HomeMy WebLinkAboutOrdinance 6138 ORDINANCE NO,
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF BRENNAN AVENUE
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
J. L. BERTRAR CONST. & ENGR. CO. FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL
ASSESSMENTS LEVIED AFTER GIV1*NG EFFECT TO SUNDRY CREDITS HEREIN
AUTHORIZED AND ALLOWED AAINST SOME OF SAID ASSESSMENTS; DIRECTING
THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF
FORT WORTH,, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO-
PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with J. L. Bertram Construction & En2r. Co. for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and
public places in .said City, to-wit,:
BRENNAN AVENUE From the east line of Decatur Avenue to the
west line of Cold Springs Road, known and
designated as Unit 1, Project No. 104-24000-170.
............................ .....................
WHEREAS19 by sundry proceedings heretofore passed by the City Council of the
�7,ity of Fort Worth, Texas, including Ordinance No. 5948-, a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
' WHEREAS, the City Council, of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 5948 a and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOWT THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH-.
TEXAS, THAT-
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
the Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows-.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth., Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day of 191f,
APPROVED AS TO FORM AND LEGALITY-.
City Attorney
UNIT NO. 1: BRENNA14 AVENUE FROM DECATUR AVENUE TO COLD SPRINGS ROAD, to be improved
with six-inch thick reinforced concrete pavement on a six-inch thick lime stabilized
subgrade together with seven-inch high curbs and two-foot wide gutters, so that the
finished street will consist of a forty to forty-four foot wide roadway and by con-
structing six-inch thicko3ncrete driveways where specified.
BLOCK
OWNER LOT ZONING FRO14TAGE RATE MOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF BIIEN114AN AVENUE AND DECATUR AVENUE
NORTH SIDE OF STREET DIAMOND HILL ADDITION
Charles E. Pelton 1 & 32 3 273. 5' Slant Lot
and Allen L. Pelton i—ndF. Adjusted to
c/o Pelton Mfg. Co. 260' Pavement $7.56 $1,965.60
P.O. Box 4148 260' Curb & Cutter 1.80 468.00
182 Sq. Ft. Driveway .53 9,6."
$2,530.06
PEAK STREET INTERSECTS
Thomas N. Baker 1 4 134' Pavement $7.56 $1,013.04
330 Bryan Avenue Ind. 134' Curb & Gutter 1.80 241.20
$1,254.24
Thomas N. Baker 30 & 31 4 302' Less S. D. Esint.
330 Bryan Avenue Res. 222' Pavefrhent $3.33 $ 739.26
164' Curb & Gutter 1.80 295.20
58' Gutter Only .90 52.20
1 ,086.66
GUNTER AVENUE INTERSECTS
U. S. Borax & Chemical Corp. 12 75' Pavement $7.56 $ 567.00
3075 Wilshire Boulevard Ind. 75' Curb & Gutter 1.80 135.00
Los Angeles, Calif. 90005 $ 702.00
GORBETT INDUSTRIAL ADDITION
Frank Bailey Pt. of Lot 1 250.1' Slant Lot
1518 Brennan 1 Ind. Adjusted to
177' Pavement $7.56 $1,338.12
177' Curb & Gutter 1.80 318.60
$1,656.72
..................
A01"
UNIT NO. 1: BRENNAN AVENUE PROJECT NO. 104-24000-170 - CONT.
BLOCK
OWNER LOT ZONING FROMME RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET CORBETT INDUSTRIAL ADDITION
Corbett Bros. WeldingTr. 1A 1 786.85' Less
P.O. Box 7338 Ind. RR Spur
776' Pavement '$7.56 45,866. 56
776' Curb & Gutter 1.80 1,396.80
810 Sq. Ft. Driveway .53 429.30
$7,692.66
Hertel General 2 1 201.3' Pavement $7. 56 $1,567. 19
Tire Company Ind. 207.3' Curb & Gutterl. 8O 373.14
801 West Seven th St. 540 Sq. Ft. D:!ive .53 286.20
$2,226.53
E. LITTLE SURVEY AND S. K. SMITH SURVEY
Gulf Oil Corp. Portions of E. 1658' Pavement $7.56 $12,534.48
P.O. Box 1000 Little and S. K. 1371' Curb & Gutter 1.80 2,467.80
Attn: G. W. Smith Surveys 87' Gutter Only .90 78.30
Holyfield Ind. $15,080.58
Area Services Supt. and
Attn: C. R. Warthum
Region Real Estate Rep.
COLD SPRINGS ROAD INTERSECTS
SOUTH SIDE OF STREET S. K. SMITH SURVEY
Carter-Day Co. Tract 2 400' Pavement $7.56 $3,024.00
P.O. Box 7443 Ind . 343' Curb & Gutter 1.80 617.40
$3,641.40
City of Fort Worth Portion of E. Purchased by City
Little Survey for North-Central
Ind. Sanitary Land Fill Site
$ 0.00
DIAMOND HILL ADDITION
Texas Electric Service Co. 47 809' Pavement $7.56 $6,116.014
c/o W. B. Flynn Ind. 309' Curb & Gutter 1.8o 1,456.20
P.O. Box 970 121. 5 Sq. Ft. Drive- .53 64.4:1
way $7,636.64
Page 2
..........
