HomeMy WebLinkAboutOrdinance 6139 ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF JAMES AVENUE
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
GLADE CONSTRUCTION COMPANY FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL
ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN
AUTHORIZED AND ALLOWED AGAINS"' SOME OF SAID ASSESSMENTS; DIRECTING
THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF
FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO-
PRIATE ORDINANCE RECORDS OF SAID CITY,; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with Glade Construction Company for the making and con'struction of certain
street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to wit
1. JAMES AVENUE From Seminary Drive to Interstate Highway
820, known and designated as Unit 1,
Project No. 104-24000-171.
.......... ............................. ..................
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
f,t,ty of Fort Worth, Texas, including Crdinance No. 6003 , a portion of the ctst of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real an6 true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances., in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 6003 , and
WHEREAS,, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, T11EREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT.-
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II®
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. 'The
numbers of the certificates, with the property descriptions to be shown on'the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
. 19
PASSED AND APPROVED THIS day of
APPROVED AS TO FORM AND LEGALITY:
00,
10
City Attorney
_TAMES' AVENUE 'FROM SEMINARY DRIVE TO 'I. H._8'2OPi-00AECT N0.]104- 4000-1' 1, to be improved,
by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick
lime stabilized subgrade with seven-inch high reinforced concrete cuto�;-s and two-foot wide
reinforced concrete gutters from Gambrell Street to Frazier Avenv, e itnd by con,,Q-tructing a
two-inch thick hot-mix asphaltic concrete surface course on existing pavement and increasing
the width of the street with two-inch thick hot-mix asphaltir. concrete surface coursc-, on
a six and one/half-inch concrete base with seven-inch high reinforced concrete ef!'Irb's and
two-foot wide reinforced concrete gutters from Seminary Drive to Gambrell Street, and by
reconstructing existing sidewalks and driveways to proper alignment and grade, and by
constructing five-inch thick concrete sidewalks and six-inch thick concrete, driveways
where specified, so that the finished street will consist of one forty-four-foot wide
roadway,
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE SOUTHEAST CORNER OF JAMES AVENUE AND SEMINARY DRIVE
HUBBARD HIGHLANDS
EAST SIDE OF STREET
Rosemont Jr. High 1-5 660' Pavement
1501 W. Seminary Res, Resurfacing and
Widening $2. 72 $1,795020
$ 1,79520
BEDDELL STREET INTERSECTS
Gambrell St. Baptist 6, 5, it 147.5' Pavement
Church & 4 Res. Resurfacing and
1616 W. Gambrell Widening $2072 $ 401.20
$ 40L20
Gambrell St. Baptist 1, 2, 11 11905' Pavement
Church & 3 Comm. Resurfacing and
1616 W. Gambrell Widening $2 72 $ 325.04
$ 325.04
GAMBRELL STREET INTERSECTS
Mrs. M. L. O'Neal 6A,5A 12 150' Pavement $5 86 $ 879.00
P. 0. Box 7617 & 4A Comm. $ 879.00
Birmingham, Alabama
Mrs. M. L. O'Neal 3, 2, 12 165' Pavement $5086 $ 966.90
P. 0. Box 7617 & 1 Comm. $ 966.90
Birmingham, Alabama
HAMMOND STREET INTERSECTS
Mrs, M. L. O'Neal 1 19 125' Pavement $5.86 $ 732.50
P. O. Box 7617 Comm. 65' Sidewalk 2.54 165010
Birmingham, Alabama 897.60
1
ag" _=Ax
UNIT 110. I CU11T.
BLOCK
1 Ba R AUAG IUNIA TE A0 SESSIENT QN F () TA G RA 1
H V Q TJ WARUD) Hi I GMH L A NN D 3
Russell Weldon 24 28 125' AdJusted to
1624 Fuller Res. 100" Pavement $2.73 $ 273.00
100' Curb & Gutter 2.40 240.00
89' Sidewalk 2.54 226.06
79.75 S.F. Driveway .74 59.02
$ 798.08
FULLER STREET INTERSECTS M. H. ARO,CHA SURVEY
United States Government Tract 1 2356' Musted to This assessment
General Services Admin. Ind. 2356' Sidewalk $2.54 $5,773.42 to be paid by
Region 7 direct billing.
