HomeMy WebLinkAboutContract 54172-A2AMENDMENT NO. 2 TO AGREEMENT
STANDARD AGREEMENT FOR PROFESSIONAL SERVICES
FORT WORTH POLICE DEPARTMENT — SOUTH PATROL DIVISION
STATE OF TEXAS 54172-A2
CITY SECRETARY CONTRACT NO.
COUNTY OF TARRANT
WHEREAS, The City of Fort Worth and Callahan & Freeman Architects (Consultant)
made and entered into City Secretary Contract No. 54172 (The Contract) which was
administratively authorized the 20th day of July, 2020, for Fort Worth Police
Department's South Patrol Division; and Amendment No. 1 was approved by M&C 20-
0549 in the amount of $262,600.00 for completion of Construction Drawings and
Construction Phase Service; and
WHEREAS, further amendment is necessary to reimburse the Consultant as part of the
design services agreement for additional services for an Oncor utility easement, and
construction administration services for extended construction schedule, value
engineering service, and structural redesign coordination of this project.
NOW THEREFORE, City and Consultant, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends the
Contract:
1.
Article I — Scope of Services, Paragraph (3) shall be added to read as follows:
(3) Provide additional professional services for the balance of the design and
construction administration of this project. The total cost of these additional
services is $78,290.00 plus $0.00 in reimbursable expenses. The scope of
services is described more fully in Attachments "B", "C", and "D".
2.
Article II — Compensation, first paragraph, is amended as follows:
"Consultant shall be compensated in accordance with the Fee Schedule shown
in Attachments "B", "C", and "D". Payment shall be considered full compensation
for all labor, materials, supplies, and equipment necessary to complete the
services described in Attachments "B", "C", and "D". However, the total fee
paid by the City shall not exceed a total of $425,890.00 unless the City
and the Consultant mutually agree upon a fee amount for additional services
and amend this Agreement accordingly."
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CFW-Std. Agreement for Prof. Services (Rev.20Mar2O2O) Page 1 of 2
South Patrol Division —Amendment No.2 February 2023
Executed effective as of the date signed by the Assistant City Manager below.
FORT WORTH:
City of Fort Worth
Dghg BULgk7doff
By: Dana Burghd off (Ma0, 202305:38 CDT)
Name: Dana Burghdoff, AICP
Title: Assistant City Manager
Date: Mar 20, 2023
Approval Recommended:
By:
Name:
Title:
Attest:
By:
Name:
Title:
Steve o ke(Fe7,2�11:42 CST)
Steve Cooke
Director, Property Management Dept.
v FORro
°o
A!`° °.10
dvo 8=4
� P�aa nEnpSgp�c
Jannette Goodall
City Secretary
VENDOR:
Callahan & Freeman Architects
By:
Name:
Title:
Date:
�91-1k W. (w4zl ae
Frank W. Callahan (Feb 3, 2023 14:38 CST)
Frank W. Callahan
Principal
Feb 3, 2023
Contract Compliance Manager:
By signing I acknowledge that I am the person
responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
By:
Name
Title:
MCI
Nikita Watts
Senior Capital Projects Officer
Approved as to Form and Legality:
By:
Name
Title:
John B. Strong
Assistant City Attorney
Contract Authorization: Not Required
M&C: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
CFW-Std. Agreement for Prof. Services (Rev.20Mar2O2O)
South Patrol Division —Amendment No.2
Page 2 of 2
February 2023
ATTACHMENT "B"
C A L L A H A N a F R E E M A N
ARCHITECTS
November 9, 2022
Alfonso Meza
Property Management Department
401 West 13th Street
Fort Worth, Texas 76102
Re: Fort Worth Police Department South Patrol Division
Additional A-E Fee Request
Dear Alfonso:
As requested by the City of Fort Worth, Callahan & Freeman Architects has received a price proposal
from Baird, Hampton & Brown for survey services to document an easement on the southeast section of
the South Patrol Division site, to be dedicated to Oncor Electric Delivery Company. This easement is
required to accommodate electrical service to the new facility. Below is the fee requested.
Boundary Survey and Easement Exhibit (BHB) $1,200
Project Management 200
Total Additional Services Fee
$1,400
It is our understanding that the City will prepare a contract amendment to add this service scope and
fee. Please let us know if anything is needed from us to support that process. Upon receipt of approval
and a notice to proceed with this work, we will engage BHB to prepare the easement documentation.
Thank you for your consideration of this request. Contact us if you have any questions. We look
forward to continuing to work with you to complete a beautiful police facility.
Sincere) ,
la4��
d,J.
Frank W. Callahan AIA
President
Attachments:
BHB Proposal for Easement Document
P.O. Box 15577 Fort Worth, TX 76119 817.478.1765 darchitects.com
ATTACHMENT "C"
CALLAHAN * FREEMAN
ARCHITECTS
December 13, 2022 (Rev. 2-2-23)
Mr. Alfonso Meza
Property Management Department
City of Fort worth
401 West 131" Street
Fort Worth, Texas 76102
Re: Fort Worth Police Department South Patrol Division
Additional A-E Fee Request
Dear Alfonso:
Callahan & Freeman Architects (C&F) respectfully requests additional fee on the Fort Worth South
Patrol Division project. This request relates to additional design work due to the coordination of the
redesign of the structural systems, Contractor's value engineering items, and the extended time
frame of the project schedule.
