Loading...
HomeMy WebLinkAboutContract 57941-CO1FORT WORTH City of Fort Worth Change Order Request Project Namel Westside III 24" Transmission Line Project No.(s)I 56002-0600430-5740010-1780 DOE No. NIA Project Description: CSC No. 57941-CO1 City Sec No. 57941 City Proj. No. 102689 24 Inch Dia. Water Transmission Main along 1-20 from FM 2871 (Chapin Scholl Road) to Ground Storage Tank at Markum Ranch Contractor: I Reyes Group, LTD Change Order: 0 Date: 3/612023 City Project Mgr.1 Walter Norwood City Inspector: I Stephen Martinez Phone Number: 817-392-5026 Phone Number: (682) 432-5485 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Water Totals Contract Time (Calender days) $3,488,888.88 $3,488,888.88 300 $3,488,888.88 $3,488,888.88 300 Amount of Proposed Change Order $32,200.84 $32,200.84 060 Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $3,521,089.72 $3.521,089.72 360 $174,444.00 $174,444.00 $174,444.00 $174,444.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER 0.92% $4,361,111.10 Change Order No. 1 provides traffic control measures along I.H. 20 near the Markum Ranch Road/ Chapin School Road intersection in order to provide a safety buffer between vehicular traffic on the frontage road and a project water main that is under construction in close proximity south of the highway frontage road. Staff recommends the approval of 60 calendar days for the change order. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. tonal 1220 days is provide dot ocm fete td Contractor Name Contractor Signature Date Reyes Group, LTD Marcos G. Reyes _ 03 06.20Z3 Inspector Date Project Manager Date Director Water Dept) Date C struction Supervisor Water Dept) Date Mar 9, 2023 3 2.3 Senior Assistant City Attorney Dale I Assistant City Manager I Date ' M r 13, 2023 baaa 3ma-JAide Mar 20, 2023 Council Action If Required M&C Number N/A M&C Date Appl NIA FORT WORTH City of Fort Worth Change Order Additions Project Name Westside III R' Transmission Line City Sec No. 57941 Project No.(s) 56002-060043O-5740010-1780 DOE No.= City Proj. No. 102689 Project Description 24 Inch Dia. Water Transmission Main along 1-20 from FM 2871 (Chapin Scholl Road) to Ground Storage Tank at Markum Ranch Contractor Reyes Group, LTD Change Order: 0 Date: 3/6/2023 City Project Mgr. Walter Norwood City Inspector F Stephen Martinez AUDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 27 Traffic Control Signage (Signs Purchased, Install) Water 1.00 LS $3,417.42 $3,417.42 28 Traffic Control Signage (Signs Purchased, Remove) Water 1.00 LS $3,417.42 $3,417.42 29 Traffic Control, Channelizing Devices (Install) Water 1.00 LS $1,617.00 $1,617.00 30 Traffic Control, Channelizing Devices (Remove) Water 1.00 LS $1,617.00 $1,617.00 31 Traffic Control - Channelizing Devices (Rental) Water 150.00 DAY $78.93 $11,839.50 32 Portable Electronic Arrow Board Water 300.00 DAY $24.06 $7,218.00 33 Traffic Control,Truck Mounted Attenuator Water 150.00 DAY $163.63 $24,544.50 34 Tab Marker TY W & Y (Install) (WZ(STPM)-23) Water 1.00 LS $1,155.00 $1,155.00 35 Tab Marker TY W & Y (Remove) (WZ(STPM)-23) Water 1.00 LS $1,155.00 $1,155.00 36 Water Filled Barrier Water 150.00 DAY $82.01 $12,301.50 37 Traffic Control Details, PE Stamped Water 2.00 EA $462.00 $924.00 38 Single Ramp Closure Water 2.00 EA $1,443.75 $2,887.50 39 Traffic Control (Maintain) Water 150.00 DAY $67.38 $10,107.00 Page 1 of 1 Water $82,200.84 lAdditions Sub Total 1$82,200.84 FORT' WORTH City of Fort worth MW Change Order Deletions Project Name Westside III 24" Transmission Line City Sec No. 57941 Project No.(s) 1 56002-0600430-5740010-1780 DOE No. NIA City Proj. No. 102689 Project Description 24 Inch Dia. Water Transmission Main along 1-20 from FM 2871 (Chapin Scholl Road) to Ground Storage Tank at Markum Ranch Contractor Reyes Group, LTD j Change Order: 11 J Date 1 316/2023 City Project Mgr. Walter Norwood City Inspector Stephen Martinez DELETIONS ITEM IDESCRIPTION DEPT I Qty JUnit I Unit Cost JTotal 26 1 Construction Allowance lWater I 0.50 LS 1$100,000.00 J$50,000.00 $50,000.00 Page 1 of 1 (Deletions Sub Total J$50,000.00 MIWBE Breakdown for this Change Order Previous Change Orders CO# DATE AMOUNT Total $0.00 Page 1 of 1 3/6/2023 Westside III 24" Transmission Line CSC:57941 CPN:102689 Chanee Order 1 Notes Staff has reviewed the requested pricing and days and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. "�z�'7� Signature Walter Norwood Name of Employee Project Manager Title ATTEST: Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX