONDITIONS Page 1 of 63 ARTICLE 1— DEFINITIONS AND TERP�IINOLOGY 1.01 Defzned Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminiue and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. l. Addenda—Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. AgYeenaent—The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application fo�- Payment—The form acceptable to Ciiy which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documentation as is required by the Contract Documents. 4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Adnvnistration. 5. Award — Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. - 7. Bidder—The individual or entity who submits a Bid directly to City. 8. Bidding Docurnents—The Bidding Requirements and the proposed Contract Documents (including all Addenda). 9. Bidding RequiYements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday tbrough Friday, except for federal or state holidays observed by the City. 11. Buzzsaw — City's on-line, electronic document management and collaboration system. 12. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFTCATION DOCTJMENTS Revision: D�ber21, 2012 007200-1 GENERA� CONDITIONS Page 2 of 63 13. Change Order—A document, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. City— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and -- chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perform: specific duties with responsibility for final enforcement of the contracts - involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Contractor has entered into the A�reement and for whom the Work is to be performed. 15. City Attorney — The officially appointed City Attomey of the City of Fort Worth, Texas, or his duly authorized representative. 16. City Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. - 18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustment of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 19. ContYact—The entire and integrated written document between the City and Contractor concerni.ng the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representations, ar agreements, whether written or oral. 20. Contract Documents—Those items so designated in the Agreement. All items listed in the Agreement are Contract Documents_ Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price—The moneys payable by City to Contractor for completion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time-The number of days or the dates stated in the Agreement to: (i) achieve Milestones, if any and (u) complete the Work so that it is ready for Final Acceptance. 23. Contractor The individual or entity with whom City has entered into the Agreement. 24. Cost of the Work—See Paragraph 11.01 of these General Conditions for definition. CI'I'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS Revision: Dec.emba�21, 2012 00 �� oo -1 GENERAL CONDITIONS Page 3 of 63 25. Danzage Claims — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 26. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 27. Di��ectoY of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Parks and Conimunity Services — The officially appointed Director of the Parks and Community Services Depariment of the Ciry of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Di�-ectoY of Planning and Developnzent — The officially appointed Director of the Planniug and Development Department of the Ciry of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 30. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31_ Directo�� of Water Departnzent — The officially appointed Director of the Water Deparhnent of the City of Fort Worth, Texas; or his duly appointed representative, assistant, or agents. 32. Di-awings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effective Date of the AgYeement—The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreement is signed and delivered by the last of the two parties to si� and deliver. 34. Enb neeY The licensed professional engineer or engineering firm registered in the State of Texas perfoiming professional services for the City. 35. ExtYa WoYk — Additional work made necessary by changes or alterations of the Contract Documents or of quantities or for other reasons for which no prices are provided in the Contract Documents. Extra work shall be part of the Work. 36_ Field Order — A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid froin Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Final Acceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CIT'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: D�ba21, 2012 oo�zoo-i GENERAL CONDITIONS Page 4 of 63 38. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and. every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requirements—Sections of Division 1 of the Contract Documents. 40. Hazardous EnviYonn2ental Condition—The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities or circumstances that may present a substantial danger to persons or property exposed thereto. 41. Haza��dous Waste—Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations—Any and a11 applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 43. Liens—Charges, security interests, or encumbrances upon Project funds, real properiy, or personal property. 44. MajoY Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 45. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award—The written notice by City to the Successful Bidder stating that upon timely compliance by the Successful Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed—A written notice given by City to Contractor fiYing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48. PCBs—Polychlorinated biphenyls. 49. Petroleunz—Petroleum, including crude oil or any fraction thereof which is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil m�ed with other non-Hazardous Waste and crude oils. 50. Plans — See definition of Drawings. CITY OF FORT WORTH ST.INDARD CONSTRUCTION SPECIFICATION DOCiJMENTS Revision: D�zmber2l, 2012 00 �� oo -1 GENERAL CONDITIONS Pa�e 5 of 63 51. P�roject Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work witivn the Contract Time. 52. P�roject—The Work to be performed under the Contract Documents. 53. Project Rep��esentative—The authorized representative of the City who will be assigned to the Site. 54. Public Meeting — An announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactive Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 (42 USC Section 2011 et seq.) as amended from time to time. 56. Reb Zai- Working HouYs — Hours beo nning at 7:00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 57_ Sanaples—Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule of Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 59. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site—Lands or areas indicated in the Contract Docuxnents as being furnished by City upon which the Work is to be performed, including rights-of-way, pexmits, and easements for access thereto, and such other lands fiunished by City which are designated for the use of Contractor. 61. Specifications—That part of the Coniract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Proj ect. 62. SubcontractoY An individual or entity having a direct contract with Contractor or with any other Subconiractor for the performance of a part of the Work at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS Revision: Decanba2l, 2012 oo�zoo-i GENERAL CONDITIONS Page 6 of 63 63. Submittals—All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 64. Successful Bidder—The Bidder submitting the lowest and most responsive Bid to whom City makes an Award. 65. Superintendent — The representative of the Contractox who is aeailable at all times and able to receive instructions from the City and to act for the Contractor. 66. Supplementa�y Conditions—That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier A manufacturer, fabricator, supplier, distributor, materialman, ar vendor having a direct contract with Contractor or with any Subcontractor to funush materials or equipment to be incorporated in the Work by Contractor or Subcontractor. �68. Undergi-ound Facilities—All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements - containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69. Unit Price Work—See Paragraph 11.03 of these General Conditions for definition. 70. Weekend WoYking Hours — Hours beguuung at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved iu advance by the City. 71. Wo�-k—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing a11 labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and fiunishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Docuxnents. 72. Working Day — A working day is defined as a day, not includi.ng Saturdays, Sundays, or legal - holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the pri.ncipal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Te�-minology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Intent of Certain TeY�ns or Aa'jectives: CTTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decavba2l, 2012 oo��00-1 GENERAL CONDITIONS Page � of 63 The Contract Documents include the terms "as allowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or import are used to describe an action or determivation of City as to the Work. It is intended that such exercise of professional jud�nent, action, or determination will be solely to evaluate, in general, the Work for compliance with the information in the Contxact Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents (unless there is a specific statement indicating otherwise). C. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference staudard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. D. Furrcish, Install, Perfo��2, Provide: The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contxact Documents, words or phrases that ha�e a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such reco;nized meaning. ARTICLE 2 — PRELIIVIINARY MATTERS 2_O1 Copies ofDocuments City shall furnish to Contractor one (1) original executed copy and one (1) electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be furnished upon request at the cost of reproduction. 2.02 Coml�zencenzent of Contract Time; Notice to Proceed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any time within 14 days after the Effective Date of the Agreement. CTI'Y OF FORT WORTI-i STANDARD CONSTRUCTION SPECTFTCATION DOCiTMENTS Revision: Decanber2l, 2012 00�200-1 GENERAL CONDITIONS Pa�e 8 of 63 2.03 Sta��ting the Wo��k Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work shall be done at the Site prior to the date on which the Contract Time commences to run. 2.04 Befor�e Starting Constncction Baseline Schedules: Submit in accordance with the Contract Docwments, and prior to starting the Work. 2.05 PYeconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.06 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. 2.07 Initial Acceptance of Schedules No progress payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. A.RTICLE 3— CONTRACT DOCUMENTS: INTENT, AMENDING, REUSE 3.01 Intent A. The Contract Documents are complementaxyy; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a fiznctionally complete project (or part thereo fl to be constructed in accordance with the Contract Documents. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result will be provided whether or not specifically called for, at no additional cost to City. G Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and siyle. Some Specification sections may be written in varying degrees of streamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in conformity with," "as shown," or "as specified" are intentional in streainlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles within a part depending on the format of the CTI'1' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCilMENTS Revision: Decanba2l, 2012 007200-1 GENERAL CONDITIONS Pa�e 9 of 63 section. The Contractor shall not take advantage of any variation of form, format or style in making Contract Claims. E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily liinited to:" and elsewhere within each Specification secrion is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. 3.02 Refei-ence StandaYds A. Standards, Specifications, Codes, Laws, and Regulations Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of openi.ng of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of Ciry, Contractor, or any of their subcontractors,-consultants, agents, oremployees, from those set forth in the Contract Documents. No such provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: ContractoY's Review of Contract Docunzents Before StaYting Work. Before undertaking each part of the Work, Contractor sha11 carefully study and compare the Contract Documents and check and verify pertinent figures therein agai.nst a11 applicable field measurements and conditions. Contractor shall promptly report in writing to City any conflicf, error, ambiguity, or discrepancy which Contractor discovers, or has actual laiowledge of, and sha11 obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. ContYactor's Review of Contract Documents During Pe�for�aance of IPork. If, during the performance of the Work, Contractor discovers any conflict, error, ambiguity, or discrepancy withiu the Contract Documents, or between the Contract Documents and (a) any applicable Law or Regulation ,(b) any standard, specification, manual, or code, or (c) any instruction of any Supplier, then Contractor shall promptly report it to City in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS Revision: Decanba2l, 2012 oo�zoo-i GENERAL CONDITIONS Page 10 of 63 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambib ity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: l. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents shall take precedence in resolving any conflict, error, ambib ity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specifically incorporated by reference in the Contract Documents). 2. In case of discrepancies, figured dimensions sha11 govern over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govern over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposaL 3.04 Anzending and Supplementing Contract Docun2ents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Change Order_ B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; 2. City's review of a Submittal (subj ect to the provisions of Paragraph 6.18.C); or 3. City's written interpretation or clarification. 3.05 Reuse ofDocuments A. Contractor and any Subcontractor or Supplier shall not: 1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents (or copies of any thereo fl prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptation by Engineer. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIfTCATION DOCUMENTS Revision: Decavba2l, 2012 oo�?oo-i GENERAL CONDITIONS Page 11 of 63 B. The prohibitions of this Parab aph 3.05 will survive final payment, or termination of the Contract. Nothing herein shall preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise stated in the Supplementary Conditions, the data furnished b� City or Engineer to Contractor, or by Contractor to Ciiy or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also lrnown as hard copies) and other Specifications referenced and located on the City's Buzzsaw site. Files in electronic media format of text, data, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If there is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When iransferring documents in electronic media format, the transferring party makes no representations as to long term compatibility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4— AVAILABILIT'Y OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; I�__7,ARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability of Lands A. City shall furnish the Site. City shall notify Contractor of any encumbrances or restrictions not of general application but specifically related to use of the Site with which Contractor must comply in performing the Work: City will obtain in a timely manner and pay for easements for permanent structures or permanent changes in existing facilities. l. The City has obtained or anticipates acquisition of and/or access to right-of-way, and/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding right-of-way, and/or easements. 2. The City has or anticipates removing and/or relocating utilities, and obstructions to the Site. Any outstanding removal or relocation of utilities or obstructions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others. B. Upon reasonable written request, City shall furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CZTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decemba2l, 2012 00�2oo-i GENERA� CONDITIONS Page 12 of 63 C. Contractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage.of materials and equipment. 4.02 Subsurf'ace and Physical Conditions A. Reports and Di-awings: The Supplementary Conditions identify: 1. those reports known to City of explorations and tests of subsurface conditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities). B. Linzited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Coniract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcon�actors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, i.nterpretations, opinions, and information contained in such reports or shown or indicated in such drawi.ngs; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. 4.03 Differing SubsuYface or Physical Conditions A. Notice: If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to establish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents; CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 007200-I GENERAL CONDITIONS Page 13 of 63 then Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or perfoxming any Work in connection therewith (except in an emergency as required by Paraa aph 6.17.A), notify City in writing about such condition. B. Possible PYice and 7'inze Adjustments Contxactor shall not be entitled to any adjustment in the Contract Price or Contract Time if: 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition could reasonably have been discovered or revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 Underb �ound Facilities A. Shown oY Indicated.� The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contib ous to the Site is based on information and data fiinushed to City or Engineer by the owners of such Underground Facilities, including Ciry, or by others. Unless it is otherwise expressly provided in the Supplementary Conditions: 1. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of all of the following will be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustment of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underb ound Facilities aud repairing any damage thereto resulting from the Work. B. Not Shown or Indicated: 1. If an Underground Facility which conflicts with the Work is uncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor shall, promptly after becoming aware thereof and before further disturbing conditions affected thereby or perfornling any CTI'I' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCiTMENTS Revision: Decanba2l, 2012 007200-I GENER,4L CONDITIONS Page 14 of 63 Work in connection therewith (except in an emergency as required by Parab aph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and deterniine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility. Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verification of existing utilities, structures, and service lines shall include notification of all utility companies a minimum of 48 hours in advance of construction including exploratory excavation if necessary. 4.05 Reference Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor sha11 report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or locations. The City sha11 be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor sha11 notify City in advance and with sufficient time to avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the full cost for replacing such points plus 25% will be charged against the Contractor, and �the fu11 amount will be deducted from payment due the Contractor. 4.06 Hazardous EnviYonnaental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings lalown to City relating to Hazardous Environmental Conditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data AuthoYized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is identified in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: l. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences and procedures of CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 00 �� oo - i GENERAL CONDITIONS Page 15 of 63 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. other data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated iu Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i) secure or otherwise isolate such condition; (ii) stop all Work in connection with such condition and in any area affected thereby (except in an emergency as required by Parab aph 6.17.A); and (ui) notify City (and promptly thereafter confirm such notice in writing). City may consider the necessiry to retain a qualified expert to evaluate such condition or take corrective action, if any. E. Contractor sha11 not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractor: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii) specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not ab ee to resume such Work based on a reasonable belief it is unsafe, or does not agree to reswne such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent pe�-fnitted by Laws and Red lations, Contractor shall indemn� and hold harnzless City, froni and against all claims, costs, losses, and danzages (including but not limited to all fees a�id charges of ena neers, aYchitects, attor-neys, and other professionals and all couYt or aYbitr�ation or other dispute resolution costs) arising out of or relating to a Hazardous EnviYonniental, Condition created by Contractor oY by anyone for whonz ContractoY is responsible. Nothing in this Paragraph 4.06.G shall obligate Contractor to indenzn� any individual or entity fi�om and against the consequences of that individual's or entity's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS Revision: Decm�ba21, 2012 00�200-1 GENERAL CONDITIONS Page I 6 of 63 ARTICLE 5— SONDS AND INSURANCE 5.01 Licensed SuYeties and InsuYers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor sha11 be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. 5.02 Perfornaance, Paynzent, and Maintenance Bonds A. Contractor sha11 furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contxact Documents. B. Contractor shall fui�ish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney-in-fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is termi.uated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 5.01 and 5.02.C. 5.03 Certificates oflnsurance Contractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of i.nsurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. l. The certificate of insurance shall document the City, and a11 identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CTTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 oo�zoo-1 GENERAL CONDITIONS Page 17 of 63 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which sha11 be identified in the certificate of insurance provided to the City. 3. The certificate sha11 be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for a11 policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a ininimum rating of A-: VII in the cturent A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liabiliiy insurance for any differences is required. Excess Liability shall follow foxm of the primary coverage. 8: Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims-made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the ab eement and the certificate of insurance sha11 state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and far three (3) years following Fina1 Acceptance provided under the Contract Documents or for the wananty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 9. Poiicies shall have no exclusions by endorsements, which, neither nullify or amend, the required liues of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the conlract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10. Any self-insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: D�emba2l, 2012 00�200-1 GENERAL CONDITIONS Page 18 of 63 lieu of iraditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 12. City, at its sole discretion, reserves the right to review the insuxance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary arid prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City sha11 be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 13. City sha11 be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications sha11 not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 5.04 Cont��actoY's InsuYance A. Workers Compensation and En2ployers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and innini.mum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: l. clai.ms under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of : Contractor's employees. B. Conanzercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or properiy damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance . - shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanber2l, 2012 00�2oo-i GENERAL CONDITIONS Page 19 of 63 insurance or self-insurance programs afforded to the Ciiy. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the Ciiy approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. D. RailJ�oad P��otective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Notifzcation of Policy Cancellation: Contractor sha11 immediately notify City upon cancellation or other loss of insura.nce coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 5.05 Acceptance ofBonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and mai.ntained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City sha11 so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase ar maintain a11 of the bonds and insurance required by the Coniract Documents, the City sha11 notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 6 — CONTRACTOR'S RESPONSIBILTTIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Dec�ber21, 2012 oo�zoo-i GENERAL CONDITIONS Page 20 of 63 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and sha11 have authority to act on behalf of Contractor. All communication given to or received from the Superintendent sha11 be binding on Contractor. C. Contractor shall notify the Ciry 24 hours prior to moving areas during the sequence of construction_ 6.02 Labor; Working HouYs A. Contractor sha11 provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor sha11 at a11 times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not pernut the performance of Work beyond Regular Worki.ng Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: l. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 6.03 Se�-vices, Materials, and Equipnzent A. Unless otherwise specified in the Contract Documents, Contractor sha11 provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, "" temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor requ.ired testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work sha11 be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by Ciiy, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CTTY OF FORT WORTi3 STANDARD CONSTRUCTION SPECIFICATION DOCUNIENTS Revision: Decanber21,2012 00�2oo-i GENERAL CONDITIONS Page 21 of 63 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents_ D. All items of standard equipment to be incorporated into the Work shall be the latest model at the time of bid, unless otherwise specified. 6.04 PYoject Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Parab aph 2.07 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 an,d the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. 2. Contractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification O 1 32 16. 3. Proposed adjustments in the Project Schedule that will change the Contxact Time shall be submitted in accordance with the requirements of Article 12_ Adjustments in Contract Time may only be made by a Change Order. 6.05 Substitutes and "OY Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality reqtizired. Unless the specification or description contains or is followed by words reading that no like, equi�alent, or "or-equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or=Equal " Items.• If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or-equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.OS.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. the City determi.nes that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and desi� characteristics; � CTI"Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS Revision: Decanber2l, 2012 oo�zoo-i GENERAL CONDITIONS Page 22 of 63 2) it- will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Itenzs: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or-equal" item under Para�aph 6.OS.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to deteimine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: a) perform adequately the functions and achieve the results called for by the general design; b) be similar in substance to that specified; c) be suited to the same use as that specified; and 2) will state: a) the exten�, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; CIT'I' OF FORT WORTIi STANDARD CONSTRUCTION SPECIFICATION DOCtTMENTS Revision: Decanba2l, 2012 007200-I GENERAL CONDITIONS Page 23 of 63 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: a) all variations of the proposed substiiute item from that specified; b) available engineering, sales, maintenance, repair, and replacement services; and 4) shall contain an itemized estimate of a11 costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by Ciiy_ Contractor shall submit sufficient information to allow City, in City's sole discretion, to detennine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor sha11 make written application to City for review in the same manner as those provided in Para�raph 6.OS.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.OS.A and 6.OS.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or-equal" or substitute wi11 be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or-equal." City will advise Contractor in writing of its detenmination. D. Special Guar-antee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall inde�ran� and hold haYnzless City and anyone directly oY indirectly employed by them fi^om and against any and all claims, danzages, losses and expenses (including attorneys fees) a� ising out of the use of substituted mateYials or equipment. E. City s Cost Reinzbu�sen�ent: Ciiy will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 6.OS.A.2 and 6.OS.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City far the charges for making changes in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. ContYactoY's Expense: Contractor shall provide all data in support of any proposed substitute or "or-equal" at Contractor's expense. CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 00 72 00 -1 GENERA� CONDITIONS Page 24 of 63 G. City Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute sha11 be incorporated to the Contract by Change Order. H. Time Extensions: No additional time will be granted for substitutions. 6.06 Concerning SubcontractoYs, Suppliers, and Others A. Contractor shall perform with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, agai.nst whom City may ha�e reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to fiunish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from tune to time require the use of certain Subcontractars, Suppliers, or other individuals or entities on the project, and will provide such requirements in the Supplementary Conditions. D. Minor-ity Business EnteTprise Con2pliance.• It is City policy to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a NIBE goal, Contractor is required to comply with the intent of the City's MBE Ordinance (as amended) by the following: l. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the City. A.ny unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outli.ned in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or exanunation of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MBE. Material misrepresentation of any nature will be grounds for tern�ination of the Contract in accordance with Paragraph 15.02.A. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. _ E. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishi.ng any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Dec.emba2l, 2012 00 �� oo - i GENERAL CONDITIONS Page 25 of 63 l. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subconlractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Pr-evailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates detennined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevaili.ng wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained. by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occuzred. The City sha11 notify in writing the Contractor or Subconlractor and any affected worker of its initial determination. Upon the City's determi.nation that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City sha11 retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CTTY OF FORT WORTFi STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 oo��oo-i GENERAL CONDITIONS Page 26 of 63 D. Arbitv�ation Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determivation pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the I lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subconlractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (u) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the Ciiy. The provisions of Paragraph 6.23, Right to Audit, shail pertain to this inspection. F. Prob ess Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor sha11 post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Conzpliance. The Contractor shall include iri its subcontracts and/or sha11 otherwise require a11 of its Subcontractors to comply with Paragraphs A through G above. 6.08 Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume a11 costs incident to the use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Documents for use in the performance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence of such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such i.nformation does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent peYmitted by Laws and Regulations, Contractor shall indemn� and hold harmless City, fi�om and against all clainis, costs, Zosses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyYights incident to the use in the performance of the Work or resulting fi-om CTTY OF FORT WORTH STANDARD CONSTRUCTION SPECffICATION DOCUMENTS Revision: Dac.anba2l, 2012 007200-I GENERAL CONDITIONS Pape 27 of 63 the incoYporation in the Woi-k of any invention, desib , process, pYoduct, or device not spec�ed in the Cont�-act Documents. 6.09 Pei-mits and Utilities A. ContYactor obtained permits and licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementaxy Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City sha11 pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained pe»nits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Documents. It will be the Contractor's responsibility to carry out the provisions of the permit_ If the Contractor uutiates changes to the Contract and the City approves the changes, the Contractor is responsible for obtaining clearances and coordinating with the appropriate regulatory agency. The City will not reimburse the Contractor for any cost associated with these requirements of any City acquired permit. The following are permits the City will obtain if required: l. . Texas Department of Transportation Permits 2. U.S. Army Corps of Engineers Permits 3. Texas Commission on Environmental Quality Permits 4. Railroad Company Permits C. Outstanding per»zits and licenses. The City anticipates acquisition of and/or access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding permits and licenses. 6.10 Laws and Reb lations A. Contractor shall give a11 notices required by and shall comply with all Laws and Reb lations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regularions, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work laiowing or having reason to know that it is contrary to Laws or Reb lations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and ail CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Dec�ba21, 2012 00�2oo-i GENER,4L CONDITIONS Page 28 of 63 court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regulations not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjustment in Contract Price or Contract Time. 6.11 Taxes A. On a contract awarded by the City, an organization which qualifies for exemption pursuant to Texas T� Code, Subchapter H, Sections 151301-335 (as amended), the Contractor may purchase, rent or lease all materials, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the t�, said exemption certificate to comply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and sha11 comply with the provision of State Comptroller's Ruling .Ol l, and any other applicable rulings pertainuzg to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: l. Comptroller of Public Accounts Sa1es T� Division Capitol Station Austin, TX 78711; or 2. http://u��.windoa�.staie.�.us/taxinfo/taxformsr`93-forms.ht�ml 6.12 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas.• l. Contractor sha11 confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with constxuction equipment or other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 00 �� oo - i GENERAL CONDITIONS Pa�e 29 of 63 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to PaYagraph 6.21, ContT^actoY shall indemnify and hold harmless City, fi-om and against all clainas, costs, losses, and damages arising out of or �-elating to any clainz oY action, legal or equitable, b�^ought by any such owner or occupant against City. B. Removal of DebYis During PeYfoYmance of the Work: During the pro�ess of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and R b�ulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make i� ready for utilization by City or adjacent property owner. At the completion of the Work Contractor sha11 remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and sha11 restore to original condition or better all property disturbed by the, Work. E. Loading Structua-es: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 6.13 Record Docunzents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Coniractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 6.14 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or properly in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor sha11 CITI' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 oo�zoo-i GENER,4L CONDITIONS Page 30 of 63 take all necessary precautions for the safety of, and sha11 provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. a11 the Work and materials and equipment to be incorporated therein, whether in storage on or offthe Site; and 3. other properly at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for _. removal, relocation, or replacement in the course of construction. B. Contractor shall comply with a11 applicable Laws and Regulations relating to the safety of persons or properiy, or to the protection of persons or properiy from damage, injury, or loss; and sha11 erect and mai.ntain all necessary safeb ards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work riiay affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with wliich City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6_14.A.2 or 6.14.A3 caused, . directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirecfly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work sha11 continue until such time as all the Work is completed and City has accepted the Work. 6.15 Safety Representative Contractor shall inform City in writing of Contractor's desi�ated safety representative at the Site_ 6.16 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 6.17 Emergencies and/or Rectification A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is obligated to act to prevent threatened damage, injury, or loss. Contractor sha11 give City prompt written notice if Contractor believes that any significant CTTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 00�200-1 GENERAL CONDITIONS Pa�e 31 of 63 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the City to rectify any discrepancies, omissions, or correction necessary to confozm with the requirements of the Contract Documents, the Ciry shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remedial action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due or become due the Contractor on the Proj ect. 6.18 Subnzittals A. Contractor shall submit required Submittals to City for review and acceptauce in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. l. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and desi� criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the iuformation for the limited purposes required by Paragraph 6.18.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCiJMENTS Revision: Decanba2l, 2012 00 �� oo - i GENERAL CONDITIONS Page 32 of 63 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City s Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to deteinune if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compati,ble with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section Ol 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 6.19 Continuing the Wo��k Except as otherwise provided, Contractor sha11 carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or posiponed pending resolution of any disputes or disagreements, except as City and Contractor may otherwise agree in writing. 6.20 ContYactor's General WaYranty and Guarantee A. Contractor warrants and b arantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, parfners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, - Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CIT'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 007200-I GENERAL CONDITIONS Pa�e 33 of 63 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptauce of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: l. observations by City; 2. recommendation or payment by City of any prob ess or final payment; the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and ab ees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDENINIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED IN WHOLE OR IN PART. BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and ab ees to indemnify and hold harmless, at its own e�pense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. TAIS INDENIlVIFICATION PROVISION IS CTI'I' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decemba2l, 2012 007200-1 GENERAL CONDITIONS Page 34 of 63 SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS �,T_,T,F,(�F,n nR PRpVFN TAAT ALL QR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSEA IN WHOLE OR IN PART. BY ANY ACT. ONIISSION OR NEGLIGENCE OF THE CITY. 622 Delegation of PYofessional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose si;nature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 622, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submiitals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 6.18.C. 6.23 Right to Audit A. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractar further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City sha11, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFZCATION DOCUMENTS Revision: Dece�nba21, 2012 oo��oo-i GENERAL CONDITIONS Page 35 of 63 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall bive Subcontractor reasonable advance notice of intended audits. C. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Adtuinistrative Code in effect as of the time copying is performed. 6.24 NondiscYimination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Deparfinent of Transportation and the Federal Transit Adininistration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as anzended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any proj ect receiving Federal assistance. ARTICLE 7— OTHER WORK AT THE SITE 7.01 Related YYork at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opporlunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patchi.ng of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: D�anba2l, 2012 007200-1 GENERAL CONDITIONS Page 36 of 63 7.02 Coordination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: l. the individual or entity who will have authoriiy and responsibility for coordination of the activities among the various contractors will be identified; 2. the specific matters to be covered by such authority and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, Ciiy shall have authority for such coordination. ARTICLE 8 — CIT'Y'S RESPONSIBILITIES 8.01 Co�zmunications to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue a11 communications to Contractor. 8.02 Furnish Data City sha11 timely fumish the data required under the Contract Documents. 8.03 Pay When Due City shall make payments to Contractor in accordance with Article 14. 8.04 Lands and Easenzents; Reports and Tests Ciry's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's identifying and making available to Contractor copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface shuctures at or contiguous to the Site that have been utilized by Ciry in preparing the Contract Documents. 8.05 Change OrdeYs City shall execute Change Orders in accordance with Paragraph 10.03. 8.06 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 00 �� oo - i GENERAL CONDITIONS Pa�e 37 of 63 8.07 Linzitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and prob ams incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perforni the Work in accordance with the Coniract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14_ 8.08 Undisclosed Haza��dous Environmental Condition City's responsibility with respect to an uudisclosed Hazardous Environmental Condition is set forth in Paragraph 4.06. 8.09 Conzpliance with Safety Progranz While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. ARTICLE 9— CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 City's P��oject Repi�esentative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. The Project Representative(s) will be as provided in the Supplementary Conditions. 9.02 Visits to Site A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as Ciiy deems necessary in order to observe the pro�ess that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtai.ned during such visits and observations, City's Project Representative will detennine, in general, if ttie Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. CZI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decemba2l, 2012 oo�zoo-i GENERAL CONDITIONS Page 38 of 63 9.03 Authorized Pa��iations in WoJ�k City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjushnent in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents_ These may be accomplished by a Field Order and will be binding on City and also on Contractor, who shall perform the Work involved promptly. 9.04 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a fuuctioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. 9.05 Deternzinations for Work PeYfoYmed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the prelimi.nary detexminations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). 9.06 Decisions on Requirements of Contract DocunZents and Acceptability of Wo�^k A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue referred. C. City's written decision on the issue referred will be final and binding on the Contractor, subject to the provisions of Paragraph 10.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 oo��oo-i GENERAL CONDITIONS Page 39 of 63 10.02 Unautho��ized Changes in the Work Contractor shall not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Contract Documents as amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change OYders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: (i) ordered by City pursuant to Parab aph 10.O1.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually perfotmed. 10.04 Ext�-a Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment thereof, and the City insists upon its performance, the Contractor shall proceed with the work after making written request for written orders and shall keep accurate account of the acival reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor shall furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a corrected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all costs Contractor incurs as a result or relating to the change or Extra Work, whether said costs are lrnown, unknown, foreseen or unforeseen at that time, including without limitation, any costs for delay, extended overhead, ripple or impact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Not�cation to Surety If the provisions of any bond require notice to be given to a surety of any change affecti.ng the general scope of the Work or the provisions of the Contract Documents (including, but not li.mited to, Contract Price ar Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS Revision: Lkcanb�21, 2012 oo�?00-1 GENERAL CONDITIONS Page 40 of 63 10.06 Contract Clainas Process A. City's Decision Requii�ed: All Contract Clai.ms, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a condition precedent to any exercise by Contractor of any rights or remedies he may otherwise have under the Contract Documents or by Laws and Regulations in respect of such Contract Clai.ms. B. Notice: 1. Written notice stating the general nature of each Contract Claim sha11 be delivered by the Contractor to City no later than 15 days after the staxt of the event giving rise thereto. The responsibility to substantiate a Contract Claim shall rest with the pariy making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractor to submit additional or more accurate data in support of such Contract Claixn). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustrnent in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5. Each Contract Claim shall be accompanied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. 6. The City shall submit any response to the Contractor within 30 days after receipt of the claimant's last submittal (unless Contract allows additional time). C. City's Action: City will review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. notify the Contractor that the City is unable to resolve the Contract Claim if, in the City's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract Claim, such notice shall be deemed a denial. CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Deczu�U�21, 2012 oo�zoo-i GENERAL CONDITIONS Page 41 of 63 D. City's written action under Paragraph 10.06.0 will be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. No Contract Claim for an adjustxnent in Contract Price or Contract Time will be valid if not submitted in accordance with this Parab aph 10.06. ARTICLE 11— COST OF T�IE WORK; ALLOWANCES; ITNIT PRICE WORK; PLANS QUANTITY MEASUREMENT 11.0 l Cost of the WoYk A. Costs Included: The term Cost of the Work means the sum of a11 costs, except those excluded in Parab aph 11.O1.B, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.O1.B, and shall include but not be limited to the following items: Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees sha11 include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroll costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll taxes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of perfonning Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of all materials and equipment furnished and incorporated in the Work, including costs of transportation and storage thereof, and Suppliers' field services required in connection therewith. 3. Rentals of all constnzction equipment and machinery, and the parts thereof whether rented from Contractor or others in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs shall be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts sha11 cease when the use thereof is no longer necessary for the Work. CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS Revision: Decanba2l, 2012 00 72 00 - I GENERA� CONDITIONS Page 42 of 63 4. Payments made by Contractor to Subconlractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids from subcontractors acceptable to City and Contractor and shall deliver such bids to City, who will then determiue, which bids, if any, will be acceptable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor's Cost of the Work and fee shall be detennined in the same manner as Contractor's Cost of the Work and fee as provided in this Parab aph 11.01. 