I. Additional Scope Items
A. Structural coordination effort — Core Construction elected to redesign the structural systems
of the building including foundation, storm shelter, concrete wall panels, and steel building
framing. Adjustments to many of the architectural elements were necessary to integrate
with the new structural frame. Additional tasks included:
1. Coordinating column locations with the architectural plans.
2. Re -dimensioning of the floor plans to utilize the new structural grid dimensions.
3. Revisions to building sections and details to coordinate with the new beam and joist
sizes.
4. Reworking the lobby roof design,
B. Value Engineering effort — Core Construction priced the project repeatedly over many
months in an effort to reduce the cost. Industry wide cost increases, due to the global
pandemic, could not have been anticipated when the budget was set for this project. This
continued value engineering effort necessitated additional work from the design team
including making many changes to the plans and even reducing the overall size of the
building. As stated in a letter to Brian Glass, dated October 15, 2021 (copy attached), we
believe the design team should be compensated for this work.
P.O. Box 15577 Fort Worth. TX 76119 817.478.1765 darchitects.com
Overall, the time from when plans were originally completed and submitted for permit
(April 26, 2021) till the construction commenced was 16 months. Pricing and value
engineering efforts continued through this time period. C&F posted 560 hours during this
"down time". We estimate that half of this time was on V.E. proposals, evaluations, and
assisting the Contractor in the repeated pricing efforts.
C. Extended project schedule — Per Article III of our Architectural Services Contract, additional
compensation is warranted if the project duration extends beyond 24 months. The Contract
was fully executed on July 20, 2020 (29 months ago). The current construction schedule
estimates a completion date of December 2023. This will result in an overall project term of
41 months (or 17 months beyond the contract term). Higher overhead and wage rates lead
us to request additional fee to cover the added cost.
II. Additional Fee breakdown
The additional fee requested for the above outlined services is as follows:
A. Structural redesign coordination
40 hours @ $150/hr.
B. Value Engineering
280 hours @ $150/hr.
C. Extended project schedule
Construction Administration fee
Total requested additional fee
$6,000.00
42,000.00
22,890.00
$76,890.00
Thank you for your consideration of this request. Please let us know if you have any questions or if
additional information would be helpful at this time.
We are excited that construction is underway!
Sincerely,
d,4
Frank W. Callahan, AIA
Callahan & Freeman Architects
P.O. Box 15577 Fort Worth, TX 76119 817.478.1765 darchitects.com
C A l L A H A N F R E E M A N
ARCHITECTS
October 15, 2021
Brian Glass
Property Management Department
401 West 13th Street
Fort Worth, Texas 76102
Re: Fort Worth Police Department South Patrol Division
Additional A-E Fee Request
Dear Mr. Glass:
At this point in the progress of the South Patrol Division project, with a bid from the Construction
Manager (CM) that is significantly higher than the budget, we believe it is necessary to agree on the
course of action required to complete the design for a successful development. We are committed
to this completion and we want to work for a strong result for the City of Fort Worth.
The process thus far has been delayed several times, caused by contractual decisions and a global
pandemic. That pandemic has also caused all prices in the world to escalate, creating a
construction market, the likes of which we cannot remember. The CM provided cost estimates at
50% and 9S%, which we believed to be accurate representations of the cost of the building as
documented at those stages of the design. At 95%, the cost was seen to be approximately
$1,000,000 over the target budget, and Callahan & Freemans Architects and engineering
consultants engaged with the CM to reduce cost through strategic changes in the design and the
selection of alternate materials and equipment. At the end of that process the design was validated
by the CM to be within the budget, with the City shifting some of the budget category totals to
increase the building portion to $12,700,000. The CM believed that this amount would be sufficient
to cover the final GMP based on 100% documents.
The status of the project at this time has a building cost from contractor bids that is $14,647,612,
almost 2-million dollars over the established budget. The industry cost increases could not have
been anticipated when the allocation of funds was decided for this project. It is clear from our
investigations that the original building program will need adjustments and significant design
changes will be needed to make the building match the budget in these current market conditions.
In light of these developments, C&F respectfully requests additional fee to revise the construction
documents. We can make the necessary changes and have already begun exploring the best ways
to alter the design to present to the City for confirmation and approval. We do believe, however,
P.O. Box 15577 Fort Worih, TX 76119 817.478 1765 cfarchitects.com
Fort Worth Police Department South Patrol Division
Additional A-E Fee Request
October 15, 2021
that the design team should not be held responsible for the effects of the drastic changes in the
market conditions. When we have determined the scope of the changes necessary to make the
South Patrol Division project viable, we will provide a proposal for additional services fees for your
review and consideration. We understand that the additional A/E fees will have to be funded out of
the overall project budget, but they will be small compared to the construction cost savings this
process will realize. We look forward to finishing the process and to getting construction underway.
Thank you for your consideration of this request. Please let us know if you have any questions. We
look forward to continuing to work with you to complete a beautiful police facility.
Sincere ,
Frank W. Callahan AIA
President
Page 2 of 2
C A L L A H A N s F R E E M A N
A R C H I T E C T S
Callahan & Freeman Architects
Hourly Charges for Professional Services
Prepared December 2022
Charges include all salaries, salary expense, overhead and profit.
1. Principal Architect $200/hour
2. Project Manager/Architect $150/hour
3. Design/Draftsman $120/hour
4. Clerical $75/hour
ATTACHMENT "D"
$170/hour
$180/hour
$135/hour
$150/hour
$85/hour
$90/hour