HomeMy WebLinkAboutContract 45303 (2)� 1IC1l�!'�1RRY L �Q�►�TN��n_ � .___ n FORTWORTH PROJECT MANUAL FOR THE CONSTRUCTION OF k Betsy Price Mayor Tom Higgins City Manager S. Frank Cruinb, P.E. Director, Water Department Prepared for The City of Fort Worth Water Department 2013 q� � � ��� � `I ( iI I �, i DFW Airport Reclaimed Water Delivery System Flushline Sewer Project No. P275-705290-202583 DOE No. 7013 City Project No. 02025 TranSystems >Ol) VV. 7'�' Sti•eet, Suite # 1 10O , ..�� l�ort Wc�rth, 'I'a 76102 —;�� OF T���� ,� P.•,•...... ,��� r °'.�'� ��' ��� S*' � ��* i.. i .......................i:: i MICHAEL R. HOBBS ,r ...:.....................:...., . ��'°� ; 10 644 ,��,�' ' � � �1 ��';,L/ " \`l�'�Sii// ,1'`� • . ...��-"��,%� �, � � , . , ;!' - !�� ...� � 7� �'- :�7'% �' OFF�t'`M. ��.r�:'��t;OR� � ' ��{µ ���i�tETARY ; � � ��+ �. � RECElVE� J�ry � � �� C/t,j/ Of FOri' VVOrtl1, T@Xa$ Mayor and Council Communication COUNCIL ACTION: Approved on 12/17/2013 DATE: Tuesday, December 17, 2013 LOG NAME: 60DFWFLUSH-NTC REFERENCE NO.: **G26611 SUBJECT: Authorize Execution of a Contract with North Texas Contracting, Inc., in the Amount of $455,324.00 for DFW Airport Reclaimed Water Delivery System Flush Line and Provide for Project Costs and Contingencies for a Project Total in the Amount of $495,090.00 (COUNCIL DISTRICT 5) RECOMMENDATION: It is recommended that the City Council authorize the execution of a contract with North Texas Contracting, Inc., in the amount of $455,324.00 for the DFW Airport Reclaimed Water Delivery System Flush Line. DISCUSSION: On December 4, 2012 (M&C C-25986), the City Council authorized the City Manager to execute an Engineering Agreement with TranSystems Corporation d/b/a TranSystems Corporation Consultants for the preparation of plans and specifications for the DFW Airport Reclaimed Water Delivery System Flush Line. The proposed line will be utilized to flush the Eastside Reclaimed Water System to the DFW International Airport. Since the Reclaimed Water System is not in service all the time, the reclaimed water must be periodically flushed to prevent stagnation. The flushed reclaimed water must be conveyed in a pipe line to a nearby Trinity River Authority Regional sewer main because reclaimed water is considered wastewater by the Texas Commission on Environmental Quality and cannot be flushed onto open ground. The project was advertised for bid on September 5, 2013 and September 12, 2013 in the Fort Worth Star- Telegram. On October 3, 2013, the following bids were received: Bidder Corrapletion North Texas Contracting, Inc. William J. Schultz, Inc. d/b/a Circle "C" Construction Company Amount Tim� ofi Completaon $455,324.00 180 Calendar Days $547,225.00 M/WBE Office - North Texas Contracting, Inc., is in compliance with the City's BDE Ordinance by committing to 16 percent MBE par�icipation on this project. The City's MBE goal on this project is 12 percent. In addition to the contract cost, $17,000.00 is required for construction staking, project management, material testing and inspection and $22,766.00 is provided for project contingencies. The project is located in COUNCIL DISTRICT 5, Mapsco 56G. Logname: 60DFWFLUSH-NTC Page 1 of 2 FISCAL INFORMATION / CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. FUND CENTERS: TO Fund/Account/Centers CERTIFICATIONS: Submitted for City Manager's Office bv: Originating Department Head: Additional Information Contact: FROM Fund/Account/Centers P275 541200 705290202583 Fernando Costa (6122) S. Frank Crumb (8207) Roberto Sauceda (2387) $455, 324.00 ATTACHMENTS 1. 2. 60DFWFIush-NTC(P275 - FAR Funds verification 11-26-2013 JCTLdocx (CFW Internal) 2. 60DFWFLUSH-NTC COMPLIANCE.pdf (CFW Internal) 3. 60DFWFLUSH-NTC MAP.pdf (Public) 4. FAR-00002 CIP#02025 P275.pdf (CFW Internal) Logname: 60DFWFLUSH-NTC Page 2 of 2 j}(} f�(} {10 - t TAf3LG QF C:C?NT'ENl�S Pagc 1 nC3 I 7 3 4 5 6 7 � 9 10 11 12 13 14 IS 16 l7 l8 19 20 21 22 23 24 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 4b 47 48 49 S�CTION 00 00 00 TABLE OF CONTENTS Division 00 - Caeneral Conditions 00 OS 10 Mayor and Council Communicatian 00 OS I 5 Addenda 00 11 13 Invitation to Bidders 00 21 13 Instructioi�s to Bidders 00 35 13 Conflict of Interest Affidavit 04 41 00 Bid Fonn 00 42 43 Yroposal Form Unit Price 00 43 13 Bid Band 00 43 37 Vendar Compiiai�ce to State Law Nonresident Bidder d0 45 i l �3idders Prequalifications 00 45 12 Prequalificatian Statement 00 45 13 Bidder Prequalification Application 00 45 26 Contractor Compliance with Workers' Compensation Law 00 45 4Q Minority Business Enterprise GoaI 00 52 43 Agreement 00 61 13 Performance Band 00 61 14 Payment Bond 00 61 19 Maintenance Bond 00 61 25 Certificate of Insurance 00 72 00 General Conditions 00 73 00 Supplementary Conditions �ivision 01 - General Requirements Ol 11 00 Summary of Wark 01 25 00 Substitution Procedures Q 1 31 19 Preconstruction Meeting Ol 31 2Q Project Meetings Ol 32 16 Construetion Progress Schedule OI 32 33 Preconstructian Video Ol 33 00 Submiitals 01 35 13 Special Project Procedures Ol 45 23 Testing and Inspection Services O1 SQ 00 Temporary Facilities and Controls 01 55 26 Street Use Permit and Modificatians to Traffic Control Ol 57 13 Sionn Water Foliution Prevention Plan 41 58 13 Tem�orary Project Signage 01 60 00 Product Requirements Ol 66 OQ Product Storage and Handling Requirements O1 70 00 Mobilization and Remobilization Ol 71 23 Construction Staking and Survey Ol 74 23 Cleaiung Ol 77 19 Closeout Requirements O1 7� 23 Operation and Maintenance Data Ol 78 39 Projeet Record Documents CITY OF FORT WORTH DFW Aarport Reclaimed Wat�� Deliv�y System Flusl�line STANDARD C�NSTRUCTION SPECiFICATIQN DOCUMENI'S City Prqiect No. 02025 Revised December 2�, 2012 OOOOGO-Z TABLE OF CONTENTS Pagc 2 oC3 1 ? 3 4 5 6 7 8 9 10 11 12 13 I4 15 l6 17 18 19 20 21 22 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 4� 49 50 Technical Specifications which have been modifed by the Engineer specificall,y for this Project; hard copies are inctuded in the Project's Contract Documents Di��ision 31 - Earthwark 31 25 00 Erosion and Sediinent Control I3ivision 32 - Exterior Improvements 32 11 23 Flexible Base Courses 32 92 13 Hydro-Mulciling, Seeding, ai�d Sociding Division 33 — Utilities 33 OS 10 Utility Trench Excavation, Embedment, and Backfill Divisian 34 - Transportatfon Technical Specifica�ions listed below are fncluded for this Project by reference and can be viewed/downloaded from the City's Buzzsaw site at: �lSl?i:i`� �IiiitC:lfi7�:�rlllt,'L}llli�zll� LCw1Y1�t�iclil'��r��F1�'tFlE�l'ttlr j�'.�1{IllICL� (}">r�.�-}�_ %�OCo�istsuction%20Docunients/S�ecifications � � �� � Division 02 - Eacisfing Conditions 02 41 13 Selective Site Demolition 02 41 14 Utility Removal/Abandonment Division (;3 - Concrete 03 3Q 00 Cast-In-Place Cancrete 03 80 d0 Ivlodiiications to Existing Concrete Structures Division 31 - Earthwork 31 23 16 Unclassified Excavation Divisian 32 - Exterior Improvements I)ivision 33 - Utilities 33 01 30 Sewer and Ivlanhole Testing 33 O1 31 Closed Circuit Television (CCTV} Inspection 33 03 10 Bypass Purnping of Existing Sewer Systetns 33 04 12 Magnesium Anade Caihodic Protection System 33 04 40 Cleaning and Acceptance Testing of Water Nlains 33 OS 13 Frame, Cover and Grade Rings 33 OS 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 33 OS 16 Concrete Water Vaults 33 OS 26 Utility Markers/Locators 33 OS 30 Location of Existing Utilities 33 I 1 OS Bolts, Nuts, and Gaskets 33 11 10 Ductile Iron Pipe 33 11 l l Ductile Iron Fittings 33 11 12 Palyvinyl Chloride (PVC) Pressure Pipe 33 12 11 Large Water Meters 33 12 20 Resilient Seated Gate Valve C1TY UF FORT WORTH DFW Airpoi�t Reclaimed Water Delivery System Flusliline STATdDARD C.ONSIRUCTION SPLCIFtCATION DOCUA�ENTS City Project No. 02025 Revised December 20, 2012 a00000-3 TABLE dF C�NTENTS Page 3 of 3 1 33 �2 25 Cannection to Existing Water Mains 2 33 49 I 0 Cast-in-Place Manholes and Jurection �oxes 3 4 A�g�e�d�x 5 GC-4.04 Underground Facilities 6 C�C-6.06.D Minority and Women t"�wn�d Busin�ss Enterprise Compliance 7 C�C-6.07 Wage Rates 8 GC-6.09 Pern�its and Utilities 9 GR-0� 6� 00 Product Requirernents 10 A I?Fi�V Environmental Affairs Importation Authorizatian Form l i B Greneral Notes 12 13 END OF SECTION C1T4' Ci� FQRT 1�1C7RTH I1F1�7 Ai�po�� Reclaii��e� 1�rat�r i7�:liveiy S�xt�rn Plusl�line STfi?�'D>i�RD Ct)T�;STRIIC'TIC3h SPE�CiFtCAT1O.N DC7C'LT��tE:�ITS City Prnjz�:t \t�.02t}2S Rc vised D�cCml��r 2t�. 3() ! 2 t 2 3 4 5 6 7 8 9 10 11 12 l3 14 15 16 17 18 19 20 21 22 �Q �1 � {) - � UtAY'C?it �l��i> C'OI�?�ICI[. t�t7;�1VliJNICt1l�IQ� (�;&L`} Paec 1 of 1 ���,`��t'ti�� o� os �o IvIAYC�R hND COUNCIL CQ'��iMt1;�'ICA"I`tON (�i&C} EN�7 �F SECTION CITY OT' F04�1' Wt3R"fH DFW Airport Reclaimed `'��'ater Delivery Syst�;�n Flushiu�e S'l IiNDIs.KL? CC)NSTRt!C:T7C3N SPECIFlC.4T10N t�OCI)19EN"fS Cit}� ?'r�jcct No. ft��25 ftevi,ed July ], 20 � l 00 Q5 i 5- i ALiDt:t�lt)r1 Pacc I of 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1� is 19 ?a � SF,CTION 00 OS IS ADDENDA 22 E� oF sEe�rioN C]TY C�F FORT WC3R'Fii STAND.aRD CONS"I'Rt,CI'ION SPF,CIFICAT[ON DOC.LI�iENTS RevisedJuly t,2tJ11 DF�V ,4irport Reclaimed Water De(ir��ery Svstcan rlushline City Project No. 02025 Ot) 1 I 13 - I INV!'iAT[E)N TO Bli}DERS Pagr I caf 2 2 3 4 5 6 � 8 9 lU 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 2b 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 SECTION 00 11 13 INVITATION TO BIDDERS 12ECEIPT t3F BIDS Sealed bids for the construction of DFW Airport Reclainled Water Delivery System Flushline, City Project No. 02025 will be received by tl�e City of Fort Worth Purcllasing Office: City of I'ort Worth Purchasing Division 1000 Throckrnorton Street Fort Worth, 1'exas 76102 until 1:30 P.M. CST, Thursday, OCTOBER 3, 2013, and bids will be opened publicly and read aloud at 2:00 PNF CST in the Council Chambers. GENERAI. DESCRIP'I'lON E3F WORK The major work will consist of the (approximate) following: Construction of l 6" recJaim water flush tii�e, valves, 10" meter a��d 8'diameter pre-cast manhole. 420 LF 1 EA 1 EA 1 EA 1 EA 2,475 SY 16" PVC (C-905) Water Line by Open Cut 10" Meter and Vault 20" Gate Valve 16" Gate Valve 8'Diameter Manhole 6" Flex Base PREQUALIFICATION City of Fort Worth The improvements included in this project nlust be performed by a contractor who is pre- qualified by the City at the time of bid opening. The procedures for qualification and pre- qualification are outlined in the Sectian 00 21 13 — INSTRUCTIONS TO BIDDERS. DFW In#erna�ional Airport The improvelnents included in t}lis project must be performed by a contractor who is pre- qualified by the DFW International Airport at the time of bid opening. The prospective bidder must contact DFW International Airport for the procedures far qualification and pre-qualification. DOCUMENT EXAMINATION AND PROCUREMENTS The Bidding and Contract Documents may be examined or ol�tained on-line by visiting the City of Fort Worth's Purchasing Division website at http://www.fortworth o� v.org/purchasing/ and clicking on the �3uzzsaw link to the advertised praject folders on the City's Buzzsaw site. The Contract Documents may be downloaded, viewed, and printed by interested contractors and/or suppliers. Capies of the Bidding and Contract Documents may be purchased fxom : Transystems 500 W. 7`�' Street, Suite 1100 Fart Worth, TX 76102 CITY OF FORT WORTH S'I�ANDARD CONSTRUCTION SPEC,IFICATION DOCUMENTS Revised July I, 20] l DFW Airport Reclaiined Water Dclivecy System Ftushlinc City Project No. U2U25 6U 11 13-2 INVITATION'f0 BIDDERS Pagc 2 o I� 2 1 z 3 4 5 6 7 8 9 IO 11 12 I3 14 15 16 17 1$ I9 20 21 22 23 24 25 26 27 28 29 3d 31 32 33 34 35 36 37 817-339-8950 The cost of Bidding a12d Contract Docwnents is: Set af Biddiz�g and Contract Docuinents witli full size drawings: $60.00 Set of Bidding and Contract Documents with half size (if available) drawings: Nat Avaiiable PREI�ID C�NFERiNCE A prebid conference �nay be held as described in Section 00 21 13 - INSTRUCTIONS TO BIDDERS at the following Iocation, date, and tiine: DA'I'E: Tuesday September 24, 2013 TIli�E: 10: Ot1 AM P��ACE: TranSystems 500 W. 7`�' Street, Suite 1100 I� ort W orth, TX 76102 817-339-8950 LOCATION: Stockyard Conference Room CIT'Y'S RIGH'� TO ACCEPT OR ,JECT B�DS City reserves the rigi�t to waive irregularities and to accept or reject bids. INQG ES All inquiries relative to this procureznent should be addressed to the following: Attn: Robert Sauceda, PE, City of Fort Worth Email: Robert. sauleda@fortworthtexas.gov Phone: 817-392-23 $7 ANI}/OR tlttn: Michael Hobbs, PE, Transystems Email: mrhobbs@transystems.com Phone: & 17-334-4449 VERTISE1�EIti'T �A�'ES September 5, 2013 September 12, ?013 I ►! IZ�� �:137�! Ij[�7�i CTiY OF FflRT GirORTH DFVJ Aicpoa2 Rec3aimed Water I�eIivei�� S}•s2em Flush3ine STAl4DA1ZD C'ONSTRUCTIQN SPECIFICATfO% DOCUh-tENTS Cih- Preject ��o. 02025 Revisc-d 7uly 1, _pl l Ot)?II�-1 INSi i2UC7�IONS TC) EitI3C�EfiS f'agc 1 of g 2 3 4 5 6 7 8 9 10 i1 l2 13 14 15 16 17 18 19 20 21 22 23 ?4 25 26 �� 28 29 30 31 32 33 34 35 36 37 38 39 40 4l 42 43 44 45 46 SEC1'iON 00 21 13 INSTRUCTIONS TO BIDDERS 1. Defined Terms 1.1. Ter7ns used in these INSTRUCTIOI�'S TO BIDDERS, which are defined in Section 00 72 00 - GENERAL CONDITIONS. 1.2. Certain additional ternls used in these INSTRUCTIOI�TS TO BIDDERS have the meallings indicated below which are applicable to hoth the singular and plural thereof. 12.1. Bidder: Ai�y person, firm, partnership, campany, association, or coiporation acting directly through a duly authorized represei�tative, submitting a bid for performing the work conteznplated under the Contract Documents. 1.22. Nonresident Bidder: Any person, finn, partnership, company, association, or corporation acting directly tlirougl� a duly authorized representative, submitting a bid for perfoi�ning the work contemplated under the Contract Documents whose principal place of business is not in the State of Texas. 1.2.3. Successful Bidder: The lowest responsible and responsive Bidder to ��haril City (on the basis of City`s evaluatian as hereinafter provided} makes an award. 2. Capies of Sidding Documents 2.1. Neither City nor Lngineer shall assume any responsibility for errors or misinterpretations resulting from tlie Bidders use af incomplete sets of Bidding Documents. 22. City and Engineer in makizig copies of Bidding Docunlents available do so olily for the purpose of obtaining Bids for the Wark and do not autharize or confer a license or grant for any other use. 3. Prequalification of Sidders (Prime Contractors and Subcontractors) 3.l .1�11 Bidders and their subcontractors are required to be prequalified for the work types requiring prequalification at the time of bidding. Bids received from contractors who are not prequalified (even if inadverteiitly opened) shall not be considered. 32. Eaeh Bidder unless currently prequalified, must be prepared to submit to City within seven {7) calendar days prior to Bid opening, the documentation identified in Section QO 45 11, BIDDERS PREQUALIFICATIONS. 3.2.1. Submission of and/or questions related to prequalificatian shauld be addressed ta the City contact as provided in Paragraph 6.1. CITY O.F FtJRT WORTH BFW' Aiaport Reclt�imert ti3 ater Delive�}� Syste3n Flusllline STANDARDCO?�!S"I'RUC"If£�N SPECiF1CATIQN IIt�CtlivIENTS Cit} Projc�;tNo.O?025 Revised December 20. 2012 0021 13-2 1NSTRUCTIONS TO QIDDERS Pagc 2 of 9 1 3.3.The City reserves the i-i�hi to requii•e a�iy pre-qualified contractor wh� is the appaz�e3lt low 2 bidder(s} for a project to sul�mit such additional inforn�ation as the City, in its sale 3 discretia�� may require, inciuditig but not Iiil�ited ta manpower anci ec�uipment records, 4 infarmation about key personnei to be assigned to the pi-oject, atld construction scliedule, 5 to assist tlle City in evaluatirlg and assessing tlle ability of t}�e apparent low bidder(s) to 6 deliver a quality product and successfully complete projects for the amount bid within 7 the stipulated time frame. Based upon t1}e City's assessment of the submitted 8 inforn�ation, a recainineildation regarding tlle award of a contract will be made to the 9 City Cou��cil. Faiiure to submit tl�e additioi�al information, if requested, ivay be grounds 10 for rejecting tlie apparent Iow bidder as noi�-responsive. Affected contractors will be 11 notified an writing of a recommendation ta tl�e City Council. 12 13 14 15 16 17 4. 18 3.4. In addition to prequalification, additional requirements for qualification may be required w�ithin various sections of tl�e Contract Documents. Examinatimn of l�idding and Contract I�oc�ments, Other iZelated Data, and �ite 14 4.1. Before submitting a Bid, eac11 Bidder sliall: 2Q 21 4.1.1. Examine and carefizIly study the Contract Docu�nents and other related data 22 identified in the Bidding Documents (incIuding "technical data" referred to in 23 Paragraph 4.2. below). No information given by City or any representative of the 24 City other than that contained in tlle Contract Documents and officialiy 25 prornulgated addenda thereto, shall be binding upan tl�e City_ 2fi 27 28 29 30 3I 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 4.1.2. Visit the site to become familiar with and satisfy Bidder as ta the �eneral, local and site conditions that may affect cost, progress, perforn�ance ar furnishing of the Work. 4.13. Consider federal, state and Iocal La«s and Regulations that may affect cost, progress, performance or furriishing of the Work. 4.l .4. Study all: (i) reports of exploratians and tests of subsurface conditions at or contiguous to the Site and all drawings of physical conditians relating to existing surface or subsurfaee structures at the Site (except Underground Facilities) that have been identifaed in the Contract Documents as containing reliable "technical data" and {ii) reports and drawings of Hazardous �nvironmental Conditions, if any; at the Site that have been identified in the Contract Documents as containing reliable "technical data." 4.1.5. Be advised that the Contract Documents an file with tlie City shall constitute all of the iilformation which the City will fumisll. All additionai informatio2� and data which the City will supply after prarnulgation of the formal Contract Documents shall be issued in fhe fonn of written addenda and sha11 become part of the Contract Documents just as though such addenda were actually written into the original Contract Documents. No information given by the City other ihan that contained in the Contract Documents and off cially promulgated addenda thereto, shall be binding upon the City. CiTY OF FORT WORTI� DFW Aitport Reclaimed Water Delivery System Flusl�line STANDARD CONSTRUCTIOi�I SPECIFTCATION DOCUMENTS City Project No. 02025 Revised December2Q.2Q12 U() 21 13 - 3 I1vSTRUCT'tONS "1�0 BIDDI:RS i'agr 3 nt'�) � 2 3 4 S 6 7 8 9 10 11 22 ]3 14 IS 16 17 �s 19 20 ?1 22 23 24 25 2b 27 28 24 30 31 32 33 34 3_5 36 37 38 39 4U 41 42 43 44 45 4.1.6. Pei•foi7n independei�t researcll, investigatial�s, tests, borings, and sucl� otliez• meaiis as may t�e necessary to gaiiy a co�nplete knotuledge of'the c�nditions wfiich will be encauntered during tl�e c�nsti-uctiou af tlie project. On i-equest, City may proti�ide each Biddei- access to tlie site to catlduct sucli exauliilations, investigztions, ex�loratioz�s, lests and studies as each E3idder deems necessary for suhmission of a Bid. Bidde�� must fi11 all ]loles ar�d cleatl up a�}d restore tlie site to its former conditians upon eoiYipletion of sucl� exploratians, investigations, tests ar�d studies. 4. l.7. Detenni�ie tlie difficulties of the Work and ai] attendiii�; circun�stances affectiilg the cost of daing the Work, time required for its completion, and obtaiti all infonnation required to n�ake a proposal. Biciders shaIl rely exclusiveIy and solely upon their own estin�ates, investigatian, research, tests, explorations, azid other data whicli are necessary tor full ai�d complete inft�nnation upon wliicll tlle proposal is to be based. I# is ur�derstood tl�at the sub�uission of a propasal is prima-facie evidence that the Bidder lias made tlie iiivestigation, exami��ations �nd tests herein required. Clain7s for additional coznpensation due to variations between conditions actually encountered in constnzetion and as iudicated in ti�e Contract Doeuments wiIl noi be allowed. 4.1.8. Promptly notify City c�f all confliets, errors, ambiguities ar diserepaneies i�� or between the Contract Docu�nents and such other related documents. Tlie Cantractor shall nat take advantage of any gross eiror or omission in the Contract Documents, and the City shall be permitted tc� make such correctians or it�terpretatians as may be deemed necessary for fulfillment of the intent af ti�e Gontract Documents. 4,2. Reference is made to Section QO 73 00 — Suppleznentary Conditions for identification of: 4.2.1. those reports of expIorations and tests af subsurface conditions at or contiguaus to the site which have been utilized by City in preparatioz� of the Contract Documents. The lags of Soil Borings, if any, on tl�e plans are foz- general informatiorl only. Neitl�er the City nar the Engineer guarantee that the data shown is representative of conditions which actually exist. 4.22. lhose drawings of physical canditions in or i-elating t� e�isting surface and subsurface structures {except linderground I�acilities} which are at ar contibuous to the site that have been utilized hy City in preparatian of the Coz�tract Documents. 4.23. copies of such reports aud drawings will be made available by City to any Bidder on req�iest. Those reports and drawings rnay not be �art of the Contract Documents, but the "technical data" co��tained therein upon whicl� Bidder is ei2titied to reIy as provided in Para;raph 4.02. of the General Conditic�ns has been iden.iified and established in Paraaraph SC' 4.02 of the Supplementa�-y Cc�i�ditions. Bidder is responsible for any interpretation ar eonclusion dra���n from any'"technieal data" or any ot��er data, interpretatians, opin'rons or information. C1�Y OF FORT WORTI3 DFVti' Aifpoit Reclaimed ti�'ater Delivcny S;�stem Fiushline STANDARU CONSTRU{'TION SPECIC'ICATtON DOCUMEhTS City Project No. 02025 Revised I}eceinber20.'Ql2 O(}?I 13-4 INS'1�RU('"f(Ol�'S't"� 131DDEiRS Pagc 4 c�f 9 1 4.3.The subn�ission ol�a t3id ��ill constitute �i� incontrovertib(c rcpreseutation by I3idder (i) � tllal I31C�CIGI- I1�S C()1111)IICC� l�Jl(II CVCI"y f'CC1Uli'CfllCll� nI �Illti I��il'��Tf1])II '�, (ii} that «�itk�out 3 exeeption the Bid is premiscci uF�on performing ancj furriishing the Wc�rk requircd l�y the 4 Contract Documents �nd al�plying the spec�fic means, methods, tccl�niques, sec�uences or � procedures ofcoilstructic�n {ifany) ihal m��y be shown or indicated ar expressly requireci 6 by the Contract llt�eui��ents, {iii) that I3idder has �iven �ity written notice al�all 7 conflict�, eirors, �n���iguities and c�iscrepancies iil the Contract Dacunients and lhe 8 writtei� resalutions thereof by City are acceptaE�le to Bidder, a�ld when said car�i7icts, 9 etc., IZave nat been resolved tilrough the intei-��retatioils by City as described in 10 Faragraph 6., and (iv) that the Contract Documents are benerally sufficient to indicate 11 and convey understanding of all terms and conditions for �3erfornling and fiirnislling the 12 W ork. 13 14 4.4. The provisions of tl�is Paragi-apl� 4, iriclusive, do Ilot appty to Asbestos, Polychlarinated 15 bipllenyls {PCBs), Petroleum, Ilazardous Waste ar Radioactive Material covered by 16 Paragrapl� 4.06. of tl�e General Conditions, unless specifically identified iu the Contract 17 Docun�ents. 18 19 S. Availabilit,y of Lands for Work, Etc. 20 21 S.J _The lands upon which the Work is to be perfoi7ned; rights-of-way and easements for 22 access thereto and ather lands desigtlated for use by Contractor in performing the Work 23 are identified in tl�e Contract Docun�ents. All additional lands and access tllereto ?4 required for temporaiy construction facilities, construction equipinent ar storage of ?5 materials and equipn�ent to be incorporated iu t11e Work are to be obtained and paid for 26 by Contractor. Easen�ents for penllanent structures or pennai�ent changes in existing ?7 facilities are to Ue obtained and paid for by City unless otherwise provided in the 28 Contract Documents. 29 30 5.?. putstanding right-of-��,�ay, easements, and/or pennits to be acquired by tl�e eity are listed 31 in Paragraph SC 4.01 e�f the Suppleme��tary Conditions. In the event the �iecessary right- 32 af-way, easements, and/or pennits are not obtained, the City reser��es the right to cancel 33 the award of contract at any time befare t1�e Bidder begins any canstruction �i�ork on the 34 proj ect. 35 36 5.3. The F3idder shall be prepared to commence construction without all executed right-of 37 way, easements, and/or pez-mits, and shall submit a schedule to the City of how 3g construcfion will pr�ceed in the other areas of the project that do not require pennits 39 and/or easements. �a 41 6. Interpreiations and Addenda 4? CiTY OF FOI27' WURTH DF4V Aiiport Reclaimed \�'atei• Delivery Syste�n Plushline S"I'ANDARQ CONS7�RUCTTON SPECIFICATION DOCUNIENTS City Pr�ject No. 02U25 }teti�ised December 20, 2Q t? Qll 21 13 - 5 fNS"I RUC.'I'10T�'S'CO [31DDE:RS Pagc 5 ��(9 1 � 3 4 5 6 7 $ 9 10 11 ]2 13 14 i5 16 17 l8 19 20 21 ?2 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 4( 47 6.I. AII ClUeStIOIlS c�h0[II iI1C I11G�111117� OI" liliel]i O� ��iC BiC{C�111� DnCLII11�l1iS arc to bc di��ected to Cltj� ]II WI'11111� OIl (?I" t)Cfnl'C 2().11l., ihe Manday prior to the I3id opening. (�uestions iCCC;1VC;C� 1f1eI' tI11S Clhy 117�1y I101 E�G I'CSE)nliCjCCj i(l. II]tEt'�)I'C�c�tlOI15 Ol' CJ£i1'1i1C1ilOT15 considered necessa�y by City ii� r-espo�lse to such questions ��ill be issued by Addci�da delivered to all pariics rccordcd by City as hr�vi��g reeeived the [3idding Docu��lents. Only questioiis answered by formal written /Addenda wil) be bit�ding. Or�1 and other interpretations or cla�•ifications will be without legal cifect. Address questions ta: City of Fort Worth 1000 Throckmortan Strcet Fort Wartll, TX 76102 llttn: Robert Sauceda, PE, Watei- Depariiiient Fax: 817-392-8195 Email: Robert.sauleda �r�fortwortlliexas.gov Pl�one: 817-392-23&7 6.2. Addenda may also be issued to modify the Biddiug Documents as deemed advisable by City. 6.3. Addenda or elarifications may be posted via Buzzsaw at Ir�t�7s:/j�roje�c�tj�ainr.htr_.-.sir�r.cr�t��i 1��� rc,4�t./!i'c�hiHol�rc��7nc(c:r?Jt�;rrlcr=l?�91•,'#,% f>� re.s��iJ�;' _.. _._ . ..... czl�%Itet�til�c�t�.s�?fr�lrier—l2'(1ct':c�«tr�rt=?(Ic�.Gt�tr�t=llcC:c����l�c.-f-.chit�--l�ulrlc�. 6.4. A prebid conference inay be held at the time and place indicated in the Advertisement or INVITAI'ION TO BIDDERS. Representatives of City will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference. City will t�-ansmit to all prospective Bidders of record sueh Addenda as City considers necessary in response to questions arising at the conference. 4ra1 statements may not be relied upon and wilJ not be binding or legally effective. 7. Bid Security 7.1. Each Bid must be accompanied by Bid Bond made payabie to City in an amouni of five (5} percent of Bidder's maximum Bid price on fonn attached, issued by a su.rety meeting the requirements of Paragraphs 5.01 of the Ueneral Conditions. %.2. Tlie Bid Boi1d of all Bidders wi11 be retained until the conditions of the Notice of Award have been satisfied. If the Successful Bidder faiis to execute and deliver the complete Agreemeilt within 10 days after the Natice of Award, City may consider Bidder to be in default, rescind the Natice af Award, and the Bid I3ond of that Bidder will be forfeited. Such forfeiture shall be City's exclusive remedy if Bidder defaults. The Bid Bond of all other Bidders whom City believes to have a reasonable chance of receiving tiie award will be retained by City until final contract execution. C1TY OF FORT WpRTH DFW Ai�ort Reclaimed Water Deliveiy System Flusliline STAI�DARD CONSfRUCTIUN SPECIFICATION DOCUMENTS City Project No. 02625 Reviscd DecemUer 20, 201? OOZI t3-6 INS'I�RUC'I'IONS'IO BIDDERS Pagc G o1 9 1 8. Contract T'imes Z The nuinber of days within wl3ich, or the dates by which, Milestones are ta be acllieved in 3 accordance with the General Requirements and tl�e Work is ta be completed and ready for 4 Final Acceptance is set forth in the Agreement or incoa-porated therein by ref'erence to the 5 attachcd Bid Form. 7 9. Liquidated Damages 8 Provisions for liquidated damabes are set forth iu the Agreemeni. 9 IO 10. Substitute and "Or-Fqual" Items 11 Tlie Contract, if awarded, ��vill be on the basis of materials and equipment described in the 12 Bidding Documents without consideration of possible substitute or "or-equal" items. 13 Whenever it is indicated or specified in the Bidding Documents that a"substitute" or "or- I4 equal" item of material or equipment may be furnished or used by Contractor if acceptable to 15 Ciiy, applicatfon for such acceptance will iiot be considered by City until after the Effective 16 Date of the Agreement. Tile procedure for submissian of any such applicatian by Contractor 17 and consideration by City is set forth in Paragraphs 6.OSA., 6.OSB. and 6.OSC. af the Caeneral 18 Conditions and is suppleinented in Section Ol 2� 00 of the General Requirements. 19 ?p 21 ?? 23 24 25 26 27 28 29 30 31 32 33 34 35 36 I1. Subcontractors, Suppliers and Others 1 I.1. In accordance witll the City's Business Diversity Fnterprise Ordinance No. 20020- 12-2011 (as ainended), the City has gaals for the participation of minority business and/or small business enterprises in City contracts. A copy of the Ordinance can be obtained from the Office af the City Secreiary. The Bidder shall submit the MBE and SBE Utilization Form, Subcontractor/Supplier Utilization Fonn, Prime Contractor Waiver Form and/or Uood Faith Effort Form with documentation and/or Joint Venture Form as appropriate. The Forms including documentation must be received by the City no later than 5:00 P.I��. CST, five (5) City business days after the bid opening date. The Bidder sl-iall obtain a receipt from the City as evidence the doeumentation was received. Failure to comply shall render the bid as non- responsive. 11.2. No Cantractor shall be required to employ any Subcontractor, Supplier, other person or organization against whom Coz�tractor has reasonable objectioiz. 37 12. Bid Farm 38 39 40 41 42 43 44 45 46 47 48 49 50 51 12.1. The Bid Form is iiicluded with the Bidding Documents; additional copies may be obtained from the City. 12.2. All blanks on the Bid Forul must be completed by printing in ink and the Bid l�orm sigi�ed in ink. Erasures or alterations shall be initialed in ink by the person si�iin� the Bid Farm. A Bid price shall be indicated for each �3id item, alternative, and unit price item listed therein. In the case of optional alternatives, the words "No Bid," "No Change," or "Not Applicable" may be entered. Bidder shall state the prices, written zn ink in bot11 words and numerals, for which the Bidder proposes to do the work contemplated or fizrnish materials required. 1111 prices shalI be writtei7legibly. In case of discrepancy between price in writien words az�d the price in w�itten numerals, the priee in written �uords shall govern. C[TY OF FORT WOR7-H DFW Ai�port Reclaimed Water Deliveiy System Flushline STANDARD COi�1STRUCTION S.PECIF3CATI01`T DOCUMENTS City Project Na. 0"_'025 Ret�ised December 20. 24 ] 2 0021 I3-7 1NSTRUC'TIONS Td QIDDERS P,tgc 7 af 9 1 2 3 4 5 6 7 8 9 1Q 21 12 I3 14 IS 16 1'7 1� 19 ?0 ?1 22 23 24 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 12.3. Bids by coipflratio�ls sl}aIl be executed in the cor��orate name by the president or a vice-president or otlter corporate officer accoil�panied by eviderice ol�autliarity to sign. The corporate seal shall be affixed. The cor�orate address and state of incorporation shall be shown below the signature. 12.4. Bids by partner-ships shall be executed in tiie pai•tnership name and signed by a partner, wl�ose title rnust appear under the signature accoiupanied by evidenee of authority to sign. 'Fhe afficial address of tl�e partnersl�ip shall be shown below the signature. I2.5. Bids by limited liability coinpanies shall be exeeuted in the name af the firn1 by a member and acco�npanied by evidence of authority to si�ii. The state af fonnation of the firm and the �fficial address of the finn shall be shown. 12.6. 12.7. 12.8. 12.9. Bids by individuals shall show the Bidder's name and official address. Bids by joint ventures sliall be executed by each joint veiiturer in the mamier indieated on the Bid Fonn. The official address of the joint venture shall be shown. All names shall be typed or printed in ink below the signature. The }3id shall contain an acknowledgeinent of receipt af all Addenda, the numbers af which shall be flled in on the Bid Fonn. 12.10. Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown. 12.11. Evidence of authority to conduct business as a Nonresident Bidder in the state of Texas shall be provided in accordance witli Section 00 43 37 — Vendor Compliai�ce to State Law Non Resident I3idder. 13. Subrnission of Bids Bids shall be submitted on tlie prescribed IIid Form, provided with the Biddin� Documents, at the tirne and place indicated in the Advertisement or INVITATION TO BIDDERS, addressed to City Ivlanager of the City, and shall be enclosed in an opaque sealed envelope, marked with tl�e City Projeet Number, Praject title, the name and address af Bidder, and accompanied by the Bid security and other required documents. If the Bid is sent tlu-ougll the mail or other delivery system, the sealed envelope shalI bc enclosed in a separate envelope with the notation 'BID ENCLOSED" on the face of it. 14. Madification and WithdrawaI of Bids 14.1. Bids addressed ta the City Manager and filed with the Purchasing O�ce cannot be withdrawn prior to the titne set for bid opening. A request for withdrawal must be made in writing by an appropriate document duly executed in the manner that a Bid must be executed and deli��ered to the place where Bids are ta be submitted at any time prior to the opening of Bids. After al] Bids not requested for withdrawal are opened and publicly read aloud, the Bids for which a��ithdrawal request has been praperly filed may, at the oplion of the City, be returned unopened. CI'l�Y OF FORT W012Tt� �FW' AitT;oe7 Reclaisne<i Vs'aiea' Delivefy .S. ystern Flushline STANDARD CONSTRUCTION SYECIF'IC.ATION DOCUMENTS City Yrojeci Itia. (1242.5 Revised Becember 20, 201? 01121 13-K WSTRUCTIONS TQ BlDDERS Pagc S af 9 1 14.2. Bidders may modify theii- Bid by electi-oTiic communication at any time prior to tI�e 2 tiane set for tl�e closing af Bid receipt. 3 4 15. Opening of �ids 5 Bids will be opened and i•ead aloud publicly at the place whei-e Bids are to be submitted. An 6 abstract of the amounts of the vase Bids and major alternates (if any} will be made available 7 to Bidders after the opening of Bids. 8 9 16. Bids to Remain Subject to Accep�ance 10 All Bids will rexnain subject to acceptance for the time period specified for Notice of Award I 1 and execution and detivery of a camplete Agreer��ent by Successfi.zl Bidder. City may, at 12 Cit}�'s sole discretion, release any Bid and ��ullify the Bid security prior to t1�at date. l.3 14 17. Evaluation of Bids and A«�ard of Contract 15 16 I7 18 19 20 21 22 23 24 25 26 27 2& 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 17.I. City reserves the right to reject any or all Bids, including without limitation the rigl�ts to reject any or all noi�conforming, nonresponsive, unbalanced or conditional Bids and to reject tl�e Bid of any Bidder if City believes that it would not be in the best intei-est of the Project to inake an award to tl�,at Bidder, whether because the Bid is not responsive or the Bidder is unqualified ar of doubtful financial ability or fails to meet any other pertinent standard ar criteria established by City. City also reserves the right to u�aive infonnalities not involving price, co�ltract time or changes in the Work with tl�e Successful �3idder. Discrepaneies between the multiplication of units af Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any calumn of figures and the correet sum thereof will be resolved in favor of the correct sum. Discrepancies betv��een words and figures will be resalved in favor of the words. 17.1.1. Any or all bids will be rejected if City has reason to Uelieve that collusion exists alno�lg the Bidders, Bidder is an interested party to any litigation against City, City or Bidder inay have a claim against the other or be engaged in litigation, Bidder is in arrears on any existing contract or has defaulted on a previous contract, Bidder has performed a prior contract in an unsatisfactory manner, or Bidder has uneompleted work which in the judgment of the City will prevent or hinder the prompt completion of additional work if awarded. 17.2. City may eonsider the qualifications and experience of Subcontraetors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors, Suppliers, and other persons and organizations must be submitted as provided in the Contract Documents or upon the request of the City. City also inay cansider the operating costs, maintenance requirements, perfornlance data and guarantees of major items of materials and equipment proposed for incorporafion in the Work wheii sucl� data is required to be submitted prior ta the Notice of Award. 46 17.3. City may conduct such investigations as City deems necessary to assist in the 47 evaluation of any Bid and to establish the responsibility, c�ualifications, and financial 48 ability of Bidders, proposed Subcontractors, Suppliers and other persozls and 49 organizations to perfarm and funlish the Work in accardance ��ith the Contract 50 Dacuments to City's satisfaction within the prescribed tin�e. 51 CITY OF FORT WORTH DFW Aitport Reclaimu3 WaLc�� Delivety System Flushline STANDARD CONSTRUCTION SPECIFICATtON DOCUA9ENTS City Project I3o. 02025 Revised December ?0. ZQ 12 1 ? 3 4 5 6 7 8 9 14 II 12 13 14 15 16 17 18 19 20 21 22 23 24 ?� 26 27 ?g ?9 30 J7 3? (}0 21 13 - 9 INS'T'RUC"I'IdNS TO B{DDERS Fttgc 9 of 9 I7.4. Contraetor sl�all perform with his own argai�izatian, work of a value not less than 35% of tl�e value embraced on the Contract, unless other�uise approved by the City. 17.5. If tlie Co»tract is to be awarded, it will be awarded to lawest responsible aald responsive Bidder wliose evaluatiori by City i��dicates tl�at tlle awar•d urill be iii t11e best interests of the City. 17.6. Pursuat�t to Texas Goven�meizt Code Chapter 2252.001, tlle City �lill not a���ar-d contract ta a Nonresident Bidder ui�iess the Nonresident Bidder's bid is lower than the lawest bid submitted by a respansibie Texas Bidder by the same ai��ount that a Texas resident bidder would be required to underbid a Nonresident Biddei• to obtain a comparable contrac� in tI7e state in wl�ich the nonresident's principal place of business is located. 17.7. A cantract is not awarded until fonnal City Council autl�orization. If the Cantraet is ta be awarded, City wiil aurard the Contract within 40 days after the day of the Bid Qpening unless extended iu writing. No other act of City or athers will co�lstitute acceptance of a Bid. Upon ihe contractor award a Notice of Award «�ilI be issued by tl�e City. 17.8. Failure or refusal t� comply ��ith the require7l�ents may result in rejectian of Bid. 18. Sagnigg off r�greemertt W11en City issues a Notice c�f Award to tl7e Successful Bidder, it will be accompanied by the required nuniber of ui2signed counterparts of the Agreeinent. Within 14 days thereafter Contractor shall sign and deliver tlie required number af courlterparts of the Agreement to City with the required I3ands, Certificates of Insurance, and all other required documentatian. City shall tl�ereafter deliver one fully si�ied counterpart to Contractor. ! f , ! ° CiTY QF `rOFT WOR'i'H DFW Airp�;t Fteclaimed t�'ater BeIivery System Flushline STANBARi� CQh�5TRUCTION SPECIF7CATiON DOCUMENTS City P�-c�ject No. 02025 Revised Dece�nber 2�, ?(?[2 003513-I CONFLICT OF INTEREST AFFIDAVIT Pagc I of I � ` 1 2 3 4 5 6 7 8 9 10 lI 32 i3 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 � 37 SECTION 00 35 13 CONFLICT OF INTEREST AFFIDAV IT Each bidder, offeror, or respondent (hereinafter also referred to as "you") to a City of Fort Worth (also referred to as "City"} procurement are required to complete Conflict of Interest Questionnaire (the attached CIQ Form) and Loca] Government Officer Conflicts Disclosure Statement (the attached CIS Form) below pursuant to state law. This affidavit will certify that the Bidder has on file with the City Secretary the required documentation and is eligible to bid on City Work. The referenced forms may be downloaded from the website links provided below. http://www.ethics_state.tx.us/forn�s/CI . df� http://w ww.ethics.state. tx.us/forms/C] S,pdf � CIQ Form is on file with City Secretary � CIQ Porm is being provided to the City Secretary 0. CIS Form is on File with City Secretary 0 C1S Form is being provided to the City Secretary �- ,.-G..��� y �� � �� �rti t.�1�, �-I� �a � BIDDER: � /: l 1�E''i/� � � �-/ ,T v�v � �../ �/��OV� ,�._ „''',"'L. �i iia�i- �' �.,��^L� '�� $ � -�i. �L. �.i i, {. 2v L/' " � 1 � � Y� "' � Company tPlerase Print) .. r � � �� y� �� L�� Lr -S�,e, � ��-j� Signature: -� - % �- _ Address 7 � �� �, �� ��� ; � � � � (.�� � Title: � �� City/State/Zip (Please Print) END OF SECTION CTI'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised March 27, 2012 DFW Airport Reclaimed Delivery System Flushtine City Project No. 02025 0o ai o0 BID FORM Page t of 3 SECTION 00 41 00 BID FORM TO: The City Manager c/o: The Purchasing Department 10Q0 Throckmorton Street City of Fort Worth, Texas 76102 FOR: DFW Airport Reclaimed Water Delivery System Flushline City Project No.: City Project No. 02025 Units/Sections: Unit 1- Water Improvements 1. Enter Into Agreement The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with City in the form included in the Bidding Documents to perForm and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Contract Time indicated in this Bid and in accordance with the other terms and conditions of the Contract Documents. 2. BIDDER Acknowledgements and Certification 2.1. In submitting this Bid, Bidder accepts a!I of the terms and conditions of the INVITATION TO BIDDERS and INSTRUCTlONS T� BIDDERS, including without limitation those dealing with the disposition of Bid Bond. 2.2. Bidder is aware of all costs to provide the required insurance, will do so pending contract award, and will provide a valid insurance certificate meeting all requirements within 14 days of notification of award. 2.3. Bidder certifies that this 8id is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation. 2.4. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid. 2_5. Bidder has not solicited or induced any individual or entity to refrain from bidding. 2.6. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph: a. "corrupt practice" means the offering, giving, receiving, or soliciting of any thing of value likely to influence the action of a public afficial in the bidding process. b. "fraudulent practice" means an intentional misrepresentation of facts made {a) to influence the bidding process to the detriment of City (b) to esiabiish Bid prices at artificial non-competitive levels, or {c) to deprive City of fhe benefits of free and open competition. c. "collusive practice" means a scheme or arrangement between two or more Bidders, with or without _ the knowledge of City, a purpose of which is to establish Bid prices at artificial, non-competitive ievels. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DFW Airpott Reclaimed Water Deliveiy System Flushline Form Revised 20120327 �0 41 0� City Project No. 02025 00 41 00 BID FORM Page 2 of 3 d. "coercive practice" means harming or threatening to harm, directly or indirectly, persons or their property to i�fluence their participation in the bidding process or affect the execution of the Contract. 3. Prequalification The Bidder acknowledges that the following work types must be performed only by prequalified contractors and subcontractors: a. Water Line Construction b. c. d. 4. Time of Compfetion _ 4.'I. The Work will be complete for Final Acceptance within 45 days days after the date when the the Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 4.2. Bidder accepfs the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work {and/or achievement of Milestones} within the times specified in the Agreement. 5. Attached to this Bid The following documents are attached to and made a part of this Bid: a. This Bid Form, Section 00 41 00 b. Required Bid Bond, Section 00 43 13 issued by a surety meeting the requirements of Paragraph 5.01 of the General Conditions. c. Proposal Form, Section 00 42 43 d. Vendor Compliance to State Law Non Resident Bidder, Section 00 43 37 e. MWBE Forms (optionaf at time of bid) f. Prequa(ification Statement, Section 00 45 12 g. Conflict of Interest Affidavit, Section 00 35 13 "If necessary, CIQ or CIS forms are to be provided directly to City Secretary h. Any additional documents that may be required by Section 92 of the Instructions to Bidders 6. Totai Bid Amount 6.1. Bidder will complete the Work in accordance with the Contract Documents for the following bid amount. In the space provided below, please enter the total bid amount for this project. Only this figure will be read publicly by the City at the bid opening. 6.2. It is understood and agreed by the Bidder in signing this proposal that the totaf bid amount entered below is "" CITYOF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DFW Airport Reclaimed Water Detivery System Flushline -- Form Revised 20120327 OO 4l OO City Project No. 02025 00 4'I 00 BID FORM Page 3 of 3 subject to verification and/or modification by multiply(ng the unit bid prices for each pay item by the respective estimated quantities shown in thls proposal and then totaling all of the extended amounts. 7. Bid Submittal This Bid is submitted on � Respectfuliy sGbmitt � � �',� �� L, ' _ By: � � �5,� 3 , z � � �3 Month Day, Year . � . (Signature) �w._� r - t, . Printed Name H��re (Printed Name) by the entity named below. Title: Tikle Here �i � � Company: Company l�ame Here �!,�;,; �i-�,, '"�L,._� �.�{y��; �' �..,� Address: AddressHere '���tih 1�:-l�u �-)�--h ,�•t �lddress Here or Space City, State Zip Code Here ����T "j-�( �G; Z,`C� State of Incorporation: State Nere T i� Emaii: Your Email Address Here �� �y h�-(,,��,�w _ iy .:�. Phone: Your Phone Number Here `� ��] - � � � -� �1 j �� END OF SECTION L r � � ` � Corporate Seal: CITY OF FOR7 WORTH STANDAP,D CONSTi2UCT10N SP�CIFICA710t� DOCUI�2EN7S DFN' Air7x�n Recluimcd 11�aicr Dcli�•cn Sy�0.7h Plushlitoc Form Rewsed 20120327 OU 4] 00 ('m Projcci \o. 02t925 0o aa az BID PROPOSAI_ Page I uf Z SECTION 00 42 43 PROPOSALFORM Bidder's Application .. . � Project ttem Infonnation Bidder's Proposal Bidlist Specification Unit of Bid Description Unit Price Qid Value Itein No. Section No. Measure Quantity Unit 1 - Water Improvements -- --- --- - --- - ---- -----.__ ________---- .__----_ ._____�. _- . 1 0241.1 ] 06 16" Pressure Plug 02 41 14 EA 2 $1,000.00 �2,000.00 --- --- - - - --_ __ --__..- -.-.__ -------- - ---- --..__.. -- ---- --- -- ------ 2 3123.0101 Unclassified Excavation by Plan 31 23 16 CY 412 $I5.00 $6,180.00 --------- ----- ----- --- _ _ _ _ -- - __ _- ------- -- ----- --- __ _ _- _- _ - 3 3125.0101 SWPPP > 1 acre 31 25 00 LS t $]0,000.00 �10,000.00 _�_ __. __ _.__. _ -----_ _ ---- --- _ ___- __._.._.._---- _ ------ 4 3211.0112 6" Flexible Base, Type A, GR-1 32 1 I 23 SY 247� $10.00 $24.7�0.00 _____ _._ _ ---- --- _----- ---_ ___. ___. ______ __� _ �_.-_--- -._..-- 5 3292.0400 Seedin�, Hydromulch 32 9� 13 SY 7950 $1.00 �7,950.00 - - -=---._._..____. ___ _ -- - ____ ----- --- _ ..--. _ -- - _ - - ---- - - - ---- - -- _ --- 6 3303.0001 Bypass Pumping 33 03 10 LS 1 $200.00 �Z00.00 - _... _-__ __ _. _ - - -- -- --._ ..----- __ _ _-__ -- 7 3304.0002 Cathodic Protection 33 04 12 LS ] $I0,000.00 �10,000.00 -- - --- _ - --- - - ----_--- _- - ----____. ---- -- ___. -- __ _ - 8 3305.0103 Exploratory Excavation of Existing Utilities 33 0� 30 EA t $1,000.00 $1,000.00 �,- - ------ ----- ----- _.__._ _..-- - _------ ------ -------- -- 9 3305.0106 Manhole Ad,iustment, Major 33 OS 14 EA 2 $700.00 $1,400.00 _ -_------- . -- _ �`_ - -- - �.-- _ _ -. 10 3305.O109 Trench Safety 33 0> 10 LP 430 $20.00 $9,600.00 -- - --- _. - - - - -- -- -- -- -- - -�-- ---- _ _---- I 1 3305.0110 Utility Markers 33 0� 26 LS I $300.00 $300.00 - --- ____. . - _- - ___ ----._ _......_---- --__ ----. _ ---- _ ---- 12 331 ].0001 Ductile Iron Watzr Fittings w/ Restraint 33 I 7 1 I TON 1 $1,000.00 $1.000.00 _ __-_ _- - ------- --- -- - - - - ----- ----- - _ _ - __ ___---- - - ___ ----- - -- _ _..-- - � 3 3311.0565 16" PVC C905 Water Pipe, CSS Backfill (Restrained 33 1 1 10, LF Joints) 33 1 1 13 420 �360.00 � I J I,200.00 14 3312.2304 ] 0" Water Meter and Vault 33 I Z 1 I FA � $30,000.00 �30,000.00 ------- -------------------- -- . ---- _ _.._- - - -._ _ __ - ---- - _ ____ _ ---- - _ ------ 15 3312.3007 20" Gate Valve w/ Vault 33 12 20 EA I $25,000.00 $25,000.00 _ ------------ __._ _____.._.._ __ ---_ --_ - _ _- -...--- 16 33I2.3106 I6" Cut-in Gate Valve w/ Vault 33 12 20 EA 1 $23,000.00 $23,000.00 - ---- --------- ------ __-- _ ---- ._ . - - -- -- -- --_ __--- 17 33123103 20" Cut-in Gate Valve w/ Vault 33 12 20 EA 1 $35,000.00 "�3�,000.00 _- - - __ _ --_ ---- -- -- --- --._. __._ _---__. _----- -___.__---- _.____- - 18 9999.0000 Remove E�istin�� 14" Temporary Flush line 02 41 14 LF 722 $2.00 �1,444.40 --___ _ - -_ _---- ------ -- ----_ . __ _ -. __ .. . - --_- --- ----- _. _----- � 9 9999.0000 Remove Existin�� Temporary Flush Line Framins and EA Manhole Modification 2 $�00.00 �1,000.00 ------- -_____ _ ._--------- --____ . ..___ . ..---- ---__ _ _ ___.._..------ ----------- -__- ------- 9999.0000 20° PVC C90> Water Pipe, CSS Backfill (Restrained 33 11 10, �� Joints) 3311 12 LF j4 $�00.00 �27,000.00 _. .__ --___.__ . ____------- --._.- ______--- --------------- ___ _ 21 9999.0000 Connection to Existing TRA Manhole LS 1 $9,000.00 $9,000.00 - - - ------ -- -------- _ __---- - - ------ - . _- ------- ---..__. . __ _ ----- 9999.0000 3' Dia Pre-Cast Manhole 33 O1 30, 22 EA 33 39 20 1 $7�,000.00 $75,000.00 ----.__.._^� ___.__�__-- - ----__ ____---__.-- ---- . ------ --------- __.._ ----- �__-�� 23 9999.0000 Miscellaneous Site Grading CY 1650 $2.00 $3,300.00 Total Bid Unit 1 $455,324.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS DFW Airport Reclaimed Water Delivery System Fiushline Forcn Revised 20120120 00 42 43 City Project No. 020?5 0o az a> BID PROPOSAL Pacc 2 of 2 SECTION 00 42 43 PROPOSALFORM [�P►li��:�L��=31�: Bidder's Application Project ftem infonnation Bidder's Proposal Bidlist Specitication Unit of Bid Description Unit Price Bid Value Item No. Section No. Measure Quantity — � � Bid Summary Ause Bid Total Bid $455,324.00 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Form Revised Z0120 t 20 00 42 43 DFW Auport Reclaimed Water Delivery System Flushline Ciry Project No, 0?02� 00 43 37 VENDOR COMPLIANCE TO STATE LAW Pagetofl SECTION 00 43 37 VENDOR COMPLIANCE TO STATE LAW NON RESIDENT BIDDER � Texas Government Code Chapter 2252 was adopted for the award of contracts to nonresident bidders. This law provides that, in order to be awarded a contract as low bidder, nonresident bidders (out-of-state contractors whose corporate offices or principal p(ace of business are outside the State of Texas) bid projects for construction, improvements, supplies or services in Texas at an amount lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a nonresident bidder in order to obtain a comparable contract in the State which the nonresidenYs principal place of business is located. The appropriate blanks in Section A must be filled out by all nonresident bidders in order for your bid to meet specifications. The failure of nonresident bidders to do so will automatically disqualify that bidder. Resident bidders must check the box in Section B. A. Nonresident bidders in the State of State Here or Blank , our principal place of business, are required to be % Here percent lower than resident bidders by State Law. A copy of the statute is attached. Nonresident bidders in the State of State Here or Blank , our principal place of business, are not required to underb�esident bidders. oy-g. r B. The principal place of business of ou ompany or our parent company or majority owner is !`—'`'in the State of Texas. � � BIDDER: 1" _. Company Name Here °�� ; ��� �� Z--,�.�-� ��' �'��'"'�' j t `= By: �rinte�d Name Here � ��t��• ►' �+� �- � Address Nere `'�., =. `� �.�.lt �_ �� ��+.0 /(�t1' _ f �' � Address Here or Space f; (Signature) City, State Zip Code Here �-� �� �:° � X 2(.' C.�� y� Title: Title Here �' 1"� Date: ��'1��1� � � C C END OF SECTION C CITY OF FQRT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Fortn Revised 201'10827 00 43 37 City Project No. 02025 0o as ,z BID FORM Page 1 of 1 � SECTION 00 45 12 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Type Contractor/Subcontractor Company Name Prequalification Expira 'on D te �� ��� ���-�� � t�._�-'� �-1 , , �, � � � 3 ° � 3 Waier Line Construction Company Name Here or spacL Date ere or space The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BlDDER: Company Name Here tl�'�:�= �{'9^ Address Here ��� %� � ��(,� u Address Here or Space City, State Zip Code Here ���(�� i 1 't.1�Y-) (.�. :#,r � � ;� �. � �., �'i.: �: �t. � � i �� By: Prir�ted Name �e�e , ���� t � � t°;/�`�' (Signature) l � ;� -� � ' k �' Title: Title Here �il � Date: ( C �'3 �� 7 EMD OF SECTION � CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMEAdTS DFW Airport Reclaimed Water Delivery System Flushline Form Revised 20120120 ��� �? 1� Gity Projecl IVo. 02025 Od 45 1 1- 1 SIDDERS PREQUAL[FICATIONS Page I af 3 1 2 3 4 5 6 7 8 9 10 il 12 13 24 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 34 31 32 33 34 35 36 37 38 39 40 41 42 43 44 SECTION 00 45 11 BIDDERS PREQUALIFICATIONS l. Summary. All contractors are required to be prequalified by the City prior to submitting bids. To be eligible to bid the contractor must submit Section 00 45 F 2, Prequalification Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder Prequalification Application in accordance with the requirements below. The prequalification process will establish a bid limit based on a technical evaluation and fmancial analysis of the contractor. The information must be submitted seven (7) days prior to the date of the opening of bids. Por example, a contractor wishing to submit bids on projects to be opened an the 7th of April must file the information by the 31 st day of March in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's Prequalification Application, the following must accompany the submission. a. A complete set of audited or reviewed financial statements. (1) Classified Balance Sheet (2) Income Stateznent (3) Statement of Cash Flows (4) Statement of Retained Earnings (5) Nates to the Financial Siatements, if any b. A certified copy of the iirm's organizational documents (Corporate Charter, Articles of Incorporation, Articles of Organization, Certificate of Formation, LLC Regulations, Certificate of Limited Partnership Agreement). c. A completed Bidder Prequalification Application. (1) The firm's Texas Taxpayer ldentification Number as issued by the Texas Comptroller of Public Accounts. To obtain a Texas Taxpayer ldentification number visit the Texas Comptroller of Public Accounts online at the following web address www.window.state.tx.us/tax�ermit/ and fill out the application to apply for your Texas tax ID. (2) The firm's e-mail address and fax number. (3) The firm's DUNS number as issued by Dun & Bradstreet. This number is used by the City for required reporting on Federal Aid projects. The DUNS number may be obtained at www.dnb.com. d. Resumes reflecting the construction experience of the principles of the firm for firms suhmitting their initial prequalification. These resumes should include the size and scope of the work performed. e. Other information as requested by the City. 2. Prequalification Requirements a. Financial Statements. Financial statement subnussion must be provided in accordance with the following: (1} The C'ity requires that the original Financial Statement or a certified copy he submitted for consideration. CTTY OF FORT WORTH DF W Airport Relcaitned Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFIGATION DOCUMENTS City Project No. 02025 Revised July 1, 20I 1 00 45 11 - 2 B[DDERS PREQUALIFICATIONS Pagc 2 oC3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4} Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as IZ independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: {1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7} The City reserves the right to require a new statement at any time. 20 (8} The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will cletermine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falis within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequali�cation Application. A Bidder Prequalification Applicatian must be 33 submitted along with audited or reviewed fmancial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected_ 36 (1} In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 {2) A minimum of five (5) references of related work must be pravided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, modei and general common description of 43 each piece of equipment. Abhreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Etigibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification_ 48 b. The City may reject, suspend, or modify any prequalification for failure by fhe 49 contractor to demonstrate acceptable financial ability or performance_ 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH DF W Airport Relcaimed Water Delivery System Flushline STANDARD CONSTRUC"I'ION SPECIFICATION BOCUMENTS City Project No. 02025 Revised 3uly 1, 2011 1 2 3 4 5 6 7 8 9 Od45 i1 -3 BR3I�ERS PREQUALIFICATIQNS Page 3 of 3 d. If a contractor has a valid prequalification Ietter, the contractor will be eligible to bid tlae prequalified work typ�s until the expiration date stated in the Ietter. ,i�, i . CCiY dP FORT WORTH DF W r�irpon Kelc�imcd Water Dclivery System Ftusl�linc STAND�'�RD �ONSTRUC'TI�?v SPEC[F1CATlOIv DUCUMENTS City E'rnjc�t �'c�. 02t}25 Rcvised July 1. 2t711 oQas ta-i PREQLIALIFICA'CION STA'iENYENT Page 1 of i 1 SECTION 04 451� 2 PREQUALIFICATION STATEMENT 3 4 Each Bidder for a City procurement is required to complete the infornzation below by 5 identifymg the prequalified cantractors and/or subcantractors whom they intend to utilize for the 6 major work type(s) listed. 7 MajBr Work Prequali�catian T� Contractor/Subcontractor Company Name �x aratioi� Ijate Water I�ine Gonstruction 8 9 i� The undersigned hereby certif es tliat the contractors and/ar subcontractors described in 1 l the table above are currently prequalified for the work types listeti. 12 I3 ��DER: 14 1 S By: l6 Cocnpax7y (PIease Prin�) 17 IA Si,�ature: 14 Address 7Q 21 Tit1e: 2� CitylState/�ip (Piease Print) 23 ?4 Date: ?$ 25 EI�tD OF SECTION 2� �CTTY OF FC)RT WORTH DF W Airport Rc�laimed Watcr Delivcry Svstem Flushlinc S1`A?�ID.ARD CONSTRUC"il0?�` SPECIFtCAT101� DOCUiviENTS Cit',- Prcj�t �o_ Q?025 Rc:vis�'d Jui}� l, 2{)1 I i V i\ i���41 � 1 11 SECTION OQ 45 13 BIDDER PREQUALIFICATION APPLICATION Date of Balance Sheet Name under which you wish to qualify Post Office Box Street Address (required) Telephone City City Fax Mark only one: Individual Limited Partnership General Partnership Corporation Limited Liability Company State State Email Zip Code Zip Code Texas Taxpayer ldentification No. Federal Employers Identification No. DUNS No. (if appiicable) MAIL THIS QUESTIONAIRE ALONG WITH FINANCIAL STATEMENTS TO: CITY OF FORT WORTH TEXAS 1000 THROCKMORTON STREET F�RT WORTH, TEXAS 7b102-6311 AND MARK TFiE ENVELOPE: `BIDDER PREQUALIFICATION APPLICATION" 00 45 13 - 2 BIDDER PREQUALiFICATlON APPLICATION Page 2 of 8 . � The following should be completed in order that we may properiy classify your �rm: (Check the block(s} which are applicable — Block 3 is to be left blank if Block 1 andlor Block 2 is checked) ❑ Has fewer tl�an 100 employees and/or ❑ Has less than $6,000,000.00 in annual b oss receipts OR ❑ Does not meet the criteria for being designated a small business as provided in Section 2006.001 of the Texas Govemment Code. The classification of your firm as a small or large business is not a factor in deternuning eligibility to become prequalified. U-: �, •, •• Water Department Augur Boring - 24-inch diameter casing and less Augur Boring - Greater than 24-inch diameter casing and greater Tunneling — 36-Inches — 60 —inches, and 350 LF or less Tunneling - 36-Inches — 60 —inches, and greater than 350 LF Tunneling — 66" and greater, 350 LF and a eater Tunneling — 66" and greater, 350 LF or Less Cathodic Protection Water Distribution, Development, 8-inch diameter and smaller Water Distribution, Urban and Renewal, 8-inch diameter and smaller Water Disiribution, Development, 12-inch diameter and smaller Water Distribution, Urban and Renewal, 12-inch diameter and smaller Water Transmission, Development, 24-inches and smaller Water Transmission, Urban/Renewal, 24-inches and smaller Water Transmission, Development, 42-inches and smaller Water Transmission, Urban/Renewal, 42-inches and smailer Water Transmission, Development, All Sizes Water Transmission, Urban/Renewal, All Sizes Sewer Bypass Pumping, 18-inches and smaller Sewer Bypass Pumping, 18-inches — 36-inches Sewer Bypass Pumping 42-inches and larger CCTV, 8-inches and smaller CCTV, 12-inches and smaller CCTV, I8-inches and smaller CCTV, 24-inches and smaller CCTV, 42-inches and smaller CCTV, 48-inches and smaller C1TY OF FORT WORTH DFW Airport Reclaimed Water Dclivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Ciiy Project No. 02025 Revised December 2Q 2012 00 45 l3 - 3 BIQDER PREQUAL[FICAT[ON APPLICATION Page 3 of 8 MAJOR WORK CATEGORIES, CONTINUED Sewer CIPP, 12-inches and smaller Sewer CIPP, 24-inches and smaller Sewer CiPP, 42-inches and smalier Sewer CIPP, All Sizes Sewer Collection System, Development, 8-inches and smaller Sewer Collection System, Urban/Renewal, 8-inches and smaller Sewer Collection System, Development, 12-inches and smaller Sewer Collection System, Urban/Renewal, 12-inches and smaller Sewer Interceptors, Development, 24-inches and smaller Sewer Interceptors, Urban/Renewal, 24-inches and smaller Sewer Interceptors, Development, 42-inches and smaller Sewer Interceptors, Urban/Renewal, 42-inches and smaller Sewer Interceptors, Development, 48-inches and smaller Sewer Interceptors, UrbanlRenewal, 48-inches and smaller Sewer Pipe Enlargement 12-inches and smaller Sewer Pipe Enlargement 24-inches and smaller Sewer Pipe Enlargement, All Sizes Sewer Cleaning , 24-inches and smaller Sewer Cleaning , 42-inches and smaller Sewer Cleaning , All Sizes Sewer Cleaning, 8-inches and smaller Sewer Cleaning, 12-inches and smaller Sewer Siphons 12-inches or less Sewer Siphons 24-inches or less Sewer Siphons 42-inches or less Sewer Siphons All Sizes Transpartat�ian Pubiic Works Asphalt Paving Construction/Reconstruction (LESS THAN 10,000 square yards) Asphalt Paving Construction/Reconstruction (10,000 square yards and GREATER) Asphalt Paving Heavy Maintenance (UNDER $1,000,000) _ Asphalt Paving Heavy Maintenance ($1,000,000 and OVER) Concrete Paving Construction/Reconstruction (LESS THAN 10,000 square yards) Concrete Paving Construction/Reconstruction (10,000 square yards and GREATER) Roadway and Pedestrian Lighting CITY OF FORT WORTH DFW Airport Reclaimed Water Belivery System Flusliline STANDARI3 CdNSTRUCTION SPECIFICATIdN DOCUMENTS City Project No. 02025 Revised December 20, 2012 UO 45 I 3- 4 BIDDER PREQUALtFtCAT1QN APPL(CAT[ON Page 4 of 8 List equipment you do not own but which is available by renting DESCRIPTION OF EQUIPMENT NAME AND DETAILED ADDRESS OF OWNER 2. How many years has your organization been in business as a general contractor under your present name? _ List previous business names: 3. How many years of experience in had: construction work has your organization (a) As a General Contractor: (b} As a Sub-Cantractor: 4. *What projects has your organization completed in Texas and elsewhere? CLASS LOCATION NAME AND DETAILED CONTRACT OF DATE CITY-COIJNTY- ADDRESS OF OFFICIAL TO AMOUNI' WORK COMPLETED STATE WHOM YOU REFER *If requalifying only show work pertormed since last statement. 5. Have you ever failed to complete any work awarded to you?_ If so, where and why? 6.Has any officer or owner of your organization ever been an officer of another organization that failed to complete a eantract? If so, state the name of the individual, other organization and reason. 7.Has any officer or owner of your organization ever failed to complete a contract executed in his/her name? If so, state the name of the individual, name of owner and reason. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANBARD CONSTRUCTION SPECiFICATION DOCUMENTS City Project No. 02025 Reviscd December 20, 20I2 Q04513-5 BIDI}ER PRcQUAUFICATION APPLfCATIC?N Pagc 5 of 8 8. In what other Iines of business are you Fnancially interested? 9. Have you ever performed any work for the City?, If so, when and to whom do you refer? 