HomeMy WebLinkAboutContract 59047DocuSign Envelope ID: 19E85C4F-3E79-4A4E-9F74-553C1988AC01
CSC No. 59047
CSJ #
0094-01-032
District #
02
AFA ID
Z00002400
Code Chart 64 #
15000
Project Name
SH 183; @ UPRR & UPRR SPUR
STATE OF TEXAS §
COUNTY OF TRAVIS §
ADVANCE FUNDING AGREEMENT FOR VOLUNTARY
LOCAL GOVERNMENT CONTRIBUTIONS
TO TRANSPORTATION IMPROVEMENT PROJECTS
WITH NO REQUIRED MATCH
ON -SYSTEM
THIS AGREEMENT is made by and between the State of Texas, acting by and through the
Texas Department of Transportation called the "State", and the City of Fort Worth, acting by
and through its duly authorized officials, called the "Local Government". The State and Local
Government shall be collectively referred to as "the parties" hereinafter.
WITNESSETH
WHEREAS, federal law establishes federally funded programs for transportation improvements
to implement its public purposes, and
WHEREAS, Transportation Code, Chapters 201 and 221, authorize the State to lay out,
construct, maintain, and operate a system of streets, roads, and highways that comprise the
State Highway System; and
WHEREAS, Government Code, Chapter 791, and Transportation Code, §201.209 and Chapter
221, authorize the State to contract with municipalities and political subdivisions; and
WHEREAS, the Texas Transportation Commission passed Minute Order Number 116073
authorizing the State to undertake and complete a highway improvement generally described as
replace railroad underpass; and
WHEREAS, the Local Government has requested that the State allow the Local Government to
participate in said improvement by funding that portion of the improvement described as
Powder Coating for the signal equipment and hardware for the four leg intersection of SH
183 (Northeast 28th Street) at Decatur Avenue in the City of Fort Worth. (Project); and
WHEREAS, the State has determined that such participation is in the best interest of the
citizens of the state;
NOW, THEREFORE, in consideration of the premises and of the mutual covenants and
agreements of the parties, to be by them respectively kept and performed as set forth in this
Agreement, it is agreed as follows:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 1 of 5
AFA VoITIP Revised 04/22/2021
DocuSign Envelope ID: 19E85C4F-3E79-4A4E-9F74-553C1988AC01
CSJ #
0094-01-032
District #
02
AFA ID
I Z00002400
Code Chart 64 #
15000
Project Name
SH 183; @ UPRR & UPRR SPUR
AGREEMENT
1. Period of the Agreement
This Agreement becomes effective when signed by the last party whose signing makes
the Agreement fully executed. This Agreement shall remain in full force and effect until
the Project has been completed and accepted by all parties or unless terminated as
provided below.
2. Project Funding and Work Responsibilities
A. The State will authorize the performance of only those Project items of work
which the Local Government has requested and has agreed to pay for as
described in Attachment A, Payment Provision and Work Responsibilities
(Attachment A) which is attached to and made a part of this contract. In addition
to identifying those items of work paid for by payments to the State, Attachment
A also specifies those Project items of work that are the responsibility of the
Local Government and will be carried out and completed by the Local
Government, at no cost to the State.
B. At least sixty (60) days prior to the date set for receipt of the construction bids,
the Local Government shall remit its financial share for the State's estimated
construction oversight and construction costs.
C. In the event that the State determines that additional funding by the Local
Government is required at any time during the Project, the State will notify the
Local Government in writing. The Local Government shall make payment to the
State within thirty (30) days from receipt of the State's written notification.
D. Whenever funds are paid by the Local Government to the State under this
Agreement, the Local Government shall remit a check or warrant made payable
to the "Texas Department of Transportation" or may use the State's Automated
Clearing House (ACH) system for electronic transfer of funds in accordance with
instructions provided by TxDOT's Finance Division. The funds shall be deposited
and managed by the State and may only be applied by the State to the Project.
