Loading...
HomeMy WebLinkAboutContract 54172-A2AMENDMENT NO. 2 TO AGREEMENT STANDARD AGREEMENT FOR PROFESSIONAL SERVICES FORT WORTH POLICE DEPARTMENT — SOUTH PATROL DIVISION STATE OF TEXAS 54172-A2 CITY SECRETARY CONTRACT NO. COUNTY OF TARRANT WHEREAS, The City of Fort Worth and Callahan & Freeman Architects (Consultant) made and entered into City Secretary Contract No. 54172 (The Contract) which was administratively authorized the 20th day of July, 2020, for Fort Worth Police Department's South Patrol Division; and Amendment No. 1 was approved by M&C 20- 0549 in the amount of $262,600.00 for completion of Construction Drawings and Construction Phase Service; and WHEREAS, further amendment is necessary to reimburse the Consultant as part of the design services agreement for additional services for an Oncor utility easement, and construction administration services for extended construction schedule, value engineering service, and structural redesign coordination of this project. NOW THEREFORE, City and Consultant, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the Contract: 1. Article I — Scope of Services, Paragraph (3) shall be added to read as follows: (3) Provide additional professional services for the balance of the design and construction administration of this project. The total cost of these additional services is $78,290.00 plus $0.00 in reimbursable expenses. The scope of services is described more fully in Attachments "B", "C", and "D". 2. Article II — Compensation, first paragraph, is amended as follows: "Consultant shall be compensated in accordance with the Fee Schedule shown in Attachments "B", "C", and "D". Payment shall be considered full compensation for all labor, materials, supplies, and equipment necessary to complete the services described in Attachments "B", "C", and "D". However, the total fee paid by the City shall not exceed a total of $425,890.00 unless the City and the Consultant mutually agree upon a fee amount for additional services and amend this Agreement accordingly." OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CFW-Std. Agreement for Prof. Services (Rev.20Mar2O2O) Page 1 of 2 South Patrol Division —Amendment No.2 February 2023 Executed effective as of the date signed by the Assistant City Manager below. FORT WORTH: City of Fort Worth Dghg BULgk7doff By: Dana Burghd off (Ma0, 202305:38 CDT) Name: Dana Burghdoff, AICP Title: Assistant City Manager Date: Mar 20, 2023 Approval Recommended: By: Name: Title: Attest: By: Name: Title: Steve o ke(Fe7,2�11:42 CST) Steve Cooke Director, Property Management Dept. v FORro °o A!`° °.10 dvo 8=4 � P�aa nEnpSgp�c Jannette Goodall City Secretary VENDOR: Callahan & Freeman Architects By: Name: Title: Date: �91-1k W. (w4zl ae Frank W. Callahan (Feb 3, 2023 14:38 CST) Frank W. Callahan Principal Feb 3, 2023 Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. By: Name Title: MCI Nikita Watts Senior Capital Projects Officer Approved as to Form and Legality: By: Name Title: John B. Strong Assistant City Attorney Contract Authorization: Not Required M&C: N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX CFW-Std. Agreement for Prof. Services (Rev.20Mar2O2O) South Patrol Division —Amendment No.2 Page 2 of 2 February 2023 ATTACHMENT "B" C A L L A H A N a F R E E M A N ARCHITECTS November 9, 2022 Alfonso Meza Property Management Department 401 West 13th Street Fort Worth, Texas 76102 Re: Fort Worth Police Department South Patrol Division Additional A-E Fee Request Dear Alfonso: As requested by the City of Fort Worth, Callahan & Freeman Architects has received a price proposal from Baird, Hampton & Brown for survey services to document an easement on the southeast section of the South Patrol Division site, to be dedicated to Oncor Electric Delivery Company. This easement is required to accommodate electrical service to the new facility. Below is the fee requested. Boundary Survey and Easement Exhibit (BHB) $1,200 Project Management 200 Total Additional Services Fee $1,400 It is our understanding that the City will prepare a contract amendment to add this service scope and fee. Please let us know if anything is needed from us to support that process. Upon receipt of approval and a notice to proceed with this work, we will engage BHB to prepare the easement documentation. Thank you for your consideration of this request. Contact us if you have any questions. We look forward to continuing to work with you to complete a beautiful police facility. Sincere) , la4�� d,J. Frank W. Callahan AIA President Attachments: BHB Proposal for Easement Document P.O. Box 15577 Fort Worth, TX 76119 817.478.1765 darchitects.com ATTACHMENT "C" CALLAHAN * FREEMAN ARCHITECTS December 13, 2022 (Rev. 2-2-23) Mr. Alfonso Meza Property Management Department City of Fort worth 401 West 131" Street Fort Worth, Texas 76102 Re: Fort Worth Police Department South Patrol Division Additional A-E Fee Request Dear Alfonso: Callahan & Freeman Architects (C&F) respectfully requests additional fee on the Fort Worth South Patrol Division project. This request relates to additional design work due to the coordination of the redesign of the structural systems, Contractor's value engineering items, and the extended time frame of the project schedule. I. Additional Scope Items A. Structural coordination effort — Core Construction elected to redesign the structural systems of the building including foundation, storm shelter, concrete wall panels, and steel building framing. Adjustments to many of the architectural elements were necessary to integrate with the new structural frame. Additional tasks included: 1. Coordinating column locations with the architectural plans. 2. Re -dimensioning of the floor plans to utilize the new structural grid dimensions. 3. Revisions to building sections and details to coordinate with the new beam and joist sizes. 