10. State names and detailed addresses of alI producers from whom you have purchased principal materials during the last three years. NAME OF FIRM OR C4MPANY DETAILED ADDRESS 11. Give the names of any affiliates or relatives currently debarred by the City. Indicate your relationship to this person or firm. 12. What is the construction experience of the principal individuals in your organizatian? PRESENT MAGNITUDE POSITION OR YEAR.S OF AND TYPE OF IN WF�iAT NAME OFFICE EXPERIEN�E WORK CAPACITY 13. If any owner, officer, director, or stockholder of your firm is an employee of the City, or shares the same household with a City employee, please list the name of the City employee and the relationship. In addition, list any City employee who is the spouse, child, or parent of an owner, officer, stockholder, or director who does not live in the same household but who receives care and assistance from that person as a direct result of a documented medical condition. This includes foster children or those related by adoption or marriage. CTI'Y OF FORT WORTH DFW Airport Reclaime�i Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Projec;t No. 02d25 Revised December 20, 2012 004513-6 BIDDER PREQUALIFICATION APPLiCATION Page 6 0£ 8 CORPORATION BLOCK PARTNERSHIP BLOCK If a corporation: Ii a p�rtnersiup: Date of Incorporation State of Organization Charter/File No. Date of arganization Fresident Is partnership general, limited, ar registered limited liability partnership? Vice Presidents File No. (if Limited Partnership) General Partners/Officers Secretary Limited Partners (if applicable) Treasurer LIMITED LIABILITY COMPANY BLOCK If a corporation: State of Incorporation Date of organization File No. Individuals authorized to sign for Partnership Officers or Managers {with titles, if any) Except for limited partners, the individuals listed in the blocks above are presumed to have full signature authority for your firm unless otherwise advised. Should you wish to grant signature authority for additional individuals, please attach a certified copy of the corporate resolution, corporate minutes, partnership agreement, power of attorney or other legal documentation which grants tlus authority. CiTY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SFECIFFCATdON DOCL�'�HNTS City Project I`�o. 02025 Revised December 20, 201? UO 45 l3 - 7 BIBDER PREQUAL[FICATION APPLICATiEJN Page 7 of 8 14. Equipment � TOTAL BALANCESHEET ITEM QUANTTTY ITEM DESCRIPTION VALUE 1 2 3 4 5 6 7 8 9 10 il 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Various- TOTAL aimliar types o� equipment may be lumped together. !f your ium has more than 30 types of equipment, you may show these 30 types and show the remainder as "various". The City, by allowing you to show only 30 types of equipment, reserves the right to request a complete, detailed list of all yaur equipment. The equipment list is a representation of equipment under the control of ihe firm and which is related to the type of work for which the firm is seeking qualifieation. I�l the description include, the manufacturer, model, and general common description of each. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCLJMENTS City Project No. 02025 R.evised December 20, 2012 004513-8 B[DBER PREQUALIFICATlON APPLICATION Page 8 of 8 ;;j� • •, �; . � �. STATE OF COUNTY OF The undersigned hereby declares that the foregoing is a true statement of the financial condition of the entity herein first named, as of the date herein first given; that this statement is for the express purpose of inducing the party to whom it is submitted to award the submitter a contract; and that the accountant who prepared the balance sheet accompanying this report as well as any depository, vendor or any other agency herein named is hereby authorized to supply each party with any information, while this statement is in force, necessary to verify said statement. being duly sworn, deposes and says that he/she is the of the entity described in and which executed the foregoing statement that he/she is familiar with the baoks af the said entity showing its financial condition; that the foregoing financial statement taken from the books of the said entity as of the date thereof and that the answers to the questions of the foregoing Bidder Prequalification Application are correct and true as of the date of this affiaavit. Firin Name: Signature: Sworn to before me this day of Natary Public Notary PubIic must not be an officer, director, or stockhaider or relafive thereof. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCU'vIENTS City Project No. 02025 Revised December 20, 2012 0 � � � � � � � � � 2 3 4 5 6 7 S 9 10 11 I2 I3 14 15 16 i7 18 19 20 21 22 23 24 25 2b z� 28 29 30 31 32 33 34 35 36 37 38 39 40 00452b-1 C�NTRACTOR COMPLIANCE WITH WORKER'S COMPENSAT1pN LAW Pagc 1 oF 1 SECTIdN QO 45 26 CONTRACTQR COMPLIANCE Vi�ITH WORKER`S COMPENSATIOIV LAW Pvrsuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies tttat it provides worker's compensation insurance coverage for all of its employees empioyed on City Projeci No. fl2025. Contractor further certifies that, pursuant to Texas Lalior Code, Section 4a6.096{b), as amended, it wiil provide to City zfs subcontractor's certificat8s of campliance with worker's compensation coverage. CONTRACTOR: No ���, T� z u s � o+�-�v���f ,�h �,-.s�._ Company �—' �aa� �.��rl�� 45��� �� Address t�fcr r �}� ���`10 City/State/Zip TI� S'I'ATE QF TBXAS COUNTY OF TARRANT § § $y: ZAG� r �i Gr as rint) Signature: � � Tifle: v 1� (Please Pzint) BEFORE ME, the undersigued authority, on this day personally appeazed 7_4L� F�s: l,' � � known to ine to be the person whose name is subscribed to fhe foregoing instnzmern, and acimowledged to me that helshe executed the sairce as the aet and deed of /�l n ��-4 7'L S s Co., �./� �„ ��, � for the puzposes and consideration therein expressed and in the rapacity�'Tieieui stated. GIVEN UNDER MY HAND AND SEAL OF OPFICE this . 2 �� da of Y _ J�..,,".� ,..20�`' - �/ � Notary Public � nd for the a e of Texas. END OF SECITON " G< KATHRYN MARIE KING * Notary Public, State of Texas N� � My Commissian Expires 'Teo�•c�'� Ob-2�-2017 .r.,._,i � i i ' � f I i; I I ,� � i CITY OF FbRT WORTH DFW Aupoct Aeclaimed Water Deiivery System Flushline STANDARD CONSTRUCTION SPECiFICATION DOCUMENCS CiryFmja;t Nv. Q2025 Rcviscd lu(y 1, 2D11 00 45 26 - 1 CONTRACTOR COMPL(ANCE WITH WORKER'S COMPENSATION LAW Page i of 1 1 SECTION 00 45 26 2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 4 Pursuant to Texas Labor Code Section 4Qb.096(a), as amended, Contractor certifies that it 5 provides worker's compensation insurance coverage for all of its employees employed on City 6 Project No. 02025. Contractor further certifies that, pursuant to Texas Labor Code, Section 7 406.096{b), as amended, it will provide to City its subcontractor's certificates of compliance with 8 worker's compensation coverage. 9 10 CON�'RACTOR: 11 12 By: 13 Company (Please Print) 14 15 Signature: 16 Address 17 18 Title: 19 City/State/Zip (Please Print) 20 21 22 T�-� STATE OF TEXAS § 23 24 COL7NTY OF TARRANT § 25 26 BEFORE ME, the undersigned authority, on this day personally appeared 2� , known to me to be the person whose name is 28 subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as 29 the act and deed of for the purposes and 30 consideration therein expressed and in the capacity therein stated. 31 32 GIVEN UNDER MY HAND 1LND SEAL OF OFFICE this day of 33 x 2�� 34 35 36 37 Notary Public in and for the State of Texas 38 39 END OF SECTION 4a CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery Systcm Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 42025 Reviscd July 1, 2011 (ll) 45 �i(I - I MI�Oltl"Il' nND 1�'OM(iTJ I3USINEiSS E;N`I`Ii1ZPItISIi t;f)AI. Pagr I oi I � 3 4 5 6 7 � 4 1� ll I2 13 14 15 ib 17 l8 19 Zo 21 22 23 24 25 26 27 ?g 29 30 3l 32 33 34 35 36 37 SI�,C`i'I�N t)() 45 40 MINORI'I'l' 13USiNI�SS f?N"I'L;RPI�iS1; GO/�I_ APPLICAI'iON OF POI..ICY If the total dollar value of thc coniract is grea(cr than $50,000, then the MBI; sul�ec�ntracting goal may be ap�lic�ble. ]f tl�e total dollar value c�f� the c�rltract is $5d,00{) ar less, tl�c MBE subcontractizig goa] is not applicable. POLICY S'I'ATEMLNT It is the policy of tlze City of Fort 1�Jorth to ensure thc Iull and equiiablc pai�ticipation by Minority Business Entei�rises (MBE} in tl�e pa-ocurement af� all gaods and services. /�I1 recJuiren�ents and regulations stated in tlle City's cun-ez�t Busilless Diversity Tilter-}�rise Ordinance apply to tllis l�id. MB.F.. PR4JF.,CT GO AL The City's MBI; goal on tliis project is 1?;'„ of tlie total bid (Bfise bic� al�plies �o Parl�s �r�z�l Conzrz�urrrty �Serl�ices). Note: If botll MI�� and SBI; subcontracting goals are establislied for this project, then an Offeror must submit both a MBE Utilization Foi-�n and a SBE Utilizatiou Fonn to be deemed responsivc. coMrLl�rc� To Bl� srFClFrcaT�oNs On City contracts greater than $SO,OUO ���here a M13E subco��ti-acting goal is appiied, bidders are required to comply with the intent of tlie City's Business Diversity (�rd.inance by one of the following: 1. Meet or e�:ceed the above stated MSE goai through M�3E subcontracting partieipation, or 2. Meet or exceed the above statec� i'VI�3E goal through MBE Joint Venture participation, or 3. Goad Faith Effort documentation, or; 4. Waiver documentation. Failure to comply witl� the City's M/WBE C)rdinance, shall result in the Bid being considered iion- responsive. Any questioi7s, please contact the M/WBE Office at (817) 392-6104. SUBMIT'�'�I.O� FtEQUIRED DOCUMF,NTA'I'Il7N The applicable documents must be received by the Managing Department, wit]Iin the following times allocated, in order for the entire bid to be considered responsi��e to ti�e specificatians. The l. Subcontractor Utilization Fonn, if goal is met or exceeded: 2. Good �'aitli F..,ffort and Subcontractor Utilization Fonn, ifparticipation is less than stated �oal: 3. Gaad Faith Effort and Subcontractor Utilization Form, if no MBE participation: 4. Prime Contractor Waiver Forn7, if fu-m �vill perfonn all subcontractin�/supplier ��ork: 5. Joint Venture Porm; if utilizing a joint venture to meet or exceed �oal. received by 5:00 p.m., five (5} City business days after the bid opening date, exclusive of the bid openin� date. received by 5:00 p.m., five (5) Cicy business days after the Uid opening date, excIusive of the bid opening date. received by S:OQ p.m., five (5) City business days after the bid opening date, exclusive of khe hid opening date. received by 5:04 p.m., five (5) City busitiess days after the bid openiiig date; exclusive of the bid opening date. received by �:0� p.m., �ve (5} City business days after the bid openin� date, exclusive of the bid opening date. END C)F S�:CT10N C1TY OF FdRT WORTH DFVd Aiiport Recia;me<i Gt'ater Dclive�}� System Flus'iline STANDARD CONSTKLiCT[ON SPECIFICATI�N BC}CUMEN"IS C'ity Prqiect No. 020�� Re��isrd €}eceu3bcr'_0. 2412 005243-1 Agreement Page 1 of 4 � � 2 SECTION 00 52 43 AGREEMENT 3 / 4 THIS AGREEMENT, authorized on �Z ��(�3 is made by and between the City of Fort 5 Worth, a Texas home rule municipality, acting by and through its duly authorized City Manager, 6 ("City"), and North Texas Contractin�, Inc., authorized to do business in Texas, acting by and 7 through its duly authorized representative, ("Contractor"). 8 City and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK 11 12 13 14 15 16 17 Contractor shall complete all Work as specified or indicated in the Contract Documents for the Project identified herein. Article 2. PROJECT The project for which the Work under the Contract Documents may be the whole or only a part is generally described as follows: DFW Airport Reclaimed Water Deliver�vstem Flushline ect No. 02025 18 Article 3. CONTRACT TIME 19 20 21 3.1 Time is of the essence. All time limits for Milestones, if any, and Final Acceptance as stated in the Contract Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 45 days after the date when the 24 Contract Time commences to run as provided in Paragraph 2.03 of the General Conditions. 25 3 3 Liquidated damages 26 27 28 29 30 31 32 33 34 35 Contractor recognizes that time is of the essence of this Ab eement and that City will suffer financial loss if the Work is not completed within the times specified in Paragraph 32 above, plus any extension thereof allowed in accordance with Article 12 of the General Conditions. The Contractor also recob izes the delays, expense and difficulties involved in proving in a legal proceeding the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof , Contractor ab ees that as liquidated damages for delay (but not as a penalty), Contractor shall pay City Six Hundred Fifly ($650.00) Dollars for each day that expires after the time specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. OFFICIAL RECORD C1Tl( �ECRE'fARY �'T. WORTH, TX CTTY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised December 20, 2012 00 52 43 - 2 A;reement Page 2 of 4 � r-- 1 Article 4. CONTRACT PRICE 2 City agrees to pay Contractar for performance of the Work in accordance with the Contract 3 Documents an amount in current funds of Four Hundred Fifly Five Thousand Three Hundred 4 Twenty Four pollars ($455,324.00). 5 Article 5. CONTRACT DOCUMENTS 6 5.1 CONTENTS: 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 A. The Contract Documents which comprise the entire ab eement between City and Contractor concerning the Work consist of the following: 1. This Agreement. 2. Attachments to this Agreement: a. Bid Form 1) Proposal Form 2) Vendor Compliance to State Law Non-Resident Bidder 3) Prequalification Statement 4) State and Federal documents (project specifzc) b. Current Prevailing Wage Rate Table c. Insurance ACORD Form(s) d. Payment Bond e. Performance Bond f. Maintenance Bond g. Power of Attorney for the Bonds h. Worker's Compensation Affidavit i. MWBE Commitment Form 3. General Conditions. 4. Supplementary Conditions. 5. Specifications specifically made a part of the Contract Documents by attachment or, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents. 6. Drawings. 7. Addenda. 8. Documentation submitted by Contractor prior to Notice of Award. 9. The following which may be delivered or issued after the Effective Date of the Agreement and, if issued, become an incorporated part of the Contract Documents: a. Notice to Proceed. b. Field Orders. c. Change Orders. d. Letter of Final Acceptance. ��FI��AL ���ORD C8� SECRE'�ARY f�`� YIIOR"S'1�1, �"X � CTI'Y OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline —_ STANDAItD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised December 20, 2012 � �- � � � 005243-3 Agreement Page 3 of 4 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 Article 6. INDEMNIFICATION 1.2 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the city, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licenses or invitees under this contract. This indemnification provision is specificallv intended to operate and be effective even if it is a1leEed or proven that all or some of the damages beinE sou�ht were caused, in whole or in part, bv anv act, omission or ne�li�ence of the citv. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the city in defending against such claims and causes of actions. 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the city, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the city, arising out of, or alleged to arise out of, the work and services to be performed by the contractor, its officers, agents, employees, subcontractors, licensees or invitees under this contract. This indemnification provision is specificallv intended to operate and be effective even if it is alleged or proven that all or some of the dama�es being sou�ht were caused, in whole or in part, bv anv act, omission or ne�li�ence of the citv. Article 7. MISCELLANEOUS 23 7.1 Terms. 24 Terms used in this Agreement which are defined in Article 1 of the General Conditions will 25 have the meanings indicated in the General Conditions. 26 7.2 Assi�unent of Contract. 27 This Agreement, including all of the Contract Documents may not be assib ed by the 28 Contractor without the advanced express written consent of the City. 29 73 Successors and Assigns. 30 City and Contractor each binds itself, its partners, successors, assib s and legal 31 representatives to the other party hereto, in respect to all covenants, ab eements and 32 obligations contained in the Contract Documents. 33 7.4 Severability. 34 Any provision or part of the Contract Documents held to be unconstitutional, void or 35 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 36 remaining provisions shall continue to be valid and binding upon CITY and 37 CONTRACTOR. 38 7.5 Governing Law and Venue. 39 This Agreement, including all of the Contract Docume��s-is�.er�o�nablT e in the State of 40 Texas. Venue shall be Tarrant County, Texas, or the �(J�it�i ,States District Court for the 41 Northern District of Texas, Fort Worth Division. "'` -- `- ' �9`Y � �i�g:��`PA�dY\ �� �� A„�� ("��4�j r�aoyi � II ° �i111 � ��':7.^ '�i ✓.�, I _.—r-��b�.,�, ' CIT'Y OF FORT WORTH DFW Airport Reclaimed WaYer Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CiTy Project No. 02025 Revised December 20, 2012 00 52 43 - 4 Agreement Pa�e 4 of 4 6 7 8 9 10 11 12 13 7.6 Other Provisions. 2 The Contractor agrees to pay at least minimum wage per hour for all labor as the same is 3 classified, promulgated and set out by the City, a copy of which is attached hereto and 4 made a part hereof the same as if it were copied verbatim herein. 5 7.7 Authority to Sign. Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory of the Contractor. IN WIT'NESS WHEREOF, City and Contractor have executed this Agreement in multiple counterparts. This Agreement is effective as of the last date signed by the Parties (`Bffective Date"). Contractor: , City of Fort Worth r ,_ � � � �, ���� �,"� `^� �i���i��� — / , •� � By: �' ^ Fernando Costa , � 1- By: p,/ `� �= Assistant City Manager (Signature) Date //Z///'�' �—�' ���� ��i� �.� %✓ (Printed Name) � 14 15 16 17 18 19 20 21 22 23 Title: �� � Attest: (Seal) Secretary Address: ��1 ` 1 `1 ��L l� �.✓ �-s�� �� ��'� M&C '�U l.e l � Date: � � l/l� � Date s . ac �� � l l G �• K 1-�'i Assistant City Attorney ,s ;., -� � k- � ,��i � : ,',' , " �� .. � �.:� �� - �"°': ,� -, �•• '+cr,•''•�.1�Ttjy1111 City/State/Zip: �� C��: ; �'� ��i ���� Approved as to Form and Legality: i APP O L RECOMNIENDED: � � 1 4' ` � S. Frank Crumb, P.E. DIRECTOR, CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2012 Water Department �FFICIAL RECORD ;; 'yIYY SECRETARY i� �� n���-��� �� � I� � J�-�� . - _ DFW Airport Reclaimed Water Delivery System Flushline City Project No. 02025 006113-1 PERFORMANCE BOND Page 1 of2 1 2 3 4 5 6 7 8 9 10 THE STATE OF TEXAS COUNTY OF TARRANT SECTION 00 61 13 Bond No. SII1124362 PERFORMANCE BOND § § KNOW ALL BY THESE PRESENTS: § That we, North Texas Contracting, Inc., known as "Principal" herein and Arch Insurance Company , a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one 11 or more), are held and firmly bound unto the Ciiy of Fort Worth, a municipal corporation created 12 pursuant to the laws of Texas, known as "City" herein, in the penal sum of, Four Hundred Fiftv 13 Five Thousand Three Hundred Twenty Four pollars ($455 324.00), lawful money of the United 14 15 16 States, to be paid in Fort Worth, Tanant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, the Principal has entered into a certain written contract with the City 18 awarded the ��� day of � P Ct N+ ���- , 20� which Contract is hereby referred to and 19 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment 20 labor and other accessories defined by law, in the prosecution of the Work, including any Change 21 22 23 Orders, as provided for in said Contract designated as DFW Airport Reclaimed Water Delivery System Flushline, City Project No. 02025. NOW, THEREFORE, the condition of this obligation is such that if the said Principal 24 shall faithfully perform it obligations under the Contract and shall in all respects duly and 25 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 26 specifications, and contract documents therein referred to, and as well during any period of 27 28 29 30 31 extension of the Contract that may be granted on the part of the City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised July 1, 2011 00 61 13 - 2 PERFORMANCE BOND Page 2 of 2 1 2 3 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and o�cers on this the ��7�h day of 6 �PC'Pr� 5 �i , 20 13 - 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 PRINCIPAL: North Texa tracti�' Inc. � BY: /� 'v' `� �--iv Signature Fusilier, Vice President Name and Title Address: 4999 Keller Haslet Rd. Keller, TX 76248 SURETY: Arch Insurance Companv BY_ Qh� � - �7ii�rz����i1/ Signature Robbi Morales, Attorney—in—fact Name and Title Address: 2711 N. Haskell Ave. , Suite 800 , Dallas, TX 7�204 �' - � , � �1 � ,1 I ' , � % bJitness as to Surety j Telephone Number: 214/989-0000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS CiTy Project No. 0202� Revised July 1, 2011 � Wi ess as to Principal 00 61 14 -1 PAYMENT BOND Page 1 of 2 1 2 3 4 5 6 THE STATE OF TEXAS COUNTY OF TARRANT SECTION 00 61 14 Bond No. SII1124362 PAYMENT BOND § § KNOW ALL BY THESE PRESENTS: § 7 That we, North Texas Contractin�, known as "Principal" herein, and 8 Arch Insurance Companv , a corporate surety 9 (sureties), duly authorized to do business in the State of Texas, known as"Surety" herein 10 (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal 11 corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the 12 penal sum of Four Hundred Fifty Five Thousand Three Hundred Twenty Four pollars 13 �$455,324.00), lawful money of the United States, to be paid in Fort Worth, Tarrant County, 14 Texas, for the payment of which sum well and truly be made, we bind ourselves, our heirs, 15 executors, administrators, successors and assib s, jointly and severally, firmly by these presents: 16 WHEREAS, Principal has entered into a certain written Contract with City, awarded the 17 / Ff h day of �< ��/'� 5�r" , 20 � 3, which Contract is hereby referred to and 18 made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, 19 labor and other accessories as defined by law, in the prosecution of the Work as provided for in 20 said Contract and designated as DFW Airport Reclaimed Water Delivery System Flushline, City 21 Project No. 02025. 22 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 23 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 24 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 25 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 26 force and effect. 27 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 28 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 29 accordance with the provisions of said statute. 30 CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised July 1, 2011 00 61 14 - 2 PAYMENTBOND Page 2 of 2 1 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the � day of 3 _ ;�`� ��' �`� , 20�- 4 ATTEST: ATTEST: � (Surety) Secre 5 6 7 8 9 10 11 12 PRINCIPAL: / North Tex Contracti '", Inc. / ` r" BY: ��`� �� � � ,�; Signature Zach Fusilier. Vice President Name and Title Address: 4999 Keller Haslet Rd. Keller, TX 76248 SURETY: Arch Insurance Company BY: ��,_--�,���/ Signature R�hhi Mnra1PG, Attorne�—in—faCt Name and Title � �. Address: 2711 N. Haskell Ave. , Suite 800 � .�� � `� Dallas, TX 7�204 '�i � � � � � .,���C� � � �itness as to Surety Telephone Number: 214/989-0000 Note: If signed by an officer of the Surety, there must be on file a certified e�ctract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CIT'Y OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Ciry Project No. 02025 Revised July 1, 2011 006119-1 MAINTENANCE BOND Page 1 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 THE STATE OF TEXAS COUNTY OF TARRANT SECTION 00 61 19 Bond No. SII1124362 MAINTENANCE BOND § § KNOW ALL BY THESE PRESENTS: § That we North Texas Contractin�, known as "Principal" herein and Arch Insurance Company , a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of the State of Texas, known as "City" herein, in the sum of Four Hundred Fifty Five Thousand Three Hundred Twenty Four pollars ($455,324.00), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly be made unto the City and its successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. 17 18 WHEREAS, the Principal has entered into a certain written contract with the City awarded 19 the ���� day of l��f.� 5'� , 20 / 3, which Contract is hereby 20 referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 21 22 23 24 25 26 27 28 29 30 31 32 33 34 materials, equipment labor and other accessories as defined by law, in the prosecution of the Woric, including any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for in said contract and designated as DFW Airport Reclaimed Water Delivery System Flushline, City Project No. 02025 and WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Conh-act Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the City of the need therefor at any time within the Maintenance Period_ CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Ciry Project No. 02025 Revised July I, 2011 00 61 19 - 2 MAINTENANCE BOND Page 2 of 3 1 NOW THEREFORE, the condition of this obligation is such that if Principal shall 2 remedy any defective Work, for which timely notice was provided by City, to a completion 3 satisfactory to the City, then this obligation shall become null and void; otherwise to remain in 4 full force and effect. 5 6 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 7 noticed defective Work, it is agreed that the City may cause any and all such defective Work to 8 be repaired and/or reconstructed with all associated costs thereof being bome by the Principal and 9 the Surety under this Maintenance bond; and 10 11 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall iie in 12 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 13 Worth Division; and 14 15 PROVIDED FURTHER, that this obligation shall be continuous in nature and 16 successive recoveries may be had hereon for successive breaches. 17 18 19 CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised Iuly 1, 2011 00 61 19 - 3 MAINTENANCE BOND Page 3 of 3 r- � IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this instrument by duly authorized agents and o�cers on this the � 8�' day of _ _ _ 3 �� E�r, � tr- , 20�- 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 AT EST: � DUr�'Yv�' (Surety) Secre ��� , � , � � �'���- � ��� , � � � ""1 Witness as to Surety PRINCIPAL: � North Te��s Contraciting, Inc. ��{ , / j��-- � BY: ' � / `� � nature Zach Fusilier, Vice President Name and Title Address: 4999 Keller Haslet Rd. Keller, TX 76248 SURETY: Arch Insurance Company BY: l ��..r, . � 7yi ,s-> � .4� Signature �obbi IyIorales,_ A,�Cor�e�-in-fact Name and Title Address: 2�11 N. Haskell Ave., Suite 800 Dallas, TX 7�204 Telephone Number: 214/989-0000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCT[ON SPEC[FICATION DOCUMENTS City Project No. 0202� Revised July t, 201 I W itness as to Yrmcipa( =-- - . _. .-. -.. .= iliJlll''III�.IIIIIII��IIIiIII II �I IIII II��III���I� �IIIIIIIII IIIlilllll��illl. AIC 0000092727 THIS POWER OF ATTORNEY /S NOT VALID UNLESS IT lS PR/NTED ON BLUE BACKGROUND. This Poweca��4ttorney limits the acts of those named herein, and they have no authority to bind the Company except in fhe manner and � the extent herein stated. Not valid for Mortgage, Note, Loan, Letter of Credif, Bank Deposit, Currency Rate, lnterest Rate or Residential Value Guarantees. POWER OF ATTORNEY _ __ =_ = �!hilll�ip� = Know All Persons By These Presents _ - That the Arch Insurance Company, a corporation organized and existing under the laws of the State of Missouri, having its principal administrative office in Jersey City, New Jersey (hereinafter referred to as the "Company") does hereby appoint: Don E. Cornell, Lisa M. Bonnot, Ricardo J. Reyna, Robbi Morales and V. DeLene Marshall of Dallas, TX (EACH) its true and lawful Attorney(s)in-Fact, to make, execute, seal, and deliver from the date of issuance of this power for and on its behalf as surety, and as its act and deed: Any and all bonds, undertakings, recognizances-and--other surety obligations, in the penal sum not exceeding Ninetv Million Dollars ($90,000,000.00). - This authority does not permit the same obligation to be split into two or more bonds In order to bring each such bond within the dollar limit of authority as set forth herein. The execution of such bonds, undertakings, recognizances and other surety obligations in pursuance of these presents shall be as binding upon the said Company as fully and amply to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at its principal administrative office in Jersey City, New Jersey. This Power of Attorney is executed by authority of resolutions adopted by unanimous consent of the Board of Directors of the Company on September 15, 2011, true and accurate copies of which are hereinafter set forth and are hereby certified to by the undersigned Secretary as being in full force and effect: "VOTED, That the Chairman of the Board, the President, or the Executive Vice President, or any Senior Vice President, of the Surety Business Division, or their appointees designated in writing and filed with the Secretary, or the Secretary shall have the power and authority to appoint agents and attorneys-in-fact, and to authorize them subject to the limitations set forth in their respective powers of attorney, to execute on behalf of the Company, and attach the seal of the Company thereto, bonds, undertakings, recognizances and other surety obligations obligatory in the nature thereof, and any such officers of the Company may appoint agents for acceptance of process." This Power of Attomey is signed, sealed and certified by facsimile under and by autho�ifyo_��he following resolution adopted by the unanimous consent of the Board of Directors of the Company on September 15, 2011: VOTED, That the signature of the Chairman of the Board, the President, or the Executive Vice President, or any Senior Vice President, of the Surety Business Division, or their appointees designated in writing and filed with the Secretary, and the signature of the _ Secretary, the seal of the Company, and certifications by the Secretary, may be affixed by facsimile on any power of attorney or bond- executed pursuant to the resolution adopted by the Board of Directors on September 15, 2011, and any such power so executed, sealed and certified with respect to any bond or undertaking to which it is attached, shall continue to be valid and binding upon the Company. — II IIi, i IIIIII — : — III'I IIIIIII'll I �il, lllll - = = � �II'II I� III I I I, _ _ - - _ ' I i l, �, , i� � � � �i� OOML0013 00 03 03 Page 1 of 2 Printed in U.S.A. '���IIII, I i I II�� Iliu��ulll I�I� ���� II = I� i I��III �� I �Ili�� _ �ii����� I� _ _ - AIC 0000092727 In Testimony Whereof, the Company has caused this instrument to be signed and its corporate seal to be affixed by their authorized officers, this 19th day of Auqust, 2013. Attested and Certified Arch Insurance Company ��: `o C7JRPK)9G57f � �� Patrick K. Nails, Secretary STATE OF PENNSYLVANIA SS r�€�p� COUNTY OF PHILADELPHIA SS �I /_ �l��N� L.a.t �J6�`/� i�l David M. in e stein, Executive Vice President I, Kathleen Marcinkus, a Notary Public, do hereby certify that Patrick K. Nails and David M. Finkelstein personally known to me to be the same persons whose names are respectively as Secretary and Executive Vice President of the Arch Insurance Company, a Corporation organized and existing under the laws of the State of Missouri, subscribed to the foregoing instrument, appeared before me this day in person and severally acknowledged that they being thereunto duly authorized signed, sealed with the corporate seal and delivered the said instrument as the free and voluntary act of said corporation and as their own free and voluntary acts for the uses and purposes therein set forth. rat.��,+arr�x�a,t.�rr� o� a�r�rrsn.�rnw,� ?J07f�RIA� SEA4. KATH�EEid iA,�RC1kkU5� N�taty Puhlic Giiy af Philerd�lphla, f�!s. Coun h4 .__ .. _ 6_ �_ ` 4 ¢ CERTIFICATION ����� ���� Kathleen Marcinkus Not Public My commission expires 3/14/2014 I, Patrick K. Nails, Secretary of the Arch Insurance Company, do hereby certify that the attached Power of Attorney dated Auqust 19, 2013 on behalf of the person(s) as listed above is a true and correct copy and that the same has been in full force and effect since the date thereof and is in full force and effect on the date of this certificate; and I do further certify that the said David M. Finkelstein, who executed the Power of Attorney as Executive Vice President, was on the date of execution of the attached Power of Attorney the duly elected Executive Vice President of the Arch Insurance Company. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the Arch Insurance Company on this 14'+`' day of �«�!�''� �� , 20 f� Patrick K. Nails, Secretary This Power of Attorney limits the acts of those named therein to the bonds and undertakings specifically named therein and they have no authority to bind the Company except in the manner and to the extent herein stated. PLEASE SEND ALL CLAIM INQUIRIES RELATING TO THIS BOND TO THE FOLLOWING ADDRESS: Arch Insurance — Surety Division 3 Parkway, Suite 1500 Philadelphia, PA 19102 6!`" ''p � , �z+Rrc,N,tr� s�tt isra OOML0013 00 03 03 Page 2 of 2 Printed in U.S.A. � �� . - .�---- `� �� ARCH �nsurance Company ARCH Surefiy �FEXAS C�O�N'SU�Vi�R� NQ7#CE iMPORi'f�N�' NOTICE � To obtain inform�tion or make a complaint: You may aoniaet your agent at the �telephone number provided o�. the Decia�-a#ions page of your poticy. . � You ma� contact William J. Misero, Surety; Arch lr�surance Company, at fihe tolf-free �Q�F:j�+i:s� ic iiuiii��i or aadr�ss providea aeiow: � - Arch� Insurance Com.{iany � . -Atfention: VI(illiam J. Misero 3 Parkway Suite-1500 . . . -Ph.�ladefphia PA 19102 - - - 1=8s6-472-8845� � - .Yo.0 may contact� -the T�xas� Depa�Ement� of Insu�a�ce , to obtain in�o�ma#io�� on companies.' coverages, rigl�is or comptaints at' � . � � -800=252-3438 -- � You may write the Texas Depai�me�i of Insurance: � � - . � � _ � . _ � - � P:O, Box 1490J1 _ � - � � '. _ . �. Ausii�, T)G 787�[�M9091. - . - . � � FP►��# (S12) 4�5-177'1 � PREMlUM OR CLAINtd DiSPUTES: � � - Should you ha�e a ctispute eonceming youf pcemium or about a claim yo� shouid contact the agent o� the cor.npar�� ftrst. If the disptate is. not �esolved, you rrray -contac# t�e Te�cas Deparimenf of lnsu�ance. � � - ATTACH THiS �OTICE TU YOUR POLiCY:. This notice is fflr info�rnation onijr and does no.# becorx�e a, part o� condition of the at�ached document_ (Ed_ 4-l92) Prie�ted in J_S_R_ �� aobizs-i CBRTIFICAT� OF INSt7tiAlVCE Page 1 of 1 � ? 3 4 5 �i 7 8 9 ic� 1r 12 13 l� IS lb 17 18 19 �? p ?� iL' 23 sECTTo� ao 6i �s CERTIFICATE QF INSURANCE U ," � .: . ��:`��,� CTTY (7F FURT WO1tTH DFW Airperrt Reclaimui Watcr I?elivery Systcm Flu�hSine STANDARD C(�NSTRUC`TIQ� SPECTFICATTQN DOCUMEN['S �'%tv PTpjc�t ha. t�2U25 ReviscdJuty i.201I • � . � � , � . �, � �; i 1 ! • ! ! '. CITY fJF FORT WORTH DFW Airport Fteclaimed Water Delivery 5ystem Flushiine STANDAR� CONSTRUCTiON SPEGIFICATION DOCUM�NTS Clty Project No. 02025 F2evision: December 21, 2012 STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION CONTRACT TABLE OF CONTENTS Page Article 1— Definitions and Terminology ..........................................................................................................1 1.01 Defined Terms ...............................................................................................................................1 1.02 Ternunology ..................................................................................................................................6 Article2— Preliminary Matters ......................................................................................................................... 7 2.01 CopiesofDocuments ....................................................................................................................7 2.02 Commencement of Contract Time; Notice to Proceed ................................................................ 7 2.03 Starting the Work .......................................................................................................................... g 2.04 Befare Starting Construction ........................................................................................................ 8 2.05 Preconstrucrion Conference .......................................................................................................... 8 2.06 Public Meeting .............................................................................................................................. 8 2.07 Initial Acceptance of Schedules .................................................................................................... 8 Article 3— Contract Documents: Intent, Amending, Reuse ............................................................................ 8 3.01 Intent .........................................................................................................�•---•---._.......................... 8 3.02 Reference Standards ......................................................................................................................9 3.03 Reporting and Resolving Discrepancies ....................................................................................... 9 3.04 Amending and Supplementing Contract Documents .................................................................10 3.05 Reuse of Documents ...................................................................................................................10 3A6Electroruc Data ............................................................................................................................11 Article 4— Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions; Reference Points ...........................................................................................................11 4.01 Availability of Lands ..................................................................................................................11 4.02 Subsurface and Physical Conditions ..........................................................................................12 4.03 Differing Subsurface or Physical Conditions .............................................................................12 4.04 Underground Facilities ...............................................................................................................13 4.05 Reference Points ....................................................................�---....._...........................................14 4.06 Hazardous Environmental Conditian at Site ..............................................................................14 Article 5— Bonds and Insurance .................................................................. 5.01 Licensed Sureties and Insurers ................................................. 5.02 Performance, Payment, and Maintenance Bonds ..................... 5.03 Certificates of Insurance .......................................................... 5.04 Contractor's Insurance .............................................................. 5.05 Acceptance of Bonds and Insurance; Option to Replace......... ........................ ..........................16 ,............-• ...................................16 .................................................16 ..................................................16 ..................................................18 .................................................19 Article 6 — Contractor's Responsibilities ........................................................................................................19 6.01 Supervision and Superintendence ...................�----�-•---...._............................................................19 CITY OF FORT WOf2TH DFW Airport Reclaimed Water Delivery System Fiushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21, 2012 6_02 Labor; Working Hours ................................................................................................................ 20 6.03 Services, Materials, and Equipment ........................................................................................... 20 6.04 Project Schedule ..............................................................................................................•--••---....21 6.05 Substitutes and "Or-Equals" ....................................................................................................... 21 6.06 Conceming Subcontractors, Suppliers, and Others ....................................................................24 6.07 Wage Rates .................................................................................................................................. 25 6.08 Patent Fees and Royalties ........................................................................................................... 26 6.09 Pernuts and Utilities ......................................................................•••-•--.......................................27 6.10 Laws and Regulations ...............................................................•---..._..........................................27 6.11 Taxes ........................................................................................................................................... 28 6.12 Use of Site and Other Areas ....................................................................................................... 28 6.13 Record Documents..-•-•-�-•-� ..........................................................................................................29 6.14 Safety and Protection ..................................................................................................................29 6.15 Safety Representa.tive ..................................................................................................................30 6.16 Hazard Communication Programs ............................................................................................. 30 6.17 Emergencies and/or Rectification ............................................................................................... 30 6.18 Subxuitta.ls ........................................�--.....---.._.........._................................................_..................31 6.19 Continuing the Work ..............................................................................................................•---.32 6.20 Contractor's General Warranty and Guarantee ....................................................•,---•---•-•--........ 32 6.21 Indemnification ......................................................................................................................... 33 6.22 Delegation ofProfessional Design Seavices ..............................................................................34 6.23 Right to Audit .........................................................•--............................................................_.....34 6.24 Nondiscrimination .............................................................................................•--.......................35 Article7- Other Work at the Site ...................................................................................................................35 7.01 Related Work at Site ...................................................................................................................35 7.02 Coordination .....................................................................•-•----._._................................................36 Article 8- City's Responsibilities ......................................�--...........-•----......_...........-•--•--................................ 36 8.01 Communications to Contractor ...................................................................................................36 8.02 Furnish Data....---•�-•--• ........................................................................�----�-------.............................36 8.03 Pay When Due ..........................................................................................................•----------....... 36 8.04 Lands and Easements; Reports and Tests ...................................................................................3b 8.05 Change Orders....--------�-•--• ..................................................................................•--......................36 8.06 Inspections, Tests, and Approvals .............................................................................................. 36 $.07 Limitations on City's Responsibilities .................................................. ..................... 37 -•• ............. 8.08 Undisclosed Hazardous Envirorunental Condition ....................................................................37 8.09 Compliance with Safety Program.--� ...................................................................•----.............._....37 Article 9- City's Observation Status During Construction ...........................................................................37 9.01 City's Project Representative .....................................................................................................37 9.02 Visits to Site ................................................��---......-•-•------.................._..._...............................----.37 9.03 Authorized Variations in Work ................................................•-�----.....------._..............................38 9.04 Rejecting Defective Work ..........................................................................................................38 9.05 Deterininations for Work Performed ..........................................................................................38 9.06 Decisions on Requirements of Contract Documents and Acceptability of Work ..................... 38 CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21, 2012 Article 10 - Changes in the Work; Claims; Exh-a Work ................................................................................ 38 10.01 Authorized Changes in the Work ............................................................................................... 38 10.02 Unauthorized Changes in the Work ........................................................................................... 39 10.03 Execution of Change Orders .......................................................................................................39 10.04 Extra Work ..................................................................................................................................39 10.05 Norification to Surety ..................................................................................................................39 10.06 Contract Claims Process .............................................................................................................40 Article 1 I- Cost of the Work; Allowances; Unit Price Work; Plans Quantity Measurement ...................... 41 1 LOl Cost of the Work .........................................................................................................................41 11.02 Allowances ..................................................................................................................................43 11.03 Unit Price Work ..........................................................................................................................44 11.04 Plans Quantity Measurement ......................................................................................................45 Article 12 - Change of Confract Price; Change of Contract Time .................................................................46 12.01 Change of Contract Price ............................................................................................................46 12.02 Change of Contract Tirne ............................................................................................................47 12.03 Delays ..........................................................................................................................................47 Article 13 - Tests and Inspections; Correction, Removal or Acceptance of Defecrive Work ...................... 48 13.01 Notice of Defects .........................................................................................................�---•--........48 13_02 Access to Work ...........................................................................................................................48 13.03 Tests and Inspections ..................................................................................................................48 13.04 Uncovering Work .....................................................................................................................•--49 13.05 City May Stop the Work ............................................................................................................. 49 13.06 Correction or Removal of Defective Work ................................................................................ 50 13.07 Correction Perioc3 ........................................................................................................................50 13.08 Acceptance of Defective Work ................................................................................................... 51 13.09 City May Correct Defective Work ......................�-�----••---................................._.........................51 Article 14 - Payments to Contractor and Completion .................................................................................... 52 14.01 Schedule of Values ........................................................................................•--�--........................52 14.02 Progress Payments ...................................................................................................................... 52 14.03 Contractor's Warranty of Title ..--•-• ............................................................................................ 54 14.04 Partial Utilization .................................................................................�-�--..................................55 14.Q5 FinalInspection ...........................................................................................................................55 14.06 Finai Acceptance ...........................................•---....._....................................................................55 14.07 Final Payment .............................................................................................................................. 56 14.08 Final Completion Delayed and Partial Retainage Release ........................................................ 56 14.09 Waiver of Claims ........................................................................................................................57 Article 15 - Suspension of Work and Terinination ...-• ...................................................................................57 15.01 City May Suspend Work ............................................................................................................. 57 15.02 City May Terrriinate for Cause ................................................................................................... 58 15.03 City May Terminate For Convenience .......................................................................................60 Article 16 - Dispute Resolution ...................................................................................................................... 61 16.01 Methods and Procedures .............................................................................................................61 CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTiON SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21, 2012 Article17 — Niiscellanevus .............................................................................................................................. 62 17.01 Ciiving Notice .............................................................................................................................. 62 17.Q2 Computation of Times ................................................................................................................ 62 1 i.03 Cumulative Rernedias ................................................................................................................. 62 17.04 �urvival of Obligations ............................................................................................................... 63 I7.Q5 Hea.dings ......................................................................................................................................63 CITY �F FORT WORTH DFW Airport Fieciaimed VJater C}elivery System Flushilne STANDARD CONSTRUC710N SPEGIFIGATION DOCUMENTS City Projed No. 02025 Revision; December29,2012 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Ternzs A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meani.ngs indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, ferninine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed-defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Gontract Documents include references to identified articles and paragraphs, and the titles of other docurnents or forms. 1. Adderida—Written or graphic instruments issued prior to the opening of Bids which clarify, correct, or change the Bidding Requirements or the proposed Contract Documents. 2. Agreement—The written instrument which is evidence of the agreement between City and Contractor covering the Work. 3. Application for Payment—The form acceptable to City which is to be used by Contractor during the course of the Work in requesting progress or final payments and which is to be accompanied by such supporting documenta.tion as is required by the Contract Docuxnents. 4. Asbestos—Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current ac�ion levels established by the United States Occupational Safety and Health Adnunistration. 5. Award — Authorization by the City Council for the City to enter into an Agreement. 6. Bid—The offer or proposal of a Bidder submitted on the prescribed form setting forth the prices for the Work to be performed. 7. Bidder—The individual or entity who submits a Bid directly to City. 8. Bidding Doczcments—The Bidding Requirernents and the praposed Contract Documents (including all Addenda). 9. Bzdding Reyuir-ements—The advertisement or Invitation to Bid, Instructions to Bidders, Bid security of acceptable form, if any, and the Bid Form with any supplements. 10. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 11. Buzzsaw — City's on-line, electronic docurnent management and collaboration system. 12. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivety System Flushiine - STANpARD CONSTRUCTION SPECIFICATION DdCUMENTS City Project No. 02025 Revision: December21,2012 13. Change Order A dacument, which is prepared and approved by the City, which is signed by Contractor and City and authorizes an addition, deletion, or revision in the Wark or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 14. Cit�— The City of Fort Worth, Texas, a home-rule municipal corporation, authorized and chartered under the Texas State Statutes, acting by its governing body through its City Manager, his designee, or agents authorized under his behalf, each of which is required by Charter to perForm specific duties with responsibility for fnal enforcement of the contracts involving the City of Fort Worth is by Charter vested in the City Manager and is the entity with whom Cantractor has entered into the Agreement and for whom the Work is to be performed. I5. City Attorney — The o�cially appointed City Attorney of the City of Fort Worth, Texas, or his duly authorized zepresentative. 16. Ciry Council - The duly elected and qualified governing body of the City of Fort Worth, Texas. 17. City Manager — The officially appointed and authorized City Manager of the City of Fort Worth, Texas, or his duly authorized representative. 18. Contract Claim—A demand or assertion by City or Contractor seeking an adjustrnent of Contract Price or Contract Time, or both, or other relief with respect to the terms of the Contract. A demand for money or services by a third party is not a Contract Claim. 19. Contract—The entire and integrated written document between the City and Contractor concerning the Work. The Contract contains the Agreement and all Contract Documents and supersedes prior negotiations, representarions, or agreements, whether written or oral. 20. Contract Documents—Those items so desib ated in the Agreement. All items listed in the A�-eement are Contract I}ocuments. Appraved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 21. Contract Price—The moneys payable by City to Contractor for compietion of the Work in accordance with the Contract Documents as stated in the Agreement (subject to the provisions of Paragraph 11.03 in the case of Unit Price Work). 22. Contract Time The number of days ar the dates stated in the Agreement to: (i) achieve Milestones, if any and (ii) complete the Work so that it is ready for Final Acceptance. 23. Contt-aetor The individual or entity with whom City has entered into the Agreement. 24. Cost af the Work—See Paragraph 11.01 of these General Conditions for definition. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTIdN SPECIFICRTION QOCUMENTS City Project No. �2Q25 Revision: December 21, 2012 25. Damage Clairres — A demand for money or services arising from the Project or Site from a third party, City or Contractor exclusive of a Contract Claim. 26. Day or day — A day, uriless otherwise defined, shall mean a Calendar Day. 27. Director of Aviation — The officially appointed Director of the Aviation Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 28. Director of Parks and Commi�ni�-y Services — The officially appointed Director of the Parks and Community Services Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 29. Director of Planning and Development — The officially appointed Director of the Planning and Development Department of the City of Fort Worth, Texas, or his duly appointed representative, assisiant, or agents. 30. Director of Transportation Public Works — The officially appointed Director of the Transportation Public Works Department of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 31. Director of Water Department — The officially appointed Director of the Water Depariment of the City of Fort Worth, Texas, or his duly appointed representative, assistant, or agents. 32. Drawings—That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 33. Effectzve Date of the 14greement—The date indicated in the Agreement on which it becomes effective, but if no such date is indicated, it means the date on which the Agreernent is signed and delivered by the last of the two parties to sign and deliver. 34. Engineer—The licensed professional engineer or engineering firm registered in the State of Texas perfornung professional services for the City. 35. Extra T�TTork — Additional work made necessary by changes or alterations of the Contract Documents or of quantities ar for other reasons for which no prices aze grovided in the Contract Documents. Extra work shall be part of the Work. 36. Field Order — A written order issued by City which requires changes in the Work but which does not involve a change in the Contract Price, Contract Time, or the intent of the Engineer. Field Orders are paid from Field Order Allowances incorporated into the Contract by funded work type at the time of award. 37. Finul �4eceptance — The written notice given by the City to the Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECfFICATION DOCUMENTS City Project No. 02025 Ftevision: December 21, 2012 38. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 39. General Requir-ements—Sections of Division 1 of the Contract Documents. 40. Hazardous Envif-onmental Condition—The presence at the Site of Asbestos, PCBs, Petroleum, Hazardous Waste, Radioactive Material, or other materials in such quantities ar circumstances tl�at may present a substantial danger to persons or praperty exposed thereto. 41. Hcu.ardous Waste—Hazardous waste is defined as any solid waste listed as hazardous or possesses one or more hazardous characteristics as defined in the federal waste regulations, as amended from time to time. 42. Laws and Regulations—Any and all applicable Iaws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdictian. 43. �iens—Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 44. Major Item — An Item of work included in the Contract Documents that has a total cost equal to or greater than 5% of the original Contract Price or $25,000 whichever is less. 45. Milestone—A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 46. Notice of Award—The written notice by City to the Successful Bidder stating that upon timeiy compliance by the Successfizl Bidder with the conditions precedent listed therein, City will sign and deliver the Agreement. 47. Notice to Proceed—A written notice given by City to Contractor fixing the date on which the Contract Time will commence to run and on which Contractor shall start to perform the Work specified in Contract Documents. 48_ PCBs—Polychlorinated biphenyls. 49. Petf�oleum—Petroleum, including crude oil or any fraction thereof wluch is liquid at standard conditions of temperature and pressure (60 degrees Fahrenheit and 14.7 pounds per square inch absolute), such as oil, petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene, and oil mixed with other non-Hazardous Waste and crude oils. 50. Plans — See defuaition of Drawings. CITY OF FOF2T WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21, 2012 51. Project Schedule—A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities cornprising the Contractor's plan to accomplish the Work within the Contract Time. 52. Project—The Work to be performed under the Contract Documents. 53. �'roject Representative—The authorized representative of the City who wili be assigned to the Site. 54. Public Meetzng —�ln announced meeting conducted by the City to facilitate public participation and to assist the public in gaining an informed view of the Project. 55. Radioactzve Material—Source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954 {42 USC Section 2011 et seq.) as amended from time to time. 56. Regular Working Hours — Hours beginning at 7:04 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal halidays). 57. Samples--Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. 58. Schedule vf Submittals—A schedule, prepared and maintained by Contractor, of required submittals and the time requirements ta support scheduled performance of related constniction activities. 59. Schedule of Values—A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for reviewing Contractor's Applications for Payment. 60. Site—Lands or areas indicated in the Contract Documents as being fumished by City upon which the Work is to be performed, including rights-of-way, perrnits, and easements for access thereto, and such other lands furnished by City which are designated for the use of Contractor. 61. Specifications—That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain adininistrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents {Dzvision 00 00 00) of eaeh Project. 62. Subcontractor—An individual or entity having a direct contract wifh Contractor or with any other Subcontractor for the perFormance of a part of the Work at the Site. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 2�, 2012 63. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work_ 64. Success,f'ul Bidder—The Bidder submitting the lowest and nnost responsive Bid to whom City makes an Award. 1.a2 65. Superintenderzt — The representative of the Contractor who is available at all times and able to receive instnictions from the City and ta act for the Contractor. 66. Supplementary Conditions—That part of the Contract Documents which amends or supplements these General Conditions. 67. Supplier A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any 5ubcantractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 68. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited ta, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 69. Unit Price Work—See Paragraph 11.03 of these General Conditions for definition. 70. Weekend I�Tjorkzng Hours — Hours beginning at 9:00 a.m. and ending at 5:00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the Ciry, 71. Work—The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Change Order or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, ail as required by the Contract I?ocuments. 72. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the perfarmance of the principal unit of work underv,�ay for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. TeYminology A. The words and terms discussed in Paragraph 1.02.B through E are not defined but, when used in the Bidding Requirements ar Contract Documents, have the indicated meaning. B. Intent of Certuin Terms or Adjectives: CITY OF FORT WORTH DFW Airport Ftectaimed Water Delivery System Ffushline STANQARD CONSTRUCTION SPECIFICAT(ON DOCUMENTS City Project No. 02026 Revision: December21, 2012 l. The Contract Documents include the terms "as alIowed," "as approved," "as ordered," "as directed" or terms of like effect or import to authorize an exercise of judgment by City. In addition, the adjectives "reasonable," "suitable," "acceptable," "proper," "satisfactory," or adjectives of like effect or impart are used to describe an action or determination of City as to the Work. It is intended that such exercise of professional judgment, actian, or deternunation will be solely to evaluate, in general, the Work for compliance with the infozmation in the Contract Documents and with the design concept of the Project as a functioning whole as shown or indicated in the Contract Documents {unless there is a specific statement indicating otherwise). C. De, f'ective.• 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been dainaged prior to City's written acceptance. D. Furnish, Install, Perform, Provide: L The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. E. Unless stated otherwise in the Contract Dacuments, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Copies of Dvcuments - City shall furnisb to Contractor one (1) original executed copy and one (1} electronic copy of the Contract Documents, and four (4) additional copies of the Drawings. Additional copies will be fumished upon request at the cost of reproduction. 2.02 Commencement of Contract Time; Notice to Proeeed The Contract Time will commence to run on the day indicated in the Notice to Proceed. A Notice to Proceed may be given at any tirne within 14 days after the Effective Date of the Agreement. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushiine STANDARQ CONSTRUCT(ON SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December2l, 2012 2.03 2.04 2.05 2.06 2.0'7 Starting the Work Contractor shall start to perform the Work on the date when the Contract Time commences to run. No Work snall be done at the Site prior to the date on which the Contract Time commences to run. Before Startzng Constncction Baseline Schedzcles: Submit in accordance with the Contract Documents, and prior to starting the Work. Precotastruction Conference Before any Work at the Site is started; the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. Initial Acceptance of Schedules No prob ess payment shall be made to Contractor until acceptable schedules are submitted to City in accordance with the Schedule Specification as provided in the Contract Documents. ARTICLE 3— CONTRACT DOCUMENTS: INTENT, AMENDING, REITSE 3.01 Intent A. The Contract Documents are complementary; what is required by one is as binding as if required by all. B. It is the intent of the Contract Documents to describe a functionally complete project (or part thereof} to be constructed in accardance with the Contract Dacuments. Any labor, documentation, services, materials, or equipment that reasonably may be inferred from the Contract Documents or from prevailing custom or trade usage as heing required to produce the indicated result will be provlded whether or not specifically called for, at no additional cost to City. C. Clarifications and interpretations of the Contract Documents shall be issued by City. D. The Specifications may vary in form, format and style. Some Specification sections may be written in varying degrees of stxeamlined or declarative style and some sections may be relatively narrative by comparison. Omission of such words and phrases as "the Contractor shall," "in confornuty with," "as shown," or "as specified" are intentional in streamlined sections. Omitted words and phrases shall be supplied by inference. Similar types of provisions may appear in various parts of a section or articles witlun a part depending on the format of the CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARd CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December2l, 2012 section. The Contractor shall not take advantage of any variation af foam, format or style in making Contract Claims. 3.02 E. The cross referencing of specification sections under the subparagraph heading "Related Sections include but are not necessarily lirnited to:" and elsewhere within each Specification section is provided as an aid and convenience to the Contractor. The Contractor shall not rely on the cross referencing provided and shall be responsible to coordinate the entire Work under the Contract Documents and provide a complete Project whether or not the cross referencing is provided in each section or whether or not the cross referencing is complete. Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Reguiations in effect at the time af opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 3.03 2. No provision of any such standard, specification, manual, or code, or any instruction of a Supplier, shall be effective to change the duties or responsibilities of City, Contractor, or any of their subcontractars, consultants, agents, or employees, from those set forth in the Contract Documents. No such provision or instnzction shall be effective to assign to City, or any of its officers, directors, mexnbers, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsihility inconsistent with the provisions of the Cantract Documents. Reportzng and Re.solving Disef�epancies A. ReportingDiscrepancies: 1. Contractor's Review of Contract Doc�uments Before Starting Wor-k: Before undertaking each part of the Work, Contractor shall carefully study and campare the Contract Documents and check and verify pertinent figures therein against all applicable field measurements and conditions. Contractor sha11 promptly report in writing to City any conflict, error, ambiguity, or discrepancy which Contractor discovers, or has actual knowledge of, and shall obtain a written interpretation or clarification from City before proceeding with any Work affected thereby. 2. Cantraetor's Review of Contract �ocuments Duritag Perforrnance of Work: If, during the performance of the Work, Contractor discovers any conflict, error, ambiguiry, or discrepancy within the Contract Documents, ar between the Contract Documents and (a) any applicable Law or Regulation ,(b} any standard, specification, manual, or code, or {c} any instruction of any Supplier, then Contractor shall promptly report it to Ciry in writing. Contractor shall not proceed with the Work affected thereby (except in an emergency as required by Paragraph ClTY OF FORT WORTFI DFW Airport Reclaimed Water Delivery 5ystem Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December2i.2Q12 6.17.A) until an amendment or supplement to the Contract Documents has been issued by one of the methods indicated in Paragraph 3.04. 3. Contractor shall not be liable to City for failure to report any conflict, error, ambiguity, or discrepancy in the Contract Documents unless Contractor had actual knowledge thereof. B. Resolving Discrepancies: 1. Except as may be otherwise specifically stated in the Contract Documents, the provisions of the Contract Documents sha11 take precedence in resolving any conflict, eiror, ambiguity, or discrepancy between the provisions of the Contract Documents and the provisions of any standard, specification, manual, or the instruction of any Supplier (whether or not specif cally incorporated by reference in the Contract Documents). 3.04 3.05 2. In case of discrepancies, figured dimensions shal] govem over scaled dimensions, Plans shall govern over Specifications, Supplementary Conditions shall govem over General Conditions and Specifications, and quantities shown on the Plans shall govern over those shown in the proposal. Amending and Supplementing eontract Documents A. The Contract Documents may be amended to provide for additians, deletions, and revisions in the Work or to modify the tenns and conditions thereof by a Change Order. B. The requirements of the Cantract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; Z. City's review of a Submittal (subject to the provisions of Paragraph 6.18.C); or 3. City's writien interpreta.tion or clarification. Reuse ofDocuments A. Contractor and any Subcontractor or Supplier shall not: l. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or other documents {or copies of any thereof} prepared by or bearing the seal of Engineer, including electronic media editions; or 2. reuse any such Drawings, Specifications, other documents, or copies thereof on extensions of the Project or any other project without written consent of City and specific written verification or adaptatian by Engineer, CITY OF FORT WORTH DFW Airport Reclaimed Water Qelivery System Fiushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: decemher2t, 2012 B. The prohibitions of this Paragraph 3.05 will survive final payment, or termination of the Contract. Nothing herein shalI preclude Contractor from retaining copies of the Contract Documents for record purposes. 3.06 Electronic Data A. Unless otherwise sta.ted in the Supplementary Conditions, the data furnished by City or Engineer to Contractor, or by Contractor to City or Engineer, that may be relied upon are limited to the printed copies included in the Contract Documents (also lrnown as hard copies} and other Specifications referenced and Iocated on the City's Buzzsaw site. Files in electronic media format of text, ciata, graphics, or other types are furnished only for the convenience of the receiving party. Any conclusion or information obtained or derived from such electronic files will be at the user's sole risk. If ihere is a discrepancy between the electronic files and the hard copies, the hard copies govern. B. When transferring doeuments in elecironic media format, the transferring party makes no representations as to Iong terrn compatihility, usability, or readability of documents resulting from the use of software application packages, operating systems, or computer hardware differing from those used by the data's creator. ARTICLE 4— AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS; REFERENCE POINTS 4.01 Availability ofLunds A. City shall furnish the Site. City shall notify Contractor of any encumbrances ar restrictions not of general application but specifically related to use of the Site with which Contractor must comply in perform.ing the Work. City wili obtain in a timely manner and pay for easements for permanent struchues or permanent changes in existing facilities. 1. The City has obtained or anticipates acquisition of and/or access to right-of-way, anti/or easements. Any outstanding right-of-way and/or easements are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding righi-of-way, and/or easements. 2. The City has or anticipates removing andlor relocating utilities, and obstructions to the Site. Any outstanding rernoval or relocation of utilities ar obstruc�ions is anticipated in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must consider any outstanding utilities or obstructions to be removed, adjusted, and/or relocated by others_ B. Upon reasonable written request, City shaIl furnish Contractor with a current statement of record legal title and legal description of the lands upon which the Work is to be performed. CITY oF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushiine STANDARD CONSiRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December2l, 2D12 C. Coniractor shall provide for all additional lands and access thereto that may be required for construction facilities or storage of materials and equipment. 4.02 4.43 Subsurface and Physical Conditians A. Reports and Drawings: The Supplementary Conditions identify: l. those reports known to City of explarations and tests of subsurface canditions at or contiguous to the Site; and 2. those drawings known to City of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities)_ B. Limited Reliance by Contractor on Technical Data Authorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings are not Contract Documents. Such "technical data" is ideniified in the Supplementary Conditions. Contractor may not make any Contract Claim against Ciry, or any of their officers, directors, members, partners, employees, agents, consultants, or subcontractors with respect to: 1. the completeness of such reports and drawings for Contractor's purposes, including, but not limited to, any aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, and safety precautions and programs incident thereto; or 2. other data, interpretations, opuuons, and information contained irt such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions, or information. D ffering Subsurface or Physical Conditions A. Notice.• If Contractor believes that any subsurface or physical condition that is uncovered or revealed either: 1. is of such a nature as to esta.blish that any "technical data" on which Contractor is entitled to rely as provided in Paragraph 4.02 is materially inaccurate; or 2. is of such a nature as to require a change in the Contract Documents; or 3. differs materially from that shown or indicated in the Contract Documents; or 4. is of an unusual nature, and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in �lie Contract Documents; CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flush(ine STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21, 2012 tllen Contractor shall, promptly after becoming aware thereof and before further disturbing the subsurface or physical conditions or performing any Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), notify City in writirtg about such condition. B. Possible Price and Time Adjz�stments Contractor shall not be entitled to any adjustment in the Contract Price or Contract Time if 1. Contractor knew of the existence of such conditions at the time Contractor made a final commitment to City with respect to Contract Price and Contract Time by the submission of a Bid or becoming bound under a negotiated contract; or 2. the existence of such condition couid reasonably have been discovered ar revealed as a result of the examination of the Contract Documents or the Site; or 3. Contractor failed to give the written notice as required by Paragraph 4.03.A. 4.04 (Jnderground Facilities A. Shown or Indicated.� The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or contiguous to the Site is based on information and data furnisheci to City or Engineer by the owners of such Underground Facilities, including City, or by others. Unless it is atherwise expressly provided in the Supplementary Conditions: l. City and Engineer shall not be responsible for the accuracy or completeness of any such information or data provided by others; and 2. the cost of aII of the following wili be included in the Contract Price, and Contractor shall have full responsibility for: a. reviewing and checking all such information and data; b. locating all Underground Facilities shown or indicated in the Contract Documents; c. coordination and adjustrnent of the Work with the owners of such Underground Facilities, including City, during construction; and d. the safety and protection of all such Underground Facilities and repairulg any damage thereto resulting from the Work. B. Not Shown or Indicated.• 1. If an Underground Facility which conflicts with the Work is u,ncovered or revealed at or contiguous to the Site which was not shown or indicated, or not shown or indicated with reasonable accuracy in the Contract Documents, Contractor sha11, promptly after becoming aware thereof and before further disturbing conditions affected thereby or perfoxming any CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFlCATIdN DOCUMENTS City Project No. 02025 Revision: December21,2D12 Work in connection therewith (except in an emergency as required by Paragraph 6.17.A), identify the owner of such Underground Facility and give notice to that owner and to City. City will review the discovered Underground Facility and determine the extent, if any, to which a change may be required in the Contract Documents to reflect and document the consequences of the existence or location of the Underground Facility_ Contractor shall be responsible for the safety and protection of such discovered Underground Facility. 4_OS 2. If City concludes that a change in the Contract Documents is required, a Change Order may be issued to reflect and document such consequences. 3. Verifcation of existing utilities, structures, and service lines shall irzclude notification of all utility companies a minunum of 48 hours in advance of construction including exploratory excavation if necessary. Refef-ence Points A. City shall provide engineering surveys to establish reference points for construction, which in City's judgment are necessary to enable Contractor to proceed with the Work. City will provide construction stakes or other customary method of marking to establish line and grades for roadway and utility construction, centerlines and benchmarks for bridgework. Contractor shall protect and preserve the established reference points and property monuments, and shall make no changes or relocations. Contractor shall report to City whenever any reference point or property monument is lost or destroyed or requires relocation because of necessary changes in grades or lacations. The City shall be responsible for the replacement or relocation of reference points or property monuments not carelessly or willfully destroyed by the Contractor. The Contractor shall notify City in advance and with sufficient ti.me ta avoid delays. B. Whenever, in the opinion of the City, any reference point or monument has been carelessly or willfully destroyed, disturbed, or removed by the Contractor or any of his employees, the fizll cost for replacing such points plus 25% will be charged against the Contractor, and the full amount will be deducted from payment due the Contractor. 4.06 Hazardous Environmental Condition at Site A. Reports and Drawings: The Supplementary Conditions identify those reports and drawings known to City relating to Hazardous Environmental Canditions that have been identified at the Site. B. Limited Reliance by Contractor on Technical Data fluthorized: Contractor may rely upon the accuracy of the "technical data" contained in such reports and drawings, but such reports and drawings aze not Contract Documents. Such "technical data" is identif ed in the Supplementary Conditions. Contractor may not make any Contract Claim against City, or any of their o�cers, directors, members, pariners, emplayees, agents, consultants, or subcontractors witk respect to: the completeness of such reports and drawings for Contractor's purposes, including, but nat limited to, any aspects of the means, methods, techniques, sequences and pracedures of CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION QOCUMENTS City Project No. Q2025 Revision: December 21, 2012 construction to be employed by Contractor and safety precautions and programs incident thereto; or 2. ather data, interpretations, opinions and information contained in such reports or shown or indicated in such drawings; or 3. any Contractor interpretation of or conclusion drawn from any "technical data" or any such other data, interpretations, opinions or information. C. Contractor shall not be responsible for any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in Drawings or Specifications or identified in the Contract Documents ta be within the scope of the Work. Contractor shall be responsible for a Hazardous Environmental Condition created with any materials brought to the Site by Contractor, Subcontractors, Suppliers, or anyone else for whom Contractor is responsible. D. If Contractor encounters a Hazardous Environmental Condition or if Contractor or anyone for whom Contractor is responsible creates a Hazardous Environmental Condition, Contractor shall immediately: (i} secure or otherwise isolate such condition; (ii) stop alI Work in connection with such condition and in any area affeeted thereby (except in an emergency as required by Paragraph 6.17.A); and (iii} notify City (and promptly thereafter confirm sueh notice in writing). City may consider the necessity to retain a qualiiied expert to evaluate such condition or take corrective action, if any. - E_ Contractor shall not be required to resume Work in connection with such condition or in any affected area until after City has obtained any required permits related thereto and delivered written notice to Contractar: (i) specifying that such condition and any affected area is or has been rendered suitable for the resumption of Work; or (ii} specifying any special conditions under which such Work may be resumed. F. If after receipt of such written notice Contractor does not agree to resume such Work based on a reasonable belief it is unsafe, or does not agree to resume such Work under such special conditions, then City may order the portion of the Work that is in the area affected by such condition to be deleted from the Work. City may have such deleted portion of the Work performed by City's own forces or others. G. To the fullest extent permitted by Laws and Regzclations, Contractor shall irademni.fy and hold hatmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, urchitects, attorneys, and other professiQnals arzd all court o� arbitrution oY other dispute resolution costs) arising out of ot- relating to a Hazardous Environmental Condition created by Contractor or by anyone for whom Contt-actor is responsible. Nothiftg in this Paragraph 4.06.G shall obligate Contractot- to indemnify any individual or entity fi-om and against the consequeraces of that individtcal's or entzty's own negligence. H. The provisions of Paragraphs 4.02, 4.03, and 4.04 do not apply to a Hazardous Environmental Condition uncovered or revealed at the Site. CITY OF FdRT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21. 2012 .i� ; � 1, � � 5.01 Licensed Sureties and Instcrers 5.02 5.03 All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverages so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided in the Supplementary Conditions. Perforrrzance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Fina1 Acceptance by the City. C. All bonds shall be in the form preseribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Mauagement Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attamey-in-fact must be accompanied by a sealed and dated power of attomey which shall show that it is effective on the date the agent or attorney-in-fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is temlinated in the State of Texas or it ceases to meet the requirements of Paragraph 5.02.C, Contractor shall promptiy notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirennents of Paragraphs 5.01 and 5.02.C. Certificates of'Insurance Cantractor shall deliver to City, with copies to each additional insured and loss payee identified in the Supplementary Conditions, certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. 1. The certificate of insurance shall document the Ciry, and a1I identified entities named in the Supplementary Conditions as "Additional Insured" on all liability policies. CITY OF FQR7 WORTti DFW Airport Reciaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pro}ec[ No. 02025 Revision: December21,2012 2. The Contractar's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Praperty & Casualty Guide 4. The insurers for all policies must he licensed andlor approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonabiy equivaient fmanciai strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies sha11 i.nclude a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable}, and each additional insured identified in the Supplementary Conditions 6. Failure of the City to demand such certificates or other evidence of fuli compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 7. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the prunary coverage. 8. Unless othen�vise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims-made basis, the retroacrive date shall be coincident with or priar to the date of the effective date of the agreement a.nd the certificate of insurance shall state that the coverage is claims-made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such msurance coverage. 9. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are deteimined to be unacceptable or the City desires additional insurance caverage, and the City desires the cantractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 10_ Any self-insured retention (SIR}, in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH DFW Airport Reciaimed Water Delivery System Flushiine STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December2l, 2012 lieu of traditional insurance, altemative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 11_ Any deductible in excess of $5,000.04, for any policy that does not provide coverage on a first-dollar basis, must be acceptable to and approved by the City. 12. Ciry, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustrnents to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjushnents shall be incorporated into the Work by Change Order. 13. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the palicy and endorsements to the requirements of the Contract. Deletions, revisions, ar modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 14. City shall not be responsible for the direct payment of insurance premium costs for Cantractor's insurance. 5.04 Contractor's Insurance A. Worke�s Compensatzon and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits far Employers' Liability as is appropriate for the Work being performed and as v✓ill provide protec�ion from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirecfly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational siclrness or disease, or death of Contractor's employees. B. Commercial General Liubility. Coverage shali include but not be limited to covering liability (bodily injury or property damage) arising from: premises/aperations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shali be provided on an occurrenee basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as prirnary insurance with respect to any other CITY QF FORT WORTH DFW Airport Redaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATI�N DOCUMENTS City Project No. 02025 Revision: December 21. 2012 insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would aiter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3} years following the completion of the project (if identified in the Supplementary Conditions). C. Automobile Liability. A cornmercial business auto palicy shall provide coverage on "any auto", defined as autos awned, hired and non-owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any af the Work, or by anyone for whose acts any of them may be liable. D. Railroad �'rotective �iability. If any of the work or any warranty work is within the limits of railroad right-af-way, the Contractor shall comply with the requirements identified in the Supplementary Conditions. E. Natification o,f Policy Cancellation: Contractar shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured There sha11 be no time credit for days not worked pursuant to this section. 5.05 Aceeptance of'Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bands or insurance required to be peu-chased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates {or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the City may reasonably request. If Contractor does not purchase or maintain ail of the bonds and insurance required by the Contract Documents, the City shall notify the Contractor in wriiing of such failure prior to the start of the Work, or of such failure to maintain pzior to any change in the required coverage. ARTICLE 6 — C4NTRACTOR'S RESPONSISILITIES 6.01 Supervision and Superintendence A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devating such attention thereto and applying such skills and expertise as may be necessary to perform the Work in accordance with ihe Contract Documents. Contractor shail be solely responsible for the means, methods, techniques, sequences, and procedures of construction. CITY OF FORT WORTH DFW Airport Reclaimed Water De{ivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21. 2012 B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced withaut written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contcactor. All communication given to or received from the Superintendent shall be bindang on Cantractor. 6.02 6.03 C. Coniractor shall notify the City 24 hours prior to maving areas during the sequence of construction. Labor; Working Hoa�rs A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required far the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Reb lar Working Hours. Contractor will not permit the gerformance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication} to perform Work: 1. for beyond Regu.lar Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. Services, Materials, and Equipmerzt A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume fu11 responsibifity for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel; power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other faciiities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if nat specified, shall be of good quality and new, except as otherwise provided in the Contract Documents, All special warranties and guarantees required by the Specifications shall expressiy run to the benefit of City. If required by �ity, Contractor shall futnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 29. 2012 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise rnay be provided in the Contract Documents. `� � , D. All items of standard equipment to be incorporated into the Wark shall be the latest modei at the time of bid, unless otherwise specified. Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.47 and the General Requirements as it may be adjusted from time to time as provided below. l. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.07 and the General Requirements) proposed adjustments in the Project Schedule that will not result in changing the Contract Time. Such adjustments will comply with any provisions of the General Requirements applicable thereto. Z. Coniractor shall submit to City a monthly Project Schedule with a monthly progress payment for the duration of the Contract in accordance with the schedule specification Ol 32 16. 3. Proposed adjustrnents in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 12. Adjustments in Contract Time may only be made by a Change Order. .1 Substitutes and "Or-Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification ar description contains or is followed by words reading that no like, equivalent, or "or-equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or--Equal " Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and su�ciently similar so thai no change in related Work will be required, it may be considered by City as an "or-equal" item, in which - case review and approval of the proposed item rnay, in City's sole discretion, be accomplished without compliance with same or a11 of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 6.QS.A.1, a proposed item of material or equipment wiil be considered functionally equal to an item so named if: a. the City deterrnines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; CITY OF FORT W�RTH DFW Airport Reclaimed Water Delivery Systern Flushline STANDARD CONSTRUCTION SPECIFICATION D�CUMENTS City Project No. 02025 Revision: December 21, 2012 2) it will reliably perform at teast equalty well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availabiliry of responsive service; and b. Coniractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and 2) it will conform substantially to the deta.iled requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material ar equipment proposed by Contractor does not qualify as an"or-equal" item under Paragraph 6.OS.A.1, it may he submitted as a proposed substitute item. b. Contractor shall submit sufficient informarion as provided below to allow City to deterinine if the item of material or equipment proposed is essentially equivaient to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment tha� Contractor seeks to fumish or use. The application sha11 comply with Section O l 25 00 and: 1) shall certify that the proposed substitute item wiil: a) perform adequately the functions and achieve the results called for by the general desi�a; b} be sunilar in substance to that specified; c) be suited to the same use as that specified; and 2} will state: a) the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion an time; b) whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other wark on the Project} to adapt the design to the proposed substitute item; CITY OF FORT WORTH DFW Airport Reciaimed Waier Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21,2012 c) whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) wi11 identify: a) all variations of the proposed substitute item from that specified; b) available engineering, sales, maintenance, repair, and repiacement services; and 4) shall contain an itemized estimate of all costs or credits that will result directly or _ indirectly from use of such substitute item, including costs of redesign and Damage Claims af other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Confractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit su�cient infarmation to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 6.OS.t�2. C. Ciry's Evalzcation: City wili be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 6.OS.A and 6.OS.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. Na "or-equai" or substitute will be ordered, instalied or urilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or-equal." City will advise Contractor in writing of its detern�ination. D. Special Guarantee.� City may require Contractor to furnish at Contractor's expense a special perforrnance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemn� and hold harmless Ciry and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) ur�ising out of the use ofsubstituted matet-ials or equipment. E. City's Cnst Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragrapl�s 6.OS.A.2 and 6.OS.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitu.te. Contractar may also be required to reimburse City for the charges for rnaking chauges in the Contract Documents (or in the provisions of any other direct contract with City) resulting from the acceptance of each proposed substitute. F. Contructor's Expense: Contractor sha11 provide ali data in support of any praposed substitute ar "or-equal" at Contractor's expense. CITY OF FORT WOf27H DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21, 2012 . 1. G. City Substitute Reimbtcrsement: Costs (savings or charges} attributable to acceptance of a substitute shall be incorporated to the Contract by Change Order. H. Time Extensions: No addational time will be granted for substitutians. Concerning Subcontractors, Suppliers, and Others A. Contractor sha11 perfonn with his own organization, work of a value not less than 35% of the value embraced on the Contract, unless otherwise approved by the City. B. Contractor shall not employ any Subcontractor, Supplier, or other individual or entity, whether initially or as a replacement, against whom City may have reasonable objection. Contractor shall not be required to employ any Subcontractor, Supplier, or other individual or entity to furnish or perform any of the Work against whom Contractor has reasonable objection (excluding those acceptable to City as indicated in Paragraph 6.06.C). C. The City may from time to time require the use of certain Subcontractars, Suppliers, or other individuals or enrities on the project, and will provide such requirements in the Supplementary Conditions. D. Business Diversity Enterp�ise Ordinance Compliance: It is City policy to ensure the full and equitable participation by Minority and Small Business Enterprises (MBE)(SBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MBE andlor SBE goal, Contractor is required to comply with the intent of the City's Business Diversity Ordinance (as arnended) by the following: 1. Contraetor shall, upon request by the City, provide complete and accurate information regarding actual work performed by a MBE andlor SBE on the Contract and payment therefor. 2_ Contractor will not make additions, deletions, or substitutions of accepted MBE without written consent of the Ciiy. Any unjustified change or deletian shall be a material breach of Contract and may result in debarment in accordance with the procedures autlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession af the Contractor that will substantiate the actual work performed by an MBE anc3/or SBE. Material misrepresentation of any nature may be graunds for termination of the Contract in accordance with Paragraph 15.42.A. Any such misrepresentation may be grounds for disqualification of Cantractor to bid on future contracts with the City for a period of nat less than three years. E. Contractor shall be fully responsible to City for aIl acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Cantractor's own acts and omissions. Nothing in the Contract Documents: C1TY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Fiushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21, 2012 1. shall create for the benefit of any such Subcontractor, Supplier, or ather individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. F. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontzactors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. G. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. H. Ail Work performed for Conh-actor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Cantractar and the Subcontractor or Supplier which specifically binds the Subcantractor or Supplier to the applicable tenns and conditions of the Contract Documents for the benefit of City. 6.07 Wage Rates A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code {as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty�or Vivlation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Yiolatioris and City Detert�aination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violafion of 2258.023, Texas Government Code, by a Coniractor or Subcontractor, the City shall make an initial detenninatiQn, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determinatian that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claiinant or claimants as the difference bet�veen wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. CITY OF FORT VJORTH DFW Airport Reciaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION D4CUMENTS City Project No. 02025 Revision: December 21, 2Q12 D. Arbitr-ation Required if Violation Not Resolved. An issue retating to an alleged violatian of Sec�ion 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes} if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial deternunation pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11 th day after the date that arbitration is required, a district court shail appoint an arbitrator on the petition of any of the persons. The �ity is not a party in the arbitration. The decisian and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. • /: E. Records to be Maintained. The Contractor and each Subcontractor shali, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupaiion of each worker employed by the Contractor in the constructian of the Work pravided for in this Contract; and (ii} the actual per diem wages paid to each worker. The records shall be open at a11 reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroil periad, whichever is less, the Contractor sha11 submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. Patent Fees and Royalties A. Contractor shall pay all license fees and royalties and assume all costs incident to tlie use in the performance of the Work or the incorporation in the Work of any invention, design, process, product, or device which is the subject of patent rights or copyrights held by others. If a particular invention, design, process, product, or device is specified in the Contract Dacuments for use in the perFormance of the Work and if, to the actual knowledge of City, its use is subject to patent rights or copyrights calling for the payment of any license fee or royalty to others, the existence af such rights shall be disclosed by City in the Contract Documents. Failure of the City to disclose such information does not relieve the Contractor from its obligations to pay for the use of said fees or royalties to others. B. To the fullest extent permitted by Laws and Regulations, Contractor shall zndemnify and hold harmless City, from and against all clairns, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professianals and all court or arbztration or othef- dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the perfornaance of the Work or resulting frorn CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushiine STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21,2012 the incorporation in the Work of any invention, design, process, prodt�ct, or device not specified in the Contract Documents. 6.09 Permits and Utilities A. Contractor obtained permits arzd licenses. Contractor shall obtain and pay for all construction permits and licenses except those provided for in the Supplementary Conditions or Contract Documents. City shall assist Contractor, when necessary, in obtaining such permits and licenses. Contractor shall pay all govemmental charges and inspection fees necessary for the prosecution of tl�e Work which are applicable at the time of opening of Bids, or, if there are no Bids, on the Effective Date of the Agreement, except for permits provided by the City as specified in 6.09.B. City shall pay all charges of utility owners for connections for providing permanent service to the Work. B. City obtained permits and licenses. City will obtain and pay for all permits and licenses as provided for in the Supplementary Conditions or Contract Docurnents. It wiIl be the Contractor's responsibility to carry out the provisions of the pernut. If the Contractor initiates changes to the Contract and the Ciry approves the changes, the Contractor is responsible for obtaining clearances and coardinating with the appropriate regulatory agency. The City wi11 not reimburse the Contractor for any cost associated with these requirements of any City aequired penmit. The following are permits the City will obtain if required: 1. Texas Deparrment of Transportation Permits 2. U.S. Arnry Corps of Engineers Permits 3. Texas Commission on Environrnental Quality Pernuts 4. Raikoad Company Permits C. Dutstanding permits and licenses. The City anticipates acquisition of andlor access to permits and licenses. Any outstanding permits and licenses are anticipated to be acquired in accordance with the schedule set forth in the Supplementary Conditions. The Project Schedule submitted by the Contractor in accordance with the Contract Documents must cousider any outstanding permits and licenses. 6.10 Laws and Regulatiorzs A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be respansible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Reb lations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and a�l CITY �F FOFtT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 02025 Revision: December2l, 2012 court ar arbitration or other dispute resolution casts} arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.02. C. Changes in Laws or Regularions not known at the time of opening of Bids having an effect on the cost or time of performance of the Work may be the subject of an adjusiment in Contract Price or Contract Time. 6.11 Ta�ces A. On a contract awarded by the City, an organization which qualiiies for exemption pursuant to Texas Tax Code, Subchapter H, Sections 151.301-335 (as amended), the Contractor may purchase, rent or lease all materiais, supplies and equipment used or consumed in the performance of this contract by issuing to his supplier an exemption certificate in lieu of the tax, said exemption certificate to camply with State Comptroller's Ruling .007. Any such exemption certificate issued to the Contractor in lieu of the tax shall be subject to and shall comply with the provision of State Comptroller's Ruting .011, and any other applicable rulings perta.ining to the Texas Tax Code, Subchapter H. B. Texas Tax permits and information may be obtained from: 1. Comptroller of Public Accounts Sales Tax Division Capitol Station Austin, TX 78711; or 2. http://www_window.state.tx.us/taxinfo/taxforms/93-forms.html 6.12 Use of Site and Other Areas A. �imitation on Use ofSite arzd OtherArea.s.• l. Contractor shall confine constniction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas pernutted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or other materials or equipment. Contractor sha11 assume fuil responsibiliry for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the VJork. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is cazrying an operations in a portion of a streei, right-of-way, or easement greater that� is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in prob ess before work is commenced on any additional area of the Site. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATtON DOCUMENTS City Project No. D2025 Revision: December21,2012 3. Should any Dama�;e Claim be rnade by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 6.21, Contractor shal! indemn� and hold harmless City, from and against all claims, costs, losses, mzd damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occz�pant against City. B. Removal of Debris Dut-ing Performance of the Work: During [he progress of the Work Contractor shall keep the Site and other areas free from accurnulations af waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenarace Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City, if the Contractor faiis ta correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and the costs of such direct action, plus 25 % of such costs, shall be deducted from the monies due or to become due to the Contractor. D. Tinal Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery; and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nar peimit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent properly to stresses or pressures that will endanger it. 6.13 Record Doccsments A. Contractor sha11 maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes rnade during construction. These record documents together with aIl approved Samples and a caunterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record docurnents, any operation and maintenance manuals, arid Submiitals will be delivered to City prior to Final Inspection. Contractor sha11 include accurate lacations for buried and imbedded items. 6.24 Saf'ety and Protectiofz A. Contractor shail be solely responsible for initiating, maintaining and supervising all safety precautions and programs in eonneetion with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushiine STANDARD CONSTRUCTfON SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21, 2012 take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. a11 persons on the Site or who may be affected by the Work; 2. a11 the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of constructian. 6.15 6.16 5.17 B. Contractor shall comply with aIl applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or properiy from damage, injury, or lass; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and sha11 cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shail inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 6.14.A.2 or 6.14.A.3 caused, directly or indirectly, in whole or in part, by Contractar, any Subcontractor, Supplier, or any other individual or entity d.irectly ar indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection af the Work shall continue until such time as all the Work is completed and City has accepted the Work. Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. Hazard Communication Prob ams Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available ta or exchanged between or among employers in accordance with Laws or Regulations. Emergencies andlor Reetifzcati�n A. In emergencies affecting the safety or protection of persons or the Work or property at the Site or adjacent thereto, Contractor is abligated to act to prevent tl�reatened damage, injury, or loss. Contractor shall give City prompt written notice if Contractor believes that any significant CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December2l, 2012 changes in the Work or variations from the Contract Documents have been caused thereby or are required as a result thereof. If City determines that a change in the Contract Documents is required because of the action taken by Contractor in response to such an emergency, a Change Order may be issued. B. Should the Contractor fail to respond to a request from the Ciry to rectify any discrepancies, omissions, or correction necessary to conform with the requirements of the Contract Documents, the City shall give the Contractor written notice that such work or changes are to be performed. The written notice shall direct attention to the discrepant condition and request the Contractor to take remediai action to correct the condition. In the event the Contractor does not take positive steps to fulfill this written request, or does not show just cause for not taking the proper action, within 24 hours, the City may take such remedial action with City forces or by contract. The City shall deduct an amount equal to the entire costs for such remedial action, plus 25%, from any funds due ar become due the Contraetor on the Project. 6.18 Submittals A. Contractor shall submit required Submittals to City for review and acceptance in accordance with the accepted Schedule of Submittals (as required by Paragraph 2.07). Each submittal will be identified as City may require. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be eomplete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to - review the information for the limited purposes required by Paragraph 6.18.C. 3. Snbmittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept sha11 be executed in confornuty with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For-Information-Only submittals upan which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 6.18.C. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFiCATION DOCUMENTS City Project No. 02025 Revision: December 21. 2012 B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any reiated Work performed prior to City's review and acceptance of the pertinent submittal will be at the soie expense and responsibility of Contractor. C. Czry's Review: City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to detenmine if the itezns covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 6.19 : 1 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance sha11 not relieve Contractor from responsibility for any variation from the requirements of the Cantract Documents unless Contractor has complied with the requirements of Section Ol 33 QO and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. Continuing the Work Except as otherwise provided, Contractor shali carry on the Work and adhere to the Project Schedule during all disputes or disagreements with City. No Work shall be delayed or postponed pending resolution of any disputes or disab eements, except as City and Contractor may otherwise agree in writing. Contractor's General WarYanty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Dacuments and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to reiy on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, mvdification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushiine STANDARD CONSTRUCTfON SPECIFICATION DQCUMENTS City Project No. 02025 Revisio�: December 21. 2412 2. normal wear and tear under norrnal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City of any progress or fmal payment; the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or 7. any correction of defective Work by City. D. The Contractor shall remedy a.ny defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall fuinish a good and sufficient maintenance bond, complying with the requirements of Article 5.02.B. The City will give notice of observed defects with reasonable promptness. 6.21 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its o�cers, agents, employees, subcontractors, licenses or invitees under this Contract. �'HIS INDEMNIFICATION PROVISION IS SPECTFiCAL�Y �TTENDED TO (JPFRATF_, AND SE EFFECTiVF EVEN IF IT IS ,�L�,,EGED OR PR�VEN THA;T ALL OR SQMF OF THE DAIVLAGES BEING SOUGHT �RF, CAUSED. IN WHQLE OR IN �'ART• B� ANY ACT. OMISSION OR NEGLIGENC�, OF THE �ITY. This indemnity provision is intended to include, without limiianon, indemnity for costs, expenses and Iegal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenanis and agrees to indemnify and hoId harmless, at its own expense, the City, its officers, servants and employees, fram and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDE.MNIFICATION P�20ViSIQN IS CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02Q25 Revision: December21,2012 � s !.. ��'. t ... �� � �' � �;: � \ i,. i �. � �' � � �� � . �;. � ♦ � b,'� .. . � � i�.. 0 . '. ' *, . � � �� '.. � f � i,.. �� i ,: . � �'' ���,. '.. 1� \ ��. i ,'�. �,, � ,...1� � � � � \ � � i \: ���. � '� • , '�.. i � U � . • •: ► � i . 622 6.23 �elegation ofProfessional Design Services A. Cantractor will not be required to provide prafessional design services unless such services are specifically required by the Contract Documents for a portion of the Work ar uniess such sezvices are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certificatians, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. C. City sha11 be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.22, City's review and acceptance of design calculations and design drawings will be only for the limited purpose af checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations a.nd design drawings) will be only for the purpose stated in Paragraph 6.18.C. Right to Audit A. The Contractor agrees that the City shall, untii the expiration of three (3) years after fmal payment under this Contract, have access to and the right to examine and photocopy any di.rectly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and sha11 be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. B. Contractar fiarther agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the Czty shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and phatocopy any directly pertinent books, documents, papers, and records of such Subcontractor, invoiving lransactions to the subcontract, and further, that City shall have access during Regular Working Hours to a11 CITY OF FORT WORTH DFW Airport Reciaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: Qecember21, 2012 Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. C. Contractor and Su6contractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractar for the cost of the copies as follaws at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 6.24 Nondiscrzmination A. The City is responsible for operating Public Transportation Programs and implementing transit- related projects, which are funded in part with Federal financial assistance awarded by the U.S. Deparlment of Transportation and the Federal Transit Administration (FTA}, without discrimirrating against any person in the United States on the basis of race, color, or national origin. B. Title YI, Civzl Rzghts fict of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. ARTICLE '7 — 4THER WORK AT THE SITE 7.Q1 Related Work at Site A. City may perform other work related to the Project at the Site with Ciry's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Docusnents, then written nofice thereof will be given to eontractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is perfonning other work with City's employees or other City coniractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properiy coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contraetor may cut ar alter others' work with the written consent of City and the others whose work will be affected. C. If the praper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by athers. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPEC(FICATION DOCUMENTS City Praject No. 02025 Ftevision: December21,2012 7.02 Coardination A. If City intends to contract with others for the performance of other work on the Project at the Site, the following will be set forth in Supplementary Conditions: the individual or entity who will have authority and responsibiiity for coordinatian of the activities among the various contractors will be identified; 2_ the specific matters to be covered by such autharity and responsibility will be itemized; and 3. the extent of such authority and responsibilities will be provided. B. Unless otherwise provided in the Supplementary Conditions, City shall have authority for such coordination. ARTICLE 8 — CITY'S RESPON�IBILITIES 8.01 Communication.s to Contractor Except as otherwise provided in the Supplementary Conditions, City shall issue all communications to Contractor. 8.02 Fisrnish Data City shall timely fizrnish the data required under the Contract Documents. 8.Q3 Pay Whet� Due • �. • �. �' 1. City shall make payments to Contractor in accordance with Article 14. Lands and Easements; Reports a�zd Tests City's duties with respect to providing lands and easements and providing engineering surveys to establish reference points are set forth in Paragraphs 4.01 and 4.05. Paragraph 4.02 refers to City's ideniifying and making available to Contractor copies of reports of explarations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at or contiguous to the Site that have been utilized by City in preparing the Contract Documents. Change Orders City shall execute Change Orders in accorda.nce with Paragraph 10.03. Inspections, Tests, and 14pprovals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 13.03. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21, 2012 8.07 Limitations on City's Resp�nsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety - precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regularions applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 6.14. 8.08 Undisclosed Hazardous Environmental Condztion City's responsibility with respect to an undisclosed Hazardous Environmental Candition is set forth in Paragraph 4.06. 8.09 Cornpliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 6.14. AR.TICLE 9— CITY'S OBSERVATION STATUS DURING CONSTRUCTION 9.01 �'ity's Project Representative City will provide one or more Project Representa.tive(s) during the construction period. The duties and respansibilities and the lirnitations of authority of City's representative during construction are set forth in the Contract Documents. The Project Representative(s) will be as provided in the Supplementary Conditions. 9.02 Yisits to Site A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of cons#ruction as City deems necessary in order to observe the prob ess that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative wi11 not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents including those set forth in Paragraph 8.07. Cli`Y OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December2l, 2012 9.03 Authori�ed Yariations in Work r• 1 �, 9.05 :! ! . City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City and alsa on Contractor, who shall perform the Work involved promptly. Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or wi11 not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Dacuments. City will have authority to conduct special inspection ar testing of the Work as provided in Article 13, whether or not the Work is fabricated, installed, or completed. Determznations for Work Pe�formed Contractor will deternline the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary deternlinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). Decisions on Requirements of Contract Documents and Acceptability of Work A. City will be the initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the Work thereunder. B. City will render a written decision on any issue refened. C. City's written decision on the issue refened will be fmal and binding on the Contractor, subject to the provisions of Paragraph 14.06. ARTICLE 10 — CHANGES IN THE WORK; CLAIMS; EXTRA WORK 10_O1 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any tune or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specificaily provided). Extra Work shall be memorialized by a Change Order which may or may not precede an order of Extra work. B. For minor changes of Work noi requiring changes to Contract Time or Contract Price, a Field Order may be issued by the City. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Ffushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Ciky Project No. �2025 Revision: December 21, 2012 10.02 Unauthorized Changes in the Work Contractor sha11 not be entitled to an increase in the Contract Price or an extension of the Contract Time with respect to any work performed that is not required by the Conh-act Documents as - amended, modified, or supplemented as provided in Paragraph 3.04, except in the case of an emergency as provided in Paragraph 6.17. 10.03 Execution of Change Orders A. City and Contractor shall execute appropriate Change Orders covering: 1. changes in the Work which are: {i) ordered by Ciry pursuant to Paragraph 10.Q1.A, (ii) required because of acceptance of defective Work under Paragraph 13.08 or City's correction of defective Work under Paragraph 13.09, or (iii) agreed to by the parties; 2. changes in the Contract Price or Contract Time which are agreed to by the parties, including any undisputed sum or amount of time for Work actually performed. 10.04 F.xtra Work A. Should a difference arise as to what does or does not constitute Extra Work, or as to the payment tlzereof, and the City insists upon its performance, the Contractor shall procaed with the work after making written request for written orders and sha11 keep accurate account af ttie actual reasonable cost thereof. Contract Claims regarding Extra Work shall be made pursuant to Paragraph 10.06. B. The Contractor sha11 furnish the City such installation records of all deviations from the original Contract Documents as may be necessary to enable the City to prepare for permanent record a coirected set of plans showing the actual installation. C. The compensation agreed upon for Extra Work whether or not initiated by a Change Order shall be a full, complete and final payment for all eosts Contractor incurs as a result or relating to the change or Extra Work, whether said costs are known, unknown, foreseen or unforeseen at that rime, including withaut limitation, any costs for delay, extended overhead, ripple or iznpact cost, or any other effect on changed or unchanged work as a result of the change or Extra Work. 10.05 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scape of the Wark or the provisions of the Contract Documents (including, but not limited to, Cantract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. CITY OF FORT WORTH DFW Airport Reclaimed Water Defivery System Flushline STANDARD CONSTRUCTfON SPECIFICATfON DOCUMENTS City Project No. 02025 Revision: December21, 2012 10.06 Contract Claims Process A. Ciry's Decision Required: All Contract Claims, except those waived pursuant to Paragraph 14.09, shall be referred to the City for decision. A decision by City shall be required as a conditian precedent to any exercise by Contractor of any rights or remedies he may othezwise have unaer the Contract Documents or by Laws and Regulations in respect of such Contract Claims. B. Notice: Writ�en notice sta.ting the general nature of each Contract Claim shall be delivered by the Contractor to City no later than 15 days after the start of the event giving rise thereto. The responsibility to subsiantiate a Contract Claim shall rest with the party making the Contract Claim. 2. Notice of the amount or extent of the Contract Claim, with supporting data. shall be delivered to the City on or before 45 days from the start of the event giving rise thereto (unless the City allows additional time for Contractar to submit additional or more accurate data in support of such Contract Claim). 3. A Contract Claim for an adjustment in Contract Price shall be prepared in accordance with the provisions of Paragraph 12.01. 4. A Contract Claim for an adjustment in Contract Time shall be prepared in accordance with the provisions of Paragraph 12.02. 5_ Each Contract Claim shall be accompartied by Contractor's written statement that the adjustment claimed is the entire adjustment to which the Contractor believes it is entitled as a result of said event. The City sha.il submit ariy response to the Contractor within 30 days after receipt of the claimant's last suhmittal (unless Contract allows additional time). G Ciry s Action: City wiIl review each Contract Claim and, within 30 days after receipt of the last submittal of the Contractor, if any, take one of the following actions in writing: 1. deny the Contract Claim in whole or in part; 2. approve the Contract Claim; or 3. natify the Confiractor that the City is u.nable to resolve the Contract Claim if, in the Ciiy's sole discretion, it would be inappropriate for the City to do so. For purposes of further resolution of the Contract elaim, such notice shall be deemed a den.ial. CITY OF FORT WORTH DFW Airport Fteciaimed Water Delivery 5ystem Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: Qecember21,2012 D. City's written action under Paragraph 10.06.0 wiIl be final and binding, unless City or Contractor invoke the dispute resolution procedure set forth in Article 16 within 30 days of such action or denial. E. Na Contract Claim for an adjustrnent in Contract Price or Contract Time will be valid if not submitted in accordance with this Paragraph 10.06. ARTICLE 11— COST OF THE WORK; ALLOWANCES; UNIT PRICE W4RK; PLANS QUANTITY MEASUREMENT 11.Q1 Cost of the Work A. Costs Ineluded: The term Cost of the Work means the sum of all costs, except those excluded in Paragraph 11.O1.B, necessarily incurred and paid by Contractor in the proper performance of the Work. When the value of any Work covered by a Change Order, the costs to be reimbursed to Contractor will be only those additional or incremental costs required because of the change in the Work. Such costs shall not include any of the costs itemized in Paragraph 11.O1.B, and sha11 inciude but not be limited to the following items: 1. Payroll costs for employees in the direct employ of Contractor in the performance of the Work under schedules of job classifications agreed upon by City and Contractor. Such employees sha11 include, without limitation, superintendents, foremen, and other personnel employed full time on the Work. Payroll costs for employees not employed full time on the Work shall be apportioned on the basis of their time spent on the Work. Payroli costs shall include; a. salaries with a 55% markup, or b. salaries and wages plus the cost of fringe benefits, which shall include social security contributions, unemployment, excise, and payroll ta.xes, workers' compensation, health and retirement benefits, bonuses, sick leave, vacation and holiday pay applicable thereto. The expenses of perforrning Work outside of Regular Working Hours, Weekend Working Hours, or legal holidays, shall be included in the above to the extent authorized by City. 2. Cost of a11 materials and equipment furnished and incorporated in the Work, including costs of transporta.tion and storage thereof, and Suppliers' field services required in connecfion therewith. 