ORDINANCE NO. z
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF WEST BERRY STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT WITH
TEXAS BITULITHIC COMPANY FOR THE CONSTRUCTION OF SAID
IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL
ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN
AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING
THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING
THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF
FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO-
PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE
DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
With Texas Bitulithic Company -for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and
public places in .said City,
WEST BERRY STREET From the west line of Cockrell Avenue to
the east line of University Drive, known
and designated as Unit 3B, Project No.
104-23000-115.
WEST BERRY STREET From the west line Of University Drive to
the east line of Stadium Drive, known and
designated as Unit 4, Project No. 104-
23000-115.
STADIUM DRIVE From the north line of West Berry Street to
the south line of Bellaire Drive North, known
and designated as Unit 5A; Project No.
104-23000-115.
WEST BERRY STREET MMNSION From the north line of West Berry Street to
the west line Of Westcliff Road ;Jest, known
and designated as Unit 5B, Project No.
104-23000-115.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
17ity of Fort Worth, Texas, including Ordinance No. 5913 a portion of the rcst of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and, true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 5913 , and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
'TEXAS, THAT.
Ia
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed,
ii.
The Mayor, be, and he is hereby, directed to issue and execute in the name
cf the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments, The certificates shall be
numbered, shall describe the property against which the assessment has been levied., shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as fcllcwso.
r
III.
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price,
IV,
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
i
PASSED AND APPROVED THIS day of
APPROVED AS TO FORM AND LEGALITY-
City Attorney
UNIT N0. 3B: WEST BERRY STREET FROM COCIM LL AVENUE TO UNIVERSITY DRIVE
to be improved by removing existing brick pavement, curbs and gutters; by utilizing
existing concrete base, widening existing roadway width using a 62 inch reinforced
concrete base on a 4-inch thick foundation course of pit run gravel; by laying a
minimum thickness of 32 inches of hot mix asphaltic concrete surface and binder base
course; by constructing 7-inch high reinforced concrete curbs with 2-foot wide gutters;
by constructing 5-inch thick concrete sidewalks where specified, so that the finished
street will be two 33-foot wide roadways with concrete median strips and necessary
left turn lanes.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHWEST CORNER OF COCKRELL AND WEST BERRY
NORTH SIDE OF STREET FOREST PARK ADDITION