Federal Office Building Amount included
in City Cost.
James H. Knapp Tract 2-A 518' Pavement $5.86 $3,152.68
201 W. Front Ind. 538' Curb & Gutter &40 1,291.20
Arlington, Texas 538' Sidewalk 2.54 1,366. 52
348 S.F. Drive for
Private Street . 74 257. 52
24' Curb & Gutter on
Private StreeL 2.40 57M
$6,05. 52
GREEI 1 B"IAR ADDIT,
M. H. Rainwater 1 2 121.5' Adjusted to
1620 Sharondale Drive Res. 100' Pavement $2.73 $ 273.00
100' Curb & Gutter 2.40 240.00
100' Sidewalk 2. 54 254.00
$ 767.00
American General 1 1 120' Adjusted to
Investment Corp. Res. 100' Pave: enL 12.73 $ 27330
1321 Ballinger St. 100' Curb & Gutter 2.40 240.00
100' Sidewalk 2.54 254.00
$ 767.00
Worth Builders-Rentals A 421.75' Sidewalk $2.54 $1,071.25
101 Westchester House Colam. $1,071,25
SCUMEST LOOP - INTERSTATE HIGHWAY 820 INTERSECTS
WEST SIDE OF STREET ADDITION
William A. Farten 10 20 75' Art juuted to
5516 James Avenue Res. IS' Sidewalk $2.54 $ 45.72
$ 45. 72
3
UNIT,NO. I" CONT.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SOUTHCREST ADDITION
H. W. Hearne 11 20 87.41 Adjusted to
5512 James Avenue Res. 60' Sidewalk $2.54 $
152.40
L. J. Flack 12 20 62' Sidewalk $x ,54 157,48
5508 James Avenue Res. f 157,48'
Charles Stewart 13 20 63' Sidewalk $2. 54 160X'x,
5504 James Avenue Res. 160.02
Sadie May Lee 14 20 63' Sidewalk $2. 5,- 'I10.02
11405 Market Res. IWO?
J. A. Huckabee 15 20 63' Sidewalk $2.54 $ 160,02
5412 James Avenue Res. 160.02
Thomas L. Watson 16 20 63' Sidewalk $2.54 $ I60 02
5408 James Avenue Res. 160.02
Inez Millsap 17 20 70' Sidewalk $2.54 $ 177.80
5404 James Avenue Res. 177.80
B. G. Horton 18 20 90.75' Sidewalk $2. 54 $ 230.51
3464 Blue Bonnet Circle Res. 230.51
FRAZIER DRIVE EAST INTERSECTS
George Zauf 22 9 113.9' Adjusted to
1700 Frazier Drive Res. 40' Pavement $2.73 1.09.20
113.9' Sidewalk 2.54 289-31
398.51
Ralph R. Sherman A-R-1 2 205.4' Pavement $2.73 560.74
5300 James Avenue Res. 205.4' Curb & Gutter 2.40 492.96
194.4' Sidewalk 2.54 493.78
115.50 S. F. Driveway .74 85.47
$ 1,632.95
Dave Klimist A-R-2 2 31' Pavement $2.73 84.63
P. 0. Box 586 Res. 31' Curb &, Gutter 2.40 74.40
31' Sidewalk 2.54 78.74
$ 237.77
J
"',d,
UNIT ,NO. 1 bONT� A
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
STANLEY AVENUE INTERSECTS
SOUTHCREST ADDITION
Harry P. Wells 8-R 1 65' Pavement $2.73 $ 177.45
5228 James Avenue Res-. 55.5' Curb & Gutter 2.40 133.20
55.5' Sidewalk 2.54 140.97
IM8' S.F. Driveway 74 8.05
459.67 ,
Karl D. Bilbrey 7-R 1 60' Pavement $2. 73 $ 163,80
5224 James Avenue Res. 51,,51 Curb & Gutter 2.40 123.60
51.5' Sidewalk 2.54 130.81
16.88 S.F. Driveway .74 49
430.70
Thananea C. Mitchell 6-R 1 65' Pavement $2.73 1,7"1 ,4 5
55x,5° Curb & Gutter, 2.40
5220 James Avenue Res. a 133020
55.5' Sidewalk 2.54 140.97
10.13 S.F. Driveway . 74 7.50
459.12
George Ray Bloomquist 5 1 60' Pavement $2.73 163.80
5216 James Avenue Res. 49' Curb & Gutter 2.40 111.60
49' Sidewalk 2. 54 124.46
6.751 S.F. Driveway .74 5.00
$ 410.86
Richard Aubrey 'Reigart 4 1 1659 Pavement $2.73 117.45
5212 James Avenue Res. 154' Curb & Gutter 2.40 129.60
, 54' Sidewalk 2.54 137.16
13.5 S.F. Driveway .74 9.99
$ 454.20
Jerry C. Seeton 3 1 65' Pavement $2.73 $ 177.45
5208 James Avenue Res. 54' Curb & Gutter 2.40 1.'9.60
54' Sidewalk 2.54 137, 16
10.13 S.F. Driveway .74 7. 50
$ 451.71
Cecil Lawson 2 1 65' Pavement $2.73 $ 177.45
5204 James Avenue Res, 49' Curb & Gutter 2.40 117.60
54' Sidewalk 2.54 137. 16
10*13 S.F. Driveway .74 7.50 $ 439.11
n v n
POTT NO. CONT.