3. Rentals of all construction equipment and znachinery, and the parts thereof whether rented from Contractor or oihers in accordance with rental agreements approved by City, and the costs of transportation, loading, unloading, assembly, dismantling, and removal thereof. All such costs sha11 be in accordance with the terms of said rental agreements. The rental of any such equipment, machinery, or parts shall cease when the use thereof is no longer necessary for the Work. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. Q2025 Revision: December 21, 2d12 4. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. If required by City, Contractor shall obtain competitive bids fram subcontractors acceptable to Ciry and Contractor and shall deliver such bids to City, who will then determine, which bids, if any, wiil be accegtable. If any subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractar's Cost of the Work and fee shall be determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 11.01. 5. Costs of special consultants {including but not limited to engineers, architects, testing laboratories, surveyors, attorneys, and accountants) employed for services specifically related to the Work. 6. Sugplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties conrzected with the Work. b. eost, ineluding transportation and maintenance, of all materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site, and hand tools not owned by the workers, which are consumed in the performance of the Work, and cost, less market value, of such items used but not consumed which remain the property af Contractor. c. Sales, consumer, use, and other similar taxes related to the Work, and for which Contractor is liable not covered under Paragraph 6.11, as imposed by Laws and Regulations. d. Deposits lost for causes other than negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, and royalty payments and fees for pernuts and licenses. �. Losses and damages (and related expenses) caused by damage to the Work, not compensated by insurance or otherwise, sustained by Contractor in connection with the performance of the Work, provided such losses and damages have resulted from causes other than the negligence of Contractor, any Subcontractor, or anyone directly or indirectly employed by any of them or for whose acts any of them may be liable. Such losses shall include settlements made with the written consent and approval of City. No such losses, damages, and expenses shall be included in the Cost of the Work for the purpose of determining Contractor's fee. f. The cast of utilities, fuel, and sanitary facilities at the Site. g. Minor expenses such as telegrams, long distance telephone calls, telephone and communicarion services at the Site, express and courier services, and similar petty cash items in connection with the Work. CITY OF FORT WORTH DFW Airport Rec4aimed Water Deli�ery 5ystem Flushline STANDARD CdNSTRUCTION SPECIFICATION DQCUMENTS City Project No. Q2025 Revisiort: December21.2012 h. The costs of premiuzns for all bonds and insurance Contractor is required by the Contract Documents to purchase and maintain. B. Costs Exeltcded: The term Cost of the Work shall not include any of the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals (of partnerships and sole proprietorships), general managers, safety managers, engineers, architects, estimators, attorneys, auditors, accountants, p�u-chasing and contracting agents, expediters, timekeepers, clerks, and other personnel employed by Contractor, whether at the Site ar in Contractor's principal or branch office for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 11.O1.A.1 or specifically covered by Paragraph 1 l.Ol.A.4, all of which are to be considered administrative costs covered hy the Contractor's fee. 2. Expenses af Contractor's principal and branch offices other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Wark and charges against Contractor for delinquent payments. 4. Costs due to the negligence of Contractor, any Subcontractor, ar anyone directly or indirectly employed by any of them or for whose acts any of them may be liable, including but not limited to, the correction of defective Work, disposal of materials or equipment wrongly - supplied, and making good any damage to property. 5. Other overhead or general expense costs of any kind. C. Contractor's Fee: When all the Work is performed on the basis of cost-plus, Contractor's fee shall be detennined as set forth in the Agreement. When the value of a.ny Work covered by a Change Order for an adjustment in Contract Price is determined on the basis of Cost of the Work, Contractor's fee shall be deternlined as set forth in Paragraph 12.O1.C. D. Documentation: Whenever the Cost of the Work for any purpose is ta be determined pursuant to Paragraphs 11.O1.A and 11.O1.B, Contractor will establish and maintain records thereof in accordance with generally accepted accounting practices and submit in a form acceptable to City an itemized cost breakdown together with supporting data. 11.02 Allowances A. Specified Allowance: It is understood that Contractor has included in the Contract Price all allowances so named in the Contract Documents and shall cause the Work so covered to be performed for such surns and by such persons or entities as may be acceptable to City. B. Pre-bid Allowances: 1. Contractor agrees that: ClTY OF FORT WORTH DFW Airport Reclaimed Water Defivery System Ffushiine STANDARD CONSTRUCTION SPECIFICATION dOCUMENTS City Project No. 02025 Revision: December2l, 2012 a. the pre-bid allowances include the cost to Contractor of materials and equipment required by the allowances to be delivered at the Site, and all applicable taxes; and b. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the pre-bid allowances have been included in the allowances, and no demand for additional payment on account of any of the foregoing will be valid. C. Contingency Allowance: Contractor agrees that a contingency allowance, if any, is for the sole use of City. D. Prior to fmai payment, an appropriate Change Order will be issued to reflect actual amounts due Contractor on account of Work covered by allowances, and the Contract Price shall be correspondingly adjusted. 11.03 Unit Price Work A. Where the Contract Documents pravide that all or part of the Work is to be Unit Price Work, initially the Contract Price will be deemed to include for all Unit Price Work an amaunt equal to the sum of the unit price for each separately identified item of Unit Price Work times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Wark are not guaranteed and are solely for the purpose of comparison of Bids and determining an initial Contract Price. Deternvnations of the actual quantities and classifications of Unit Price Work performed by Contractor will be made by City subject to the provisions of Paragraph 9.45. C. Each unit price will be deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. Work described in the Contract Documents, or reasonably inferred as required for a functionally complete installation, but not ideniified in the listing of unit price items shall be considered incidental to unit price work listed and the cost of incidental work included as part of the unit price. D. City may make an adjustment in the Contract Price in accardance with Paragraph 12.01 if: 1. the quantity of any item of Unit Price Work performed by Contractor differs materially and significantly from the estimated quantity of such item indicated in the Agreement; and 2. there is no corresponding adjustment with respect to any other item of Work. E. Increased or Decreased Quantities: The City reserves the right to order Extra Work in accordance with Paragraph 10.01. If the changes in quantities or the alterations do not significantly change the character of work under the Contract Documents, the altered work will be paid for at the Contract unit price. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Praject No. 02025 Revision: December21,2d12 2. If the changes in quantities or alterations significantly change the character of work, the Contract will be amended by a Change Order. If no unit prices exist, this will be considered Extra Work and the Contract will be amended by a Change Order in accordance with Article 12. 4. A significant change in the character of work occurs when: a. the character of work for any Item as altered differs materially in kind or nature from that in the Contract or b. a Major Item of work varies by more than 25% from the original Contract quantity. 5. When the quantity of work to be done under any Major Item of the Contract is more than 125% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price on the portion of the work that is above 125%. 6. When the quantity of work to be done under any Major Item of the Contract is less than 75% of the original quantity stated in the Contract, then either party to the Contract may request an adjustment to the unit price. 11.04 Plans Qttantity Measurement A. Plans qua.ntities may or may not represent the exact quantity of work performed or material moved, handled, or placed during the execution of the Contract. The estimated bid quantities are designated as final payment quantities, unless revised by the governing Section or this Article. B. If the quantity measured as outlined under "Price and Payment Procedures" varies by more than 25% (or as stipulated under "Price and Payment Procedures" for specific Items) from the total estimated quantity for an individual Item originally shown in the Contract Documents, an adjustment may be made to the quantity of authorized work done for payment purposes. The party to the Cantract requesting the adjustment will provide field measurements and calculations showing the final quantity for which payment will be made. Payment for revised quantity wili be made at the unit price bid for that Item, except as provided for in Article 10. C. When quantities are revised hy a change in design approved by the City, by Change Order, or to correct an error, or to correct an error on the plans, the plans quantity will be increased or decreased by the amount involved in the change, and the 25% variance will apply to the new plans quantity. D. If the total Contract quantity multiplied by the unit price bid for an individual Item is less than $250 and the Item is not originally a plans quantity Item, then the Item may be paid as a plans quantity Item if the City and Contractor agree in writing to iix the final quantity as a plans quantity. CITY OF FORT WORTH DFW Airport Reclaimed Water Detivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City ProjeCt No. 02025 Revision: December 21, 2D12 E. Far callout work or non-site specific Contracts, the plans quantity measurement requirements are not applicable. ARTICLE 12 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 1 Z_Ol Change of Contract Price A. The Contract Price may only be changed by a Change Order. B. The value of any Work covered by a Change Order will be determined as follows: 1. where the Work involved is covered by unit prices contained in the Contract Documents, by application of such unit prices to the quantities of the items involved (subject to the provisions af Paragraph 11.03); or 2. where the Work involved is not covered by unit prices contained in the Contract Documents, by a mutually agreed lump sum or unit price {which may include an allowance for overhead and profit not necessariiy in accordance with Paragraph 12.O1.C.2}, and shall include the cost of any secondary impacts that are foreseeable at the time of pricing the cost of Extra Work; or 3. where the Work involved is not covered by unit prices contained in the Contract Documents and agreement to a lump sum or unit price is not reached under Paragraph 12.O1.B.2, on the basis of the Cost of fihe Work (determined as provided in Paragraph 11.01� plus a Contractor's fee for overhead and profit {detern�ined as provided in Paragraph 12.O1.C}. C. Contractor's Fee.• The Contractor's additional fee for overhead and profit shall be deterniined as follows: 1. a mutually accepta.ble fixed fee; or 2. if a fixed fee is not agreed ugon, then a fee based on the following percentages of the various portions of the Cost of the Work: a. for costs incurred under Paragraphs 11.Ol.A.l, 11.O1.A.2. and 11.OI.A3, the Contractor's additional fee shall be 15 percent except for: 1) rental fees for Contractor's own equipment using standard rental rates; 2} bonds and insurance; b. for costs incurred under Paragraph 11.01.A.4 and 11 A1.A.5, the Contractor's fee shall be f ve percent (5%); 1) where one or more tiers of subcontracts are on the basis of Cost of the Work plus a fee and no fixed fee is agreed upon, the intent of Paragraphs 12.O1.C.2.a and 12.O1.C.2.b is that the Subcontractor who actually performs the Work, at whatever CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02D25 Revision: December 21, 2012 tier, will be paid a fee of 15 percent of the costs incurred by such Subcontractor under Paragraphs 1I.O1.A.1 and 11.O1.A2 and that any higher tier Subcontractor and Contractor will each be paid a fee of five percent (5%} of the amount paid to the next lower tier Subcontractor, however in no case shall the curnulative total of fees paid be in excess of 25%; c. no fee shall be payable on the basis of costs itemized under Paragraphs 11.O1.A.6, and 11.O1.B; d. the amount of credit to be allawed by Contractor to City for any change which results in a net decrease in cost will be the amount of the actual net decrease in cost plus a deduction in Contractor's fee by an amount equal to five percent (5%) of such net decrease. 12.02 Chatage af Contract Time A. The Contract Tirne may onty be changed by a Change Order. B. No extension of the Contract Time will be allowed for Extra Work or for claimed delay unless the Extra Work contemplated or claimed delay is shown to be on the critical path of the Project Schedule or Contractor can show by Critical Path Method analysis how the Extra Work or claimed delay adversely affects the critical path. 12.43 Delays A. Where Contractor is reasonably delayed in the perforrnance or completion of any part of the Work within the Contract Time due to delay beyond the control of Contractor, the Contract Time may be extended in an amount equal to the time lost due to such delay if a Cantract Claim is made therefor. Delays beyond the control of Contractor shall include, but not be limited to, acts or negleet by City, acts or negleet of utility owners or other contractors performing other work as contemplated by Article 7, fires, floods, epidemics, abnormal weather conditions, or acts of God. Such an adjustment shali be Contractor's sole and exclusive remedy for the delays described in this Paragraph. B. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limiied to all fees and charges of engineers, architects, attorneys, and other professionals and aIl court or arbitration or other dispute resolution costs} sustained by Contractor on or in cannection with any other project or antieipated project. C. Contractar shall not be entitled to an adjustment in Contract Price or Contract Time for delays _ within the control of Contractor. Delays attributable to and within the control of a Subcontractor or Supplier shall be deemed to be delays within the control of Contractor. D. The Contractor shall receive no compensation for delays or hindrances to the Work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information ar material, if any, which is to be furnished by the City. CITY OF FORT WORTFi DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECfFICATION QOCUMENTS City Project No. 02025 Revision: December21, 2012 ARTICLE 13 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE W4RK 13.01 Notice ofDefects Notice of all defective Work of which City has actual knowledge wi11 be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 13.02 Access to Work City, independent testing laboratories, and govemmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 13.03 Tests and Inspections A. Cantractor shall give City timely notice of readiness of the Work for a11 required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Reguiations of any public body having jurisdiction require any of the Work (or part thereo fl to be inspected, tested, or approved, Contractor shall asstune full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary CQnditions or any Texas Department of Licensure and Regula�ion (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re-tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, miY designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re-tests, or approvals shall be performed by organizations acceptable to City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") ta perform any inspections or tests ("Testing") for any part of the Work, as determined salely hy City. l. Ciry will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 13.03 D result in a"fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Coniractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH DFW AirpoR Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21,2412 Any amounts owed for any retest under this Section 13.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue Fina1 Payment until the Testing Lab is paid. E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered hy Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. F. Uncovering Work as provided in Paragraph 13.03.E shall be at Contractor's expense. G. Contractor sha11 have the right ta make a Contract Claim regarding any retest or invoice issued under Section 13.03 D. 13.04 �ncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered far City's observation and replaced at Contractor's expense. B. If City considers it necessary or advisable that covered Work be observed by City or inspected or tested by others, Contractor, at City's request, shall uncover, expose, or otherwise make available for abservation, inspection, or testing as City may require, that portion of the Work in question, furnishing al1 necessary labor, materiai, and equipment. 1. If it is found that the uncovered Work is defective, Contractor shall pay all claims, costs, losses, and darnages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such uncovering, exposure, observarion, inspectian, and testing, and of satisfactory replacement or reconstructian (including but not limited to all costs of repair or replacement of work of others}; or City shall be entitled to accept defective Wark in accordance with Paragraph 13_08 in which case Contractor shall still be responsible for aIl casts associated with exposing, observing, and tesfing the defective Work. 2_ If the uncovered Work is not found to be defective, Contractor shall be allowed an increase in the Contract Price or an extension of the Contract Time, or both, directly attributable to such uncovering, expasure, observation, inspection, testing, replacement, and reconstruction. I3.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or faiis to perform the VVork in such a way that �he cornpleted t�Vork will conform to the Contract Dacurnents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been elirninated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit af Contractar, any CITY OF FORT WORTH DFW Airport Redaimed Water Delivery 5ystem Flushline STANDARD CONSTRUCTfON SPEGFICATION DOCUMENTS City Project No. 02Q25 Revision: December 21, 2012 Subcantractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 13.06 Carrection ot-Remaval ofDefective Work A. Promptly after receipt of written notice, Contractor shatI correct all defective Work pursuant to an accepta.ble schedule, whether or not fabricated, instailed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defecrive. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not Iimited to all fees and charges of engineers, architects, attomeys, and other professionals and all court or arbitration or other dispute resolution costs} arising out of ar relating to such correction or removal (including but not limited to all costs af repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance af such Work. B. When conecting defective Work under the teims of this Paragraph 13.06 or Paragraph 13.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 13.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract Documents), any Work is found to be defective, or if the repair af any damages to the land or areas made available for Contractor's use by City or pemutted by Laws and Regulations as contemplated in Paragraph 6.10_A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective Iand or areas; or 2. correct such defective Work; or if the defective Work has been rejected by Ciry, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If �ontractor does nat promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of Ioss or damage, City may have the defective Work corrected or rcpaired or may have the rejected Wark removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attomeys, and other professionals and ali court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacernen� (includi.ng but not limited to all casts of repair or replacement of work of others) will be paid by Contractor. CITY OF FORT WdRTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21, 2012 C. In special circurnstances where a particular item of equipment is placed in continuous service befare Final Acceptance of all the Work, the correction period for that item may start to run from an earlier date if so provided in the Contract Documents. D. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 13.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of tlie initial correction period. City shall provide 30 days written notice to Contractor should such additional warranty coverage be required. Contractor may dispute this requirement by fiting a Contract Claim, pursuant to Paragraph 1 Q.06. E. Contractor's obligations under this Paragraph 13.07 are in addition to any other obligation or warranty. The provisions of this Parab aph 13.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation ar repose. 13.08 Acceptance ofDefective �T'ork If, instead of requiring conection or removai and replacement of defective Work, City prefers to accept it, City may do so. Contractor shall pay all claims, costs, Iosses, and damages (including but not lirnited to all fees and charges of engineers, architects, attarneys, and other professionals and all court or other dispute resolution costs) attributable to City's evaluation of and determination to accept such defective Work and for the diminished value of the Work to the extent not otherwise paid by Contractor. If any such acceptance occurs prior to Final Acceptance, a Cha.nge Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work, and City shall be entitled ta an appropriate decrease in the Contract Price, reflecting the duninished value of Work so accepted. 13.09 City May Corr-ect Defectzve Work A. If Contractor fails within a reasanable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 13.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice ta Contractor, correct, or remecly any such deficiency. B. In exercising the rights and remedies under this Paragraph I3.Q9, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all ar part of the Work and suspend Contractor's services related thereto, and incorporate in the Work a11 materials and equipment incorporated in the Wark, stored at the Site or for whieh City has paid Contractor but which are stored elsewhere. Contractor shall a11ow City, City's representatives, agents, consultants, employees, and City's other coutractors, access to the Site to enable City to exercise the rights and remedies under ihis Paragraph. C. All claims, costs, losses, and darnages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution CITY OF FORT WORTH OFW Airport Reclaimed Water Delivery System Fiushline STANDARD CONSTRUCTION SPECIF{CATION DOCUMENTS City Project No. 02025 Revision: December2l, 2012 costs} incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shail not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 13.09. ,, ,, i i ''. ♦' • t �'1' � 14.01 Schedule of i�alues The Schedule of Values for lump sum contracts established as provided in Paragraph 2.07 will serve as the basis for progress payments and will be incorporated into a form of Application for Payment acceptable to City. Progress payments on account of Unit Price Work will be based on the number of units completed. 14.02 Progr-ess Payments A. Applications for Payments: 1. Contractor is responsible far providing all information as required to become a vendor of the City. Z_ At least 20 days before the date established in the General Requirements for each progress payment, Contractor shall submit to City for review an Appiicatian for Payment fiiled out and signed by Coniractar covering the Work completed as of the date of the Application and accompanied by such supporting documentation as is required by the Contract Dacuments. 3. If payment is requested on the basis of materials and equipment not incorporated in the Work but delivered and suitably stored at the Site or at another location agreed to in writing, the Application for Payment shall also be accompanied by a bill of sale, invoice, ar other documentation warranting that City has received the materials and equipment free and clear of all Liens and evidence that the materials and equipment are covered by appropriate insurance or other arrangements to protect City's interest therein, all of which must be satisfactory to City. 4. Be� nning with the second Application for Payment, each Application shall include an affidavit of Contractor stating that previous progress payments received on account of the Work ha�e been applied on account to discharge Contractor's legitimate obligations associated with prior Applications for Payment. The amount of retainage with respect to progress payments will be as stipulated in the Contract Documents. CITY OF FORT WORTH DFW AirpoR Reclaimed Water Defivery System Flushiine STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December2'1,2092 B. Review ofApplications: 1. City will, after receipt of each Application for Fayment, either indicate in writing a recammendation of payment or reiurn the Application to Contracior indicating reasons for refusing payment. In the latter case, Contractor may nnake the necessary corrections and resubmit the Application. 2. City's processing of any payment requested in an Application for Payment will be based on City's observations of the executed Work, and on City's review of the Application for Payment and the accompanying data and schedules, that to the best of City's knowledge: a. the Work has progressed to the point indicated; b. the quality of the Work is generally in accordance with the Contract Documents (subject to an evaluation of the Work as a functioning whole prior ta or upon Final Acceptance, the results of any subsequent tests called for in the Contract Documents, a final determination of quantities and classifrcations for Work performed under Paragraph 9.05, and any other qualiiications stated in the recomrnendation). 3. Processing any such payment will not thereby ba deemed to have represented that: a. inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in pro�-ess, or involved detailed inspections of the Work beyond the responsibilities specifically assib ed to City in the Contract Documents; or b. there may not be other matters or issues between the parties that might entitle Contractor to be paid additionally by City or entitle City to withhold payment to Contractor, or c. Contractor has complied with Laws and Regulations applicable to Contractor's performance of the Work. 4. City may refuse to process the whole or any part of any payment because of subsequently discovered evidence or the results of subsequent inspections or tests, and revise or revoke any such payment previously made, to such extent as may be necessary to proteet City from loss because: a, the Work is defective, or the completed Work has been damaged by the Contractor or his subcontractors, requiring correction or replacement; b. discrepancies in quantities contained in previous applications for payment; c. the Contract Price has been reduced by Change Orders; d. City has been required to correct defective Work or complete Work in accordance with Paragraph 13.09; or CITY OF FORT VJORTH DFW Airport Reclaimed Water Delivery System Flushline STANQARD CONSTRUCTION SPECIFlCATION DOCUMENTS City Project No. 02025 Revision: C?ecember21, 2012 e. City has actual Irnowledge of the occurrence of any of the events enumerated in Paragraph 15.02.A. C. Retainage: l. For contracts less than $400,000 at the time of execution, retainage shall be ten percent (10%). 2. For contracts greater than $400,000 at the time of execution, retainage shall be five percent �5%)- D. Liqasidated Damages. For each calendar day that any work shall remain uncompleted after the tim.e specified in the Contract Documents, the sum per day specified in the Agreeznent, will be deducted from the monies due the Contractor, not as a penalty, but as liquidated damages sufFered by the City. E. Paytnent: Contractor will be paid pursuant to the requirements of this Article 14 and payment will become due in accordance with the eontract Documents. F_ Redasction in Payment: 1. City may refuse to make payment of the amount requested because: a_ Liens have been filed in connection with the Work, except where Contractor has delivered a specific bond sarisfactory to City to secure the satisfacrion and discharge of such Liens; b. there are other items entitling City to a set-off against the amount recommended; or c. City has actual knowledge of the occurrence of any of the events enumerated in Paragraphs 14.02.B.4.a through 14.02.B.4.e or Paragraph 15.02.A. 2. If City refuses ta make payment of the amount requested, Ciry will give Contractor written notice stating the reasons for such action and pay Contractor any amount remaining after deduction of the amount so withheld. City shall pay Contractor the amount so withheld, or any adjushnent thereto agreed to by City and Contractor, when Contractor remedies the reasons for such action_ 14.03 Contractor's WaYranty of Title Contractor warrants and guarantees that title to all Work, materials, and ec�uipment covered by any Applicatian for Payment, whether incorporated in the Project or not, will pass to City no later than the time of payment free and clear of all Liens. CITY OF FORT WORTH DFW Airpott fteclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21,2012 14.04 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use ar occupy any substantially completed part of the Work which has specifically been identified in the Contract Dacuments, or which City, deternunes constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing ta pernut City to use or occupy any such part of the Work which City detezmines to be ready for its intended use, subject to the fallowing conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. ___ 2. Within a reasonable time after notification as enumerated in Paragraph 14.OS.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City_ 14.05 Finallnspection A. Upon written notice from Cantractor that the entire Work is camplete in accordance with the Contract Documents: 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incamplete or defective. Contractor shall unmediately take such measures as are necessary to complete such Work or remedy such def ciencies. B. No time charge will be made against the Contractor between said date of notificatian of the City and the date of Final Inspection. Should the City determine that the Work is not ready for Final Inspection, City will notify the Contractor in writing of the reasons and Contract Time will resume. 14.06 Final Acceptance Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a Ietter of Final Acceptance. CIFY OF FORT WORTH DFW Airport Reclaimed Water deiivery System Flushtine STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21, 2012 14.07 Final Payment A. Application.for Payment: Upon Final Acceptance, and in the opinion of City, Contractor may nnake an application for iinal payment following the procedure for progress payments in accordance with the Contract Documents. 2. The final Application for Fayment shall be accompanied (except as previously deiivered} by: a. all documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; b. consent of the surety, if any, to fmal payment; c. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and d. affidavits of payments and compPete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connecrion with the Work. B. Payment Becomes Due: l. After City's acceptance of the Application for Payment and accompanying documentation, requested by Contractor, less previous payments made and any sum City is entztled, including but not Iimited to liquidated damages, will become due and payable. 2. After all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 3. The making of the final payment by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. 14.Q8 Final Completion Delayed and Partial Retainage Release A. If fmal completion of the Work is significantly delayed, and if City so confirms, Ciry may; upon receipt of Contractor's fmal Application for Payment, and without terminating the Contract, make payment of the balance due for that portion of the Work fully completed and accepted. If the remaining balance to he held by City for Work not fully completed ar corrected is less than the retainage sfipulated in Paragraph 14.02.C, and if bonds have been furnished as required in Paragraph 5.02, the written consent of the surety to the payment of the balance due for that CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Ftevision: December 21, 2012 portion of the Work fully completed and accepted shall be submitted by Contractor to City with tbe Application for such payment. Such payment shall be made under the terms and conditions governing final payment, except that it shall not constitute a waiver of Contract Claims. B. Partial Retainage Release. For a Contract that provides for a separate vegetative establishment and maintenance, and test and performance periods following the completion of all other construction in the Contract Documents for all Work locations, the City may release a portion of the amount retained provided that all ather work is completed as determined by the City. Before the release, all submittals and final quantities must be completed and accepted for all other work. An amount sufficient to ensure Contract compliance will be retained. 14.09 Waiver of Clazms The acceptance of final payment will constitute a release of the City from all claims or liabilities under the Contract for anything done or fumished or relating to the work under the Contract Documents or any act ar neglect of City related to or connected with the Contract. ARTICLE 15 — SUSPENSION OF WORK AND T�RMINATION I 5.01 City May Suspend W�rk A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will make no extra payment for stand-by time of construction equipment and/or construction crews. B. Should the Contractor not be able to complete a portion af the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Cantractor and City that a solutian to allow const7uction to proceed is nat available within a reasonable period of time, Contractor rnay request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefuute period, the Contractor sha11 store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he sha11 take every precaution to prevent da.mage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. D. Contractor may be reimbursed for the cost of moving his equipment off the job and returning the necessary equipment to the job when it is determuied by the City that canstruction may be resumed. Such reimbursement shall be based on actual cost to the Contractor of moving the equipment and no profit will be allowed. Reimbursement rnay not be allowed if the equipment is moved to another construction project for the City. CITY OF FORT WORTH DFW Airport ReGaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No, 02025 Revision: December21,2D12 15.02 City May Terminate for Cause A. The occurrence of any one or more of the foilowing events by way of example, but not of lim.itaxion, may justify termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents (including, but not liznited to, failure to supply sufficient skilled workers or suitable materials or equipment, failure ta adhere to the Project Schedule established under Paragraph 2.07 as adjusted from rime ta time pursuant to Paragraph 6.04, or failure to adhere to the City's Business Diversity Enterprise Ordinance #2002d-12-2011establisYted under Paragraph 6.06.D); 2. Contractor's disregard of Laws or Regulations of any pubiic body having jurisdiction; 3. Contractor's repeated disregard of the authority of City; or 4. Contractor's violation in any substantial way of any provisions of the Contract Documents; or 5. Contractor's failure to promptly make good any defect in materials or workmanship, or defects of any naiure, the correction of which has been directed in writing by the City; or 6. Substantial indication that the Contractor has made an unauthorized assinnment of �he Contract or any funds due therefrom for the benefit of any creditor or for any other purpose; or 7. Substantial evidence that the Contractor has become insolvent or bankrupt, or otherwise financially unable to carry on the Work satisfactorily; or 8. Contractor commences legal action in a eourt of competent jurisdietion against the City. B. If one or more of the events identified in Paragraph 15.02A. occur, City will provide written notice to Contractor and Surery to arrange a conference with Contractor and Surery to address Coniractor's failure to perform the �Vork. Conference shall be held not later than 15 days, after receipt of notice. 1. If the City, the Contractor, and the Surety do nat agree to allow the Contractor to proceed to perform the constniction Contract, the City may, to the extent pemutted by Laws and Regulations, declare a Contractor default and formally terminate the Contractor's right to complete the Contract. Contractor default shall not be declared earlier than 20 days after the Contractor and Surety have received notice of conferenee to address Contractor's failure to perform the Work. 2. If Contractar's services are terminated, Surety shall be obligated to take over and perform the Work. If Surety does not commence performance thereof within 15 consecutive calendar days after date of an additional written notice demandir�g Surety's performance of its CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery Sysfem Flushli�e STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December21,2�12 obligations, then City, withaut process or action at law, may take over any portion of the Work and complete it as described below. a. If City completes the Work, City may exclude Contractor and Surety from the site and take possession of the Work, and all materials and equiprnent incorporated into the Work stored at the Site or for which City has paid Contractor or Surety but which are stored elsewhere, and finish the Work as City may deem expedient. 3. Whether City or Surety completes the Work, Cantractor shall not be entitled to receive any further payment until the Work is finished. If the unpaid balance of the Contract Price exceeds all claims, costs, losses and damages sustained by City arising out of or resulting from completing the Work, such excess will he paid to Contractor. If such claims, costs, losses and damages exceed such unpaid halance, Contractor sha11 pay the difference to City. Such claims, costs, losses and damages incurred by City will be incorporated in a Change Order, provided that when exercising any rights or remedies under this Paragraph, City shall not be required to obtain the lowest price for the Work performed. 4. Neither City, nor any of its respective consultants, agents, officers, directors or employees - shall be in any way liable or accountable to Contractor or Surety for the method by which the campletion of the said Work, or any portion thereof, may be accomplished or for the price paid therefor. 5. City, notwithstanding the method used in complering the Contract, shall not forfeit the right to recover damages from Contractor or Surety for Contractor's failure to timely complete the entire Contract. Contractor sha11 not be entitled �o any claim on account of the method used by City in completing the Contract. 6. Maintenance of the Work shall continue ta be Contractor's and Surety's responsibilities as provided for in the bond requirements of the Contract Documents or any special guarantees provided for under the eoniraci Doenments or any other obligations otherwise prescribed by law. C. Notwithstanding Paragraphs 15.OZ.B, Contractor's services will not be tern�inated if Contractor begins within seven days of receipt of notice af intent to terminate to correct its failure to perform arid proceeds diligently to cure such failure within no more than 30 days of receipt of said notice. D. Where Contractor's services have been so terminated by Ciry, the termination will not affect any rights or remedies of City against Contractor then existing or which may thereafter accrue. Any retention or payment of moneys due Contractor by City will not release Contractor from liabiiity. E. If and to the extent that Contractor has provided a performance bond under the provisions of Paragraph 5.02, the termivation procedures of that bond shall not s�persede the provisions of this Article. CITY OF FORT WOR7H DFW Airport Reclaimed Water Delivery System Fiushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21. 2012 15.03 City May Terminate For Convenience A. City may, without cause and without prejudice to any other right or remedy of City, terminate the Contract. Any termination shall be effected by mailing a natice of the termination to the Contractor specifying the extent to which performance of Work under the contract is terniinated, and the date upon which such terniination becomes effective. Receipt of the notice shall be deemed conclusively presumed and established when the letter is placed in the United States Postal Service Mail by the City. Further, it shall be deemed conclusively presumed and established that such termination is made with just cause as therein stated; and no proof in any claim, demand or suit shall be required of the City regaxding such discretionary action. B. After receipt of a notice of ternunation, and except as otherwise directed by the City, the Contractor shall: 1. Stop work under the Contract on the date and to the extent specified in the notice of texmination; 2. piace no further orders or subcontracts for materials, services or facilities exeept as may be necessary for completion of such portion of the Work under the Contract as is not ternunated; 3. terminate all orders and subcontracts to the extent that they relate to the performance of the Work terminated by natice of termination; 4. transfer title to the City and deliver in the manner, at the times, and ta the extent, if any, directed by the City: a. the fabricated or unfabricated parts, Work in progress, completed VJork, supplies anc2 other material produeed as a part of, or acquired in connection with the performanee of, the Work terminated by the notice of the temiination; and b, the completed, or partially completed plans, drawings, information and other property which, if the Contract had been completed, would have been required to be furnished to the City. 5. complete perfoimance of such Work as sha11 not have been terminated by the notice of tertnina�ian; and 6. take such action as may be necessary, ar as the City may direct, for the protection and preservation of the properly related ta its contract wl�ich is in the possession of the Contractor and in which the owner has or may acyuire the rest. C. At a time not later than 30 days after the termination date specified in the notice af termination, the Contractor may submit to the City a list, certified as to quantity and quality, of any or all items of tem�ination inventory not previously disposed of, exclusive of items ihe disposition of which has been directed or authorized by City. CITY OF FORT WORTH DFW Airport Redaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No_ OZ025 Re�ision: december21,2012 D. Not later than 15 days thereaf�er, the City shall accept title to such items provided, that the list submitted shall be subject to verification by the City upon removal of the items or, if the items are stored, within 45 days from the date of submission of the list, and any necessary adjustments to correct the list as submitted, shall be made prior ta final settlement. E. Not later than 60 days after the notice of ternunation, the Contractor shall submit his temlination claim to the City in the form and with the certification prescribed by the City. Unless an extension is made in writing within such 60 day period by the Contractor, and granted by the City, any and all such claims shall be conclusively deemed waived. F. In such case, Contra.ctor shall be paid for (without duplication of any items): 1. completed and acceptable Work executed in accordance with the Contract Documents prior to the effective date of termination, including fair and reasonable sums for overhead and profit on such Work; 2. expenses sustained prior to the effective date of termination in performing services and furnishing labor, materials, or equipment as required by the Contract Documents in connection with uncompleted Work, plus fair and reasonable sums for overhead and profit on such expenses; and 3. reasonable expenses directly attributable to ternunation. G. In the event of the failure of the Contractor and City to agree upon the whole amount to be paid to the Contractor by reason of the termination of the Work, the City shall detexmi.ne, on the basis of information available to it, the amount, if any, due to the Contractor by reason of the ternunation and shall pay to the Contractor the amounts detemuned. Contractor shall not be paid on account of loss of anticipated profits or revenue or other ecanomic loss arising out of or resulting from such ternunation. ARTTC�,E 16 — DISPUTE RESULUTION 16.01 Methods and Procedures A. Either City or Contractor may request mediation of any Cantract Claim submitted for a decision under Paragraph 10.06 before such decision becomes fmal and binding. The request for rnediation shall be submitted to the other party to the Contract. Timely submission af the request shall stay the effect of Paragraph 10.06.E. B. City and Contractor shall participate in the mediation process in good faith. The process shail be commenced within 60 days of filing of the request. C. If the Contract Claim is not resolved by mediation, City's action under Paragraph 14.06.0 or a denial pursuant to Paragraphs 10.06.C.3 or 10.06.D shall become final and binding 30 days after - termination of the mediation unless, within that tune period, City or Contractor: CITY OF FOF2T WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONS7RUCTION SPECIFICATI�N DOCUMENTS City Project No. 02025 Revision: December 21, 2012 1. elects in writing to invoke any other dispute resolution process provided for in the Supplementary Conditions; or 2. agrees with the other party to submit the Contract Claim to another dispute resolution process; or 3. gives written notice to the okher party of the intent to submit the Contract Claim to a court af competent jurisdiction. . . , � •� 17.01 GivingNotice A. V�Thenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the fum or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be prompfly made in writing to the other pariy_ C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 17.02 Computation o, f Times When any period af time is referred to in the Contract Documents by days, it will be computed to exclude the first and inciude the last day of such period. If the last day of any such period falls on a Saturday or Sunday or an a day made a legal holiday the next Working Day shall become the last day of the period. 17.03 Cumulalive Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are nat to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisians of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH DFW Airport Reclaimed Water Detivery System Flush[ine STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revision: December 21, 2012 17.04 Survivc�l of Obligations A11 representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance witlz the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, campletion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 17.05 Headings Article and paragraph headings are inserted for convenience only and da not constitute parts of these General Conditions. GITY QF FORT WORTH DFW Airport Reclaimed Water De(ivery System Ftushiine STANRARD CONSTRUCTIOt� SPEGFICATION DDCUMENTS City Project Na Q2025 Rev�sion: December21,2012 oo��oo-i SUPPLEMENTARY CONDITIONS Pagc i ol G 1 ? 3 4 5 6 7 8 4 la I1 12 13 14 15 lb 17 18 19 20 21 22 23 24 25 26 27 24 29 30 31 32 33 34 35 36 37 sEc��ar� ao �3 00 SUPPLEMENTARY C(�NDITIONS TO GENERAL CONDITIONS Sapplementary Canditions 'I�hese Supplementary Conditions modify and supplement Section 00 72 00 - General Conditians, and other provisions of the Contract Documents as indicated below. All provisions of the General Conditions that are modified or supplemented remain in full force and effect as so modified or supplemented. All provisioxis of the General Conditions which are not so modified or supplemented remain in full force and effect. Defined Terms The terms used in these Supplemeutary Conditions whrch are defined in the General Conditions have the meaning assigned ta them in the General Conditions, unless specifically noted herein. Modiiacations and Supplements The following are instnictions that modify or supplement specific paragraphs in the General Conditions and other Contract Documents. SC-3.03B.2, "ResoIving Discrepancies" Plans govem over Specifications. SC-4.OIA Easement limits shown on the Dra�ring are approximate and were provided to establish a basis for hidding. Upon receiving the final easements descriptions, Contractor shall compare them to the lines shown c>n tlie Contract Dra��ings. SC-4.41A.1., "Availabitity of �ands" The following is a list of known outstanding right-of-way, and/or easements to be acquired, if any as o£ Aub st 26, 2013 Outstand�ng Right-Of-�'ay, and/or Easements to Be Acquired PARGEL OV��NER TARGET DATE NIJMBER OF POSSESSION Parcel 1& 2(Fiush Line DFW Auport October 15, 20I3 Maintenance and Access I.,icense} Parcel l, 2 R 3(Road Access DFW Airport �ctober 15, 2013 License) Parcel 1&2{Easement for I'lusli DFW Airport December 15, 2013 Line} 38 The Contractor ui�derstands and agrees that the dates 2isted above are estimates only, are not guaranteed, 39 and do not bind the City. 40 41 If Contractor considers the fir�al easements provided to differ materially from the representations on the 42 Goniract Drawings, Contractor shall within five (5) Business Days and before proceeding with the Work; 43 notify City in ��ritinb associated with tlle differing easement line locations. CITY OF FORT WORTH DFW Airp�rt Rec;laimed Water Deliveiy Systens Flushline STANDARD CONSTRUCTiON SPECIFICATION DOCUMENTS CiYy Project No. 020?5 Revised Aptil ] , 20I3 0O 73 00 - 2 SUPPLEMENTARY CONDITIONS Pagc 2 oC6 1 ? 3 4 5 SC-4.41A.2, "Availability of Lands" Utiiities or obstructiotts to be removed, adjcasteci, a,adlor re[acated The follo�uing is list of utilities and/or obstructions tliat have not been removed, adjusted, and/or relocated as of August 26; 2013 EXPECTED UTILITY AND LOCATION OWNER TARGET DATE OF ADJUSTMENT Noi�e 9 10 lI 12 I3 14 15 16 17 �� 19 20 ?� 22 23 24 25 26 ?7 ?g ?9 3Q 31 32 33 34 35 36 37 38 39 aa 41 42 43 44 45 46 47 The Contractor understands and agrees tl�at the dates listed above are estimates only, are not guaranteed, and do not hind the City. SC-4.02A., "Subsu�•face and PhysicaI Conditions" The following are reports of explorations and tests of subsurface conditions at the site of the Wark: None SC-4.06A., "I�8Z81'CIDUS FilVTiOYl[11CI1tdI COI1�t�10I15 aY S1YE" The following are reports and drawings of existing hazardous enviroiunental conditions known to the City: None SC-5.03A., "Certificaies af Insurance" The entities listed below are "additional insureds as their interest may appear" including their respective officers, directors, agents and employees. (1) City (2) Consultant: ATone (3) Other: Nane SC-5.04A., "Contractor's Insurance" The limits of liability for the in.5urance required by Paragraph GC-5.04 shall provide the following coverages for not less t31an the following amounts or greater where required by laws and regulations: SA4A. Workers' Compensation; under Paragraph GG5.04A. .�IC7Zt1�Oi"S' ldd}27iS Er���l�yer-',s lirahilri�� .�IOO.C�CJ(} eaci� �rcc�zdenvc�c;cr.rt-l�enc� �'1 �}(�, i1�11 Z>i_;errse - ec�c�r Lt�7z�lo��ec: .SJt�t7.�{�O Z?zsease-�}��7zc:�� Iti�rit SC-S.d4B., "Contractor's Insurance" CITY OF FORT WORTH DFW Airport Reclaimed Water Deliveiy System Flushlitte STANDARD CONSTRUCTION SPECIFICATION DOCL'MENTS City Project No. 02025 Revised Apri1 1, 2013 OQ 73 O(3 - i S1IPPLF:MIiN"l AltY CONDffiQNS Pagc 3 <�1�G 1 2 3 4 5 6 7 8 9 10 11 12 I3 14 l5 ]6 17 18 19 20 21 ?2 23 24 25 26 27 28 29 3U 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 5� 53 54 55 5.04B. Commercial General LiaUility, under Para�raph GC-5.048. C`ontractor'ti Liability Ii7�urance iinder Paragraph GG5.04B., ��rl�ich sl�all be on a per project basis covering the Contractor wiUi n�inimum limiCs of: S.1,0{7U.(7011 c:Uc1� t�ccirrrerrcc� 52,0�(�,f�(�0 a��rt•e,�atc' limi� Tbe policy n�ust have an ez�darsement {Amendment — Aggregate Limits of Insurance) making the Generat Aggre;ate I.itnits apply separately t� each job site. The Com�nercial General Liability [nsurance policies shall pr-ovide "X", "e", aild "U" co�Jerabe's. Verification of such coverage niust be showrn in dle Remaa-ks Article of tlle Certiiicate of Insurance. SC 5.04C., "Cvntractor's Insurance" 5.04C. Automobile Liability, ui�der Paragraph GC-5.04C. Contractor's l.,iability Insw�ance under Paragraph GGS.Q4C., ���hich sliall be in an amouut not less than the fallowing amou3its: (1) Aufomobiie Liabilitg� - a coa�mercial busiuess policy shall provide coverage on "A�iy Auto", defined as autos owned, hired and non-owned. SI,D�t).l1t7� each accident on a combined siizgle limit basis. Split liinits are acceptable if limits are at least: �'?�(1,�00 Bc�Llili�htjtu��}7�:r�l�ct�.so�t- SS(J11,O(iti Rc>flrlrhajim�l�et•a�cr�lc�i�i- SI(I(i,11�0 f'�•r�,�c>r�t,' Dr�niag� SC-5.04D., "Cantractor's Insurance" The Contractor's canstruetio�y activities N�ill require its employees, a�ents, subcantractors, equipment, and material deliveries to cross railroad propeRies and tracks None The Contractar shall conduct its operations an railroad properties in such a manner as not to interfere u�ith; hinder, or obstruct tlie railroad company in any manner �uhatsoever in the use or operation of its/their trains or other property. Such operations on raiIroad properties may require that Contractor to eaecute a"Right �f Entry Aereement" v��ith the particuIar railroad companyo ur compailies involved, and to this end the Contrac#or should satisfy itself as to the requirements of each railroad campany and be prepared to execute the rigltt-of-entry (if any} required by a railroad company. 1�he requirements specified herein likewise relate to the Contractor's use of private and/or consn�uctian access roads crossing said railroad company's properties. The Contractual Liability caverage rec�uired by Paragraph S.U�D of the General Conditions shall �rovide coverage for not less than tile follou�ing amounts, issued by companies satisfactory to the City and to the Raiiroad Company for a tenn that continues far so long as the Contractor's operations and �lork cross, occupy, or t�uch railroad property: (1} General Aggregate: (2} Each Occurrence: e 4 __� Rc:�uire�� fr_�r ?Itis C:2��a1r-rrr.�t _,_ X,__ .nrot rccftriratl fi�r r'Iris Con�rziet , . . , � <.��t`Cli'7Clt? Cr)'] ��i: � 19c'.1710 lllt' CIl?fli"O�)77L1i� SC'%E:C'fl011 cll�(�l'B !7CLcgC� 0T7 l�?E' i 0i7f7"(!Ci T`C�[�i(17"P1t7C'.1715 -' With respect to the abave outlined insurance requirements; the follo�ving shall gover�i: CITY OF F4RT WORTH DFW Aiiport Reclaimed Vdater Delivery System Flushiine STANDARD CONSTRUCTION SPECIFICATIOI`' DOCI)MENTS City Project No, 02025 Rel�ised Apri] 1, 2013 [JO 73 Ot) - 4 SLJPPLEA4LNTARY CON�lCI'It}NS Ptigc 4 0l"6 l. 2 3 4 5 6 7 s 9 la 11 12 13 ].4 l5 26 17 1g i9 20 21 �2 23 24 25 26 27 �g 29 30 31 32 33 34 35 36 31 38 39 40 4l 42 43 44 45 46 47 48 49 50 SI 52 53 54 1. Wi�ere a single railroad company is invoh�ed, tlie Contractor shall prtn�ide one intiurance E�olicy i�i the name of the railraad company. Ho���ever, if� niore thaiz oue grade separatioil or al-grade crossing is affected by tlle Projec[ at entirely separat� locations on the line or line5 of the same railr�ad company, separate cavera�e inay Ue requii•ed, eacli in t(ie ainount stated abo�re. Z Where more than one railroad coiupany is operating on the same right-of-���ay o�- ��rhere several railroad companies are im�aived and opei-ated on ti}eir own separate rights-of-way, tl�e Co�ltractor may be required to provide separate insurance policies in the name of eacl� railroad comgany. 3. If, in addition to a grade separatioit or a�i at-grade crossiug, otlier work or actrvity is proposed on a raitroad company's right-of-way at a location entirely separate from the grade separation or at- grade crossing, insurance coverage far this �vork must be included in flie policy covering the grade separation. 4. If no grade separation is involved but ot[�er �vork is proposed on a railroad c�mpany's ri�ht-of- ��jay, all such other ���ork may be covered in a single policy for that railroad, even tlZough the u�ork �nay be at two ar more separate locations. No ti�Jork or activities on a railroad company's property to be performed by the Contractar shall be commenced until the Contractor has funlished the City with an original policy or policies of tlie insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning ���ork. The insurance specified above must be can-ied until all Work to be perfornled on the railroad right-of-way has been completed and the grade crassing; if at�y, is no longer used by the Cantract:or. In addition, insurance must be carried during all maintenance andlor repair work perfonned in the railroad rigl�t-of-�ray. Such insurance must name the railroad company as tlie insured, together with any tenant ar lessee of the railroad coinpany operating over tracks involved in the Project. SC-6.04., "Project Scheduie" Project schedule shall be tier 3 for the project. SC-6.07., "Wage Rates" The follawing is the prevailing wage rate table(s) applicable to flus project and is provided in the Appendixes: GC 6.07 Wag� Rrrtes SC-6.04., "Permits and Utilities" SC-6.09A., "Contractor obtained permits and licenses" The following are knotivn permits and/or licenses required by the Contract to be acquired by the Contractor: 1. TCf�D Pr.=rfni� Jor Cc,r,ctr�crcrrc��r _'. l��T�"Inter��_r,riotrrrl.�,ir�url ��r�t:str-ucriatt Perli,it SC-6.Q9B. "Cit�� obtained permits and licenses" The iolIowing are knot��n permits and/or licen5es required by the Contract to be acquired by the City: 1. �riir;.;�I�i1�cr��ftrlhor�iti:F'oi€:�t�J'�Er7r��i .�c�r��ttf' '. LJ��'��.'�ii)?Uf�f.�CL�C'S'('1rZi�C'iiC._' SC-6.09C. "Outstanding permits and licenses" C1TY OF FOR`I' WOKTFI DFW Aitpoi� Reclai�ned Water lleIive�y Sysiem Flushline STANDARD CONSTRUCI'lON SPECIFICA710N DOCL'MENTS City Project No. OZU25 Revised April l, 2G13 i 2 3 4 5 6 7 8 9 10 (?O 73 (Sfl - 5 SUpPLE:MEN"I'ARY C'ONDCI'IONS Pagc 5 0!' 6 The following is a list caf known outsTandii�g permits a��d/ol• licen�es to be acquired; if� any as of Augi�st 26, 2013 CDutstanding Pcrgnits aaad/or �,ice�ises to Be Acquirec3 O���NER PERMI7' C�IZ LICI:NSE AND I.Oe,�'I'ION 1'AItGET DA'IE OF POSSESSION Trinity River Authority Point of �ntry Pern�it ����October 1 S, 2013 Parcel 1, 2& 3(Road Access DFW Ai�por( October j 5, 2013 License) SC-7.Q2., "Coordination" The individuals or entities listed below have coutracts with the City for tl�e performance of other work at the Site: Noue �'endor Sco e of �'t'ork Coordination Autharitv 11 12 13 ]4 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SC-8.01, "Communications to Contractor" 1. Contractor shall coordinate with DFW International Airport En��ironmenta2 Affairs llepartment for sub�nittal and approval of the 5torn1 Water Pollution Prevention Plan(S WPPP) 2. Contraetor shall coordinate witll Trinity River Authority for Constnzction and connection to TRA facilities. C�ntact Bill Cyrus at 972-263-2251. 3. Contractor shall coordinate removal and transport of temporary flush line with Steve Nutter — CiTy of Fort Worth, 817-392-8291 or 817-392-4965 4. Contractor sha11 submit and have approval of any material imported material used on this proiect. The form for approval is included in appendix A and shall be submitted to DFW International Airport Envirorunental Affairs for approval. 5. Testing and inspections for this contract will be perfonned by the City of Fort Vdorth, Trinity River Authority and DFW International Airport. 6. Contractors for this contract sliall be preapproved for constructian by the City of Fort Wortl1 and DFW International Airport. SC-9.01., "City's Project Representative" The following firni is a consultant to The City r�sponsible for construction management of this Project: None SC-13.03C., "Tests and Inspections" Testing and inspections for tlus contract will be performed by the City of Fori Worth, Trinity River Authority and llFW International Airport. Contractor shall coordinate with all entities for testing and inspections. SC-16.OIC.1, "Methods and Procedures" Alone CtTY OF FC}RT WORTH I�FW Ai�port Recfaimed Water Delivery Syste�n Fiush[ine S7�ANDARD CONSTRUCT'IOI�' SFECIFICA'I�t�N llOCUMEN'I'5 City Project No. Q2025 Re��ised April I, 2013 t)0 73 U(3 - 6 SUPPI..EM1IENT'/�RY CON[}ITiONS Pti�e (3 a!'b I � �� CITY OF FORT 1�JQ�iTH I�F�i' Aiipoat I2eclaiuled 4Water I7elivei}� 5ystem F1usl�Iine ST.ANDARD COTvSTRUCiION SPBCIPICA"I'If3N L7OCUiv1E\7'S City Projec? �e. Q2€�25 Ret�ised April ], 2013 01 (I UQ- i SUMMARY OF WORK Fagc I of 3 1 ? 3 PART 1- GENERAI� 4 l.l SUMMARY SECTION Ol 11 00 SUMMA.RY OF WORK 5 A. Section Includes: 6 1. Surrunary of Work to be performed in accordance with the Contract Documents � B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0- Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1- General Requirements 12 1Z PRICE AND PAI'MENT PROCEDURES 13 A. Measurement and Payment 14 l. Work associateci with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQLTIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 3a 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include fizrnishing aIi labor, materials, and equipment, and perfornung all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work l. Any and aIl Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the itern shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposai for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights-of-way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the constnaction operations. CITY OF FORT WORTH DFW Airport Reclanned Water Delivery System F(ushline STANDARD CONSTRUCTION SPECIFICATION DOCCIMENTS City Pmject I�Io. 02025 Revised December 20, 2012 oi i�oo-2 SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shail be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. & D. Work within Easements 9 1_ Do not enter upon private property for any purpose without having previously 10 obtained pernvssion from the owner of such property. 11 2_ Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights-of-way or easements of 15 obstructions which must be removed to make possible proper prasecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 27 28 29 30 31 32 e.7 c. Notices sha11 be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, maierial, ar equiprnent. 33 34 35 36 37 38 39 40 41 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated ovemight, and/or at all times to provide site security. c. The cost for a11 fence work within easements, including removal, temporary closures and replacement, shall be subsidiary ta the various items bid in the projeci proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pmject No. 02Q25 Revised December 20, 2012 01 I100-3 SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 111 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS (NOT USED] 10 PART 3- EXECUTION [NOT USED] lI 12 END OF SECTION Revision Log DATE NAME SUNIIvIARY OF CI-�ANGE 13 CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUC'I'ION SPECIFICATION DOCITMENTS City Project No. 02025 Revised December 20, 2012 o�2soo-� StJBSTITUTION PROCEDURES Page I of 4 I. ? 3 PARTl- GENERAL 4 1.1 Sti�MMARY 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 1.2 SECTION O1 25 00 SUBSTITUTION PROCEDURES A. Section Includes: 1. The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or-equals". B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Divisian 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid_ - 22 No separate payment will be allowed for this Item. 23 I.