5. Costs of special consultants (including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Supplemental costs including the following: a. The proportion of necessary transportation, tra�el, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work. b. Cost, including transportation and maintenance, of all materiais, supplies, equipment, machi.nery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the properly of Contractor. c. Sales, consumer, use, and other similar taxes related to the Contractor is liable not covered under Paragraph 6.11, as Regulations. . Work, and for which imposed by Laws and d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indarectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for pernuts and licenses. e. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of deterniining Contractor's fee. f. The cost of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communication services at the Site, express and courier services, and similar petty cash items in connection with the Work. CTTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 00 �� oo - i GENERAL CONDITIONS Pa�e 43 of 63 h. The costs of premiums for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Excluded: The term Cost of the Work shall not include any of the following items: Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Parab aph 1l.Ol.A.l or specifically covered by Paragraph 11.O1.A.4, a11 of which are to be considered administrative costs covered by the Contractor's fee. 2. Expenses of Contractor's principal and branch offices other than Contractor's office at the Site. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges agai.nst Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contr-actoY's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be determined as set forth in the Agreement. When the value of any Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be determ.i.ued as set forth in Paragraph 12.O1.C. D. Documentation: Whenever the Cost of the Work for any purpose is to be determiued pursuant to Paragraphs 11.O1.A and 11.O1.B, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such sums and by such persons or entities as may be acceptable to City. B. Pre-bid Allowances: 1. Contractor agrees that: CIT'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 007200-1 GENERAL CONDITIONS Page 44 of 63 a. the pre-bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre-bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contxactor ab ees that a contingency allowance, if any, is for the sole use of Ciry. D. Prior to final payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price sha11 be conespondingly adjusted. 11.03 Unit Price Wor�k A. Where the Contract Documents provide that a11 or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amount equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. - B. The estimated quantities of items of Unit Price Work are not b aranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Determinations of the actual quantities and classifications of Unit Price Work performecl by Contractor will be made by City subject to the provisions of Paragraph 9.05. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably infezred as required for a funciionally complete installation, but not identified in the listing of unit price items sha11 be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accordance with Paragraph 12.0,1 if: 1. the quantity of any item of Unit Price Work performed by Contractor difFers materially and siQnificantly from the estimated quantity of such item indicated in the A�eement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Ouantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. If the changes in quantities or the alterations do not sianificantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: D�anba2l, 2012 oo�zoo-i GENERAL CONDITIONS Page 45 of 63 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. 3. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A s banificant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either parly to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the origi.nal quantity stated in the Conlract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Ouantity MeasuYement A. Plans quantities may or may not represent the exact quantity of work perFoimed or material moved, handled, or placed during the execution of the Contract. The estianated bid quantities are desibuated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outli.ned under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Contract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity will be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised by a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to fiY the final quantity as a plans quantitY- CIT'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCiJMENTS Revision: Decc�nber2l, 2012 007200-1 GENERAL CONDITIONS Page 46 of 63 E. For callout work or non-site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHA.NGE OF CONTR.A.CT PRICE; CHANGE OF CONTRACT TIlVIE 12.01 Change of ContYact Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions of Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price (which may include an allowance for overhead and profit not necessarily in accordance with Paragraph 12.O1.C2), and sha11 include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.O1.B.2, on the basis of the Cost of the Work (determined as provided in Paragraph 11.01) plus a Contractor's fee for overhead and profit (detennined as provided in Paragraph 12.O1.C). C. Cont��actor's Fee.• The Contractor's additional fee for overhead and profit shall be deternuned as follows: 1. a mutually acceptable fiYed fee; or 2. if a fu�ed fee is not agreed upon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.O1.A.1, 11.O1.A.2. and 11.O1.A.3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2) bonds and insurance; b. for costs incurred under Paragraph 1 l.Ol.A.4 and 11.O1.A.5, the Contractor's fee shall be five percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no f�ed fee is ab eed upon, the intent of Paragraphs 12.O1.C2.a and 12.O1.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS Revision: Acanber2l, 2012 oo��00-1 GENERAL CONDITIONS Page 47 of 63 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 11.Ol.A.l and 11.O1.A.2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%) of the amount paid to the next lower tier Subcontractor, however in no case sha11 the cumulative total of fees paid be in excess of 25%; c. no fee sha11 be payable on the basis of costs itemized under Paragraphs 1l.Ol.A.6, and 11.O1.B; d. the amount of credit to be allowed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12A2 Change of Contract Tin�e A. The Contract Time may only be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12_03 Delays A. Where Contractor is reasonably delayed in the performance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Contract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or neglect by City, acts or neglect of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment sha11 be Contractor's sole and exclusive remedy for the delays described in this Para�aph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attomeys, and other professionals and a11 court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other proj ect or anticipated project. C. Contractor shall not be entitled to an adjustment in Contract Price or Contract Time for delays within the control of Contractor. Delays atlxibutable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City. CiT'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Dec�ba21, 2012 00�2oo-i GENERAL CONDITIONS Page 48 of 63 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 13.01 Notice ofDefects Notice of all defective Work of which City has actual lrnowledge will be given to Contractor. Defective Work may be rejected, conected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observarion, inspection, and testing. Contractor sha11 provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and sha11 cooperate with inspecrion and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereo fl to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Deparlment of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions_ C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, miY designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as deteriruned solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testi.ng under this Section 13.03 D result in a"fail", "did not pass" or other similar negative result, the Contractor shall be responsible for payi.ng for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CTTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanber2l, 2012 00 �� oo - i GENERAL CONDITIONS Page 49 of 63 Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Fina1 Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Parab aph 13.03.E shall be at Contractor's expense. G. Contractor shall have the right to make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 Uncovering Wo��k A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for observation, inspection, or testing as City may require, that portion of the Work in question, fizrnishing all necessary labor, material, and equipment. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attomeys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observation, inspection, and testing, and of satisfactory replacement �or reconstruction (including but not limited to all costs of repair or replacement of work of others); or City shall be entitled to accept defective Work in accordance with Paragraph 13.08 in which case Contractor shall still be responsible for a11 costs associated with exposing, observing, and testing the defective Work. 2. If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, exposure, observation, inspection, testi.ng, replacement, and reconstruction. 13.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any CII'I' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Dec�ba21, 2012 00�2oo-i GENERAL CONDITIONS Page 50 of 63 Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Correction oYRemoval ofDefective WoYk A. Promptly after receipt of written notice, Contractor shall coirect all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such conection or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Wark under the terms of this Parab aph 13.06 or Parab aph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranry and. a arantee, if any, on said Work. 13.07 CoT^rection Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special buarantee required by the Contract Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by Ciiy or permitted by Laws and Regulations as contemplated in Paragraph 6.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not li.mited to all costs of repair or replacement of work of others) will be paid by Contractor. CTTY OF FORT WORTH STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS Revision: Decanba2l, 2012 007200-1 GENERAL CONDITIONS Page 51 of 63 C. In special circumstances where a particular item of equipment is placed in continuous seroice before Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Wark (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by filing a Contract Claim, pursuant to Paragraph 10.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 13.07 sha11 not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 13.08 Acceptance ofDefective Work If, instead of requiring correction or removal and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) atlributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled to an appropriate decrease in the Contract Price, reflecting the diminished value of Work so accepted. 13.09 City May Co��Yect Defective Work A. If Contractor fails wit�un a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Confract Documents, City may, after seven (7) days written notice to Contractor, conect, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 13.09, Ciiy shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contxactor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution C1TY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: D�ba21, 2012 oo��oo-i GENERAL CONDITIONS Page 52 of 63 costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ARTICLE 14 — PAYMENTS TO CONTRACTOR AND COMPLETION 14.01_ Schedule of Values The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 PYogress Payments A. Applications foY Payments: l. Contractor is responsible for providing a11 information as required to become a vendor of the City. 2. At least 20 days before the date established in the General Requirements for each progress payment, Contractor sha11 submit to City for review an Application for Payment filled out and signed by Contractor covering the Work completed as of the date of the Application and accompanied by such snpporting documentation as is required by the Contract Documents. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sa1e, invoice, or other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therei.n, all of which must be satisfactory to City. 4. Beginniug with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work have been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. 5. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CTTY OF FORT WORTIi STANDARD CONSTRUCTION SPECIFICATION DOCLJMENTS Revision: Decanba21,2012 007200-1 GENERAL CONDITIONS Page 53 of 63 B. Review ofApplications: 1. City will, after receipt of each Application for Payment, either indicate in writing a recommendation of payment or return the Application to Contractor indicating reasons for refusing payment. In the latter case, Contractor may make the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of Ciiy's knowledge: a. the Work has progressed to the poiut indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior to or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classificatious for Work performed under Paragraph 9.05, and any other qualifications stated in the recommendation). 3. Processing auy such payment will not thereby be deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in prob ess, or involved detailed inspections of the Work beyond the responsibilities specifically assigned to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to protect City from loss because: a. the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Dec�ba21, 2012 oo��oo-i GENERAL CONDITIONS Page 54 of 63 e. City has actual knowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: 1. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent (5%). D. Liquidated Danzages. For each calendar day that any work shall remain uncompleted after the time specified in the Contract Documents, the sum per day specified in the Agreement, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages suffered by the Ciiy. E_ Payment: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the Contract Documents. F. Reduction in Payment: l. City may refuse to make payment of the amount requested because: a. Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond satisfactory to City to secure the satisfaction and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. - 2. If City refuses to make payment of the amount requested, City will give Contractor written notice stating the reasons for such action and pay Contractor any amount remain.i.ng after deduction of the amount so withheld. City sha11 pay Contractor the amount so withheld, or any adjustment thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action. 14.03 Contractor's War�anty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decsnba2l, 2012 007200-1 GENERAL CONDITIONS Page 55 of 63 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, detennines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: l. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Parab aph 14.OS.A.1, City and Contractor shall make an inspection of that part of the Work to detertnine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constiiute Final Acceptance by City. 14.05 Finallnspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: 1. withiu 10 days, City will schedule a Fina1 Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor�shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. B. No time charge will be made against the Contractor between said date of notification of the City and the date of Final Inspection. Should the City deternune that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance_ CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCiJMENTS Revision: D�c�ba21, 2012 oo��00-1 GENERAL CONDITIONS Page 56 of 63 14.07 Final Payment A. Application for Payment: l. Upon Final Acceptance, and in the opinion of City, Contractor may make an application for final payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Payment shall be accompanied (except as previously delivered) by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to final payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. �davits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. B. Paynaent Beconzes Due: 1. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entitled, including but not limited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Coniract Documents which specifically continue thereafter. 14.08 Final Conzpletion Delayed and Partial Retainage Release A. If final completion of the Work is significantly delayed, and if City so confirms, City may, upon receipt of Contractor's final Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to be held by City for Work not fully completed or coirected is less than the retainage stipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Ikcanba2l, 2012 00 �� oo - i GENERAL CONDITIONS Page 57 of 63 portion of the Work fully completed and accepted shall be submitted by Contractor to City with the Application for such payment. Such payment sha11 be made under the terms and conditions governing final payment, except that it shail not constitute a waiver of Contract Claims. B. PaYtial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of a11 other constxuction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that a11 other work is completed as deternliued by the City. Before the release, all submittals and final quantities must be completed and accepted for a11 other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Clainzs The acceptance of final payment will constitute a release of the City from a11 claims or liabilities under the Contract for anything done or fizrnished or relating to the work under the Contract Documents or any act or neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND TERA'IINATION 15.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fu� the date on which Work will be resumed. Contractor shall resume the Work on the date so fiYed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be detemiined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not available within a reasonable period of time, Contractor may request an extension in Contract Tim.e, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor sha11 store all materials in such a manner that they will not obshuct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary struciures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is detennined by the Ciry that construction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement may not be allowed if the equipment is moved to another construction proj ect for the City. CTtI' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanba2l, 2012 00 �2 00 - i GENERAL CONDITIONS Page 58 of 63 15.02 City May Terminate for Cause A. The occurrence of any one or more of the following events by way of example, but not of limitation, may justify termination for cause: l. Contractor's persistent failure to perform the Work in accordance with the Contract „Documents (including, but not limited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure to adhere to the Project Schedule established under Paragraph 2.07 as adjusted from time to time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #20020-12-2011established under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any public body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any nature, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assignment of the Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or baulaupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor cominences legal action in a court of competent jurisdiction against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surety to arrange a conference with Contractor and Surety to address Contractor's failure to perfonm the Work. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do not agree to allow the Contractor to proceed to perform the construction Contract, the City may, to the extent permitted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conference to address Contractor's failure to perform the Work. 2. If Contractor's services are terminated, Surety sha11 be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demanding Surety`s performance of its CTl'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decanber2l, 2012 007200-1 GENERAL CONDITIONS Page 59 of 63 obligations, then City, without process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equipment incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. Whether City or Surety completes the Work, Contractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will be paid to Contractor. If such claims, costs, losses and damages exceed such unpaid balance, Contractor shall pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees shall be in any way liable or accountable to Contractor or Surety for the method by which the completion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in completing the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor shall not be entitled to any clai.m on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue to be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the Contract Documents or any other obligations otherwise prescribed by law. C. Notwithstanding Parab aphs 15.02.B, Contractor's services will not be termivated if Contractor begins within seven days of receipt of notice of intent to terminate to correct its failure to perform and proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so tenninated by City, the tennination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liability. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termination procedures of that bond shall not supersede the provisions of this Article_ CTI'I' OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decemba2l, 2012 00�2oo-i GENERAL CONDITIONS Page 60 of 63 15.03 City May Terminate FoY Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any tennination shall be effected by mailing a notice of the tennination to the Contractor specifying the extent to which performance of Work under the contract is terminated, and the date upon which such texmination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presu.med and established that such termi.nation is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regarding such discretionary action. B. After receipt of a notice of terxnination, and except as otherwise directed by the City, the Contractor shall: l. Stop work under the Contract on the date and to the extent specified in the notice of termination; 2. place no further orders or subcontracts for materials, services or facilities except as may be necessary for completion of such portion of the Work under the Contract as is not terminated; 3. tenninate a11 orders and subcontracts to the extent that they relate to the performance of the Work terminated by notice of ternsination; 4. transfer title to the City and deliver in the manner, at the times, and to the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed Work, supplies and other material produced as a part of, or acquired in connection with the performance of, the Work terminated by the notice of the texmination; .and b. the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be fiunished to the City. 5. complete perfoimance of such Work as sha11 not have been terminated by the notice of texmination; and 6. take such action as may be necessary, or as the City may direct, for the protection and preservation of the property related to its contract which is in the possession of the Contractor and in which the owner has or may acquire the rest. C. At a time not later than 30 days after the termination date specified in the notice of termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of termination inventory not previously disposed of, exclusive of items the disposition of which has been directed or authorized by City. CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Dec�ba21, 2012 007200-1 GENERAL CONDITIONS Page 61 of 63 D. Not later than 15 days thereafter, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior to final settlement. E. Not later than 60 days after the notice of ternunation, the Contractor shall submit his tenuination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing withiu such 60 day period by the Contractor, and b anted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contractor sha11 be paid for (without duplication of any items): 1. completed and acceptable Work executed in accorda.nce with the Contract Documents prior to the effective date of terinination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performiug services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly atlributable to termination. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termivation of the Work, the City sha11 detenvine, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the termination and shall pay to the Contractor the amounts deterniined. Contractor sha11 not be paid on account of loss of anticipated profits or revenue or other economic loss arising out of or resulting from such termination. ARTICLE 16 — DISPUTE RESOLUTION 16.01 Methods and ProceduT�es A. Either City or Contractor may request mediation of any Contract Claim submitted for a decision under Paragraph 10.06 before such decision becomes final and binding. The request for mediation shall be submitted to the other parly to the Contract. Timely submission of the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process sha11 be commenced within 60 days of filing of the request. C. If the Contract Clai.m is not resolved by mediation, City's action under Paragraph 10.06.0 or a denial pursuant to Paragraphs 10.06_C3 or 10.06.D shall become final and binding 30 days after termination of the mediation unless, within that time period, City ar Contractor: CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Decemba2l, 2012 00�2oo-i GENERAL CONDITIONS Page 62 of 63 l. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Clai.m to another dispute resolution process; or 3. gives written notice to the other party of the intent to submit the Contract Claim to a court of competent jurisdiction. ARTICLE 17 — NIISCELLANEOUS 17.01 Giving Notzce A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: l. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other pariy. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confinnation of receipt by the receiving parly. 17.02 Conzputation of Tinzes When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cunzulative Ren2edies The duties and obligations imposed by these General Conditions and the rights and remedies a�ailable hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS Revision: Decanba2l, 2012 oo��oo-i GENERAL CONDITIONS Page 63 of 63 17.04 Sui-vival of Obligations All representations, indemnifications, warranties, and b arantees made in, required by, or given in accordance with the Contract Documents, as well as all conti.nuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or teriuination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headi.ngs are inserted for convenience only and do not constitute parts of these General Conditions. CTI"Y OF FORT WORTIi STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revision: Ikxanba2l, 2012 007300-1 SUPPLEMENTARY CONDITIONS Page 1 of 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 SECTION 00 73 00 SUPPLEMENTARY CONDITIONS TO. GENER.AL CONDITIONS Supplementary Conditions These Supplementary Conditions modify and supplement Section 00 72 00 - General Conditions, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are mod�ed or supplemented remain in full force and effect as so modified or supplemented. All provisions of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplementary Conditions which are defined in the General Conditions have the meaning assigned to them in the General Conditions, unless specifically noted herein. Modifications and Supplements The following are instructions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "Resolving Discrepancies" Plans govem over Specifications. SC-4.OlA Easement limits shown on the Drawing are approximate and were provided to establish a basis for bidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown on the Contract Drawings. SG4.OlA.l., "Availability of Lands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as of September 16, 2013 Outstanding Right-Of-Way, and/or Easements to Be Acquired PARCEL OWNER NU1vIBER None TARGET DATE OF POSSESSION The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. If Contractor considers the final easements provided to differ materially from the representations on the Cqntract Drawings, Contractar shall within five (5) Business Days and before proceeding with the Work, notify City in writing associated with the differing easement line locations. CTTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised April 1, 2013 City Project No. 01372 00 73 00 - 2 SUPPLEMENTARY CONDITIONS Page 2 of 6 1 2 3 4 5 6 7 8 SG4.OlA.2, "Availability of Lands" Utilities or obstructions to be removed, adjusted, and/or relocated The following is list of utilities and/or obstructions that have not been removed, adjusted, and/or relocated as of September 16, 2013 EXPECTED UTILITY A1�TD LOCATION OWNER TARGET DATE OF ADNSTMENT None 9 10 l�J 12 13 14 15 16 1'7 18 19 20 21 22 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 The Contractor understands and agrees that the dates listed above are estimates only, are not guaranteed, and do not bind the City. SC-4.02A., "Subsurface and Physical Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Work: None The following are drawings of physical conditions in or relating to existing surface and subsurface shuctures (except Underground Facilities) which are at or contib ous to the site of the Work: None SC-4.06A., "Hazardous Environmental Conditions at Site" The following are reports and drawings of existing hazardous environmental conditions known to the City: None SG5.03A., "Certificates of Insurance" The entities listed below aze "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: None (3) Other: None SC-5.04A., "Contractor's Insurance" The limits of liability for the insurance required by Paragraph GC-5.04 shall provide the following coverages for not less than the following amounts or greater where required by laws and regularions: 5.04A. Workers' Compensation, under Paragraph GG5.04A. Statutory limits Employer's liability $100,000 each accident/occurrence $100,000 Disease - each employee $500,000 Disease - policy limit CITY OF FORT WORTH WATER AND SANITARY SBWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised April i, 2013 City Project No. 01372 00 73 00 - 3 SUPPLEMENTARY CONDTTIONS Page 3 of 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 SC-5.04B., "Contractor's Insurance" 5.04B. Commercial General Liability, under Paragraph GC-5.04B. Contractor's Liability Insurance under Paragraph GC-5.04B., which shall be on a per project basis covering the Contractor with minimum limits of: $1,000,000 each occurrence $2,000,000 aggregate limit The policy must have an endorsement (Amendment — Agb egate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. The Commercial General Liability Insurance policies shall provide "X", "C",. and "TJ" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. SC 5.04C., "Contractor's Insurance" 5.04C. Automobile Liability, under Paragraph GC-5.04C. Contractor's Liability Insurance under Pazagraph GC-5.04C., which shall be in an amount not less than the following amounts: (1) Automobile Liability - a commercial business policy sha11 provide coverage on "Any Auto", defined as autos owned, hired and non-owned. $1,000,000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: $250,000 Bodily Injury per person / $500,000 Bodily Injury per accident / $100,000 Property Damage SG5.04D., "Contractor's Insurance" The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks: None The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their h-ains or other property. Such operations on raikoad properties may require that Contractor to execute a"Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right-of-entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said raikoad company's properties. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: (1) General Aggregate: (2) Each Occurrence: _ Required for this Contract CITY OF FORT WORTH STANDARA CONSTRUCTION SPECIFICATION DOCUMENTS Revised Aprii i, 2013 $Confum L'units with Railroad $Confirm Limits with Railroad X Not required for this Contract WATER AND SANI'I'ARY SEWER REPLACEMENT CONTRACT 2003 STM-B WII,LIS AVENUE City Project No. 01372 00 73 00 - 4 SUPPLEMENTARY CONDITIONS Page 4 of 6 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ?? 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 With respect to the above outlined insurance requirements, the following shall govern: l. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at-grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. 2. Where more than one railroad company is operating on the same right-of-way or where several raikoad companies are involved and operated on their own separate rights-of-way, the Contractor may be required to provide separate insurance policies in the name of each raikoad company. 3. If, in addition to a grade separation or an at-grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at- b ade crossing, insurance coverage for this work must be included in the policy covering the grade separation. 4. If no grade separation is involved but other work is proposed on a railroad company's right-of- way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. No work or activities on a railroad company's properly to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and tke �ade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. SC-6.04., "Project Schedule" Project schedule shall be tier 3 for the project. SC-6.07., "Wage Rates" The following is the prevailing wage rate table(s) applicable to this proj ect and is provided in the Appendixes: GC-6.07 Heavy & Highway Construction Prevailing Wage Rates 2008 SC-6.09., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" The following are laiown permits and/or licenses required by the Contract to be acquired by the Contractor: 1. SWPPP/TCEQ permitting as required per specification 31 25 00 Erosion and Sediment Control SC-6.09B. "City obtained permits and licenses" The following are known permits and/or licenses required by the Contract to be acquired by the City: 1. TxDOT Permit CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRAGT 2003 STM-B WII.,LIS AVENUE Revised April 1, 2013 City Project No. 01372 00 73 00 - 5 SUPPLEMENTARY CONDITIONS Page 5 of 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 SG6.09C. "Outstanding permits and licenses" The following is a list of known outstanding permits and/or licenses to be acquired, if any as of September 16, 2013 Outstanding Permits and/or Licenses to Be Acquired OWNER PERMIT OR LICENSE AND LOCATION None SG6.24B., "Title VI, Civil Rights Act of 1964 as amended" TARGET DATE OF POSSESSION During the performance of this Contract, the Contractor, for itself, its assi�ees and successors in interest (hereinafter referred to as the "Contractor") agrees as follows: 1. Compliance with Regulations: The Contractor shall comply with the Regulation relarive to nondiscrimination in Federally-assisted programs of the Department of Transportation (hereinafter, "DOT") Title 49, Code of Federal Regulations, Part 21, as they may be amended from time to time, (hereinafter referred to as the Regulations), which are hereiu incorporated by reference and made a part of this contract. 2. Nondiscrimination: The Contractor, with regard to the work performed by it during the contract, sha11 not discriminate on the grounds of race, color, or national origin, in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The Contractor shall not participate either directly or indirectly in the discrimination prohibited by 49 CFR, section 21.5 of the Regularions, including employment practices when the contract covers a program set forth in Appendix B of the Regulations. 3. Solicitations for Subcontractors, Including Procurements of Materials and Equipment: In all solicitations either by competitive bidding or negotiation made by the contractor for work to be performed under a subcontract, including procurements of materials or leases of equipment, each potential subcontactor or supplier shall be notified by the Contractor of the Contractor's obligations under this contract and the Regulations relative to nondiscrimination on the grounds of race, color, or national origin. 4. Information and Reports: The Contractor shall provide all information and reports required by the Regulations or directives issued pursuant thereto, and shall permit access to its books, records, accounts, other sources of information and its facilities as may be detennined by City or the Texas Department of Transportation to be pertinent to ascertain compliance with such Regulations, orders and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish this information the contractor shall so certify to the City, or the Texas Department of Transportation, as appropriate, and shall set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of the Contractor's noncompliance with the nondiscriinination provisions of this Contract, City shall impose such contract sanctions as it or the Texas Department of Transportation may determine to be appropriate, including, but not limited to: � � withholding of payments to the Contractor under the Contract until the Contractor complies, and/or cancellation, termination or suspension of the Contract, in whole or in part. 6. Incorporation of Provisions: The Contractor shall include the provisions ofparagraphs (1) through (6) in every subcontract, including procurements of materials and leases of equipment, unless exempt CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENiJE Revised April l, 2013 City Project No. 01372 007300-6 SUPPLEMENTARY CONDTTIONS Page 6 of 6 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ?2 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 by the Regulations, or directives issued pursuant thereto. The Contractor shall take such action with respect to any subcontract or procurement as City or the Texas Department of Transportation may direct as a means of enforcing such provisions including sanctions for non-compliance: Provided, however, that, in the event a contractor becomes involved in, or is threatened with, litigation with a subcontractor or supplier as a result of such direction, the contractor may request City to enter into such litigation to protect the interests of City, and, in addition, the contractor may request the United States to enter into such litigation to protect the interests of the United States. Additional Title VI requirements can be found in the Appendix. SC-7.02., "Coordinafion" The individuals or entities listed below have contracts with the City for the performance of other work at the Site: Vendor Sco e of Work Coordination Authority None SG8.01, "Communications to Contractor" At least two weeks prior to construction the contractor shall coordinate water line isolations and shut down date and time with: The City of Fort Worth, Roger Hauser, Assistant Water Systems Superintendant, 817-925-2360 Contractor to communicate with City of Fort Worth, Chris Harder, P.E. Engineering Manager, Water Production 817-392-8923 when 24-inch water main is taken out of service and returned to service. Contractor to call the Texas Department of Transportation, Area Inspector (48 hours prior to construction in T�OT R.O.W.) SC-9.01., "City's Project Representafive" The following firm is a consultant to the City responsible for construction management of this Project: None SG13.03C., "Tests and Inspections" None SG16.O1C.1, "Methods and Procedures" None 45 END OF SECTION CTfY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised April 1, 2013 City Project No. 01372 oiiioo-i SUMMARY OF WORK Page 1 of 3 1 2 3 PART1- GENERAL SECTION O1 1100 SUNINIARY OF WORK 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 10 11 12 1.2 C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0- Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1- General Requirements PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQLTIltEMENTS 18 A. Work Covered by Contract Documents 19 1. Work is to include funzishing all labor, materials, and equipment, and performing 20 all Work necessary for this construction project as detailed in the Drawings and 21 Specifications. 22 B. Subsidiary Work 23 1. Any and all Work specifically governed by documentary requirements for the 24 project, such as conditions imposed by the Drawings or Contract Documents in 25 which no specific item for bid has been provided for in the Proposal and the item is 26 not a typical unit bid item included on the standard bid item list, then the item shall 27 be considered as a subsidiary item of Work, the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C. Use of Premises 30 1. Coordinate uses of premises under direction of the City. 31 2. Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3. Use and occupy only portions of the public streets and alleys, or other public places 34 or other rights-of-way as provided for in the ordinances of the City, as shown in the 35 Contract Documents, or as may be specifically authoriz�d in writing by the City. 36 a. A reasonable amount of tools, materials, and equipment for construction 37 purposes may be stored in such space, but no more than is necessary to avoid 38 delay in the construction operations. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 011100-2 SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private properly unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights-of-way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 18 19 20 21 ?? 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to a11 water, sewer, and gas lines, to all conduits, overhead pole�lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest ui lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance oi the b bainuing of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed duri.ng construction of the Proj ect to the original or a better than. original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the proj ect proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Project No. 01372 011100-3 SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USEDJ 3 1.7 CLOSEOUT SUEMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED) 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WA.RRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUIvIMARY OF CHANGE CITY OF FORT WORTH WATER AND SANITARY SEWER RbPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 012500-1 SUBSTTI'UTION PROCEDURES Page 1 of 5 1 2 3 PART1- GENERAL 4 1.1 SUMIVIA.RY 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1.2 SECTION O1 25 00 SUBSTITUTION PROCEDURES A. Section Includes: 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. . Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or-equals". B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. 22 No separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQITIltEMENTS 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certaiu types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or-equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or-equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCITMENTS CONTRACT 2003 STM-B WII,LIS AVENLJE Revised July 1, 2011 City Project No. 01372 o12s oo - 2 SUBSTITUTION PROCEDURES Page 2 of 5 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ?? 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents � 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) VJeight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the properly of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection l. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-S WII..LIS AVENUE Revised July 1, 2011 City Proj ect No. 01372 012500-3 SUBSTTTUTION PROCEDURES Page 3 of 5 1 4. No additional contract time will be given for substitution. 2 5. Substitution will be rejected if: 3 a. Submittal is not through the Contractor with his stamp of approval 4 b. Request is not made in accordance with this Specification Section 5 c. In the City's opinion, acceptance will require substantial revision of the original 6 design 7 d. In the City's opinion, substitution will not perform adequately the function 8 consistent with the design i.ntent 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE 13 A. In making request for substitution or in using an approved product, the Contractor 14 represents that the Contractor: 15 1. Has investigated proposed product, and has determined that it is adequate or 16 superior in all respects to that specified, and that it will perform fiznction for which 17 it is intended 18 2. Will provide same b arantee for substitute item as for product specified 19 3. Will coordinate installation of accepted substitution into Work, to include building 20 modifications if necessary, making such changes as may be required for Work to be 21 complete in all respects 22 4. Waives all clauns for additioual costs related to substitution which subsequently 23 arise 24 1.10 DELIVERY, STORAGE, AND AANDLING [NOT USED] 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 26 1.12 WA,RRANTY [NOT USED] 27 PA.RT 2- PRODUCTS [NOT USED] 28 PART 3- EXECUTION [NOT USED] 29 30 END OF SECTION Revision Log DATE NAME SL1�vIMARY OF CHANGE C1TY OF FORT WORTH WATER AND SANITARY SBWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised July i, 2011 City Project No. 01372 012500-4 SUBSTITUTION PROCEDURES Page 4 of 5 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 EX�IIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's b arantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted _ Recommended _ Recommended Firm Address Date Telephone Not recommended Received late By — Date Remarks For Use by City: Approved CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July l, 2011 Rejected WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B WII.,LIS AVENLTE City Project No. 01372 1 Clty CTI'Y OF FORT WORTA STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July l, 2011 Date 012500-5 SUBSTITUTION PROCEDURES Page 5 of 5 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B WILLIS AVENUE City Project No. 01372 013119-1 PRECONSTRUCTION MEETING Page 1 of 3 1 2 3 PARTl- GENERAL �i��.Y1Ju lu I:_\_.i'1 SECTION 0131 19 PRECONSTRUCTION MEETING 5 A. Section Includes: 6 l. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 l. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1— General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 1 S 1.4 ADMINISTRATIVE REQUIREMENTS 19 20 21 ?2 23 24 25 26 2'7 28 29 30 31 32 33 34 35 36 37 38 A. Coordination 1. Attend preconstnzction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the begiiuling of the meeting. 3. Attendance shall inclucle: a. Project Representative b. Contractor's proj ect manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDAR.D CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised August 17, 2012 City Project No. 01372 013119-2 PRECONSTRUCTION MEETING Page 2 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 ?� ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 e. Other City representatives f. Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section Ol 32 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliininary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material l. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre-Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Wanung System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. M/WBE or MBE/SBE procedures hh. Final Acceptance ii. Final Payment jj. Questions or Comments CTfY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised August 17, 2012 City Project No. 01372 O1 31 19 - 3 PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTA.LS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED) 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WA,RRANTY [NOT USED] 9 PART 2- PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CI'I'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised August 17, 2012 City Project No. 01372 013120-1 PROJECT MEETINGS Page 1 of 3 1 2 3 PART1- GENERAL 4 l.l SUIVIMARY 5 6 7 8 9 10 11 12 13 14 SECTION 013120 PROJECT MEETINGS A. Section Includes: 1. Provisions for project meetings throughout the construction period to enable orderly review of the progress of the Work and to provide for systematic discussion of potential problems B. Deviations this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES (NOT USED] 19 1.4 A.DMINISTRATIVE REQUIREMENTS 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings throughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meetings admuustered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. 4. Meetings, in addition to those specified in this Section, may be held when requested by the City, Engineer or Contractor. B. Pre-Construction Neighborhood Meeting 1. After the execution of the Agreement, but before construction is allowed to begin, attend 1 Public Meeting with affected residents to: a. Present projected schedule, including construction start date b. Answer any construction related questions 2. Meeting Location a. Location of ineeting to be determined by the City. 3. Attendees a. Contractor CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 013120-2 PROJECT MEETINGS Page 2 of 3 1 ? 3 4 5 6 b. Proj ect Represeniative c. Other City representatives 4. Meeting Schedule a. In general, the neighborhood meeting will occur within the 2 weeks following the pre-construction conference. b. In no case will construction be allowed to begin until this meeting is held. 7 C. Prob ess Meetings 8 l. Formal project coordination meetings will be held periodically. Meetings will be 9 scheduled and adininistered by Proj ect Representative. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ?g fi], 3 � Additional progress meetings to discuss specific topics will be conducted on an as- needed basis. Such additional meetings shall include, but not be limited to: a. Coordinating shutdowns b. Installation of piping and equipment c. Coordination between other construction projects d. Resolution of construction issues e. Equipment approval The Project Representative will preside at prob ess meetings, prepare the notes of the meeting and distribute copies of the same to all participants who so request by fully completing the attendance form to be circulated at the b bQinning of each meeting. Attendance shall include: a. Contractor's project manager b. Contractor's superintendent c. Any subcontractor or supplier representatives whom the Contractor may desire to invite ar the City may request d. Engineer's representatives e. City's representatives £ Others, as requested by the Project Representative 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 5. Preliminary Agenda may include: a. Review of Work progress since previous meeting b. Field observations, problems, conflicts c. Items which impede construction schedule d. Review of off-site fabrication, delivery schedules e. Review of construction interfacing and sequencing requirements with other construction contracts f. Corrective measures and procedures to regain projected schedule g. Revisions to construction schedule h. Progress, schedule, during succeeding Work period i. Coordination of schedules j . Review submittal schedules k. Maintenance of quality standards l. Pending changes and substitutions m. Review proposed changes for: 1) Effect on construction schedule and on completion date 2) Effect on other contracts of the Project n. Review Record Documents o. Review monthly pay request p. Review status of Requests for Information CTI'Y OF FORT WORTH WATER AND SANTfARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCtTMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July I, 2011 City Project No. 01372 013120-3 PROJECT MEETINGS Page 3 of 3 1 6. Meeting Schedule 2 a. Progress meetings will be held periodically as determined by the Proj ect 3 Representative. 4 1) Additional meetings may be held at the request of the: 5 a) City 6 b) Engineer 7 c) Contractor S 7. Meeting Location 9 a. The City will establish a meeting location. 10 1) To the extent practicable, meetings will be held at the Site. i l 1.5 SUBMITTALS [NOT USED] 12 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 13 1.7 CLOSEOUT SUEMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSLTRANCE (NOT USED] 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 l.