BLOCK
ZZONING FR.OI TA -E RAC A ! A58E
SOFT ADD1110
Jerry L. Ashford i 1 75' Pavement $2.73 $ 2040 .15
U00 James Avenue Res. 64' Curb & Cutter i.40 15J"60
64' Sidewalk 2x54 162.56
510.91
80UTHCREST DR1Vg INTERSECTS
SEMINARY HILL ADDITION
Jimmy L. Wilson 9 & 10 �42 95' Pavement $5086 $ 556070
5541 James Comma 458 Sidewalk 2,54 114o)O
671.00
Greater Southwest 11, 12 42 1508 Pavement $5.86 $ 679.00
Petroleum Co. , Tne, & 13 Comm. $ 879000
3W Hemphill
Mrs. M. L. O'Neal 14, 15 42 150' Pavement $5086 $ 879.00
P. 0. Box 7617 & 16 Comm. 150' Curb & Gutter 2040 360.00
Eirmngham, Alabama 80' Sidewalk. 1054 203.20
507050 S.F.Driveway .74 3M55
$ 1,817.75
COVERT STREET INTUS CTS
Mrs. M. D. O'Neal 13 31 508 Pavement $5086 $ 1.9"'1.00
P. 0. Boat 7617 comm. 50' Curb & Cutter 2,40 1.120.00
Birmingham, Alabama 50' Sidewalk 2.54 12 a07
540.00
Mrs. M. L. O'Neal 14 31 50' Pavement $5.86 $ 29100
P. 0. Box 7617 Comm. 50' Curb & Gutter z.40 1 '.0.00
Birmingham, Alabama 39' Sidewalk 2.54 99006
79.75 S.f. Driveway ,74 59002
$ 57108
E. G. Mallory 15 _31 50' Pavement $5.86 $ 293.00
4401 Mountaindale Road Comm. 50' Curb & Cutter 2.40 120.,00
44m ngham, Alabama 39' Sidewalk 2054 99006
79.75 S.F. Dr veway .74 59.02
4LOCK
LOT ZU II,N -42_ M 1 ASSIMA1 T
SM
S IMINARY H LL ADDITION
AtIly J. Holcomb 16 31 50' Pavement $5.86 $ 293.00
5784 6th Avenue Comm. 50 Curb and Gutter 2.40 120.00
39' Sidewalk x.54 99.06
59.75 S.F. Drtvewa .74 59.Q2
$ 571.08
A. Ira Doty 17 31 50' Pavement. $5.86 $ 2$3.00
5020 ,Tames Avenue Comm. 50' Curb and Cutter e'.40 1X0.00
509 Sidewalk 2.54 11,7.00
540.00
A. Ira Doty 18 & 9 �1�m 100' Paveiner<.t $4.29 $ 419.00
5Q20 James avenue Comm. 66' Curb and Gutter, 2:.40 158.40
78' Sidewalk 2, l98. 12
$ 705.52
A. Ira Doty 20 31 50' Pavement. $5.86 7917 00
5020 James Avenue Comm. 50' Curb and Gutter 2.40 1..20.00
50' Sidewalk 2. 54 127.00
549.00
'A. Ira Doty 21 & 22 1 100' Pavement w$5.86 $ 56�.00
5020 Jazzes Avenue Comm. 74' Curb and Gutter 2.40 I77.6C
80' Sidewalk 2.54 70M0
966.80
., . hmv
a
BLOCK
,. p, G ER,,,,o_TAGJ T l dQW AS3ESSjffNT