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 26 27 28 29 30 31 32 33 34 35 3b 37 38 39 40 A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Speciiications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other praducts bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or-equals," as detezmined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or-equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CTI'Y OF FORT WORTH DFW Airport Reclaimed 4Vater Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATIQN DOC[1MENT5 Ciry Projcct No. 02025 RevisedJuly i,2Qll oi2soo-2 SUBSTITUTION PROCEDURES Page 2 oF4 b. Contractor proposes a cost andlor time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 l. Substitution shall be considered oniy: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 9 10 11 12 13 14 15 16 1'1 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identif cation a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Cantract Documenis 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past proj ects utilizing product b) Name and telephone number af persons associated with referenced projects lrnowledgeable conceming proposed product � c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b} Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rej ection 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, the resulting cost and/or time reduction 46 will be documented by Change Order in accordance with the General Conditions. C]TY OF FORT WORTH DFW Airporl RecIaimed Water Dclivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pmject No. 02025 Revised Juiy l, 2011 O12S00-3 SUBSTiTUTION PROCEDURES Pagc 3 of 4 1 2 3 4 S 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 4. No additional contract time wili be given for substitution. S. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the City's opinion, acceptance will require substantial revision of the original design d. In the City's opinion, substitution wiil not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALS/INF4RMATIONAL SUBMITTALS [NOT USEDj 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAI, SUBMITTALS [NOT USED] 1.9 QUALITY ASSLTRANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has deternuned that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FI.EI.D [SITE] CONllITIONS [NOT USED] Z.12 WA,RRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] 28 PART 3- EXECUTI�N [NOT USED] 29 30 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 31 CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDAItD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02d25 Revised July 1, 2011 012500-4 SUBSTITUTiON FROCEDURES Page 4 af 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: �� DATE: �� We hereby submit for your consideration the following product instead of the specified item for �� �� the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: _ Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal The undersigned states the speciiied item. Submitted By: Signature as noted Firm Address Date Telephone For Use by City: Approved City Better (explain on attachment) that the function, appearance and quality are equivalent or superior to For Use by City Recommended Recommended Not recommended Received late By i Date Remarks Date Rejected CITY OF FORT WORTH DFW Airport Reclaimed Water Belivery System Flushline STANDARD CONSTRUCTION SPECIFICATiON DOCUMENTS CiTy Pmject No. 02025 Revise3luly t, 20ll O1 31 19 - ( FRECONSTRUCT[ON tvtEETING Page 1 of 3 1 � 3 PARTl- GENERAL 4 1.1 5UIVIMARY SECTION O1 31 19 PRECONSTRUCTION MEETING 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administratian procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1— General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQITIREMENTS 19 2Q ?� 22 23 24 ZS 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Coordination 1. Attend preconsiruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the execution of the Agreement and before Work is started. a. The meeting will be scheduied and administered by the City. 2. The Project Representative will preside at the meeting, prepare the nates of the meeting and distribute copies of same to al1 participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance sha11 include: a. Proj ect Representative b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the eontractor may desire to invite or the City may request CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CdNSTRUCTIQN SPECIFICATION DOCUMENTS City Project No. 02025 Revised August 17, 2012 013I 19-2 PRECONSTRUCTION MEETING Page 2 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 25 ?� 28 29 30 31 32 33 34 35 36 31 38 39 40 41 42 43 44 45 e. Other City representatives f. Others as appropriate 4. Construction Schedule a. Prepare baseline construction schedule in accordance with Section Ol 32 16 and provide at Preconstruction Meeting. b. City will notify Contractor of any schedule changes upon Notice of Preconstruction Meeting. 5. Preliminary Agenda may include: a. Introduction of Projeci Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedute e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing a. Public Safety and Convenience p. Dacumentation of Pre-Construction Conditions q_ Weekend Wark Notifcation r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y_ Contractor Evaluation z_ Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc_ Substitution Procedures dd. Conespondence Routing ee. Record Drawings ff. Temporary construction facilities gg. M/WBE or MBE/SBE procedures hh. Final Acceptance ii. Final Payment jj. Questions or Comments CiTY OF FORT WQRTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project tJo. 02025 Revised August 17, ?012 O1 3l 19-3 PRECONSTRUCTION MEETING Page 3 oi3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USEDJ 3 1.'7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USEDj 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 l.11 FIELD [SITE] CONDITIONS [NOT USEDJ 8 1.12 WARRANTY [NOT USED] 9 PART 2- PRODUCTS (NOT USED] 10 PA.RT 3- EXECUTION [NOT USED) 11 12 13 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY �F FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised August 17, 2012 Q13120-I PROIECT MEET[NGS Page I of 3 1 2 3 4 PART1- GENERAL 5 1.1 SUMMARY 6 7 8 9 10 I1 12 13 14 15 SECTION Ol 31 20 PR03ECT MEETINGS A. Section Includes: l. Provrsions for project meetings throughout the construction period to enable orderly review of the progress of the Work and to provide for systematic discussion of potential problems B. Deviations this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily Iimiied to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYMENT PROCEDURES 1.2 16 17 18 19 1.3 20 1.4 21 22 23 24 25 26 ?� ?g 24 30 31 32 33 34 35 36 37 38 A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. REFERENCES [NOT USED] ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Schedule, attend and administer as specified, periodic progress meetings, and specially called meetings throughout progress of the Work. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meetings adininistered by City may be tape recorded_ a. If recorded, tapes will be used to prepare ininutes and retained by City for future reference. 4. Meetings, in addition to those specif ed in this Section, may be held when requested by ihe City, Engineer or Contractor. B. Pre-Construction Neighborhood Meeting 1. After the execution of the Agreement, but before construction is allowed to begin, attend 1 Public Meeting with affected residents to: a. Present projected schedule, ineluding construction start date b. Answer any construction related questions 2. Meeting Location a. Locafiion of ineeting to be deterrnined by ihe City. 3. Attendees CTi'Y OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION 3PECIFICATION DOCUMBNTS City Pmject No. 02025 Revised July I, 2011 QI 31 20-2 PROJECT ►vIEET[NGS Pagc 2 of 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 3b 37 38 39 40 41 42 43 44 45 46 47 48 a. Contractor b. Project Representative c. Other City representatives 4. Meeting Schedule a. In general, the neighhorhood meeting will occur within the 2 weeks following the pre-construction conference. b. In no case will construction be aliowed to begin until this meeting is held. C. Progress Meetings 1. Formal project coordination meetings will be held periodically. Meetings will be scheduled and administered by Project Representative. 2. Additional progress meetings to discuss specific topics will be conducted on an as- needed basis. Such additional meetings shall include, but not be limited to: a. Coordinating shutdowns b. Installation of piping and equipment c. Coordination between other construction projects d. Resolution of construction issues e. Equipment approval 3. The Project Representative will preside at progress meetings, prepare the notes of the meeting and distribute copies of the same to all participants who so request by fuIly completing the attendance form to be circulated at the beginning of each meeting. 4. Aitendance shall include: a. Contractor's proj ect manager b. Contractor's superintendent c. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request d. Engineer's representatives e. City's representatives £ Others, as requested by the Project Representative 5. Preliminary Agenda may include: a. Review of Work progress since previous meeting b. Field observations, problems, conflicts c. Items which impede construction schedule d. Review of off-site fabrication, delivery schedules e. Review of construction interfacing and sequencing requirements with ather canstruction contracts f. Conective measures and procedures to regain projected schedule g. Revisions to construction schedule h. Progress, schedule, during succeeding Work period i. Coordination of schedules j. Review submittal schedules k. Maintenance of quality standards 1. Pending changes and substitutions m. Review proposed changes for: 1) Effect on construction sched.ule and on completion date 2) Effect on other contracts of the Proj ect n. Review Record Documents o. Review monthly pay request CI'TY OF FORT WORTH DFW Airport Reclaimed Water Delivery 5ystem Flashline STANDARD CONSTRUCTION SPECIFICATION Dt?CLTMENTS City Pmject No. 02025 Revised luly 1, 2011 01 31 20-3 PROJECT M EET[NGS Page 3 oi'3 - i p_ Review status of Requests for Information 2 6. Meeting Schedule 3 a. Progress meetings will be held periodically as determined by the Project 4 Representative. 5 1} Additional meetings may be held at the request of the: 6 a) City 7 b) Engineer 8 c) Contractor 9 7. Meeting Location 10 a. The City wili establish a meeting location. 11 1) To the extent practicable, meetings will be held at the Site. 12 1.5 SUBMITTALS [NOT USED] 13 1.6 ACTION SUSMITTALS/INFORMATIONAL Si.3B1VIITTALS [NOT USED] 14 1.7 CLOSEOUT SUBMITTALS [NOT USED] 15 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 16 1.9 QUALITY ASSURANCE [NOT USED] 17 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 18 l.11 FIELD [SITE] CONDITIONS [NOT USED] 19 1.12 WARRANTY [NOT USED] 20 PART 2- PRODUCTS [NOT USED] 21 PART 3- EXECUTION [NOT USED] 22 23 24 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMEN'I'S City Projeci No. 02025 Revised July 1, 2021 01 32 Ib - 1 CONSTRUCTION PROGRESS SCHEDULE Page I of 5 I � 3 PART 1- GENERAI. 4 1.1 SUMMARY 5 6 7 8 9 10 I1 12 13 14 15 1.2 16 17 18 19 1.3 20 21 22 23 24 25 26 27 28 24 30 31 32 33 34 35 36 37 38 39 40 SECTION 01 32 Ib CONSTRUCTION PROGRESS SCHEDULE A. Section Includes: 1. General requirements for the preparation, submittal, updating, status reporting and management of the Construction Progress Schedule 2. Specific requirements are presented in the City of Fort Worth Schedule Guidance Document B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily Iimited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements PRICE AND PAYIVIENT PROCEDURES A. Measurement and Payment 1. Work associated with this Itern is considered subsidiary to the various items bid. No sepazate payment will be allowed for this Item. REFERENCES A. Definitions 1 _ Schedule Tiers a. Tier 1- No scheduie submittal required by contract. Small, brief duration proj ects b. Tier 2- No schedule submittal required by contract, but will require some milestone dates. Small, brief duration projects c. Tier 3- Schedule submittal required by contract as described in the Specification and herein. Majority of City prajects, including all bond program proj ects d. Tier 4- Schedule submittal required by contract as described in the Specification and herein. Large andlor complex projects with long durations 1) Examples: large water puxnp station project and associated pipeline with interconnection to another governmental entity e. Tier 5- Schedule submittal required by contract as described in the Specification and herein. Large and/or very complex projects with long durations, high public visibility 1} Examples might include a water or wastewater treatment plant 2. Baseline Schedule - Initial schedule submitted before work begins that will serve as the baseline for measuring progress and departures from the schedule. 3. Progress Schednle - Monthly submittal af a progress schedule documenting progress on the project and any changes anticipated. CITY OF FORT WORTH DFW Airport Reclaimed Water System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised July 1, 2011 Ol 32 16 -2 CONSTRUCTION PROGRESS SCHEDULE Pagc 2 of 5 1 2 3 4. Schednle Narrative - Concise narrative of the schedule including schedule changes, expected delays, key schedule issues, critical path items, etc B. Reference Standards 4 1. City of Fort Worth Schedule Guidance Document 5 1.4 ADMINISTRATIVE REQUIREMENTS 6 7 8 9 10 11 12 13 14 15 A. Baseline Schedule l. General a. Prepare a cost-loaded baseline Schedule using approved software and the Critical Path Method (CPM) as required in the City of Fort Worth Schedule Guidance Document. b. Review the draft cost-loaded baseline Schedule with the City to demonstrate understanding of the work to be performed and lrnown issues and constraints related to the schedule. c. Designate an authorized representative (Project Scheduler) responsible for developing and updating the schedule and preparing reports. 16 B. Prob ess Schedule 17 1. Update the progress Schedule monthly as required in the City of Fort Worth 18 Schedule Guidance Document. 19 2. Prepare the Schedule Narrative to accompany the monthly progress Schedule. 20 3. Change Orders 21 a. Incorporate approved change orders, resulting in a change of contract time, in 22 the baseline Schedule in accordance with City of Fort Worth Schedule 23 Guidance Document. 24 C. Responsibility for Schedule Compliance 25 I. Whenever it becomes apparent from the current progress Schedule and CPM Status 26 Report that delays to the critical path have resulted and the Contract completion 27 date will not be met, or when so directed by the City, make some or all of the 28 following actions at no additional cost to the City 29 a. Submit a Recovery Plan to the City for approval revised baseline Schedule 30 outlining: 31 1) A written statement of the steps intended to take to remove or arrest the 32 delay to the critical path in the approved schedule 33 2) Increase construction manpower in such quantities and crafts as will 34 substantially eliminate the backlog of work and return cu.rrent Schedule to 35 meet projected baseline completion dates 36 3) Increase the number of working hours per shift, shifts per day, working 37 days per week, the amount of construction equipment, or any combination 38 of the foregoing, sufficiently to substantially eliminate the backlog af work 39 4) Reschedule activities to achieve maximum practical concurrency of 40 accomplishment of activities, and comply with the revised schedule 41 2. If no written statement of the steps intended to take is submitted when so requested 42 by the City, the City may direct the Contracior to increase the levei of effort in 43 manpower (trades), equipment and work schedule (overtime, weekend and holiday 44 work, etc.) to be employed by the Contractor in order to remove or azrest the delay 45 to the critical path in the approved schedule. 46 a. No additional cost for such work will be considered. C1TY OF FORT WORTH DFW Aiiport Reclaimed Water System F7ushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised July 1, 2011 01 32 l6 - 3 CONSTRUCTION PROGRESS SCHEDUI.E Page 3 of 5 1 D. The Contract completion time will be adjusted only for causes specified in this 2 Contract. 3 a. Requests for an extension �f any Contract completion date must be - 4 supplemented with the following: 5 1) Furnish justification and supporting evidence as the City may deem 6 necessary to determine whether the requested extension of time is entitled 7 under the provisions of this Contract. 8 a) The City will, after receipt of such justification and supporting 9 evidence, make findings of fact and will advise the Contractor, in 10 writing thereof. 11 2) If the City finds that the requested extension of time is entitled, the City's 12 deternunation as to the total number of days allowed for the extensions 13 shall be based upon the approved total baseline schedule and on all data 14 relevant to the extension. 15 a) Such data shall be included in the next updating of the Progress 16 schedule. 17 b) Aetual delays in activities which, aecording to the Baseline schedule, 18 do not affect any Cantract compleTion date shown by the critical path in 19 the network will not be the basis for a change therein. Za 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 2. Submit each request for change in Contract compleiion date to the City within 30 days after the beginning of the delay for which a time extension is requested but before the date of final payment under this Contract. a. No time extension will be granted for requests which are not submitted within the foregoing time limit. b. From time to time, it may be necessary for the Contract schedule or completion time to be adjusted by the City to reflect the effects of job conditions, weather, technical difficulties, strikes, unavoic3able delays on the part of the City or its representatives, and other unforeseeable conditions which may indicate schedule adjustments or completion time extensions. 1) Under such conditions, the City will direct the Contractor to reschedule the work or Contract completion time to reflect the changed conditions and the Contractor shall revise his schedule accordingly. a) No additional compensation will be made to the Contractor for such schedule changes except for unavoidable overall contract time extensions beyond the actual completion of unaffected work, in which case the Contractor shall take all possible action to minimize any time extension and any additional cost to the City. b} Available float time in the Baseline schedule may be used by the City as well as by the Contra.cior. 3. Float or slack time is defined as the amount of time between the earliest start date and the latest start date or between the earliest finish date and the latest fuush date of a chain of activities on the Baseline Schedule. a. Floai or slack time is not for the exclusive use or benefit of either the Contractor ar the City. b. Proceed with work according to early start dates, and the City shall have the right to reserve and apportion float time according to the needs of the project. CI'fY OF FOR'I' WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 DFW Airport Reclaimed Waler System Flushline City Project Ido. 02025 013216-4 CONSTRUCT[ON PROGRESS SCHEDULE Pagc 4 of 5 I 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 1'7 E. Coordinating Schedule with Other Contract Schedules c. Acknowledge and agree that actual delays, affecting paths of activities containing float time, will not have any effect upon contract completion times, providing that the actual delay does not exceed the float time associated with those activities. 1. Where work is to be performed under this Contract concurrently with or contingent upon work performed on the same facilities or area under other contracts, the Baseline 5chedule shall be coordinated with the schedules of the other contracts. a. Obtain the schedules of the other appropriate contracts from the City for the preparation and updating of Baseline schedule and make the required changes in his schedule when indicated by changes in corresponding schedules. 2. In case of interference between the operations of different contractors, the City will determine the work pniority of each contractor and the sequence of work necessary to expedite the completion of the entire Project. a. In such cases, the decision of the City sha11 be accepted as final. b. The temporary delay of any work due to such circumstances shall not be considered as justification for clairns for additional compensation. 18 1.5 SUBMITTALS 19 A. Baseline Schedule za 21 22 23 24 25 1 2. Submit Schedule in native file format and pdf format as required in the City of Fort Worth Schedule Guidance Document. a. Native file format includes: 1) Primavera (P6 or Primavera Contractor) Submit draft baseline Schedule to City prior to the pre-construction meeting and bring in hard copy to the meeting for review and discussion. Zb B. Progress Schedule 27 1. Submit progress Schedule in native file format and pdf format as required in the 28 City of Fort Warth Schedule Guidance Document. 29 2. Submit progress Schedule monthly no later than the last day of the month. 30 31 32 33 34 C. Schedule Narrative 1. Submit the schedule narrative in pdf format as required in the City of Fort Worth Schedule Guidance Document. 2. Submit schedule narrative monthly no later than the last day of the month. D. Submittal Process 35 1. The City administers and manages schedules through Buzzsaw. 36 2. Contractor shall submit documents as required in the City of Fort Warth Schedule 37 Guidance Document. 38 3. Once the project has been completed and Final Acceptance has been issued by the 39 City, no fizrther progress schedules are required. CTI'Y OF FORT WpRTH DFW Airport Reclaimed Water System Flushiine STANDARD CONSTRUCTION SPECIFICATIOiv' DOCUMENTS City Pmject No. 02025 Revised July t, 201 I 41 32 ( 6 - 5 CONSTRUCTION PROGRESS SCHEDULE Page 5 of 5 1 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 2 1.� CLOSEOUT SUBMITTALS [NOT USEDj 3 1.8 MAINTENANCE MATERIAL SUSMITTALS [NOT USED] 4 1.9 QUALITY ASSURANCE 5 A. The person preparing and revising the construction Progress Schedule shall be 6 experienced in the preparation of schedules of similar complexity. 7 B. Schedule and supporting documents addressed in this Specification shall be prepared, 8 updated and revised to accurately reflect the performance of the construction. 9 C. Contractor is responsible for the quality of all submittals in this section meeting the 10 standard of care for the construction industry for similar projects. i l 1.10 DELIVERY, STORAGE, AND AANDLING [NOT USEDJ 12 l.l l FIELD [SITE] CONDTI'IONS [NOT USED] 13 1.12 WARRA.IVTY [NOT USED] 14 PART 2- PRODUCTS [NC?T USED] 15 PART 3- EXECUTION [NOT USEDj 16 17 18 END OF SECTIQN Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH DFW Airport Reclaimed Water System Flushline STANDARI? CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02fl25 ���� Revised Ju1y 1, 201 I 013233-1 PAECONSTRUCTI4N VIDEO Pagc I of 2 1 � 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 SECTION Ol 32 33 PRECONSTRUCTION VIDEO PART1- GENERAL l.l SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specifcation Sections include, but are not necessarily limited. to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary ta the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUII�EMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety perioct. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBIVIITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS (NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND I�ANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NO'I' USED] 1.12 WARRAIVTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CTI'Y OF FORT WORTH DFW Airport RecIaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCLJMENTS City Project No. 02025 Revised July l, 2011 O1 32 33 - Z FRECONSTRUCTION VIDEO Page 2 of 2 ',�', �, �, 1 h, " 1 ! i , �, .�, Revisian Lag DATE ?�1AME SUMMARY OF CHANGE GTTY OF FQI2T V✓QRTH DFW Airport RecZaimed Water Dclivery System Flushline STANDARI} CfJNSTRUCTION SPECIFICATION DOCUMENTS iity Froject No, 02025 Revised 3uly l, 2011 d1330�-1 SUBM [TTALS Page t of & SECTION Ol 33 00 SUBMITTALS 3 PART1- GENERAL 4 5 6 7 8 9 IO 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 1.1 SiTMMARY A. Section Includes: 1. General methods and requirements of submissions applicable to the fallowing Work-related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specifcation Sectians include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements af the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of perfornung the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will noi be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required} b) Coordination with other submittals c) Testing d) Purchasing e} Fabrication f} Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work_ CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS City Project No. 02425 Revised December 20, 2012 01 3300-2 SUSMITTALS Pagc 2 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 25 16 17 18 19 20 B. Submittal Numbering ! 1 11 /: : C. Contractor Certification d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identiiication numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers O 1-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing {i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: I) 03 3Q 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Sectian 3) B is the third submission (second resubmission) of that particular shop drawing 2l 1. Review shop drawings, product data and samples, including those by 22 subcontractors, prior to submission to deternune and verify the following: 23 a. Field measurements 24 b. Field construction criteria 25 c. Catalog numbers and similar data 26 d. Conformance with the Contract Documents 27 2. Provide each shop drawing, sample and product data submitted by the Contractor 28 wiih a Certification Statement affixed including: 29 a. The Contractor's Company name 30 b_ Sib ature of submittal reviewer 31 c. Certification Statement 32 1} `By this submittal, I hereby represent that I have determined and verified 33 field measurements, field construction criteria, materials, dimensions, 34 catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 37 38 39 40 41 42 43 44 D. Submittal Format 1 P� Fold shop drawings larger than 8'/a inches x 11 inches to 8%z inches x 11 inches. Bind shop drawings and praduct data sheets together. 45 46 3. Order a. Cover Sheet 1) DescriptionofPacket 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATIQN DOCLJMENTS City Project No. 02025 Revised December 20, 20I2 013304-3 SUBMITTALS Page 3 o f 8 1 2 3 4 5 6 7 8 9 10 11 I2 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 2. The Project title and number 3. Contractor identification 4. The naines of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materiais 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting af deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limiied to: a. Custom-prepared data such as fabrication and erection/installation {working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable ta the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1} Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. Far submittals of produet data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data} 1) Such as the manufaciurer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of complianees and applicability 4) Roughing-in diagrams and templates 5) Catalog cuts 6) Product photographs CIT'Y OF FORT WORTH DFW Aizport Reclaimed Watcr Delivery System Flushline STANDARD CQNSTRUCTION SPECII�ICAT[ON DOCUMENTS City Pmject No. 02025 Revised December 20, 2012 0133i30-4 SUBM ITTA LS Page 4 of 8 1 2 3 4 5 6 7 8 9 �0 11 12 13 14 15 16 17 7) Standard wiring diagrams 8} Printed perfannance curves and operational-range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare-parts listing and printed praduct warranties 12) As applicable to the Work H. Samples 1. As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1} Sections of manufactured ar fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of VVork to be used by the City for independent inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample ar product data nar any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 24 1. Fabrication performed, materials purchased or on-site construction accomplished 2l which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish confornuty. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop dra.wings, applicable samples, and product data. J. Submittal Drstribution 1 2. Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Bi.uzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to desi�ated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shap Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2} Hard Copies a) 3 copies for ail submittals d. Samples 1) Distributed to the Project Regresentative Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System F7ushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pmjc:ct No. 02025 Revised December 20. 20I2 013300-5 SUBMITTALS Pagc 5 of 8 1 2 3 4 5 6 7 8 9 20 11 12 13 14 15 16 I� 18 i9 20 21 22 23 24 25 26 2'7 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 4fi 47 48 a. Shop Drawings 1) Distributed to the City 2} Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1 E� 3 � E The review of shop drawings, data and samples will be for general confarmance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein The review and approval of shop drawings, samples or produet data by the City does not relieve the Contractor from his/her responsibility with regard to the fulf llment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the eity will have no responsibility therefore. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City iinds to be in the interest of the City and to be so minor as nat to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1} "NO EXCEPTIONS TAKEN" is assigned when there are no notations or cornments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTt�N SPHCIFICATION DOCt3MENTS City Pro}ect No. 02025 Revised December 20, 2012 O13300-6 SUBM[TTALS Page 6 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 ZO 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 4"7 48 49 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporatetl into the final product. c. Cade 3 1} "EXCEPTIONS NOTED/RESUBMIT". This combination of cades is assigned when notations and comments are extensive enougk to require a resubmittal of the package. a} The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non-confornung items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1} "I�TOT APPROVED" is assigned when the submittai does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections ather than requested. by the City 2) Marked with revisian triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no mare than twiee at the City's expense. 1} All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2} Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretian. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or rnark the submittal directing the Contractor to the areas that are incomplete. 8. Lf the Contractor considers any conection indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the City at least 7 Calendar Days prior io release for manufacture. CITY OF FORT WORTH DFW Aicport Reclaimed Water belivery System Flushiine STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised December 20, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 013300-7 SUBM[TTALS Page 7 of 8 9. When the shop drawings have been compteted to the satisfaction of the City, the Contractor may carry aut the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submitial, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standaz-d of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Informatian (RFI) 1. Contractor Request for additional information a. Clarification or intexpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. Vt�hen the Contractoz believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Use the Request for Information (RFI) form provided by the City. 3. Numbering of RFT a. Prefix with "RFI" followed by series number, "-xx�c", beb nning with "Ol" and increasing sequentially with each additional transxnittal. 4. Sufficient information shall be attached to permit a written response without further information. 5. The City will log each request and will review the request. a. If review of the project infarmation request indicates that a change to the Contract Documents is required, the City will issue a Field Order or Change Order, as appropriate. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/IlVFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUEMITTALS [NOT USEDr] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 i.9 QUALI7'Y ASSURANCE [NOT USED] 35 1.10 DELIVERY, STORAGE, ANI3 �ANDLING [NOT ITSED] 36 1.11 FIELD [SIT�] CONDITIONS [NOT USED] 37 1.12 WA�2RANTY [NOT USED] CTTY dF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCI'lON SPECIFICATION DOCUMENTS City Project No. 02025 Reviscd December 20, 2012 t) I 33 (lU - 8 �{J13M17"ir�LS i'a�.0 2� t�f $� 1 PART 2- PRODUCTS [NOT USED] 2 PART 3- EXECUTION [NOT USED] 3 END OF SECTION Revision Lag DATE NAME SUMMARY OF CHANGE 12!'?n/20 i 2 D. Jol�nson 1.4.K.8. Working d}ays modified ta Calendar Days Gl?Y C?� FORT W4KTH STAd+IDARD GQI�fSTRUCTIO� �AEC[FIGtlTION L1QCUiviEI�TS Reviscd Decemb�r 2p, 2Q 12 I3FW Aisgdre Re�;laim�d Wazer Detivery S}�tern FlnsltliTte City Proje�t No. 02025 6135f3-1 SPECIAL P[20JECT PROCEDURES Pagc i of 8 i � 3 PART1- GENERAL 4 1.1 SUMMARY 5 6 7 8 9 10 11 12 13 14 15 16 17 18 I9 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 SECTI�N O1 35 13 SFECIAL PROJECT PROCEDURES A. Section Includes: 1. The procedures for special project circumstances that includes, but is not limited to: a. Coordination with the Texas Department of Transportation b. Work near High Valtage Lines c. Confined Space Entry Program d. Air Pollution Watch Days e� Use of Explosives, Drop Weight, Etc. f. Water Department Notification g. Public Natifzcation Prior to Beginning Construction h. Coordination with United States Army Corps of Engineers i_ Coordination within Railroad permits areas j. Dust Control k. Employee Parking B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirernenis, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 33 12 25 — Connection to Existing Water Mains 1.2 PRICE AND PAYMENT PRt�CEDURES A. Measurement and Payment 1. Coordination within Railroad permit areas a. Measurement 1) Measurement for this Item will be by lump sum. b. Payment 1} The work performed and materials funiished in accordance with this Item will be paid for at the lump sum price bid for Railroad Coordination. c. The price bid shall include: 1) Mobilization 2) Inspection 3) Safety training 4) AdditionalInsurance 5) Insurance Certificates 6) Other requirements associated with general coordination with Railraad, including additional employees required to protect the right-of-way and property of the Railroad from damage arising aut of and/or from the canstruction of the Project. 2. Railroad Flagmen CI'TY OF FORT WORTH DFW Airport Reclaimed Water System Flushline STANDARD CON3TRUCTION SPECIFICATION DOCLJMENT'S City Pro}ect No. 02025 Revised December 20, 2d12 O13513-2 SPECIAL PROJECT PROCEDURES Page 2 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 a. Measurement 1) Measurement for this Item will be per working day. b. Payment 1) The work performed and materials furnished in accordance with this Item will be paid for each working day that Railroad Flagmen are present at the Site. c. The price bid shall include: 1} Coordination for scheduling flagmen 2} Flagmen 3) Other requirements associated with Railroad 3. All other items a. Work associated with these Items is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 14 1.3 REFERENCES 15 16 17 18 19 20 21 22 A. Reference Standards 1. Reference standards cited in this Specification refer to the cunent reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction Specification 23 1.4 ADMINISTRATIVE REQUII�MENTS 24 A. Coordination with the Texas Department of Transportation 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1. When work in the right-of-way which is under the jurisdiction of the Texas Department of Transportation (TxDOT}: a. Notify the Texas Department of Transportation prior to commencing any work therein in accordance with the provisions of ihe pemut b. All wark performed in the TxDOT right-of-way shall be gerformed in compliance with and subject to approval from the Texas Departsnent of Transportation B. Work near High Voltage Lines I . Reb latory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductars or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a_ Provide sign of sufficient size meeting a114SHA requirements. 3. Equipment operating within 10 feet af high voltage lines will require the following safety features a. Insulating cage-type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the awner of the high voltage lines 4. Work within 6 feet of high voltage electric lines CTTY OF FORT WORTH 5TAN1?ARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised December 20, 2412 DFW Airport Reclaimed Water System Flushline City Project No. 02025 013513-3 SPECIAL PROJECT PROCEDURES Page 3 of 8 1 a. Notification shall be given to: 2 1} The power company (example: ONCOR) 3 a) Maintain an accurate log of all such calls to power company and record 4 action taken in each case. 5 b. Coordinatian with pflwer campany 6 1} After notification coordinate with the power company to: 7 a) Erect temporary mechanical barriers, de-energize the lines, or raise or 8 lower the lines 9 c. No personnel may work within 6 feet of a high voltage line before the above 10 requirements have been met. I 1 C. Confined Space Entry Program 12 I. Provide and follow approved Confined Space Entry Program in accordance with 13 OSHA requirements. 14 Z. Confined Spaces include: 15 a. Manholes I6 b. AlI other canfined spaces in accordance with OSHA's Permit Required for 17 Confined Spaces 18 D. Air Pollution Watch Days 19 l. General 20 a. Observe the following guidelines relating to working on City construction sites 21 on days desi�ated as "AIR POLLtJTION WATCH DAYS". 22 b. Typical Ozone Season 23 1} May 1 through October 31. 24 a Critical Emission Time 25 1) 6:00 a.m. to 10:00 a.m. 26 2. Watch Days 27 a. The Texas Commission on Envirorunental Quality (TCEQ), in coordination 28 with the National Weather Service, will issue the Air Pollution Watch by 3:00 29 p.m. on the afternoon prior io ihe WATCH day. 30 b. Requirements 31 1) Begin work after 10:00 a.m. whenever construction phasing requires the 32 use of motozized equipment far periods in excess of 1 hour. 33 2} However, the Contractor may begin work prior to 10:00 a.m. i£ 34 a) Use of motorized equipment is less than 1 hour, or 35 b) If equipment is new and certified by EPA as "Low Emitting", or 36 equipment burns L11tra Low Sulfizr Diesel (tTLSD}, diesel emulsions, or 37 alternative fuels such as CNG. 38 39 40 41 42 43 44 45 E. TCEQ Air Permit 1. Obtain TCEQ Air Pern�it for construction activities per requirements of TCEQ. F. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the praject the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. Z) Minimum 24 hour public notification in accordance with Section 41 31 13 46 G. Water Department Coordination CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised Deeember 20, 2012 DFW Airport Reclaimed Water System Flushline City Project No. 02025 O 1 35 l3 - 4 SPECIAL PROJECT PROCEDURES Page 4 of 8 1 1. During the constructian of this proj ect, it will be necessary to deactivate, for a Z period af time, existing lines. The Contractor sha11 be required ta coordinate with 3 the Water Department to determine the best times for deactivating and activating 4 those lines. 5 2. Coordinate any event that will require connecting to or the operation of an existing 6 City water line systern with the City's representative. 7 a. Coordination shall be in accordance with Section 33 12 25. 8 b. If needed, obtain a hydrant water meter from the Water Department for use 9 during the life of named proj ect. 10 c. In the event that a water valve on an existing live system be turned off and on 11 to accommodate the construction of the project is required, coordinate this 12 activity through the appropriate City representative. 13 1) Do not operate water line valves of existing water system. 14 a) Failure to camply will render the Contractor in violation of Texas Penal 15 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 16 will be prosecuted to the full extent of the law. 17 b) In addition, the Contractor will assume all liabilities and 18 responsibilities as a result of these actions. 19 H. Public Notification Prior ta Beginning Construction 20 1. Prior to beginning construction on any block in the project, on a block by block 21 basis, prepare and deliver a notice or flyer of the pending construction to the front 22 door of each residence or business that will be impacted by construction. The notice 23 shall be prepared as follows: 24 a. Post notice or flyer 7 days prior to beginning any construction activity on each 25 block in the project area. 26 1) Prepare flyer on the Contractor's letterhead and include the following 27 information: 28 a} Name ofProject 29 b) City Project No (CPN) 30 c} Scope of Project (i_e. type of construction activity) 31 d) Actual construction duration within the block 32 e) Name of the contractor's foreman and phone number 33 fl Name of the eity's inspector and phone number 34 g) City's after-hours phone number 35 2) A sample of the `pre-construction notification' flyer is attached as Exhibit 36 I:� 37 3) Submit schedule showing the construction start and iinish time for each 38 block ofthe project to the inspector. 39 4) Deliver flyer to the City Inspector for review prior to distribution. 40 b. No constructian will be allowed to begin on any block until the flyer is 41 delivered to all residents of the block. 42 43 44 45 46 4? 4$ I. Public Notification af Temporary Water Sezvice Interruption during Construciion 1_ In the event it becomes necessary to temporarily shut down water service to residents or businesses during construction, prepare and deliver a notice or flyer of the pending interruption to the front door of each affected resident. 2. Prepared notice as follows: a. The notification or flyer shall be posted 24 hours prior to the temporary intemzption. C1TY OF FORT WORTH DFW Auport Recla.imed Water System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised December 20, 2d12 OI 35 13 - 5 SPECIAL PROJEC'C PROCSDURES Page 5 of 8 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 2'1 28 29 30 31 32 33 34 35 36 37 38 b. Prepare flyer on the contractor's letterhead and include the following information: 1) Name of the project 2) City Project Number 3) Date of the interruption of service 4) Period the intemiption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notiiication to the City inspector for review prior to being distributed. e. No interruptian of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions af the sample flyers can be obtained from the Project Construction Inspector. J. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit_ K. Coordination within Railroad Pernut Areas 1. At lacations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad pernut. This includes, hut is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed io comply with the railroad's requirements. 3. Railroad Flagrnen a. Submit receipts to City for verif cation of working days that raiIroad flagmen were present on Site. 39 L. Dust Control 40 1. Use acceptable measures to control dust at the Site. 41 a. If water is used to control dust, capture and properly dispose of waste water. 42 b. If wet saw cutting is performed, capture and properly dispose of slurry. 43 M. Employee Parking 44 1. Provide parking for employees at locations approved by the City. CTtY OF FORT WORTH DFW Airport Reclaimed Water System Flushline STANDAR.D CONSTRUCTION SPECIFICATION DOCUTvtENTS City Project No. 02025 Revised Dccember 20, 2U12 013513-6 SPEC[AL PROJECT PROCEDURES Page 6 oF 8 1 1.5 SUBMITTALS [NOT USED� 2 I.b ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS (NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NQT USED] 8 1.12 WARRANTY jNOT USED] 9 PART 2- PRODUCTS [NOT USED] la PART 3- EXECUTION [NOT USEDj 11 12 ��1►�1Zl7a�.�xill�[�l�l Revision Log DATE NAME SUMMARY OF CHANGE l.4.B — Added requirement of compliance with Health and 5afety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. I.4.E — Added Contractor responsibility for obtaining a TCEQ Air Permit 13 CITY OF FORT WORTH DFW Airport Reclaimed Water System Flushline STANDARD CONSTRUCTION SPECIFICAT[ON DOCUMENTS City Project No. 02025 Revised Dec;ember 26, 2012 0135t3-7 SPECfAL PROIEC7 PROCEDURES Page 7 of 8 1 2 3 4 5 6 Date: 7 8 CPN No.: 9 Project Narne: 10 Mapsco Location: 11 Limits of Construction: 12 13 EXHIBIT A (To be printed on Contractor's Letterhead} 14 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WfLL WORK ON UTILITY �INES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WtLL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 iF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR°S SUPERINTENDENT> AT <TELEPHONE NO.> 29 3o OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 3� PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL 37 CI'I'Y OF FORT WORTH DFW Airport Reclaimai Water System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pmject No. U2025 Revised December 20, 2012 d13513-8 SPECtAL PROJECT PROCEDURES Page 8 oi8 1 2 I D►:�: �:3fi : FORT �YORTH, � �: � no_ � r�.,o,� n.�.: 1�0?ICE OF TEMPORARY WATER SERVICE IHTERRLiP'tION DUE TO UTILTTY IMPROVEMENTS iN YOUR NEIGFIBORAOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT-OUT, PLEASE CALL: MR AT (CONTRACTORS SUPERINTENDEN7� (TELEPHONE NUMBER) OR MR. AT (CTI'Y INSPECTOR) (TELEPHONE NUMBER) THIS IIVCONVENIENCE WILL BE AS SHORT AS POSSIBLE. T$ANK YOU, CONT'RACTOR 3 4 CI'TY OF FORT WORTH STANDARD C�NSTRUCTION SPECIFICATION DOCUMENTS Revised December20, 20L DFW Airpoat Rec;laimed Water System Flushline City Project No. 02025 014523-t TESTING AND INSPECT(ON SERVICES Page I of 2 i ? 3 PART1- GENERAL 4 1.1 Sti�MMARY SECTION 41 45 23 TESTING AND INSPECTION SERVICES 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associateti with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 1� Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in fu11. 25 1.3 REFERENCES jNOT USED] 26 1.4 ADMINISTRATIVE REQUIR.EMENTS 27 28 29 30 31 32 33 34 35 36 37 38 A. Testing l. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, snfficiently in advance, that testing will be perfarmed. 3. Distribution af Testing Reports a. Electronic Distribution 1) Confirm development of Project directory far electronic submittals to be uploaded to City's Buzzsaw site, or another extemal FTP site approved by the City. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised July 1, 2011 01 45 23 - 2 TESTING AND INSPECTION SERVICES Paae 2 of 2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 2) Uplaad test reparts to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute I hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Narne of pit b. Date of delivery c. Material delivered 15 B. Inspection 16 l. Inspection or lack of inspection does not relieve the Contractor from obligation ta 17 perform work in accordanee with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/LNFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT US�D] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STOR.AGE, AND FIANDLING [NOT USED] 24 25 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 26 PART 2- PRODUCTS [NOT USED] 27 PART 3- EXECUTION [NOT USFD] 28 29 c 1 • ��31:I1C�� Revision Log DATE NAME SUMMARY OF CHANGE 30 CITY OF FORT WORTH DFW Airport Rec3aimed Water Delivery System Flushline STAIv'DARD CONSTRUCTION SPECIFICATION DOCL`MENTS Ciiy Project No. U2025 Revisett Ju1y 1, 2011 0 I 50 00 - ( TEMPORARY FACILITIES AND CONTROLS Pagc ( of 4 sEc�zarr ol so oa TEMPORARY FACILITIES AND CONTROLS 3 FARTl- GENERAL 4 1.1 SIJMMARY 5 6 7 8 9 10 11 12 13 14 15 16 17 18 A. Section Includes: 1. Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification I. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES 19 20 21 22 1.3 23 1.4 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. REFERENCES [NOT USED] ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service campanies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Wark is approved for Final Acceptance. 1) Included are fiiel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide waier required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for doinestic consumption by Contractor personnel and City's Proj ect Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH DFW Airpnrt Aeclaimed Water Delivery System Flushiine STANDARD CONSTRUCTION SPECIFICATION DOCLJMENTS City Project No. 02025 Revised July 1, 2011 O1 5000-2 TEMPORARY FAC[LITIES AND CONTROLS Pagc 2 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 ?7 28 29 30 31 32 33 34 35 36 37 38 39 40 41 4 5. d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and athers performing work or furnishing services at Site. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem_ d. HauI sewage and waste off-site at no less than weekly intervals and properly dispose in accordance with applicahle regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventary. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating ar ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or canstruction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STAh�DARD CONSTRUCTION SPECIFiCATION DOCUMENTS City Pmject No. 02025 Revised Ju1y I , 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 o� saoo-s TEMPORARY FAC[LITIES AND CONTRO[S Page3 of4 1. Contractor is responsible for maintaining dust control throug� the duration of the project. a. Contractor remains on-call at all times h. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] 16 PART 2- PRODUCTS [NOT USED] 17 PART 3- EXECUTION [NOT USED] ls 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIIt] ! [RESTORATION] 25 3.6 RE-iNSTALLATION 26 3.7 FIELD [oxJ SITE QUALITY CQNTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USEDJ 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CPTY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECTFICATION DOCLJMENTS City Project No. 02025 Revised July 1, 2011 o a so 00 - a TEIvIPORARY FACILITIES AND CONTROLS Page 4 of 4 i 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. ��� � • f C�c�K�u : 1► �l►/1► � t � . ;1 � 1 6 , 1 � • Revision Log DATE NAME SUMMARY OF CHANGE Clil' OF FURT WORTH I3I-`W Airport ReclaSmed W�ter Deliv�ry System Flushline &7'ANQARD CONSTRUGTiON SPECTFIC.4i1dN DO�UME?JTS Gity Proj�ct \o. 02{i25 Revised Juty i, 24U 01 55 26 - 1 STREET USE PERMIT AND MOD1F[CATIONS TO TRAFFIC CONTROL Page I of3 i 2 SECTION O1 55 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIG CONTROL 3 PART1- GENERAL C���.Y�u iu' I:�:�'1 5 6 7 8 9 10 11 12 13 14 15 16 A. Section Includes: l. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Remaval of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirernents 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payrnent will be allowed for ttiis Item. 20 1.3 REFERENCES 21 22 23 24 25 26 ?� 28 29 30 31 32 33 34 35 36 37 38 A. Reference Standards 1. Reference standards cited in this specification refer to ihe cunent reference standard published at the time of the latest revision date Iogged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD}. 1.4 ADMINISTRATIt�E REQUIREl��IENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 I3. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Sireet Use Permit 1. Pz-ior to installatian of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Pernut, submit Traffic Control Plans to City Transportation and Public Works Department. CTTY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flusliline STANDARD CONSTRUCTION SPECIFICATIOtV DOCUMENTS City Pmject No. 02025 Revised July ] , ZOI 1 01 55 26 - 2 STREET USE PERMIT AND MODIFICATIONS 7�0 TRAFFIC CONTROL Pagc 2 of 3 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 1) Allow a minimum of 5 working days for permit review. 2} Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that constructian is not delayed. C. Modification to Approved Traffic Control 1. Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for constructian, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1, In the case of regulatory signs, replace permanent sign with temporary sib meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD}. 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 sUBMITTALs jNOT usED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUSMIT'�"AI,S [N(?T USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT LJSED] 30 1.9 QUALITY ASSURANCE [NOT USE�] 31 1.10 DELIVERY, STORAGE, A..ND FIANI3I.ING [NOT USED1 32 33 ilfi� �11 � A7��(K��►i7f1 Il C�l►(c7i►Ci711li1.'��l 7] 1.22 W TY [NQT USED] c� '• • ''�1 � 1 35 PART 3- EXECUTION [N4T USED] 36 1 • ', ! CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SFECIFICATION DOCUMENTS City Project No. 02025 Revised July 1, 2d11 1 7 41 SS26-3 S1"REET USE PERMIT AN13 Fvifl�'JIFICATiONS TQ TR�%FFiC CON'TROL Page 3 of 3 Rf%Yi51421 I.,CJg �1�T� �.�.�� ����Y Q� �H�i�'TE CITY pI' FORT W OR7'H DFW fti.-port Reclaimed Water I3eliv�ry System ITushiine ST,4NpARD CC1ivSTRUCl"IOI�t SPECIF1CrlT101v DOCi3i�tEIvTS Csty Frajeat Na. 42{�2S Rcvised Jnly t, 2QI l 01 57 13 - i STORM WATER POLLUTION PREVENTION Pagc I of4 i � S�CTION O1 57 13 STORM WATER POLLUTION PREVENTION c ' : : e� �►`i �17�i1 4 5 6 7 8 9 10 11 12 13 14 15 15 17 18 19 20 21 22 23 24 25 2b 27 28 29 30 31 32 33 34 35 3 E� 37 1.1 SUMIViAR1' A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviatians from this City of Fort Worth Standard Specification 1. 1.3.A.6, 1.3.B.3, 1.4.A2, 1.S.A.l.a, 1.S.B2 and 1.7 C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Farms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 31 25 Od — Erasion and Sediment ControI 1.2 P�CE ANI� PAYMENT PROCE�IJRES A. Measurement and Payment 1. Construction Aetivities resulting in Iess than 1 acre of disturbailce a. Work assoeiated with this Item is eonsidered subsidiary ta the various Iteuzs bid. No separate payment will be allowed far this Item. 2. Gonstruction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordaiice with Section 31 25 00. 1.3 REFER�NCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: N�T 3. Stonn Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Qualzty: TCEQ 5. Notice of �hange: NOC 6. Construction Site Notice: CSN B. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of tlie latest revision date logged at the end of tlus Specification, unless a date is specifically cited. 2. Iutegrated Storm Management (iSWM} Technical Manual for Construction Contrals 3. DFW Airport Lnviranmental Affairs SWPPP requirements 3.4 ADh�INISTRA I'IVE 1`; QU ,MEI'�TS A. General CITY OF FORT WORTH DF�u Aitport Reclaimed Water Delivzry System Flusl�line STA%IDARD CONSTRUCTION SPECIFICA"f10N DOCUMENTS City Project No. 02025 Revised Jaly 22, 20I3 01 57 I3 -2 STORh4 VdATER POLLUTION PREVENTION Page 2 oC4 1 2 3 4 5 6 7 & 9 10 11 12 13 14 IS 16 17 18 P9 20 21 22 23 24 25 26 27 ?g 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 I. Contractor is responsible far resolution and payment of ai3y fines issued associated wit11 compliance to Stonnwater Poliution Prevention Plan. 2. Coi�tractor shall contact DFW Enviranmental Affairs staff, Deena Henry 972-973- �569 or Patricia Luse 972-973-5574, priar to starting tI�e writing of any SWPPP to get current DFW Airport requirements to include in the SWPPP B. Construction Activiries resulting iii: 1. Less than 1 acre of disturbance a. Provide erosian and sediment control in accordance witl� Section 31 25 00 and Drawings. 2. 1 to less tl�an 5 acres of disturbance a. Texas Poilutant Discllarge Elig�iination Systein (TPDES) General Canstruction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Natice Required under general permit T�iRI5QQ00 a} Sign and post at job site b) Priar to Preconstruction ivleeting, send 1 copy to City Department of Traz�sportation and Public Works, Environmental Division, (817} 342- 6U88. 2) Provide erosion and sediment cozitral in accordance with: a} Section 31 25 00 b) The Drawings c) TXR150000 General Pernlit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elinunation System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirenients 1) Prepare a TCEQ NOI form and submit to TCEQ along ��ith required fee a) Sib and past at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2} TCEQ Notice of Cllange required if makfng changes or updates to NOI. 3) Provide erosion and sediment control in accordance with: a) Section 31 25 00 b) The Drawings c) TXR150d40 General Permit d) SWPPP e) TCEQ requirements 4} Once the proj ect has been completed and all the closeout requirements of TCEQ have been inet a TCEQ Notice af Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, {817} 392-6088. 45 �.5 S lYII'TT'AI.,S •. : y�.+.., 47 l. Subnlit in accordance with Section �I 33 d0, except as stated lierein. C1TY OF FORT WORTH DFW Aiipori Reclaimed Water Delivery System Flushtine STANDARD CONSTRUCTION SPECIFICATION DC}CUMENTS City Project No. 02425 Revised ]uiy 22, 2b 13 1 2 3 4 5 6 7 8 9 10 ri 12 13 14 15 16 17 rs 19 20 2l 22 23 24 25 26 27 28 29 30 31 32 33 34 O1 57 t3 -3 STORM WATEft POLLUTION PREVENTIdN Pagc 3 of�4 a. Prior to the Preconstruction Meeting, subinit a draft copy of SWPPY to the City and DFW Airpart Environmeiitat Affairs as follows: I) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department af Transportation and Public Works, Environmental Division for review 2) DFW Environmental Affairs Contact a) One copy of the SWPPP b) 4ne copy of t17e NOI. c) One copy of the CSN. B. Modified SWPPP L If the SWPPP is revised during constl�uction, resubmit modified SWPPP to the City in aecordauce with Sectian O1 33 00. 2. DFW reserves the right to require changes to tlie SWPPP during a review and approval proeess and will be considered an operator on the SWPPP. 1.6 ACTION SiJS1VII'�'TALS/INFORIVIATIONAL SLJ�MITTALS [NOi' USED] 1.7 CLOSEOUT SUBMITTALS A. The cantractor is required to request and pass a fiiial inspection of the site by Environmenial Affairs staff prior to considerin� the SWPPP elosed ar filing the NOT. Final inspection shall verify that the site meets final stabilization, all temporary BMPs installed have been removed and the site is clear of all supplies ar wastes, etc. B. Upon approval of the �nal inspection submit the following shall be submitted to DFV>> Environmental Affairs for project closeout. 1. Final copy of the SWPPP which includes all pages, fornls, tables, charts, where changes were made or hand notations filled in. 2. Copies of the SWPPP inspeciians perfonned. 3. Copy af the NOT. 1.8 MAINTENANCE MATERIAL StiB1VIITTAI,S jNOT USED] 1.9 QUALITY ASSUIZANCE [NOT USED] 1.10 �}ELIVERY, STOIZAGE, A1�TD ITAIVDLING [NOT USED] 1.11 FIELD [SITE] CQNDITIONS [N�T USED] 1.12 �i' TY [NOT USED] �,. ..�� � � 3s PART 3- EXECUTIQN [NOT usED] 3b 1 f ' i CTTY OF FORT t��dRTf-I DFW Aiiport Reclaiined Watez• llelivery System Flusialine STANDARB CONSTRUCTION SPECIFICATION DOCUT�dEN i S City Project No. 02U25 Revised Jc:1y 22, 2�13 Q15713-4 STQR?�i V�faTCR Pf}LLUi"I�TV FREV�t�TIC7?V Fage 4 of 4 [Ze�.�isian I_o�* Dr1Ti: 1'�,�1h�E S�MARS' C3� C�i�GE CfTY OT Ft7RT l�+pR'171 DFVt'� Ait}�r� Redaimeti t:'atef• D�li�°�a•}^ S}stcro Fl���l�lin+: S7":�ND.'�RD CC7PiSTAUCTICi�I SPECIFICAI�IQT�; DQCt':v1LN'tS City Prnject Vn. 02(1�5 Rc� i�ei6 h�l,- 2"� 2i11 : Q158l3-i TEMPORARY PROJECT SIGNAGE Page I of3 � 3 4 5 b 7 8 9 10 il 12 13 14 15 I6 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 SECTION O1 58 13 TEMPORARY PROJECT SIGNAGE PART1- GENERAL 1.1 SUMIVIARY A. Section Includes: 1. Temporary Project Signage Requirements B. Deviations from this City of Fort Worth Standard Specificatian 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATI�E REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUSMITTALS [NOT USED) 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] l.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WA�RRANTY [NOT USED] PART 2 - PRODUCTS 2.1 OWNER-FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 EQUIPMENT, PRODIJCT TI'PES, AND MATERIALS A. Design Criteria l. Provide free standing Project Designation Sign in accordance with City's Standard Details for project signs. CITY OF FORT WORTH DFW Airport Reclaimed Water System Flushline 3TANDARD CONSTRUCTION SPECIFiCATION DOCLIMENTS Ciry Project No. 02025 Revised July 1, 201 ] 015813-2 TEMPORARY PROJECT SIGNAGE Page 2 of 3 1 B. Materials 2 1. Sign 3 a. Constructed of 3/-inch fir plywood, grade A-C (exterior) or better 4 2.3 ACCESSORIES [NOT USED] 5 2.4 SOURCE QUALITY CONTR4L [NOT USED] 6 PART 3 - EXECUTION 7 3.1 INSTALLERS (NOT USED] 8 3.2 EI�;AM[INATION [NOT USED] 9 3.3 PREPARATION [NOT USED] 10 3.4 INSTALLATION 11 A. General 12 1. Provide vertical installation at extents of project. 13 2. Relocate sign as needed, upon request of the City. 14 B. Mountang options 15 a. Skids 16 b. Posts 17 c. Sarricade 18 3.5 REPAIR / RESTORATION [NOT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.7 FIELD [ox] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP jNOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING [NOT USED] 24 3.11 CLOSEOUT ACTIVITIES [NOT USED] 25 3.12 PROTECTION [NOT USED] 26 3.13 MA.INTENANCE 27 A. General 28 1. Maintenance will include painiing and repairs as needed or directed by the City. 29 3.14 ATTACFIMENTS [N4T USED] 30 31 1 �' t' CITY OF FORT WORTH DFW Airport Reclaimc;d Water System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCIIMENTS City Project No. 02025 Revised July I, 2011 Oi5&13-3 TEMFORAItY PROJBCT SIGNAGE Page 3 of 3 1 Reviszon Log DATE NAME SUMMARY C)F CFiANGB Z CITY OF F�RT WORTI-i STAhiI}ARB Cf3NSTRUCI'ION fiPECIFIGA'FTQN I}�CUMENTS Revised 3uty 1, 2411 DFW Airport R�laimes3 Water System F2ushline C.`ity Projecf Na. 02425 oti 6oao- � PRODUCT REQUIf2EMENTS Pagc 1 of 2 1 2 3 PARTI- GENERAL 4 5 6 7 8 9 10 1l 12 13 14 15 16 17 18 19 aa 2I 22 23 24 25 26 27 28 29 3a 31 32 33 34 SECTION O1 60 00 PRODUCT REQUIREMENTS 1.1 SiJMMARY A. Section Ixzcludes: 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. A list of City approved products for use is located on Buzzsaw as follows: 1. Resources\02 - Construction Documents\Standard Products List B. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the Ciry. C. Any specific product requirements in the eontract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. D. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but nat limited to, that manufacturer's standard product. E. See Section O 1 33 00 for submittal requiremenis of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [N4T USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH DFW Airport Reclaimed Water System Flushline STANDARD CONSTRUCTIOi�! SPECiFICATION DOCUMENTS City Project No. 02025 Revised December 20, 2012 Ol60OQ-2 PRODUCT REQUIREMENTS Page 2 of 2 1 1 ' •''. /;' 1 1, � 1; 1 1 � ,1 ! � 1 3 1.12 WA�RRANTY [NOT USED] 4 PART 2- PRODUCTS [NOT USED] .,. � �;, � ,� ;. �' �' � . 7 Re�risian Log DATE NAME SLTMMARY OF CHANGE t�/12�12 D. Jahnson Modified Location of City's Standard Product List S GTI`Y 01= r�RT ��lORTH DFVb' Airpart Rcclaimcd Water System Ilu_+l�iinc STA�IDARD CC��ISTRUCTION SPEC1FIf'ATIOtV DQGUP+riENfS City Arojr+:t N�. U2025 Revised Decem6cr2G, 2012 0166U0-I PRODUCT STORAGE AND HANDLING REQUIREMENTS Pagc 1 of 4 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 ?� 28 29 30 31 32 33 SECTION O1 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PARTI- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for deiivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary ta the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USEDj 1.4 ADMINISTRA.TIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSIiNFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLt�SEOUT SUB1ViITTALS [NUT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] �.s QuaLiTY Assuu�NeE INOT usEv� 1.10 DELIVERIT AND HAlVDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate persannel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH DF W Airport Rec:laimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02U25 Revised Juty 1, 2011 01 660d-2 PRODUCT STORAGE AND HAR'dLfNG REQUIREMENTS Page 2 of 4 1 4_ Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 l. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 11 12 13 14 IS 15 17 18 19 ?p 21 ?2 23 24 25 25 27 28 29 30 31 32 33 34 35 36 37 38 C. Storage Requiremenis l. Store materials in accordance with manufacturer's recommendations anci requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place ioose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility serviee company installations in vicinity of Work_ 3 � 5 : 9. 10 Keep materials and equipment neatly and compactly stared in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. Provide off-site storage and protection when on-site storage is not adequate. a. Provide addresses of and access to off-site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written pernussion of owner or other person in possession or control of premises. Store in manufacturers' unopened containers. Neatly, safely and compactly stack materials delivered and stared along line of Work io avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant_ Keep public and private driveways and street crossings open. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,OOQ linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH DF W Airport Rectaimed Water Dclivery System Flushline STANDARD CONSTRUCTION SPECIFICATIQN DC}CL?MENTS City Proiect No. 02025 Revised July 1, 2011 Q16b00-3 PRODUCT STORAGE AND HANDLING REQUfREMENTS Page 3 0£4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART Z- PRODUCTS [NOT USED] 4 PART 3 - EXECUTIUN 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 ERECTION [NOT USED] 9 3.5 REPAIl2 / RESTORATION [NOT USED] 10 3.6 RE-INSTALLATION [NOT USED] i 1 3.7 FIELD [oR] SITE QUALITY CONTROL 12 A. Tests and Inspections 13 1. Inspect all products or equipment delivered to the site prior to unloading. 