3. Right of Access
If the Local Government is the owner of any part of the Project site, the Local
Government shall permit the State or its authorized representative access to the site to
perform any activities required to execute the work.
4. Adjustments Outside the Project Site
The Local Government will provide for all necessary right of way and utility adjustments
needed for performance of the work on sites not owned or to be acquired by the State.
5. Responsibilities of the Parties
The State and the Local Government agree that neither party is an agent, servant, or
employee of the other party and each party agrees it is responsible for its individual acts
and deeds as well as the acts and deeds of its contractors, employees, representatives,
and agents.
Page 2 of 5
AFA VoITIP Revised 04/22/2021
DocuSign Envelope ID: 19E85C4F-3E79-4A4E-9F74-553C1988AC01
CSJ #
0094-01-032
District #
02
AFA ID
I Z00002400
Code Chart 64 #
15000
Project Name
SH 183; @ UPRR & UPRR SPUR
6. Document and Information Exchange
The Local Government agrees to electronically deliver to the State all general notes,
specifications, contract provision requirements and related documentation in a
Microsoft® Word or similar document. If requested by the State, the Local Government
will use the State's document template. The Local Government shall also provide a
detailed construction time estimate including types of activities and month in the format
required by the State. This requirement applies whether the local government creates
the documents with its own forces or by hiring a consultant or professional provider. At
the request of the State, the Local Government shall submit any information required by
the State in the format directed by the State.
7. Interest
The State will not pay interest on funds provided by the Local Government. Funds
provided by the Local Government will be deposited into, and retained in, the State
Treasury.
8. Inspection and Conduct of Work
Unless otherwise specifically stated in Attachment A, the State will supervise and inspect
all work performed hereunder and provide such engineering inspection and testing
services as may be required to ensure that the Project is accomplished in accordance
with the approved plans and specifications. All correspondence and instructions to the
contractor performing the work will be the sole responsibility of the State. Unless
otherwise specifically stated in Attachment A to this contract, all work will be performed
in accordance with the Standard Specifications for Construction and Maintenance of
Highways, Streets, and Bridges adopted by the State and incorporated in this agreement
by reference, or special specifications approved by the State.
9. Increased Costs
If any existing or future local ordinances, commissioners court orders, rules, policies, or
other directives, including but not limited to outdoor advertising billboards and storm
water drainage facility requirements, are more restrictive than State or Federal
Regulations, or if any other locally proposed changes, including but not limited to plats or
replats, result in increased cost to the department for a highway improvement project,
then any increased costs associated with the ordinances or changes will be paid by the
Local Government. The cost of providing right of way acquired by the State shall mean
the total expenses in acquiring the property interests either through negotiations or
eminent domain proceedings, including but not limited to expenses related to relocation,
removal, and adjustment of eligible utilities.
10. Insurance
If this Agreement authorizes the Local Government or its contractor to perform any work
on State right of way, before beginning work the entity performing the work shall provide
the State with a fully executed copy of the State's Form 1560 Certificate of Insurance
verifying the existence of coverage in the amounts and types specified on the Certificate
of Insurance for all persons and entities working on State right of way. This coverage
shall be maintained until all work on the State right of way is complete. If coverage is not
maintained, all work on State right of way shall cease immediately, and the State may
recover damages and all costs of completing the work.
Page 3 of 5
AFA VoITIP Revised 04/22/2021
DocuSign Envelope ID: 19E85C4F-3E79-4A4E-9F74-553C1988AC01
CSJ #
0094-01-032
District #
02
AFA ID
I Z00002400
Code Chart 64 #
15000
Project Name
SH 183; @ UPRR & UPRR SPUR
11. Project Maintenance
The Local Government shall be responsible for maintenance of locally owned roads and
locally owned facilities after completion of the work. The State shall be responsible for
maintenance of the State highway system after completion of the work if the work was
on the State highway system, unless otherwise provided for in Attachment A or existing
maintenance agreements with the Local Government.