4. Reworking the lobby roof design, B. Value Engineering effort — Core Construction priced the project repeatedly over many months in an effort to reduce the cost. Industry wide cost increases, due to the global pandemic, could not have been anticipated when the budget was set for this project. This continued value engineering effort necessitated additional work from the design team including making many changes to the plans and even reducing the overall size of the building. As stated in a letter to Brian Glass, dated October 15, 2021 (copy attached), we believe the design team should be compensated for this work. P.O. Box 15577 Fort Worth. TX 76119 817.478.1765 darchitects.com Overall, the time from when plans were originally completed and submitted for permit (April 26, 2021) till the construction commenced was 16 months. Pricing and value engineering efforts continued through this time period. C&F posted 560 hours during this "down time". We estimate that half of this time was on V.E. proposals, evaluations, and assisting the Contractor in the repeated pricing efforts. C. Extended project schedule — Per Article III of our Architectural Services Contract, additional compensation is warranted if the project duration extends beyond 24 months. The Contract was fully executed on July 20, 2020 (29 months ago). The current construction schedule estimates a completion date of December 2023. This will result in an overall project term of 41 months (or 17 months beyond the contract term). Higher overhead and wage rates lead us to request additional fee to cover the added cost. II. Additional Fee breakdown The additional fee requested for the above outlined services is as follows: A. Structural redesign coordination 40 hours @ $150/hr. B. Value Engineering 280 hours @ $150/hr. C. Extended project schedule Construction Administration fee Total requested additional fee $6,000.00 42,000.00 22,890.00 $76,890.00 Thank you for your consideration of this request. Please let us know if you have any questions or if additional information would be helpful at this time. We are excited that construction is underway! Sincerely, d,4 Frank W. Callahan, AIA Callahan & Freeman Architects P.O. Box 15577 Fort Worth, TX 76119 817.478.1765 darchitects.com C A l L A H A N F R E E M A N ARCHITECTS October 15, 2021 Brian Glass Property Management Department 401 West 13th Street Fort Worth, Texas 76102 Re: Fort Worth Police Department South Patrol Division Additional A-E Fee Request Dear Mr. Glass: At this point in the progress of the South Patrol Division project, with a bid from the Construction Manager (CM) that is significantly higher than the budget, we believe it is necessary to agree on the course of action required to complete the design for a successful development. We are committed to this completion and we want to work for a strong result for the City of Fort Worth. The process thus far has been delayed several times, caused by contractual decisions and a global pandemic. That pandemic has also caused all prices in the world to escalate, creating a construction market, the likes of which we cannot remember. The CM provided cost estimates at 50% and 9S%, which we believed to be accurate representations of the cost of the building as documented at those stages of the design. At 95%, the cost was seen to be approximately $1,000,000 over the target budget, and Callahan & Freemans Architects and engineering consultants engaged with the CM to reduce cost through strategic changes in the design and the selection of alternate materials and equipment. At the end of that process the design was validated by the CM to be within the budget, with the City shifting some of the budget category totals to increase the building portion to $12,700,000. The CM believed that this amount would be sufficient to cover the final GMP based on 100% documents. The status of the project at this time has a building cost from contractor bids that is $14,647,612, almost 2-million dollars over the established budget. The industry cost increases could not have been anticipated when the allocation of funds was decided for this project. It is clear from our investigations that the original building program will need adjustments and significant design changes will be needed to make the building match the budget in these current market conditions. In light of these developments, C&F respectfully requests additional fee to revise the construction documents. We can make the necessary changes and have already begun exploring the best ways to alter the design to present to the City for confirmation and approval. We do believe, however, P.O. Box 15577 Fort Worih, TX 76119 817.478 1765 cfarchitects.com Fort Worth Police Department South Patrol Division Additional A-E Fee Request October 15, 2021 that the design team should not be held responsible for the effects of the drastic changes in the market conditions. When we have determined the scope of the changes necessary to make the South Patrol Division project viable, we will provide a proposal for additional services fees for your review and consideration. We understand that the additional A/E fees will have to be funded out of the overall project budget, but they will be small compared to the construction cost savings this process will realize. We look forward to finishing the process and to getting construction underway. Thank you for your consideration of this request. Please let us know if you have any questions. We look forward to continuing to work with you to complete a beautiful police facility. Sincere , Frank W. Callahan AIA President Page 2 of 2 C A L L A H A N s F R E E M A N A R C H I T E C T S Callahan & Freeman Architects Hourly Charges for Professional Services Prepared December 2022 Charges include all salaries, salary expense, overhead and profit. 1. Principal Architect $200/hour 2. Project Manager/Architect $150/hour 3. Design/Draftsman $120/hour 4. Clerical $75/hour ATTACHMENT "D" $170/hour $180/hour $135/hour $150/hour $85/hour $90/hour P.O. Box 15577 Fort Worth, TX 76119 817.478.1765 cfarchitects.com