Safeway Stores 10 11 125' Pvmt. $5.28 $660.00
P.O. Box 266 T71r- $660.00
Property Dept.
Dallas, Texas
Marvin Schuster 1 11 Waived due to stipulations of
& Ben Rubin & 77- Sales Contract -0-
Sons, Inc.
3053 University Dr.
UNIVERSITY DRIVE INTERSECTS
SOUTH SIDE OF STREET FOREST PARK ADDITION
C. T. Duncan 8 4 1351 Pvmt- $5.28 $712.80
P.O. Box 231 7rfTr- $712.80
Weatherford, Texas
Mrs. L. T. Swift 16 4 1251 Pvmt- $5.28 $660.00
4250 Westway "E" $660.00
Dallas, Texas
COST TO PROPERTY OWNERS - ASSESSMENTS $ 2,032.80
COST TO CITY OF FORT WORTH 37,065.52
TOTAL COST - UNIT NO. 3B IL9,098.32
UNIT No. 4: WEST BERRY STREET FROM UNIVERSITY DRIVE TO STADIUM DRIVE,
to be improved with 7-inch thick reinforced concrete pavement on a -inch thick lime
stabilized subgrade, with 7-inch high reinforced concrete curbs and 2-foot wide gut-
ters, with 5-inch thick concrete sidewalk where specified, so that the finished
street will be a 58-foot wide roadway with median strip and necessary left turn lanes.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESS16ENT
BEGINNING AT THE NORTHWEST CORNER OF UNIVERSITY DRIVE AND WEST BERRY STREET
NORTH SIDE OF STREET FOREST PARK ADDITION
Texaco. Co., Inc. 8 10 150' Pvmt. $3.31 $496-50
P.O. Box 7655 7rflr- $496-50
76111
City of Fort Worth 1 (Residue) 10 1251 Cb. & Gut. $1.83 $228-75
7rdTr- 1251 Pvmt. 3-31 413.75
1251 walk 1.91 238.75
$881.25
ROGERS STREET INTERSECTS
C. Crutchfield 7 9 125' Pvmt. $3.31 $413-75
Rt. 1, Box 96 7rFr- $413-75
Burleson, Texas
D. T. Miller 1 9 1251 Pvmt. $3.31 $413.75
3071 Wabash 'T
WABASH AVENUE INTERSECTS
worthie Barden 7 8 125' Pvmt- $3.31 $413-75
3070 Wabash 7rdT'_ 102' Walk 1.91 194.82
$6o8-57
John Tarter 1 8 125' Walk $1.91 $238-75
7r
3071 Odessa VI $238.75
ODESSA AVENUE INTERSECTS KENSINGTON ADDITION
Bellaire House Ltd. 7 thru 1 3501 Pvmt- $3.31 $1,158-50
2708 West Berry 12 7 3501 Walk 1.91 668-50
$1,827.00
STADIUM DRIVE INTERSECTS
SOUTH SIDE OF STREET
City of Fort Worth 1 (Residue) 2 1571 Adjusted to
777
r 1571 Walk $ .80 $125.6o
100, Pvmt.,
Cb. & Gut. 2.16 216.90
$341.6o
Earl P. Paris, Jr, 19 2 160, Side Lot
1749 Merrick _TTA_-1 Adjusted to
100' Cb. & Gut- $1.83 $183.00
1001 Pvmt. 3-31 331-00
16o, walk 1.91 305.6o
$819.6o
ODESSA AVENUE INTERSECTS FOREST PARK ADDITION
Alice Langford 7 1 1-,5' Side Lot
3105 Odessa 1" Adjusted to
100' Cb. & Gut $1.83 $183-00
100, Pvmt. 3.31 331-00
125' Walk 1.91 238.75
$752-75
WEST BERRY STREET FROM UNIVERSITY DRIVE TO STADIUM DRIVE "continued"
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
Lilla Walker Fenton 15 1 125' Side Lot
3104 Wabash "B-2" Adjusted to
100' Cb.&Gut, $1.83 $183,00
100' Pvmt. 3.31 331.00
125' Walk 1.91 238.75
$752,75
WABASH AVENUE INTERSECTS
Lorraine Sherley 7 2 125' Side Lot
3101 Wabash 11B-2" Adjusted to
100' Cb.&Gut. $1.83 $183.00
100' Pvmt. 3.31 331.00
125' Walk 1.91 238.75
$752.75
P, M. Hall 15 2 125' Side Lot
3104 Rogers "B-2" Adjusted to
100' Cb.&Gut. $1,83 $183.00
100' Pvmt. 3.31 331.00
125' Walk 1.91 238.75
$752.75 k
1
ROGERS STREET INTERSECTS
City of Fort Worth 8 3 125' Existing
B-2 Facilities $0.00 $000,00
$000.00
