HomeMy WebLinkAboutOrdinance 5735ORDINANCE NO.
ORDINANCE ACCEPTING I'eRGVEMENTS ON A PORTION OF HULEN STREET
AND PORTIONS OF SLM.RY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
-BROW & BLAXNEY, INC. FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL
ASSESSMENTS LEVIED "TER GIVING EFFECT TO SUNDRY CREDITS HEREIN
AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING
THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF
FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO-
PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with BROWN & BLAKNEY, INC. for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to-wit.
Hulen Street: From Valentine Street South across the Zrinity
River., known and designated as Unit No. 3,
Project No. 094-23000-106
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
�,ity of 11"ort Worth, Texas, including Ordinance No. a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
an each of the above described portions of streets, avenues and public places and against
Lhe real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits agairst
some one or more of the assessments levied by Ordinance No. 5384 e and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW � THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I .
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted;.and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
Ii.
The Mayor, be, and he is hereby, directed to issue and execute in the name
cf the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
Lo attest same and impress thereon the corporate seal of the City, all in accor6ance with
the proceedings relating to such improvements and assessments, The certificates shall be
numbered,, shall describe the property against which the assessment has been levied, shall,,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows-.
Ill.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth., Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day 19,w
APPROVED AS TO FORM AND LEGALITY:
City Attorney
d
0
GC
U)
m
p
1-4
R
0
P
U)
I
Ca
V.
I'D m
0
is
0
(Y) -
AC\l C\l
r)
I wt
m
El
110
ca
F-I
LfN
�o
cl-
r-i
.10
ON
-t
0
ac
%
o
LfN
�o
cl-
r-i
.10
ON
-t
0
%
o
%
614
40
co
(D
to
n
U)
w
•
L"
Ito
0
c;
cr)
all
�)l
N
-i
A
r-4
C\l
LO
--cot
t-ot
t-ot
t
--t
--t
40
V4
4&
to
4
:E
n
to
-co
to
U)
r--q
r-A
a
�o
0
w
to
0
G\
LIN
cr\
ICO
Cn LO
CN
0
ICO
H
UN
40
60
to
614
40
10
C\
LfN
UN
C\l
N
Lu
08
all
GN
'
r-4
w
r4
r-1
-b9-
CN
-6�
CN
44
to
V)
s-4
LLI
4
PA
0
0
L)
O
z
U)
U)
U)
'14
LD
z
W
O
0 =
Ck
all
G)
C2
0
C\l
C\l
O
to
o
0�
n
1�
to
D
as
ca
-t
IrN
oll
ad ga
CI-
ico
ico
ON
N
N
C\l
ico
to
0
to
n
r-I
n
N
C\l
ON
cr�
00
r-4
cYl
L4 a:
0 Lu
a.
0
to
1-4 L14
n
0
1�0
to
D �i
ico
CN
CP\
W �4 ad
-t
10
12: C•
Lrl\
to
W U h
C\l
ft
COW
t
Q)
G)
Lr\
LU
Om
P�
P.
r -f
-P 43
(f)
U)
Or'
C;
4-) 4-3
7
rN
uj
0:
'Q
C\l ri
U) 5:-
0 ri) Q
C--
L4
co
Q) 0)
C\l
CNI 0) a) Q)
0
co 0
0 -H ()
4-)
r_,
CT3
N
5 d
O
C\l
C\l
I
Chi
F-4
Q) 0
C�
t>�
loo
+
'T
u
+
pq co
+
b.0 LC\
cd
0 U) 4-7
-P
:U)+3
4-3
cr,
ico
0
Cu
M.
0
01,
r-q
N
• +
0
Cat
t ON
I
r-q
Cq
+
n
+
0
+
'co
G\
4n'
0 C\l
0
d r-I �
C\l
�4 -0 4-3
-1
4 -3
xCd -,
r-q
0 r-q
0 r-q
4-3
Q)
4-�'
w 0
9:1
Fq 0
tO
0
-j
awl
C)
pq
U)
w U)
S-4
co
CD
C4 'o
m �
(1) rq
C:)
0
r-A 0
C)
•
I.J.0
0 \.O
ft, cYl
124
t4
E N
0
0 =
it of Fort Worth, Texas
Mayor and Council Communication
DATE REFERENCE - Final Payment - Hulen Street PAGE
NUMBER Bridge and Paving Improvements I of
FP-419 S U BJ ECT
Final Council action on the project described below is requested.
Project Description
Name: Construction of Hulen Street Bridge and Paving Improvements from
Valentine Street South Across Trinity River
Contractor, Brown and Blakney, Inc.
Contract Awarded: May 24, 1965 (MC C-512)
Work Order Issued: July 8, 1965
Work order Effective: July 19, 1965
Date of Final Inspection and Approval: January 18, 1967
Working Time Bid: 340 Working Days
'Working Time Used: 312 Working Days
Project Cost and Financing
Bid Price-, $1,426,254.96
Final Contract Cost: $1,440,465.90
Partial Payments Previously Made: 17 Amount: $1,300,390.56
Final Payment Due: $140,075.34
Payment to be made from Project No. 094-23000-106
Deviation from Bid Price: $14,210.94 over-run because of variations
between quantities estimated in the contract specifications and
quantities measured and used at the job site.
Com2liance with Sgecifications
During testing on
this project,
37 corings were made with
the following
results:
Exceeds
Even With
Under Specs But
Below
Pavin& Specs
Sgecs
Within Tolerance
Tolerance
Surface 27
9
1
0
Base 24
8
5
0
On this project, the average thickness of the reinforced concrete paving
was 7.34 inches as compared with 7.0 inches specified. The average base
thickness was 4.4 inches as compared with 4.0 inches specified.
Tests made during construction on materials used on this bridge project
show that materials used were in compliance with specifications.
Recommendation,
It is recommended that the above project be accepted by adoption of an
ordinance and that final payment of $140,075.34 be a t o. _izgA
--to,.-Brown
and Blakney, Inc.
JLB:lp
SUBMITTED BY- DISPOSITIgA BY COUNCIL:
SED B
L
APPROVED OTHER (DE R (h L L
IL
S E R 2
DATE
CITY MANAGER