14 B. Non-Conforming Work 15 l. Reject aIl products or equipment that are damaged, used or in any other way 16 unsatisfactory for use on the project. 17 3.8 SYSTEM STARTUP [NOT USEDJ 18 3.9 ADNSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 2d 3.11 CLOSEOUT ACTIVITIES jNOT USED] 21 3.12 PROTECTION 22 A. Protect all products or equipment in accordance with manufacturer`s written directions. 23 B. Store products or equipment in location to avoid physical damage to items while in 24 storage. 25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by 26 the manufacturer. 27 3.13 MAINTENANCE �NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION 30 CITY OF FORT WORTH DF W Airport 4teclaimed Water Belivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOC(IMENTS Ciry Project No. 02025 Revised July l, 2011 4S 6600-4 PRQI3UCT ST03ZACaE ANI3 HANI?i,ING R�QUIItEPvf �NTS Page 4 of 4 R�visitrn I�ag DATE NAME SLJN�AR� C}F ��€ANt�E CITY OF FORT WORTH DF W Aitpon Reclaimed VJater Delivcn• System Flushline S?AI�IDARII CONSTRIJCTiON SPECIFiCATId11i DOCUIviEI�TS City Project k�o. 02025 Reviseei JuiY l. 201 1 ai �aoo- � MOBILlZAT10N AND REMOBtLIZATiON Page [ of 4 � ? 3 PART1- GENERAL sEc�TON al �o 00 MOBILIZATION AND REMOBILIZATION 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 IS 16 17 rs 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 1 2 3 Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishnient of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from I location to another locatian on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. Remobilization a. Rernabilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disasseinbly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a} Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one Iocation to another on the Site in the normal progress of perfarming the Work. b) Stand-by or idle time c) Lost profits Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CTI'Y OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline S'£ANDARD CONSTRUCTION SPECIFICATION DOCLT�ENTS City Project No. 02025 Revised December 20, 2012 01 7000-2 MOBILIZAT[ON AND REMOBIUZAT[ON Page 2 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation af Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b} Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall cansist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b} Site Clean-up for each issued Work Order c) Removal af all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract_ 4. Emergency Mobilizations and Deznobilization for Miscellaneaus Proj ects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification l. None. 21 C. Related Specificatian Sections include, but are not necessarily limited to: 22 1. Division 0— Bidding Requirements, Contract Fo�ns and Conditions of the Contract 23 2. Division 1— General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measu.remeni and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials fun�shed in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 34 35 36 37 38 39 40 41 42 43 44 45 46 2. Remobilization for suspension of Work as specifically required in the Contract Documenis a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1} The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section I.l.A.2.a.1) 2) Remobilization as described in Section 1.1.A2.a.2) d. No payments will be made for standby, id�e tirne, or lost profits associated this Item. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECiFICATIQN DOCUMENTS City Project No. 02025 Revised December 20, 2012 O( 70U0-3 MOBfL(ZATION AND REMOB1LiZATION Page 3 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 2l 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 3. Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Gontract Claim in accordance with Article 10 of Section 00 72 00_ 2) No payments will be cnade for standby, idle time, or lost profits associated with this Item. 4. Mobi]izations and Demobilizations for Miscellaneous Projects a. Measurement 1} Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accardance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mabilization and shall not be paid for separately. c. The price shall indude: 1) Mobilization as described in Section 1.1.A3.a.l) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Dernobilization required by the Contract Doctunents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" wiil be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1} Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.1.A3.a.2) d. No payments will be made for standby, idle time, or lost pro.fits associated this Itern. 1.3 REFERENCES [NOT USED] 1.4 ADMINIST'RATiVE REQiJIREMENTS [NOT USED] 1.5 SUBMITTALS [N(?T USED] 1.6 INFORMATI�NAL SUBMITTALS (NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MAT�RIAL SUBMITTALS [NQT USED] i.� QuAi.,rTy assuR.ANCE [NOT usEDl I.1Q DEI,IVERY, S�'(3RAGE, AND LING [NOT USED] CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCLTMENTS City Project No. 02025 Revised December 2d, 2012 01 70 40 - 4 MOB1LfZP.TION AND REMOBII,IZATION Page 4 of 4 1 l.11 FIELD [SITE] CONLlITIONS [NOT USED] 2 1.1Z WARRANTY [NOT U3ED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3- EXECUTION [NOT USED] �� � � Revision Log DATL NAME SUMMARY OF CHANGE 9 CtfY OF !-ORT 1�"ORTEI DFW Airpon fieciaimed Wate.K Deiivery System Flusltline STANDARD CONSTRUCTIOI�fi SPECII�ICATION DOG1TMFh°TS Git}� Prcjjcct �lo_ 02025 Revisc�cl Dey;emher 2Q. ?012 017123-I CONSTRUCTION STAK[NG AND SURVEY Page I of 4 SECTION Ql 71 23 CONSTRUCTION STAKING AND SURVEY 3 PARTl- GENERAL 4 5 6 7 8 9 10 11 12 13 I4 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 1.1 SLJMMARY A. Section Includes: 1. Requirements for construction staking and construction survey B. Deviations from this City of Fort Worth Standard Specification 1 _ None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division Q— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Paymeni 1. Construction Staking a. Measurement 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work perfozmed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Construction Survey a. Measurement I) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2.3 REFERENCES [NOT USED] 1.4 ADMIlVISTRATIVE REQUII2EMENTS [NOT USEDJ 1.5 SiTSMITTALS A. Submittals, if required, shall be in accordance with Section Ol 33 00. B. All submittals shall be approved by the City prior to delivery_ 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS A. Certificates 1. Provide certificate certifying that elevations and locations of improvements are in conformance or non-conformance with requirements of the Contract Documents. a. Certificate must be sealed by a registered professional land surveyor in the State of Texas. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System F'lushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised December 20, 2012 017t23-2 CONST€tUCTION STAKItVG AND SURVEY Page 2 of 4 B. Field Quality Control Submittals 2 l. Documentation verifying accuracy of field engineering work. 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Construction Staking 7 1. Construction staking will be performed by the City. 8 9 10 ii 12 13 14 15 16 1� 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 3& 39 4Q 41 42 43 44 45 2. Coordination a. Contact City's Project Representative at least 2 weeks in advance for scheduling of Construction Staking. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes furnished by City. b. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed or disturbed, by Contractor's neglect, such that the contracted Work cannot take place, then the Contractor will be required to pay the City for new staking with a 25 percent markup. The cost for staking will be deducted from the payment due to the Contractor for the Project. B. Construction Survey 1. Construction Survey will be performed by the City. 2. Coordination a. Contractor to verify that contro2 data established in the design survey remains intact. b. Coordinate with the City prior to field investigation to deternune which horizantal and vertical control data will be required for construction survey. c. It is the Contractor's responsibility to coordinate Construction 5urvey such that construction activities are not delayed or negatively impacted. d. Notify City if any control daxa needs to be restored or replaced due to damage caused during construction operations. 1) City shall perForm replacements andtor restoratians. 3. General a. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work as it progresses for Project Records. b. The Contractor will need to ensure coordination is maintained with the City to perform construction survey to obtain construction features, including but not limited to the following: 1) All Utility Lines a) Rim and flowline elevations and coordinates for each manhole or junction structure 2) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Every 2501inear feet CITY OF FORT WORTH DFW Airporl Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised December 20, 2012 al�iz3-3 CONSTRUCTION STAKING AND SURVEY Page 3 of 4 1 2 3 4 5 b 7 8 9 10 Il 12 13 14 15 16 1? 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 c. � (2) Horizontal and vertical points of inflection, curvature, etc. (All Fittings) {3) eathodic protection test stations (4) Sampling stations (5} Meter boxes/vaults (All sizes) (6) Fire lines (7) Fire hydrants {8) Gate valves (9) Plugs, stubouts, dead-end lines (1Q) Air Release valves {Manhole rim and vent pipe) (11) Blow off valves (Manhole rim and valve lid} (12) Pressure plane valves (13) Cleaning wyes (14) Casing pipe (each end) b) Storm Sewer (1) Top of pipe elevations and coordinates at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. c) Sanitary Sewer (1) Top of pipe elevations and coordinates for sanitary sewer lines at the following Iocations: (a) Every 2501inear feet (b) Horizontal and vertical points of inilection, curvature, etc. (c) Cleanouts Construction survey will be performed in order to maintain complete and accurate logs of control and survey work associated with meeting or exceeding the line and grade required by these Specifications. The Contractor will need to ensure coordination is maintained with the City to perform construction survey and to verify control data, including but not limited to the following: 1) Established benchmarks and control points provided for the Contractor's use are accurate 2) Benchmarks were used to furnish and maintain all reference lines and grades for tunneling 3) Lines and grades were used to establish the location of the pipe 4) Submit to the City copies of field notes used to establish all lines and grades and allow the City to check guidance system setup prior to be� nning each tunneling drive. 5) Provide access for the City to verify ihe guidance system and the line and grade of the carrier pipe on a daily basis. 6} The Contractor remains fully responsible for the accuracy of the work and the correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to City. 9) If the installation does not meet the specified tolerances, immediaieiy notify the City and correct the installation in accardance with the Contract Documents. 49 1.10 DELIVERY, ST(?RAGE, AND HANDLING [NOT USEI}] CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STAt�1DARD CONSTRUCTION SPECIFICATIOI�T DOCIIMENTS City Pmject No. 02025 Revised December 2Q 2012 01 71 23 - 4 CONSTRUCT[ON STAKING AND SURVEY Page 4 of 4 1 1.11 FIELI3 [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION � � 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USEDJ 3.4 APPLICATION 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [ox] SITE QUALTTY CONTROL A. It is the Cantractor's responsibility to maintain alI stakes and control data placed by the City in accordance with this Specification. B. Do not change or relocate stakes or control data without approval from the City. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.22 PROTECTION [NOT USED] 3.13 NFAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 8/31l2012 D.Johnson 24 CTI'Y OP FORT WORTH DFW Airport Reciaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Cify Project No. 02025 Revised December20, 2d12 1 � 3 4 5 6 � 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 Q 1 74 23 - I CLEANIt�tG Pagc i of4 SECTION Ol 74 23 CLEANING PART1- GENERAL 1.1 SUMMARY A. Section Includes: l. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 3. Section 32 92 13 — Hydro-Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item_ 1.3 REFERENCES [NOT USED] 1.4 ADMINTSTRATIVE REQUII2EMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contarninants disturbed by cleaning process will nat fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATTQNAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUSMITTALS [NOT USED►] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flustiline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised July 1, 2011 01 74 23 - 2 CLEANING Page 2 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARI2ANTY [NOT USED] 3 PART Z - PRODUCTS 4 2.1 OWNER-FLTRNISHED [oR] OWNER-SUPPLIEDPRODUCTS (NOT USED] 5 2.2 MATERIALS 6 7 8 9 10 11 12 A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] ifc�' •1'�ITc�=�`i�iliJl����l 14 3.1 INSTALLERS [NOT USED] 15 3.2 E�;ANYINATION [NOT IISED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION [NOT USED] 18 3.5 REPAIR / RESTORATION [NQT USED] 19 3.6 RE-INSTALLATION [NOT USED] 20 3.'7 FIELD [ox] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 24 25 26 27 28 29 3a 31 32 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in siorm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved soiid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an altemate manner approved by City and regulatory agencies. CITY OF FORT WORTH DFW Airport RecIaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPEC[FICATION DOCUMENTS CiTy Project No. 02025 Revised July 1, Zal l 017423-3 CLEANING Page 3 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. &. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do no� burn on-site. B. Intertnediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container{s}: a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haui from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as-needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Interior Final Cleaning l. Remove grease, mastic, adhesives, dust, dirt, stains, fingerprints, lahels and other foreign materials from sight-exposed surfaces. 2. Wipe all Iighting fixture reflectors, lenses, lamps and trims clean. 3. Vt�ash and shine glazing and mirrors. 4. Polish glossy surfaces to a clear shine. 5. Ventilating systems a. Clean permanent filters and replace disposable filters if units were operated during construction. b. Clean ducts, blowers and coils if units were operated without filters during construction. 6. Replace all burned out lamps. 7. Broom clean process area floors. 8. Mop office and control room floars. 35 D. Exterior (Site or Right of Way} Final Cleaning 36 l. Remove trash and debris containers from site. 37 a. Re-seed areas disturbed by location of trash and debris containers in accordance 38 with Section 32 92 13. 39 Z. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object 40 that may hinder or disnzpt the flow of traffic along the roadway. 41 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, 42 junction boxes and inlets. CTI'Y OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Projeci No. 02Q25 Revised Iuly I , 2011 1 2 3 4 5 6 7 � 9 O1 74 Z3 - 4 CLEANING Page 4 of 4 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS (NOT USEDj END OF SECTION Revision Lag DATE NAME SUMMARY OF CHANGE 10 CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushiine STANDARD CONSTRUCTION SPECIFICATIOIV DOCUMENTS City Pmject No. Q2025 Revised July 1, 20I 1 Ot 77 i4-1 CLOSEOUT REQUIREMENT3 Page t of 3 1 � SECTION O1 77 19 CLOSEOUT REQUIREMENTS 3 PARTl- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: b 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the variaus Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] I7 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Boncis and Affida.vits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CTTY OF FORT WORTH DFW Aicport Reclalmed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMF,NTS City Project No. 02025 Revised July 1, 2011 Q177 f9-2 CL05EOUT REQUCREMENTS Fagc 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS (NOT USED] 3 PART 2- PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATI4N [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 10 11 12 13 14 15 16 17 18 14 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 m A. Prior to requesting Final Inspection, submit: l. Project Record Documents in accordance with Section O1 78 39 2. Operation and Maintenance Daia, if required; in accordance with Section Ol 78 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section al �4 z3. C. FinalInspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the �ity will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Wark is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the VJork required to remedy deiiciencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Cantractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubricatian of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses £ Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of a11 equipment D. Notice of Project Completion CIFY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANBARD CONSTRUCTION SPEC[FFCATION DOCCJ:vIENT5 City Pmject No. 02025 Revised July l, 201 I 1 ? 3 4 5 b 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 01 77 19 - 3 CLOSEOUT REQUIREMENTS Pagc 3 of 3 l. Once the City Project Representative finds the Work subsequent to Final Inspectian to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet}. E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional fornis: a. Final Payment Request b. Staternent of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required} f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Dacumentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [N4T USED] 3.S ADJUSTING [NOT U5ED] 3.10 CLEANING [NOT USED] 3.11 CLUSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NQT USED] 3.13 �'EP�ANCE [NOT USED] 3.44 ATTAC�IMENTS [NOT USED] END OF SECTION Revision Log DATE NAME S UMMARY OF CHANGE CTI'Y OF FORT WORTH IIFW Airport Reclaimed Water Delivery System Flushline STANDATtD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 — Revised 7uly 1, 20t 1 01 78 23 - 1 OPERATION AND MAINTENANCE DATA Page I of 5 sECTTorr ai �s 23 OPERATION AND MAINTENANCE DATA 3 PARTI- GENERAL 4 5 6 7 8 9 14 11 12 13 14 15 I6 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 1.1 SITMMA.RY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE A1VD PAI'MENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USEI?] 1.4 ABMINISTRATIVE REQUIItEMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals sha11 be in accordance with Section 01 33 00 . All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8%2 inches x 11 inches b. Paper 1) 40 pound miniinum, white, for typed pages 2) Holes reinforced with plastic, clath or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pmject No. 02025 Revised December 2Q 2012 01 78 23 - 2 OPERAT[ON AND MAINTENANCE DATA Page 2 of 5 1 Z 3 4 5 6 7 8 9 10 11 12 I3 14 15 16 17 18 I9 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 d. Drawings 1) Provide reinforced punched bincier tab, bind in with text 2) Reduce larger drawings and fald to size of text pages. e_ Provide fly-leaf for each separate product, or each piece af operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b} Identity of separate structure as applicable c) Identity af general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 3 :� 1_ Neatly typewritten table of contents for each volume, arranged in systematic order a_ Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify eack product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) C1early identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable infarmation Drawings a. Supplement product data wiih drawings as necessary �o clearly illustrate: 1) Relations of component parts af equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Iiocuments to assure correct illustration of completed installation. c. Do not use Project Record I?rawings as maintenance drawings_ Written text, as required io supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures_ b. Provide logical sequence of instructions of each procedure. C1TY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flwhline STANDARD CONSTRUCTION SPECIFICATI4N DOCL7MENTS Ciry Pmject No. 02025 Revised December 20, 2012 Ot7823-3 OPERAT[ON AND MA(NTENANCE DATA Pagc 3 of 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 25 16 17 18 19 24 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 4$ 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2} Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual an final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required far reardering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrinnental to product 3} Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products I ) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and 5ysterns 1. Submit 5 copies of complete manual in finai form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut-down and emergency instructions 3) Summer and w.inter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassemb2y, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1} List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As insialled cantrol diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FQRT WORTH DFW Aiiport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUIVIENTS City Project No. 02025 Revised December 2d, 2012 01 78 23 - 4 OFERAT[ON AND MAINTENANCE DATA Page 4 of S 1 2 3 4 5 6 7 8 9 1Q 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 2'7 28 29 i. .l• k. 3. Content, for each electric and electronic system, as appropriate: a. Description af system and component parts 1} Function, normal aperating characteristics, and limiting conditzons 2) Performance curves, engineering data and tests 3} Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures I) Routine and normal operating instructions 2) Sequencesrequired 3) Special operating instructions e. Maintenance procedures 1) Routine operatians 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sectians of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. Charts of valve tag numbers, with location and function of each valve List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage Other data as required under pertinent Sections of Specifications 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATE $LTBMITTALS [NOT �JSED] 32 19 �UALITY ASSITItANCE 33 A_ Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CONSTRUCTIOTv' SFECIFICATION DOCUMENTS City Project No. 02025 Revised December 2Q 2012 Ol 'I$ 23 - 5 OPERATION AND MAtI�TENANCE DATA Page 5 of 5 � � '' �'• 1:!• 1; 1 ' i l � r i i • � � ���• •: � �• � ���1 � r 5 PART 3- EXECUTION [NOT USED] G•'� 7 s � • , ;, S Revision Lo� DATE NAME SUMMAR.Y OF CHANGE 8t31!'�Ol� D.Jol�nson 1.5.p.1 —titleofsect�ic�n rcmoved CiTY' QF FORT WORTH DF!'J .4ir�nzt Reclaimed 4Vater I)elives}= 5ystem Flush9ine �TANDARD C4NS'I'RUC'it0?J SP��IFICATIC7:�f DOCUME?�tT5 Gity Project No_ 02024 Reviscd Deceinbc:r 2U, 2ti12 � t 78 39 - I PR03EGT RECORD D(3CUMENTS Page 1 af 4 1 2 3 PART1- GENERAL 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 SECTION Ol 78 39 PROJECT RECORD DOCUMENTS 1.1 SUMMARY A. Section Includes: l. Work associated with the dacumenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports S. Deviations from this City of Fort Worth Standard Specification l. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0— Bidding Requirements, Corztract Forms and Conditions of the Contract 2. Division 1— General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measuremen� and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADIVIINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representaiive. 1.6 ACTION SUBMITTALS/INFORMA�'IONAL SUBMITTALS [NOT USED] 1.7 CLOSE4UT SUBMITTALS [NOT USED] 1.8 1VIAINTENANCE lYIATERIA�� SUSMITTALS (NOT USEDj 1.9 QUALITY ASSURANCE A. Accuracy of Records l. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specificatians and each sheet of Drawings and other pocuments where such entry is required to shaw the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documenis may rely reasonably on information obtained from the approved Project Record Documents. CTTY OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushiine STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised July 1, 2011 017839-2 PROJECT RECORD DOCUMENTS Page 2 of 4 1 2 3 4 5 C 3. To facilitate accuracy of recards, make entries within 24 hours after receipt of inforrnation that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STQRAGE A1�ID HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WA.R1'�NTY [NOT USED] 17 PART 2 - PRODUCTS 18 2.1 OWNER-FURNISHED [oR] OWNER-SUPPLIED PRODUCTS [NOT USED] 19 20 21 22 23 24 25 2b 27 • #•1 ;� J�_ . A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 camplete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract_ 2.3 ACCESSORIES [NOT USED] i . ' f, , � • � � : � 28 PART 3 - EXECUTION 29 3.1 IhiSTALLERS [NOT USED] 30 31 32 33 34 35 3.2 EXA ATION [NOT USED] �c ''''•'• t 1 # 3.4 i1iAINTENANCE DOCLTIVIENTS A. Nlaintenance of Job Set 1. Inunediately upon receipt of the job set, identify each of the Documents with the title, °RECORD DOCLJMENTS - JOB SET". CTTY OF FORT WORTH DFW Aitport Reclaimed Water I}elivery System Flushline STANDARD CONSTRUCTION SPECIPICATION DOCL'MENTS City Froject No. 02025 Revised July 1, 2011 01 �8 39 - 3 PROJECT RECORD DOCUMENTS Pagc 3 of4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 ?g ?9 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 2. Preservation a. Considering the Cantract completion tirne, the prabable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimuin, in accordance with the intervals set forth in Section Ol 71 23, clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and nate as required. c. Date all entries. d. Call attention to the entry by a"cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. 5. Conversion of schematic Iayouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1} Final physical anangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical loeation of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make aIl identification sufficiently descriptive ihat it may be related retiably to the Specifications. c. The City may waive the requiremenis for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. Hawever, do not rely upon waivers being issued except as speeifically issued in writing by the City. B. Final Project Reeord Documents I. Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding fmal documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. CTI'Y OF FORT WORTH DFW Airport Reclaimed Water Delivery System Flushline STANDARD CQNSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised July 1, 20 t 1 01 7839-4 PROJECT RECORD DOCUMENTS Page 4 of 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2Q 21 22 23 24 zs c. Call attention to each entry by drawing a"cloud" around the area or areas affected. d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other pocuments a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge far reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIIZ / RESTORATION [NOT USEDj 3.6 RE-INSTALLATION [NOT USED] 3.7 FIELD (ox] SITE QUALITY Ci)NTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.4 ADJUSTING [NOT USED] 3.IQ CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENAIV CE [NOT USED] 3.14 ATTAC ENTS [NOT USEDj r.� • i. Revision Log DATE NAME SUMMARY OF CHANGE � CITY OF FORT WORTH DFW Aiiport Reclaimed Water Delivery System Ftushtine STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project No. 02025 Revised 7uly 1, 2011 3f 25(l0- t ERQSION ANDSEDIMENTCONTROL Pagc I of 9 l � 3 P'AI2T 1 - GENERAL 4 5 6 7 8 9 10 lI 12 13 14 ]5 16 1� 18 19 20 21 22 23 24 25 26 27 28 29 30 3l 32 33 34 35 36 37 38 39 4d SFCi'ION 31 25 OQ EROSI�N AND SEDIMENT CONTR�L 1.1 SIJIdiMARY A. Section Includes: l.. fmpleme2�tatioji of the project's Storm Water Pollution Prevention Plan (SWPPP) and installation, maintenance and removal of erosian and sediment control devices B. Deviations from this City of Fort Wortl1 Standard Specification 1. 1.1.C.3, 1.3.5, 3.4.A.2, 3.4.B.6, 3.11.0 and 3.13.E C. Related Specificatian Sections include, but are not necessarily liinited to: 1. Division 0— Bidding Requireinents, Contract Fornzs and Conditions of the Contract 2. Division 1— General Requirements 3. Division 1— Section OI 57 13 Stonn Water Pollution Prevention 1Z P12ICE AND FAYMENT FROCEI?I7gtES A. Measurement and Payment 1. Stonl� Water Pollution Prevention Plan �1 aci-e a. Measuremcnt 1) This Item is eonsidered subsidiary to the various Iteins bid. b. Pa}mlent 1) The work performed and the materials furnished in accordance with this Item are subsidiary to the structure or Items Ueing bid and no other compensation will be allowed. 2. Storm Water Pollufion Prevention Plan > 1 acre a. �easurement for this Item sha11 be Uy lump sum. b. Payment 1) The wark perfonned and ti�e materials funlished in accordance with this Itenl shall be paid for at the lump sum pxice bid for "SWPPP > 1 acre". c. The price bid shall ineiude: 1) Preparation of SWPPP 2} Implementation 3} Permitting fees 4) Instailation �) Maintenance 6} Removal 1.3 �FERENCES A. Reference Standards 1. Keference standards cited in this Specification refer to the current reference staudard publi shed at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. ASTM Standard: C2TY OF FORT WORTH DFW niiport Reclaiuied Water Deli�=ery System Flushline STANDARD CONSTRUCTION SPECIF1CATlOi� DOCUMENTS Cit7� Preject No. 020_5 Revised July 22, 2013 31250U-2 EROSION AND SGDIA4ENT CONTROL Paee 2 «f 9 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 3 4 5 a. ASTM D3786, Standard Test Method for Bursting Strength of Textile Fabrics—Diaphragm Bursting Strength Testei- R�tetl�od b. ASTM D4632, Standard Test Metliod for Grab Breaking Load aa�d Elotlgatiorl of Geotextiles c. ASTM D4751, Standard Test Methad for Deternli�ling Apparent Opening Size of a Geotextile d. ASTM D4833, Standard Test Method for Index Puncture Resistance of Geomembranes and Related Products Te�as Commission oil Environmental Quality (TCEQ) TPDES General Permit No. 1,XR150000 TxDOT Departmental Material Specificatians (DMS} a. DMS-6230 "Teanporan� Sediment Conti-ol Fence Fabi•ic" DFW Airport EnvirorunentaP Affairs S�PPP requirements , • 1 �. � # • � �. 16 1.5 SLJ�lYIITTALS 17 A. Storm Water Follution Prevention Plan (SWPPP) 18 B. "I'CEQ Notice of Intent (NOI) for Storm Water Discl�arges Associated witli 19 Constnietion Activity under thc TPDES General Pennit 20 C. Construction Site Notice 21 D. TCEQ Notice of Termination (NOT) far Storni Water Discharges Assaciated with 22 Construction .�ctivity under the TPDES General Permit 23 E. Notice of Change (if applicable) 24 1.6 ACT'��N S�TTBIViIT"I'ALS/II��'OR�ViATIONAi� SIIB1VVi�'I'TAi,S [l��}T LT��B] 25 �.7 CLOSEQtiT S�,�h'��T`�'Ai1S [IVOT USEU� 26 1.8 Ii'�A�'� I`ENANC�,IVIA'I"�I��A.I, S IVIIT�'A�,S [l�r�'I` USEi�] 27 19 QU�ITY ASS �NCE [N�'I' IJSE�3] 28 1.10 DELIVER�', S'TORAG� �IVD �'vIlI,I1�TG [IVO'�' IIS�;�] 29 l.11 FIELD [SIT`�] CONI�ITI�NS j_NOT LSE�� 30 1.12 W �'�'Y [NO'I' IJSEi�j 3I PAR"I" 2 - PI�OI)UC�'S 32 2.1 OWNER-� IS�ED [oxj Oi�'N��2-SiJPPI.I�I) I'RO�?I1CT'S (1�C}T t7SEi?] 33 2.2 PROI�LTC'i' TYPES �ND 1VI�i'E S 34 A. Rock Filter Dams 35 1. Aggregate CI1'Y OF FORT V✓ORTH DT=W Aiipo�l Reclai�ned Water Delivery System Flushline S7ANDARD CONSTRUCTION SPECIFICATIUN DOCUMENTS Ciiy Pr�ject No. 02025 Revised July 22, ?Q13 31 2500-3 EROSION AND SGD(MCNT COIv'"I'ROI.. Pagr 3 of �) 1 2 3 4 5 6 7 g 9 10 11 I2 13 14 15 16 17 18 l9 20 21 �2 23 24 25 26 27 za 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 a. Furnish aggregate with liardness, dui-abilit�, cleanliness and resistance to crumbling, flaking and eroding acceptable to the Engineer. b. I'rovide the following: 1} Types 1, 2 and 4 Rock Filter Dains a) Use 3 to b inch ag�regate. 2) Type 3 Rock Filter Dams a) Use 4 to 8 inch a�gregate. 2. Wire a. Provide minimum 20 gauge galvanized wire for tl�e steel wire mesIi aild tie wires for Types 2 and 3 rock filter dams b. Type 4 dams require: 1} Double-twisted, hexaganal weave with a nominal mesh opening of 2'/2 inches x 3 % inches 2) Minimum 0.0866 iuch steel wire for netting 3) Minimum 0.1063 inch steel wire for selvages and corners 4) Minimum t?.Q866 ineh for binding or tie u�ire B. Geoteatile Fabric 1. Place the ag�-egate over geotextile fabric meeting the following criteria: a. Tensile Strenb h of 250 pounds, per ASTM D4632 b. Puncture Strength of 135 pounds, per ASTM D4833 c. Mu11en Burst Rate of 420 psi, per ASTM D3786 d. Apparent Opening Size of No. ZO (max}, per ASTM D475I C. Sandbag Material 1. Furnis}� sandbags meetin� Section 2.5 except that any gradation of aggregate may be used to fill the sandbags. D. Stabilized Construction Entrances 1. Provide nnaterials that meet the details shown on the Drawings and this Section. a. Provide crushed aggregate for long and short-term construction exits. b. Furnish aggregates that are clean, hard, durable and free from adherent coatings such as salt, alkali, dirt, clay, loam, shale, so$ or flaky materials and organ'rc and injurious matter. c. Use 3 to 5 inch coarse aggregate with a mininzum thickness of 12 inclles. d. The aggregate shall be placed over a geotextile fabric meeting the fallowing criteria: 1) Tensile Strength of 300 pounds, per ASTM D4632 2) Puneture Strength of 120 pounds, per ASTM D4833 3} Mullen Burst Rate of 6Q0 psi, per AS'I'M I�3786 4) Apparent Opening Size af No. 40 (znax), per /3 STM I34751 E. Embankment for Erosion Control 1. Provide rock, loam, clay, topsoil or other earth materials that will fornl a stable enibaillcment to meet the intended use. I�. Sandbags 1. Provide sandbag material of polypropylene, polyethyiene or polyamide woven fabric with a minimum unit weight of 4 ounces per square yard, a Mu11en burst- strength exceeding 300 psi, and an ultraviolet stability exceeding 70 percent. CITI' OF FORT WORTH DFW Aiiport Reclaimed Water Delive�y System Flushline STANDARD CONSTRUCT�ON SPECIFICATION DOCliMENTS City Project No. 02025 Revised July 22, 20Y3 3 I 25 O(l - 4 L•RQ31QN AND SGDIMGNTCONTR{?L Pagc 4 of <1 1 ? 3 4 5 6 2. USe Ilailli�� COaiSe Sc3ri{� OI' 3i7aI1ll�aGiilI'Ea SaI1C� illeeilIl� ille CI'aC13t10I1 �?IVeil Iri �8�)1e 1 ta fill sandbags. 3. Filied sandbags must %e 24 to 30 inclies lan�, 1 b to 18 incl�es wide, al�d 6 to 8 i�}c13es thick. ,; .�, �, Sieve # It'Iaxim�am Ret�ined (°fo bv ��'ei�ht) 4 3 ercent � 100 80 percent 200 95 ercent 7 8 9 1Q 11 12 13 14 15 16 17 18 19 2C) 21 22 23 24 25 G. Temparary Sediment Contral Fence I. Provide a net-reinforced fez�ce usiiig woven geo-textile fabric. 2. Logos visible ta tlie traveIiilg public wi11 not be aliowed. a. Fabric I) Provide fabric materials in accordai�ce with DMS-6230, "Temporaiy Sediment Control Fence Fa%ric." b. Posts 1} Provide essentialiy straight ��ood or steel posts with a minin�uin length of 48 inches, unless atherwise shown on the Drawings. 2) Soft wood posts n�ust be at least 3 inches in diaineter or noininal 2 x 4 inch 3) Hardwood posts must l�ave a lninimum cross-section of 1-1/2 x 1-1/2 ineli �) T- or L-shaped steel posts must have a minimum �,�eight of 13 poulids per foot. c. Net Reinforcement 1) Provide net reinforcement of at least 12-1/2 gauge galvanized welded wire mesh, witl� a maximum opening size of 2 x 4 inch, at least 24 inches wide, ui�Iess otherwise shown on the I3ra�lings. d. Staples 1) Pravide staples �jith a crown at least 3/4 inch wide and legs 1/2 inch long. • • �; i r • • � ; . � i �; � �.. � 29 3.l INS'I'AI1�,E�S [NOT �J�E�] 30 3.B E' IIlTEs,'�'IQN [NO�' iiSEi3] , , ,. . . � � � 32 33 34 35 36 37 38 t •; f A. Stor�n Water Pollution Prevention Plan 1. Develop and implement the pa•oject's Siortn Water Pollution Prevention Plan (SWPPP) in accordance with the TPDES Construction General Pennit "I'XR150000 requirements. Prevent water pollution from storm water runoff by using and maintaiiung appropriate structural and nonstrueturaI BMPs to reduee pollutants discharges to the MS4 from the construetion site. CITI' OF FORT WORTH DFW Airport Reclaimed Wa[er Delivery System Flushline S7'ANDARB CONSTRUC7lON SPECIFICATIOT� DOCU�RENTS City Projeet No. 02025 Revised Jul}� 22, 2013 31 2$ O(} - 5 L•ROSfON AND SEDIMLNT CONT20L Pagc: ,4 0 (' 9 l ? 3 4 5 6 7 8 9 10 11 12 13 14 rs 16 17 I� t9 20 21 22 23 24 25 2. DFW reserves the ri�ht ta require changes to tlle SWPPP durilig a review afid approval process and will be eonsidered an o�erator on the SWPPP. B. Control Measures 1. Implement control measures in tl�e area to be disturbed before beginning COIIStI1]CilOTI, or- as directed. Limit tl�e disturbaiice to tl�e area shown an tlle Drawings or as diz•ected. 2. Control site waste such as discarcied building materials, eonerete truck ���ashout water, cliemicals, litter and sanitary waste at the construction site. 3. If, in the opinion of the Engineer, the Contractor cannot contr�l soil erosion and sedimentation restziting from canstruetion operations, tlie Eiigineer will limit tlle disturbed area to tI�at which the Contractor is able to cantrol. Minimize disturbance to vegetation. 4. Immediately correct ineffective control measures. Implement additional controls as directed. Remove excavated material witl�in tIie time requirements specif ed in the applicable stonn water permit. �. Upon acceptance of vegetative cover by the City, remove and dispose of all temporary control measures, temporary en�bankments, bridges, inatting, falsework, piling, debris, ar ot��er obsiructions placed during canstraction that are not a part of the fnished work, or as directed. 6. The contractor is required to use DFW Enviromnental Affairs approved control ineasures. C. Do not locate dispasal areas, stockpiles, or haul roads in any weiiand, water body, or streambed. D. Do not install temporary construction crossings in or across aily water body withaut the prior approval of the appropriatc resource agency and the Engineer. 26 F.,. Provide protected storage area for paints, chemicals, solvents, and fertilizers at an 27 approved location. Keep paints, chemicals, soivents, and fertilrzers off bare ground and 28 provide sheiter for stored chemicals. 29 F. I�istallation and Maintenance 30 I. Perfortn work in accordance with the TPDLS Construction General Permit 31 TXR 150000. 32 2. When approved, sediments may be disposed of within embankments, or in areas 33 wiiere the material will not contribute ta further siitation. 34 3. Dispose of removed material in accordance witli federal, state; and local 35 regnlations. 36 4. Remove devices upon approval or when directed. 37 a. Upon removal, finish-grade and dress the area. 38 b. Stabilize disturbed areas in accordance with the permit, and as shown on the 39 Drawings or directed. 40 5. The Contractor retains ownerslup of stockpiled material and must remove it from 4I the project wlien new installations or replacements are no longer required. 42 G. Rock Fitter Dams for Erosion Control 43 1. Remave trees, brush, stumps and other objectionable material that may interfere 44 with the construction of rock filter dams. C1TY OF FORT �VORTH DFW Aiiport Reclaimed Vr'ater Delivery System Flushline - STANDARD CONS7'RUCTIOI�� SPEC1FiCATION DOCUMENTS City Proiect Na. 02025 Revised July 22, 2Q13 312500-6 EROSION AND SEDIMGNT CONTROL Pagc G c�1' 9 � 3 4 5 5 7 8 9 20 11 12 13 14 15 IS 17 18 19 za 2l 22 23 24 25 26 27 28 29 30 3 l. 32 33 34 3� 36 37 38 39 2. Place sandbags as a foundatioil wlien i•equired or at the Contractor's optioi�. 3. For Types 1, 2, 3, and 5, place the aggregate to the lines, heigllt, and slopes specified, ���ithout undue voids. 4. For Types 2 and 3, place the aggregate on the mesh and tlaen fold the �nesl� at the upstream side over tl�e aggregate and secure it to itself on the downstreaia� side with wire ties, oY- hog ria�gs, or as dir-ected. 5. Place rock filter dains perpendicuiar to the flow of the stream or chaiulel unless atherwise directed. b. Construct filter dams according to the following criteria, unless otherwise shown on the Drawings: a. Type 1 (Non-reinforced} 1) Height - At least 18 inches rneasured verticaliy frorn existing ground to top of filter dam 2} Top Width - At least 2 feet 3) Slapes - At most 2: I b. Type 2 (Reinforced} 1) Heighi - At Ieast 18 inches measured verticalIy from existing ground to top of filter dam 2) Top Width - t�t least 2 feet 3) Slopes - At most 2:1 c. Type 3 (Reinforced) 1) Height - At least 36 inches measured vertically from existing ground to top of filter dam 2) Top Width - At least 2 feet 3) Slopes - At most 2:1 d. Type 4 (Sack Gabions} 1) tinfold sack gabious and smooth out kinks and bends. 2) For vertical filling, connect tlie sides by lacing in a single loop--double loop pattern on 4- to 5-inches spacing. At 1 end, pull the end lacing rod until tight, wrap around the end, and tvaist 4 tunes. At the filling end, fill with stone, pull the rod tight, cut the wire with approximately 6 inches remainin�, and twist wires 4 times. 3) For horizontal filling, place sack flat in a filling trotzgh; fill with stone; and cannect sides and secure ends as described above. 4) Lift and place withaut c3amaging the gabian. 5} Shape sack gabions to existing contours. e. Type 5 1) Provide rock tlter dams as shawn on the Drawings. H. Construction Entrances 40 1. When tracking conditions exist, prevent traffic froin crossulg or exiting the 41 construction site or moving directly onto a public roadway, alley, sidewalk, parking 42 area, or other t7ght of way areas other than at the locatian of construction entrances. 43 2. Place t]le exit over a foundation course, if necessary_ 44 a. Grade the foundation course or compacted subgrade to direct runoff from the 45 construction exits to a sediment trap as sho��n on the Dra�Tin�s or as directed. 46 3. At drive approaches, make sure the constructian entrance is the full width of the 47 drive and meets the length shown on the Drawings. CI7'Y OF FOR7� WORTH DFW Aiipori Reclaimeci Water Deliveiy System Flusliline 5TANDARD CONSTRUCTION SPF_.CIFICATION DOCUMEN7'S City Pt'�iect No. 02025 Reviscd July 22, 20l s 3125U0-7 E?ROSION AND SCDIMENTCONTROL Pil�?C "r Lt( <) 1 2 3 4 5 6 7 8 9 10 11 32 13 14 15 16 17 t8 19 20 21 22 23 24 25 26 27 2$ 29 30 31 32 33 34 35 36 37 34 39 40 4I 42 43 4� 45 J ��� a. The widtli shall be at least 14 feet for 1-way and 24 feet for 2-way traific for all other points of inbress or egress or as directed by the Engineer. I. Eart}�work for Erosion Control 1. Perform excavation and embankment operations to minimize erosion and to reniove collected sediments froin other erosion control devices. a. Excavation and Embankment for• Erosiou Control Measui•es 1) Place earth dikes, s��ales or combinations of both alai�g the low crown of daily lift placement, or as directed, to �revent runoff spillover. 2) Place swales and dikes at other locations as shown on the Drawiiigs or as directed to prevent runoff spillover or to divert runoff. 3} Construct euts with the Iow e�ld blocked with urldisturbed eartli to pr•event erosion of hillsides. 4) Construci sediment traps at drainage stnzctures iv conjunction �uith ather erosion control measures as shown on the Drawings or as directed. 5} Where required, create a sediment basin praviding 3,600 cubic feet of storage per acre drained, or equivaIei�t control measures for drainage locations that serve an area with 10 or more disturbed acres at 1 time, not including offsite areas. b. Excavation of Sediinent and Debris 1) IZemove sediment and debris when accumulatioil affects the perfonnance of the devices, after a rain, and when directed. Sandbags for Erosion Control 1. Construct a berm or dam of sandbags that will intercept sediment-laden stonn water runoff from disturbed areas, create a retention pond, detain sediment and release water in sheet flow. 2. Fill each bag �uith sand so that at least the top 6 inches of the bag is unfilled to allow for proper tying of the open end. 3. Place the sandbags witl� tlleir tied ends in the same direction. 4. Offset subsequent rows of sandhags 1/2 the lengih af the preceding row. 5. Flace a single layer of sandbags downstreaz7i as a secondary debris trap. 6. Place additional sandbags as necessary or as directed for supplementary suppart to berms or dams of sandbags or earth. Temporary Sediment-Control Fence 1. Pravide temporary sediment-control fence near the downstream perimeter of a disturbed area to intercept sediment from sheet flo��. 2. I.ncorporate the fence into erosian-cantrol rneasures used to control sediment in areas of higher flow. Install the fence as shown on tl�e Drawings, as specified in this Section, or as directed. a. Post Installation 1} Embed posts at least 18 inches deep, or adequately anchor, if in rock, with a spacing of 6 to 8 feet and install on a siight angle toward the run-aff saurce. b. Fabric Anchoring 1} Dig t�•enc�ies along the uphill side of the fence to anchor 6 ta 8 iuclies of fabric. 2} Provide a minimum trench cross-section of 6 x Ei inches CITY OF FORT WDItTH DFW Ai�ort Reclaimed Water Delrvery System Flushline STANDARD CONSTRUeTiON SPECIFiCATJON DOCUM ENTS Gity Project No. 020?5 Revised July 22, 2013 312500-8 GROSION AND SCDlMENT CON"�ROL Pagc fi af 9 1 2 3 4 5 6 7 8 9 la I1 12 13 14 15 16 17 18 19 20 ?1 c. � 3} Flace the fabric agai2�st the side of the trencl� and align ap�roaimately 2 incl�es af fabric aiong tiie bottom in the upstream direction. 4) Backfill the treneh, then hai�d-tamp. Fabric and Net Reinforcement Attachment 1) Unless otherwise slzouln under the Drawings, attacl� the reinforcement to wooden posts witli staples, or to steel posts with T-clips, in at least 4 plaees equally spaced. 2} Sewn vertieal poekeis may be used to attach reinforcen�ent to end posts. 3) Pasten the fabric to t17e top strand of reinforcement by hog rings or cord every 15 inches or less. Fabric and Net Splices 1) Locate splices at a fence post with a minimum lap of 6 inches attached in at least 6 places equally spaced, unless otherwise shown undei- tlie Drawi3�gs. a) Do not locate splices in concentrated flovsT areas. 2) Requiremei�ts for installation of used temporary sedin�ent-cai�trol fence include the foliowing: a) Fabric with minimal or r�o visible sib s of biodegradation {weak fibers} b) Fabric without excessive patching (more thai� 1 patclz every 15 ta 20 feet) c) Posts without bends d) F3acking u�ithout holes 22 3.5 PA� ES'�� TIQN [NOT US�II�] 23 3.6 -INSTALLA�ION [NQT TJSED] 24 3.7 FIE�,I? [ox] SITE QITA�,I'I"�' �ONT'RQI, [NO"I' USED] 2S 3.8 SYS'I'Ell� S���UP [NO'I` YTSEDj 26 3.9 A�3.Ti7S'I'�11VG [NOT LJ�E�] 27 3.1d CI.EAN�TG 28 A. Waste Management 29 1. Remove sediment, debris and Iitter as needed. 30 �.�� CLOS��EJT r�C'I'IVI'I'IES 31 A. Erosion eantrol measures remain in piace and are maintained until a11 soii disturbing 32 activities at ihe project site have been completed. 33 B. Establish a uniforn� vegetative cover with a density of 70 percent on all unpaved areas, 34 on areas not covered by permanent structures; ar in areas where permanent erosion 35 control measures (i.e. riprap, gabions, ar geotextiles) have been employed. 36 C. 'The contractor is required to request and pass a final inspection af the site by 37 Environmental Affairs staff prior to considering the SWPPF closed or tiling the NOT. 38 Final inspection shall verify that the site meets fmal stabilization, all temparary I3IvIPs 39 installed have been removed and the site is clear of all supplies or wastes, etc. 40 CITY OF POA1' WflRTH DF�V Ai�pozl Reciai;ned Watcr Belivefy Systern Fiushline STA�I�.ARf} CUNSTRi1CTlON SPECIPICATION DOCLI�4ENTS City Proiect No, OZOZ� Revised luly'_2, 2Qi3 3125Q0-�1 ER0510N AND SED[MENTCONTROL Pagc 4 0(9 1 3.1� P��T'�C�'I�N (I�I4'i' i1SEl�] 2 3.13 IVI��NTENANCE 3 A. Itistall and maintain tlle integrity c�f te�nporary erosion and sedimentation controi 4 devices to aceumuiate silt and debris u��til eartliworlc cor�struction and peimanent 5 erosion conti•ol features are in place or tl�e disturbed area has been adequately stabiiized 6 as deiei7�ined by tl�e Engineer. 7 B. If a device ceases ta functiot� as intended, repair or replace the device or portioils 8 thereof as necessary. 9 C. Perforin inspections of the construetion site as prescribed in the Canstruction C'seneral 14 Permit TXR150000, i l D. Records of izlspeetioiis and n�odifications based on the results of inspections nlust be 12 maintained and available in acco�•dance witll the pei7nit. 13 E. DFW reserves the right to require clianges to the erosioi� and sedimentation coazh-al and 14 SW�I'PP duri��b eonstruction and will be considered ar� operator on the SWPPP, IS �6 �.�� ��r������N�s [�ro� us��I 17 EiVI) �F S�CTI�I� 18 14 R8i�15I0Il �.O�T ➢ATE NAME SUMMARY OP CHANGE CiT1' OF Ft1RT WORT�I D�W' Ai3� ot1 Reciaiined Watci- L?elivezy System Fluslzline STANDARD COi�'S"I�RUC"i'lON SPECIFiCATiON [?QCUMENTS City Pa�ject \o. 02C125 Rcvised 7iaiy 22,'�Qi3 32I123-I �=LEaIBLE: gASE COt�ItS'�S P�tgc I o1"' 1 2 3 4 5 6 � 8 9 10 11 12 13 14 15 I6 17 18 19 20 21 ?? 23 24 25 26 27 28 29 30 3l 32 33 34 35 36 37 38 39 40 S�C`i'ION 32 11 23 FLEXIBLE I3ASE COL'RSES PART' 1 - G�NERAL 1.1 SL'1VIMARY ,�. Section I�Zcludes: I. Foundation course For surface course or for otller base cour-se composed of �lexible base constructed in one or more courses in confonnity with the typical section. B. Deviations from tliis City afFort Wortii Standard Specification 1. 2.2.A.2-6 C. Related Specification Sections include, but are noi necessarily liinited ta: 1. Divisian Q— Bidding Requirements, Cantract Farms, and Conditions of the Contract 2. llivisioll 1— General Requirements 1.2 P�ZICE AIY� PAY1t�I�NT PR�CEI)�JRES A. Measuren�ent and Payinent l. Measurement a. IVleasureinent for this Item will be by t}le square yard of I�lexible Base Course for various: 1) Depths 2) 'I'ypes 3} Gradations 2. Payment a. The wark perfonned and materials furnished in accordance with this Itez17 and measured as provided under "Measureme»t" ���ill be paid for at the u11it price bid per square yard of Flexible l3ase Course. 3. The price bid skall include: a. Preparation and correction of subgrade b. Funiishing of material c. Hauling d. Blading e. Sprinkling f. Compacting 1.3 �FERENCES A. .Definitions 1. RI-LP — Recycled Asphalt Pavenlent. B. Reference Standards 1. Reference standards cited u1 this specificatian refer to the cunent reference standard publisl�ed at tlle time of tlie laiest revisian date logged at the end of this specification, unless a date is speciizcally cited. 2. 1�STM Tnternational (ASTM): C7TY OF FOR7- WdRTH DFW Ait�o�� Reclaimed Water Delive�y System Clusl:line STANDAitD CONSTRUC7'lON SPF.CIFICATION DOCUMENTS City Project No. 0?Q25 Revised July 22, 2013 32�1�3_� FLEXiBLE BASE COURSL-;S Pagc 2 c�C7 1 2 3 4 5 6 7 8 9 10 11 12 13 14 1.4 a. D698, Standard Test Metl�ods for Labo►-atoz-y Compaction Characteristics of Soil Usinb Standard Cff�rt (12 400 ft-Ibflft3 (600 kN-n�/m3}} 3. Texas Department of Ti-ansportation (TXDOT): a. Tex-104-E, Detenni��ing Liquid I,imits of Soils b. Tex-106-E, Calculating tl�e Plasticity Itidex of Soils c. Tex-i 07-E, Deternliiling the Bar Linear Shrinkage of Soils d. Tex-1 l0-E, Particle Size Ai�alysis of Soils e. Tex-116-E, Ball Mill Metllod for Deter�llining the Disintegration of Flexible Base Material f. Tex-117-E, Triaxial Compression far Disturbed Soils and Base Materials g. Tex-411-A, Sounduess of Aggregate [Jsing Sodium Sulfate or Magnesium Sulfate h. Tex-413-A, Detennining Deleferious Material in Mineral Aggregate MINISTT�ATIVE RE�L1I M�NTS [NQT LSEDj 15 1.5 ACTI4N S MIT�'ALS [N�T USED] 16 1.6 ACTT�i\' SUBMI'�'TALS/�NFOi211'�A'I'IONAL SLJBIYII'�'TAlLS (NOT IJSEI3j 17 1.7 CI.OSEOUi' SUBIVIIT�'AI,S [�t��' I7SED] 18 1.8 1VIAINTENANCE IYIA�'E AL SIJI;MITTAI.S [NOT USED] 19 1.9 Q�TAI.I`I'�' ASSL NCE [NC}T LTSEI}] 20 1.1Q I3ELIVERY, S14RAG�, fiNll �I�tDLING [N�T LTSFDj ?� ?2 I i ! i• 1 1; , • , . � , � , , . . . � �; � �; • ' ' i ' � , • , � �: 25 26 27 28 29 30 31 32 ?3 34 35 36 37 38 34 40 2.B I!'IA'� �,RIAI,S A. General 1. Furnish uncontaminated materials of unifonn quality that meet the requireincnts of the Drawings and specifications. 2. Obtain materials fram sources that are approved by DFW Airport and approved for use on DFVtT Airport property. 3. Notify City and DFW Airport of chanbes to material sources. 4. Tl�e City and DFW aiiport may sample and test project materials at any time before compaction througl�out tlie duratian of the project to assure specification compliance. 5_ In no cases may material be removed from DFW Airport property. Any excavated excess materiai shall be taken to the DFW airport soil storage site. 6. AlI imported material shall be approved far use on DFW Airport property by DFW Envirolunental Affairs. Contractor shall submit an Imported Material form foz- approval prior to bringing material an DFW property. �3. Aggregate CT71 OF FQRT WORTH DFW Aiipori Reclaimed �uater Delive�y System Flushline S1'ANDARD CONS"I'KUC"rION SPECIFICATION DOCUMENTS City Project Na 02025 1Ze��ised JuJy 22, 2013 321123-i FLEXIE3LE BASE COUFZSES P,+gc + cs1 7 1 ? 3 4 5 6 7 8 9 I. Fun�ish aggregate of tl�e type and grade sllawn on tlle 13i-a�vings a��d coi�farmiilg to f11e require��lerits of Table 1. 2. Lach sour-ce must meet Table 1 rec�uiremeiits for liquid limit, plastiCity ii3dex, aiid ��Tet ball mill far the grade speci�ed. 3. Do noi use additives sucli as but uot limited to lime, ceii�ent, or- fly ash to modify aggregates t� �l�eet t37e requireme7its af Table ?; ui�less sho��tn on the Drawings. Table 1 iFiaterial Requirements Pr�perlr� Tes4 hleileod Grade I Grade 2 ivfasicr gradatian sicvc __ I SI'LE (°in i'C1itiT1C�} .... ��.. . ._._ 2- � %? III... .. . ..... ..,, ......m ...... � . .. ...__ . ......_ ._..._. _........ ........ .. _. 1-3/4 in. fl t1 l4 _ 7/8 in __ .. Tex- i I Q-E I Q-35 _3/8 in...... _. 30-56 .__ — . _...___ .__ — No.4 _ 45-65 45-7w � No, 4(t ?ij-RS ��bt}-:S� '� '�� Liyuid�lmui_ %max 1 I'ex IU4 £ 35 � 4Q �� PlasiiCitv index. max.� ~ Tex-106-E � 10 1' _ ...... _ . _ _.__ - _ ___. � - __ _- . _ _ _..__ . . Wet bali mill, %max.i I 40 45 Wet ball mit] °o max. Tex-1 J 6-E � — ; increase ��assmg the 20 2C� � ; No. 40 sieve ; Classification' 1.0 i i.1-2.3 � . _ . __ .. ...._...._ — . __ .._. Min compressivc sU-ezigth', PS� Te�;-31?-E ' lateraJ pressua•e Q psi 45 35 latera3 ps�essure I S psi i 175 ' 17� ��1. Detennine plastic inde� in ac�ordance �vifh Tex-107 F�(lineai' shrinkage)lvhen liquid limit is unattainab]e as defined i�� Tex-104-E. 2. When a sovndness value is reqaired by [I�e Drawings, test material in aceordanee with Tex-<{! t-A. 3. Meet both the classification a�ad the �a�inimum compressive strength, unless atherwise sho�;m on tlie Dr•a�vings. IO 71 12 13 14 IS 16 17 18 19 �a �� 22 23 24 25 ?�, 2'7 4. R�Iaterial Tolerances a. The City may accept material if no more than I af the 5 most recent gradation tests has an individual sieve outside the specified Iimits of the gradation. b. When target brading is required by tlle Drawings, rao singie failin� test may exceed the �naster grading by more than 5 percenta�e �oints on sieves No. 4 and larger or 3 percentage points an sieves smaller than No. 4. c. The City may accept material if no niore than 1 of the 5 mvst recent plasiicity index tests is outside the specified lim�t. No single failing test may exceed the allowable limit by mare than 2 paints. 5. Material Types a. Do not use fillers or binders u��less appraved. b. Furnisli the type specified on the Drawings in accardance with ihe following: l ) Type 1� a} Crushed stone produced and graded frozn oversize quarried aggregatc that c�riginates from a sizi�Ie, naturally occurring saurce. b) Da not use gravei or multiple sources. 2) Type � CITY OF PORT WORTH DfW Airpor[ Rec(aimed Water llelivery System Flushline STANDARD CONSTRliCT10N SPF.,CIFICATli?N DOCLA�ENTS City Pr�ject No_ 02t125 Revised luly 23, 201: 32 1 1 23 - 4 FLE}i1BLE BASE COURSES Pagc 4 oC7 1 2 3 4 5 6 7 8 9 Id 11 12 13 I4 C. Water a} Only for use as base material for temporary pavemei�t repairs. b} Do not exceed 2Q percent RAP by weiglit unless sl�own on Drawi�lgs. 3) Type D a) Type A material or crushed concrete. b) Crushed concrete coiltaining gravel wil] be considered Type D material. c} Ti�e City may require separate dedicated stockpiles in order to verity compliance. d) Crushed concrete must meet the following requireineilts: (1) Table 1 for the grade specified. (2} Recycled materials must be free fi-om reinforcing steei and other objectianable rnaterial and }lave at most 1.5 percent deleterious material when tested i2t accordance with TEX-4l 3-A. 15 1. Furnish water free of industrial wastes and other objectionable inatter. 16 2.3 ACCESSOl2IES [N�'I' USED] , ! ! , i ` ,� t, �, . � . .. � • , ; �, 1 ! i ! . . . , , , � 22 23 �4 A. General 1. Shape the subgrade or existing base to confonn to the typical sections sho��rn on the Drawings or as directed. 25 2. When new base is required to be mixed with existing base: 26 a. Deliver, place, and spread the new flexible base in the required amount. 27 b. Ma��ipulate and thoroubllly mix the new base with existing material to pravide 28 a unifonn mixture to the specified depth before shaping. 29 B. Subgrade Compaction 30 1. Proof ra11 the roadbed before puhrerizing or scarifying in accordance with the 31 followi�g: 32 a. Proaf Rolling 33 1} City Project Representative must be on-site during proof rolling operations. 34 2) Use equipz�lent that will appl_y sufficient load to identify soft spots that rut 35 or pump. 36 a) Acceptable equipment includes fully loaded single-axle water truck 37 with a 1540 gallon capacity. 38 3) Make at least 2 passes with the proof raller (down and back = 1 pass). 39 4) Uffset each trip by at most 1 tire width. 40 5) If an unstable or non-uniform area is found, conect the area. 41 b. Correct 42 1) Soft spots that rut or pump greater than 3/4 ineh 43 Z) Areas t}lat are unstable or nan-uniform C1TY OF FORT WORI'H DI'W Airport Keclaimed Wate: Delivery Systeni P{ushline STANDARD CONSTRUCTION SP�CIFICATION DOCUMENTS City Project No. 02025 Revised Ju1y 22, ZOl3 32I123-5 �LL"a1E3LE BASE COURSL-'S Ptigc ? o!' 7 1 2. Installation of base material cannot proceed until compacted su[�grade ap�xoved by 2 the City. 3 3.4 INSTALLA'�'ION 4 $ 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 ?4 25 ?� z� 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 A. General 1. Coustruct each layer unifonnly, free of loose or segregated areas, and with t11e required density and moisture content. 2. Provide a smooth surface tllat confanns to the typieal sections, lii�es, and grades shown on tl�e I�rawings or as directed. 3. IIaul approved f]exible base in clean, covered trucks. B. Equipment 1. Gcnerai a. Pravide machinery, taols, and equi�ment necessary for proper execution af the work. 2. 1Zollers a. The Contractor n�ay use any type of roller to meet the production rates and quality requireinents of the Contract unless �therwise shown on the Dra���ings or directed. b. When spccific types of equipinent are required, use equipment that meets the specified requirements. c. �Iternate Equipment. 1) Instead of the specified equi�ment, the Contractor may, as approved, operate other cam�action equipment that produces equivalent results. 2) Discontinue the use of the alternate equipment and furnish the specified equipuzent if tlie desired results are not achieved. d. City may require Contractor io substitute equipznent if production rate and quality requirements of the Contract are not met. G Placing 1. Spread and shape flexible base into a uniform layer by approved means the same day as delivered unless otherwise approved. 2. Place material such that it is mixed ta minin�ize segregaiion. 3. Construct layers to the thickness shown on the Drawings, while maintaining tlle shape of the course. 4. Where subbase ar base course exceeds 6 inches in thickness, construct in 2 or mare courses of equal tl�ickness. 5. Minimum lift deptl�: 3 inches 6. Control dust by sprinkling. 7. Correct or replaee segregated areas as directed. 8. Place successive base courses and fmish courses using the same canstruction metbods required for the first course. D. Campaction 1. General a. Compact using deilsity control unless othervaise shown on the Drawulgs. b. Multiple tifts are pei7nitted when shown on the Drawings or appraved. CITY OF FORT VJORTH DFW Airport Reclaimed Water Delivcry System Flushline STANDARD CONSTRUCTION SPEClFICATION DOCt.JMENTS City Pr�ject No, 02025 Revised .TLtly 2�. 2013 321123-G FLGXIBLL QASE COLJRSES Pagc fi ctii 7 1 ? 3 4 5 b 7 8 9 iQ 11 12 13 14 l5 IC� 17 I8 19 20 21 22 ?3 24 25 26 27 28 29 3a 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 4b 47 3 � c. Bring each Iayei- to tlle moisture cor�teiit directed. Wllen necessaiy, sprinkfe tl�e material to the extent i�ecessa�y to pro��ide not less than the ret�uired density. d. Compact the full depth of tl�e sUbbase or base to the extent necessary ta remain fii�n and stable u��der construetion equipment. 2. Rolling a. Begin rolling longitudinally at the sides and proceed towards the center, overlapping oai successive trips by at least U2 the width of the railer unit. b. On superelevated curves, begin rolling at tlle low side and progi-ess toward the l�igi� side. c. Uffset alte�llate trips of the rolier. d. Operate rallers at a speed between 2 and 6 mph as directed. e. Re�uork, recompact, and refnish material that fails to meet or that Ioses required inoisture, density, stability, or f nish before tlie next course is placed or the project is aceepted. f. Continue work until specification requirements are i��et. g. Proaf roli tile compacted flexible base in accordauce with the following: 1) Praof Rolling a) City Project Representative must be on-site duriisg proof rolling operatious. b) Use equipment that will apply sufficient load to identify soft spots t}iat rut or pump. (1} Aceeptahle equi�ment includes fully loaded single-axle water truck with a 1500 gallon capacity. c) Make at least 2 passes witl� the praof roller (down and back = 1 pass). d) Offset each trip by at most 1 tire ��idtll. e} If au unstabie or non-uniform area is faund, conect the area_ Z) Conect a} Soft spots that rut or pump greater tl�an 3/4 inch. b) Areas that are unstable or non-uniform. Tolerances a. Maintain the shape of the course by blading. b. Completed surface shali be smooth and in conforn�ity with the typicai sections shawn on thc Dra«ings to the establisl�ed lines and grades. c. For subgrade beneath paving surfaces, correct any deviation in excess of 1/4 inch in cross section in lez�gth greater than 16 feet illeasured longitudinally by loosening, adding or reinoving material. Reshape and recompact by sprinkling and rolling. d. Correct all fractures, settlement ar segregation immediately by scarifying tlle areas affected; adding suitable n�aterial as required. Reshape and recompact by sprinkling and rolling. e. Should the subbase or base course, due to any reason, lose the required stability, density and finish before the surfacing is complete, it shall be recompacted at the sole cxpense of the Contractor. Density Control a. Miniinum Density: 95 percent compaction as deiermined b}� ASTM D698. h. Moisture content: minus 2 to plus 4 of optimum. E. Finisliing CIT'Y OF FOR7' R✓OR?H DFVJ Aiiport Keclain�ed Wafer L}elivery System Flusliline STANDARD CONSTRUCTION SPECIFICATION DOCliMENTS City Project No. 02025 Revised Jui}+22, 2C113 321(23-7 �LEXIBLE [3ASE COURSES Pagc; 7 0l'7 1 ? 3 4 5 6 7 8 9 10 11 12 33 14 15 16 I7 18 29 ?a 21 22 23 24 25 26 ?� zs 29 30 1. Afier completing compaction, clip; skin, or tight-blade the surface with a maintainer ar subgrade trimmer to a depth of approximately 1(4 inch. 2. Remove loosened material and disp�se of it at an approved location. 3. Seal the clipped sarface immediately by i•olling with an appropriate size pneuii�atic tire roller until a smooth sur•face is attained. 4. Add small increments af water as needed dul•ing rolling. 5. Shape and maintain the course and surface in confarmity with the typical sections, lincs, and grades as shown on the Dra��srings or as directed. 6. I�7 areas where surfacing is to be placed, correct grade deviations greater than 1/4 ulch in 16 feet measured lougitudinally or greater than 1/4 inch over the entire width of ihe cross-section. 7. Correct by loosening, adding, or remavin�; �naterial. 8. Reshape and recon�pact in accordance with 3.4.C. 3.5 R�PA�RlRESTQRATION [NOT LTSED] 3.6 ItE-Il�'STAL]C.AT'Io1V (NO'i' USED] 3.7 QUAI,ITY CC}lY'I'ROL A. Density Test 1. City to measure density of flexib�e base course. . a. Notify City Project Representative when flexible base ready for density testing. b. Spacing directed by City (1 per block rninimtun). c. City Project Representative determines locaiion of density testing. 3.8 SYSTElVV� STARTUP [NOT US��9] 3.9 A�.IUS'I"ING [NOT USED] 3.I0 ��,EANING [N�T USED] 3.1.1 CZ.QS��U'I' ACTI�TITIES [IlTO'I' ITS�D] 3.12 I�idOTECTI�N [NOT I7SED] 3.1.3 1V�A�1vTEN,A.Nc� [No'I` i.ISEI3j 3.14 ATTA��IMEN'�'S [NQT dTS�D) � a Revision Log DATE NAME SUIv1I��ARY OF CHANGE �J CITY OF F'OR7 WORTH DF�' Airport Reclaimed l�ater Deliv�•y System Flusliline STANDARD CUNSTRUCTIQN SPLCIPICATION DOCUA4ENTS Cit}- Project N�. OZ(125 Revised July 22, 2013 329213-I lil'DftOMULC'f(ING, SEGDING AND SODDING Pagc ( oF7 1 ? 3 4 5 6 7 8 9 I0 11 12 73 14 15 16 I7 18 19 Za 21 22 23 24 25 26 27 28 29 3Q 31 32 33 34 35 36 37 38 39 40 41 42 43 SECTION 32 42 13 HYDROMULCHING, SEEDiNG AND SODDING PART � - G�NEIZAL 1.1 SUIVIIVi�I2Y A. Section Inciudes: l. Furnishing and instalfinb grass sod and pennanent seeding as sliown on Drawings, or as directed. B. Deviations from t11is City of Fort V�,�ortll Standard Specification 1. l.6.A.2, l.l O.B.1, 1.10.B.2, 22.A_2.c (rye renloved}, 2.2.A.2.d,3.4.B.1.b, 3.4.B.6.c, 3.13.1�.1, 3.13.B.1, 3.13.B.3.a and 3.i3.C.l C. Related Specification Sections include, but are »ot necessarily limited to: 1. Division 0- Bidding Requirements, Contract Fanns, and Conditions of the Contract 2. Division 1- GeneraI Requireinents 3. Section 32 9I 19 — Topsoil Placement and Finishing of Parkways 1.2 P�22ICk� r�.Nll PAYIVI�N 1' PROC�vU1�;S A. Measurement and Payment 1. 