SEMINLY ILL ARD M
Mrs. M. L. O'Neal 23 & 24 37 100' Pavement $5.86 $ 586.00
P.O. box 7617 Comm. 49' Sidewalk 7.54 124,46
Birmingham, Alabama $ 710.46
YATES STREET INTERSECTS
Mrs. F. Mitchell Speairs 13, 14, 330 150° Pavement $5.85 $ V9,.00
4944 James Avenue 4 15 Comm. 150' Curb and Gutter 2.40 1+60.00
150' Sidewalks 2.. 54 381.00
$1,620.00
Charles C. Collins 16 30_,,.... 50' Pavement $2. 73 $ 135. 50
4936 James Avenue Res. 50' Curb and Gutter 2.40 120.00
39' Sidewalk 2.54 99.06
79. 75 S.F. Driveway .74 59.0>`;
$ 41.4.58
L. E. Horsman 17 A0 50' Pavement $2.73 $ 1341�150
1920 Fifth Avenue Res. 50' Curb and Gutter 2,40 120ti 00
39' Sidewalk x .,54 99.06
$ 355.56
Charles B. Parker 18 30 50' Pavement $2. 73 $ 136,50
4924 James Avenue Res. 50' Curb and Gutter 2.40 120.00
50' Sidewalk. 2. 54 127.00
383.50
UNit Nd"f ONTO
ft.Ock
OWNER Wt zoNtNG rkoNTAGt MT-E AMOUNT AIII•
SEMINARY Hitt AbbftION
tallah Wright io & 26 30 iOd' Pavement $5.86 586.00
4016 James Avenue Comm. 100' Curb & Gutter 2.40 240.00
18' Sidewalk 2.54 196. 12
159.50 S.F. Driveway .74 118.03
$ 1,142.15
terft&rJ temoine 30 Pavement $2.73 1W 56
51405 Wheatoh bri4e Res- 30 Curb & Gutter 2.46 86.40
32' Sidewalk 2.54 81.28
76 S.F. Driveway .74 56.24
$
YelAa 1 ttit, Trustee 22 30 50' Pavement $2.13 136.50
351,2 Park. Ridge tivd, Res. 50' Curb & Gutter 2.40 120.00
39' Sidewalk 2.54 99.06
79.75 S. F. Driveway .14 59.02
$ 414.58
S. C. kailok� 23 30 56' Pavement $2.73 06.50
4401 Nountaindaie Res, 501 Curb & Gutter 2.40 120.00
girminghAmo A14 and JO' Sidewalk 1.54 90.06
70.15 S. F. Driveway .14 50.02 $ 4i4.50
C. t. McCarthy 14 io 50' Pavement $2,, 13 $ 136.50
1121 Gordon Res. 50' Curb & Gutter 2.40 120.00
47' Sidewalk 2.54 1.19.38
MARION LYDON SMEt TXTIRS9Ct§
W. W. Wharton 13, 14 19 1,50' Pavement S;-.73 $ 409.50
040 James Avenue & 15 Res. 150' Curb & Gutter 2,40
146' Sidewalk 2. 54 370.84
t,i46.34
kiiiis A. tane 16 10 50' Pavement $2. 73 136.50
4832 James Av6ftud Res, 501 Curb & Gutter 2t,4p 126.00
39' Sidewalk 2.54 99.06
19.75 S.F. Driveway .74 59.02 $ 44.55
'AA,
UNIT NO. 1 CONT.