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WA,RRANTY [NOT USED] 19 PART 2- PRODUCTS [NOT USED] 20 PART 3- EXECUTION [NOT USED] 21 END OF SECTION 22 Revision Log DATE NAME SUMMARY OF CHANGE 23 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENiJE Revised July 1, 2011 City Project No. 01372 013216-1 CONSTRUCTION PROGRESS SCHEDULE Page 1 of 5 1 2 3 PARTl- GENERAL SECTION 0132 16 CONSTRUCTION PROGRESS SCHEDULE 4 1.1 Si1MMMARY 5 A. Section Includes: 6 l. General requirements for the preparation, submittal, updating, status reporting and 7 management of the Construction Progress Schedule 8 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance 9 Document 10 11 12 13 14 15 1.2 16 17 18 19 1.3 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. REFERENCES A. Definitions l. Schedule Tiers a. Tier 1- No schedule submittal required by contract. Small, brief duration projects b. Tier 2- No schedule submittal required by contract, but will require some milestone dates. Small, brief duration projects c. Tier 3- Schedule submittal required by contract as described in the Specification and herein. Majority of City projects, including all bond program projects d. Tier 4- Schedule submittal required by contract as described in the Specification and herein. Large and/or complex projects with long durations 1) Examples: large water pump station project and associated pipeline with interconnection to another governmental entity e. Tier 5- Schedule submittal required by contract as described in the Specification and herein. Large and/or very complex projects with long durations, high public visibility 1) Examples might include a water or wastewater treatment plant 2. Baseline Schedule - Initial schedule submitted before work begins that will serve as the baseline for measuring progress and departures from the schedule. 3. Progress Schedule - Monthly submittal of a progress schedule documenting progress on the project and any changes anticipated. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 20ll City Project No. 013'72 013216-2 CONSTRUCTION PROGRESS SCHEDULE Page 2 of 5 1 2 3 4_ Schedule Narrative - Concise narrative of the schedule including schedule changes, expected delays, key schedule issues, critical path items, etc B. Reference Standards 4 1. City of Fort Worth Schedule Guidance Document 5 1.4 ADMINISTRATIVE REQUIl2EMENTS 6 7 8 9 10 11 12 13 14 15 A. Baseline Schedule 1. General a. Prepare a cost-loaded baseline Schedule using approved software and the Critical Path Method (CP1Vn as required in the City of Fort Worth Schedule Guidance Document. b. Review the draft cost-loaded baseline Schedule with the City to demonstrate understanding of the work to be performed and known issues and constraints related to the schedule. c. Designate an authorized representative (Project Scheduler) responsible for developing and updating the schedule and preparing reports. 16 B. Progress Schedule 17 1_ Update the progress Schedule monthly as required in the City of Fort Worth 18 Schedule Guidance Document. 19 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 20 3. Change Orders 21 a. Incorporate approved change orders, resulting in a change of contract time, in 22 the baseline Schedule in accordance with City of Fort Worth Schedule 23 Guidance Document. 24 C. Responsibility for Schedule Compliance 25 1. Whenever it becomes apparent from the current progress Schedule and CPM Status 26 Report that delays to the critical path have resulted and the Contract completion 27 date will not be met, or when so directed by the City, make some or all of the 28 following actions at no additional cost to the City 29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule 30 outlining: 31 1) A written statement of the steps intended to take to remove or arrest the 32 delay to the critical path in the approved schedule 33 2) Increase construction manpower in such quantities and crafts as will 34 substantially eliminate the backlog of work and return current Schedule to 35 meet projected baseline completion dates 36 3) Increase the number of working hours per shift, shifts per day, working 37 days per week, the amount of construction equipment, or any combination 38 of the foregoing, sufficiently to substantially eliminate the backlog of work 39 4) Reschedule activities to achieve ma�mum practical concurrency of 40 accomplishment of activities, and comply with the revised schedule 41 2. If no written statement of the steps intended to take is submitted when so requested 42 by the City, the City may direct the Contractor to increase the level of effort in 43 manpower (trades), equipment and work schedule (overtime, weekend and holiday 44 work, etc.) to be employed by the Contractor in order to remove or arrest the delay 45 to the critical path in the approved schedule. 46 a. No additional cost for such work will be considered. CITY OF FORT WORTH WATER AND SANTTARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WIL.LIS AVbTTUE Revised July 1, 2011 City Project No. 01372 013216-3 CONSTRUCTION PROGRESS SCHEDULE Page 3 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 D. The Contract completion time will be adjusted only for causes specified in this Contract. a. Requests for an extension of any Contract completion date must be supplemented with the following: 1) Furnish justification and supporting evidence as the City may deem necessary to determine whether the requested extension of time is entitled under the provisions of this Contract. a) The City will, after receipt of such justification and supporting evidence, make findings of fact and will advise the Contractor, in writing thereof. 2) If the City finds that the requested extension of time is entitled, the City's determination as to the total number of days allowed for the extensions shall be based upon the approved total baseline schedule and on all data relevant to the extension. a) Such data shall be included in the next updating of the Prob ess schedule. b) Actual delays in activities which, according to the Baseline schedule, do not affect any Contract completion date shown by the critical path in the network will not be the basis for a change therein. 2. Submit each request for change in Contract completion date to the City within 30 days after the beginning of the delay for which a time extension is requested but before the date of fmal payment under this Contract. a. No time extension will be granted for requests which are not submitted withi.n the foregoing time li.mit. b. From time to time, it may be necessary for the Contract schedule or completion time to be adjusted by the City to reflect the effects of job conditions, weather, technical di�culties, strikes, unavoidable delays on the part of the City or its representatives, and other unforeseeable conditions which may indicate. schedule adjustments or completion time extensions. 1) Under such conditions, the City will direct the Contractor to reschedule the work or Contract completion time to reflect the changed conditions and the Contractor shall revise his schedule accordingly. a) No additional compensation will be made to the Contractor for such schedule changes except for unavoidable overall contract time extensions beyond the actual completion of unaffected work, in which case the Contractor shall take all possible action to minimize any time extension and any additional cost to the City. b) Available float time in the Baseline schedule may be used by the City as well as by the Contractor. 3. Float or slack time is defined as the amount of time between the earliest start date and the latest start date or between the earliest finish date and the latest finish date of a chain of activities on the Baseline Schedule. a. Float or slack time is not for the exclusive use or benefit of either the Contractor or the City. b. Proceed with work according to early start dates, and the City shall have the right to reserve and apportion float time according to the needs of the project. CTfY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July i, 2011 City Proj ect No. 01372 013216-4 CONSTRUCTION PROGRESS SCHEDULE Page 4 of 5 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 c. Acknowledge and ab ee that actual delays, affecting paths of activities containing float time, will not have any effect upon contract completion times, providing that the actual delay does not exceed the float time associated with those activities. E. Coordinating Schedule with Other Contract Schedules 1. Where work is to be performed under this Contract concurrently with or contingent upon work performed on the same facilities or area under other contracts, the Baseline Schedule shall be coordinated with the schedules of the other contracts. a. Obtain the schedules of the other appropriate contracts from the City for the preparation and updating of Baseline schedule and make the required changes in his schedule when indicated by changes in corresponding schedules. 2. In case of interference between the operations of different contractors, the City will determine the work priority of each contractor and the sequence of work necessary to expedite the completion of the entire Project. a. In such cases, the decision of the City shall be accepted as final. b_ The temporary delay of any work due to such circumstances shall not be considered as justification for claims for additional compensation. 18 1.5 SUSMITTALS 19 A. Baseline Schedule 20 21 ?? 23 24 25 1. Submit Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. a. Native file format includes: 1) Primavera (P6 or Primavera Contractor) 2. Submit draft baseline Schedule to City prior to the pre-construction meeting and bring in hard copy to the meeting for review and discussion. 26 B. Progress Schedule 27 l. Submit prob ess Schedule in native file format and pdf format as required in the 28 City of Fort Worth Schedule Guidance Document. 29 Z. Submit progress Schedule monthly no later than the last day of the month. 30 31 32 33 34 35 36 37 38 39 C. Schedule Narrative 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit schedule narrative monthly no later than the last day of the month. D. Submittal Process 1. The City administers and manages schedules through Buzzsaw_ 2. Contractor shall submit documents as required in the City of Fort Worth Schedule Guidance Document. . 3. Once the project has been completed and Final Acceptance has been issued by the City, no further progress schedules are required. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCtJMENTS CONTRACT 2003 STM-B WII.,LIS AVENUE Revised July 1, 2011 City Project No. 01372 013216-5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 1.8 MAINTENANCE MATERIAL SUBMITTA.LS [NOT USED] 4 1.9 QUALITY ASSURANCE 5 A. The person preparing and revising the construction Prob ess Schedule shall be 6 experienced in the preparation of schedules of similar complexity. 7 B. Schedule and supporting documents addressed in this Specification shall be prepared, 8 updated and revised to accurately reflect the performance of the construction. 9 C. Contractor is responsible for the quality of all submittals in this section meeting the 10 standard of care for the construction industry for similar projects. 11 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 12 l.11 FIELD [SITE] CONDITIONS [NOT USED] 13 1.12 WA.RRANTY [NOT USED] 14 PART 2- PRODUCTS [NOT USED] 15 PART 3- EXECITTION [NOT USED] 16 17 18 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH WATER AND SANTfARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Pmject No. 01372 013233-1 PRECONSTRUCTION VIDEO Page 1 of 2 1 ? 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 � 33 SECTION Ol 32 33 PRECONSTRUCTION VIDEO 1.1 SUMMARY A. Section Includes: l. Administrative and proceduxal requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment l. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADD�IINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USEDj 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] l.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WA,RRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 013�2 Oi3233-2 PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SLT�vIMARY OF CHANGE C1TY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WIL,LIS AVENUE Revised July 1, 2011 City Project No. 01372 013300-1 SUBMITTALS Page 1 of 8 1 2 3 PARTl- GENERAL • �u�u s_' _� SECTION 0133 00 SUBMTTTALS 5 A. Section Includes: 6 1_ General methods and requirements of submissions applicable to the following 7 Work-related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 15 16 17 1.2 C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADA'IINISTRATIVE REQUIREMENTS 23 24 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication � Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECffICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 013300-2 SUBMITTALS Page 2 of 8 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ?? 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 Fold shop drawings larger than 8%z inches x 11 inches to 8%z inches x l linches. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations 45 E. Submittal Content 46 l. The date of submission and the dates of any previous submissions d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering l. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 1 1 11 1: : 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification l. Review shop drawings, product data and saxnples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement aff�ed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) "By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1 F], CTl"Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCITMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 013300-3 SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 parab aph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom-prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting far approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing-in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Project No. 01372 013300-4 SUBMITTALS Page 4 of 8 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 7) Standard wiring diagrams 8) Printed performance curves and operational-range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare-parts listing and printed product warranties 12) As applicable to the Work H. Samples 1. As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed, materials purchased or on-site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 24 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution 1 2. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1} Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to desi�ated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative Hard Copy Distribution (if required in lieu of electronic distribution) C1TY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised December 20, 2012 City Project No. 01372 013300-5 SUBMITTALS Page 5 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Proj ect Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 3 � 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFTCATION DOCUMENTS CONTRACT 2003 STM-B WII.LTS AVENUE Revised December 20, 2012 City Proj ect No. 01372 013300-6 SUBMITTALS Page 6 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 c. � 1) 'BXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the fmal product. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the fmal product. b) This resubmittal is to address all comments, omissions and non-conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised December 20, 2012 City Project No. 01372 01.33 00 - 7 SUBMITTALS Page 7 of 8 1 9. When the shop drawings ha�e been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFl� l. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Use the Request for Information (RFI) form provided by the City. 3. Numbering of RFI a. Prefix with "RFI" followed by series number, "-�", beguuung with "Ol" and increasing sequentially with each additional transmittal. 4. Sufficient information shall be attached to permit a written response without further information. 5. The City will log each request and will review the request. a. If review of the project information request indicates that a change to the Contract Docwnents is required, the City will issue a Field Order or Change Order, as appropriate. 30 1.5 SUBMTTTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUSMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MA.TERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] 35 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 36 37 l.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLIMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 013300-8 SUBMITTALS Page 8 of 8 1 PART 2- PRODUCTS [NOT USED] 2 PART 3- EXECUTION [NOT USED] 3 END OF SECTION CiTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII.LIS AVENLTE Revised Deceinber 20, 2012 City Project No. 01372 013513-1 SPECIAL PROJECT PROCEDURES Page 1 of 8 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1 2 3 PART1- GENERAL 4 l.l SUMMARY SECTION 013513 SPECIAL PROJECT PROCEDURES A. Section Includes: 1. The procedures for special project circumstances that includes, but is not limited to: a. Coordination with the Texas Department of Transportation b. Work near High Voltage Lines c. Conf`med Space Entry Program d. Air Pollution Watch Days e. Use of Explosives, Drop Weight, Eic. f. Water Department Notification g. Public Notification Prior to Beginning Construction h. Coordination with United States Army Corps of Engineers i. Coordination within Railroad permits areas j. Dust Control k. Employee Parkiug B. Deviations from this City of Fort Worth Standard Specification 1. None. 20 C. Related Specification Sections include, but are not necessarily li_mited to: 21 1. Division 0— Bidding Requirements, Contract Fonns and Conditions of the Contract 22 2. Division 1— General Requirements 23 3. Section 33 12 25 — Connection to E�sting Water Mains 24 L2 PRICE AND PAYMENT PROCEDURES 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 A. Measurement and Payment 1. Coordination within Railroad pemut areas a. Measurement 1) Measurement for this Item will be by lump sum. b. Payment 1) The work performed and materials furnished in accordance with this Item will be paid for at the lump sum price bid for Railroad Coordination. c. The price bid shall include: 1) Mobilization 2) Inspection 3) Safety training 4) AdditionalInsurance 5) Insurance Certificates 6) Other requirements associated with general coordination with Railroad, including additional employees required to protect the right-of-way and property of the Railroad from damage arising out of and/or from the construction of the Project. 2. Railroad Flagmen CTI'Y OF FORT WORTA WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII..LIS AVENUE Revised December 20, 2012 City Project No. 01372 013513-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 ? 3 4 5 6 7 8 9 10 11 12 13 a. Measurement 1) Measurement for this Item will be per working day. b. Payment- 1) The work performed and materials furnished in accordance with this Item will be paid for each working day that Railroad Flagmen are present at the Site. c. The price bid shall include: 1) Coordination for scheduling flagmen 2) Flagmen 3) Other requirements associated with Railroad 3 _ All other items a. Work associated with these Items is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 14 1.3 REFER.ENCES 15 A. Reference Standards 16 17 18 19 20 21 ?Z 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction Specification , 23 1.4 ADP�IINISTRATIVE REQUIREMENTS 24 A. Coordination with the Texas Department of Transportation 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1. When work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (TxDOT): a. Notify the Texas Department of Transportation prior to commencing any work therein in accordance with the provisions of the permit b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines %J, 3 � 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage-type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines Work within 6 feet of high voltage electric lines CTTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-S WILLIS AVENUE Revised December 20, 2012 City Pmject No. 01372 013513-3 SPECIALPROJECTPROCEDURES Page 3 of 8 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a} Erect temporary mechanical barriers, de-energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other coniined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Air Pollution Watch Days 1 �� General a. Observe the following guidelines relating to working on City construction sites on days designated as "AIIZ POLLUTION WATCH DAYS". b. Typical Ozone Season 1) May 1 through October 31. c. Critical Emission Time 1) 6:00 a.m. to 10:00 a.m. Watch Days a. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the Air Pollution Watch by 3:00 p.m. on the afternoon prior to the WATCH day. b. Requirements 1) Begin work after 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. 2) However, the Contractor may begin work prior to 10:00 a.m. if: a) Use of motorized equipment is less than 1 hour, or b) If equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (LJLSD), diesel emulsions; or alternative fuels such as CNG. E. TCEQ Air Permit 1. Obtain TCEQ Air Permit for construction activities per requirements of TCEQ. F. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate i.nsurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section Ol 31 13 G. Water Department Coordination CTTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 O13513-4 SPECIALPROJECTPROCEDURES Page 4 of 8 i 1. During the construction of this project, it will be necessary to deactivate, for a 2 period of time, existing lines. The Contractor shall be required to coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an e�sting 6 City water line system with the City's representative. 7 a. Coordination sha11 be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named proj ect. 10 c. In the event that a water valve on an existing live system be turned off and on 11 to accommodate the construction of the project is required, coordi.nate this 12 activity through the appropriate City representative_ 13 1) Do not operate water line valves of existing water system. 14 a) Failure to comply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischie fl and the Contractor 16 will be prosecuted to the full extent of the law. l� b) In addition, the Contractor will assume all liabilities and 1 g responsibilities as a result of these actions. 19 20 21 ?2 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 H. Public Notification Prior to Bea nning Construction Prior to beginuing construction on any block in the proj ect, on a block by block basis, prepare and deliver a notice or flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice shall be prepared as follows: a. Post notice or flyer 7 days prior to beo nn;ng any construction activity on each block in the project area. 1) Prepare flyer on the Contractor's letterhead and include the following information: a) Name ofProject b) City Proj ect No (CPI� � c) Scope of Project (i.e. type of construction activity) d) Actual construction duration within the block e) Name of the contractor's foreman and phone number fl Name of the City's inspector and phone number g) City's after-hours phone number 2) A sample of the `pre-construction notification' flyer is attached as E�ibit A. 3) Submit schedule showing the construction start and finish time for each block of the project to the inspector. 4) Deliver flyer to the City Inspector for review prior to distribution. b. No construction will be allowed to begin on any block until the flyer is delivered to a11 residents of the block. I. Public Notification of Temporary Water Service Interruption during Construction 43 l. In the event it becomes necessary to temporarily shut down water service to 44 residents or businesses during construction, prepare and deliver a notice or flyer of 45 the pending interruption to the front door of each affected resident. 46 2. Prepared notice as follows: 4� a. The notification or flyer shall be posted 24 hours prior to the temporary 48 interruption. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Project No. 01372 013513-5 SPECIAL PROJECT PROCEDURES Page 5 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 � c. d. e. f. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number A sample of the temporary water service interruption notification is attached as Exhibit B. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. No interruption of water service can occur until the flyer has been delivered to a11 affected residents and businesses. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 J. Coordination with United States Army Corps of Engineers (USACE) l. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. K. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad pemuts are required, meet all requirements set forth in each desi�ated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors a Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and properiy of the Raikoad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures sha11 be used in accordance with the permit guidelines_ 2. Obtain any supplemental information needed to comply with the railroad's requirements. 3. Railroad Flagmen a. Submit receipts to City for verification of working days that railroad flagmen were present on Site. L. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. M. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 013513-6 SPECIAL PROJECT PROCEDURES Page 6 of 8 1 2 3 4 5 6 7 8 7 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBNIITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS (NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] l.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WA.RRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 10 PART 3- EXECUTION [NOT USED] 11 12 END OF SECTION Revision Log DATE NAME SLI�vIMARY OF CHANGE 1.4.B — Added requirement of coinpliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 1.4.E — Added Contractor responsibility for obtaining a TCEQ Air Pernut CiTY OF FORT WORTH WATER AND SANTfARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised December 20, 2012 City Project No. 01372 013513-7 SPECIALPROJECTPROCEDURES Page 7 of 8 1 2 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: l0 Mapsco Location: 11 Limits of Construction: 12 13 EXI�BIT A (To be printed on Contractor's Letterhead) 14 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR°S SUPERINTENDENT> AT <TELEPHONE NO.