131ock Sad Placement a. Measuremeizt I) Measurement for t}izs Item sl�all be by tlle square yard of Block Sod piaced. b. Payment 1) The work performed and ulaterials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price bid per square yard of Block Sod p].aced. c. The price bid shall include: 1) Furnishing and placing a11 sod 2) Rolling and tamping 3} Watering (until established} 4) Disposal of surplus materials 2. Seeding a. Measurement l) Ivleasurement far this Item shall be by the square yard of Seed spread. b. Payment 1) The work perfanned and materials furnished in accardancc with this Item and measured as provided undei- "Measurement" will be paid for af the unit price bid per square yard of Seed placed for various installation met}iods. c. The price bid shall include: 1} Furnishing and placing ai1 Seed 2) Furnishing and applying water for seed fertilizer 3) Slurry and hydraulic mulcl�ing 4} Fertilizer 5) Watering and mowing (until established} 6) Disposal of surplus illaterials 3. Mowing CITY OF FORT WORTH DFW Ai�potK Reclaimed Water IIeliveiy System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Pi•oject No. 020'_� Revised Ju1y 22, 2013 32 g2 I 3 _ ? H1'DROMULCHING. SE[DING AND SODDiNG Page 2 of 7 1 ? 3 4 5 6 7 1.3 8 1.4 9 IS 10 �.6 d. MeaSUI'eIllell� ]} Measurement for this Item shall per each. b_ Payment 1} The work perforn�ed and materials fur-��ished in accordat�ce with this Item and measured as provided under "Measurement" will be paid foi- at the unit priee bid per each. R�FERENCES [NOT USED] ADMINISTRATIVE REQUIREMENTS [NOT USED] ACTION SUBMITTALS [NOT USED] INFORMATI4I�TAL SUBMIT"�'ALS 11 A. Seed 12 1. Vendors' certificatiot� tliat seeds rneet Texas State seed Iaw including: 13 a. Testing and labeling for pure live seed (PLS) 14 b. Name and type of seed 15 2. All seed shall be tested in a laboratory with certified results presented to the City 16 and DFW Airport in writing, prior to planting. I7 3. All seed to be of the previous seasou's crop and tl�e date on the container shall be 18 within 12 montils of the seeding date. 19 1.7 CL(JSEOUT SLTBMITTAI.S [NO�' USED] 20 I.8 MAINTENANCE MATERIAL SUBMTI'TALS [NC?T USED] 21 1.9 Q1IlALITY ASSURANCE [_NOT LTSED] 22 1.10 DELNERY, STO1t�GE, AND HANDLING 23 A. Block Sad 24 1. Protect from exposure to wind, sun and freezing. 25 2. Keep stacked sod moist. 26 B. Seed 2� 1. If using native grass seed, seed must have been harvested within 104 m.iles of the 28 construction site. 29 2. Eac}i species of seed shall be supplied in a separate, labeled container far 30 acceptance by the City and DFW Airport. 37 C. Fertilizer 32 1. Provide fertilizer labeled with the analysis. 33 2. Conform to Texas fertilizer law. 34 35 36 37 1 • 1 ! • i1 .... �; � ► a. . �.� a , ��... ,�. �, �, � ' i "•�1 � i CITY OF FORT WORTH DFW Ai�po�t Reclaimed Water DelivcKy System Flushline STANDARD CONSTTZUCI'ION SPLCIFICATION DOCUMENTS City ProjectNo. d2025 Revised July 22, 20l 3 32 �)2 l3 - i EIYVROMULCI{[NG, SEL•DING AND SODDING Pagc :i ��I ? ? 3 4 5 6 7 8 9 I0 II 12 l3 I4 15 16 17 l8 l9 20 21 22 23 24 25 ?� 7� ?� ?9 �a 31 32 33 34 35 36 37 38 39 40 41 42 43 44 4.5 l�i�►TlF���►7��� �►-'1 ' f � A. Materials 1. Block Sad a. Sad Varieties (match existing if applicable) 1) "Ste�lotapl�rum secu��datum" (St. Augustine gi-ass) 2} "Cyiiodon dactylan" (Common Bermudagrass) 3) "Bucliloe dactyloides" (Buffalagrass} 4) ari ap�1-oved hy�rid af Common Bermudagrass 5) or an approved Zoysiags ass b. Sod must contain stolons, leaf blades, rhizomes and roots. c. Sod shall be ali��e, healthy and free of insects, disease, stones, undesirable foreign mate�•ials and weeds and grasses deleterious to its growth ar whicl2 inight affect its s�bsistence or hardiness when transpIanted. d. Minimum sad tllickness: 3/4 inci� e. Maximun� grass I�eiglit: 2 inches f. Acceptable growing beds 1} St. Augustine grass sod: ciay or clay loarn tt>psoil 2) Bennuda grasses and zoysia grasses: sand o�� sandy loam soils g. Dimensions 1} Machine cut to unifonn soil tl�ickness. 2) Sod s11a11 be af equal widtil and of a size that peinlits the sod to be lifted, handled and rolled without breaking. h. Broken or torn sad or sod with uneven ends shall be rejected. 2. Seed a. General 1) Plant ali seed at rates based on pure live seed (PLS} a) Pure T ive Seed (PLS} determined using tl�e formuia: (1 } Yercent Purc Live Seed = Percent Purity x[(Percent Genni�aation + Percet�r Finn �r Hard Seed) + 104] 2) Ava�ilability of Seed a) Substitutian of individual seed types dzae to lack of a��ailability may he pennitied by the City at the time of planting. b) I�Totify the City prior ta hidding of difficulties locating certain species. 3) Weed seed a} lvot exceed ten percent by weight of the totai of pure live seed (PLS) and other material in the mixture b) Seed not allou�ed: (1) 3ohnsangrass (2) Nutgrass seed 4) Harvest seed within I-year prior to planting b. I�Ton-iiaiive Grass Seed I) Plant between April 15 and September 10 Lbs. Common Name Botanical Name F?u; ity Gennination 1'LSiAcre (percent) (percent) 25 Bermuda (unhulled) cyl�oclo3r cluctylor� �{ y� 75 Bermuda (hulled) eynoclora dr�ctylorz 9S g� 2} Plant bet���ee�1 Septeinber 10 and April 15 CiTY OF FURT WORTH DFu' Aitport Reclaimed Water Bctivery System Plushline STANB.ARD CO]*iSTRUCTION SPECIFiCATiON DOCL)ivlETviTS City Praject No. 02U25 Revised Julv 22, 20I3 3292 E3-4 HYBRQ'��1i�L£'HiNG. SEEIJI�G A'�Q SflDD1NG Pttg� � aS�? Lbs. Con�mon Name Botanical Nanie Purity Germinatian PLS!Acre (percent) (percent) 220 Rye Grass lolium r�tulti�lori.rm 85 90 � 75 Bern�uda (unhulled} cy�aorlo�r dnctylnn R5 90 2 3 4 5 c. Native Grass Seed I} Pla�lt between February 1 and October 1. I..bs. PLS/Acre l.6 5.5 3.7 17.0 1.8 4.5 b.0 8.0 1.2 1.8 6 7 8 9 la 21 12 13 14 15 16 i7 18 19 20 ?� 22 23 24 25 ?6 ?� 28 F3''� Co�n�non Name Green Sprangletop Sideoats Graina* Little Bluestem* Buffalagrass Indian Grass* Sand Lovegrass* Big Bluestem Eastern Grama Blue Grama Switchgrass d. Wildflower Seed — Not AlIawed Botanical Name Leptochlon dubia Boutelotra curtrpex�IctJa Sclaizadr}n-icnn scoparifn�� &uchloe dnct��loides Sorghastrum nutalas Eragrostis triclrodes .4ndroJ�ogon gei•ar•dii Ti-ipscucum dacryloides Bouteloua gracilis Pu��icum i�irgatu�rl e. Temporary Erosion Contral Seed 1) Consist of the sowing of cool season plant seeds. 3. Mulch a. For use with canventianal mechanical or hydraulic pianting of seed. b. Wood cellulase fiber produced from virgin wood or recycled paper-by-products (waste products from paper mills or recycled Slewspaper}. c. No grawth or germination inhibiting factors. d. No more than ten percent moisture, air dry weight basis. e. Additives: binder in powder form. f. 1{orm a strong moisture retaining mat. 4. Fertilizer a. Acceptable conditian for distribution b. Applied unifo.rnZly over the planted area c. Analysis 1 } 16-20-0 2} 16-$-8 d. Fertilizer rate: 1) Not required for wildflower seeding 2) Ne��ly estahlished seeding areas - 100 pounds af nitrogen per acre 3) Established seeding areas - 150 paunds of uitrogen per acre 5. Topsoil: See Section 32 91 19. 30 6. Water: clean alld free of industrial wastes or other substances harmful to the 31 germination af the seed or to the growth af the vegetation. 32 7. Soil Retention Blanket 33 a. "Curlex I" from An�erican Excelsior, 900 Ave. H East, Post Offce I3ox 5624, 34 Arlin�on, Texas 76001, 1-800-777-SOIL or approved equaL C(TY OF FORT ��r'dRTH DF�� A�ipoil Reclaimed itJatc.�� Deli��eiy 5ystem Flrshiine STAiv'DARD CONST'Rt)CTidN SpEC[FiCATiON I?OCUNf�N'7-S City P3��ject 3�Io. C�2025 Re��ised Juiy ?=, 2Q l � 329213-5 HYDROMUI.CHING, SEEBING AND SODDING Pag� 5 ��i' 7 1 2 2.3 ACCESSOItiES �NOT USEI�] 3 2.4 Sf)g1RC'E �UALI`T Y�ON'I"I20L. (NOT USEI�j 4 5 6 7 8 9 l0 lI 12 13 I4 15 16 17 I8 19 20 21 22 23 24 25 26 27 ?g �g 30 31 32 33 34 35 36 37 3& 39 40 41 42 PART 3 - EXECdJTICiN [NOT USEDj 3.1 INSTALLEIZS [NOT USED� 3.2 EXA�Aii'IINA"I'ION (N4'T LJSEI}] 3.3 PREPARA'I'IQN A. Surface Preparation: clear surface of all ii�aterial inciuding: 1. Stumps, stones, and ather objects Iarger than one inch. 2. Roots, bnish, wire, stakes, ete. 3. Any objects that may interfere with seeding or maintenance. B. Tilling 1. Compacted areas: till 1 incll deep 2. Areas sloped greater tlian 3:1: run a tractor parallel to slope to provide less seed/water run-off 3. Areas near trees: Do not till deeper than 1/2 inch inside "drip line" of trees. 3.4 INS'I'ALI..ATIQN �. Block Sodding 1. General a. Place sad between curb and walk and on terraces that is the same type grass as adjacent grass or existing lawn. b. Plant between the average last freeze date in the spring and 6 weeks prior to the average first freeze in the fall. 2. Installation a. Plani sod spec'rfied after the area has been completed to the Iines and grades shown oi� the Drawings with 6 inches of topsoil. b. Use care to retain native soil on the roots of the sod during the process af excavating, hauling and pianting. c. Keep sod material maist from �l�e time it is dug until planted. d. Place sod so that ihe eiitire area desi�lated for sodding is covered. e. Fill voids Ieft in ihe solid sodding with additional sod and tamp. f, Rall and tainp sod so that sod is in eomplete contaet with topsoil at a uniform slope. g. Peg sod with wooden pegs {or wire staple) driven through the sod block to the firm earth iiz areas that may slide due to the height or slope of the surface or nature of the soil. 3. Watering and Finishing a. Furnish water as an ancillary cost to Contractar by means of temporary metering / irrigation, ��ater truck ar by any ather method necessary to achieve an acceptable stand of turf as defined in 3.13.B. b. Thoroughly water sod immediately after planted. a Water until established. CI7`Y OF FORT WORTH DPW Aiipori Reclaimed Water Delivety System Plushlinc STANllARD CONSTRUCTION SPECIFICA'tION DUCUMENT5 City Project No. 0?OZS Revised July 22, 2013 329213-6 Nl'DROMULCHING, SEEDfNG AND SOdDING Pagc G c�l�7 I 2 3 4 5 6 7 8 9 10 li 12 13 14 15 16 17 18 I9 30 ?� �2 23 24 25 ?� ?� �g< ?9 3Q 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 d. Generaily, an amou�}t of water that is equal to the average amount of raitlfall plus I/2 inch per week should be applied until accepted. If app]icable, plant large areas by irrigation zones to ensure areas are watered as soon as they are planted. B. Seeding 2. 3 � �.7 General a. Seed only those areas indicated an the Drawiz�gs and areas disturbed by construction. b. Mark each area to be seeded in the field prior to seeding for City and DFW Airport approval. Broadcast Seeding a. Broadcast seed iY� 2 directions at rigl�t angles to each other. b. I�arrow or rake lightly to cover seed. c. Never cover seed with �nore soil than twice its diameter. d. For wildflower pIanlings: 1) Sealp existing grasses to 1 inch Z} Remove grass clippings, so seed can make contact witl� the soil. Ivlechanically Seeding (Drilling): a. Unifonnly distribute seed over the areas shown on the Drawings or as directed. b. All varieties af seed and fertilizer inay be distributed at the same time provided that each cou�ponent is uniformly applied at the specified rate. c. Drill seed at a depth af 1i4 incl� to 3/8 inch utilizing a pasture or rangeland type drill. d. Drill on the contour of slapes e. After planting roll with a roller integral to the seed drill, or a corrugated raller of the "Cultipacker" type. f. Roli slape areas on the contour. Hydroinulcl�ing a. Mixing: Seed, mulch, fertilizer and water may be mixed provided that: 1) Mixture is uniformly suspended to form a l�oinogenous slurry. 2) Mixture forms a blotter-Iike ground cover impregnated unifonnly with grass seed. 3) Mixture is appiied within 3011�inutes after placed in tlie equipment. b. Placing 1) Unifarn�ly distribute in the quantity specified over thc areas shown on the Drawings or as directed. Fertilizing: uniformly apply fertilizer aver seeded area. 6. Watering a. Furnish water by means of temporary metering / irrigation, water truck or by any other method necessary to achieve an aeceptable stand of turf as defined in 3.13.B. b. Water soil to a minimum depth of 4 inches within 48 hours of seeding. c. Water as drrect by the City or I)�W Airport at Ieast twice daily for 14 days aiter seeding in such a manner as to prevent washing of the slopes ar dislodgemenf of the seed. d. Water until fmal acceptance. e. Generally, an amount of water that is equal to the average amoui�t of rainfall plus 1/2 inch per week should be applied until accepted. CITY dF FORT WORTH DFW Aiipott Reclaimed Water Delivery System Flushline STANDARD CONS'I�RliCT10N SPECIFICATION DOCUMENTS Cit7� Project No. 02Q25 Revised July 22, 2Q73 32�1213-7 HYDROtvIULCH3NQ SEEDING At�lD SODDING Pagc 7 0l'7 1 3.5 R.EPAIR/RFST�RA'I'ION (NOT USF,1D) 2 3.6 ItE-INSTALLATIOPJ (NOT US�D] 3 3.'7 FIELD QUALITY CONTROL [NOT USEDJ 4 3.8 SYSTEM S1'ARTUP jNOT USED] 5 3.9 ADJUSTING [NOT USED] 6 3.I0 CLEANANG [NOT USED] 7 3.21 CLOSEOUT ACTTVITIES � 3.22 PROTEClIQN [NnT USEDJ 9 3.13 MAINT�NANCE ] 0 A. B1ock Sodding 11 l. Water and mow sod until completion and fnal acceptance of tl�e Project or as 12 directed by the City or DFW Airport. 13 2. Sod shall not be considered �nally accepted until the sod has started to peg down 14 (roots growing into the soii} and is fi•ee from dead blacks of sod. 15 B. Seeding l6 1. Water and nlow sad until completion and final acceptance of the Pro}ect or as 17 directed by the City or DFW Aiiport. 1� 2. Maintaiii the seeded area until each of the following is achieved: 19 a. Vegetation is evenly distributed 20 b. Vegetation is free from bare areas 21 3. Turf will be accepted once fuIly established. 22 a. Seeded area must have 100 percent growth to a heigllt of 3 inches with 1 mow 23 cycle performed by the Contractor priar to consideratian of acceptance by the 24 City or DFW Airport. ZS C. Rejection 26 1. City or DFW l�rrport may reject block sod or seeded area on the basis of weed 27 populations. 28 3.14 A'i"i`ACI�VVIENTS [NOT US.ED] 29 END OF SECTION 30 31 Revisian Log DATE NAME SUMMARY OF CHANGE i C'ITY OF FORT 1i�'ORTH DFW Airport Reciaimed V+'ater Delivery System Flushiine STANf3,4RB CO'�STRUC7'lON SPECIFICATION BOCLI�4ENTS Cin Pf�ojcct Nc. 62O�� Rcti-ised Juiy 22, �Oi? 33U510-I UT�ILI`fY'T'RENCN EXCAVATION, EMB�DMENT, AND QAC'Kf�ILI. Pagr I of 20 I � SECTION 33 OS 10 UTILITY TRENCH EXCAVATIC?N, EMBEDMENT AND BACKFILL , . . � � 5 6 7 8 9 10 11 12 13 14 IS 16 17 i8 19 20 21 22 23 24 25 ?� ?7 ?g 29 3U 31 32 33 34 35 36 37 3� 39 :�1, I.l. SUNiMARY A. Section Includes: 1. Excavation, Embedmeni and Backfill for: a. Pressure Applications I) Water Distribution or Transmission Main 2} Wastewater Force Main 3) Reclaimed Water Main b_ Gravity Applications 1) Wastewater Gravity Mains 2) Storn� Sewer Fipe and Culverts 3} Stvnn Sewer Precast Box and Culverts 2. Including: a. Excavation of all material encountered, including rock and unsuitable materiais b. Disposal of excess unsuitable material c. Site speeific trench safety d. Pumping and dewatering e. Embedment £ Concrete encasement for utility lines g. Backfiil h. Compaction B. Deviations from this City of F�rt ��Jorth Standard Specification l. 1.6.B and 1.IO.B C. Related Specification Sect.ions include, but are not necessarily lim.ited to: 1. Division 0— Bidding Requirements, Contract Farms, and Conditions of the Contract 2. Division 1— General Requirements 3. Section 02 41 13 — Selective Site Demolition 4. Section OZ 41 15 — Paving Removal 5. Section {i2 41 14 — Utility RemovaUAbandonment 6. Section 03 30 00 — Cast-in-place Concrete 7. Sectian 03 34 13 — Controlled Low Strength Material(CLSM} 8_ Section 31 10 00 — Site Clearing 9. Section 31 25 00 — Erosiozl and Secliment Col�troi 10. Sectian 33 OS 26 — Utility Markers/Locators 11. Section 34 71 13 — Traffic Control 1.2 PI2ICE �'A �IlTT �'ROCED ES A. Ivleasurement and Payn7ent CITl' OF FORT �VORTF3 DFw' niTpoit Reclaimed VJater Deliveiy SYstein Flusliline STANDARd CC3tVSTRUCTION SPECIFICATtON DOCUMENTS City Project No. p2025 Revised July 22. 2� l3 33 ()5 I ii - 2 UTILtTY TRENCH EXCAVA'i�iON, F1vi[3€=Dh1ENT, AND BACKEILL Ptigc 2 oI Zi} I l. Trencl� Excavation, EmbedmeT�t atid Backfill associated ��ritl� tl�e ii�stallatioii of aT� % underground utility or eAeavation 3 a. Measurement 4 1} This Item is considered subsidiary tc� tl�e instaliation of the utility pipe lii�e 5 as designated in tl�e Drawings. 6 b. Payn�ent 7 1} Tlie work perfarmed and the materials furnished in acco��da��ce with tliis 8 Itei�i a�-e considered subsidiary ta tl�e instailation of tl�e utili#y pipe for the 9 type of embedmei�t and backfill as indicated an the plans. No otlier IO com�ensatio�� will be aliowed. I 1 2. I�nported Embedme��t or Backfill 12 a. Measureineiit 13 1) Measu��ed by tl�e cubic yard as delivered ta the site and recorded by truck 14 tieket provided to the City 15 b. Payz�ent I b 1) linported fill sl�all only be paid ��17en usiaag i��aterials for embedment and 17 backfill other than thase identified in t1�e Drawings. The u�ork performed 18 and mate3-ials fui�iished in accordance witI� �re-bid icern ai�d �neasured as 19 provided u��der `�Measure»�e��t" �uiil be paid for at the unit priee bid per 20 cubic yard af "Imported E���bedanentlBackfill" delivered to the Site far: 21 a) Various embedment/backfill materials 22 c. The price bid sha11 include: ?3 1) Furnishing backiill or enabedment as specified by tllis Specification 24 2} Hauling ta the site �5 3) Placement and compaction af backfill or embedment 26 3. Concrete Encaseznent far Utility Lines 27 a. Measurelnent 28 1) Measured by the cubic yard as delivered to the site and recorded by iruck 29 ticket provided to the City 30 b. Payment 31 1) The work performed�and materials furnislled in accardance with this Item 32 and measured as p�'ovicled under "Measurement" ���ill be paid for at i.i�e unit 33 p�-ice bid per cubic yard of "Co1�c�-ete Encasement for Utility Lines" 34 delivered to tl�e Site. 35 e. The price bid shall include: 36 1) Furnishing, hauling; plaeiz-�g azad finislu��g concrcte in accardance with 37 Sectioi� 03 30 00 38 2) Clean-up 34 4. Ground Water Control 4Q a. Nleasurement 41 1} Measurement shall be 1uz71p sum when a ground water eontrol plai� is 42 speeifically required by the Contract Dacun�ents. 43 b. Payment 44 1) Payinef�t sl�all be per the Iu�np sum price bfd for "Grour�d Watcr Control" 45 incIuding: 4E a} Subinittals 47 b) Additioiial Testinb 4& c) Ground water control system installation 49 d) Ground water control system operations and maintenance CITY OF FORT �iiOR"3'H DF�N Aiipart Raclaimed R'ater Delivery System Fhishline S7'ANI3AitD C4NSTRUCTi4`v SPECIFIC.ATIQN DOCl�MENTS City Praject No. 02025 Revise:� July 2=, 2013 330510-3 tiTILITY'1'RENCH EXCAVAT'ION, ER4BEDMENT, AND BACKPILL Pagc 3 of 2{) I e) Disposal of watez� 2 f) Renioval of ground water control system 3 5. Trench Sa%ty 4 a. Measuren�ent 5 1) iVleasured per linear foot of exeavatian foi• all trenches that require tre��c11 6 safety in accordanee wit1� OSHA excavation safety standards (29 CI�R Part 7 1926 Subpart P S�fety and HealtIi re�ulations for Constructian) 8 b. Payment 9 1) The work performed and materials furnished in accordanee with tliis Item 10 a�id measured as pi-ovided u��der "Measureaner�t" �vill be paid for at il�e u��it 11 price bid per linear foot of excavation to comply ��it13 OSHA excavatian 12 safety starldards (29 CFR Part 1926.650 Subpart P), iiicluding, but not i3 limited to, aII submittals, labor and equipment. 14 1.3 � F`ERE�T�ES I S A. Definitians 16 1. General — Defnitions used in this section are in accordance with Tenninologies 17 AST?vI F412 and ASTM D8 and Tenninology ASTM D653, unless otherwise 18 noted. 19 2. Definitions for trench widtl�, back.fill, e�n�edi7lent, initial hackfiIl, pipe zone, 20 haunclung bedding, sprin ;Iine, pipe zone and foundation are defined as sho�m in 2 i the following schematic: 1if':,; fi' �-� d � C �,,: r.,�F:. .. ,_ia � I ^;! � Ir''ti �___ �`,f�`' : ( :�_i.. r I..il s� i�'� .;Y'��iil�ii;�..:�'IF- �,_7 ,� F ,,;Yt,i-IIE;�t> � BE:i:�?Er�yta } �?U1!�'. ��0'V ;. 22 I _�__ � �� � �XCA',�ATEC TRE'�;GH i�r'iDTH � �� � W � � �s; f � rv,' �r' ,�_ li�' l«,...�i.i�i�.V CITY OF FORT R�ORTH [�FW Aiip.xt Reclaimed ��'ater Delivezy Syste�n Flusl�Iinc STAND.ARD CONSTRUCTION SPECIF7C;ATIQN DOCUMENTS Cit�- Yreject'�o. 0?Q25 Reviseci JuJy 22, 2013 33 OS 10 - 4 UT1L!"iY TKGNC'1{ EXCAVATION. CMIiCDMEN'1". AND C3ACKFILL P<�gc 4 oI-20 1 ? 3 4 5 6 7 8 9 10 11. 12 13 14 15 16 17 18 19 20 21 ?2 23 24 ?$ 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 4I Reference standards cited in tl�is Specification refer to the cutrent reference standard published at the time of the latest revisior� date logged at tl�e end of this Specificatioll, unless a date is specifically cited. ASTM Standards: a. ASTM C33-08 Standard Specifications for Concrete Aggregates b. �STM C88-OS Soundness of Aggregate by Use of Sodium Sulfate or 1Vlagnesiuni Sulfate c. ASTM C136-01 Test Method for Sieve Analysis af Fine and Coarse Aggregate d. ASTM D448-08 Standard Classificatian for Sizes of Aggregate for Road and Bridge Construction. e. ASTM C535-09 Standard Test Method for Resistance to Degradation of Large- Sizc Coarse Aggregate by AUrasion and I�llpact in the Los Angeles Machine f. ASTM DS&8 — Standard Test method for Moisture-Density Relatians of Saii- Cement Mixture g. ASTM D698-Q7 Test Method for Laboratory Compaction Characteristics of Soil Using Stand Lfforts (12,40d ft-lb/ft3 600 Kn-mIM3}}. h. ASTM 1556 Standard i'est Methods for Density and Unit Weight of Soils in Place by Sand Cone I�Tethod. i. ASTM 2487 —10 Standard Classif cation of Soils for Engineel7ng Pur�oses {Unified Soil Classificatian System) j. ASTM 232I-09 Underground Installation of Tliermaplastic Pipe for Sewers and Other Gravity-Flo«� Ap�lications k. ASTM D2922 — Standard Test Metliods for Density of Sails and Soil Aggregate in Place by Nuclear Methods (Shallow Depth) 1. ASTM 3Q17 - Standard Test Method for Water Content of Soil and Roek in place by Nuclear Methods (Shallow Depth) m. ASTM D4254 - Standard Test Method for Minimum Index Density and Unit Weight of Soils and Calculations of Relative Density 3. OSHA a. Caccupational Safety and Health Administration CFR 29, Part 1926-Safety Regulations for Construction, Subpart P- Excavations � , � •. � �, 43 44 45 4h 3. Deleterious matei-ials — Hannfiil maferials sucl� as clay lu�z�ps, silts and organic rnaterial 4. Excavated Trencll Depth — Distance fi�om the surface to tl�e bottom of tlle bedding or the trench foundation 5. I'inal I3ackfi1l Depth a. Unpaved Areas —'The depth of tI�e final backfill measut-ed from tlle top of tlle initial backtill to the surface b. Paved Areas — Tl�e depth of the final backfill measured fi-otn the to� of the initial backfill to botto�n of �ermaneiit or temporary paveiilent repair B. Referei�ce Standards 1 2. A. Coordiiiation 1. Utility Company Notiticatio�a a. Notify area utility companies at least 48 hours in advance, e�cluding ��eekends and holidays, before starting excavation. CITY OF FORT WORTH DF1'J Aitpo�t Reclaimed Water Delivety System Flushline STANDARD CONSTRUCTION SPECIFICA?ION DQCUMENTS City Pr�ject No. 02025 Re��ised July 22, 2013 33()$ 10-5 U71�ITY'1�RENCF{ EXCAVATION, EMBEDMEN"I�, AND BACKFILL P.igc 5 of 2(1 1 2 3 4 5 6 7 8 b. Request the locatio�� of buried liiies and cables in the vicinity of tlie pl•oposed work. �3. Sequencing 1. Sequence work for each section of the pipe installed to complete the ernbedinent and backfill placement on the day the pipe foundation is eomplete. 2. Sequence work such that proctors are cornplete in accordance with ASTM D698 prior to commencement of canstruction activities. 1.5 S�IBIVIIITTALB 9 A. Sub�nittals shall be iu accordance ��ith Section O1 33 00. 10 B. All submittals shall be approved by the City prior to constructian. 11 1.6 ACTION SUBMI'T'I'ALS/INF�RTViATI�IlTAL SiJBI1TITTALS 12 13 l4 15 16 l7 18 19 20 2 l. 22 23 24 25 26 �� 2g A. Shop Drawings 1. Provide detailed drawings and explariation for ground water and surface water eontrol, if required. 2. Trench Safety Plan in accordance with Occupational Safety and Health Administration CFR 29, Part 1926-Safety Regulations for Constructian, Subpart P- Excavations 3. Stockpiled excavation and/or backfill material a. Provide a description of the starage af the excavated inaterial only if the Contract Documents do nat allow storage of materials in tl�e right-of-way of the easeinent. B. Imported Materials 1. Al] im�orted material shall be approved for use on DF�3J Airpart property by DFW Environmental Affairs. Contractar shall submit an Imported M. aterial form for approval prior ta bringing rnaterial on DFW property. � . ! ' � 1 f Z ' : i 29 1.9 Q�;.4LITY ASSURANCE [:V07[' i�SF�] 30 1.1Q i}ELIVEit�', STO][�AGE, AllTD FIA'V�LING 31 32 33 34 35 36 37 38 39 40 41 A. Storage 1. Wi.thin Existing Rights-of-Way (ROW) a. Spail, imported embedment and backfill materials may be stored within existing ROW, easements or temporary construction easements, unless specifically disallowed in the Contract Documents. b. Do not block drainage ways, inlets or driveways. c. Provide erosion contral in accordance with Section 31 25 00. d_ Store materials only in areas barricaded as provided in the traffic control plans. e. In non-paved areas, do not store material on tl-ie root zone of any trees or in landscaped areas. 2. Designated Storage Areas CITY QF FORT WORTH DFW Aia-poit Reclaimed Water Deli��e�y System Flushline S't�ANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City ProjectNo. 020?5 Revisc;d July 22, 2013 33OS IO-G UTILITI' TRENCIi EXCAVATiON, £MBF,DMENT, AND BACKFILL Pagc G nC20 I ? 3 4 5 6 7 s 9 10 11 12 c1. I��Il� �OI111'ZCi BUCU111�I115 Cj0 IIOt BI�O�V t�le Sf01'a�t;C d�S�OlIS, embedt�iei�t o7- backfiil materials within the ROW, ease���ent or temporary construction easement, ti�en secure and n�aintain an adequate stt�rage locatian. b. Provide ai� affida��it that rigilts Ilave been secu�-ed ta stare tlie materials on private property. c. Pravide erosion corltral ii� accarda��ce «�ith Section 31 25 OQ. d. Da not block dz-ait�age ways. e. Only �naterials used for 1 working day will be allowed to be stored in the u�ork zone. B. Deliveries and I�aul-off - Coordinate all deliveries and haul-off witl� the City and DFVd Airport. I�� no eases nlay material be remaved from DFW Airpart property. !�ny excavated excess material shal] be taken to tl�e DFW airport soil starage site. 13 �.11 �`��;I,i7 (SI'1 �:] C�l�ti�I'I'IOI�TS 34 15 16 l7 18 14 A. Existing Conditior�s Any data which has been or may be provided on subsurface conditions is not intended as a re��resentatian Qr ��an-az�t�j of accuracy or coz�tinuit}I betureei� soiIs. It is expressly understood that neitller the Cit}� nor the Engineer u�ill ve responsible far interpretations or canclusions drawn there from by tl�e E;ontractor. 2. Data is made available for the coilvenience of the Contractor. 1 � i fr,� �� i .1117r����� �1 iL�11 If_.i i � � 1; .. . , � , �. 23 2.2 l�I�TEI2I�.,S 24 25 26 27 28 29 3Q 31 32 33 34 35 36 37 38 A. IVlaterials i . Utilit�� Sand a. Granuiar and free floi�ring b. Genera115� meets or exceeds the limits an deleterious substances per Table 1 for fine aggregate aeeording to ASTM C 33 c. Reasonably free af organic inateriai d. Gradatioii: Sieve Size Percent Retained 1 inch 0 3/8 inch 0-10 #40 20-60 #100 95 2. Crushed Rock a. Durable crushed rock or recycled concrete b. ;Vleets the gradation of AST?�� D448 size nuinbers 56, 57 or 67 c. May be �nwashed d. Free from significant silt clay r�r unsuitable materials e. Percentage of �vear not more than 40 percent per ASTM C131 or C535 f. I��ot �nore than a 12 percent ���aAi�laum loss when subjective to 5 c}�cles of sodium sulfate soundness pe�- ASTM CSS CITY UF FORT RjORTH DPVd ,�irpoft Reclaimed G'Jater• Deli�-ery Systei.� Ftushline STANDARD CONSTP�UCTIQ'� SPECIFICATION DC>CUJvIENTS City Project 1�io. 0?625 Revised July 22, �0 i 3 33OS 10-7 Ufil.Il�Y i'ftL-:NCH EXCAVATiON, EMBEDMENT, AND i3ACKFILL P�igr 7 ul'2{1 i 2 3 4 5 6 7 8 9 IO Il 12 13 14 IS lE 17 18 19 ?o 2I ?2 23 24 25 2b 27 28 ?g 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 3. Fil�e Crushed Rock a. Durable cruslied rock b. Meets tl�e gi•adatioil ai.�STM D448 size numbers 8 or 89 c. May be unwashed d. Free from sigi�ificaut silt clay ar unsuitable materials. e. Have a percei�tage of wear not mvre thau 40 percent per ASTM C 131 or C535 f: Not more than a 12 percent maximum loss when subjective to 5 cycles of sodiun� sulfate sowidness per AST�vI C88 4, Ballast Stone a. Stoi�e ranging from 3 inches to 6 incl�es in greatest dimension. b. iVlay be unwaslied c. Free from significant silt cIay or uiisuitable materials d. Percentage of wear no# �nore t1�an 40 percent per ASTM C131 ar C535 e. Nat iizore tlian a 12 percent maximum loss «rhe�� subjected to 5 cycles of sodium sulfate soundness per 4ST �VI C88 5. Acceptable Backfill Material a. I�l-situ or i��ipc�rted soils classired as CL; CH, SC: or GC in accordanee witt� AST��I D2487 b. Free fram deleterious inaterials, t��ulders over 6 inches i�l size and organics c. Can be placed free from voids d. IVlust have 20 percent passing the number 200 sieve 6. Blended Backfill Material a. In-situ sails elassified as SP, SM, GP ar GM in aeeordance ��ith t�STM D2487 b. Blended witll in-situ or imported accepiable backfill material to meet ihe requiretnents of an flcceptal3le Backf 11 Material c. Free from deleterious materials, boulders aver 6 inches in size and organics d. Must have 24 percent passing the number 200 sieve 7. Unacceptable Backfill ivFaterial a. In-situ soils classitied as ML; MH, PT, OL cn- OH in accordance with ASTM D2487 8. Select Fill a. Classified as SC or CL in accardance with ASTM D2487 b. Liquid limit less than 35 c. Plastieity index bet�feen � and 20 9. Cemeni SYabilized Sand (CSS} a. Sand 1} Shall be clean, dui-able sand meeting b ading requirements for �ne aggregates of ASTM C33 and the followinb requirements: a} Classified as SW, SP, or SM by tlle United Soil Classificati�n Systeul of AS 1�M D2487 b) Deleterious materials (1) Clay 3um�s, AS1�Ui C142, less ttzan 0.5 percent (2) Lightweight pieces, ASTM C123, less than 5.0 percent (3) Organic impurities, �STI�� C40, color no darker tilan standard color (4} Flastieity index of 4 or Iess «he2� tested in accordance with AS1'M D4318. b. ��ii�iu�lum of 4 percent cement content af Type UII portland cement CITY OF FOft1' WORTH DFV,' .Airport Reclaimed Water Delivery S��stem Flusl�line STAND,4RQ CON5TKUC"fION SPECIF1CATlOiv DOCUMEN'TS City Pr�ject Nc. t�2U25 Revised July 22, 2013 33O510-8 UTILITY'(RENCH EXC'AVA"iION, EMBEDM[N"1�, AND BACKFILL Pagc 8 of 20 1 ? 3 4 5 6 7 8 9 10 il 12 1.3 I4 15 16 17 18 19 20 2i �� 23 ?4 25 ?� 27 2$ 29 30 31 32 33 c. Water 1) Patable water, free of soiis, acids, alkalis, c�rganic matter or ot��er deleterious sul�stances, meeting rec�ui�-en�ents of ASTM C94 d. Mix in a stationary pug mill, ���ei�h-batcl� or continuous rnixing plant. e. Strellgth 1} 50 to 150 psi compressive sireugth at 2 days in accordarlce ti��ith ASTM D1F33, Metl�od A 2} 200 ta 25Q psi cc�t��pressive stre��gth at 28 days in accordance witl� AST:V1 D1633, Metl�od A 3} The n3axiz��un� compressive strengtll in 7 days shall be 400 psi. Backfi(1 that exceeds the maxi�num conlpressive strength shall be removed by the Contractor for no additionai con�pensation. f. Randoin sai�l�les af delivered product will be taken in tl�e field at po€��t af delivery far each e�ay of �lacement in the work area. Speci�nens will be prepared in accordance witl� ASTM D1632. 10. Cantrolled Low Strength Material (CZ,SIVI) a. Conform to Section 03 34 13 21. Trencl� Ge�textile rabric a. Soi1s other than ML or OH in accordance witl� ASTM D2487 1} Needle punch, nonwaven geatextile composed af polypropylene fibers 2} Fibers shall retain their relative position 3} I��ert to biologieal degradatian 4) Resist naturally occurring cheinicals 5) UV Resistani 6} Mirafi 140N by Tencate, or approved equal b. Soils Classified as ML or Of� in accordance with ASTM D2487 1} Higll-tenacity monofilament polyprapylene woven yarn 2) Percent open area of 8 percent to 1 U percent 3) Fibers sl�all retain tlieir reIative position �} I.��ert ta bialogical debradation 5) Resist natuxal.ly occurri��g chemicals 6} UV Resistant 7} Miraf FW402 by Tez�cate, or approved equal # '� i : = 1� '� � ,, R •� . �; � , • � ° �i; � � � . ►,' � ,. � , r�, 38 3.� ��'i�Iilgit�.I i�l� 39 �. Verification of Conditions 40 1. Revie�T all known, identified ar n�arked utilities, whether public or private, prior to 4 I excavati.on. 42 2. Locate and protect aIl known, identified and marked utilities or underground 43 facilities as exca�Tation progresses. CTl'Y OF FORi WOR?H DFW Aiipo:-t Reclaimed 1�'ater Deiivery System Flushline STAiyDAItU CONSTRUC"F'ION SPECTFICATI�N DOCUhRENTS Citv Project No. 02025 IZevised 3uly 22,'_O1? 33t1510-�) U"i'ILITY TRENCH EXCAVATION, EMB[:DMEN'1', AND BACKFILL Pagc 9 of20 1 2 3 4 5 6 7 8 9 la 11 3. I��otify all utility owners within tlie project ]iti�its 4�i ilours prior to l�eginning excavation. 4. The infonnation and data sliown in the Dr-awiligs witll respect to utilities is approxiinate and based on record ii�farn�atian or o�i physical appurtenances observed within tlle I3roject limits. 5. Caordinate with tlie Ownei•(s) of underground facilities. 6. Immediately notify any utility owner of damages to underground facilities resulting from construction activities. 7. Repair any damages resulting fram the construction activities. B. Notify the City immediately of any changed condition that impacts excavation azld installatioi� of ihe proposed utility. .. .. � � . - 13 14 15 16 17 18 19 20 21 22 23 24 25 26 �� 28 �g 30 31 32 33 34 3_5 36 3'7 38 39 40 41 42 43 44 45 4b A. Protection of I�i-Place Conditions 1. Pavement a. Canduct activities in such a��ay that does not dalnage existing pavemelit that is desib ated to remain. 1} Where desired to inove equipment not licensed for operation on public roads or across pavement, provide means to protect the pavement from all damage. b. Repair or replace any paveinent damaged due to the negligence of the contractor outside the limits designated for pavement removal at no additianal cost ta the City. 2. Drainage a. Maintain positive drainage during construction and re-establish drainage for aIl swales and culverts affected by construction. 3. Trees a. When operating outside of existing ROW, stake permanent and telnporary canstructian easements. b. Restrict all constructian activities to the designated easements and ROW. c. Flag and protect all trees designated to remain in accordance with Section 31 10 00. d. Conduct excavation, embedment and backfill in a n�anner sucll that tllere is no damage to the tree canapy. e. Prune or trim tree limbs as specifically allowed by tlle Drawings or as specifically allowcd by the City. 1) Pruniilg or trimming may only be accolnplished with eguipments specifically desimaed for tree pruning or triinn�ing. f. Remove trees specifically designated to be removed in the Drawings in accordance with Section 31 10 00. 4. Above ground Structures a. Protect all above ground stnzctures adjacent to the constnzction. b. Remove above ground structures designated for remaval in the Drawings in accordance with Sectian 02 41 13 S. 'I'raffic a. Maintain existing traffic, except as madified by the traffic control plan, and in accordance with Section 34 7l 13. CITY OF FOKT Vr'ORTH llFW Aiipoi�t Reclaimed VJate�- Delivery System Flushline STANDARD CONSTKUCTtON SPECIFICI�TiON DOCUM�NTS Ciry Pr�iect No. 02025 Revised July 22, 20I3 i3 (i5 I{)- Il) Ull[.l il''I KIiN('1{ I:XC'�1V/�"I�ION. [:MBFDMf_N-l�. ANf� l3AC'KPII._I_ N.tgr i0nC20 1 2 3 4 5 6 7 8 9 10 11 1? 13 14 IS 16 17 L c. 6. Traffic Signal — Poles, Mast AI-ms, I'till boxes, Detector loops a. Notify the City's Traffic Services Division a minimum of 48 hours prior to auy excavation that could impaet the operations of an existing traffic signal. b. Prot�ect all traffic signa] �oles, mast arl��s, pull boxes, traffic cal�inets, concluit and cietector Joops. c. Immediately notify tIie City's Traftic Services Division if an}� damage acctn�s ta any component of the traffic signal due to tl�e contractors activities. d. Repair any dama�e to tlle traffic sigr�al poles, mast arms, pull t�axes, tr-aftc cabinets, conduit and detector loops as a result of the eonstruction activities. 7. Fences a. Protect atl fences designated to remain. b. Leave fe��ee in the equal or better condition as prior to colistruction. Do not hlock access !o drive���ays or alleys for extended ��eriods �f tinie unless: i} Alternative access h�ts been provided 2) Proper natification has been provicled to tl3e prapei-ly o��fner or resident 3) It is specifically allo�red in tlie traflic control plau Use traffic i-ated plates to maintain access untiI access is i•estored. 18 3.4 I�S1'AI,LATI�N 19 ?0 21 ?2 23 24 25 ?�, ?� ?g 29 30 31 32 33 34 35 36 37 38 39 40 4l 42 43 44 45 A. Excavation E�cavate fo a deptli iz�dicated on the Dra��ings. 2. Trench excavations are defined as unclassified. No additional payment shall be granted for rock or other in-situ materials encouniered ill the trencl�. 3. �xcavate to a width sufficient for laying the pipe in accordance witIi the Drawings and bracing in accordance u�ith che Excavation Safety Plan. 4. The bottom of the etcavation sI1a11 be firm and fi-ee from standing watea-. a. Natify the C�ity immediately if tlze watei- and/or the i��-situ soils do not provide for a firm trench bottom. b. The City will detennine if any changes are requrred iii the pipe foundation or beddin�. 5. Unless otherwise permitted by the Drawings or by the City, the limits of the eacavation sliall not advailce beyond the pipe placement so that the trench inay be baelcfilled ui the same day. 6. Over Eacavation a. Fill over excavated areas with the specified bedding material as specif ed far the specific pipe to be installed. b. Na additional paytnent will be made for over excavatioil or additional bedding material. 7. Unacceptable Backfill Materials a. Itl-situ soils classified as unacceptable backfill material shall be separated from accepiaUle backfill materials. b. If the unacceptable backfill material is to be blended in accordance �jitl� tllis Specificati�n, then store inaterial in a suitable locatiotl until the material is blended. c. Ren�ove all unaceeptaUJe material from the �roject site that is l�ot intended to be blended ar modified. CI?Y OF FORT WORTH DF\�1 Airport Reclaimed 1�✓ater Delivet�� System Flusiiline S'1-ANDARD CONSTRUCTION SPECIFICATfON DOCUn9L-NTS Ciry Prc�iect No. 02025 Revised .luly'2, 2013 33 05 10 - 1 1 UTII.ITY TR�NCH [�XCAVAl'(ON, f:MEiEDMFNi�, AND BACKPILL Pag� I I nf 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 3$ 39 40 41 42 43 44 45 46 8. Rock — No additional coanpensation will be paid for rock excavation or other challged field conditions. B. Shoring, Sheeting and Bracing 1. Engage a Liceiised Professional Engineer in the State of Texas to design a site specific excavatiaT� safety systein in accordance with Federal and State requirements. 2. Excavatian protection systezns shall be designed according to tiie space lili�itatians as indicated in the Drawings. 3. Furnish, put in �-�lace and maintain a trench safety system in accordance with the Excavatian Safety Plan aud required by Federal, State or local safety requirements. 4. If soil or water conditions are encountered that are not addressed by the current Excavation Safety Plan, engage a Licensed Professional Engineer in tlle State of Texas to ri�oclify the Excavation Safety Plan and provide a revised submittal to tlie City. 5. Do not aIlowf sail, or water containing soil, to migrate tl�rougl� the Excavation Safety System in sufficient quantities to adversely affect the suitability of the Excavation Protection System. Movable bracing, shoring plates ar trench boxes used to suppc>rt tl-te sides of the trench excavatioia sl7all not: a. Disturb the embedment located in the pipe zone or lower b. Alter the pipe's Iine and grade after the Excavation Protection System is removed e. Comproulise the campaction c�f tlie e7nbedment located below the spring line of the pipe and in the haunclung C. VJater Cantrol 1. Surface Water a. Funiish all materials and equipment and perform all incidenial wark required to direct surface water away fram the excavation. 2. Graund Vijater a. Furnish all materials and equipment to dewater ground ��ater by a methad which preserves the undisturl�ed state of the subgrade soils. b. Do not allow the pipe to be submerged wiihin 24 hours after placement. c. Do not allaw water to flow over conerete until it has sufficiently cured. d. Engage a Licensed Engineer in the State of Texas to prepare a Ground Water Control P1an if any of the follawing conditions are encountered: 1) A Ground Water Control Plan is specifically required by the Contract Documenis 2) If in the sole judgment of the City, ground water is so severe that an �ngineered Ground Water ContrQl Flan is required to pratect the trench ar the installaiion of the pipe which may include: a) Ground water levels in the trench are unable to be maintained belaw the top of the bedding b) A firm trench bottom cannot be maintained due ta ground water c) Ground water entering the excavatiozl undernlines the stability of the excavation. d) GraL�nd �Tater entering the excavation is transporting unacceptable quantities of sails througl� the Exeavation Safefy System. CITY OF FORT WORTH DFW Ai�port Reciaimed Water Dclivery System FlushJinc STANDARDCQNSTRUCTIdN SPF..CiFICATION DOCUMEN"IS CityProjectNo.02025 Revised 7uly 22, �013 33 OS 10 - 12 UTIL!"i'1' "i'RCNCH EXCAVA'1'ION, GMQEDMC:N"1�, AND BAC'K�tLL Pagc 12 nf2Q J. 2 3 4 5 6 7 s 9 10 ll 12 13 14 15 16 1� Is 19 20 21 22 23 24 25 z� ?7 ?g ?g 30 31 32 33 34 35 36 3i 33 39 40 41 42 43 44 45 46 47 48 49 e. In tlie event that tllei-e is no bid item for a Ground Water Control and the City requires aii Engineered Growld Water Control Plan due to conditions discovered at the site, the contractor will be eligible to submit a change order. f. Control of grotal�d water shall be considered subsidiary to the excavation whei�: 1) No Grout�d Water Control Plan is specificaIly identified and required in the Contract Documents g. Ground Water Control Plan installation, operation and maintenance 1) Furnish all materials and equipine��t necessary to implement, operate and ir►aintain tl�e Ground Water Control Plan. 2} Once the excavation is caniplete, remove all ground water control equipment a�ot called to be incorporated i�lto the work. l�. Water Disposal 1} Dispase of �round water in accordance wit11 City poliey or Ordinance. 2) Do not discharge ground water onto or across private property �;�ithout written perniissron. 3} Pennission from the City is required prioi- to disposal into the Sanitary Sewer. 4) Disposal shall not violate any Federal, State or local regulations. D. Embedment and Pipe Placement 1. Water Lines less than, or equal to, 12 inches in diameter: a. "l�he entire embedment zone shall be of unifonn nlaterial. b. Utility sand shall be generally used for en�bedment. c. If graund water is in sufficient quantity to cause sand to pump, tlien use ct-ushed rock as embedment. 1) If crushed rock is not specifically identified in the Cantract Dacuments, ihen crushed rock shall be paid by the pre-bid unit price. d. Place evenly spread bedding material an a firm trench bottom. e. Provide tml, uniform bedding. f. Place pipe on the bedding in accc�rdance with the ali�mient of the Drawings. g. In no case sl�all the t�p of the pipe be less than 42 inches from the surface of the proposed grade, unless specifically called for in the Drawings. h. Place embedment, including initial backfill, to a minimum of 6 inches, but not more tllan 12 inches, above the pipe. i. Where gate valves are present, the initial backfill shall extend to C ulches above the elevation of the valve nut. j. Forni all blockizlg against undisturbed trench wall to the dimensions in tl�e Drawings. k. Compact embedment and initial baekfill. l. Place marker tape on top of �lie initial trench baekfill in accordance with Section 33 OS 26. 2. Water Lines lb-inches thro�gh 24-inclles in diameter: a_ The eirtire ernbedment zone shall be of uniform il7aterial. b. Utility sand may be used for en�bedment when the excavated trench depth is less than 15 feet deep. c. Czushed rock or fine crushed rock shall be used for embedment for e�cavated trench depths 15 feet, or greater. d. Crushed rock shall be used for e�nbedn�ent for steel pipe. e. Provide trench �eotextile fabric at any location ��here crushed rock or fine crushed rock come into coiitaet with utility sand CTTY OF FORT WORTH DFW Auport Reelaimed Wate�� Delivcry System Flushline STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Projcct No. 02025 Rc��Ised Juty 22, 2013 3305 IO- 13 UTILITY 7'RENCH CXCAVA'i'ION, LMIiLDMFN"1', AND EAC'KF1LL Page 13 of2(} 1 2 3 4 5 6 7 8 9 l0 11 12 13 l4 15 16 17 18 19 20 2l ?2 23 24 f. �• �1. i. .1• k. 1. m. 12. o. P- Place even(y spread bedding material an a firm trenc}i bottom. Provide firin, utliform bedditig. ]} Additional beddin� may be required if�ground water is present iu tl�e trenc�i. 2} If adciitional crushed roek is required not speeifieally identified iil the Contract Documents, then crushed rock sl�all be paid by the pre-bid unit �rice. Place pipe on tlle Uedd'ulg accordin� ta tlie aligmnent shown oil tlle Drawings. The pipe line shall be within: 1) f3 inches of the elevation on the Drawings for 16-i�ich and 24-inch water lines Place aud compact embedment mater'ral to adequately support haunches in accordance with the pipe manufacturer's recommendations. Place remaining embedment including initial backfili to a minilnum of 6 inclies, but not more than 12 inches, above the pipe. Where gate valves are present, the initial backfiil shall extend to up to the valve nut. Gompact the embedment and initial backfill ta 95 percent Stiandard Proctor 1�STM D 698. Density test may be performed by City to verify that the compaction ol embedment meets requirernents. Place trench geotextile fabric on top o�the initial backfill. Place marker tape on top of the trench geotextile fabric in accordance with Section 33 OS 26. 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 4i 42 43 44 45 46 47 48 49 3. Wa#ei• Lines 30-inches and greater in dian�eter a. The entire embedinent zone shall be af unifor�n material_ b. Crushed rock shall be used for embedment. c. Provide trench geotextile fabric at any location where crushed rock or �ne cruslied rock come into cont:act with utility sand. d. Place evenly spread bedding material on a fir�n trezlch bottam. e. Provide firm, uniform bedding. 1} Additional bedding may be required if ground uTater is present in the trench. 2) If additional crus}ied rock is required wluch is not specifically identified in the Contract Documents, tl�en crushed rock shall be paid by the pre-bid unit price. f. Place pipe on the bedding accordiug to the alignmeilt shown on the Drawulgs. g. The pipe line shall be within: 1) �1 inch af the elevation on the Drawings for 30-inch and lar;er water lines h. Place and compact embedment material to adequately support haunches in accordance with the pipe lnanufacturer's recommendatians. i. For steel pipe greater than 30 inches in diameter, the initial embedment lift shall not exceed the spring line prior to conzpaction. j. Place reinaining embedinent, including initial backfill, ta a minimum of 6 inches, but not more than 12 inches, above the pipe. k. Where gate valves are present; the initial backfill shall eAtend ta u� to the valve nut. 1. Compact the embedment and initial backfill to 95 percent Sta�idard Practor ASTM D b98. CITY OF FORT WORTH DFW Aiiport Reciaimed Water Delivery System Flusl�line STANDARD CONSTRUCTiON SPLClPICATION DOCLIMENTS City Pr�iect Na 02025 Revised July 22, 2�13 33U510-14 UT[LiTY TRENC'H GXC'AVAI�ION, f:MHL'DMFNT, AND BACKFILL Pagc 14 of2t? 1 ? 3 4 5 6 7 8 9 10 I1 12 13 14 15 16 17 18 19 20 21 ?2 23 24 25 Zfi 27 ?g ?g 34 3I 32 33 34 35 36 37 38 39 44 41 42 43 44 45 46 47 48 m. Density test may be performed by City to verify that the compaction of embedment meets requirements. n. Place trench geotextiie fabric on top of tlie ii�itial bac�fill. o. Place marker tape on top of the tre�lch geatextile fabric in accordanee with Section 33 OS 26. 4. Sanitary Sewer Lines and Stonn Sewer Lines (HDPE) a. The entire embedinent zo��e shall be of uniform material. b. Crushed rock s1�a11 be used for embedment. c. Place evenly spread bedding materiai on a finn trencli bottam. d. Spread beddiz�g so that tines and grades are maintained and that there are na sags in the sanitaiy sewer �ipe line. e. Pro��ide firnl, unifonn bedding. 1) Additional bedding may be required if ground water is preselit in ti�e trench. 2) If additional crushed rock is required which is not specifically identified in the Contract Documents, tlien crushed rock shall be �aid by tlze pre-bid unit f. g� h. i. J� k. 1. an. n. price. Place pipe on the bedding aecording to the ali�runent shown in the Drawings. The pipe line shall be witllir� =0. I inches of the elevation, and be cor�sistent uTith the grade sho�m on the Drawings. Place and compact embedment material to adequately support Iiaunclies in accordance with the pipe manufactui•er's recommendations. For sewer lines greaier than 30 inches in diameter, the embedment lift shall not exceed the spriilg line prior to coi�lpaction. Place remaining embedment ineluding initial backfill to a minimum of 6 inches, but not more than 12 inches, above the pipe. Coznpact the embedment and initial backfill to 95 percent Standard Proctor t�STM D 698. Density test may he performed by City to verify that the compactian of embedinent meets requirements_ Place trez�ch geotextile fabric on top of the initial backfill. Place marker tape �n top of the treileh geotextile fabric in aecordance with Section 33 OS 26. 5. Storm Se�uer (RCF) a. The bedding and the pipe zone up to the spring line shall be of uniform material. b. Crushed Y•ock sha11 be used for embedment up to the spring line. c. The specified backfill material inay be used above the spring line. d. Place evenly spread bedding material on a finn trench bottom. e. Spread bedding so that lines and grades are maintained and that there are no sags in the storm sewer pipe line. f. Provide firni, uniform bedding. 1} Additional bedding may be required if ground water is present in the trench. 2) If additional crushed rock is required which is not specifcally identified in the Contract Documents, theu crushed rock shall be paid by the pre-bid unit price. �. Place pipe on the bedding according to the alignment of the Drawings. CITY OF FORT WQRTH DFW Airpoi2 Reclaimed VJater Delive�y System Flusltline S7'ANDARD COhSTRLCTION SPECIFICATION DOCUMENTS City Project No. 020�5 Revised July 22, 2013 33 os �u - is U�1'ILII'Y "t'RFNCH [XCAVATfON, EME3EDMENT, AND I3AC'KE�ILf. Pagc I S of 2G 1 ? 3 4 5 6 7 8 9 10 11 12 1� 14 15 ib 17 lb 19 �0 2I 22 23 24 25 26 27 ?g 29 3a 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 4f> 47 h. T��e �3i��e line shall be within �0.1 i�lches of the elevation, and be consistent with the grade, sho��n on the Drawin�;s. i. Flace embedment material up to tl�e spring line. 1) Place eml�edment to ensure that adequate support is obtained in the hauneh. j. Compact tl�e embedmeiit and initial backfill to 95 percent Standard Proctor IASTM D 698. k. Density test may be pei•forn�ed by City to verify that tlle compaction of embedment meets requirements. 1. Place trench geotextile fabric on top of pipe and crushed rock. 6. Stonn Sewer .Reinforced Concrete Box a. Crushed rock shaU be used for bedding. b. The pipe zone and the initial backfill shall �e: 1) Crushed rock, or 2) Accepiable backfill material compacted to 95 percent Standard Proctor density c. Place evenIy spread coii�pacted bedding material on a finn trench bottom. d. Spread t�edding so that lules and brades are maintained ai�d that tl�ere are no sags in the stonn sewer pipe line. e. Provide f rn�, uniform bedding. l} Additional bedding may be required if ground water is present in the trench. 2) If additional crushed rock is required which is not specifieally ideiltified in the Contract Documents, then crusl�ed rock shall be paid by the pre-bid unit f � h �. price. Fill tlle annular space between multiple boxes ���ith crushed rock, CLSM according ta 03 34 l3. Place pipe on the bedding according to tl�e alignment of tl�e Drawings. The pipe shail be within f0.1 inches af the elevation, and be consistent with the grade, shown o� the Drawings. Compact the embedment initial backfill ta 95 percent Standard Proctor ASTM D698. 7. Water Services (Less than 2 Inches in Diameter) a. The entire embedment zone shall be of uniform materiai. b. Utility sand shall be gellerally used for emhedment. c. Place evenly spread bedding nlaterial on a�rm trench bottom. d. Pravide fiim, uniform beddinb. e. Place pipe on the bedding accordin� to the alignment of the Plans. f. Compact the initial backfill to 95 percent Standaa-d Proctor ASTM D698. 8. Sanitary Sewer Services a. The entire embedment zone shali be of unifornl material. b. Crushed rock shall be used far elnbedment. c. Place evenly spread bedding material on a�rm trelieh bottom. d. Spread bedding so that lines and grades are maintained and that there are no sags in the sanitary sewer pipe line. e. Provide firm, uniform bedding. 1) Additional bedding may be required if ground water is present in the trench. CITY OF FORT WORTH DF�V Airpori Reclaimed VJater Ueli��ery System Flushline STANDARD CUNSTRUCTION SPECIFICATION DUCUMEN7'S City Yraject No. 02025 Revised July 22, 2013 33p510-IG UTiLITY'TRENC'H EXCAVATtON, EMSEDMENT, AND BACKI=ILL Pagc I G of'20 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 1� 16 17 18 19 2d 21 ?� 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 3$ 39 40 41 42 43 44 45 46 47 48 49 f. g� h. 2) If additiaiial crusl�ed rock is required which is not specifically identified ii1 the Contract Documents, then cf-ushed rock sl�all be paid by the pre-bid unit �rice. Place �ipe on the bedding according to the align�i�ent af the Drawiugs. Place remaining embedment, including initial backfill, to a minimum of 6 inctles, but not more tl�ai� 12 inches, above tlie pipe_ Coinpact the initial backfill to 95 percent Standard Proctar ASTM D698. Density test nlay be required to verify that the conlpactioil meets the de��sity requirements. E. Trench Backfill 1. At a minimurn, place backfill in such a rnanner tliat t]Ie required in-place density al�d moisture content is obtained, and so that there will be i�o dan�age to the surface, pavement or structures due to any trench settle7nent or trench mavement. a. Meeting the requirement herein does not relieve tIle respoalsibility io darnages associated with the Work. 2. Backfill Material a. Final backf il deptl� less than 15 feet 1) Backfill witl�: a) Acceptable backfill material b) Blended backfill material, or c) Select backfill materiai, CSS; or C'LSM when specifically required b. liinal backfill depth 15 feet or greater: (under pavemeiit or future pavement) 1) Backfill depth from 0 ta15 feet deep a) Backfili with: (1) Acceptable backfill fnaterial (2) Blended backfill anaterial, or (3) Select backfill material, CSS, or CLSM when specifically rec�uired 2} Backfill depth from 15 feet and greater a) Backfill with: (1 } Select Fill (2) CSS, or (3) CLSM when specifically required c. Final backfill depth 15 feet or greater: (not u�lder pavement ar future pavement) 1) Backiill witl�: a) Acceptable backf 11 material, ar b} Blended backfill material d. Back�ll %r service iines: 1} Backfill for water or sewer sernice rines shall be the same as the requiremeni of the �nain that the service is connected to. 3. Required Campaction and Density a. Final backfill (depths less than I S feet) I) Coinpact acceptable backfill material, blended backfili material or select backfill to a minimum of 95 percent Standard Proctor per A.STM D698 at moisture content within -2 to +5 percent of the optimum moi sture. 2} CSS or CLSM requires no compaction. b. Final backfill (depths 15 feet and greater/under existing or future pave�nent} 1) C�mpact select backfill ta a minimum of 98 percent Standard Proctor per ASTM D 698 at moisture content withui -2 to +5 percent of the optimum moisture. C1TY �F FORT WOI27'H DFW Aiiport Reclaimed V+'ater Deliv��y System Pluslilioe STAA',DARD CONSTRUCTION SPECIFICATION DOCU��tEI�TS CiTy Project No. 0'_025 Revised July 22, 2013 330i 10-17 UTIL(TY TRENC'H EXCAVATION, EMBGDM�NT, ANU [3At'KFILL Pagc I 7 nf 20 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 2a 21 22 23 24 25 26 ?� 2$ 29 30 31 32 33 34 35 36 37 38 39 40 4l 42 43 44 45 46 47 48 49 2) CSS at' CLSM requi►•es no cotnpaction. c. Final backfill {depths 15 feet and greater/not under existing oz- future pavei�lent) I) Coi��pact acceptable backfill material blended backfill material, or select backfill to a minimum of 95 percent Standard Practor per ASTM D 69S at moisture eontent within -2 to +S pe��cent af the o��timum moisture. 4. Saturated Soils a. If in-situ soiis consistently demonstrate tl�at they are greater tliail5 percent over opti�num moisture content, tlie soils are considered saturated. b. Flooding tl�e trencl� or water jetting is strictly pi•oliibited. c. If saturated soils are identified in the Drawings ar Geotecluiical Report in the Appendix, Contractor shall praceed witll Work foliowing all backfilI procedures autlined in the Drawings for areas of soil saturation greater than 5 percent. d. If saturated soils are encouniered during Work but not identifed in Drawings o1- Geotechiiical Report in the Appendix: 1) The Contractor sl�all: a) Immediately iiatify the City. b) Submit a Cantract Claim for Extra Work associated with direction from City. 2) The City shall: a) Investigate soils and deterniine if Work ca�l praceed in the identified location. b) Direct the Contractor of changed backfill proeedrues associated with the saturated soils that may inelude: (1) Imported backfill (2) A site specific baekfill dasign 5. Placement of Backfill a. Use only compaction equipment specifically designed for cornpaction of a particuIar soil type and within the space and deptih limitation experienced in the trench. b. Flooding the trench or water setting is strictly prohibited. c. Place in loose lifts not to exceed 12 inches. d. Compact to speeified densities. e. Com�act oniy on top of initial backfill, undisturbed trench or previausly coznpacted backfill. f. Remove any loose materials due to the movement of any trench box or shoring or due io sloughing of the trench wall. g. Iusiall appropriate tracking balls for water and sanitaz}� seiuer trenches in accardance with Section 33 OS 26. 6. Backfill Means and Metbods Deinonstratian a. Notify the City in writing with s�fficient tiuie for the City to obtain samples and perform standard proctor test in accoxdance with ASTM D698. b. The results of the standard proctor test niust be received prior to begimling excavation. e. Up�n commencing af backfill plaeement for the project t11e Cantractor shall demoustrate ineans and metl�ods to obtain the required densities. d. Demonstrate Means and Methods for compaction includinb: 1) Depth of lifts for backfill which sha11 not e�ceed 12 inches 2} Method of z��oisture control for excessively dry or wet backfill C11'Y �F FOR7' WORT'}i DFVr' Ai�port Reclaimed Water Delivery System Flushiine STANDARD CONSTRUCTI4N SPEC]P[CATION DOC'UR4EN"I'S City Proiect Nc�. 02025 Revised July 22, 2013 33OSI0-Ib UTILITI' TRENC'H EXCAVAT{ON, EM6EDM�NT, AND [3ACKPtLL Pagc I R o1'20 1 ? 3 4 5 6 7 8 9 10 11 12 13 14 15 3) Placement and movinb trench box, if used 4} Campaction tecl�niques in an open trencl� 5} Campaction techniques around structure e. Provide a testing trench box io provide access to the reeently backfilled materiai. f. TI�e City will provide a qualified testing lab fcall Tin1e during this period to randomly test density and moisture continent. 1} The testing lah wiII provide results as availabie on tl�e job site. 7. Varying Ground Conditions a. Notify the City of varyit�g graund conditions and the need for additional proctors. b. Request additional proctors w11en soil eonditions cIlange. c. The City may acquire additionaI proctors at its discretion. d. Significant chai�ges in soii conditions will i-equire ai� additioxial Mea��s and Methods demonstration. lb 3.5 Y�IPA�R [1�OT USEDj , ' • ! �'' ; � • � ''•': 19 zo 2I ?? 23 24 25 26 �� 28 29 30 31 32 33 34 35 36 37 38 39 40 42 42 43 44 45 46 47 A. Field Tests and Inspections 1. Proctors a. The City will perfonn Proctors in accordance with AS'I'M D69�. b. Test results will generalIy i�e available to within 4 calendar days and distributed to: 1) Contractor 2) City Proj ect Manager 3} City Inspector 4) Engineer c. Notify the City if tl7e characteristic of ihe soil changes. d. City will perform new proctors for varying sails: 1) When indicated in the geotecllnical investi ;ation in the Appendix 2) If iiotified by the Cantractor 3) At the convenience of the City e. Trenches where different soil types are present at different depths, the proctors shall be based on the znixture of those soils. 2. Density Testing of t3ackfill a. De�7sity Tests shall be in confannance with ASTM D2922. b. Provide a testing trench protection for trench depths in excess of 5 feet. c. Flace, Inove and renlove testin� trench protectian as necessary to facilitate all test conducted by the City. d. For final backfill depths less than 1 S feet and trenches of any depth not under existing or future pavement: 1) The City will perform density Testing twice per working day when backfllinb operations are being conducted. 2j The testing lab sha11 take a zninimum of 3 density tests of the current lift in the available treneh. e. For final. backfill depths 15 feet and greater deep and under existing or fizture pavement: CITY OF FQRT WORTI-1 DFW Aiipori Reclaimed Wa[er Deliveiy System Flushline STANDARD CONSTRUCTIQN SPECIPICATION DOCUR�ENTS City Project No. 02025 Revised July 32, 2013 33 OS i(i - l9 UTILI"l'Y "i'RSNCH FXCAVATION, EMBFUMFNT, AND E3.ACKFILL Pa�r I9 of 20 1 1} The City wiI1 perfol7n de��sity testirlg t�uice per «orking day �rl�eri 2 back�lling operations are being canciucted. ���� � 3 2) Tlle testii�g Iab sl�all take a�i�inimu�n of 3 density tests oftlle curz•ent lift in 4 the available trer�ch. 5 3) The testing lab will ren�ain onsite sufficient ti��ie to test 2 additional lifts. 6 f. Make the excavation available for testing. 7 g. The Ci2y will detennine tlle Iocatio�l of the test. - 8 h. '£'l�e City testing lab will provide results to Contracto�- and the �ity's Inspector 9 upon completion of the testiiig. IO i. A forinal repart ���ill be posted to the Cit}J's Buzzsaw site witi�in 4� hours. 11 j. Test reports sI1a11 include: 12 1} Location of test by statiol� �lumber 13 2) Time and date of test 14 3} Depth af testing IS 4) I�ield inoisture 16 5} Dry del�sity 17 6) Proctar idezitifier 18 7) Percent Proctor De7�sity 19 3. Density of Embedment 20 a. Storns sewer boxes that are en�bedded witll acceptable backfill material, 21 blended backfill matel�ial, cement modified backfill material o�- select materiai 22 u�ill follow the same testing procedure as backfill. 23 b. Tl�e City �nay test fine crusl�ed rock ar crushed rock embedinent in accordance 24 with ASTIv1 D2922 or ASTM 1556. 25 B. Non-Confarming Work 26 1. All non-con£onz7ing work shall be removed and replaced. 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 r�JUSTING [N()T USEllj 29 3.10 CLEANING [NOT USED] 30 3.11 CL�SEOUT ACTIVITIES [NOT USEI3] 31 3.12 PROTECTION [NOT USED] 32 3.13 MAINTENANCE [NOT USED] 33 3.14 ATTACHMFNTS [NOT US�D] 34 END OF SECTION 35 Revision Log D�1TE ?�IAME SUiVIM�Y O�' CHANG� I.2 — Added Item for Cvncrete Encasetnent fvr titi [ity Lines ]2I20I2012 D..lohnst�n Various Sections—Revised De,pttlsta Include IS' and greater 3.3.I3 — Additionai nates for pavement pratecti«n and positive drainage. CITY OF FORT 1'JORTH DrW Ai�pofl Rsclaimed i�'ater Uelivery System Fiushline STANDARD CONSTRUCTION SPECTPICATt�JN DOCUMETdTS C�iry Pioject No. 0?J25 Revised ,lui} 22, 2013 33 Q> I tl - _U U"i']LI-i'l�"{'RI:NCH EXC'AV>>TIO`�, Ei�)IIEL���if:NT. AND BAt'KI�iLL_ Pacc =t� n1'�U 3 G.C.2 — ftti<icci ��cc�uircmcnts fi27r bs�ckii!] oi�scr�-icc iines. 3.�.E.S — �lddcd It�nguagc ��rol�ibiEi�ig tl�x�ding of�C�•cnch CiTY O� 7={3RT S'Jdi�"l f3 DFti�' r+.i3pori Re�{ain�ed 1Vater Delivery S;��ten-� �iush(ine STANDARiI Ci?NSTEZUCTIO:N SPEC'IFiCATiE7� i�OCL'1vIEN?S Cin� Projet;t No. 02025 Revised July 2', 2013 � � � GC-4.04 Underground �'acilities GC-6.Ob.D Minority and Women Owned Business Enterprise Compliance GC-6_07 Vdage Rates GC-6.09 �'ermits anc3 Utilfties GR-Ol 60 00 Product Requirements A DFW Environmental Affairs Importation Authorization Farm B �ieneral Notes CI`i1' OF F�R'i' «r`QRTId bF�u Aix-�ort Rrcl�imed �vate�- Bcli��ery Systezr� Fh�slzline 5TAUD.��RI1�C?NSTRL�C"i'30\ SPECiT�ICA`iIQN Dt"�CLei�9Ei�i'S City Pi�?jrct �t�. f??t1?5 Rc��aseci Sulv 1. 