Loading...
HomeMy WebLinkAboutContract 57154-CO4CSC No. 57154-CO4 FORT WORTH® City of Fort Worth Change Order Request Project Name Trail Gap Connections City Sec # 157154 Client Project #(s) 101632 Project Description Construction of accessible trails connecting to the existing trail system at two separate locations throughout the city: Arcadia Trail Park to Beach Street (4859- 4899 Seneca Dr, Fort Worth, TX 76137) and Buck Sansom Park to HWY 820 (3600 Sansom Park Dr, Fort Worth, TX 76106) Contractor 2L Construction, LLC Change Order # 4 Date 3/2/2023 City Project Mgr. Robert Kevin Rodriguez City Inspector Jason Bradley Dept. PARD Totals Contract Time CD Original Contract Amount $1,386,580.00 $1,386,580.00 180 Extras to Date $54,675.00 $54,675.00 80 Credits to Date Pending Change Orders (in M&C Process) $1,441,255.00 $1,441,255.00 260 Contract Cost to Date Amount of Proposed Change Order $291,970.00 $291,970.00 178 Revised Contract Amount $1,733,225.00 $1,733,225.00 438 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding (if necessary) $291,970.00 $291,970.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 25.00% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $1,733,225.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER ► During construction, it was determined that a change order #4 would be needed due to the following: • Alternative traffic signal foundations were required • Replacement of manhole top was necessary • The installation of a new communication box • Additional quantities of contrast crosswalk striping beyond what was originally accounted for • The opportunity for a bridge and an additional 0.1 miles +/- of recreational trail to be constructed and renovated further along at Arcadia Trail South Extension ► The additional scope of work will increase the contract time from 260 calendar days to 438 calendar days. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring; and administration of this contract, including ensuring all performance and reporting; requirements. ontractoes Company Namel EContractor (NamM Contract Si natu 2L Construction, LLC Chip Fisher OAL IF Date I Mar 3, 2023 Inspectolfinspection Supervisor Date Project and Contract Compliance Manager Date 8-9- Mar9,2023.Xe� Mar2,2023 Program Manager Date Senior Capital Project Officer Date /1-2.-1 Mar9,2023 s P Mar 13,2023 Assistant Director (Dept) Date Director, Contracting Department (Dept) Date Mar 13, 2023 Assistant City Attorney Date JAssistant Cit Manager Date Mar 15, 2023 Mar 24, 2023 OIL Council Action if required) ATTEST: a -&g Jannette Goodall, City Secretary M&C Number I M&C 23-0134 WE M&C Date Approved 2/14/2023 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth IV- Change Order Additions Project Name Trail Gap Connections City Sec # 57154 Client Project# 101632 Contractor 2L Construction, LLC PM Robert Kevin Rodriguez Inspector Jason Bradley Change Order Submittal # ® Date 3/212023 ADDITIONS TEM DESCRIPTION UEF I Qty Unit Unit st Total 1 MOBILIZATION (Arcadia Trial South Extension) PARD 1.00000000 LS $59,192.50 $59,192.50 4 REMOVING CONCRETE PARD 470.00000000 SY $22.00 $10,340.00 5 REMOVING TREES PARD 7.00000000 EA $550.00 $3,850.00 10 ADJUST SS MANHOLE (Replacement) PARD 1.00000000 EA $2,500.00 $2,500.00 27 CONCRETE SIDEWALK (5' Reinforced) PARD 4,550.00000000 SF $7.00 $31,850.00 28 CONCRETE CURB & GUTTER PARD 82.00000000 LF $25.00 $2,050.00 30 RIPRAP PARD 10.00000000 CY $150.001 $1,500.00 34 GUARDRAIL (Removal) PARD 14.00000000 LF $25.00 $350.00 38 TRAFFIC SIGNALS (Spread Footer Foundation) PARD 2.00000000 EA $3,900.00 $7,800.00 39 TRAFFIC CONTROL PARD 1.00000000 LS $6,000.00 $6,000.00 43 SOIL RETENTION BLANKET PARD 1,635.00000000 SY $2.00 $3,270.00 47 CONTRAST CROSSWALK STRIPING PARD 343.00000000 LF $40.00 $13,720.00 new COMMUNICATION BOX PARD 1.00000000 EA $700.00 $700.00 new ICLEARING & GRUBBING PARD 7,500.00000000 AC $1.57 $11,775.00 new TRAIL CLOSED SIGN (Install & Remove) PARD 2.00000000 EA $300.00 $600.00 new EROSION CONTROL PARD 1.00000000 LS $16,240.00 $16,240.00 new NATIVE SEEDING PARD 38,300.00000000 SF $0.40 $15,320.00 new TEMPORARY IRRIGATION PARD 38,300.00000000 SF $0.28 $10,724.00 new UNCLASSIFIED EXCAVATION (Moved to On -Site Fill) PARD 222.00000000 CY $36.00 $7,992.00 new UNCLASSIFIED EXCAVATION (Hauled Off -Site) PARD 2,800.00000000 CY $35.00 $98,000.00 new DRAIN HEADWALLS & WINGWALLS (18-inch RCP) PARD 2.00000000 EA $1,400.00 $2,800.00 new DRAINAGE PIPE (18 Corrugated HDPE Pipe) PARD 50.00000000 LF $75.00 $3,750.00 new BRIDGE DECK PARD 440.00000000 SF $35.00 $15,400.00 new ABUTMENT WALLS PARD 2.00000000 EA $15,600.00 $31,200.00 new STEEL I -BEAM PARD 5.50000000 TON $5,500.00 $30,250.00 PARD $387,173.50 Sub Total Additions $387,173.50 Change Order Additions Page 2 of 4 FORT City of Fort Worth Change Order Deletions Project Name Trail Gap Connections City Sec # 57154 Client Project# 101632 Contractor 2L Construction, LLC PM Robert Kevin Rodriguez Inspector Jason Bradley Change Order Submittal # ® Date 3/2/2023 DELETIONS Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub I Type of Service Amount for this CO Maintaining commitment on original agreement of 20.65% Total $0.00 Previous Change Orders CO# DATE AMOUNT 1 7/27/2022 $17,660.00 2 8/24/2022 $15,600.00 3 11 /2/2022 $21,415.00 Total $54,675.00 M&C Review Page 1 of 2 A CITY COUNCIL AGEND Create New From This M&C DATE: 2/14/2023 REFERENCE **M&C 23- NO.: 0134 CODE: C TYPE: CONSENT Official site of the City of Fort Worth, Texas FoRT WORTH 80 TRAIL GAP LOG NAME: CONNECTIONS —CHANGE ORDER #4 PUBLIC NO HEARING: SUBJECT: (CD 2 and CD 4 / Future CD 2 and CD 4) Authorize Execution of Change Order No. 4 to City Secretary Contract No. 57154, in the Amount of $291,970.00, with 2L Construction, LLC, for the Trail Gap Connections Project, Increasing the Total Contract Amount to $1,733,225.00 for Additional Scope of Work (2018 Bond Program) RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No. 4, in the amount of $291,970.00, to City Secretary Contract No. 57154, a construction contract with 2L Construction, LLC, increasing the total construction contract amount to $1,733,225.00 and adding 178 days to the contract time. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the execution of Change Order No. 4, in the amount of $291,970.00 to City Secretary Contract No. 57154, a construction contract with 2L Construction, LLC, increasing the total contract amount to $1,733,225.00. On December 14, 2021, City Council authorized the execution of a construction contract with 2L Construction, LLC, in the amount of $1,386,580.00 for construction of Trail Gap Connections (M&C 21-0998). After the award of construction, it was determined that a new bridge and an additional 0.1 miles +/- of recreational trail should be constructed at Arcadia Trail Park, south extension. Construction of Trail Gap Connections began in April 2022 and was substantially completed in January 2023. The additional scope of work will increase the contract time from 260 calendar days to 438 calendar days. This project is included in the 2018 Bond Program. Available resources within the General Fund will be used to provide interim financing until debt is issued. Once debt associated with the project is sold, bond proceeds will reimburse the General Fund in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance No. 23209-05-2018) and subsequent actions taken by the Mayor and Council. Funding is budgeted in the Park & Recreation Department's 2018 Bond Program Fund for the purpose of funding the Trail Gap Connection project, as appropriated. 2L Construction, LLC agrees to maintain its initial M/WBE commitment of 20.65\% that it made on the original contract and extend and maintain that same M/WBE commitment of 20.65\% to all prior change orders up to and inclusive of this Change Order No. 4. Therefore 2L Construction, LLC remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. The Trail Gap Connections project is located in COUNCIL DISTRICTS 2 and 4 / FUTURE COUNCIL DISTRICTS 2 and 4. http://apps.cfwnet.org/council_packet/mc review.asp?ID=30760&councildate=2/14/2023 3/24/2023 M&C Review Page 2 of 2 FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the 2018 Bond Program Fund for the Trail Gap Connections project to support the approval of the above recommendation and execution of the change order. Prior to an expenditure being incurred, the Park & Recreation Department has the responsibility of verifying the availability of funds. Fund Department ID Account Project ID Program Activity Budget Year Reference # (Chartfield 2) Amount FROM Fund Department Account Project Program Activity Budget ount Reference # Am ID ID Year (Chartfield 2) Submitted for City Manager's Office by: Jesica L. McEachern (5804) Originating Department Head: Dave Lewis (5717) Additional Information Contact: Joel McElhany (5745) ATTACHMENTS MAP Arcadia Trail South Extension.docx (Public) 101632 Trail Gap Connections APC approved 221229 rz.pdf (CFW Internal) 2L Form 1295.pdf (CFW Internal) 80 TRAIL GAP CONNECTIONS CHANGE ORDER #4 funds availability.pdf (CFW Internal) 80 TRAIL GAP CONNECTIONS CHANGE ORDER #4 Updated FID.xlsx (CFW Internal) SAM SearchResults 2.pdf (CFW Internal) TRAIL GAP Change Order #4 Electronic Routing.xlsm (CFW Internal) http://apps.cfwnet.org/council_packet/mc review.asp?ID=30760&councildate=2/14/2023 3/24/2023