12. Termination
A. This agreement may be terminated in the following manner:
1. By mutual written agreement and consent of both parties;
2. By either party upon the failure of the other party to fulfill the obligations set
forth in this agreement; or
3. By the State if it determines that the performance of the Project is not in the
best interest of the State.
B. If the agreement is terminated in accordance with the above provisions, the Local
Government will be responsible for the payment of Project costs incurred by the
State on behalf of the Local Government up to the time of termination.
C. Upon completion of the Project, the State will perform an audit of the Project
costs. Any funds due to the Local Government, the State, or the Federal
Government will be promptly paid by the owing party.
13. Notices
All notices to either party by the other required under this agreement shall be delivered
personally or sent by certified or U.S. mail, postage prepaid or sent by electronic mail,
(electronic notice being permitted to the extent permitted by law but only after a separate
written consent of the parties), addressed to such party at the following addresses:
Local Government:
City of Fort Worth
ATTN: Assistant City Manager
200 Texas Street
Fort Worth, TX 76102
State:
Texas Department of Transportation
ATTN: Director of Contract Services
125 E. 11 th Street
Austin, TX 78701
All notices shall be deemed given on the date so delivered or so deposited in the mail,
unless otherwise provided in this agreement. Either party may change the above
address by sending written notice of the change to the other party. Either party may
request in writing that such notices shall be delivered personally or by certified U.S. mail
and such request shall be honored and carried out by the other party.
14. Sole Agreement
In the event the terms of the agreement are in conflict with the provisions of any other
existing agreements between the Local Government and the State, the latest agreement
shall take precedence over the other agreements in matters related to the Project.
Page 4 of 5
AFA VoITIP Revised 04/22/2021
DocuSign Envelope ID: 19E85C4F-3E79-4A4E-9F74-553C1988AC01
CSJ #
0094-01-032
District #
02
AFA ID
I Z00002400
Code Chart 64 #
15000
Project Name
SH 183; @ UPRR & UPRR SPUR
15. Successors and Assigns
The State and the Local Government each binds itself, its successors, executors,
assigns, and administrators to the other party to this agreement and to the successors,
executors, assigns, and administrators of such other party in respect to all covenants of
this agreement.
16. Amendments
By mutual written consent of the parties, this agreement may be amended in writing prior
to its expiration.
17. State Auditor
Pursuant to Texas Government Code § 2262.154, the state auditor may conduct an
audit or investigation of any entity receiving funds from the state directly under the
contract or indirectly through a subcontract under the contract. Acceptance of funds
directly under the contract or indirectly through a subcontract under this contract acts as
acceptance of the authority of the state auditor, under the direction of the legislative
audit committee, to conduct an audit or investigation in connection with those funds. An
entity that is the subject of an audit or investigation must provide the state auditor with
access to any information the state auditor considers relevant to the investigation or
audit.
18. Signatory Warranty
Each signatory warrants that the signatory has necessary authority to execute this
Agreement on behalf of the entity represented.
THIS AGREEMENT IS EXECUTED by the State and the Local Government.
THE ST T OF TEXAS THE LOC RNMENT
Igna ure
Carl L. Johnson, P.E. Dana Burghdoff
Typed or Printed Name Typed or Printed Name
District Engineer, FTW Assistant City Manager
Typed or Printed Title Typed or Printed Title
5/16/2022
Date
5/16/2022
Date
Page 5 of 5
AFA VoITIP Revised 04/22/2021
DocuSign Envelope ID: 19E85C4F-3E79-4A4E-9F74-553C1988AC01
CSJ #
0094-01-032
District #
02
AFA ID
I Z00002400
Code Chart 64 #
15000
Project Name
SH 183; @ UPRR & UPRR SPUR
ATTACHMENT A
PAYMENT PROVISION AND WORK RESPONSIBILITIES
The Local Government has requested to participate in the improvement described as
the powder coating for the signal equipment and hardware for what is described as the
four leg intersection of SH 183 (Northeast 28th Street) at Decatur Avenue in the City of Fort
Worth.
The Local Government is responsible for the cost of the project. The Local Government will
contribute a fixed amount of $14,050.00 to the project, total cost of which will be $14,050.00.