2C1i 1 �C-4.04 Underground Facilities THIS PAGE LEFT INTENTIUNALLY BLANK CTTY OF FQKT WL)RTH DFVV� Airport Rcclaimed ivatrr Deii�ery System Flushline STA:^tDARD GOi3STRUC`fION SPECiFICA'TiON DOCiTNfE�'TS City Prt>jcct �vo, 02025 RcWiscti July 1, 20I I GC-6.06.D Minority and Women Uwned Business Enterprise Compliance THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WOKTH DFW Airport Reclaimed water Delivery System F1ushIine STAl`'DARD CONS1'RUCTION SPECiFICATION DOCUMENTS City Project No. 02025 Revised July 1, 2011 FC? P.T �f� RT H �"�''`� City of Fort Worth Minority Business Enterprise Specifications . , • • •- : �� � APPLICATION OF POLICY If the total dollar value of the contract is greater than $50,000, then a MBE subcontracting goal may be applicable. If the tatal dollar value of the contract is $50,000 or less, then an MBE subcontracting goal is not applicab(e. PULICY STATEMENT It is the policy of the City of Fort Worth to ensure the full and equitable participation by Minority Business Enterprises (MBE) in the procurement of all goods and services. All requirements and regulations stated in the City's current Business Diversity Enterprise Ordinance applies to this bid. MBE PROJECT G{3ALS The City's MB� goal on this project is � 2 °10 Of th8 tOt81 bld (Base bid applies to Parks and Community Services). Note: [f b�th !VlBE and S8E subcaniracting goals are established for this project, then an Offeror must suismit bc�tFt a lVfBE lltiiization F�rm and a SBE U�ilization Form to be rleemed responsive. COMPLIANCE TO B1D SPECIFICATIONS On City contracts greater than $50,OQQ where a MBE subcontracting goal is applied, bidders are required to comply with the inte�t of the City's Business Diversity Enterprise Ordinance by one af the following: 1. Meet or exceed the above stated MBE goal through MBE subcontracting participation, or 2. Meet or exceed the above stated MBE goal through MBE Joint Venture participation, or; 3. Good Faith Effort documentation, or; 4. Waiver documentation. SUBMITTAL OF REQUIRED DOCUMENTATION The applicable documenfs must be received by the Managing Qepartment, within the following times allocated, in order for the entire bid to be considered responsive to the specifications. The Offeror shall deliver the MBE documentation in person to the appropriate employee of the managing department and "obtain a`date/time receipt. Such receipt shall be evidence that the Ciry`recei�ed the documentation in the time allocated. A faxed copywill not be accepted_ 1. Subcontractor Utilization Form, if goal is received by 5:00 p.m., five (5) City business days after the bid met or exceeded: o enin date, exclusive of the bid o enin date. 2. Good Faith Effort and Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization Form, if participation is less than apening date, exclusive of the bid opening date. stated oa1: 3. Good Faith �fi�rt �nd Subcontractor received by 5:00 p.m., five (5) City business days after the bid Utilization form, i# no M8E partici Gt:on: o enin date, exclusive of the bid o enin date. 4. Prime Contractor Waiver Form, if you will received by 5:00 p.m., five (5) City business days after the bid erForm all subcontractin /supp(ier work: openin date, exclusive of the bid o enin date. 5. Joint Venture Form, if utilize a joint venture received by 5:00 p.m., five (5) City business days after the bid to met or exceed oal. openin date, exclusive of the bid openin date. FAILURE TO COMPLY WITH THE CITY'S BUSINESS DNERSITY ENTERPRISE ORDINANCE, WILL RESULT IN THE BED BEING CONSIDERED NON-RESPONSIVE TO SPEClFICATIONS Any qu�st4ons, pf�ase eor�tact the fYI/tN�� �ffice at (817} 212-2&74. Rev. S/30/12 ATTACHMENT tA Page 1 of 4 FoRT WoRTH city of Fort wortn MBE Subcontractors/Suppliers Utilization Form PR1ME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: MlUV/DSE NON-N1/NUDBE DFW Airport Reclaimed Water Delivery System Flushline BID DATE — City's MBE Project Goal: Prime's MBE Project Commitrnent: PROJECT NUMBER 12 0�0 0�0 02025 Identify all subcontractors/suppliers you will use on this project Failure to complete this form, in its entirety with requested documentation, and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening, exclusive of bid opening date, ,will result in the bid being considered non-responsive to bid specifications. The undersigned Offeror agrees to enter into a formal agreement with the MBE firm(s) lis#ed in this utilization schedule, conditioned upon execution of a contract with the City of Fort Worth. The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specificafions MBEs listed toward meeting the project goal must be located in the six (6) county marketplace at the time of bid. Markeiplace is the geographic area of Tarrant Dallas Denion Johnson Parker and Wise counties. Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1 St tier, a payment by a subcontractor to its supplier is considered 2�d tier ALL MBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means thase firms, located within the Marketplace, that have been determined to be a bondafide minority business enterprise by the North Central Texas Regional Certification Agency (NCTRCA) or other certifying agencies that the City may deem appropriate and accepted by the City of Fort Worth. If hauling services are utilized, the prime will be given credit as long as the MBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The MBE may lease trucks from another MBE firm, including MBE owner-operators, and receive full MBE credit. The MBE may lease trucks � from nan-MBEs, including owner-operators, but wif( only receive credit for the fees and commissions earned by the MBE as outlined in the lease agreement. Rev. 5l30/12 FC}Rfi��''OR'I'H ATTACHMENT 1A Page 2 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. MBE firms are to be iisted first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a copy of the firm's S8E certification if they have not previously registered with the City's MNVBE O�ce, which may be contacted for verification. Please note that onl certified MBEs will be counted to meet an MBE oal_ Attach N NCTRCA Certificate ° SUBCONTRACTOR/SUPPLIER T � Detail Detail Company Name i Subcontracting Supplies Dollar Amount Address e M W S M Work Purchased Telephone/Fax � g e B B E E E E �I�� �❑�■ �❑� �� �❑� �❑� ( Rev. 5l30/12 �t�fi'i��QR"I'H ATTACHMENT 1A Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers, regardless of status; i.e., Minority and non-MBEs. Please list MBE firm's first, use additional sheets if necessary. If a subcontractor/supplier is identified as an SBE, please attach a copy of the firms SBE certification if they have not previously registered with the City's M/WBE Office which may be contacted for verification. Please note that onl certified MBEs wil! be counted to meet an MBE oal. Attach N NCTRCA Certificate ° SUBCON'fRACTOR/SUPPUER T � Detai( Detail Company tVame i Subcontracting Supplies Doilar Amount Address e M W S M Work Purchased Tefephone/Fax � B B g B E E E E � � � � � � � � � � ❑ a Rev. 5l30/12 Fo�z��'�o�;�rH ATTACHMENT 1A Page 4 of 4 Total Dollar Amount of MBE Subcontractors/Suppliers $ Total Dallar Amount of Non-MBE Subcontractors/Suppliers $ TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS � The Contractor wiil not make additions, deletions, or subs#itutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office through the submittal of a Request for Approval o Change/Addifion form. Any unjustified change or deletion shali be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance. The contractor shall submit a detailed explanation of how the requested change/addition or deletion will afFect the committed MBE goal. If ihe detail explanation is not submitted, it will affect the final compliance determination. By afFixing a signature to this form, the Offeror further agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed by all subcontractars, including MBE(s) and any special arrangements with MBEs. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company. The bidder agrees to allow #he transmission of interviews with owners, principals, officers, employees and applicable subcontractors/suppliers participating on the contract that will substantiate the actual work perFormed by the MBE(s) on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or �ocal laws concerning false statements. Any failure to comply with this ordinance creates a material breach of the contract and may result in a determination of an irresponsible Offeror and debarmen# from participating in City work for a period of time not less than one (1) year. Authorized Signature Tit1e Company Name Address Printed Signature ontact NamelTitle (if different) Telephone and/or Fax E-mail Address City/State/Zip Date Rev. 5/30/12 F��T �(�RTH _..._�,,,,��W�✓,.__._. City of Fort Worth Prim� Ccrntractor Waiver Form ATTACHMENT 1 B Page 1 of 1 PRIME COMPANY NAME: Check applicable block to describe prime PROJECT NAME: MMI/DBE NON-M/lWDBE DFW Airport Reclaimed Water Delivery System Flushline $ID DATE City's MBE Project Goal: Prime's MBE Project CommiVnent: PROJECT NUMBER 12 0�0 °�p 02025 If both answers to this form are YES, do not complete ATfACNMENT 1C (Good Faith Effort Form). All questions on this form must be completed and a detailed explanation provided, if applicable. If the answer to either question is NO, then you must complete ATTACHMENT 1 C. This form is oniy applicable if ho�h answers are yes. Failure to complete this form in its entirety and be received by the Manaainq Department on or before 5:00 p.m., five t5) Citv business days after bid openinq, exclusive of the bid opening date, will result in the bid being considered non-responsive to bid specifications. Will you perform this entire contract without subcontractors? YES ff yes, please provide a detaifed explanation that proves based on the size and scope of this NO project, this is your normai business practice and provide an operational profile of your business. Will yau perform this entire contract without suppliers? YES If yes, p}ease provide a detailed explanation that proves based on the size and scope of this project, this is your normal business practice and provide an inventory profile of your business. NO The bidder further agrees to provide, directly to the City upon request, complete and accurate information regarding actual wark performed by all subcontractors, including MBE(s) on this contract, the payment therefore and any proposed changes to the original MBE(s) arrangements submitted with this bid. The bidder also agrees to allow an audit and/or examination of any books, records and files heid by their company that will substantiate the actual work performed by the MBEs on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or Local laws concerning false statements. Any failure to comply with this ordinance creates a material breach of contract may result in a determination of an irresponsible offeror and barred from participating in City work for a period of time not less than one (1) year. Authorized Signature Tit1e Company Name Address City/State/Zip Printed Signature Contact Name {if different� Phone Number Fax Number Email Address Date Rev. 5l30/12 ATTACHMENT 1C Page 1 of 3 F+C�►RT V�O►RTH .�------ Gity of Fort Worth 1�1 : _ • s . _ t __ � � �t • PRIME COMPANY NAME: Check applicabte block to describe prime PROJEGT IYAME: MNUlDBE N4N-M!lWdBE DFW Airport Reclaimed Water Delivery System Flushline B�D DATE — City's MBE Project Goal: Prime's MBE Project Commitment: PROJECT NUMBER 12 0�0 0�0 02025 If #he Offeror did not mee# or exceed the MBE subcontracting goal for this project, the Offeror must complete this form. If the Offeror's method of compliance with the MBE goal is based upon demonstration of a "good faith effort", the Offeror will have the burden of correctty and accurately preparing and submitting the documentation required by the City. Compliance with each item, 1 thru 11 below, shall satisfy the Good Faith Effort requirement absent proof of fraud, intentionat and/or knowing misrepresentation of the facts or intentional discrimination by the Offeror. Failure to complete this form, in its entirety with supporting documentation, and it being submitted to and received by the Managing Department on or before 5:00 p.m. five (5} City business days after bid opening, exctusive of bid opening date, will resuit in the bid being considered non-responsive to bid specifications. 1.) Please fist each and every subcontracting and/or supplier opportunity for the completion of this project, regardless of whether it is to be provided by a MBE or non-MBE. (DO NOT LIST NAMES OF FIRMSI On all projects, the Offeror must list each subcontracting and or supplier opportunity regardless of tier. {Use additional sheets, if necessary) List of Subcontracting Opportunities List of Supplier Opportunities Rev. 5/3d/12 ATTACHMENT 1C Page 2 of 3 2.) Obtain a current {not more than two (2) months old from the bid open date) list of MBE subcontractors and/or suppliers from the City's M/WBE Office or the City's website. Yes No Date of Listing 3.) Did you solicit bids from MBE iirms, within the subcontracting and/or supplier areas previously listed, at feast ten calendar days prior to bid opening by mait, exclusive of the day the bids are opened? ❑ Yes (If yes, attach MBE mail listing to include name of firm and address and a dated copy of letter mailed.) �No 4.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by telephone, exclusive of the day the bids are opened? Y8S (If yes, attach list to include name of MBE firm, ep rson contacted, phone number and date and time of contact.) No 5.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously listed, at least ten calendar days prior to bid opening by facsimile (fax), exclusive of the day the bids are opened? �Yes � � (If yes, attach list to include name of MBE firm, fax number and date and time of contact. In addition, if the fax is returned as undeliverable, then that "undeliverable confirmation" received must be printed directly from the facsimile for proper documentation. Failure to submit confirmation and/or "undetiverable confirmation" documentation may render the GFE non-responsive.) 6.) Did you solicit bids from MBE firms, within the subcontracting and/or supplier areas previously tisted, at least ten calendar days prior to bid opening by email, exclusive of the day the bids are opened? �_Yes �_No (If yes, attach emai! confirmation to include name of MBE firtn, date and time. In addition, if an email is returned as undeliverable, then that "undeliverable message" receipt must be printed directly from the email system for proper documentation. Failure to submit confirmation and/or "undeliverable message" documentation may render the GFE non- responsive.) NOTE: The four methods identified above are acceptable for soliciting bids, and each selected method must be applied to the applicable contract. The Offeror must document that either at feast two attempts were made using two of the four methods or that at least one successful contact was made using one of the four methods in order to be deemed responsive to the Good Faith Effort requirement. NOTE: The Offeror must contact the entire MBE list specific to each subcontracting and supplier opportunity to be in compliance with questions 3 through 6. 7.) Did you provide plans and specifications to potential MBEs? �Yes _�No 8.} Did you provide the information regarding the location of plans and specifications in order to assist the MBEs? Yes No Rev. 5/30/12 ATTACHMENT 1C Page 3 of 3 9. Did yau prepare a quotation for the MBEs to bid on goods/services specific to their skill set? Y@S (if yes, attach all copies of quotations.) No 10. Was the contact information on any of the listings not valid? Y@S (If yes, attach the information that was not valid in order for the M/WBE O�ce to address the corrections needed.) _�No 11.}Submit documentation if MBE quotes were rejected. The documentation submitted should be in the forms of an affidavit, include a detailed explanation of why the MBE was rejected and any supporting documentation the Offeror wishes to be considered by the City. In the event of a bona fide dispute concerning quotes, the Offeror will provide for confidential in-camera access to and inspection of any relevant documentation by City personnel. Ptease use additional sheefs, if necessa , and a#tach. Com an Name Tele hone Cc�ntact Person Sco e of Wark Reason far Re"ection ADDITIONAL INFORMATION: Ptease provide additional information you feet will further explain your good and honest efforts to obtain MBE participation on this project. The Offeror furEher agrees to provide, directly to the City upon request, complete and accurate information regarding actual work performed on #his contrac#, the payment thereof and any proposed changes to the original arrangements submitted with this bid. The Offeror also agrees to allow an audit and/or examination of any books, records and files held by their company that wili substantiate the actual work performed on this contract, by an authorized officer or employee of the City. Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal, State or �ocal laws concerning false statements. Any failure to comply with this ordinance shall create a material breach of Rev. 5/30/12 ATTACHMENT '! C Page4of3 contracf and may result in a determination of an irresponsible offeror and debarment from participating in City work for a period of time not less than one (1) year. The undersigned certifies that the information provided and the MBE(s) listed was/were contacted in good faith. It is understood that any MBE(s) lis#ed in Attachment 1C will be contacted and the reasons for not using them will be verifred by the City's M1WBE Office. Authorized Signature Title Printed Signaiure Cantact Name and Title (if different) Company Name Phone Number Fax Number Ad d ress City/State/Zip Email Address Date Rev. 5/30/12 Joint Venture Page 1 of 3 F�►RT Wt�►RTH ��'`� CITY OF FORT WC}RTH IYI�E Joint Ve�ture Eligibiiitv F�rm Al/ r�uesfions nrust be Rrrswere�f; rrse "N/A"if iaot applicab/e. -- Name of City project: DFW Airport Reclaimed Water Delivery System Ffushline A joint venture fonn must be completed on eacl� projeci RFPBid/Purchasing Number: �2p2S 1. Joint venture information: Joint Venture Name; ,Toint V�iiture Ad�lress: ��%nPPlicat>I�) T`ele�l�one: T=�csui�il�: E-n»il addre�s�. Gelluiar. Identify the firms that comprise the joint venture: , Please atfach extra sheefs if additional space is required to provrde defailed explanations of work fo be performed by each firm comp�ising the bint venttrre 14�i3�E fiir��i Non-&4fiBE firm n:ime: namc• Bttsine.s .addre�s: Iiusincss r�dclr��s: City, State, Zip: C'ity�. Saaic:. Zip: Tei4pftnne Facsuiiile E-znstii Ted��iron� Faesimilc C�llula�r CGili�l.�a• Cer�ki�cn#ion Ststtus: E-mail address Name of Certifying Agency: 2. �co e of �vork erformed b�� the Jaint Venture: Describe the sco e of work of the MBE: I3escrfbe the sco e of work of the nan-NiBE: Rev. 5/30/12 Joint Venture Page 2 of 3 3. What is the percentage of MBE participation on this ,joint venture that you wish to be counted toward meeting the project goai? 4. Attach a copy of the joint venture agreement. 'rJ. �,ast eeamponents of ownershi� of jaint venture: (Do rrvt comp(ele iJ�tlrrs rrt%armntio�r is r(escriber( i�t jor�i! verrlu��e ag1•eerr�eirO I� Profit and loss sharing: ' � Capital contributions, including equipment: � Other applicable ownership interests: 6. Identify by name, race, sex and firm those individuals (with titles) who are responsible for the day-to-day management and decision making of the joint venture: Financial decisions {to include Accouni Payable and Receivable): Management decisions: a. Estimating b. Marketing and Sales c. Hiring and Firing of inanagement personneI d. Purchasing of major equip�nent andlor supplies Supervision of field operations The City's Minority and Women Business En#erprise Office will review your joint venture submission and will have final approval of the MBE percentage applied toward the goal for the project listed on this form. NOTE: From and after the date of project award, if any of the participants, the individually defined scopes of work or the dollar amounts/percentages change from the originaliy approved information, then the participants must inform the City's MNVBE O{fice immediafely for approval. Ar�y unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the City's BDE Ordinance. Rev. 5/30(12 Joint Venture Pa e3of2 A�FIDAVIT The undersigned affirms that the foregoing statemelits are tnie and correct and include all material information necessary to identify and explain the tenns and operation of the joint venture. Furtliercnore, the undersigned shall agree to provide to the joint venture the stated scope of� work, decision-making responsibilities and payments herein. The City aiso reserves the right to request any additiorial irifor�nation deetned necessary to detennine if tl�e joint �renture is eligible. Failure to cooperate and/or provide requested infarnlatioi� within the time specified is grounds for terminaiion of the eligibility process. The undersigned agree to permit audits, interviews witl� owners ai�d examination of the books, records and files of the joint venture by any autllorized representatives of the City of Fort Worth. Failure to coinply «litll this provision shall result in the termination of any contract, whicly may be awarded undei• the provisions of this joint venture's eligibility and may initiate action under Fedet•al, State and/or Local laws/ordinances concerning false statements or willful misrepresentation of facts. — _ ___._�____ __�___�--------____.____-------_______.__________-----_________�___________.._ Name of MBE fii7n Namc of non-MBE tinn Printed Na�ne af Owner Printcd Name of Owner Signature of Owner Signature of�Owner Printed Name of O�vner Printed Name of Owner 5ignatm•e of Owner Signature of Owner Title Tifle Date Date NOtal'iZafi0I1 State of On this day of County of 20 , before me appeared aud to me personally known and who, being duly sworn, did execute the foregoing aff davii and did state that they were properly authorized to execute this affidavit and did so as their free act and deed. Notary Puhlic Print Name Notary Public Signature Commission Expires � (sea!) Rev. 5130/12 GC-6.07 Wage Rates THIS PAGE LEFT INTENTIUNALLY BLANK Ci f`Y OF FORT 1�VOR`I'H IIFW Airpnrt Reclauned u�acer Belavcry System Fius}iline STAT�DARD CO�ISTRCBC7"IQN SFECIF[GAfi[�N DOCUMEI�fT5 City Praject Na. 42025 ttevised July I, 2�11 I V/t�/ of FQrt Wi�i�th, Teira$ Mayor and Council Communication COUNCIL ACTION: Appraved on 7/8/2a08 pe,ys�n�r DA�E: Tuesday, July O8, 2008 LOG NAME: 3QWAGE RATES REFERENCE NO.: '�'G-16190 SUBJECT: Adopt 2008 Preva�ling Wage Rates for City-Awarded Public-Works Projects � ��� RECOMMENDATION: It is recommended that the City Council adapt the attached 2008 Prevailing Wage Rates for City-awarded public warks projects. DISCUSSION: Texas Government Code Chapter 2258 requires that a public body awarding a contract for public works shail determine the general prevailing rate of per diem wages for each craft or type of worker needed to execute the contract, and shall specify In the bid documents and in the contract the prevailing wage rates in that locality. Each year The Quoin Chapter of the Associated General Contractors, in conjunction with the Assvciation of Builders and Contractors {ABC} and the American Sub-Contractors Association (ASA), conducts a wage rate survey for No�th Texas construction. The attached 2008 Prevailing Wage Rate data was compiled from #hat survey. FISCAL INFORMATION/CERTIFICATIQN: The Finance Director certifies that this action will have no material effect on City funds. TO Fund/AccountlCeniers FROM Fund/Account/Centers SubmittQd for Citv Managgr's Q�ce by• Originating Deaartment Head: Additionaf Infarmafian Con�acf: Fernando Costa (8476} A. Douglas Rademaker {6157} Eric Bundy (7598) DFW Airport Reclaimed Water Delivery System Flushline City Project No. 02025 HEAVY & HIGHWAY CONSTRUCTION PREVAILING WAGE RA.TES 2048 Asphalt Distributor Opet Asphalt Paving Machine AsvhaJt Ralcer Asphalt Shoveler Batching Plant Weigher Broom ar Sweeper Oper� Bulldozer Operator Concrete Finisher, Structures Concrete Paving Cwbing Machine Concrete Paving Finishing Machin Concrete Paving Joint Sealer Oper Concrete paving Saw Operator Concrete Paving Spreader Operato Concrete Rubher Crane, Clamshell, Backhoe, Denic Form Buiider/Setter, S Form Seiier, Paving & Foundation Drill Oper Faundation Drill Oper� Front End Loader Ope Laborer, Common Laborer, Utility Mechanic Miltin� Machine Oper Mixer Operator Motor orader Operato Motor Grader Operato Oiler Yainter, Struch�res Pavement Markin� M� Crawler Mounted �r, Fine Grade Fine Grade Reinforcing Sieei Setter, Paving Reinforcing Steel Setter, Sf�ucture Roller Operator, Pneumatic, Self-1 Roller Operator, Steel Wheel, Flat RoIler Qperator, Steel Whee[, Piar. Slin Form Machine Os�erator Spreader Box Opera4or Tractor Operator, Crawler T; Tractor Operatar, Pneumatic Truck Driver, Single Axle, Heavy Truck Driver, Single Axle, Light Truck Driver, Tandem Axle, Semi= Truck Driver, Transit-Mix Wagon Drill, Borin�Machine, Post Welder Work Zane Barricade Servicer Shovel Pavement $ l O.Ob $ I 3.99 $ l 2.78 $I 1.01 $ 8.86 $I4.15 � 9.88 $ i 3.22 $12.80 $i2.85 $13.27 $12.00 $13.63 $ l 2.50 $13.56 �I4.50 �10.61 $D4.12 $18. I2 $ 8.43 $ l l ,63 $11.83 $13.67 $16.30 $ I2.62 $ 9.i8 �10,65 $ ] 6.97 $11.83 $11.58 $15.20 $1Q.50 $I4.98 $13.17 �IQ.04 $11.04 $14.86 $ ! 6.29 $>>,a� $10.92 $11.28 $11.42 $12.32 $12.33 $10.92 $ l 2,64 �12.91 $12A3 $ i 4.93 $l 1.47 $] 09I $11.75 $12.08 $14.40 � 13.57 $ l 0.09 DFW Airport Reclaimed Water Delivery System Flushiine City Project No. 02025 AC Mechanic AC Mechanic 15tone Mason lStone Mason Concrete Farm Bultder Drywalt Methanic Etxtrician Helper EtectronSc Teshnician Electronic Technician Floor Layer (Resi(ient; ftoor Layer Helper Gtazier Gtazier Helper IRsulator Insu(ator Helper Laborer Common Laborer Skilled Lather Painter Painter Nelaer Ptasterer PlasCerer 200$ PREVAILING WAGE RATES CONSTRUC710N JNDUSTRY 521.69 Plumber $52.00 Ptumber Helper $15.24 Reinforcin SteelSetter $19.12 Roafer $10.10 Roofer Helper 546,23 Sheet Metat Worker $�1.91 Sheet Metat Worker HelpF $13.49 5 rinkler 5 tem Instalter $13.12 S rinkler 5 stem instalier S14.62 Steel Worker Structural $90.91 Concrete Pum Crane, Ctamsheet, Backhc 513.Q9 Shovet $9.00 Forklift 520.20 �rontEnd Loader $14.43 Truck Drlver 519.86 WeEder $12.U0 Wetder Helper 520.OU $13.OQ 518.00 513.00 $14.78 $11.25 510.27 $13.18 $16.14 $54.83 $8. � $18.85 $12.83 $17.25 512.25 $1 A.94 510.00 514.00 S1Q.v0 516.9b $12.31 sis.oa 517.43 52D.50 597.7b $'f 2.63 514.5Q 514.91 596.06 59.75 DFW AirpoR Reclaimed Water Delivery System Flushline Ciry Project No. 02025 GC-6.09 Permits and Utilities TH:IS P.AGE LEFT INTENTIONALLY BLANK CfTY 4F FORT WdRTH DFW Airg4zt Reclainxcad a�ater Delivety Sysiem Flushlin� STr1I1iAARD CONST[tL1C7[Uid SPECIFTCATION DC7Ci3ivSEa'�71'S Czty Projeca Tva 02025 BevisedJuly 1,2flll ,, ----"'��.r . C.ans'�r�c�I�an ��rrnl.t, A'�-0-48'�B � , - '''��"�.- ,, -:;�,:,: iss:u:e D�te �8�.2:�/2Q �:0 ; _ . - � � DFt�+I`:f;n'tern:�t�oria:l'�fAi%port ___ _ _ _ __ ____ _ __ .� __� ._ �_ . _ �., ___ ._ �, � � � - _ - - _. . --._.. .. .__ . G;ael:e�om�Jia�ce�b�parir�risrif � , .,... ,.__, P.b:=Bb�r;���0:08 . ��?!!�A,r�fl`tt, %X 7525'i _ .,. :.._ _ . . .. .. . ...... � . .... .. .._ ,.. .. � ,.,;,,,t,x-;�,.,�. �_ , ■ 1:}�C�o Gh�'r.ig�s ai�.�#�e plan� 6��p�,r•s.;shali �6�: ��ti� v�i�out �e �a��t.o�i""-d�_o� �1�� Bi�1��i��:-C3f,�cia�:: . . _ .,. � Z) Yb.0 shal! h'e.reb.y �o'nsent to r�s#orQ'any �ari;d �II da�na�es'to �tay ��iva`�� Qt�-pvblte propetfiyw}iich�ma,y. resu7i. 3} P�rmit an�1 �pproved;pCar�s must be,�.c�tsplaye:d �h �':conspicua�s��ace pn �`� jo� si#�,;�- �•j T�e-can�r,actoris:�rsquired.�a::�c,ntact'1,iarQ'sh'��hh�`tij�anr {�972=973�772)�t�iscfier��tf�;;a:pre-construc"tion-me�iGng prlarto;ste�t ' af"vvotk, . . S} �vild3isg site siiall'�Se kep� clean �t:a4l�tirrte�:and it�e.f�-ah� #�fl,�ar.a`ss andweects a�c���s�t,:�r.:io` de�itis: Gj A11 pr.ov;sions af laws ��n�3 �r.dinari¢es,�governing t�iis.:.ty'Pe of•woek vsi.�}! fse c-amptres�>s�v�3� �u!�etkrer.spe�c�'e.a he7�its or e�oty � The,gr.an't�rs�:of-a pecrnit do.es t�ot `resu ,e't� r�e,a� o.'t� a vya,l�te or'�artcel��h��,r`r.4y�'sians ofany-o'ther. s�te o� local' s'' P . � s h i�y�. . law.regu#a#ina �ons:t�uct�o�ior�he.perForrnar�.ce a'�-ca_hs�r.�ctio7i�. ' l;}: C.om�lia�c�wit�i ���e aita�h�c�_DF�N`EnYtC��p��it�al �issessrn��t Met`raor�t�c�uiii; � _ 3j l�f�:.cu-t�rt�g;ar:v,tel.dtn�:isa'tobe:condc3czetjt�as��. Far� cz�`t�e pr�o;}ec�7 separate�permc�;�;iill,be r.es�.uireci: C;onias��the;I�eparttnent; ; • e' �o�:Pt�b:i'r,c::Saf�ei�+'s Bz�r.easa o���r."ePt-eYe7�tiofi (��2 ,�7�'.4=s����} #ox add,iirohaT:���q�;l��i�ia, . %��Fre �,Iarm�permit�s,requir�d�'fr�r�t [�,e��rt�e�ritr�fFu�al�c-S����y,_Bitr�ats o���re'�r.�eyer�t�"¢nf.�r�a11'�vork��ki�treqri'ir.es �n$�afla�io�s or..t'n'odtf�cairoi�tts�fire alaYtii ��x�.det�t��,�in,,s;�s�-��`at�cl r,'��a��c3`ec�1.�aP,i�ii�.nt�AgT���ox��'i�45.7;�-offik��;�.tr�e�cid,e, {2006' I��}.. �Va'in`fier�a�ce per`�'�rMed �r�,at.card�nc�'vv;i��,#�ii's cade 9s:�o'fi�si�stder�: a r�aodi�aca�i.an� �. ., . . d. )j=5ubtxii'ta:.complete. se�:of�co��ractorYcertt��e�l'-�,s-hnil't dtavii"rigs cS���ie pro�e;�G- � r'i��nn ...� £�`�'t�'{: , . . . .. t� . i - {���� � �.� 'flXint: D"aies8�2;4�Zi).�i3: :Z:'l9:ZQPM M� � ���� rv�.:, . ��.-- � La�t�;EcTit�312'$�2fl11 iD;44':58.Aii� L?.a7lasJFrart`N7:�r�h tnternatioraai�A�r�rort _.. . . - -�nvi�oncrierit�l�ffa s`flepartr�eri� -_ __ _ _ _ _ ____ _ _ _ _ _�.m. _ CN7`€�O.�F.S:CE� ivI�Iuf:oR�ANDtI�M L�a��; :Fr'c_d,ay;.-tVfarci��2�5,�:2�0��.. . To; �A3;Mag�iz.ir�e Ft'sitim ;Deet'ta�{��fi�:y � �;epi: :ati.D;, q'e�iti :.��v�r�'�ai�e�fall�f#a�r.'� _ _ Re:� D�tl� Eiiviro.n`rri�t��ta'� A;ssessr.��;rit;%r, p�r_t}iit:�AppI(��t�%pn':�io� A�0=1��.�58 PQr.rnit �1p�li�a�i`�-h A1 t7-.(i8`5�B far �D'� ;�7D.� � lrastafl r�ew��urnp;s���io'n, ��nk=farrn��and ��-:rri.il�s :o� . . �.:. ,; p���n�, 3ia�s-k�e�t���revie.ws�cl far enriir.or�rne.ntal ina.p�ct; Revievv ofithe::�.p�li�a�io�n:a:�c( {��ans ind�cats - - �- ..... .. . . that•the pro�os�d projeat-rr5a�t present'rh��fo.�l.�v�iifi'g �et��t'ranm�rit�2�l �irnplact. 1FAFT'��i��RF1!lE�1tV�`(OU��WO:U-i:i?; L��`'�:`C .L?�:S:C1�S��A1�'i' �:F Tf=i��:SE R�.Q�i:�-���(��5:;;:P`�:E�S�E 'CO'[r�TAC�'E%�i? :,�T ;��972} �973-��:�`,t�; �� �s�°th� �es:�onsfbiii�;o."f t�,he -ap�l{ca�� �o�:info�m� F�: i�'��er�;_�:�n::a�n�+ �h��n�e�:a���t#�.e, p��s,� scg,p:e, �es��n_ or� rmp'lemen�atio��.�s�:tice.'tki;� �ertziif %ita�' �is��f�:i� . �: TF1:�$ :P�R�:J��l' !i!f�'i`.1���;l��LT�.IN �'ki�E ��}�L03�tilf3�l ,�"'a_ '�l�U�����;+Ji�NT�t J�#'A�CS: = 5f�r��`V!i(at�r(St�P�PPj ' ' - �C),ue :Go`t�i�:scop� a�d siy� of'tf;ie p:ro�ec�; � Sto.rm VVatet Rn)hr�a� P'r,even�f�i,n Pfan {S�V;PPP�,was; � sub,eaiitterJ. tc �EAD.�for:�z:evt�ew. ar�ci� ��i.pr,ova! �,��or• tct :iiie�:apyplic�nt r�c�iv�cig_ a�coris�i�uc��o'ri p,ei�rxiit: A �o�jl of:�h�e SVVf'P-R:�haJf'b� "k�}��:a�t�t�e�;srte and; Fie available:`fiar r.er�iew-cin ��er�uest, i`he'�'VC�f'P.P sh�.JT be:icept upda�e�J"io r.e#le.ct��han.g;es?�,:sit�e and pro�ec�,conclifizit�s. .Cfaar�g:�s�to�'�te':sto�p;e.�;�atui�e�of,' . , . . . .: . � or-a.dr����on at are�stp f�ie �Sra;:e;:tshafl bQ nr�t�fi�c� ta :�AD �e �aV'Uf'PEx.mt�s��e irnp���;;'e�fed at�'t1 am'��ded �trt �accr�rctance-ar,i'th th�: XP#3�� �onstr:uc�tton :C�en���;f �'��-m.%t �;�Si�OQQ: . . -. N�Cl C<i;EA1Z��N�,; �:R�;D1NG QR ;�X:C;?�1/�'T't�31�!`ACTIU:I�'1"QF��f�l"":�C1t�{D��sX�R�.�?:�:�Ep'�U.�L�S�' TF2E C��.NST'�t.1.C1"!!C�i�i .S1yF.E .hI;,O�EC�'��C..fi�l).AJ�!'bf F�R �'Rp.JE�S�{?-F � AGR�S QR� M�:�.E, �`i;`C�• N�3T1C� C�����l�fE�1�IT �NOI�-A��;P;a.57fD-_�.:47`�T�i'�.J.O�'S1TE;I�SND 7`.����tV�P�P !S: �i�'�H�E J�� ��T�. - _ ; .� w. . . _ . ... . .. __ . , . , ,Ir�st�;l�at�o��r,`Iri�fntena�rrce, t�pa�r=snd in�p��t�o� of eros.ian;a';n�;���}�r•�;er�t�cz�s���'ols�:at�d ot}ier B�s�� Manag�ern'eri�.P�actites {8.i�(:��j,:��at! be��erfvrmer� �s�t{�s�rj�i:�;3 i�i ��te 5�1F���' ��ap`r�s �%�he,sagn�e:c! . . . .and °ce�rt-rfred=it�s�ie��c�ns;:s�ia.11 b;e.��r�t��vi�ia t�e.5'�`f�FP; B�iv��P�. s�tali:�e'rrtaii�ta:in,et�;ir� 7tai�ctiariing e.anditi.oa� D�atx,a�es:�o�;o�;�ci:e��cier's�z�'i� i�r� �.'1;#'� sha�l� �e�r:��a7red�°orca�tect;edF�;vi��iJr�-�e:ve�n,47}. ca���t�d:at days �x k3efQ����:h'e�t►�x� rain even�,�wtiic`�aev�G�.c�ccuis.�fi.r.si: Stab.�l.'t;z�tzon:m:ea��r.es:sti�z�fl=b-.'e i�iit'ta'�e�i;�a�:sre»-.�s,�.r��ticable��t� ar�y-p.QrE;onfo#�t�ie;sitewF�eze: cons�r:t�ctian ac�cv��res �air� ter�pnra�'�ly•o:r,�serrnar�,��fi}� c�asec37 t��t�i4 3a'�e,r��a.�.�4�;a,�� a�tei� . 1 .. .. - ' - "� _h " �iavEr�9; �eriiporaril.y or p'er.m�ane�ii{3r'�e�se.d A;cons�r.ucfio�.safe �rsi�� veget�ai��ar� as�#fi� �traal �stab:iiizat�on rne`t�sci�3:s�.a[i:.`t�ot. b.e app[av�'�' for;clasure:u�at�l ,a �er-en�a�I�ve�'e�tatton •c�ove� has: °ceac�ae'a` 7�Oal� o� �a'e �na�-rve 3�aekc,�-.r.a�rrid'�cien�� ��d is urirfaxr�.�nd �e�r.enl.y. distr-���g��i.. . _ .. .. _ _ _ _ _ _ ._, _. : � :A1�.=08�:6' " -. e . _. , P� ��•I:of_�:1 F'or�Iosu�'2�:of'the S:11�1P�''P; a�il installe:d B.1ViPs',shali;�be�remov,ed,=���'a,ppli:cantsha;il�r�equasf:anc! pass e . . . .._ . . __ ___ __a..final�r?sp;e�:fiion:6y :EAD_and,.subtn��dcaptes Q�;�#( inspecttori"s _pe�:�ormed_��d a �►na�.cc�.pj� r,# tl�e.--- - - _ _ _ _. __ . _ SWP,PP�iti:�l�c�mg �l( chaiagesi�amendtnent"s:an_d ci�`inp�etad=�orrns. :P.ro�e.cts requir.irag a N,o�tc-e�f Tsr.m"rna�on (�tV��=�e.:sen#�to:the T.GE� s�a11 riat s��tc3 it�e_�Tx?+T,it�ioU`t:�raor r�uaev,� ancf;ap,��'aval: �Sy EAC?.: Pos�ings�o'�#Fie'.C�N�'and,�f'rec�uit'����"he-t5lO:is�tall r:�maira-�tth:e rab.slt��untit.;fhe.pro�ect:= rec�iv�s �a�iprov.aa for. _cta`sure =of`tlte SY'JPP� �ry:��[D:,;. 2 �s�i'e�e�:Suruey� � As req.uir�dl���2�5 TxiC;29� 34�.;a� asbes�os �v"r.uey srj�{I ��inain��jj�ed.c�r�=si�e-,a�tc� s`��a3��;��e�ssljr. pTcciucecl :ctpoEi,;request ��iy an�;�nspeeting�of#i�ia fs.: (� ari�ur�p�an�n,ed d�s���r��ric� of a:ma#eriaf pr-�viot�sly�den�ifer3 as<�co'nta�ir�'sr�g �s���'���e�x }�xes�r�e.�� . ... . - �o coritaira:a�sbesfc�s. accuzs,,-ti3r�a#��:s�.a'�1 sto�, tt�:e.,area;�s��it:be:evac�ateci a.n,d ��b. s�i��l �z �?�s�re;d: rii�r�a���ate�;j!; ^ . �f:�ri�unplar�:�ed di��r��ance�f rraateria-l;:o.uts"(de t�►�e:'a�ea uf'�e o.r�git�alsu��� o��ur�;,�ts��:s�h�:�I` sto�., �re�ar.ea.s�ail:be:.ev:acua.t�d �nd�=EAD �E�a�l. f�e n�Q�.�tfie,d;l;r�t.me'cfi_��`�ly' Corisgrs�cxion w:orkers sl�all �.e.irzf:orrnec�:o'�-tli�,.presenc� o� as�e�t?s �n_�h�=+�+r�rk.�rea pr�orio beiti:g 3llobvec3 on the wor(csit�_ l��or,kErs s#ia�9i �e �a�ae�E aw.ar�•ofi'the.�:hazardsar�d=safe wark pra:cfices- i�vc�Iva;�,g�tiv�rkin� aso�.nd,asE�esto:s cs>.n�aink�g;ii�t�te��a�s,. This wi�{ kie th� Cesponst�ijl�tyof`tf1¢ g���Ta�' �. ._.�_._ � . _.._ . ..._ __. _ . ....__ .,..._.._ ___.._ ..__.. ._.__.�_ .. ..�___._. __ __...._..�.._».... _ ._..-----...._____._..__..---... , _ �o��r'aCtQ-f: �35�^�; `�i?�;3 ['3`d'.� E7Fi�i3$' a4 �1%�J'aste (,Vi.����:.e`,�i�:ePi P,la�, (ti�:F.� �aas su6rr.ia�ed. and' a�?,p�i�ved%sy ��,D asr�o.ria��srr�ai#�p�r�V�d: G�a;nges ih"th� tiva:st�esti;�arra �o��e p.roj�c't; fiEiat �s,r�ewan�3sies �t.of.�is�ed _it5 ��-e.}��a� ar;r�jajo.�' cha.r�gesih,�h� �.�r?'Qt��.t af a��ueia tivaste:stream m�is��be::cc�mrnrt�icaw�c�£�o;F�.'Dr-a�d;~tti�;='l�/:MP upd"a�ed.a�.d apj�t�vec�=pi'a�t1'�io dtsp�s�1>.� . . . - --..... .�...-�_ ..:...... :.. .... - ._.... _... �o.iid�a,�ste::generat�d b��ili� cons�tUctinn pr.o�,eCt,;"_s_��1_: b°Q�:m�a_�ag.e.'�l. �n s��h::a;tTian�i�r.:as;�to,:�raarr.nrmrze� o.r-pteven� rel�a�e ;fr�rai�fi�ie corisYruci�on stte� I�!on-,rr9v:riic'tj�a� w�s��_skia.i( n�it leav� t�� �i�par�;�f�n;u�:i#;ie�prf�'r �kn:ov�iet?�� ar,i�i app.x�va��f�the :C3F�11'�,�uiroiaxrientaf A#fa�rs.Depar�me�at: . Spill �Res,pot�se::Flan- ' S�p;�i R'e:s:po_ris.e ��a� :���etr�fcals,,.=ria��t;t.r3t'n`9: �e�%o�.�z�r�a :l pa�-t.y�.es�biasjble.for��he spt11 �11 pro,�Q�t, ��th ri�.tails regai'�33�ag re stiblrnjttec�=to ��c1;ag'��qv�d by � E�D;�r B�r#�c3ri�,�3ctStanclatds. ... :up �J��t�i�? �g ofis�?ill�,vasYe i�nrts�_be:. spi�l p.lan�is a.v.ai:�able�#`�oin . ..,_ . . al'U-QBfiB' - F�ge-� of1:3 ti '�- :so4�: ti��rz;�getn�r�t=G:an.'e�al�`���'�:�r.ea �_ _ .. .__� . . _.. _ .. . Soi�'�?3a.nag�r��:ntwGen�ra�3 �'V.c�tk_:Ar.e�_ ._ �'�ie��rajeeisEi�Sa aef�y;ere t� t�e �pp.rov,ed-Sri;1 �vi�n�a:�,err�en;t i?`�a,rs:f,a���i�e` G.�a��t'al;l/�7os4� Ar�a., f��y •�xcess sciii�, c�a�r, gr��te� or��;�aVa�ect rraateri�(�'sh�'�l �a;�r� he;x�r�i4ued fr-om `�f�e, a�rpi��t p�op��': , ,. � .: . , r . r r._ .. . _ . . _ . . . . . ... ` t . � . Sotls: dfstui�?.e�l �j� �Xcav�f4Qt��.or:ar��l��:�:;sha'.f:,k�e-oE���n!ed �or'vt����:�;h�i :Q?��ctor,}!. _�irad��?�� ii� -conta�iinatio.n. ;(�'any.-vis,�al,a,��.l�actQry�vioi.en�e of�c�n�£arriir�atio� is nQze_df�s!���� �faoi►6:d::�� s�oppes� i'ri�,i��c�r�tely �ri:i� �4D;contacbed a��.7� $7'3:v.5��Y1:= � Jiii-isdtctioia�l �lVater� .J;�iri,s,c���f�[�aa�t�� �N��s: co.�'�Ie���P� �f�1�t�:F ? ��p.e�`;ati�iii�a�;��;�[a..� ���j;�risd��c�toraa�i:�ivarei�s, �'h�e aApi�cartf;�arrd �cantra�cto:r'j stiall Cam.p�.�wrfii a-?1' x�or:tif�e�applic�ble�_N2�trQri�v�c�e perrni� z'r�d v�itktiC�C2,$s�tian�40i� �!�i.aYe7' Conr�r�rons�for�he �I��t�nn�vyrci���ser�m`it, <i'f�s ��aplrcaci��ja�d conttactQr� slaa�!-fulCy e.wifk��#ivsE_ Yeq uii:em�nt's: atad-fiixn is.�: �7�I? withsu�h:°;�t.o.�ur�i��t#a�ao n`l�p�p:n �rrto.ri a# t�e_war:k._ ' i!,�a�g#� �Qua�ity� �ns�-cot�s'tFUe�itsra',.engiiae:ere:c�:�;ape;rafiioti:a(c�.$�=P�s . ___._— _ _ _ . ... T�e �ro�aci�.shal� .�r���re:�t�t�ai cori�ar�rna�i.on n.�=st�rr.ai•ti!v.�#er ;cfisch�����_wt��: 6'.� r�3:uc�� befoyvt�te- fe�ler.<aa benc€�ma�ks defii�'e.'d b�r.f,eder'.al 1�w,{,6� fR'¢�7�7 a�i.d.:�;ny ap:p��c�ak�l��su:bs.e,:qu�n�-�ta�e o'iF ��de��� t����la#icsns��.as ave�i as"t�i'.aseiri��i�"�±�b.�5s�s�x�-t.v�a�r��r-rti�ar��{ ar�y su�s�e�Er,e�,� ap�l:�ea6le-st�e re�ct�a�fvtjs' Yj'i�e�:�'espR�?s�b�,��,��i;ci�� s#aa,ll�;s��5�rt�t th� t��i���}'-m� dts,cb��,tt�s; :th��xsYa�F.occ�:;i' a�t�ie;�sifeK'�fi�at��Q'u�:e3 Th�s: s#is5.�i � cl, in c� u a e sam{�1in�, T�rfs:c3acurne.�tr:n�us:E.E%i� o�era�c�nal ac�i�itie!s oc-currrng::oh: B, t?a.�.�'raa:�;n�s, �i�e�i;lin.g: �iie opeYa�tto�a�C �ontrols:, w�icti . : = . �o�uFd:p�ossib:(y �a;�,ar�.��h� fortin��a�an operd�tiai�a;lasio� v� �(�'e�foririat',coi�t;� 1�'e.lesss��_uetc�r�ti� lti an�r_ca:�e, i"��:•�,� e�np:(o�e.��.a�:t�e`�facilr�;!.rnust #�e;�c;1�a�Iy.;stated.: T.#ir�, dcs ..... :.� .. . . ^f � • �:A h ' . •v��ll.b�; res�ivias�Ie $or a1i oper�atc�?.n'aa ��t�v�#�sxi�t����? as:�tad .t�e iocat�a�("s��forstar•m�wa'ter i�.F�o wil�he resp�ns�bie'For;ali �Dl'�s�ftr�,tipn+ .��� � � �er�facat�r��� s�a�d �X ��veiesxg� �ngrn��r,�s����rrig' �ha� "'���e�. upar� �I�e ��csye `r�pY�s,;��ya�Eotrs rna'e4e b�thie Ce,s��nYa.si�ie offic..ta�,��je.�nc�p¢�ed.s.�t�irrai co�#c�l�w�1("tt��'e�l:s�+o;rm ;�W�t'�r"d3s�h�`rged �.rA�n t�i�:fa�i.i�t;��to t�t�`t ��'�3 �er�c�ni��4c.sta��.a,�ls:# - $, �:�cscr�� ._ - �'or�;e�'�e i��or`er�'�e:va7� �e �zs�#:�ii�-tl�ts pro�eci, u��ss�aut�awal) �� �onduc-�ed a�i.� pro.p�rly d�s�gneti �i�r� maanta���e� w�s�o;u�: �'�;ie�:t�as�aia,�-,�A�a��rn�i�i�! be ��z�l�:i�e�l,ir�::t��_���o� ��?l��'�'� �b�l��:e �:��.�-�c-�e; ' :iu�s�e'vui�f ��,addre`ss�c�;rt� tk�e.�'o'(id ����- it+9?.t��€,��an;et�i �'l�n;; � _.. : _ .�. �, , __� _� _ , . , ,.. y . .. . _. �. . .._ . . .. A`1.0�}85:B. _ . _ . _ , _ �._ :.:_ a._ s. _.m . � . , � .. ... i��e3 0��2 �: A � a ze_-auaii'aii l�: on�`diwa lrpo rt.eom�.� �Q'd��,�.�' ��. . �e�1��'�C��. ��:t��l` � ..•. ; . • i ta�th,$ proJec� :;.-_ .. t���� �€`�_rec�uired ta:-adhere�to. �stdr.age;y.ai.e{. A eopy=+�f'the.policies..arat(,procectur.e's � . � � a n a .:� ' ':s .�ma s�. ��^° a:' ��� :+� a'� .. _. _ , . .. .. . . .. . ..... _ . .. .. _ . _. ... _ _ .._ ._ . . . _. . . . _ .. .. . .. . . �1�=o"S�B, . . .... . , .._. ... . .__ , .. Pags 4tif:��i . ������?t�r t��?.�{ol�o�t� �'`�r.�� . s E, �r11 ro.n r�:e��n���[ � ��- � r�: _ .���.: ...�?.. � C����l�s� __. __�.._.�._ _._..__.__.._..__._n �.�._ ..._. �_.. ,......�__ .___. _.._ . _. � _ __ ... __ .. _ . _ � .__�. -.._,_ .... ._ .: �':$t'B�°tl�,��� I'���'tir!'-��"r �s;T�'�t��; -,6 .._,... . ,... ;��Ui+`�����-'f.�i�t�4���ie� �Zi��;i.p:s`��£%a�,��i����`�:rar:"t�ri.��'9�:�i`i�� . P. P��� . . . �� 'i ,Issua �t3a��; >�"�a'�h,2�.; -�R;1;�' �i�rar� ct�mp�.e�ep� a.f t�te v�orky.�e�u,�n�his �ot����t�d'.''��-. ���t��'�'�� ��`����-� e' b;(' �fac;E�` ��x�a�- . � , a-�; � .�. _.�. �:�_�.. � �;i'�-1!'i�`Air�pii.;�::Bo�;rt�� .A�r� � 7ianani�C`ons�rvc�ioil'Fa,cil,ifat�ot �3�U3� Soq�}i �er�fce �o,�r�: 'D FW =Air�so r�,'TeZcas�Si61=�Q:0,$ _.. : -• . (9.7:2} :9`�3.='I'.;7�� 1 ��inal`5:1N.f'P:P mciu.�izig:a��;�ic3r�reri� ����"r.t�e�l��.�c�f`�c��. ...� . . Y�es � i.�-`�a: .... .. .. ... ._.. . . �4�I:;(��?a:��s`�`sp`��,��` ���?:car„�.� subra�rtie.dlat�a�f.i�r�� �`��s,T._.� t��'o . �`i$ ��"QE���?����� ,r":ep�rts su�r�ti���3�a,`�:4�'"�'d> Yes'.. ���� . . . `. ��:31;�i��`��T sc�b�itt'sel�at'ta�ched: ��s;;,,�..,. :°t�z� _ ._ _. , u .._ . . _ . _ ._ . . _ _�� ... _...�_._ ... ,. , -.�._� . � _ ,._ _. _ �..:._. _ � � A�.Q �8�3 P�ge �-o��:�: �� ��i:�iicutxten�afiQ� required to=:i�ndicate Sha�.asb�stos�s�n!ey� � :�'s. �erfor-r;��r}:in-�ccorrla�ce,v4ii�a all�j��p��ra�1:�,Fedet,al; . : . ._ . - r � _.__. __ _ ._ .... _ .. .__. .._ . _ _ . _ � _ _ _._. ,� _ , , _ . . __ _ . .. _. ._ . �. ._. _ _ _.__ _. . _ _..__ __. _ �.��- �i^� lc��� .��£:���,�;�e�u �ians �s=att�c e� . A�b�stos _S.urv�y�.suhm'ifte�dla�a��her-3,prior. ��=.v�o�k: tiegiriii`iii`g: �Yes ;Ri"o l�n �i:ri{��a�t:i��d'c�i"s,'tu.�=b:��i�e;o�sbtiilr�ir�� rrrat�rl�:I's;sccux.,re�l, Yes _ 3�7.0 . . . . . - .. �B�1eli�rgyma'ter�als�oufside.the -scope..af the sr��ey,-o:r =r"tia�e;�als c�oictl asACtN_'s but,#�ot�a#�ate��+nx.ere.accrt�e.�ita�ly :disfu�ibet3::. . Yes ��o; �If�y.e�.;-�t!a�:�C .u,cas: si��F-p=e��i :and F.�AD uv:as an�orii�e�l.. `Y'es IU�o_ �lT�. �if-ar� vn�:xp�e���ef: dis�uF���,ce �i�f�-an :P:CIi� �oce:iir�:"�..:��as. a�; _..-- •. -- --___ _._._ .----- eme�e�c: ab�:e�eni p-erfflcrrreti7 . 1`�es: . . Ni� . 3; %�1;su�i��.v,ras�e ma�a;geinerif pfar�;+k?as s.u�t7ii%Ee,c(:=s�r�t�is.- p:role;�.fi: . ]'`es:-..: _:1?�ii, . . ��re;'���civus,wastes g.e3r�r'a�ec� as part�#'-��i;k���.�ajeG#?; �.E5::.: �p..;:.:..; CNe�e.:�� ly#ical results, 4prav�c�e;cl'zo� �U. p�pTti�>��:re,rxa;atral ����vastes frorn��e a��rpQ,rf� ..YQ'�. N.o. Did�,�At�.�a�p{��ou�`t�i,e retn'aVaj`;a�:�riy no3-i=�m�;ra�ci�sal �c�+a��es: -Ero�n �li� :a�r.p.ort�• . . Y�s_ ... . . �al:a _, .. >�%f1. .._ -�, :5 .i4 �pi)I. Res�onse PT��v.as:�ubrrartted #o a`c�d approa�d b� �'Ai� ,prior.#o.:tar�m�ncerrie�� of�ork. a�-tt��e ��o���.i.�`e; 1'�e�. _ . ,�i�= .. . __ . ..... ., _ .._ ,...__ .__,.. --___.. ..... . . _. . .A1�-t�85B.� -. . . .. Page� ci�31 �i �Y�s.��ty�.�o�k �:��'i.taue�f �'��?t���.�':���'Y,�,i�; __. . .._,.__.._... . .__ ___ :._ e.... _. _ ._ ._ _ � . .__ .. ._ . _�._ ._ _. .._... _.. _ _ _ . .. .. . � _ . _ _ e e. _ __ Y�s.. N�_ .. -_ _. _,_ . ffi,y,:e',s, v,!as�,t�t�.,��;�i rnana:g�c3 rci-accorclati�;e �;�iE#i �� ����5�,.=�`�-� :a�d_p.ro�`�'ci�'"s Sof( N�anagement`�F1ans:�=` °�'�� �:� �: Nas a copy�of -a`ii c3ocuriie��a�i;ciri teqUi"r.e� k�y�h:e (�latiarn,vi`d�-'�Serm�tan�l�7CEQ,S:ectt�n 4t7� W�:tet' Qiia1i�- �ertifrcatitin C�anai�to�as�•(far i}a.e Natiori�,vade ;pe;Chn'itj: �a�c�s�i,���#�: E��� . . ,,> Yes��t�o� `�, %lv'er.e�r�ocurneri�'s��a���a�rng:�b_Po.�t;can��i;uct)ora:,�en,�iti�er�ei; . ope:r`atzat��� ;Bl�#�s pravit�.��? `t''�`s ; F��� _._ , .�.__- � ... . .. . �:�.�� .�. r�--_ ._ � -.. � � ._�._..._. .._,__.._.. , �: ,. . :��.�c��ic��.�e:;��`e�-' �;r-: F�s- ��: ��'?`,�.._,._��_._.........�<..�..._�._...�______.__....�._�._.,...� . `�e�, . ._ _. �=�; - rf cori�ret� tivas� =usecf for�=this pr;oj.ect� was th� vsiashouf co.taau��-ed'�'t a ,aioper(y cle�i,gne�~�nci rri'��t��aiKec��was�;o�� � �or,a�iori? . . . . ' ��.�� ��:�- ..--. -- - �� ... _ . _._�._ _ - - . _ ._. . �. _ : .. .. .. _ - . . .. .. . _ .aio ,as.�� _ . �a��� a��: t' ter.t`�:�y �t}ia#:��i�s �a6fl..v_e%ii�f�irmat�one:is correct and`�t}iat al( act�vit,es cov_ered �nci,er �ti�e aE��ove r�f,�reiir�ed.�er-rni�a�i��icatsonwere ronducte+3 ih=accor.cTa�iice tvith;atl appf[cable�fe�eYal,;`s"fate� ana:3ocali�.ales:�hci r��citaiians �s:weff as in;accardanre wit3i%tE►e'aqstrucfions�•pro.uided in;-#ho= D1F1�`Envi'ronmental' AsSessii'►eri#. Cpnt�actor Printed:NameTt[e � . � . __� � _...--- -- . -� _.._.�._._ _ _.__ - :�S7g'n�ttc�e " _ Date= _ 'To. �he 6est o� m�. .knov�le"tlge, 'EnfQttriati'pit :anci' ;b�ftef; ;:an� ot�i �gh.� 3�sis: �af' :t�ie �bpue; CE�'L1�f4.��IDTt� .�fr•om. Siie: :coti�racYor a11 ;artt+�tfle� caveCeu�+ �n.de�'�� a5ove� Yeferencer� �erm�f appliEatio.�:wer.e concllic'c�ed ��-:accorda7�ceav'Ith.ai��;}?pltca�ile.�edes�aJr�siate;ancl toc�l ril�es��rici: =.e�i�fafionsas=�yel� as�in-�cEor�anc�'g,+'n�tEr-t,`iee�ins%`stc.iions€pl'o�rlded�triatk�e=O��U'._Envir,oxii��i�rxal= As"sessfT�ent:� � PertrtiCee �Pr7�ted:Narne`J_Tifte: � __ . _ .. _ _. . ,. .� .__ .. _ ._.._._.. ,.._.. _..__. _ _ _ _ .. _ �--. ._ . SignaFitr� pa'�e' - --- � . . _ .,. ... �. A . ,.. . • . R11[}}•OS�SB __ . ._ _ ._. _ - - -�- -. _. _... . . � _ .... . , A ,. � '��ge.&`��1� �riv����-or�:m.�:�i:��=l: ���o�m��:�:i:a�n.c.e�.�;ri.s,p:�:c;�io�: 1nsp�clor e i 6 n ji7'FiJ1T�'tiDE.��ris�Il:a:t�ev��s�r�p>statio'ri,;t��ik;�ar�.a�'¢�9�.f;r?�(e� a�� �7�te� - P����: -f . Asbe�ios,Suracey °a:- �lVas any ma:�eria:l �1as,c�:rrb;�d :ti,iat iyva:s::not,eov��'�;d iri'��ie :arigrri�� C NC f� i�f: � co a.e? � �i. `h`a�e;pr:olec�.cNor�ers b.een..i�`c�:o.r�neet of-an,y:AGNf:`iRtf�eirvuotic C, •�G. t�tA: f�i;�� �area �ar�cl: is tFe sUrat�ey:��!a'tl.aEi:l'e:��"t.'tFi;e.°si�;e'� Z,.: �n k:%CFe�6; .a. fif��ss��;�et�`.�-was �s�c? fo:r�'�hi� �%3�is��°�,--�.;��!.�'s=��i'e w�s;li'o;��; aN-as�t3p; riri��r����i;.o# e�s�ipn�e�st:or d�lavet��tr�:r:�k..inro.:�a �rop�i^�y I' op�era�ed;;was�or�t`#�c� {iiy:3' b, If�t�i'stpi'�a��;�;�r�volu�d cgti��e�Ce-�sa�ru cu�trr�g:{ g;��ndii�;�;�or �r:o�ovir�g: act��r�ies��u�as �he:s�ur.�y;.anc1 dusi cr.e.a�e�t cl�an:ed up:��rrd �1.a�e:c1� 9n't'a �� ap�:copttate-disp;o.s-��la:ca�ro�i� �",. �.utiscfictia�ri.�7+����si'� a. :Is;E�e:.j�raje��corrr�ljring v?.i�tli.�i��e' "t�:rms�ar�d. co.ndi�i.ons..of�tlae: t1SA.CE 404 �erm�t? b. Nas: c.o,ns�r�.u�ti�ti. activi�y ��'pa�cfec� �� cfi�e�t;��ctr�;i��;ge•�:Q�>otfi�e:r �ti�rater'boely�� . - . - 4:`-:: ��t-a�'ro�a'�`s�tar-r� 1�',at�r: �tsa�if;�r a°,� .H�s•sa��pos�--cor�s%r�c�i�n, �en.�i�.e.e.r.ec� 8���i�:ei�;:tri'�a:��e;�`*as de�:Zgt��c� a:r�d �#;�ified? C: �!C •fsl�1• N� £�.: �IC� '�� NI �.E N;C 1�lA: I�} � t�C :t��i. ;l�,i � J�3:� �t`A '�Cl, 5�. Sco�?:� ����t:g:�- a:; �l�ve;"ail sc�;:�ie ch;��ig�s b�een,scib�t7t�ecl�o �A�7 fQ�--rev���r:•:ar�d� C t�� f�A N� a�ppr:�v��:�rior-�fl;irrtp!'ernez�tation?. � z�::. S:oz� IVI�r;sg�fiy;�i��:Agr.e��':C�3r�er a. F�tas,tlae��i rso e�-f.or r�a ##i�f'r,�Idarial s.y evarii�s�dt"e:. C� PJC �� ,� � � P. �' S J�..'� .... _. �._: �. .. �ns�rs;�rnent�''iiie#fts��ef �ef4re�?` . b, ,Is calit�ra�itar.i�.b�an_g..�erf�aned`ar�[:t'�cti:t�ded:i��a�cat���ce t�i"� � =N.0 '%.'�� f�� -p.eriYa�= �ci�tc�:iti:vr'is� c.. Are •�(.a�a �romt�e.s:cre,enirig E�e,in:g're�orr�ecl�;� a:cc�irda�� u�r:i.�h. C. �C -.it,►�k �dt' ;Per.mi�.�orir�fi�o.�s�= " �: .,�3resampl"e,s' bei�a e.o:Iie; �e,:' : .,.�.:.•,.�"., . _ _ g�� t��_s�A`i��;�oc.o,rs�,ar�ce�i��p�r�id#' �. �� €iIA P�,I� c;qxx,r;3;Ftipi%�7 - _. _. :: _: :_:_ : �_:`. ," .:.:~.: -_ ..._.... .._ ...___ , . .. . _ .� _ � -�_. �,.� AI{3-0858• 4'�ge��3.'.o,f 3:�. e e. -Are sarnp:f�s tha`��ariscreenanc�E�er�g.s�,nt'�o���ie::(a6orato:r;y�iri C� `d�C �3� t�it� �ccordatice wifl�:.per-rtiit`condi�ic�rrs� . _ ___._._ ... _.__ � _ : . _� : . - _ _ .__. _ - - _ ------ . _........ '��--fs'S'a�i'�CEa.��-��a�is�c.r,eer5i�i���:ingsegt'e.gatec�;fo��FUrt}i.e;'��es�irig;o�-" C,' �,C: :.�_..��.... d,s�pA�a�? . 7�:. :��zi� �aM'a�;�ri�e�st-G:ex;�rai;�CrY'o`r:k,Ar�� a. 1A��s��so€�: excay�:�ecl:ari�:'.rnci;uei�`'�orr"j'�k��. proje�f �lo�ca�ion`? 1f ye�; atisy,rer�h� �oi#o'v,i:�g,. b. ��s:sfl�!':m�oue�":to.a'ri:�i�}�.art`s�;oc�¢pi1:e �r�:oi�ier��ap�?r.ou.e.d::.s�ta�it�g: ���:��� �, .D�� €Ez�D �i:tT�: pfto� ap��"Gvat (3afoi`.esai�y's,oif;in�s ��sp���c3 0.��0�' #he-_ a rrn ar�� . d:- �Ivla�`,�,p. �AD is��k'S�tacl�pil,e,p�r`sii�t, �om�j�tecis�xso�#o fr��isportEn.g so�l f�o the-�ti�,po�;sYb�ckpile'?. =8.. Spilf��es�ox�s:e Pfar� a; D�d any�spills af oii n�rc}iemrcais:tacc�.� a�;�h�, proje�c� site; or ' asso:�iaterl' ��'eas? #�:: i�'.a spi�� qrc:crr�e�, was it r�port2.ei tci:��`�.=A�U.� ���d° a;?�:8;fan.��-. fA�.�.aw up>�e,�orfi-��. EI�D"�'. . �.. A� ���;.s,PAll to:t�tr�i7i�r�sp;n��e,st1��'l�.es=s�eGaf,t�r��t�;�.����:p. pr�,ser�-� �i�i� au�i3a��e �an::sr�$? �} Is �t�iie �i3P _ttpd�t�cl �a: :curr'ent:�,r,o�e.c� �oi��ifii`�s'?° 5'. :S��rm`�1Y���r:�S,'1!C�{�'1'�; � . a. Gbrr�c�s:si�ns>�C°�4l#��:�+3}. pasted' a��:si� Q�ntrances;a�nd s��g�ng �,a.r�s:� - f�>: �SW,PPP ;a�r#:���e;ci �cs'.refj:ect:.tur�entsiatits acyt� pr.oject.s�,gc�a- _ .. _ . ... _- _. t-f . r. c.: B:�VI�s-°I�e�ri•g:r,r��a�����;ir��d? d: cvid.��1c� bf�s�dime�nxsK.o•r�:�:�1i'ufants.�e�i+�gb`��e:-p:�oJ.'.�r.�:;ars�? e�� �nsp:e:c�io'r�ts �ar,sd �re:pa:rtsb.eir�g cam,plete� ai�d:�3:3er�'�;� �he���a�!�'PP?` �:Q:: Vtif�ste ��t�.ag.e.r,riert�� . ta: -V.tra�ti�,�aerng's#t�re.d'sfn apPropc3aie,, ii��ac�, Ia���ec�Y ak�:� cf�s;�s� �o����;��r�?� �}�.�:. .�?al:a���st�'e�r;ris>'6�i�'g:k-e.�f���re��tec� ��-��coccf'a�:r�e_w<i� t��e= _ ���:��: . C. ��:S��t5; �;Eii•l`t'.�IE.�L�X!L,�e� �i'Q7i'���}j�'Si#2;.QC� �;L`9��I��.3I� ��S_`JS?? c�; P,�a��c� ���fE<ai'i ;t�'l,�'s.�2:�tFt$ri�a(''� i�7Tse;'li #� ii7:��1�-'�:�1'1�-P?i " "_T�. . _ , - _'�y ,.. : .. ... �'i `�:�. : 4: �. �, . . .. . . e; ��d �:ii:re;gU'7a'�e_d:w.as#e rrr�n'�fes�s r:ece�`ve�ap�raval b�r`�A�J: ar� ��{�r.iiv�r� r��r,�se,t�:�afive:ii;e�o�t� �����a's����e`�i'tl�e �air.'�zii�? �,: ��� t�;�� ;�!. � ��. ��, ��f� :C �G !�: :t��. :C f��G. NA =�';1 C. :f�� t�fla�. ��� C� �.C. ''�,� �3�: C:. �#°�C' .�;�, i�i. �C" ,I��= ii�#A '3��� ��. NC :�t�� ,t`il � i�:�. �►�A ,i�# �� ��> t�?A :,f�1� :� l�G= ��A� �Ni �C N� �,�i�_ :f�i�� �- �vC �A i�i �: ��� �� �i� 'e� :�� ��: t�i= C; =�G ;�i�• NI: � :�d�< f°�� -t�(� , _. . . _ _ ., ,_ .. . -.. .... __. . _._v _ . � _ . _.._. _ _ . �. __. . _ � . ... - _ A3:0-�8��8 . _.. . _. . _ Pa" �1b:of'13 v � � J�'$A��I:G-t:l_.�07TtRTC�'R#5" . .. _..., . _ _... . _...,. _ _. ,. _.-e �- A19-{}8�8 . . _ P2:ge'�i-���'I:�_ GR-0160 00 Product Requirements THIS PAGE LEFT INTENTIUNALLY BLANK CIT`Y OF FE712T WORTEi DFW Airport Reclaimed watcr I3elivery System FIushiine STANBARD C4NSTIZUCTIQN SF'ECfF'ICATTO'_�l DOCUMENTS City Proj�i No. 02025 Revised July i, 2011 •' i i ' 1 ` ,` � � ' • • � r, � � � � , � , � � THIS PAGE LEFT INTENTI�NALLY BLANK CITY C3P FORT WORTH BF1� Ait�or[ Rec':auned watc� L}clivery Systam Flushlinc STA°VDARD CONSTRUCTIOi� SPECIFICATtON Z}OCUhiENTS City Praject No. 62025 Revised J��Iy 7, 20I i Environmental Affairs Dallas/Fort Worth International Airport Environmental Affairs Department Importation Authorization Date: Construction Application No.: Request for: Importation of Material Project Name: Type of Material: (i.e. topsoil, engineered fill material, rock, crushed stone, sand, CTB, mulch) Amount of imported Material: Amount of Exported Material: Analytical Test Resuits (attached): {minimum one sample per 50 cu yds) Rock and pea gravel screening results: (Screening required per load/truck) Exported Soil Location: Import Soil/Material Vendor Name: Address: City/State: Applicant's Signature: Date: (Contractor, PM, CM) *PI��s� �tt�ch � c�rra -�� tFs� ct`r�tr��# st��;�:if`r��ti��� reea�ir�n i�-n�c�rt�t's�r�= DFW Environmental AfFairs Department Approval (VP Environmental AfFairs or Manager, Env. Operations) Date: August 2010 Appendix B— CFW General Notes �HIS PAGE LEFT INTENTIONALLY BLANK CTTI` ("JI= F(?RT 1�'ORT!! DCI�' t1is7�ort R�claii�cd n•atei� Drlivs�-t�}> Sy°stcrr� Fluslsiinc STAI�I)ARD C01�:STRL�C°TIti1� SPEC'IFI�ATIC)t� LJC�C13Aq Gi��"I'S C`ity P�titjcct i'�;U. t72t125 Rc��iscd Ju6v 1. ?41 ! Genea-ai Notes Divisfon 41— Generat Requirements General: 1. The Contractor shall be responsible for locating all utilities, whether public or private, prior to excavatian. The information and data shown with respect to existing underground facilities at or contiguous to the site is approximate and based on information furnished by the owners of such underground facilities or on physical appurtenances observed in the field. The City and Engineer shall not be responsibie for the accuracy or completeness of any such information or data. The Contractor sha11 have full responsibility for reviewing and checking all such information or data, for locating all underground facilities, for coordination of the work with the owners af such underb ound facilities during construction and for the safety and protection thereof and repairing any damage thereto resulting from the Work. This Work shall be considered as a subsidiary item of Work, the cost of whieh shall be included in the price bid in the Proposal far various bid items. The Contractor shall notify any affected owners (utility companies) or agencies in writing at least 48 hours prior to construction. a. Notify TEXAS 811 (1-800-DIG-TESS or www.texas811.org) to locate existing utilities prior to construction. b. Caution! Buried electric Iines may exist along this project. Contact electrical providers 48 hours prior to excavation : • Company Representative X�=XXX-.Y��C • Company Representatzve X�'Y-���Y • Company Representative X�I'X-��'Y c. Caution! Buried gas lines may exist along this project. Contact �gas com�any� 48 hours prior to excavation, and within two (2) hours of encountering a gas line (Representative 's Name: �I�X-XXX-�� d. Caution! Buried communication cables may exist along this project. Contact communication companies 48 hours prior to excavation: • Company Representative h����0i�' • Campany Representative ��� • Company Representative � h�1� � e. Caution! When doing work within 200 feet of any signalized intersection, the Contractar shall notify Traffic Management Division of City of Fort Worth T/PW, 72 hours prior ta excavation (Representative's Name: �I�X��XX}. The Cantractor shall protect existing signal hardware, ground boxes, detection loops, and underground conduit at signalized intersections. Any damages at signalized intersections shall be replaced at the expense of the Contractor. The Contractor sha11 contact the City at 817-392-5100 to perform conduit line Iocates at signalized intersections '72 hours prior to commencing work at the intersection. f. The Contractor shall notify the City of Fort Worth Froject Manager 48 hours prior to the start of any excavation (Pra�Ect Manager's Name: h�Y-� �i� 2. Coniraetor's personnel shall have identifying clothing, hats or badges at all times which identify the Contractor's name, logo or company. 3. Protect concrete curb and gutter, driveways, and sidewalks that are not designated for removal. Removal anc3 replacement of these iterns shall be as designated in the drawings. DFW Airport Reclaimed Water Delivery System Flushline City Project No. 02025 Division 32 — Exterior Impravements General: l. At locations where the curb and gutter are to be replaced, the Contractor shall assume all responsibility fflr the re-establishment of existing street and gutter grades. Establishment of grades shall be considered as a subsidiary item af Work, the cost of which shall be included in the price bid in the Proposal for various bid items. 2. All driveways, which are open cut, shall have at least a temporary driving surface at the end af each day. The temporary surface shall be considered as a subsidiary item of Work. The cost of which shall be included in the price bid in the Proposal for various bid items. Bike Lanes and Shared Pavement Markings: 1. Proposed bike lanes should maintain a minimum effective width of 4 feet (measured from edge of gutter to center of stripe). 2. Bicycle pavement markings should be located 20 feet from the curb return, stop bar, or cross walk (whichever is applicable) unless denoted otherwise in the drawings. 3. Combined width of bike lane and on-street parking should not be less than 13 feet. 4_ If travel lane is �reater than 14 feet wide, shared pavement markings shail be placed 4 feet from face of curb or edge of on-street parking (whichever is applicable). 5. If travel lane is less than or equal to 14 feet wide, shared pavement markings sha11 be placed in the middle of the travel lane. 3. Bike Iane symbol, arrow, and shared pavement markings should be repeated at the beginning af each intersection. 4. On uninterrupted sections of roadway, bike lane symbol and arrow should not be spaced more than 330 feet apart and shared pavement markings should not be spaced more than 250 feet apart. 5. Bike lane symbol, arrow, and shared pavement markings should not be placed at private driveways or public intersections. 6. Bike lane striping should be 4 inches solid white, hot-applied thermoplastic unless specified otherwise in the drawings. All other bike lane pavement markings shall also be white, hot applied thermoplastic unless otherwise specified in the drawings. 7. All dimensions are from face of curb and are to center of the pavement marking. 8. Shared pavement markings should not be used on facilities with a posted speed greater than 35 mph. Sidewalks and Curb Ramps: 1. The curb ramp standard details are intended to show typical layouts for the construction of the curb ramps. The information shown on the standard details meet the requirements shown in the "2012 Texas Accessibility Standards" (TAS) and the "2010 ADA Standards for Accessible Desi�" by the Department of Justice_ 2. City of Fort Worth Standard Details are only intended to indicate pay limits for each type of ramp, the Engineer is responsible for the development and design of the sidewalk and curb ramp layout, including actual dimensions and slope percentages. 3. The Contractor may not rr�ake changes to the sidewalk and curb ramp layout without approval of the City. The Contractor may propose changes to the sidewalk and curb ramp layout due to field conditions, but any proposed changes must be approved by the City_ 4. Curb ramp ruiuzing slopes shall not he steeper than 8.3% {12:1}. Adjust curb ramp length or grade af approach sidewalks as directed by the City. 5. Curb ramp flare slopes shall not be steeper than 10% (10:1) as measured along back of curb. 6. Maximum allowable cross slope on sidewalk and curb ramp surfaces is 2%. 7. The minimum width of sidewalks and curb ramps shall be 4 feet. DFW Airport Reclaimed Water Delivery System Flushline City Project No. 02025 8. Landings shall be provided at the top af cwb ramps. The landing clear length shall be 5 feet minimum from the end of ramp. The landing clear width shall be at least as wide as the curb ramp, excluding flares. The landing shall have a maximum slope of 2% in any direction. 9. In alterations where there is no landing at the tap of the curb ramp, curb ramp flares shall be provided and shall not be steeper than 8.3% (12:1}. 10. Where tuming is required, maneuvering space at the top and bottom of curb ramps shall be 5 feet by 5 feet minimum. The space at the bottom shall be wholly contained within the crosswalk markings and shall not project into vehicular traffic lanes. 1 l. Curb ramps with returned curbs may be used only where pedestrians would normally walk across the ramp, either because ihe adjacent surface is planting or other non-walking surface or because the side approach is substantially obstructed. 12. Where curb ramps are provided, crosswalk markings shaIl be required and ramps shall be aligned with the crosswalk. 13. Counter slapes of adjoining gutters and road surfaces immediately adjacent to the curb ramp shall not be sieeper than 5% (20:1) in any direction. DFW Airport Reclaimed 1�'ater Delivery System Flushline City Project No. 02025 Division 33 - Utilities General: 1. Por utility work within utility easements, once pipe or appurtenances have been installed or rehabilitated, immediately comrnence temporary surface restoration. Complete surface restoration to the owner's satisfaction within seven (7) days of work finishing on-site. Failure to maintain surface restoration, as noted above, may result in suspension of work until restoration is complete. 2. Existing vertical deflections and pipe slopes shown on the drawings are approximate and have not been �eld verified, unless otherwise noted. Rim elevations, flow lines, and horizontal locations of existing manholes were deternuned from field survey. If field conditions vary from those shown on drawings Contractor shall notify City. 3. Maintain all existing water and sewer connections to customers in working order at all times, except for brief interruptions in service for water and sewer services to be reinstated. In no case shall services be allowed to remain out of service overnight. 4. Establish and maintain a trench safety system in accardance with the excavation safety plan and Federal, State or local safety requirements. 5. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. Confined Spaces shall include manholes and all other confined spaces in accordance with OSHA's Permit required for Confined Spaces. 6. Only City prequalified Contractors, by appropriate Water Department work category, shall be allowed to adjust valve boxes, manholes, ring & covers, etc. Water: l. Provzde thrust restraint by means af restraining joints at fittings and concrete blocking. When specifically indicated on the Drawings, provide thrust restraint at desi�ated joints beyond the fittings. Each method shall be capable of thrust restraint independent of the other system. The Contractor shall refer to City Standard Details for area required to install concrete blocking. 2. All ductile iron mechanical joint fittings shall be restrained to pipe using retainer glands. 3. Proposed water mains shall have a minimum cover of 48-inches cover above the top of pipe, unless shown otherwise on the drawings or details. 4. All water services shall be installed above storm sewers, except where shown otherwise in the drawings. 5. Elevation adjus�ment at connections may be made with bends, offsets, or joint deflections. Joint deflections shall not exceed fifty percen� (50%) of manufacturer's recommendations. 6. Temporary pressure plugs required for sequencing of construction and testing of proposed water lines shall be considered subsidiary to the work and shall be included in the price bid in the Proposal for various bid items. Sanitary Sewer: 1. Verify that all cannections to the sanitary sewer system are for sanitary sewer orily. Notify City of any discovered illicit connections. 2. The Contractor shall be liable for all damages to properties, homes, and basements from backup, which may result during the installation of new pipe and/or abandonment of existing pipe. The Contractor will be allawed to open clean outs where available. The Contractor will be responsible for all clean up associated with opening clean outs. 3. For a11 sanitary sewer service connections at manholes, provide a hydraulic slide in accordance with the details. DFW Airport Reclaimed Water Delivery System Flushline City Project No. 02025 Storm Drain: 1. Maintain the existing storm drainage system until the proposed system is in service. In no case should the Contractor lea.ve the existing storm drain out of service whereby runoff would cause damage to adjacent groperty. 2. Construct all drainage improvements from the downstream end to the upstream end to allow continued storm drain service. If the Contractor proposes to construct the system otherwise, the Contractor shall submit a sequencing p1an to the City for approval. 3. Take appropriate measures to preserve wildlife in accordance with applicable federal, state and local guidelines. DFW Aizport Reclaimed Watcr Deliuery System FlusUlinc City Project Itio. 02CI?5 Division 34 - Transportation General: l. Notify Traffic Management Division (817-392-773$) at least one week prior ta starting work on Traffic Signals. 2. Notify Traffic Management Division (817-392-7738) Project Representative at least 24-hours in advance of all concrete pours. Inspector must be present when concrete is placed on the project site. 3. Equipment supplied by the City will be available for pick up from the Transportation/Public Works (T/PVt� Warehouse at 5001 James Avenue or other sites designated by the City. The Project Representative must authorize all equipment pickups. 4. All pier foundations shall have one continuous concrete pour. 5. No traffic signal poles shall be placed on foundations until seven days have elapsed following the pouring of concrete. 6. Install the required electric services and obtain an electrical service pernzit in each instance, the cost of which will be waived by the City. Tra�c Signals: 1. The City will fizrnish the following material to the Contractor (clarify if the Contractor is required to purchase the material from the City or nol): a. Design Engineer to coordinate with the City and list the City furnished materiad here. If none, remove this section. b. ... 2. Existing signal equipment shali remain in place and operating until new equipment is in place and ready to operate. 3. Existing stop signs and posts will be removed by City forces upon, or before, the signal turn-on. 4. Unless directed by the City, signals sha11 be placed in full operation between 9:00 a.m. and 1 Z:00 p.m. (noon) on Monday thraugh Thursday only. A representative from the Traffic Services Division shall be present when the signal is placed in operation. The Contractor shall contact Traffic Management Division (817 -392-7�38) to arrange time and date of signal turn-on. Luminaires: 1. The City wi11 furnish the following material to the Contractor {clarify if the Contractor is required to purchase the material from the City or not},- a. Design Engineer to coordinate with the City and list the City furnished material here. If none, remove this section. b. ... 2. All new streetlight pole types should match those of the surrounding area of Fort Worth for which they are being installed in. Contact the City at {817)-392-7738 for direction on Iight pole types allowed in particular areas. The same poles shall be consistently used throughout subdivisions. Signs: All signs and hardware shown in the drawings will be furnished by the Contractor, except for the Metra Street Name Signs and hardware, which will be furnished by the City. DFW Airport Reclaimed Water Belivery System Flushline City Project No. 02025 CITY OF FORT WORTH Bid Documents Package Folder Contents Checktist Item Item INCLUDED N/A COMMENTS Sc INITIALS No. � 00 11 13 Invitation to Bidders.doc 00 41 00 OQ 43 13 00 42 43_00 43 2 37 00 45 12 00 35 13 Bid Proposal Workbook.xls 3 00 45 11_Bidders Pre ualifications.doc 4 00 45 13 Bidders Qualification A lication.xls 00 45 26 Contractor Compliance 5 with Workers Compensation Law.doc Complete Specifications and 6 Contract Document in pdf form (Referenced Specifications in Construction Specifications Folder) 7 Complete Plan Set in pdf form 8 Link to dwf sheets in Final Drawings Folder g Plan Holder Registration 10 Plan Holder List (In Plan Holders Folder) 11 This Document DFW Airport Reclaimed Water Delivery System Flushline City Project No. 02025