HomeMy WebLinkAboutContract 57891-R1CSC No. 57891-R1
FIRST RENEWAL TO CITY SECRETARY
CONTRACT NO. 57891
WHEREAS, on July 27, 2022, the City of Fort Worth ("City") and Woody Contractors,
Inc. ("Contractor"), collectively the ("Parties"), made and entered into City Secretary Contract No.
57891 (M&C 22-0524, June 28, 2022) (the "Contract") for Citywide Storm Drain Improvements,
City Project No.: 100092; and
WHEREAS the Contract may be renewed up to two times, in the amount of $2,000,000.00,
at the same terms, conditions, and unit prices as originally bid; and
WHEREAS prior to any expenditure being incurred, the Transportation & Public Works
Department has the responsibility to validate the availability of funds.
WHEREAS the Contract is approaching the end of its original term;
NOW, THEREFORE, the Parties, hereby agree as follows:
I.
a. The Contract is hereby renewed in the amount not to exceed $2,000,000.00 at the
same terms, conditions, and unit prices as originally bid.
b. Task (work) orders will continue to be issued and remain contingent upon the
availability of funds and the availability of the contractor.
II.
All other terms and conditions of the Contract remain unaffected and in full force and
effect.
IN WITNESS WHEREOF, the City and the Contractor have each executed this First
Renewal by and through each Party's duly authorized signatory, effective as of the date subscribed
by the City's designated Assistant City Manager.
BY:
CITY OF FORT WORTH
William Johnson (Ma 20, 202315:02 CDT)
William Johnson
Assistant City Manager
CONTRACT RENEWAL No. 1 CS NO. 57891
Citywide Storm Drain Improvements, City Project No. 100092
BY:
Woody Contractors, Inc.
TrayftiptMar 16, 2023 15:59 CDT)
Troy Woody
President
OFFICIAL RECORD Page 1
CITY SECRETARY
FT. WORTH, TX
Date:
M a r 20, 2023
APPROVAL RECOMMENDED:
By: Lauren Prieur (Mar 19, 2023 08:12 CDT)
Lauren Prieur
Director, Transportation and Public Works
Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
%%�/Ialz//—
Michael Wellbaum, PE, CFM
Project Manager
APPROVED AS TO FORM AND LEGALITY
By: DBlack Mar20, 202312:29 CDT)
Doug Black
44onn
qa
EORt-.0
Assistant City Attorney
F011.8oA
ATTEST:
O0, �, oo°*�
p
aaa4
neza5apa
Jannette Goodall
City Secretary
CONTRACT RENEWAL No. 1 CS NO. 57891
Citywide Storm Drain Improvements, City Project No. 100092
Date: M a r 16, 2023
Form 1295 No.: 2022-892750
M&C No.: 22-0524
M&C Date: 06/28/2022
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 2
City of Fort Forth Texas
Mayor and COLInCil Comm Unication
DATE* OW20.2 M&C FILE NUMBEW M&C 22-0524
LOG NAME° 20SWM Gl] YWIOE STORIODR AIN IMPROVEIVIEN Uq 2022
SUBJEC
(ALL) Authofizt E xe.cutlon DF a Conlmd. M11 VVGody Conlraek'OM Ina , I in fan Amount Up to $2,000,606.015, for the Ci"da Slo.rm DrWn
improvements Prqeitt with the Opilon to Reriew the Cdntrad Up to Two Times
191 Al! lug M
It Is recommended thAl the City Coiji-w.11 aulborize the execution of a wnlfacl mtl i Woody Conlradors, Inr,. in an amount up to. $2,00a,OCCAO, for
tile -Olywide Storm Main Improvers enit; project. Mvide for contingende5, nrianagQrnontj surveyIng, inspeOon and material lesUng
for a toIW prqezt amoijrit of $2,282,(MO-OD wth the oplian to Fenaw ihg oontrW tip to two firlies under Me isame lern s. conditions and uriji prices
provided Wffident fundiag has been appropriated.