BLOCK
LOT ZONING FRONTAGE RATE AM01V A;SESSMENT
SEMINARY HILL ADDITION
J. B. Jones 17 19 50' Pavement $2.73 $ 06.50
4828 James Avenue Res, 50' Curb & Gutter z,,40 i2:0,00
39' Sidewalk 2.54 99,06
79.75 SF. Driveway 474 59,:0
414,58
Mrs. Audrey Wood 18 19 50' Pavement $2',=,73 $ 136450
Rt. 2, Box 44 Res, 50' Curb & Gutter 2„40 110 00
39' Sidewalk —54 99..06
79.75 S.F. Driveway , 74 59 02
$ 414, 58
Stanley E. White 19 _19 50' Pavement $2..73 $ 136.50
4802 Finley Drive Res. 30” Curb & Gutter 2 40 7200
Austin, Texas 34' Sidewalk 2-54 86 .36
$ 294„86
Atchinson, Topeka & 20 & 21 19 100' Pavement adjusted to
Santa Fe Res. 90' Pavement $2,,73 $ 245.70
14th and Jones Street 85' Curb & Gutter 2.,40 204900
85' Sidewalk 2.54 215 90 L L
y 665.60
Mrs, C. M. Rhodes 22 & 23 19 100' Pavement $5.68 $ 586, 00
3532 Corto Comm. 100' Curb & Gutter 2.40 Z40,00
100' Sidewalk 2.54 254 .00
$ 1 ,080..00
T. J, Reilly 24 19 50' Pavement $5.86 $ 293 .00
4801 Stanley Comm. 40' Curb & Gutter 2 .40 96,00
25' Sidewalk 2.54 63.50
143, 75 S,F. Driveway .74 106, 38
$ 558,88
FULLER STREET INTERSECTS
Southwestern Baptist 13, 14, 18 200' Pavement $5.86 $1 ,17z' 00
Theological Seminary 15 & 16 Comm, 4006 Curb & Gutter 2,40 480,00
Po 0. Box 22000 2OO' Sidewalk 2 ,54 508000
$ 2, 160 00
10
UNIT MO. 1 CONT.
BLOCK
OWNER ZONING FRONTAGE AM„O�N �d1SSESSMENT
.LOT SEMINARY HILL ADDITION
Anne Lou Owen 17 18 50' Pavement $2. 73 $ 136.50
4728 James Res. 39' Sidewalk 2, 54 99.06
10. 75 S.D. Driveway . 74 7.96
$ 243.52
Southwestern Baptist Sem. 18 18 50' Pavement $2. 73 $ 136.50
P.O. Box 22000 Res. 39' Gutter only 1.20 46.80
6„5 S.F. Driveway o74 4.81
$ 188.11
Nily Dees 19 18 50' Pavement $2,73 $ 136. 50
1212 Cameron Res. 39' Gutter only 1G20 46.80
6.5 S.F. Driveway . 74 4.81
$ 188. 11
Paul J. Stanfield 20 18 50' Pavement $2. 73 $ 136, 50
4716 James Avenue Res. 50' Curb & Gutter 2.40 120.00
39' Sidewalk 2.54 99.06
79.75 S.F. Driveway 74 59°02
$ 414,58
Marshal J. Weaver 21 18 50' Pavement $2, 73 $ 136.50
Rt. 2, Box 434 Res. 50' Curb & Gutter 2,40 120.00
Wilmington, N. C. 39' Sidewalk 2. 54 99.06
79075 S,,F. Driveway o74 59,02
$ 414,58
Susan B. Coshow 22 18 50' Pavement $2.73 $ 136,50
4708 James Avenue Res. 50' Curb & Gutter 2x40 120.00
39' Sidewalk 2, 54 99:06
79.75 S.F. Driveway . 74 59.02
414.58
S. W. Baptist Seminary 23 18 50" Pavement $2. 73 $ 136. 50
P.O. Box 22000 Res. 50' Curb & Gutter 2.40 120.00
39' Sidewalk 2 54 99.06
79.75 S.F. Driveway .74 59.02
$ 414. 58
Ester Friesen 24 18 50' Pavement $2,73 $ 136. 50
4700 James Avenue Res. 50' Curb & Gutter 2.40 120.00
50' Sidewalk 2.54 127.00
$ 383.50
11
UNIT NO, 1. CONT.
