Loading...
HomeMy WebLinkAboutOrdinance 6244 ORDINANCE NO. AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF BLACK TONE DRIVE _ AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT l: Blackstone Drive From Churchill Road to Isbell Road,, known and designated as Unit 1, Project No. 104-24000-198, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six- inch thick cement stabilized subgrade, seven- inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. UNIT 2: Tidwell Drive From Banks Street to Springer Street, known and designated as Unit 2, Project No. 104-24000-195, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. UNIT 3: Quail Trail From Shenna Boulevard to Ohio Garden Road, known and designated as Unit 3, Project No. 104-24000-198, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick driveways where specified. ...................................................................................................... UNIT 4, Robinson Street From NW. 23rd Street to NW. 24th Street, known and designated as Unit 4, Project No. 104-24000-198: to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four -foot wide concrete sidewalk where specified. UNIT 5,1 Robinson Street From NW. 24th Street to NW. 26th Street, known and designated as Unit 5, Project No. 104-24000-198: to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. UNIT 6, McCandless Street From NW. Loraine Street to NW. 32nd Street, known and designated as Unit 6, Project No. 104-24000-198: to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, seven-inch high curb and eighteen-inch concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six- inch thick concrete driveways and four-foot wide concrete sidewalks where specified. UNIT 7, 29th Street From McCandless Street to Titus Street, known and designated as Unit 7, Project No. 104-24000-198: to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalk where specified. UNIT 8, NW. Loraine Street From Titus Street to Sherman Street, known and designated as Unit 8, Project No. 104-24000-198: to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen inch wide concrete gutter, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with S.R.O. ASPHALT. INC. , ARLINGTON, TEXAS and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described , with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: UNIT 1: Blackstone Drive From Churchill Road to Isbell Road , known and designated as Unit 1, Project No. 104-24000-198. The estimated cost of improvements is 37-229.23 —; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is 2.44 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.65 the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ 2.67 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ .30 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 10, 76 plus the cost incurred for concrete driveway construction where specified. A hearing be given and held by and before the City Council of t'e City of Fort o° th, Texas, to all owning or claiming any property abutting upon said portions of highways, streets, avenues and public places , as well as to all, owning or claiming any interest in any such property. Such hearing shall be given and held on the __2,_ day of 19_,ZQ_._, at in the Council Chamber in the City Hall in the City of Fort Worth, Texas , and the City Secretary is hereby directed to give or cause to be given notice of the time and place of such hearing and of other matters and facts in accordance with the to and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas , and known as Chapter 106 of the Acts of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May 12, 1967. Such notice shall be by advertisement inserted at least three (3) times in a newspaper published in the City of Fort Worth, Texas , the first publication to be imnade at least, twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amendecl. Ilie City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places , as well as to all owning or claiming any interest in any such property. Such personal notice shall be in writing and shall be given, or caused to be given by the City Secretary by depositing such written notice in the United States Mail at least fourteen (14) days before the date of the hearing, postage prepaid, in envelopes addressed to all persons o%niing or claiming any interest in the respective properties abutting the high- ways, streets , avenues and public places or portions thereof to be improved, as the names of such persons are shown on the current rendered tax roLls of the City of Fort Worth and at the; addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be improved is listed as %nknmen" on the then current City of Fort Worth tax rolls, or the name of an owner is shown an the City of Fort Worth tax rolls 'but no address for such owner is shown, no notice need ba mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be p •ejmred and filed with these proceedings a list of the properties to be assessed, the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those per-,, sons owning or claiming any interest in said property. . he City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy of the notice of hearing and shall further certify the date or dates on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con., clusive evidence of the facts therein recited,, xzv. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS DAY APPROVED AS TO FORM AND LEGALITY: ze7-"flo City Attorney UNIT 2: Tidwell Drive From Banks Street to Springer Street, known and designated as Unit 2, Project No. 104-24000-198. The estimated cost of improvements is $ 8,474.68 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.44 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5_ 99 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .80 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $-8.03 plus the cost incurred for concrete driveway con- struction where specified. UNIT 3: Quail Trail From Shenna Boulevard to Ohio Garden Road, known and designated as Unit 3, Project No. 104-24000-198. The estimated cost of improvements is $ 19047-4S ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2_44 '; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $5_91 the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .80 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8.35 plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: Robinson Street From NW. 23rd Street to NW. 24th Street, known and designated as Unit 4, Project No. 104-24000-198. The estimated cost of improvements is $ g,894,60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2,44 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.60 the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 of wide concrete sidewalk is $ 2.67 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ 80 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 10_ 71 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 5: Robinson Street From NW. 24th Street to NW. 26th Street, known and designated as Unit 5, Project No. 104-24000-198. The estimated cost of improvements is $ 21.366.95 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $-2.44 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.91 the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ 2.67 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ 80 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $_11,02 plus the cost incurred for concrete driveway con- struction where specified. UNIT 6: McCandless Street From NW. Loraine Street to NW. 32nd Street, known and designated as Unit 6, Project No. 104-24000-198. The estimated cost of improvements is $_ 330519.75 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $-2.44 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5.64 the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .80 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $-8.08 plus the cost incurred for concrete driveway con- struction where specified. UNIT 7: NW. 29th Street From McCandless Street to Titus Street, known and Designated as Unit 7, Project No. 104-24000-198. The estimated cost of improvements is $ 15.047,45 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.44 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5,99 the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .80 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8,43 plus the cost incurred for concrete driveway con- struction where specified. UNIT 8: NW. Loraine Street From Titus Street to Sherman Street, known and designated as Unit 8, Project No. 104-24000-198 The estimated cost of improvements is $ _16,683.70 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 2.44 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ 5,80 the estimated amount per front foot to be assessed against abutting property and the owners thereof for -0- wide concrete sidewalk is $ -0- ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ .80 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 8.24 plus the cost incurred for concrete driveway con- struction where specified. The estimated cos of improvements is $ the estimated amount L 1 per front foot to b assessed against abutting property and the owners thereof for I concrete curb and gut r is $ the estimated amount per front foot to be j assessed estimated property and the owners thereof for pavement is $ the estimated amount per FTont foot to be assessed against abutting property and the owners thereof for wide concrete sidewalk is $ ; the estimated amount per square foot to be 'Assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ per square foot; the total estimated amount per front foot to,, be assessed against abutting property and the owners thereof is $ plu S"""the cost incurred for concrete driveway con- struction where specified. The estimated cost of improvements is the estimated amount per front foot to be assessed against abutting property and tie owners thereof for concrete curb and gutter is $ the estimated amount""'kr front foot to be assessed against abutting property and the owners thereof for pavement is $ the estimated amount per front foot to be assessed against abuttin'k, property and the owners thereof for wide concrete sidewalk is he estimated amount per square foot to be assessed against abutting property and th 6,,,owners thereof for 6-inch thick concrete driveway is $ per square foot;"",t,he total estimated amount per front foot to be assessed against abutting property atn d, the owner's thereof is $ plus the cost incurred for concrete driveway 6qn- struction where specified. Q City of Fort Worth, Texas Mayor and Council Communication, DATE AUEREN E suu irrn Kard of Contract _ Assessment Mot 2;9/70 71663 1 I Council action is requested on the ro ct described below. projectUsIliktion, Nature of Work: Assessment Paving at S Locations on the Northwest Side. Roadway Unit Street Limits Width R.041 1 Blackstone Drive Churchill Drive to Isbell Rod 30 feet 5 0 feet I 2 Tidwell Drive Banks Street to Springer Street 38 feet 50 feet 3 Quail Trail Shenna Boulevard to Ohio Garden ,cued 30 feet 50 feet 4 Robinson Street N.W. 23rd Street to N.W. 24th Street 30 fee's 60 feet 5 Robinson Street N.W. 24th Street to N.W. 26th Street 30 feet 60 feet 6 McCandless Street N04 Loraine Street to W.W. 32nd Street 30 feet, 60 feint 7 N.W. 29th Street McCan4less Street to Sherman Street, 30 feet 60 feet 8 N.W. Loraine Titus Street to Sherman Street 30 feet 60 feet Paving an doses units was petitioned with the exception of Robinson Street thich was initiated as the result of a poll card survey. . Suuluuuui cup _of I Bids The following bids have been received- Bidder ,u uunt Bid, S.I .C . Asphalt, Inc. , Klington, Terns $146,310.75 Austin Gaud Company 1.54,830.80 Ernest Lod 1`701,319.25 Texas 8f tuulfthic Company a 172,491.25 General Construction Clump nyr , 18C ,999.54 Bids ceived; January 15, 19 70 Working Days Allowed: 145 J/'Na DATE REFERENCE SUBJECT: Award of Contract Assessment PAGE NUMBER Paving at 8 Locations on the Northwest 2 2 2/9/70 C-16,63 fide of — Project Cost and Financin Based on the low bid., approximately ately $68,621.84 will be assessed against abutting property owners. The coat to the City-at-large will be approximately $92,320, including engineering expense. A Bond fund °T"ransf r-frout Future Sales of Unspecified Funds is proposed to provide for the City's portion of the cost of the project. Future Sales financing is required because the 1969 bond sale allocation for this purpose has been exhausted. Recommendations It is recoil -nded that: 1) The following bond Fund "Transfers be approved-; Amopat From To Reason $68,621.84 Unspecified 8 Locations on the Property Corners' portion 042-09724-901 Northwest Side of construction cost. 042-10424-198 $91,000.00 Unspecified 8 Locations on the City's portion of con- 104-24000-901 Northwest Side struction, engineering (Future Sales) 104-24000-198-198 and miscellaneous costs. Approximately $1,500 is available in the City cost account, which was estab- lished for preliminary engineering costs. ) An ordinance be adopted: a) Declaring the necessity for and ordering the improvements; b) Making provisions for levying of assessments; c) Directing the Public Works Director to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to S.R.O. Asphalt, Inc. , Arlington, Texas, in the amount of $146,310-75; and., e) Making appropriations to cover the indebtedness thereby incurred for improvements as described above. 3) An ordinance be adopted; a) Approving the estimates of cost and amounts to be assessed; and., b) Setting March 9, 1971, as the date for the Benefit Tearing. UD : Attachments. "A" Resume of Project "B" - Location Maps "C" - Engineers" Preliminary„ Rolls SUBMITTED SY: DISPOSITI±D Y COUNCIL. PROCES BY APPRO'VEO 3 OTHER (DESCRIBE) V � CITY SECRETARY e DATE CITY MANAGER w