Mobil Oil Corp. 16 3 150'Pvmt. $3.31 $496.50
P. 0. Box 900 E-Com. $496.50
Dallas, Texas p
f
I
i
V
I
t
COST TO PROPERTY OWNERS-ASSESSMENTS $ 9,5427
f
COST TO CITY OF FORT WORTH 92,541.80
1
TOTAL COST - UNIT NO. 4 $102.090.07
h
f
I
UNIT NO, 5A: STADIUM DRIVE FROM WEST H1,FRY S'TkEET TO 3ELT,kl"u E DRIVE NORTH
to be improved with 7-inch thick reinfor d concrete pavemenL on a 6-inch thick lime
stabilized subgrade with 7-inch high rej hforced ccncr�le curbs and 2-foot wide gutters,
with 5-inch thick concrete sidewalk when specified, so that 01t, finished roadway will
be 44 feet wide,
BLOCK
OWNER LOT ZONING FRONIAGE RA fE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHEAST CORNER OF WE I' BERRY STREET AND STADIUM DRIVE
EAST SIDE OF STREET KENSINGTON ADDITION
Bellaire House Ltd, I & 12 1 302' PvmL. $3, il $999.62
2708 West Berry ''C" 302' Walk 1,91 576 82
$1,57t,44
BELLAIRE DRIVE NORTH INYERSECITS
WEST SIDE OF STREET J. SMITH SURVEY
Texas Christian Tract 2 "A" 302'llvmt. $3.31 $999.62
University 302'Walk 2.86 863.72
2000-3000 South $1,863.34
University Drive
COST TO PROPERTY OWNERS-ASSESSKLNTS 3,439.78
COST TO CITY OF FORT WORTH 8,506.92
TOTAL COST UNIT NO. 5A ^a 11,946.7
UNIT 5-B; WEST BERRY STREET EXTENSION FLOM WEST.' BERRI STREET TO WESTCLIFF ROAD WEST
to be improved by constructing a 7-inch orhick reinforced concrete pavement on a
6-inch thick lime stabilized subgrade wi'A 7-inch high reinforced concrete curbs
and 2-foot wide gutters, with 5-inch thi.'✓,, concrete sidewalk where specified, so
that the finished street will be two 24- ?._rot wide roadways with median strip and
necessary turn lanes.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTH LINE OF WEST BEF.Ik.Y STREET, PROC;E.EDING SOUTH AND WEST PARALLEL q
PAU ADJACENT TO STADIUM DRIVE AND BELLAIRE DRIVE SOUTH AND TERMINATING AT THE WESTERLY
LINE OF WESTCLIFF ROAD WEST
WEST AND NORTH SIDE OF STREET J, SMITH ( P, VOGN'I" SURVEYS
Texas Christian Tract 2, T. Sm;ch 4148.22 Pvmt. $8.49 $35,218.39
University Survey and fracr 1, 40:6.22 Ch.&Gut. 1.83 7,496.08
2000-3000 South A. Voght Survey 731.0 Walk 2.86 2,090.66
University Drive $44,605.13
Fort Worth, Texas
BELLAIRE DRIVE WEST INTERSECTS_
NORTH SIDE OF STREET BELLAIRE .0DI'L10N
City of Fort Worth 22(Renidue) 1'r 150' Side: Lot
A-I Adjusted ted to
0G, Pvvt. ,
Cu. & Gut. i5,40 $540.00
$540.00
City of Fort Worth, l(Residue) 1 . 150' Side Lot_
A-�h Adjusted to
IUD' Qn r, .
Cb. & Gun. $5.40 $540.00
$540,00
COST TO PROPERTY OWNERS-ASSESSMENTS $_45,88533
COST TO CITY OF FORT WORTH :544.012,03
TOTAL COST - UNIT NO. 5B QW 00 7,16
g,
City of Fort Worth, Texas
Mayor and Council Communication
DATE REFERENCE SUBJECT: 1�iwa�a;1 � � - � pace
0 Nu..R
7/21!69 LKP Street Extension , o;r
Final, Council action on the project described below is requested.
Project Oescri
Name: West Merry Street Extension from Westcliff
!load 'lest to Cockrell Avenue, project loo.
104-23000-115
Contractor: Texas Bitulithit Company
Contract Awarded:: January 22, 1968 (M&C C--1145)
Work Order Issued: January 23, 1968 (parti,,al work order for
storm drain line 1.1 only. Full work order
was issued ,tune 19, 1968.)