The State will perform all work and cost overruns.
The Local Government is responsible for maintenance and operation of said intersection.
Page 1 of 1
AFA VoITIP Attachment A
DocuSign Envelope ID: 19E85C4F-3E79-4A4E-9F74-553C1988AC01
ADVANCE FUNDING AGREEMENT
CSJ: 0094-01-032
PROJECT NAME: SH 183: 0 UPRR & UPRR SPUR
ADDITIONAL ROUTING SIGNATURES
CITY OF FORT WORTH
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Aziz Rahman
Title: Enaineerina Manager
Email: aziz.rahman @fortworthtexas.gov
APPROVAL RECOMMENDED:
Lauren Prieur, Interim Director
Transportation and Public Work
Email: lauren.prieur@fortworthtexas.gov
CONTRACT AUTHORIZATION
M&C: N/A
Date Approved:
Form 1295: N/A
APPROVED AS TO FORM AND LEGALITY:
BY. DE la(l!Mar 13, 202308 �1 CDT,
Douglas W. Black
Senior Assistant City Attorney
Email: douglas.black@fortworthtexas.gov
4pUUpn
ATTEST AS TO CITY MANAGER SIGNATURE: �aoF FORraa
c �' o °o
p9��
°ate° Q
BY: °o� *�a
Jannette S. Goodall o�II� nE...0 15
City Secretary
Email: Jannette.Goodall@fortworthtexas.gov
Name of Employee/Signature
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Texas
Department
of Transportation
FOR STATE USE ONLY
Deposit Fund 6 (06991-3767) Project Charge: 02-76-0094-01-032
ADVANCE PAYMENT
Highway SH 183
County Tarrant
Limits AT UPRR RAILROAD & UPRR SPUR
Description Railroad Crossing Improvements
Type of Agreement AFA
Requested By
Section
Date
Entity Name
Entity Code
Shelia Jenkins
TP&D
CSJ
Project No.
January 23, 2023
City of Fort Worth
15000
Reason & Amount of Funds Requested
0094-01-032
BR 2023(505)
Right of Way
❑
$
0.00
Preliminary Engineering
❑
$
0.00
Preliminary Engineering Overrun
❑
$
0.00
Preletting
❑
$
0.00
Construction
®
$
14,050.00
Construction Overrun
❑
$
0.00
Total
$
14,050.00
To be Filled in by Outside Entity
Amount Submitted
Check #
Date Submitted
PLEASE RETURN THIS COMPLETED FORM WITH PAYMENT
To be Filled in by TxDOT After Receipt
Amount Received
Date Received
Name of Employee
(who received and
processed deposit)
Signature:
Aziz Rah (Mar 6,202 2023 10:37 CST)
Email: Aziz.Rahman@fortworthtexas.gov
FORTWORTHH)
Routing and Transmittal Slip
Transportation & Public Works
DOCUMENT Authorize Payment to the Texas Department of
TITLE: Transportation in an Amount of $14,050.00 for the
Advance Funding Agreement for the SH 183 at
Decatur Avenue Railroad Crossing Improvements
Project Using 2022 Bond Fund for Traffic Signal.
M&C: N/A CPN: CSO: DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Aziz Rahman
TPW - Signature
M
2.
Rajnish Gupta
TPW — Initial
RG
3.
Anna Benavides
TPW — Initial
AA8
4.
Martin Phillips
TPW — Initials
5.
Lauren Prieur
TPW - Signature
E
6.
Douglas W. Black
Legal — Signature
d
7.
Melissa Brunner
CMO - Signatures
8
William Johnson
CMO - Signature
H—
W Johnson,M 13,2023 IS:09 CDT)
9
Jannette S. Goodall
CMO - Signature
10.
Allison Tidwell
CSO - Initial
11
Aziz Rahman
TPW — Initial
12.
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ❑No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
TPWContracts(affortWorthTexas.gov at ext. 7233 for pick up when completed.
Return To:
Thank you!