Loading...
HomeMy WebLinkAboutOrdinance 6138 ORDINANCE NO, ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF BRENNAN AVENUE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH J. L. BERTRAR CONST. & ENGR. CO. FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIV1*NG EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH,, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO- PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract with J. L. Bertram Construction & En2r. Co. for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in .said City, to-wit,: BRENNAN AVENUE From the east line of Decatur Avenue to the west line of Cold Springs Road, known and designated as Unit 1, Project No. 104-24000-170. ............................ ..................... WHEREAS19 by sundry proceedings heretofore passed by the City Council of the �7,ity of Fort Worth, Texas, including Ordinance No. 5948-, a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues and public places and against the real and true owners thereof; and, ' WHEREAS, the City Council, of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 5948 a and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOWT THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH-. TEXAS, THAT- The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. the Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows-. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth., Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS day of 191f, APPROVED AS TO FORM AND LEGALITY-. City Attorney UNIT NO. 1: BRENNA14 AVENUE FROM DECATUR AVENUE TO COLD SPRINGS ROAD, to be improved with six-inch thick reinforced concrete pavement on a six-inch thick lime stabilized subgrade together with seven-inch high curbs and two-foot wide gutters, so that the finished street will consist of a forty to forty-four foot wide roadway and by con- structing six-inch thicko3ncrete driveways where specified. BLOCK OWNER LOT ZONING FRO14TAGE RATE MOUNT ASSESSMENT BEGINNING AT THE NORTHEAST CORNER OF BIIEN114AN AVENUE AND DECATUR AVENUE NORTH SIDE OF STREET DIAMOND HILL ADDITION Charles E. Pelton 1 & 32 3 273. 5' Slant Lot and Allen L. Pelton i—ndF. Adjusted to c/o Pelton Mfg. Co. 260' Pavement $7.56 $1,965.60 P.O. Box 4148 260' Curb & Cutter 1.80 468.00 182 Sq. Ft. Driveway .53 9,6." $2,530.06 PEAK STREET INTERSECTS Thomas N. Baker 1 4 134' Pavement $7.56 $1,013.04 330 Bryan Avenue Ind. 134' Curb & Gutter 1.80 241.20 $1,254.24 Thomas N. Baker 30 & 31 4 302' Less S. D. Esint. 330 Bryan Avenue Res. 222' Pavefrhent $3.33 $ 739.26 164' Curb & Gutter 1.80 295.20 58' Gutter Only .90 52.20 1 ,086.66 GUNTER AVENUE INTERSECTS U. S. Borax & Chemical Corp. 12 75' Pavement $7.56 $ 567.00 3075 Wilshire Boulevard Ind. 75' Curb & Gutter 1.80 135.00 Los Angeles, Calif. 90005 $ 702.00 GORBETT INDUSTRIAL ADDITION Frank Bailey Pt. of Lot 1 250.1' Slant Lot 1518 Brennan 1 Ind. Adjusted to 177' Pavement $7.56 $1,338.12 177' Curb & Gutter 1.80 318.60 $1,656.72 .................. A01" UNIT NO. 1: BRENNAN AVENUE PROJECT NO. 104-24000-170 - CONT. BLOCK OWNER LOT ZONING FROMME RATE AMOUNT ASSESSMENT NORTH SIDE OF STREET CORBETT INDUSTRIAL ADDITION Corbett Bros. WeldingTr. 1A 1 786.85' Less P.O. Box 7338 Ind. RR Spur 776' Pavement '$7.56 45,866. 56 776' Curb & Gutter 1.80 1,396.80 810 Sq. Ft. Driveway .53 429.30 $7,692.66 Hertel General 2 1 201.3' Pavement $7. 56 $1,567. 19 Tire Company Ind. 207.3' Curb & Gutterl. 8O 373.14 801 West Seven th St. 540 Sq. Ft. D:!ive .53 286.20 $2,226.53 E. LITTLE SURVEY AND S. K. SMITH SURVEY Gulf Oil Corp. Portions of E. 1658' Pavement $7.56 $12,534.48 P.O. Box 1000 Little and S. K. 1371' Curb & Gutter 1.80 2,467.80 Attn: G. W. Smith Surveys 87' Gutter Only .90 78.30 Holyfield Ind. $15,080.58 Area Services Supt. and Attn: C. R. Warthum Region Real Estate Rep. COLD SPRINGS ROAD INTERSECTS SOUTH SIDE OF STREET S. K. SMITH SURVEY Carter-Day Co. Tract 2 400' Pavement $7.56 $3,024.00 P.O. Box 7443 Ind . 343' Curb & Gutter 1.80 617.40 $3,641.40 City of Fort Worth Portion of E. Purchased by City Little Survey for North-Central Ind. Sanitary Land Fill Site $ 0.00 DIAMOND HILL ADDITION Texas Electric Service Co. 47 809' Pavement $7.56 $6,116.014 c/o W. B. Flynn Ind. 309' Curb & Gutter 1.8o 1,456.20 P.O. Box 970 121. 5 Sq. Ft. Drive- .53 64.4:1 way $7,636.64 Page 2 .......... UNIT NO. 1: BRENNAN AVENUE, PROJECT NO. 104-24000-17'0 - CONT. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET DIAMOND HILL ADDITION Frank A. Bailey 18 433.3' Less RR Spur 1518 Brennan Ind. Adjusted to 423' Pavement $7.56 $3,197.88 423' Curb & Gutter 1.80 761.40 $3,959.28 City of Fort Worth 17 334' PaveEi.ient $3.33 $1,112.22 Park Department Ind. 334' Curb & Gutter 1.80 601.20 202.5 Sq. Ft. Driveway.53 107.33 $1,820.75 Maria Sosa 8 16 131. 15' Side Lot 2414 Peak Ind. Owner Occupied Ad"ilusted to 100' Paveinent $3.33 $ 333.00 100' Curb & Gutter 1.80 180.00 $ 513.00 PEAK STREET INTERSECTS Frank Paprskar 15 2 13(J' Slant Lot 2409 Peak Ind. Adjusted to 120' Pave�ient $7.56 $ 907.20 50' Curb & Gutter 1.80 90.00 81 Sq. Ft. Driveway . 53 42.93 $1,040.13 Tom Garcia Part of 16 2 55' Slant Lot 1302 Brennan Avenue Ind. Adjusted to 50' Pavement $7.56 $ 378.00 50' Curb & Gutter 1.80 90.00 45 Sq. Ft. Driveway .53 23.85 $ 491.85 Page 3 UNIT NO. 1: BRENNAN AVENUE. PROJECT NO, 104-21000-170e- COST. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE OF STREET DIAMOND HILL ADDITION Don E. Hansen Part of 16 2 821 Slant Lot 2312 Decatur Ind. Adjusted to 70' Pavement $7.56 529.20 45' Curb & Gutter 1.80, 81.00 135 Sq. Ft. Drive .53 71.55 $ 681.75 TOTAL PROPERTY OWNERS' COST - ASSESSMENTS $ 52,014.25 TOTAL COST TO CITY OF FORT WORTH $124,457.83 TOTAL ESTIMATED CONSTRUCTION COST $176,472.08 Page 4 City of Fort Worth, Texas LINE Mayor and Council Communication 1 . DATE REFERENCE Final. Payment - Brennan PAGE NUMStI Avenue Improvement vautant 2 WOMAM 7/21/69 Pig-640 n of �.._ Final Council artiva on the project described 'below is requested. Ppjqu t lensdri bean Name: Bxenrnarn Avenue from Decatur Avenue to Cold Springs Road, Project No. 104-24000-170 Contractor: J. L. Bertram Construction and n ineerin Company Contract Aura d d: lardpu 25„ 1968 (MY C-1173) Work Order Issuue : : July 31, `196 - Partial Work Order October 7, 1968 - Full Work Order Work Order Effective: August 12, 196 Date of Final. Inspection and Approval: May 22, 1969 Working Time did: 100 Working Days Working Time Used: 107 Wbrking Da;2, Contract Time Charged; Working time bid on this project was 100 working days. Liquidated damages for 7 days at $100 per day for a total of $710 have been assessed. Pry att llaust d. inaaxjc n Original Bid Price: $1.58,294.67 Change Order No. 1: 60 C-1173, 3/25/68) + $4,478.00 Change Order No. 2: (AR o. 1-15, 10/0/68) + 762.28 Change Order No. 3,: (M&C C-1435, 3/10/69) + 3,020.05 Revised Contract Price: $166,554.95 Final Contract Guist: $160,429.16 Partial Payments Previously dads: 10 Amount: $145,943.05 Less Liquidated Damages: 7 days 0 $100 per daffy 700.00 1«i4al Qywent Due: $13,,786.11 Final. payment will be made from Project Account Number 104-24000-170. Deviation from Bid Price: An uundu r-ruuur of $6,125.79 resulted in mart from., 1; The ouurnt of unclassified cbaanel excavation required was less than estimated resulting in a savings of $2,604.93 and; 2) The amount of 6-indh concrete pavement required was less than estimated resulting in a savings of $2,904.00. The remaining savings of $616.86 resulted from minor variations between esti- mated quantities and quantities actually used on the job Waite. DATE REFERENCE susiecT, final Payment — ,Brennan PAGE NUMSER Avenue Improvement 2 7/21 ' + -640 m._ of ..�._ .,.w....._._ _.._. CoLn2, lian,ce with Specifications ns During testing on this 'project, 16 cor ngs were made with the following results Exceeds Even wi,tti; Under Specs But Below pcs Specs Within Tolerance "Tolerance Concrete Slab 10 4 2 Stabilized Subgrade 4 12 On the entire project,, the average thickness of the concrete pavement is 6. inches as compared to the 6, inches specified. Also average thickness of the lime stabilized su bgrade is 6.00 inches as specified. Tests made during the construction of sins-grade, pavement, lox.-culvert , and other miscellaneous, items show that materials used 'were in compliance with contract specifications. Recommendation, It is recommended that the above project to accepted by the adoption of an ordinance and that final payment of $1.3,786.11 be authorized to J. L. Bertram Construction and Engineering, Inc. from project Account No. 104-24 4 -170. SUBMITTED BY* DISPOSMON,oeY COUNCIL. PRO E�SSED BY Otl'APPROVEO D OTHER (DESCRIBE) rug, 1"1° CITY sE ETARY r t "VII," ois���'��.�,I�"e�. �� aNPIl, ' DATE CITY MANAGER