BLOCK
OWNER LOT ZONING FRONTAGE FATF MC,"'NT A5SESSXENTS
SPURGEON STREET INTERSECTS
Southwest Baptist 7 7 150' Side Lot
Theological Seminary Res. Adjusted to
P. 0. Box 22000
,1001 Pavement ":3 .`,i 00
100' Curb & Gutter t-c
100' Sidewalk 5- 0(i
767.00
S. W. Baptist: Seminary 150' Pavement $5.86 879,00
P. 0. Box 22000 6 1,50 9 Curb & C;.'u t t r 2 ,40 36C�OO
Apt . 150' Sidewalk 54 '381 .CIO
L,620,,00
BOYCE STREET INTERSECTS
Mrs. M. L. O'Neal, 12 & 13 E, 115' Ta�)'(-,ment S5.8 $ do
Box 7W 67M0
Birmingham, Alabama
Mart W. Payne 14 6 50' Pavement $5.86 $ X3.00
4528 James Avenue Comm. 50P Curb & Cutter 40 1.":0.CIO
50' Sidewalk 5`; i 00
$ 540.00
Mart W. Payne 15 6 50' Pavement _29 2,1 Cj
4528 James Avenue Comm. 50' Cutb & Outter .4j( '20. C
39' Siciewalk 2-54 9' ,CQ
79.75 S, F. Dt.,ve-way
492.58
Southwest Baptist 16 & '17 6 Pavement 45.86 5a6�C'C'
78' G��itter OrAy 1 . ' 0 1
Theol eg i cal.- &,.mtnary 9 1.11 0
P. O. Box 22000 89' S:idewa'jk 54 =6 C 6
,9.75 S.P. Dr• ,,,eviay .7 a 59„0'
96%L.68
James J. Austin 18 6 50' Pavement $5.86 293 00
812 St. Louis Comm. 508 Curb & Gutter 2.40 120.00
30' Sidewalk 2.54 7620
1,25 S.F. Dpi:*reway . 74 92.50
581. 70
Ira Doty 19 6 50' Pai;ement $5.84' 293.00
5020 James Avenue Comm. 50' C�.irb & Cu •ter 2.40 IMOO
3C " Side,4alk 0 54 76.20
125 S.F'. Dti-veway .7 4 9.21.50
581.70
12
UNIT NO. 1,CONT,
BLOCK
OWNER LOT ZONING FRONTACE RAID A)Ko*!-mr ASSESSMENT
SEMINARY H:1-1
Mrs. M. L. O'Neal 20 6 50" Pavement 5 5 86 $�9�-i 00
P.O. Box 7617 Comm. 50° Curb & Cutter Z, 40 I2;0,00
Birmingham, Alabama 20' Sidewalk 2.54 50 ,80
18750 S,F. Driveway .74 118 ,"?5
$ 60255
Phillips Petroleum Co. 21 & 22 6— 115' Pavement $5,,86 $67390
P.O. Box 1967 comma 115° Curb & Gutter 2.40 278,00
Houston, Texas 45' Sidewalk Z,54 114,30
437.50 S.F.Driveway 323 75
S,-L ,387 ,95
GAMBRELL STREET INTERSECTS
E. A. Baldridge 12 & 13 3 115' Favement R,-z-iria - ing
4458 James Avenue Comm' ', acrd Widening X4, 08 X4t9 40
$ 469 ,20
Gambrell Street 14 & 15 3 tOW Pavement Resurfact.rg
Baptist Church Res. and Widening
1616 W. Gambreli 27Z? 0'0
Southwest Baptist 16 3 50' Pavement Resurfacing
Seminary Res. and Widening 52, 2 S06,00
P. 0. Box 22.000 S 1316a00
Monroe Odom 17 3 50' Paveme.-A Rclurfacing
4422 James Avenue Res. a,:a Widening $2- �2 5136,00
39" Sidewalk 2:.,54 99- 06
79, y5 S,,F. Driveway �"4 59 02)
. 94,08
Lou Ellen Boyd, et al 18 & 19 3 100' Pavement Rest� "acaing
415 North Drive Res. and Widening
San Antonio, Texas 78201 891 Sidewa.Lt,, 2.54 L,6,06
8'4'1, 50 SnF Driveway 74 6L05
$ 559.11
Southwest Baptist 20 3 50'" Pavement Resurfacing
Seminary Development,Inc. Res. and Widening $2-72 $136-00
P. 0. Box 22000 50" Sidewalk 2,54 127 ,00
263000
13
UNIT NO. 1 CONT.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
SE14MARY HILL ADDITION
T. B. 14,atson 21 & 3, 115' Pavement Resurfacing
4400 James Avenue 22 Res. and Widening $2.72 $312.80
1111 Sidewalk 2.54 281.94
$594-74
BROADUS STREET INTERSECTS
Southwestern Baptist S. 1001 2 1001 Pavement Resurfacing
Seminary of Apt. and Widening $5.44 $544.00
P. 0. Box 22000 Lot 17 $544.00