Work Order Effective: January 23, 1968
Date of Final Inspection
and Approval: Marcia 31 1963
Working Time, Bid: 220 Working Days
Working Time hued: 206 "Working Days
Project Cost and inancin
Original Bid Price: $452,092.65
Change Order loo. 1: &C C-1218, April. 29, 1968) + 1,201.50
Change Order No. 2: (( 1&C C-1292, August 19, 1968) 4,.308.75
Change Ceder Nos. 3 & 4: (K&C C-1346, October, 28, 1968)'+ 4,691 .85
Cbange Order No. 5 : (M&C C-1346, October 28, 1968),+ 4,831 .00
Change Order lip. 6: (M&C C-1346, October 28, 1968)µ+ 1,594.00
Change Order Nofi 7: (M&C C-1346, October 28, 1968)+ 1,00000
Change Order No. : (M&C C-1420, March 10, 1969) + 7 839 .00
Revised Contract Cost: $477,558.7
Proposed Change Order No. 9: + 1,440.00
Revised Contract Cost: ,$478,998.75
Final Contract Cost: $493,665 .68
Partial Payments Previously Made: 13 Amoun t 4381841 .43
Final Payment ;Due: 54,824.25
Final payment will be made from Project Account No. 104-23000-115 .
Deviations from Bid Pride: An over-run sf $14,666.93 resulted in part
from-,
1) The amount of 6-inch pavement required,
exceeded the estimate resulting in an
additional expense of $7,621.05.
2) The area of concrete driveways required to
'be constructed exceeded the estimate re-
sulting in an additional expense of
$3,107,40.
nre UMRCE �na�f inal Payment - West Berry
7/21,/69 IT-643 Street Extension ,_... or -a _...
3) The amount of li,ste required exceeded the
estimate resulting in an additional cost
of 2,97.40.
The remaining over-run resulted from minor
variations. between° estim,a,ted quantities and
quantities actually measured and used on
the Job site,.
Proposed Change Order No. 9
Proposed Change Order No. 9 provides payment of $1,440.00 for the installation
of cast iron down spouts with removable covers in the sidewalk ,adjacent to the
buildings on the east side of University Drive, between "hest Berry Street and
Bowie Street. The addition of these down spouts was necessary in order to
provide proper drainage and to comply with current city policy.
Oom l,iance°with S ecifications
During testing on this project 28 cdrin ;s were made with the following results:
Berry Street: Exceeds ;Sven with Under Specs but Below
S eC_s Specs Within 'tolerance Tolerance
Paving 14 0 0 0
Sub-grade 10 4 0 0
On Berry Street the average thickness of the pavement is 7.22 inches as compared
to the 7.00 inches specified, and the average thickness of the lime stabilized
subs-grade is 6.07 inches as compared to the 6.00 inches specified.
Stadium Drive: Exceeds Even with Under Specs but Below
Specs. _ S ecs Within "tolerance Tolerance
Paving S 0 0 0
Sub-grade :3 2 0 0
On Stadium Drive the average thickness of the pavement is 6.12 inches as compared
to the 6.00 inches specified, and the average thickness of the lime stabilized
sub-grade is 6.04 inches as compared to the 6.00 inches specified.
Bellaire Drive
South; Exceeds Sven with Under Specs but Below
Sys, S eca_ Within Tolerance Tolerance
Surface 1 S 0 0
Bane 3 6 0 0
4n' Bellaire Drive South the average thickness of the surface is 1.53 inches as
compared to the 1.50 inches specified, and the average thickness of the stabi-
lized base is 6.02 inches as compared to the 6.00 inches specified.
Tests made during construction show, that materials used were in compliance with
the' specifications.
DATE REFERENCE PAGE
NUMBER Final Payment - West Berry
7/21/69 FP-643 Street Extension 3 of —3--
Recommendations
It is recommended that:
1) Change Order No. 9 in the amount of $1,440.00 be approved, thereby increasing
the contract cost to $478,998.75; and,
2) That the above project be accepted by the adoption of an ordinance and final
payment of $54,824.25 be authorized Texas Bitulithic Company from Account
No. 104-23000-115.