> 29 3o OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CTTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENLTE Revised December 20, 2012 City Project No. 01372 013513-8 SPECIAL PROJECT PROCEDURES Page 8 of 8 1 2 1�:�:11.3Y1�.? FORT WORTH Dete: nos xo. �cxxx Project I/ame: 1�i0?ICE OF TEMPORABY WATER SERVICE II�ITERRLIP?IOI�I DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF �D IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT, PLEASE CALL: MR AT (CONTRACTORS SUPERINTENDENI7 (TELEPHONE NUMBER) OR MR AT (CTTY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHOiZT AS POSSIBLE. T'HANK YOU, CONTRACTOR G 4 CITY OF FORT WORTH WATER AND SANTI'ARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 014523-1 TESTiNG AND INSPECTION SERVICES Page 1 of 2 1 2 3 PART1- GENERAL -4 11 SIfP✓IlVIARY 5 6 7 8 9 10 11 12 1.2 13 14 15 16 17 18 19 20 21 22 23 24 25 1.3 SECTION Ol 45 23 TESTING AND INSPECTION SERVICES A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of a11 Quality Control testing. b. City is responsible for perfonning and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until a11 required payments for testing by Contractor have been paid in full. REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 28 29 30 31 32 33 34 35 36 37 38 A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, su�ciently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another extemal FTP site approved by the City. CITY OF FORT WORTH WATER AND SANTTARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVHNUE Revised July i, 2011 City Project No. 01372 014523-2 TESTING AND INSPECTION SERVICES Page 2 of 2 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 . SUBMITTALS [NOT USED] 19 1.6 ACTION SUSMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBNIITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SiTBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 25 l.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 26 PART 2- PRODUCTS [NOT USED] 27 PART 3- EXECUTION [NOT USED] ?g 29 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 30 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS � CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 2011 City Project No. 01372 015000-1 TEMPORARY FACILTI'IES AND CONTROLS Page 1 of 4 1 2 SECTION Ol 50 00 TEMPOR.ARY FACIL,ITIES AND CONTROLS 3 PART1- GENERAL 4 1.1 SI:RVIMARY 5 6 � 8 9 10 11 12 13 14 15 16 17 18 1.2 A. Section Includes: 1. Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildi.ngs d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1 _ None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADNIINISTRATIVE REQUIREMENTS 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Temporary Utilities l. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 O15000-2 TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 ?2 23 24 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 39 40 41 d. Contractor Payment for Construction Water . 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing �vork or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe. working conditions. B. Sanitary Facilities 2. K� 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off-site at no less than weekly intervals and properly dispose in accordance with applicable reb lation. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off b ound. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or constnzction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised July 1, 2011 City Project No. 01372 1 ? 3 4 5 6 7 S 9 10 11 12 13 14 15 015000-3 TEMPORARY FACIL.ITIES AND CONTROLS Page 3 of 4 1_ Contractor is responsible for maintaining dust control through the duration of the proj ect. a. Contractor remains on-call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED) 1.7 CLOSEOUT SUBMITTALS [NOT USEDJ 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED) 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] l.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WA RRANTY [NOT USED] 16 PART 2- PRODUCTS [NOT USED] 17 PART 3- EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIlt] / [RESTORATION] 25 3.6 RE-INSTALLATION 26 3.7 FIELD [ox] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 O i 50 00 - 4 TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SLT�vIMARY OF CHANGE CITY OF FORT WORTH WATER AND SANTfARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECffICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised July 1, 2011 City Project No. 013'72 015526-1 STREET USE PERMTT AND MODIFICATIONS TO TR.AFFIC CONTROL Page I of 3 1 . SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART 1 - GENERAT, ���.Yi�u-1�_/:� ��•1 5 6 7 8 9 10 11 12 13 14 15 16 A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. 1Vlodification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Biddiug Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Tra�c Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIl2EMENTS A. Tra�c Control l. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit l. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Tra�c Control Plans to City Transportation and Public Works Department. CTI'Y OF FORT WORTH WATER AND S?.NITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 O15526-2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16. 17 18 19 20 Z1 22 23 24 25 1) Aliow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised trafFic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2j Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public VJorks Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1_ In the case of regulatory si�s, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Tra�c Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F: Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 33 34 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WA,�2RANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 35 PART 3- EXECLTTION [NOT USED] 36 END OF SECTION CTfY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENLJE Revised July 1, 2011 City ProjectNo. 01372 1 2 015526-3 STREET USE PERMTI' AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUNIMARY OF CHANGE CTI'Y OF FORT WORTH WATER AND SANTI'ARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 01 57 13 - 1 STORM WATER POLLUTION PREVENTION Page i of 3 1 2 SECTION Ol 5713 STORM WATER POLLUTION PREVENTION 3 PART 1- GENERAT, 4 1.1 5 6 7 8 9 10 11 12 13 14 1.2 15 16 17 18 19 20 21 1.3 SiTNIlVIARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract , 2. Division 1— General Requirements 3. Section 31 25 00 — Erosion and Sediment Control PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 31 25 00. REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIl2EMENTS 35 A. General 36 l. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised July 1, 2011 City Project No. 01372 O1 57 13 - 2 STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1 2. 3. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 31 25 00 and Drawings. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Si� and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more,of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. Z) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 21 ?2 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 1.5 SUBMITTALS A_ SWPPP l. Submit in accordance with Section Ol 33 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.,LIS AVENtJE Revised July 1, 2011 City Pmject No. 01372 01 57 13 - 3 STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 3 in accordance with Section Ol 33 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUEMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSUI2ANCE [NOT USED] 8 1.10 DELIVERY, STOR.AGE, AND HANDLING [NOT USED] 9 l.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WA1tRANTY [NOT USED] i l PART 2- PRODUCTS [NOT USED] 12 PART 3- EXECUTION [NOT USED] 13 END OF SECTION 14 15 Revision Log DATE NAtv� SLINIMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 WATER AND SANITARY SEWER REPLACEMENT CONTRACT 2003 STM-B WII,LIS AVENUE City Project No. 01372 015813-1 TEMPORARY PROJECT SIGNAGE Page 1 of 3 1 2 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 SECTION O1 58 13 TEMPORARY PROJECT SIGNAGE l.l SUNIlVIARY A. Section Includes: l. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements L2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIl2EMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUSMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MA.TERIAL SUSMITTALS (NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WA,RRANTY [NOT USED] PART2- PRODUCTS 27 2.1 OWNER-FURNISHED [ox] OWNER-SUPPLIEDPRODUCTS [NOT USED] 28 2.2 EQUIPMENT, PRODUCT TYPES, AND MATERIALS 29 A. Design Criteria 30 l. Provide free standing Project Designation Sign in accordance with City's Standard 31 Details for project signs. CTTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTTON SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 015813-2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 1 B. Materials 2 l. Sign 3 a. Constructed of 3/-inch fir plywood, grade A-C (exterior) or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTROL [NOT USED] 6 PART 3 - EXECUTION 7 3.1 INSTALLERS [NOT USED] 8 3.2 EXAMINATION [NOT USED] 9 3.3 PREPARATION [NOT USED] 10 3.4 INSTALLATION 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 A. General l. Provide vertical installation at extents of project. 2. Relocate sign as needed, upon request of the City. B. Mounting options a. Skids b. Posts c. Barricade 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [ox] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE 27 A. General 28 1. Maintenance will include painting and repairs as needed or directed by the City. 29 3.14 ATTACHMENTS [NOT USED] 30 END OF SECTION ,, CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 O1_58 13 - 3 TEMPORARY PROJECT SIGNAGE Page 3 of 3 1 Revision Log DATE NAME SUMMARY OF CHANGE 2 CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENLTE Revised July 1, 2011 City Project No. 01372 016000-1 PRODUCT REQUIKEMENTS Page 1 of 2 1 2 3 PART 1- GENERA.L 4 1.1 SUMIVIARY SECTION Ol 60 00 PRODUCT REQUIREMENTS 5 A. Section Includes: 6 l. References for Product Requirements and City Standard Products List � B. Deviations from this City of Fort Worth Standard Specification 8 l . None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADl�'IINISTR.ATIVE REQUIREMENTS 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 A. A list of City approved products for use is located on Buzzsaw as follows: 1. Resources\02 - Construction Documents\Standard Products List B. Only products specifically included on City's Standard Product List in tliese Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. C. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. l. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. E. See Section Ol 33 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUSMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SITBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Project No. 01372 016000-2 PRODUCT REQUIREMENTS Page 2 of 2 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3- EXECUTION [NOT USED] 6 END OF SECTION CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised December 20, 2012 City Project No. 01372 016600-1 PRODUCT STORAGE AND IiANDLING REQUIREMENTS Page i of 4 1 2 SECTION O1 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PART1- GENERAL 4 l.l SITIVIlVIARY 5 6 � 8 9 10 11 12 13 14 15 16 A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 l. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRA.TIVE REQUIl2EMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUENIITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 24 25 26 27 28 29 30 31 32 33 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised July 1, 2011 City Project No. 01372 016600-2 PRODUCT STORAGE AND HANDLING REQUIlZEMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufactuxer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 l. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 11 12 13 14 15 16 17 C. Storage Requirements l. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or e�sting facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 18 3. 19 20 21 22 4. 23 24 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 5 7. 8. 9. 10 Keep materials and equipment neatly and compactly stored in locations that will cause ininimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. Provide off-site storage and protection when on-site storage is not adequate. a. Provide addresses of and access to off-site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. Store in manufacturers' unopened containers. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. Keep public and private driveways and street crossings open. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,0001inear feet, unless otherwise approved in writing by City's Proj ect Representative. CITY OF FORT WORTH WATER AND SANTTARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.,LIS AVENUE Revised July 1, 2011 City Project No. 01372 016600-3 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WA,ItR.ANTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 6 7 S 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3.1 INSTALLERS [NOT USED] 3.2 EXAIVIINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED) 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [ox] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non-Conforming Work l. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 311 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION C1TY OF FORT WORTH WATER AND SANTTARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 20ll City Project No. 01372 O16600-4 PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 CTTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.,LIS AVENUE Revised July l, 2011 City Project No. 013'72 01 70 00 - 1 MOBILIZATION AND REMOBII.IZATION Page 1 of 4 1 2 3 PARTl- GENERAL SECTION O1 70 00 MOBILIZATION AND REMOBILIZATION 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1 2 3 Mobilization and Demobilizaiion . a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from ihe Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: - a) Mobilization and Demobilization from one location to another on the Site in the normal progress of perforining the Work. b) Stand-by or idle time c) Lost profits Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 013'72 oi�000-.2 MOBILIZATION AND REMOBILIZATION Page Z of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City a.nd the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification l. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1— General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES - 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section l.l.A.2.a.1) 2) Remobilization as described in Section l.l.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. CiTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Project No. 01372 01 70 00 - 3 MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 3. Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle ti_me, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price sha11 include: 1) Mobilization as described in Section 1.1.A3.a.l) 2) Demobilization as described in Section l.l.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The VJork performed and materials fiu-nished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section l.l.A.4.a) 2) Demobilization as described in Section l.l.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIl2EMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USEDj 41 1.7 CLOSEOUT SUSMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSLTI2ANCE [NOT USED] 44 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised Decexnber 20, 2012 City Project No. 01372 017000-4 MOSILIZATION AND REMOBILIZATION Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS (NOT USEDJ 2 1.12 WA.RRANTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3- EXECUTION [NOT USED] 5 END OF SECTION CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 S'�M-S WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 017123-1 CONSTRUCTION STAKING AND SURVEY Page 1 of 4 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION Ol 7123 CONSTRUCTION STAKING AND SURVEY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 � 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 11 . 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 l. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will 2� be allowed. 28 1.3 REFERENCES [NOT USED] 29 1.4 A.DMIl�TISTRATIVE REQITIltEMENTS [NOT USED] � 30 1.5 SUBMITTALS 31 A. Submittals, if required, shall be in accordance with Section Ol 33 00. 32 B. All submittals shall be approved by the City prior to delivery. 33 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 34 A. Certificates 35 1. Provide certificate certifying that elevations and locations. of improvements are in 36 conformance or non-conformance with requirements of the Contract Documents. 37 a. Certificate must be sealed by a registered professional land surveyor in the 38 State of Texas. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project no. 013'I2 017123-2 CONSTRUCTION STAKING AND SURVEY Page 2 of 4 B. Field Quality Control Submittals 2 1. Documentation verifying accuracy of field engineering work. 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIEIL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Construction Staking 7 1. Construction staking will be performed by the City. g 2. Coordination 9 a. Contact City's Proj ect Representative at least 2 weeks in advance for 10 scheduling of Construction Staking. 11 b. It is the Contractor's responsibility to coordinate staking such that construction 12 activities are not delayed or negatively impacted. 13 14 15 16 17 18 19 20 21 ?2 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 3. General a_ Contractor is responsible for preserving and maintaining stakes furnished by City. b. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed or disturbed, by Contractor's neglect, such that the contracted Work cannot take place, then the Contractor will be required to pay the City for new staking with a 25 percent markup. The cost for staking will be deducted from the payment due to the Contractor for the Proj ect. B. Construction Survey 1. Construction Survey will be performed by the City. 2. Coordination a. Contractor to verify that control data established in the design survey remains iutact. b. Coordinate with the City prior to field investigation to determine which horizontal and vertical control data will be required for construction survey. c. It is the Contractor's responsibility to coordinate Construction Survey such that construction activities are not delayed or negatively impacted. d. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. 1) City shall perform replacements and/or restorations. 3. General a. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work as it progresses for Proj ect Records. b. The Contractor will need to ensure coordination is maintained with the City to perform construction survey to obtain construction features, including but not limited to the following: 1) All Utility Lines a) Rim and flowline elevations and coordinates for each manhole or junction structure 2) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Every 250 linear feet CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENLJE Revised December 20, 2012 City Project no. 01372 017123-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 c. � (2) Horizontal and vertical points of inflection, curvature, etc. (All Fittings) (3) Cathodic protection test stations (4) Sampling stations (5) Meter boxes/vaults (All sizes) (6) Fire lines (7) Fire hydrants (8) Gate valves (9) Plugs, stubouts, dead-end lines (10) Air Release valves (Manhole rim and vent pipe) (11) Blow off valves (Manhole rim and valve lid) (12) Pressure plane valves (13) Cleaning wyes (14) Casing pipe (each end) b) Storm Sewer (1) Top of pipe elevations and coordinates at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. c) Sanitary Sewer (1) Top of pipe elevations and coordinates for sanitary sewer lines at the following locations_ (a) Every 2501inear feet (b) Horizontal and vertical points of inflection, curvature, etc. (c) Cleanouts Construction survey will be performed in order to maintain complete and accurate logs of control and survey work associated with meeting or exceeding the line and grade required by these Specifications. The Contractor will need to ensure coordination is maintained with the City to perform construction survey and to verify control data, including but not limited to the following: 1) Established benchmarks and control points provided for the Contractor's use are accurate 2) Benchmarks were used to furnish and maintain a11 reference lines and b ades for tunneling 3) Lines and grades were used to establish the location of the pipe 4) Submit to the City copies of field notes used to establish all lines and grades and allow the City to clieck guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City to verify the guidance system and the line and grade of the carrier pipe on a daily basis. 6) The Contractor remains fully responsible for the accuracy of the work and the correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to City. 9) If the installation does not meet the specified tolerances, i_mmediately notify the City and correct the installation in accordance with the Contract Documents. 49 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CTTY OF FORT WORTH WATER AND SANTTARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised December 20, 2012 City Project no. 01372 O17123-4 CONSTRUCTION STAKING AND SURVEY Page4 of4 1 1.11 FIELD [SITE] CONDITIONS [NOT USEDJ 2 1.12 WARRANTY [NOT,USED] 3 PART 2- PRODUCTS [NOT USED] 4 PA.RT 3 - EXECUTION 5 6 7 8 9 10 11 12 13 14 15 16 17 18 � 19 20 21 22 23 24 3.1 INSTALLERS [NOT USED] 3.2 EXANIINATION [NOT USED] 3.3 PREPA,RATION [NOT USED] 3.4 APPLICATION 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [ox] SITE QUALITY CONTROL A. It is the Contractor's responsibility to maintain ail stakes and control data placed by the City in accordance with this Specification. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 311 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHI��NTS [NOT USED) END OF SECTION CTI'Y OF FORT WORTH WATER AND SANTI'ARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECffICATION DOCUMENTS CONTRACT 2003 STM-B WII.,LIS AVENUE Revised December 20, 2012 City Project no. 01372 017423-I CLEANING Page 1 of 4 1 2 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 SECTION O1 74 23 CLEANING l.l SITIVIlVIARY A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 32 92 13 — Hydro-Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQITIItEMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fa11 on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUEMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.'7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND I3ANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF fiORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 013�2 01 74 23 - 2 CLEANING Page 2 of 4 1 1.11 FIELD (SITE] CONDITIONS (NOT USED] 2 1.12 WA.RRANTY [NOT USED] 3 PART 2 - PRODUCTS 4 2.1 OWNER-FURNISHED (ox] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 7 8 9 10 11 12 A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3 - EXECUTION 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 3.1 INSTALLERS [NOT USED] 3.2 E�;ANiINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [ox] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site_ 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH WATER AND SANTfARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 2011 City Project No. 01372 017423-3 CLEANING Page 3 of 4 1 � 3 4 5 6 7 8 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary constntction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on-site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of 11 , personnel in existing facility operations. 12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a ininimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 19 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airbome or transported by flowing water during the storm. 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 C. Interior Final Cleaning l. Remove b ease, mastic, adhesives, dust, dirt, stains, fingerprints, labels and other foreign materials from sight-exp.osed surfaces. 2. Wipe all lighting fixture reflectors, lenses, lamps and trims clean. 3. Wash and shine glazing and mirrors. 4. Polish glossy surfaces to a clear shine. 5. Ventilating systems a. Clean permanent filters and replace disposable filters if units were operated during construction. b. Clean ducts, blowers and coils if units were operated without filters during construction. 6. Replace all burned out lamps. 7. Broom clean process area floors. 8. Mop office and control room floors. D. Exterior (Site or Right of Way) Final Cleaning l. Remove trash and debris containers from site. a. Re-seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets_ CITY OF FORT WORTH WATER AND SANiI'ARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 1 2 3 4 5 6 7 8 9 10 01 74 23 - 4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CiTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 017719-1 CIASEOUT REQUIREMENTS Page 1 of 3 1 2 3 PARTl- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 � SECTION O1 7719 CLOSEOUT REQUIlZEMENTS 1.1 SLr1VIlVIARY A. Section Includes: l. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADNIINISTRATIVE REQUIIZEMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims l. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CTfY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.,LIS AVENUE Revised July i, 2011 Ciry Project No. 01372 017719-2 CLOSEOUT REQUIIZEMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUSMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 E�:AIVIINATION [NOT USED] 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 3.3 PREPARATION (NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: l. Project Record Documents in accordance with Section Ol 78 39 2. Operation and Maintenance Data, if required, in accordance with Section Ol 78 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section Ol 74 23. C. FinalInspection 3 � 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not lim.ited to: a. Specified spare parts b. Adequate oil and b ease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses £ Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment 39 . D. Notice of Project Completion CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENLTE Revised July 1, 2011 City Project No. 01372 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 01 77 19 - 3 CLOSEOUT REQUIREMENTS Page 3 of 3 l. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Proj ect Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Accepiance and release the Final Payment Request for payment. 3.5 REPAIIt / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [ox] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CTfY OF FORT WORTH WATER AND SANI'I"ARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July i, 2011 City Project No. 01372 017823-1 OPERATION AND MAINTENANCE DATA Paae 1 of 5 1 2 3 PART1- GENERAL 4 5 6 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 SECTION O1 78 23 OPERATION AND MAINTENANCE DATA 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE R.EQIJIREMENTS A. Schedule l. Submit manuals in fmal form to the City within 30 calendar days of product shipment to the project site. 1.5 SUSMITTALS A. Submittals shall be in accordance with Section O1 33 00 . All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form l. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8%z inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH WATER AND SANTfARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIF'ICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised December 20, 2012 City Project No. 01372 017823-2 OPERATION AND MAINTENANCE DATA Page 2 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 3 0 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly-leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subj ect matter covered in the manual Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent b oupings. If available, provide an electronic form. of the O&M Manual. B. Manual Content 3 � 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diab ams b. Coordi.nate drawiugs with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CTI'Y OF FORT WORTH WATER AND SANTfARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 01 78 23 - 3 OPERATION AND MAINTENANCE DATA Page 3 of 5 1 � 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel b1VISIb. 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full i.nformation on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving fizll information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2_ Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and noxmal operating instructions 2) Regulation, cantrol, stopping, shut-down and emergency instructions 3) Suinmer and winter operating instructions 4) Special operating instructions c_ Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts _ g. As installed control diab ams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENLTE Revised December 20, 2012 City Project No. 01372 O17823-4 OPERATION AND MAINTENANCE DATA Page 4 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2,1 22 23 24 25 26 27 3 L� J k. Charts of valve tag numbers, with location and function of each valve List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage Other data as required under pertinent Sections of Specifications 28 29 Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical sexvice 2) Controls 3) Communications c. As installed color coded wiring diab ams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications Prepare and iuclude additional data when the need for such data becomes apparent during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CIT'I' OF FORT WORTH WATER AND SANTfARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised December 20, 2012 City Project No. 01372 01 78 23 - 5 OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELNERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WAl[2RANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] 5 PART 3- EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. 7ohnson 1.S.A.1 — ritle of section removed 0 CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised December 20, 2012 City Project No. 01372 017839-1 PROJECT RECORD DOCUMENTS Page 1 of 4 1 2 3 PARTl- GENERAL C! 5 6 7 8 9 10 11 12 13 14 15 16 17 l.l SUMMARY SECTION O1 78 39 PROJECT RECORD DOCUMENTS A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQITIltEMENTS [NOT USED) 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTA.LS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS (NOT USED] 29 30 31 32 33 34 35 36 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other pocuments where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CTTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised Juty l, 2011 City Pmject No. 01372 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 2 3 4 5 0 7 8 9 10 11 12 13 14 15 � 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the fmal Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. l.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WA►RRANTY [NOT USED] 17 PART 2 - PRODUCTS 18 19 20 21 22 2.1 OWNER-FURNISHED [oR] OWNER-SUPPLIED PRODUCTS [NOT USED] 2:2 RECORD DOCUMENTS A_ Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Recard Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 28 29 30 31 32 33 34 35 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTA.LLERS [NOT USED] 3.2 E�:AMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the j ob set, identify each of the Documents with the title, "RECORD DOCLJIv1ENTS - JOB SET". CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STNI-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 017839-3 PROJECT RECORD DOCUMENTS Page 3 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the j ob set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Proj ect Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum, in accordance with the intervals set forth in Section Ol 71 23, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a"cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Fina1 physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to withi.n 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful puipose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents 1. Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July l, 2011 City Project No. 01372 O17839-4 PROJECT RECORD DOCUMENTS Page 4 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 c. Call attention to each entry by drawing a"cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other pocuments a. If the Documents, other than Drawings, have been kept clean during prob ess of . the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. . b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIIZ / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [ox] SITE QUALITY CONTROL [NOT USEDJ 3.8 SYSTEM STA.RTUP [NOT USED] 3:9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 26 CiTY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCtTMENTS CONTRACT 2003 STM-B WII.,LIS AVENUE Revised July 1, 20ll City Proj ect No. 01372 APPENDIX GC-4.01 Availability of Lands - None GC-4.02 Subsurface and Physical Conditions - None GC-4.04 Underground Facilities - None GC-4.06 Hazardous Environmental Condition at Site - None GC-6.06.D Minority and Women Owned Business Enterprise Compliance MBE Good Faith Effort Form MBE Joint Venture Eligibility Form MBE Prime Contractor Waiver Forxn MBE Specifications — Special Instructions for Bidders MBE Subcontractors/Suppliers Utilization Form GC-6.07 Wage Rates Mayor and Council Communication (30-Wage Rates /**G-16190) Heavy & Highway Construction Prevailing Wage Rates 2008 GC-6.09 Permits and Utilities Texas Department of Transportation Permit (FTW201309251'71626) GC-6.24 Nondiscrimination - None GR-O l 60 00 Product Requirements - None CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATTON DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 GC-4.01 Availability of Lands None CTI'Y OF FORT WORTH . WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.,LIS AVENUE Revised July 1, 2011 City Project No. 01372 GC-4.02 Subsurface and 1'hysical Conditions None CITY OF FORT WORTH WATER AND SANTI'ARY SEWER REPLACEMENT STANDARD CONSTRUCTiON SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 2011 City Project No. 01372 GC-4.04 Underground Facilities �� . CTI'Y OF FORT WORTH WATER AND SANTTARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 GC-4.06 Hazardous Environmental Condition at Site None CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECffICATION DOCUMENTS CONTRACT 2003 STM-B WIi.LIS AVENUE Revised July i, 2011 City Project No. 01372 __ GC-6.06.D Minority and Women Owned �usiness Enterprise Compliance MBE Good Faith Effort Form MBE Joint Venture Eligibility Form MBE Prime Contractor Waiver Form MBE Specifications — Special Instructions for Bidders MBE Subcontractors / Suppliers Utilization Form CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised July 1, 2011 City Project No. 01372 F(� �.T �C� RT H � �''` City of Fort Worth Minority Business Enterprise Specifications SPECIAL INSTRUCTIONS FOR BIDDERS APPLICATION OF POLICY If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal may be applicable. If the total dollar value of the contract is $50,000 or less, then an MBE subcontracting goal is not applicable. � POLICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance applies to this bid. ��{BE �RC�JECi CCiA�S The Gity`s MBE gaal on this project is � � % of th2 tofal E�id (Base bid agpiies to Parks ancE Commun'sty Services}. E�oie: Ef both lVEBE and SBE subcontracting gaals are est�bEished for this pro}ect, then an Offero:- must subrn�t both a[t�6�E U�iEization Forrrt and a SBE UiiE�za�€c�n Form to t�e cfeemed respansave. COMPLIANCE TO BID SPECIFICATIONS On City contracts greater than $50,000 where a MBE subcontracting goal is applied, bidders are required to comply with the intent of the Ciry's Business Diversity Enterprise Ordinance by one of the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or; 3. Good Faith Effort documentation, or; 4. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documents must be received by the Managing Department, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Oferor shall de(iver the h�BE documentation in _. � ___ person to ihe appropriate employee of the managing ciepartment a�d obfain a date!time receipf. 5uch receipt shall be evidence that the City received the document�tic�n in the time all�cated. A#axed capy wiil not be accepteci. 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: opening date, exclusive of the bid opening date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m:, five (5) City business days after the bid Utilization Form, if participation is less than opening date, exclusive of the bid opening date. stated goal: 3. Gaod Faith EfFort anc! Subcantractor received by 5:00 p.m., five (5) City business days after the bid Ut'sfezation Form; if no MBE parkicipation: opening date, exclusive of the bid opening date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid perform all subcontracting/supplier work: � opening date, exclusive of the bid opening date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed goal. opening date, exclusive of the bid opening date. FAILURE TO COMPLY WITH THE CITY'S BUSINESS DIVERSITY ENTERPRISE ORDINANCE, WILL RESULT IN THE B1D BEING CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS Any questians, pfease contaet the NilWBE Office at (8'E7} 212-2674. Rev. 5/30/12 ATTACHMENT1A Page 1 of 4 �'C}RT �r�{JRTH �---- City of Fort Worth MBE Subcontractors/Suppliers Utilization Form PR COMPANY NAME: Check applicable block to describe prime r�t--i'S��' �p r1 �--�r't,e.c�- � 0�-, L.1� PROJECT NAME: �'�,{,e �^ � C` ,�� r' e place rn en-t- �'l:"!t'/D8C x NQN-iv1i:^NDBE `� BID DATE CDn�uc�-aoo3 S`rM-� � 1 1- ��I - a Di Cit�s MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER � % O.,' % O ���� Identify all subcontractors/suppliers you will use on this project _ _ _ _ _ _ _ Failure .to complete this: form, in its entirety with requested documentation,' and received by the Managing Department on or before 5:00 p.m. five (5) City business days after 6id opening, exclusive of bid opening date; will result in the bid being considered non-responsive to bid'specifications. Tfie undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) listed in this utilization schedule, conditioned upon execution of a contract with the City of. Fo�t Worth:' The intenfiional and/or knowing �misrepresentati.on of facts is grounds for consideration of disqualification and will result in the bid being �considered non-responsive to .bid specifications , MBEs listed toward meeting the project goal must be located in the six (6) county marketplace �at the time of bid. Marketplace is the geographic area of Tarrant, Dallas. Denton, Johnson. Parker, and Wise counties. Idenfiify each Tier level. Tier . is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contracfor to a subcontrac.tor is considered 1 St tier, a payment by a subcontractor to its supplier'is considered 2"d tier ' ' ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms, located within the Marketplace, that have been determined to be a bondafide minority business enterprise by the North Central Texas Regional Certification Agency (NCTRCA) or other certifying agencies that the City may deem appropriate and accepted by the City of Fort Worth. If hauling services are utilized;;the prime will be given credit as long as the MBE listed owns and operates at least one fiully licensed and operational truck to be used on the contract. The MBE may lease trucks from another MBE firm, including MBE owner-operators, and receive full MBE credit. The MBE may lease trucks from n.on-MBEs, including owner-operators, but will only receive credii for the #ees and commissions earned � the MBEas outlined in the lease agreement. ' Rev. 5/30/12 �Q#�T'��'(}H j']-j ATTACHMENT 1A Page 2 of 4 - Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. MBE firms are to be listed first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a copy of the firm's SBE certification if they have not previously registered with the City's MM/6E Office, which may be contacted for verification. Please note that onl certified MBEs will be counted to meet an MBE oal. Attach N NCTRCA Certificate ° SUBCONTRACTOR/SUFPLIER T " Detail Detail Company Name i Subcontracting Supplies Address e M W S M Work Purchased Dollar Amount Telephone/Fax � g B B B E E E E `Tr u.c�K ; r� � ROBERT GRA]YAD �4�` ' ��['�, � DD •°° OS TRUCHING S�-Y, ��l�l.S 1076 Grand National glvd. ❑ ❑ ort Worth, Texas 76179 J 817) 237-3520 �o nc��e.+� COWTOWN REDI-MIX � j � � �, �DD UD PO Box 162327 � � ❑ ❑ Fort Worth, Texas 76161 ,� ; � v (817) 759-1919 f (817) 759-1716 �u. � 1 I SUN COAST RESOURCES INC. � 31' DL� UD Teri Bateman � ❑ ❑ PO Box 972321 Dallas, Texas 75397 v (300)677-38�5 x655 1 �+ MJ PIPELINE INSPECTION, INC. �" �SC"�'' ��' 1 ��� [ J�/1 •D� PO Box 851 ❑ ❑ O� L1�� L(/ Granbury, TX 76045-0351 � Melody Bendewald (817) 946-1126 '��,�Q2 HD SUPPLY WATERWORKS, Ltd. }� 7�� ,�y;, S� ��a �5�� D D PO Box 840700 J �� ► Dallas, Texas 75284 �❑� � vA ` L� �S (817)595-0580 �i �,�i�e D RINKER MATERIALS �. �� j� ��1 / I Db, D PO Box 730197 �7 Dallas, Texas 75373 —0197 � � � �. �(� 1 J�S (317)491-4321 Rev. 5/30/12 �C}PT� . ATTACHMENT 1A Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. Please list MBE firm's first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a copy of the firms SBE certification if they have not previously registered with the Ciry's M/WBE Office which may be contacted for verification. Please note that onl certified MBEs will be counted to meet an MBE oal. Attach N NCTRCA Certificate ° SUBCONTRACTOR/SUPPLIER T " Detail Detail Company Name i Subcontracting Supplies Address e M W S M Work Purchased Dollar Amount Telephone/Fax � B B B B E E E E � � � � � � � � � � � � � � Rev. 5/30/12 ���� ����'t�� �'I ATTACHMENT1A " Page 4 of 4 Total Dollar Amount of MBE Subcontractors/Suppliers $� 1�� �� _ �� Total Dollar Amount of Non-MBE Subcontractors/Suppliers $ � gl, y 5)_0 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS � I�`� �� 5�.�� _ _ _ _ The Contractor vvill not meke additions; deletions, or substitutions to fhis certified list withouf ihe prior approval of the Minority: and Women Business Enterprise Office through the submittal of a Request for Approval o Chenge/Addition form: Any unjustified change or' delefion shall be a material breach of contracfi and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion rivill affect the committed MBE goaL 1f the detail explanation is not submitted; it will affect the final compliance determination. By affixing a signature to this form, the Offeror further agrees to provide, directly to the City. upon request, complete and accurate information regarding actual work perFormed by all subcontractors, including MBE(s) and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work performed by the MBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of the contract and may result in a determination of an irresponsibfe Offeror and debarment from participating in City work for a period of time not less than one (1) year. ignature rit�e 0 � � ,� �12Q, I � �T L� Company Name �.�- �x I ���---�� Address -�-��� r� �-�1-� , � %C � (� ) � q City/State/Zip � � �S� � Printed Signatu e c `�t �ri -p Contact �e�tlOe�f di�fferent) � / GL �t' g �3 -i 7� g�7 �3��� e epho e andlor Fax � � 1�� �f �cr� �-�s� ��. C aY �--�. E- ail Addres l�-1'�-l� Date Rev. 5/30/12 F� ��O �T H City of Fort Worth Prime Contractor Waiver Form ATTACHMENT 1 B Page 1 of 1 PRIME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: ❑ fUIV`!/DBE NON-tt�i/./in�CBE Water and Sanitary Sewer Replacement Contract 2003 STM-B Willis Avenue B�D DATE October 24, 2013 City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER 10 0�0 0�0 01372 If both answers to this form are YES, do not complete ATTACHMENT 1C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1 C. This form is only applicable if bQth answers are yes. Failure to complete this form in its entirety and be received by the Manaqinq Department on or before 5:00 p.m., five {5) Citv business days after bid openinq, exclusive of the bid opening date, will result in the bid being considered non-responsive to bid specifications. � Will you perform this entire contract without subcontractors? YES If yes, please provide a detailed explanation that proves based on the size and scope of this NO project, this is your normal business practice and provide an operational profile of your business. Will you perform this entire contract without suppliers? YES If yes, please provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractors, including MBE(s) on this contract, the payment therefore and any proposed changes to the original MBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. Authorized Signature Title Company Name Address City/State/Zip Printed Signature Contact Name (if different) Phone Number Fax Number Email Address Date Rev. 5/30l12 ATTACHMENT 1C Page 1 of 3 F�T �C��TH City of Fort Worth MBE Good Faith Effort Form PRIME COMPANY NAME: Check applicable block to describe prime {�i:NViDBE NON-h�/MIDBE PROJECT NAME: Water and Sanitary Sewer Replacement Contract 2003 STM-B Willis Avenue BID DATE October 24, 2013 City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER 10 0�0 0�0 01372 If the Offeror did not meet or exceed the MBE subcontracting goal for this project, the Offeror must complete this form. If the Offeror's method of compliance with the MBE goal is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctly and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentional and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation, and it being submitted to and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, will result in the bid being considered non-responsive to bid specifications. 1.) Please list each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non-MBE. (DO NOT LIST NAMES OF FIRMS On all projects, the Offeror must list each subcontracting and or supplier opportunity regardless of tier. (Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Rev. 5/30/12 ATTACHMENT 1C Page 2 of 3 2.) Obtain a current (not more than two (2) months old from the bid open date) list of MBE subcontractors and/or suppliers from the City's M/WBE Office or the City's website. �Yes Date of Listing No 3.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by mail, exclusive of the day the bids are opened? ❑ Yes (If yes, attach MBE mail Iisting to include name of firm and address and a dated copy of letter mailed.) �No 4.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the liids are opened? �Yes (If yes, attach list to include name of MBE firm, ep rson contacted, phone number and date and time of contact.) �_N o 5.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile (fax), exclusive of the day the bids are opened? �_Yes (If yes, attach list to include name of MBE firm, fax number and date and time of contact. In addition, if the fax is returned as undeliverable, then that "undeliverable confirmation" received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or "undeliverable confirmation" documentation may render the GFE non-responsive.) � No 6.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? _aYes (If yes, attach email confirmation to include name of MBE firm, date and time. In addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" documentation may render the GFE non- responsive.) �No NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Offeror must document that either at least two attempts were made using two of fhe four methods or that at least one successful contact was made using one of the four methods in order to be deemed responsive to the Good Faith Effort requirement. NOTE: The Offeror must contact the entire MBE list specific to each subcontracting and supplier opportunity #o be in compliance with questions 3 through 6. 7.) Did you provide plans and specifications to potential MBEs? _�Yes �_N o 8.) Did you provide the information regarding the location of plans and specifications in order to assist the MBEs? �_Yes �No Rev. 5l30/12 ATTACHMENT1C Page 3 of 3 9. Did you prepare a quotation for the MBEs to bid on goods/services specific to their skill set? Y2S (If yes, attach all copies of quotations.) No 10. Was the contact information on any of the listings not valid? YeS (If yes, attach the information that was not valid in order for the M/WBE Office to address the corrections needed.) _QNo 11.)Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. Please use additional sheets, if necessa , and atfach. Company Name Telephone Contact Person Scope of Work Reason for Rejection ADDITIONAL INFORMATION: Please provide additional information you feel will further explain your good and honest efForts to obtain MBE participation on this project. The Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work perFormed on this contract, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that will substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance shall create a material breach of Rev. 5/30/12 ATTACHMENT 1C Page 4 of 3 contract and may result in a determination of an irresponsible offeror and debarment from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the MBE(s) listed was/were contacted in good faith. It is understood that any MBE(s) listed in Attachment 1 C will be contacted and the reasons for not using them will be verified by the City's M/WBE OfFice. Authorized Signature Printed Signature Title Contact Name and Title (if different) Company Name Phone Number Fax Number Address City/State/Zip Email Address Date Rev. 5/30/12 Joint Venture Page 1 of 3 Ft� ��€' '�€� r:�' H � ~� CITY OF FORT WORTH MBE Joint Venture Eliaibility Form All questions must be answered; use "N/A"if�zot applicable NaIriC Of Clij� ptOJ eCt: Water and Sanitary Sewer Replacement Contract 2003 STM-B Willis Avenue A joint venture form must be completed on each project RFP/Bid/Purchasing Number: 1. Joint venture information: Joint Venture Name: Joint Venture Address: (If applicable) Telephone: Facsimile: E-mail address: Cellular: Identify the firms that comprise the j oint venture: Please attach extra sheets if additional space is required to provide detailed explanations of work to be performed by each firm comprising the 'oint venture MSE firm Non-MBE firm name• name• Business Address: Business Address: City, State, Zip: City, State, Zip: Telephone Facsimile E-mail Telephone Facsimile Cellular Cellular Certification Status: E-mail address Name of Cerfifying Agency: 2. Sco e of work erformed b the Joint Venture: Describe the sco e of work of the MBE: Describe the sco e of work of the non-MBE: Rev. 5/30/12 Joint Venture Page 2 of 3 3. What is the percentage of MBE participation on this joint venture that you wish to be counted toward meeting the project goal? 4. Attach a copy of the joint venture agreement. 5. List components of ownership of joint venture: (Do not complete tf this information is described in joint venture agr-eenient) Profit and loss sharing: Capital contributions, including equipment: Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions (to include Account Payable and Receivable): Management decisions: a. Estimating b. Marketing and Sales c. Hiring and Firing of management personnel d. Purchasing of major equipment and/or supplies Supervision of field operations � The City's Minority and Women Business Enterprise Office will review your joint venture submission and will have final approval of the MBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participanis, the individually defined scopes of work or the dollar amounts/percentages change from the originally approved information, then the participants must inform the City's M/WBE Office immediately for approval. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's BDE Ordinance. Rev. 5/30/12 Joint Venture Page 3 of 3 AFFIDAVIT The undersib ed affirms that the foregoing statements are true and correct and include all material information necessary to identify and explain the terms and operation of the joint venture. Furthermore, the undersigned shall agree to provide to the joint venture the stated scope of work, decision-making responsibilities and payments herein. The City also reserves the right to request any additional information deemed necessary to determine if the joint venture is eligible. Failure to cooperate and/or provide requested information within the time specified is grounds for termination of the eligibility process. The undersib ed agree to pernut audits, interviews with owners and examination of the books, records and files of the joint venture by any authorized representatives of the City of Fort Worth. Failure to comply with this provision shall result in the termination of any contract, which may be awarded under the provisions of this joint venture's eligibility and may initiate action under Federal, State and/or Local laws/ordinances concerning false __statements or willful misre�resentation of facts._________ _________ Name of MBE firm Name of non-MBE firm `� Printed Naine of Owner Printed Name of Owner Signature of Owner Signature of Owner Printed Name of Owner Printed Name of Owner Signature of Owner Signature of Owner Title Title Date Date Notarization State of On this Counry of day of , 20 , before me appeared and to me personally known and who, being duly swom, did execute the foregoing affidavit and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Public Print Name Notary Public Signature Commission Expires _ (seal) Rev. 5/30/12 GC-6.07 Wage Rates Mayor and Council Communication (30 Wage Rates / *�G-16190) � Heavy & Highway Construction Prevailing Wage Rates 2008 CTI'Y OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WILLIS AVENUE Revised luly i, 2011 City Pmject No. 01372 �:' , t �, . ` �� ' +�.'