Loading...
HomeMy WebLinkAboutContract 51709-A1AMENDMENT NO. ONE TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES FIRE STATION 45 STATE OF TEXAS CITY SECRETARY CONTRACT NO. 51711-A1 COUNTY OF TARRANT WHEREAS, The City of Fort Worth and RPGA Design Group, Inc. (Consultant) made and entered into City Secretary Contract No. 51709 (The Contract) which was authorized by the City Council by M&C C-28941, the 4th day of December, 2018, for Design and Construction Administrative Services for Fire Station 45; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional design services for Civil revisions due to Harmon Road and additional structural site visits. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional design services for the design and detailing of Civil revisions due to Harmon Road and additional structural site visits. The cost of this additional service is $5,575.00 plus $0.00 in reimbursable expenses. The scope of services is described more fully in RPGA Design Group, Inc Letter dated January 31, 2023, subject: "Additional Service for iSWM revisions due to Harmon Road Changes and additional structural site visit due to extended duration of construction". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachment "A". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachment "A". However the total fee paid by the City shall not exceed a total of $228,395.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." City of Fort Worth, Texas OFFICIAL RECORD Standard Agreement for Professional Services AMENDMENT CITY SECRETARY Revision Date: 3/20/2020 Page 1 of 2 FT. WORTH, TX Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth 'Daira &Uhk f' By: Dana Burghdoff (M 20, 2023 0 :40 CDT) Name: Dana Burghdoff, AICP Title: Assistant City Manager Date: M a r 20, 2023 Approval Recommended: By: Steve ke (M 8, 21� � o r 0235 •24 CST) Name: Steve Cooke Title: Director, Property Management Dept. Attest: poi FOR,°aa ?-40 Pvo o=o dP*o °4#G Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: 4' 4 Name: Nikita N. Watts Title: Sr. Capital Projects Officer Approved as to Form and Legality: By: Name: John B. Strong Title: Assistant City Attorney p Aa°a 4bp°°°°°°°°°°° p Contract Authorization: a nE7(aga By: M&C: n/a Name: Jannette Goodall Title: City Secretary VENDOR: RPGA Design Group, Inc. Qa By: Javi do (Mar 1, 202310:00 CST) Name: Javier Q. Lucio Title: Principal Date: Mar 1, 2023 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Standard Agreement for Professional Services AMENDMENT Revision Date: 3/20/2020 Page 2 of 2 3 Attachment "A" 01R P G A D E S I G N G R O U P, I N C. January 31, 2023 Ronald Clements, Architect Property Management Department City of Fort Worth 401 West 13th Street Fort Worth, Texas 76102 RE: FS #45: Additional Service for iSWM revisions due to Harmon Road Changes and additional structural site visit due to extended duration of construction. Mr. Clements: In order that we might reach a clear understanding, please accept this as our proposal for additional services required from AIM Engineering and RL Woods and Associates: 1. AIM Engineering to modify the iSWM documentation due to the expansion of Harmon Road along the east side of the FS #45 property. The redesign will allow for the elimination of the existing bar ditch design and allow storm water from FS #45 to run directly to the new storm lines that are included it the expansion of Harmon Road. We submit the following for your consideration and approval. 2. R L Woods and Associates to provide additional site visits due to the extending duration of construction. One (1) additional trip at a cost of $600.00. Additional Services Fee (AIM Engineering) ................................................. $ 4,975.00 Additional Services Fee (R L Woods).......................................................... $ 600.00 Architectural Coordination and Processing (RPGA Design Group, Inc.) ..... $ 0.00 TOTAL........................................................................................................ $ 5,575.00 If you have any questions or if you need additional information to review and approve this proposal please contact me at your earliest convenience. ince ly, Javier . Lucio RPGA Design Group, Inc. Attachments: AIM Engineering, LLC — January 11, 2021 101 S. Jennings Avenue, Suite #100 Fort Worth, Texas 76104 (817) 332-9477 FAX (817) 332-9487 (888) TRY-RPGA www.rpgaarchitects.com January 11, 2021 Javier Lucio RPGA Design Group, Inc. 101 S. Jennings Avenue, Suite 100 Fort Worth, TX 76104 RE: Fort Worth Fire Station 45 Project Dear Mr. Lucio: AIM Engineering, LLC submits this fee proposal to provide additional civil engineering services to revise iSWM Plan and construction document plans for the Fort Worth Fire Station 45 Project in Fort Worth, Texas. These revisions will reflect the deletion of the on -site storm water detention pond currently included in the site design. A summary of the scope of our services and our fee is as follows: Hydrology analysis will include running new hydrological models, updating and revising iSWM forms and coordination with iSWM Plan reviewer, Halff Associates. Our civil engineering design will include revising the site layout, site grading and drainage, site erosion control, and site utilities. Our fee for the above scope of work is as follows: Hydrology Analysis and Revision: $ 1,975.00 to iSWM Plan Revision to Construction Documents : 3,000.00 Total: $ 4,975.00 Please contact me at 817.715.1287 if you have any questions or wish to discuss this proposal further. Sincerely, AIM Engineering, LLC Jos oto, P.E. Principal AIM Engineering, LLC, 530 Bedford Road, Suite 102, Bedford, TX 76022, (817) 715-1287 Texas Registered Engineering Firm F-10732 R. L. WOODS & ASSOCIATES, LLC 1151 W. Pioneer Pkwy Arlington, TX 76013 Client: RPGA Design Group, Inc. 101 S. Jennings Ave., Ste. 100 Fort Worth, TX 76104 INVOICE Date: Invoice No: 10/28/2022 22-0690 Project Number: Due Date: Project Name: Stipulated Sum of $ P O NO: RPG1813 10/28/2022 1813-SA CoFW FS#45 Supplement Ob... $1,800.00 E C IP 10 on.A t P r m u a 3 Site Visits @ $600/each 1,800.00 33.33% 33.33% 600.00 LTotal $600.00