UNIT NO. 1: BRENNAN AVENUE, PROJECT NO. 104-24000-17'0 - CONT.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET DIAMOND HILL ADDITION
Frank A. Bailey 18 433.3' Less RR Spur
1518 Brennan Ind. Adjusted to
423' Pavement $7.56 $3,197.88
423' Curb & Gutter 1.80 761.40
$3,959.28
City of Fort Worth 17 334' PaveEi.ient $3.33 $1,112.22
Park Department Ind. 334' Curb & Gutter 1.80 601.20
202.5 Sq. Ft. Driveway.53 107.33
$1,820.75
Maria Sosa 8 16 131. 15' Side Lot
2414 Peak Ind. Owner Occupied
Ad"ilusted to
100' Paveinent $3.33 $ 333.00
100' Curb & Gutter 1.80 180.00
$ 513.00
PEAK STREET INTERSECTS
Frank Paprskar 15 2 13(J' Slant Lot
2409 Peak Ind. Adjusted to
120' Pave�ient $7.56 $ 907.20
50' Curb & Gutter 1.80 90.00
81 Sq. Ft. Driveway . 53 42.93
$1,040.13
Tom Garcia Part of 16 2 55' Slant Lot
1302 Brennan Avenue Ind. Adjusted to
50' Pavement $7.56 $ 378.00
50' Curb & Gutter 1.80 90.00
45 Sq. Ft. Driveway .53 23.85
$ 491.85
Page 3
UNIT NO. 1: BRENNAN AVENUE. PROJECT NO, 104-21000-170e- COST.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE OF STREET DIAMOND HILL ADDITION
Don E. Hansen Part of 16 2 821 Slant Lot
2312 Decatur Ind. Adjusted to
70' Pavement $7.56 529.20
45' Curb & Gutter 1.80, 81.00
135 Sq. Ft. Drive .53 71.55
$ 681.75
TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $ 52,014.25
TOTAL COST TO CITY OF FORT WORTH $124,457.83
TOTAL ESTIMATED CONSTRUCTION COST $176,472.08
Page 4
City of Fort Worth, Texas
LINE Mayor and Council Communication
1
. DATE REFERENCE Final. Payment - Brennan PAGE
NUMStI Avenue Improvement vautant 2
WOMAM 7/21/69 Pig-640 n of �.._
Final Council artiva on the project described 'below is requested.
Ppjqu t lensdri bean
Name: Bxenrnarn Avenue from Decatur Avenue to Cold Springs
Road, Project No. 104-24000-170
Contractor: J. L. Bertram Construction and n ineerin Company
Contract Aura d d: lardpu 25„ 1968 (MY C-1173)
Work Order Issuue : : July 31, `196 - Partial Work Order
October 7, 1968 - Full Work Order
Work Order Effective: August 12, 196
Date of Final. Inspection
and Approval: May 22, 1969
Working Time did: 100 Working Days
Working Time Used: 107 Wbrking Da;2,
Contract Time Charged; Working time bid on this project was 100 working days.
Liquidated damages for 7 days at $100 per day for a
total of $710 have been assessed.
Pry att llaust d. inaaxjc n
Original Bid Price: $1.58,294.67
Change Order No. 1: 60 C-1173, 3/25/68) + $4,478.00
Change Order No. 2: (AR o. 1-15, 10/0/68) + 762.28
Change Order No. 3,: (M&C C-1435, 3/10/69) + 3,020.05
Revised Contract Price: $166,554.95
Final Contract Guist: $160,429.16
Partial Payments Previously dads: 10 Amount: $145,943.05
Less Liquidated Damages:
7 days 0 $100 per daffy 700.00
1«i4al Qywent Due: $13,,786.11
Final. payment will be made from Project Account Number 104-24000-170.
Deviation from Bid Price: An uundu r-ruuur of $6,125.79 resulted in mart from.,
1; The ouurnt of unclassified cbaanel excavation required was less than
estimated resulting in a savings of $2,604.93 and; 2) The amount of 6-indh
concrete pavement required was less than estimated resulting in a savings
of $2,904.00.
The remaining savings of $616.86 resulted from minor variations between esti-
mated quantities and quantities actually used on the job Waite.
DATE REFERENCE susiecT, final Payment — ,Brennan PAGE
NUMSER
Avenue Improvement 2
7/21 ' + -640 m._ of
..�._ .,.w....._._ _.._.
CoLn2, lian,ce with Specifications
ns
During testing on this 'project, 16 cor ngs were made with the following
results
Exceeds Even wi,tti; Under Specs But Below
pcs Specs Within Tolerance "Tolerance
Concrete Slab 10 4 2
Stabilized Subgrade 4 12
On the entire project,, the average thickness of the concrete pavement is 6.
inches as compared to the 6, inches specified. Also average thickness of the
lime stabilized su bgrade is 6.00 inches as specified. Tests made during the
construction of sins-grade, pavement, lox.-culvert , and other miscellaneous,
items show that materials used 'were in compliance with contract specifications.
Recommendation,
It is recommended that the above project to accepted by the adoption of an
ordinance and that final payment of $1.3,786.11 be authorized to J. L. Bertram
Construction and Engineering, Inc. from project Account No. 104-24 4 -170.
SUBMITTED BY* DISPOSMON,oeY COUNCIL. PRO E�SSED BY
Otl'APPROVEO D OTHER (DESCRIBE)
rug, 1"1° CITY sE ETARY
r t
"VII," ois���'��.�,I�"e�. �� aNPIl, ' DATE
CITY MANAGER