Southwestern Baptist N. 501 2 50' Pavement Resurfacing
Seminary of Apt. and Widening $5.44 $272.00
P. 0. Box 22000 Lot 17 $272.00
TOM BUTLIM ADDITION
Southwestern Baptist 1 145-9f Pavenent Resurfacing
Seminary Res. and 'Widening $2.72 $396.85
P. 0. Box 22000 145.9' Sidevalk 2.54 370-59
$767.44
COST TO PROPERTY OWNEM - ASSESS PINT $64,176-12
COST TO CITY OF FORT WORTH $197,759.42
TOTAL ESTIHATED CONSTRUCTION COST $261,935.54
14
City raj' Fort Worth, Texas
MOM*" Mayor and Communication
M
mmP10 DATE REFERENCE SUBJECT. Final Payment - Widening and PAGE
NUMBER Paving of James Avenue 2
R.ammo 7/21/69 FP-64;'1 a of
Final Council action, on time Project described below is requested.
Project 7escri tion
Name: Assessment Paving of James Avenue from Seminary Drive
to Frazier Drive, East, Project Number 10,4-24,000-171
Contractor. Glade, 'Enc.
Contract Awarded: August 26, 1968 ( C C-1299)
Work Order Issued: November 21, 1968
Work Order Effective. December 2, 1968
Date of final Inspection
and Approval. June 4, 1969
'Working Time Bid. 120 'Working Days
Working Ti Used: 107 Working gays
Pro'eet Cost and Pinaamcima
Original Bid Price. $258,808.67
Change Order No. 1 - 3,846.00 (M&C C-1329, 9/30/68)
Change Order No. 2: 1,2.15.00 (A.R. 1.-15, 2.3.1, 1/3/69)
Change Order No. 3: 1,300.00 (A.R. 1°-15, 2.3.1, 2/10/69)
Revised Contract Price: $26:5,169.50
Final Contract Cost: $238,1.23.22
Partial Payments Previously Made: 5 Amount: $21,880. 74
Final Payment Due: $26,242.48
Payments mts to be made from Project Account Mo. 104-24000-17.1.
Deviation from Bid Price: An under-run of $27',046.38 resulted in part because
estimated quantities of below listed items were in excess of quantities used:
24" Dia. Class ,Ill. RCCP 1,008.00
/" Curb and 2' Cutter 2,429.70
Std 6" Conc. Driveway 1,5203.40
Std. 5" Conc. Sidewalk 9,579.60
6" HHAC Pavement 2,126.40
Total Savings $16,664.10
7be remaining $10,382.28 of time under-run occurred due to minor variations
between quantities estimated in the contract specifications and quantities
actually measured and used at the john site.
DATE REFERENCE SuaiECT: final Payment - Widening and PAGE
NUMBER paving of James Avenue 2 2
7/21/69 FP1 6 11. �_ of
Cow liance with Specif ications
During testing of this project, 27 corings were made with the following results:
Exceeds Even with Under Specs But Below
-ems Specs: Within Tolerance Tolerance
Paving 16 9 2 0
Sub-Grade. g 19 0 0
Chi the entire project, the average thickness of the paving is 6.21 inches as
compared to the 6.00 incties specified. Die average thickness of the lime
stabilized sub-grade is 6,00 inches as compared to the 6.00 inches specified.
,rests Dade during construction of sub--grade, base and pavement show that
aerials used were in compliance with contract specifications.
e,c ommend ations
It is recomuended that the above project he accepted by the adoption of an
ordinance and final payment of $26,242.48 be authorized to Glade, Inc.
7's
SUBMITTED BY: DISPOSITION BY,COUNCW PROCESSED BY
A F*ROYED El OTHER (DESCRIBE)
CITY SECRY
DATE
CITY MANAGER