Approval of this Wyar aW Gouridl CommunicMIon (M&C) will alltTlOFiZe t1le eXeG1J11,On of a riIrad for the exteri5ion, replacement, and/or
Impravomarirt of exi:stinq City drainage Infrasiruclure on an on-cail bErsis. Work an individual locations Oil he authorized by wank orders. The cost of
each woik ordfovvill be based Gn Ihe unit prices bid by lha.contra.ctor for the work, Items in the sioNcitation. The maximum curriuWive arrimint0fall
work carders For thin corilrarl will be $2,000,000.00.
-Ria bid amaun15 ciled, In the saftilafian were based an bypothaticalquaritllio� for the puqpctse otesWblishng unilpr[ces fore-edi voork i1ein.
PayTnard for each warit order will be made based an actual measured quanfilies fit those 410 price. Fundijig will bfl verilied individually for each
work ordw prior toits execution.
71 ils project was advertised in the Farr VV4xlh Slar- TakFqrdhl on APFFI 2 1. n22 and Apfll 28, 21122. On May 10, 2022 onn bid was rec.!edved. T h a
term pf The conlmcj wHI be lialil vvqTk is oornplaled, funds are expended, or the expimlion Df five -years, whidiever. occurs firsl-
The mntra(A may he renewed Lip 16 two limes under the same terms, c4nditIonB and unit prim, al Ifie Clitys discietitmi ,
Wddera Amount
Mody Caritraclors. Inc, $-11.:562.750.00
Project Cost Desioription
Amount
Vaoody Conifadws, Jnc,
Canflrigerii*s. Cori structlon Maniqamoni,
Surveying, InspWion Mstrsl Testing
$282.000.00
Total Project Budget
These projects w1li have no Inspect arl the sponwring depnFirnorils Opuraflon a SLIdgOL
Funding is budgeted In the Dra'j"g a Irriprwenierit Projects programmatika project vAlftin Ihe Stomwater Cardtal Prijects Fund for fire purpose of
funding Vallous task order pr*c1s, as apprapusted,
Business Eq uRy - Miady Contractofs, Inc_ Is in oornplIanca Min lh- C Ity's 8951ness Equity Ordinance by conimiffing to 14,W% Busin4ss Equity
porticipallon W tfiIrWf)j6CJ. TfiB City's Business Equity goal on this pitilact is 13%.
The projeris aria Watiod in ALL COUNCIL DISTRICTS,
FtSCAl- INFORMATION I CERTIFICATLO ft,
The filfectur ol Fli iatrice cmftifies Ihaq funds are available in the c..kirrenl capital budget, as pravionly apptopjrlated. In the Stommalor Capilal
ProJects Furth for, the Dramaga ImpmvementF, Projecis pro-grartimableproject to sup"il the approval of the abave recommundailam Mid L-Xerullan
,qf Jilt) I COn , Departmenj har, he rsp t�anqlbllhy to validate the,
traCt. PnQT- tG any experlditure beii;g Incurred, [he Trampailalian A Publir. VWWs
avW[ablIlty nf kinda
Oanal�tjrghdaff 801H
QLWjm-Wrishies IJ n 1 t Head; WlIlarTI johor on 7,904
AdditlpTigjLnfajm2qIqn 1 i#6 Linda Young 246ri
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Woody Contractors Reactive Contract 1 st
Renewal
M&C: 22-0524 CPN: 100092 CSO: 57891 DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Michael Wellbaum
TPW
Mar 16, 2023
2.
Troy Woody
Contractor
Mar 16, 2023
3.
1
4.
Michael Owen
TPW
lo
Mar 18, 2023
5.
Lauren Prieur
TPW
Aw
LLP
Mar 19, 2023
6.
Doug Black
Legal
d
Mar 20, 2023
7.
William Johnson
CMO
Mar 20, 2023
8.
Melissa Brunner
CSO
Mar 20, 2023
9.
Jannette Goodall
CSO
,.2�
Mar 20, 2023
10.
Allison Tidwell
CSO
AT
Mar 21, 2023
11.
TPW—SW—Contracts
TPW SW
CC: Program Manager — Linda Young, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon Team —
Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: [—]YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(&fortworthtexas.gov Call 817-229-3283 with questions. Thank you!