.. , � ,...., It �� ��` :� i ;,��I �� � � +/; � mt-..�^"'sa��� ... "'"� �:�i��{�d�.,. ����f}�: ���i't}V�°t� f3� �,��%�Q�� ,----... � ....y .�.......�,,�....,.—.�.,. .� —. �B�l�'E: �"c�eSCfu�Y, ,ilflj� Q$, 2Qfl$ L.£3C �9�e�i�: 301/1,�AGE RAT�S R��ER�t�CE E�C}.: �t�-'t6�9#� �E1�.3�CT: A4dapt 2008 Frevaii�ng 1lVage� Rafes for Cify-Awarded �ubi�c-'sl�orks Projec�s . ---s-a--� —�---�-�.---� R�c4�n����AitQn�: f� is r�commended �hat the Ciy CaunciE ado�# the at�ached 2008 �revailing i,'Vaga Rates for Ciiy-awarcleei public �vorks �rojects. [��SCE�5Sit3t�: iexas Governmeni Code Cnapier 225� raguFres that a pu(a(ic body awarding a�ntract far puialic v,rorks snaE� cietern�tir�e th� general prevai#in� rate df p�r �iern wages far eac�r craft or type of �vorker rreeded �a execute the cantract, and shall specify 1n ihe bid c�acurr�ents and in the contracf the �revailing �nr�g� rafes in ihat locality. Eac% year The Q�oin Ci�apfer o: ths Assaciated General Gontractars, in cor���nction v�i�f� ti�e Associa�ion ef Suiiders and Gantractors (ABC} and the Arnerican Sub-Cont�actors Ass�ciation (AS/-�}, conducis a wage rate survey for NarEh Texas consfructiart. The attaehed 20Q8 Prevailing ttlFage Rate clata was c�rnpifed fr�m that survey. FISC�iL E[�FORN�ATiC}�/CERT[FIC1�Tl�'3P�: The Finanee �3irectar cestifiies ti-�at this ac�icsn will nave no material effec� on City funcfs. TO Func�lkccaur��tCeniers FFtO�fi FundfAccae�nttCeniers SubmiL�ed far Ci Mana �r's Q�€ice bv: Ori inating E3e�artment Head; Acfdi�iona[ �nfcsrrrtafion Cor��ac�: Fernando Costa {8�76} A. Douglas Rademaker (6 i 57� Eric Bt�rtdy (7598j I�AVY & ��G�t"6��iY CaPvST�2li�'I`ION �'REVA.��ING �WA�� �t�TES 2�}g� ; Air Toot �perator . k Asphatt I7istrzbuior {}pa.rator � As Ia�it Pavina Machine O ra�:or al As hait Raker As halC Shaveler Batchin� Plant Wei�her Broom or Swveeper OperaYor � B fdeza,r Operator ( Carpenter � Concrete Finzsher Paving Concrete Finisher, Structwes Concrete Pavin Curbi�� Machine O eraiar Cancrete Pavin �inishin� Macl�ine O erator �onerete Paviri Joint Seaier Opera�ar - Concrete avin Saw � erator Concrete Paving S rea�er O rator Concrete Rubher �rane, Clamshe3l, BacI�k�oe, Denick, Dra line, Shovel t E?ectracian _ Fla er Form �uilderlSeLter, Siructures Form Set�er, Pav:ng & Curb Foeindatioit DrilI C? erazor, Crawler Mounted Fa�indation Drili C� erator, Tr�ck Mounted Frant End I,oader O eratar _ , T�aborer, �ammon ' Labarer, L,7fII2 � Mecha�tic ` Miliin¢ Machine O erator, Fi��e Grade , Mixer Operator I Moeor Gr�der O zratar, Fine Gxade Motor Grader C1 erator, Rou�h _ Oiier Painter, Sii�uctures Pavement MarkinQ Machane Operator Re�nforcing Steei Se�ter, Paving Reinforcing Steel Set�er, Structure Rotiar 4perator, Pz7eurr�atic, Seif-PropeIied Rolisr dperator, S�eet Vv'heeI, FIat Whee1/2'ampin� Raller Operator, Steel Wheet, Piant Mix Pavement Scraper Qpera�or Servicer Slip �'orrn A�Iachine 4p�ratar Spreader Box Qperator Tractor Operator, Crawler 'Fype Tractoa• Operator, Pneurnatic Trat�eting Mixer Operatar Truck I?river, Lowboy�-�'laat Truck Dz-iver, SingIe Axle, Heavy Truek Driver, Sin�te Axle, T.ight Tnzck llriver, i"anden� A�:le, Semi-Traiier Tss.�ck I}river, `T'ransit-Mix Wa�an Driii, Boring Machine, Post Hole Dri�Ier 4 Welder ��Vork Zone Barricade Servicer $1Q.06 �I3.99 $ I2.73 �� t.o� � 8.&0 �14.15 $ 9.88 � I 3.22 ��z.so $12.&5 $I3.27 � 3 2.f�G $13.63 �12.Sfl. �i3.Sb $14,�4 �ic7.61 $i.4_ i2 $�8.12 � 5.43 �I1.&3 $i 1.&3 �:3.b7 ;i 6.34 $12.62 $ 9.i8 ��d.bJ $I6.4? $I I.83 �I1.58 $15.20 $1�'.50 S I4.98 �13.17 �I0.4� �Ii.04 $14.86 $1 b.29 $F1.47 $I0.�2 $11:?8 $11.42 $12.32 ��2.33 $20.92 � 12.60 $12.91 $12.03 $14.93 $i i a7 $IQ91 $I1.7� $I2.48 �I4.�Q $13.�i � 1 �.09 GC-6.09 Permiis and Utilities Texas Department of Transportation Permit (FTW20130925171626) CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B VJILLIS AVENUE Revised July 1, 2011 City Project No. 01372 Approval Form Approval Form QppROVAL Online version 11/2005 To Adolfo Lopez Date 10/11/2013 City of Fort Worth Application No. FTW20130925171626 1000 Throckmorton Str District App. No. 220S-W-342-13 Fort Worth, TX 76102 Highway SH 0183 Control Section 000812 Maintenance Section South Tarrant County Tarrant Page 1 of 1 TxDOT offers no objection to the location on the right-of-way of your proposed utility installation, as described by Notice of Proposed Utility Installation No. FTW20130925171626 (District Application No. 220S-W-342-13) dated 10/11/2013 and accompanying documentation, except as noted below. Have a great day. When instaliing utility lines on controiled access highways, your attention is directed to governing laws, especially to - Texas Transportation Code, Title 6, Chapter 203, pertaining to Modernization of State Highways; Controlled Access Highways. Access for serving this installation shall be limited to access via (a) frontage roads where provided, (b) nearby or adjacent public roads or streets, (c) trails along or near the highway right-of-way lines, connecting only to an intersecting roads; from any one or all of which entry may be made to the outer portion of the highway right-of-way for normal service and maintenance operations. The Installation Owner's rights of access to the through-traffic roadways and ramps shall be subject to the same rules and regulations as apply to the general public except, however, if an emergency situation occurs and usual means of access for normal service operations will not permit the immediate action required by the Utility Installation Owner in making emergency repairs as required for the safety and weifare of the public, the Utility Owners shall have a temporary right of access to and from the through-traffic roadways and ramps as necessary to accompiish the required emergency repairs, provided TxDOT is immediately notified by the Utility Instailation Owner when such repairs are initiated and adequate provision is made by the Utility Instailation Owner for convenience and safety of highway traffic. The installation shall not damage any part of the highway and adequate provisions must be made to cause minimum --- inconveniences to traffic and adjacent property owners. in the event the Installation Owner faiis to comply with any or all of the requirements as set forth herein, the State may take such action as it deems appropriate to compel - - compliance. It is expressly understood that the TxDOT does not purport, hereby, to grant any right, ctaim, title, or easement in or upon this highway; and it is further understood that the TxDOT may require the Instaliation Owner to relocate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. If construction has not started within six (6) months of the date of this approval, the approval will automatically expire and you will be required to submit a new application. You are also requested to notify this office prior to commencement of any routine or periodic maintenance which requires pruning of trees within the highway right-of- way, so that we may provide specifications for the extent and methods to govern in trimming, topping, tree balance, type of cuts, painting cuts and ciean up. These specifications are intended to preserve our considerabie i�vestment in highway pianting and beautification, by reducing damage due to trimming. Special Provisions: --- You are required to notify TxDOT 48 hours (2 business days) before you start construction to allow for proper inspection and coordination of work days and traffic control plans. Use the UIR website for the 48-hour notification. DO NOT start construction until you have coordinated the construction start date and inspection with TxDOT. You are also required to keep a copy of this Approval, the Notice of Proposed Instailation, and any approved amendments at the job site at all times. Texas Department of Transportation By J D Greenhill Titie Utility Supervisor _ . District rori Wor"th . hrip://apps. dot. state.�.us/apps/ITIRPROv2/lib/NoticeApproval.asp?ApproverID=DOT20070622102546... 10/ 11 /2013 Page 1 of 1 Notice of Proposed Installation ��rx�= Utili#y Line On TxDOT Highway Right of Way Dopanmen; or rrans�on�non Installation Application Online version 4(2006 To the Texas Transportation Commission Date 9/26/2013 c/o District Engineer Application No. FTW20130925171626 Texas Department of Transportation Fort Worth District, Texas Formal notice is hereby given that City of Fort Worth Ni'vNv5c5 iv iii5icii a Uiiiiiy iaCiiiiy 'vviiiiiii i, ic iiyiii-Oi-V✓d'y" �i jriv i o� in Tarrant County, Texas as follows: (details are shown on page 2) An installation of 162 feet of 24" Ductile Iron Water Main inside a 42" Welded Steel Casing and 162 feet of 12" Ductile Iron Water main inside a 24" Welded Steel Casing across State hwy 183 (Southwest - Blvd) at the intersection of Willis Ave/Bal Lake Dr. There will be no TxDOT pavement cut. -- The line will be constructed and maintained on the highway right-of-way as shown on the attached drawing and in accordance with the rules, regulations and policies of the Texas Department of Transportation (TxDOT), and all gover�ing laws, including but not limited to the "Federal Clean Water Act," the "National Endangered Species Act," and the "Federal Historic Preservation Act." Upon request by TxDOT, proof of compliance with all goveming laws, rules and regulations will be submitted to TxDOT before commencement of construction. Our firm will use Best Management Practices to minimize erosion and sedimentation resulting from the proposed installation, and we will revegetate the project area as indicated under "Revegetation Special Provisions." Our firm will ensure that traffic control measures complying with applicable portions of the Texas Manual of Uniform Traffic Control Devices will be installed and maintained for the duration of this installation. The location and description of the proposed installation and appurtenances is more fully shown by 2 files containing drawings and other pertinent information uploaded to the website. Construction will begin on or after October 1. 2013 and end on or before November 1. 2013 . I certify that I am authorized to represent the Firm listed below, and that our Firm agrees to the conditions/provisions included in this notice. Utility Installation Owner City of Fort Worth By Adolfo Lopez Title Sr. Engineering Tech Address 1000 Throckmorton Str Fort Worth, TX 76102 Phone No. 817-392-7829 E-mail address adolfo.lopez(c�fortworthgov.orc7 _ _ _ ___.._ _ https://apps. dot. state.tx.us/apps/LTIRPROv2/lib/PermitNotice.asp?PermitEventNo=O&PermitApNo=FTW... 9/26/2013 � _ M . � _. — �� _; � � , ; _ .. �;. -��� s� �� _ ,: � � �: . ,� ,� _� ..F� ,. � ' - , d � . Ye:n u[W�qv., m t ' -.. � ���.6 , - - •i ' �. ..,��:? F.��f ..... �^ _._. � .. ...�:. i . . ' . . �OSi ._. : � +- ' ..-. �._ ___ -,._' - =C�`` _ ' i..30...."'_ . �..c i.y:-.. ' � Y. :Ir.n:iA�.�� _ . "._ ...._r. �. . -�._ � .,... C 4 ... _ , ��� . � .� �...�.. 1 ��Uqe�:. ...'N,.tr�V.y di .. � " -- �:_--.. -` c._, iF..v. �� , c .:aweaal.St - �Ne� i v _ , - � " _ ___ _ ' G � � �ell F.r ' .... _ . . � .. ,.� . - . SPur � a . , i. _ .. . . � � `n . . 'vL A Icn �1vf - � .. :.-• i.4C� '�u� _ '[ .. ... .. � �� ..�, .. .... �.,- � . c ��.,6��� _ . . � ... �, 2o:i � , v, � =UVe52 fwy i: _.: ' . �a - - ,�i,�, : , :.:: �, . ,,,w� ....... ..v � r,a� `, :.` ,. i.� . . J , � � .=.i; i-., � ,. .. �vc,:«�:� _ `s = r ! - r „, � ....... ��+, .37? ;.�.: ::��.. :..'��.ii�.,.i e .d}efr;it ' - i iira t2'. . - � .. . . . _ � ,:;' �� . . '� . ... . _._ . ._ . ..,.:: :�� a" � . �. �::n.�_. ::;;. .. _.,. _ I . ------ .. ."'__ 4 lq nea �a : 7u -- � .._` _ � o ia�.rv.•i- .. . e� Y . '.� �.-_' ...... , ;.. i ..::. _�.r. .-.. ..� �� � . -. ,... s �. ..._ � . , '} �. .. . p ' 2571 � R 72'> - - y ^ ;I�iC� '�JSc�naN�r A � °�atd Reagan_Memorial:Hwy -____ Ronafd Reagan 1y ' � ' a � ' '. ' . a Nfio � P < r�ac.ar c� � �_, ��d/h, v - ' iczt �. o , , . ._ _,...,. k.y.. ;:,.. e � � .. - . . _ . .. . . -. . . , _ . -- � .� ., _. ..... � � �. ' �e�, i �... _ .. ,i . � : . :.:. ... � � . .' _' .. . � � - �!. 377 _ 5 , : ..... .. � w•. � 9;�... � . . �.A . -... . :, . _ �j. -.._.� �' 'o:r ✓a ... �. .. . ._. v' Oa.smor.c 31v] v _ � _ ' ..... �..^. :t _..�... �;, . � .... .. . . .. . . ' \ ... � y�� . . lobe;:,�� � .. i . . . - _ l31 � O�_ � . . „ y � : ., ,�� . .,, � 3yo: ; �. _ ,. . _.. . . ...... ..... z' ' n r.u, _"'i:c .: . , r��.m� � Seled a location on a route by clicking on the map .. _ ._. .__... _.._ _. ..... _.. ___. . .... _ _..__.. .... _ _._ _ _._. ......_... .... _ . . . . . . . ... strid ' Fort4'�iorth �Counh� Tarrant FouteWo. �.SH0193 Control5zd �Ou812 — �, .�i� . ��. �I .� � , __ ,. . __. _� . . -..._ � _ . u,,:�. � � ��� s_. � _._,....�..._.�... _ . � _.� �..._,. _..._ ..................�......�.. ,.��.... ..���.�...._,... .�.r..�" •`s,��'-,:.��...�.eii."��`'.�i V �T .y 0 0 8 oR�c� „� 9 0 � .. mzna^- a. i ' , �. . ' ,.. ' woz�i Am . �m��� ;;�o • �� �rfti . . . _� zFm �� to RsN .,�o J'- ��.. .. .�: ..� �. . : .'oovH' �'`�^ ��� $'^ 9 .. ,. «.�� �x `+ MATCHLINE STA. 7+00 ' n� w'' m s` r.� o $ : xm�n� i�L c,��.;,p o �, p2" . ', �Ro=� wg� \ ' .... � p' .. x �n� vonw^' , ;• � . . � . . -� m�xr�: � 'ys ',6. '�: � • � . � m'�3 0 § ' p � � � �,�nm. o s``c` "\ . m ^ .... � o�' � '. � i"'-�i 4g��'�^ �' �\ � � �� .L-ESTA 8+0290- �� ``\ 9� r � ��. k If'S6-1T�. LEfT. r�.�.���,� u _ � Q ii / �* ^� 0 0 _ ^ '^�. �. � - OTA7E 00'1Y30' UP. . i$ ^ ro �b ,� • � i : . .; - - 93 68 �, ` : � e ..... +$ � . . ', � g N � �^ .m'�.F = � � �%j 4��°� \ ��`I k P ME-6 � � �� � � � . , { T . :� '�, '�. 0� � �/� _ 1 M� +� r^ �:� �� � n � . . .. . � f�� � . . e . � . � \ � � . �.� +��, � �� �, - ' , M1 ^ � �i \ � dJy` �r � . . . � .. �.. ': y` �7�{ � { � � \ i 0 �, , � � � . . ��. .L-E SfA 6+]G]S- � S,�v o j" � � n m � ��. [FF7. . „a 8g,'.3i� I S a` �,d'o � ` � � . .... , C ,. tl'361295.67 �, \ �J�:5�4 � �� � ` �S ^d \ = N /PlPE=6 b � �. ' . �,. � � ` `�k � �n� �� ' ~l ~ • . + � � .G-E STA: .9�51.�1- '� O�� � � E ry �� • n � $ , 11'S6 12� LEF(. � � 0 � p ' 07A1E 00'SS'f10^ (!P. "' �[� \,¢ , , .� 'o ' �P£-691.5t ,�m,o • `� �ny�` j'^(��� un$n�r . . $ .' ^^inb 'IL7 i ti �'� �zy4�m: �S�inr .._ , x ��� BgR�, � esra: �wrs.az- ��� -o'�:� i�' ��: ���,� ,j`C •o'�. a^z�m^: �',I-� . , �', rrss�z rFr7. �"F^�: :e>�� = / b�� � ��� �'�' �<i�N �' OTATEOP32JD OK . M1��n '/ 5 � d °=$n"�. �`v�ni . ,,. � ��� �:. � �p/PEe6943t - eo .> -- � _ O 1 _�� `y -In^qa �' 4� m-`�a 4 _ �i oN , 4' �w �' V�j 4� w� AE�` r w�e o � .L-E SiA: 16f9S19- � 4 u �, � � NSfALI, f1. % 6, ANCNqP m<m ^�q .1 �� ��A u NTv $. -;. . k ' . . .'. ' S C W7E YALYf. / w Z O z^' i � r w . 1 ..... �. � OX d LID. PROV/OEflFf `� ^� � i��", �i ' vi� , � ..f0.7'[£Fl. ' �. ' � . m $ � � �� P/P/PE 68].91 � . .. ^`� , . �. .L-ESfA1Ph98.10- N _____� � ____ i,yr�mr p �'i � NS7ALL 12. CATE VALV£ ' _ . . •� , ,� �ruo. � 1. � ___ �- ----�-�--�-_ K � �, , � � , - k � /P/PE=697.99 � — --- - - -- - --- .. .. � ' . .. . . � r ;\� n g. .,. . . , . .L-fSTA: i1rtOCA- � -�.��o�t�' o°�S .. EFtECT.00'J036 OM �. C-' ..I = � aki � o � � P/A/PEv69H.f0 ' - � i. y�yA^• �4 . .. � � , z • fSTA ff+09.5]- ���. I'1 ( � -� �T ���yi "o�+ � . . � EWN 2f W£�E� STEEf: - h _ S.H. ISi � ^ � � o . � � S/NG i/AE BY HOR£.' ' � • , __'___" _____ �. ..; � ' a 4'� �'� '" . (SOUTH\VESTBLVD.Ja N '�'�n� �' .... �� ' � �� �:. . . ��usncRsv�Rcevxis . I & s '� 9 � 4 � � � . ,... . _.. . A C�a, ; /?�vsouva.rs : � .`�- . n + � GLS.H.18I— ---' � ��- -- —GLS.H.183 _ I. ... . o - � .. '. � �C � g � � O C�i ��. .L-E STL 11�11.11- - I _ ��c o 4 - ___ _ ____ _ �orim: ,ww ��� .. ��]] � ND Zf WEIDED 57E£L �_s__.n � � -..- � _ � '.,�. �' SYNCPIPEBIBOFE --J�rwcw-- --�rnKw-- S�. .. � . . . � X : /I2'�GRR/FR P/PE —� � � g GS/NC SPACFRS. — _ � — _' - �' — . �.. . ' � . � „ �.. /P/P£a699:76 ~ � 1 . y 1 ` ^,� � a 9� i�� n ,�.. .... , . . . . V e $' w ;ga `p . i 0 G : ', . . ' �. � .L-E STA: 12+]562- � N n' n 3 � e ( s � I - 2ri '7 �� N ALL ' 0 . N � ' e . � __� r � �, . . .. �, '.. �p/PE=8D9:d1 l`� � �LA l� zn$�n�ot' .. . .. . . . . .. �_� 5�. r a i- , �� ^ m sU7e I 4 I.. $ � � o � e�m�in^ro^: � D f2� WAIEX REPL. � ' E ---� - �' • "" • . . • . . � � � ONNfCTTOIXiST.12'�:' _�, x 3��F n �> ____xi"x�p �^ro"' m<�Gi��> ��ex w/�r rec s y-�''s`=- r-' I'" � ti c,�-:-A. o z t^ 8�� _ �^ n , o a ..... . . . , OTA]L� � G � r� � »ab� � °��F I "�"`iii�z� Y�~�As , . . . , - EC£9'AFY. V ' � o:�n'� � ^ CJ���N�'� N�-� �� i� '^ o . , , /A/PFa701.39 ',, ` � 4 � � A 1 �^k C'i w n � o L • 4"� r i ..... x _ . . . z:7 oos�^m �o + � '" o ^'>�� � n� F ti' k ' . . �� � , ,. � Q I �;(_ . I \iq Y� .,��ijz ' �� Z I -1 c�E � z� N��Ni� .. I. . , �� _ . �. � . -°v�°.� '° w � L � I � . . .. . . . . �. , - Y-;. .� , �.. . . ��w . rC . ... . �... . .,. . . ., ag� �I .. l' Y . � � 02oa wFi * , . . . . . . n�N I . .... � , . . . , . . � '�'., �j�A n 2mvz�i � 2�`a4a . , . .. �, : � * m s� a��� Fo ,A��oo g��a: . $ , �q �o �o , . , , ' n �NpN, QNnM a�~n$ ,, . . . . , � . �4p C ... " '`�NTAyi v,^�It�D� . . . . �� jA�C ��a�4i.'a Qt�] , 2A�� o q�n�^_ _ ,�'� v � ' -. N22 O (o O O � N�n -um a � ti � a.�� �� a"q <4 >� �'� �n�=�qzBs �� � � � - a s •• a^x� ' �q �S-3 � °`: .. . DDD ' o n� i = C � ,.m omr ^' "eS�s„ >€ ���u ^"° y�� °��R � s �'i` ��$S <� z4�s''.��� ' �� � O � G �2,,, �c ^ ox�y.'�y _ gao �� �� Gaorogn^ . .. `� � > C z � v� mz� ., a {u� �' s �S �ge����� � _ � -� M n c "� j - � � � $ ^- ��msao � � ��� NNo r _ � � � � ` z> •�N Rx '�a �e Z �� .�� ��: $� R°- �F�,��sCE o Nm< s 1 �' . ip ; r, „ r � z < P g�u � �L � "� � � ^a � ? C Z 0��j ,�-I � m �E� � 3�i; I . kF, �� �� 6J �^ i I R o m � �n � `� _ 08 � ��s . i � ��, . � a � �y� Z i � < . �m � * .. n7_� �. a$ �m Xp �_ � , � �a = . _ g o - � � '� � � � � o � � � � ��� � ! a� _ � , - � "' - �, � � �" ' n � ,. � �� g� F R' Z Sa� N m . ,.. . _ N , . � � + z �,_ m� -�-- � z c z o� ���� c mo .� c�� 0 �� om ms o ��z ------ J� ?aN .. • - y� � l:� c=� r1. = �gx 4 9v m uo$ z f� V I � 6 �R om v � w I `� ��Rl� m { a -i ��% .2� g . � o Re ' ( � ��? � � r 6pN is 4�0 UN O �?Su•m-•G$.'mi�� �' ri o'" � � I) �q� �A. .. ' o p C"' Cu � �"I a 48 �� n�mmu'�p'r�.'..° 9 m'+�' u�F, " � n � Z a,`�, - �� ���_- ' $ � �� F � � C . u.o ��»oa WATER A?ID SANITARY SEWER REPLACEMENTS CONTRACT 2003 STM-B DOE k a057 0 o I� v R$w� „a .hoo • � �9j. noouN �m O� � MATCHI,INE STA.'7+00 : m � � �� $ xmv�� iN��F �"�,�2 'L�+ � ,.. s� � ,. � =R$_r tig378 �i� J+ � �q�om_ � g� �,;s', y m�, • o�H . ,,,�,v�;° � m"' . ,� n� N t *,�� so Op o :r . . . � xm<n� g;q � r i .L-esr�:e+ao.as- �.. �-� }L� ' ka I201 CEFI: �R�om� O�n �� �� � 7ATE 00'SS't1 (/➢. . p � � /`� y � . /P/PFm691..4t 2 an� S�`� p�� � 8 � . .. . . $�000 N�o�n �� s-`��� ,,t` \ a• o. � . .fl � �, � � � �� . .c-a n�. e.�ss, °'�i :> ����"' � ' A � � � ' .. tS01 J � (EfT. ^ n O ii '�' . - c . /aivc_sszst � 8 z a Y � \ C)b `� T 9\ ^ . � �. � ''3y ` Q � d' ii. 5\�S� �2'1 '. [ �+,a . . � I � 1hY^ �^;Sti �,( Y,i ,��.° �� . a_ . �L-BST/.Ah53.fl1- � y�' �\ �' S'��^ . S�O/ 5 (DT � � .c� `� . i . . OTA7f OP/3'S9' fIP. f�O � � qoY 3`� �, P/PrPE b93.61 \ s 'f * ,� �, ��° '�¢ i�� � S' 0 $ ' O o L B STA- 1Ph27.B9- '' a� � ��� ` /i 3 � `�� �` � I e>$ ,zor , c�n � b rA;r�� ,i.s`` b� 2. , . 7� .. . � � . . P/P(PF=69S.6C , , \ 0� ��'^ "T h� �1 k `° � m� .L-B STA. f0+60.)9- �� O�� �\` � ,� 45'00 00.. RlGF?. 0 . .8 � � R � .. /F/PEm6D6.ST �' ; � ` t� ��� � ��. { . . ,. L-B SfA: f0+71.A0- 2max� � S'r3 �' ` ^, mo � asoaaa tEt�: ��$�r �� Cpy �' 5�.�' � zman� o v/vrveesys.ar o',Eo� �'�: �ll / �� .Z _^;�, oRoL� � .L-B ST/: IPFDO.00- � yn� m� a ' b�� a S•• $ . . � � . y Q : a n' ,,,///��� O n ` G��$m ��hr . .. M57A(1 2 COMB A/R Q. . O i g� `O N� i 2$� o<� ��. � - ' ACUf1N RESEASE YACYE N'- _ a ' . . N�ucrlwrm-orq ^ ^x' �"--��� '� `y `�a ��N � ��HH ,� � . , ', EFLECf.01'SZiB'DN. �$�� �� �� r"' ^� � '� � . ? P/!'lPE6B731 _ �v < � `��''g�a� ny�`as . . . ,Q , ��. . y`R i I y '� _ �m� . . �, � . -_ ' .(.-B STA. ilfOS99_ , � ' • N � y "S ? -• . . � � ' NSfA[L1t. FtSlLENT-. ��t`" �y$ .. .. � FATID GilE VKY£ � s n.��'4 � - . . . : /CONCFE7F VAULT. '* . . . y ^ � � J _s ' — �� � � . � .L-BSTA. t'�a]f..10- � " —�� � Y - . � 2sa� 2�wZF NS7A(11� B TEE G x�en"2---' __�' _ __ L 2 F �NE S"^1� ' ' � � ' �' l�� cK1. ra^/vmfesa�si' D �cn� .'.� :�� a�,�r `aBaFm. �, � .t-es,�: rr.�s..a-'.. t yaBroH L � �,. . . a � EG/N12 W�57EEt. � � �N . EiA�$N_ NY'r ��o�r � � lNG P/Yf BY BORE '�' � c� � . . > : /34' GRRI£R WPE � i � r � _ � A�. . GS/NGSPACE4S Z� '-�—����R A �+ '�Cw � � . ;�. , � P�P/P£m68]:3] CI I ' � I o 4 "J � ��'iNn _ _' __ _ � G7 _._a_ S.H I4; �=N�o .. I y.a___'_' a v N . � '. . . . . � �.. .L-B STA. 11+�E.1�- ---- . d g/ (SOUTH�VESTtlLV0.7o o � WATER A.�'D SAIVITARY SEWER REPLACEMENTS CONTRACT 2003 S'M-B DOE K 405'7 � NO LT WE[O SlFd . , O. ' ��. � SYNG P/AE BY B3P£ Q . . . . . . � . /3<' GRNffR P(PE . � "` . . . $ . . . GSING SGACERS � , . � ,. �. . k . . P/F/PE 69�.11 o <x : . . . .. . �. . . . p .L-B STA: 12+8).1<- =`o � <IS0000 tEFI.flOTAIE ' . . 1 � BENO dCSO'29' UP. � l• ,' , �Q �P)P£=69J:S} :>e�...,-_.�a�o,..r � T 4 ' � � — Y �I.L B S/A. 12+86J9 �, Im ,�� I,--_- O 0 � ALLTI. YJ sauu � -Ro�r- � � —�' �����;%_— � � m� I's. � � ' �revc '� .. v3 m; . � � ' I.�.I ' /P/P£=697.76 . uno NaVY � Nnv1 � eti1 � T ��„ ., . , � �. o x a , �, b . I �.� . �, � ..i-ssr�, vz sras �... • " >�O � 3 Nn_I oR� �;� � ' a� �Ld �, u-oam� mcHr aorAre ���a�7 ` ' z Q +� . ,. aa�si�.u' oowx. ��� a 8 3 * t� o^;i � j� = q';� c� . . � � k . � /dire=cse.zo '.. .'AF�� e•x�� � � �,£ � . .�' . ' ' � L-B ST��: )I 0599- a_� 0 E I a� _ �. . . �. .. 'FJID 2t WATER REPL . " O ��am r I � � _ J� p'" n a �ONNELTlO £N/3T. 2�' ' _C�_� S:F I � fT) z 1" � o , F-� ��r --- c.; g . . '. . . . ' . _ � v/v�re>sna�a . � _soy � ��. m �—°��. . .. . . . : . . . . _ . � 0 4 ' ~ � . . . . . . . . � 3 � G 'I� � �� O �2.. , . � . ... i Z k �.. � '. . Q E N ' Y� A S� � .� �. n . � . �. . . : . �,, z �5��; i � L v� .� C . i 1�i�.�J , x � � � p' i---� . . .. , .. . _. .. .. ...�. . T$�" � ^�io� - , �g - �� �nNm. , .. . .. . �. ��� �eo� �$� y��� a�o>> � ��,nA �a �A# xv�eE r AF� ��� ` �, oc�; :a f ;t'm ' . . .. .. . . � � . a2�$ �� o ' �p a��.. . . �NgN F .�. . . , y��xN � .. ,. ' . . '.. . . . . . . ob�� n .. a�� $ � ' o a o N €� 'wp : _ �=" q i R N a > ���y� �, ��� 4u '� �9� '�t'�?$og$ °� �p� ` � � Q ^' � aQ��o" ^=q 'a�s e'o�u��v n'�S �^' �'n�R�3 �i ,�^-?n � � > � v a ��:v �z �_� - _� � �� �� � � �$ ��a -� C '"�i m�` �� t� �� gR �c a� � � Z^ o� m � Rx R"4 �e c �g e �; s €• � �� �? r a h-zi? r"7 < e^�m . y �e� '�z s�as o 0 0-' $:. �F� � e c g- �� �e " + z o c` �> d- a= � ��: 8��"s a o _ 0 ._ �"x�,y m� v ;$ _ < � �� � �� g� � o � � a oy '� z �; � ��� � � � o o �" t�-' C < � :8 f; � � ; �s sa� z . 9 �*�, z � h _ � ` 9 = 4 _m� ' �� m; ' � � " � ° Z >"' �-3 ° 9P n _ � i " _�� � � �° � h c= � _ �cy a - m -o� �_ ', �j �I I i ; ; i �r= ' -' � � � �� =o - � ��� ' $; ' �, � ; ; 'i o '�� � � m Z �op a� a�c �'m ° �' ����$.,..�.�mmm � m� o� [rs1 tC-� Z � q y,m$ y�� qe�mwr+4� ' �� C rn . u�a � ��'.w�w8� $ � x�N� xmea� 2'^N� o .o $ r �"�� po `oAs ��m: $�q� N� �n p i .� ^�� r ^ �� " ^x 48Z e � 0 4 � m Ce � TXDOT DIREC?O�Y FC)R UT9�ITIES F'ORT'6V�R'I"I� D�S'�'�C"�" U�'ILITI' O�'FIC� Vacant Utility Section Supervisor JD. Greenhill Uiility Section Lead Vacant Utility Section Coordinator Paul Fierro Utility Section Coordinator Brenda Richards Utility Section Pernuts Vacant Utility Section Permzts Ben Trevino Utility Section Permits �I (5�) JO�3iTi S�l�i C�U1�T�'Y 4�A ��FIC'E Ronald Robinson Area Engineer Randy Bowers Assistant Area Engineer Jerry Stout Utility Coordinator (Sl j 6�'IS�+ c�i � �CK �'��Ti�B'�' �+ � O�+'�$CES Bill Nelson Area Engineer Vacant Assistant Area Engineer Paul Glidewell Uiility Coordinatar (52} 1Y0�'I"� 3'�.�NT C�UN1'i' AREA O�FI�'E (1�i. ��' �H3Q j Ricardo Gonzales Area En�in.eer Minh Tran Assistant Area Engineer ���) SO��'I�'�'�A��l�'I' C'O�JN��' Aff�� O�FgC� (S. O&' ��30} Greg Cedillo Area Engineer David Neeley Assistant Area Engineer 817-370-��X 817-370-6588 817-370-�� 817-37Q-686� S 17-370-6589 817-313-X�'� 817-370-6523 CELL 817-307-1617 {Sb) �+ 12AT'�-I, �O�D c& SONiER�I�L ���Tl���' AREr� ��'+�'IC'�+ S David Fowler Area En�ineer David BuIlard Assistant Area Engineer. �5� �'A�'�R & P�O P�i�'� C'OU1�ti'�' �2�A O�'FIC�S John Cordary Area Engineer Vacant Assistant Area Enb neer. _ _ ;,�... . . �. <, 3 817-202-2900 817-202-29d0 817-202-2900 940-626-3400 940-626-3400 940-626-3�00 817-399-4302 817-399-4302 & 17-370-6640 817-370-6640 254-9b5-3511 254-965-3511 682-229-2800 682-229-28Q0 I���'S�A'�'S — ��G1�TAI.S —1dIlESSA�E IBOARI)S �31�`VE�Vr�Y� P.EI3IV�I'I'S Wallace Rennels Driveway Permit Supervisor B'RA�'�'I�` ,��Gl�Tr�II,S Billy Manning Supervisor �'i�AFFIC 10�i�,1\tAGE1V�l�'I' -19�IESSAGE 13�ARDS Billy Manning S�ipervisor FOR7C'6�'O�'�� D�Si'��"I' lO�IAIN'a'ENA..I�iCE ��'k�IC�S .�O�ieiS01�1 CO�Jl�T'I"� 1l��l+i'�'�NANC'E RaIph Garza Maintenance Supervisox Tl�omas Willis Utility Permits '6��SE � dAC� C'O�t'i'�' I��AIN'�'�NA1�TC� Ricky Tompkins. Maintenance Supervisor Keith Prochnow Utility Penniis (WISE) Jana Robinson Utility Permits (JACK) IlTO�'y'� `�'�R�2.r�N'I' C'�gTN'B"�.' l�iA��'�NA1�tC� Smokey Phillips Maintenance Supervisor Ben Trevino Utility Permits S�I7'�'�I 7'AA�2]]�'�' COZ���' N�Ail�'T�l�ANC'� Ralp� Garza Maintenance Supervisor Ben Trevino Utiliiy Permits ��2A'�"�, ��0�, SO1d�El2�'ELI, C'�LTNT�.' i�AIl��'E1��1NC`E James Hand Maintenance Supervisor Larry Walker Utility Permits 817-370-6526 817-370-6745 817-370-6745 817-202-2900 817-2d2-290� CELL 817-240-054� 94Q-b26-3400 940-b26-3400 940-567-b611 817-399-4350 CELL 817-307-1617 817-370-6903 CELL 817-3 07-1617 254-897-2647 254-965-3511 CELL 817-287-9802 PAR�fl� � ��L� ��NT� �O�TN'I'�' 16�A�i`I'IE�AIeIC'� Scot� Jones Maintenance Supervisor 682-229-2804 Wayne Doye Fraizer Utility Permits 682-229-2806 CELL 682-239-8206 IN CASE O�' EiV��RGENC�S, COl�"I'ACT' J.�. Gfl�El��I,�.. A�' 682-22�-�3796. . .. � 4 GC-6.24 l�Tondiscrimination �� . CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII.LIS AVENUE Revised July i, 2011 City Project No. 01372 Gl�-01 60 00 Product Requiremenis None CITY OF FORT WORTH WATER AND SANITARY SEWER REPLACEMENT STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CONTRACT 2003 STM-B WII,LIS AVENUE Revised July 1, 2011 City Project No. 01372