Loading...
HomeMy WebLinkAboutContract 57419-A1CSC No. 57419-Al AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 57419 WHEREAS, the City of Fort Worth (CITY) and HDR Engineering, Inc., (ENGINEER) made and entered into City Secretary Contract No. 57419, (the CONTRACT) which was authorized by M&C 22-0183 on the 8th day of March, 2022 in the amount of $353,658.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Contract 2020 WSM-E, CPN 103360; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $130,514.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $484,172.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas [W&SS Contract 2020, WSM-E] Prof Services Agreement Amendment Template [1033601 Revision Date: November 23, 2021 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Dana Burghd off (M r 27, 20 :25 CDT) Dana Burghdoff Assistant City Manager DATE: Mar 27, 2023 APPROVAL RECOMMENDED: Christopher arder (Mar 21, 2023 16:38 CDT) Christoher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER HDR Engineering, Inc. Luc s . Bathurst, P.E. Vice President DATE: 03/20/2023 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 61 Abolfazl Zakersalehi, P. E. Project Manager APPROVED AS TO FORM AND LEGALITY: Mack (Mar 27, 202314:06 CDT) Douglas W. Black Sr. Assistant City Attorney ATTEST: U Jannette Goodall City Secretary "7 O0 0� 0 O Pv0 0 0 °°004 � o °000000 .c/ ?EXASaaa M&C: 23-0186 Date: 02/28/2023 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas [W&SS Contract 2020, WSM-E] Prof Services Agreement Amendment Template I1033601 Revision Date: November 23, 2021 Page 2 of 2 F)2 hdrinc.com March 15, 2023 City of Fort Worth — Water Department 311 W 10th Street Fort Worth, Texas 76102 RE: Water and Sanitary Sewer Replacement Contract 2020, WSM-E City Project Number: 103360—Amendment No. 1 Dear Mr. Zakersalehi, We are pleased to confirm that HDR Engineering has received your request via email dated October 17, 2022, to perform professional engineering services for additional segments related to water and wastewater pipeline replacements for the City of Fort Worth. We would like to inform you that the original contract, signed on April 18, 2022, will be amended to include the additional segments. The work on these additional segments will be carried out in parallel with the original segments, and we assure you that our team will strive to complete all work in a timely and efficient manner. Additional segments' locations and scope of works are followed. Exhibit A-1 through A-3 illustrate the scope of work and limit of each segment. Location From To W (LF) WW (LF) Scope of Work Segment between Milam and Mims St, Beaty St. Van Natta Ln. N/A 520 Sewer Beaty St. Milam St. Warren Ln. N/A 1,285 Sewer Major St. Beaty St. I Craig St. 1,135 490 Water/Sewer Van Natta Ln. Milam St. I Mims St. 990 885 Water/Sewer TOTAL 2,125 3,180 HDR Engineering propose additional lump sum fee of $130,514.00 as detailed in Exhibit B forthis Amendment. This lump sum fee includes full compensation for services described, as well as necessary labor, materials, supplies, and equipment. The fee is inclusive of taxes or additional fees. Summary of Contract Fee Original Contract Amount $353,658.00 Amendment No.1 (This Amendment) $130,514,00 Revised Contract Amount $484,172.00 Please feel free to contact us with any question or concerns you may have. SLucaA. Bathurst, PE Vice President 17111 Preston Road, Suite 300, Dallas, TX 75248-1232 (972)960-4400 EXHIBIT A SCOPE OF SERVICES DESIGN SERVICES FOR FORT WORTH WATER/WASTEWATER REPALCEMENT CPN 103360 — CONTRACT 2020, WSM-E AMENDMENT #1 ADDITIONAL ENGINEERING SERVICES 1.0 PROJECT UNDERSTANDING HDR Engineering, Inc. (CONSULTANT) entered into a contract with the City of Fort Worth (OWNER) on April 18, 2022, for professional engineering services of water and wastewater pipeline replacements. Additional engineering services, under Amendment No.1, are being added to the original contract and will be completed in parallel with the original segments. 2.0 SCOPE OF WORK Per OWNER request, HDR will skip 30% set of plans submittal for an additional segments under this Amendment and will deliver 60% set of plans along with original segments. Additional segments' locations and scope of works are followed; Location From To W (ILF) WW (LIF) Scope of Work Segment between Milam and Mims St. Beaty St. Van Natta Ln. 520 Abandon WW Beaty St. Milam St. Mims St. 1,285 Replacement Major St. Beaty St. Craig St. 1,135 490 Replacement Van Natta Ln. Milam St. Mims St. 990 885 Replacement TOTAL 2,125 3,180 City of Fort Worth does not have easement for wastewater segment between Milam Street and Mims Street, therefore, HDR will not perform topographic survey for this segment. HDR will provide abandonment sheet for this segment, redesign wastewater main at Beaty Street to accommodate flow, and will recommend wastewater laterals relocation. 3.0 COMPENSATION The CONSULTANT shall be compensated a total lump sum fee of $130,514.00 as summarized in Exhibit B. The total lump sum fee shall be considered full compensation for the services described in Exhibit A, including all labor, materials, supplies, and equipment necessary to deliver the service. The CONSULTANT shall be paid monthly payments, as described in the original contract. 4.0 SCHEDULE CONSULTANT will complete design phase of the original contract and Amendment No. 1 within 12 months of the Notice to Proceed. Attached Exhibit C is a detailed revised schedule for the original contract and Amendment No. 1. m N A W 71 IJ IJ N N Z C7 C1 W W n TDU)m21 C7 U7-0� c) 3a 0 o w Dw'�c S: o; o 5 � = o m'm m :vv7'om T O° C) 0 D o a m » o °1 p1 u1Di » m m a c 3 3 J o O f o O J° O N O N W Q O N y �m > p m 3cf) J 3 m J `°° c ° n� m i o S�^`O �m `.� m o m 3 o O O d J n p, tit N o O J° d J o J O d J m d m m w o p N A A m A A W m o w V w a N � � J O N A m A A A m N OD m A A A O 00 O O N W W � •-� N A U m m tp V m O W O O W V r �-J V N m � D O O W A 0 0 O N p w � C N Wn N A Ul O O O O O m m N N N N N 0 b W V O 0 0 0 o F^ D 3 N N N N O W O N O w_ r m W W t0 W N N cD m N N ffp� N W m t�0 N t�0 N V v o O Ou U i Vi ffl O O O j m V O U A Hi O O (D tp A 00 W O. O N Ncn O O O W A W C m a 0 0 0 0 o O Z O N d J C� m 0 0 0 0 o K m 0 0 0 0 0 a m f0 0 0 0 0 o O a c p J --I O d_ m ff1 O U O fo O fo Ho O O Hi ffl O O O T fo O O 8 -o O M O -o -o 0 0 -o t 0 0 O 2 E33 O T O -o O -o O d1 O o ° x N � H N J N N F C W W (O W N t0 m N N N V W m N (�O <WD Oo N N 'o - m � O A -� O t0 4O A m W O O N t0 N 0 0 O m W O A p1 — > < D 2s E� �' a:0 Ill z ') = o 3 m so = .' m 7 < ;o,(n ITIW Zi m m° —1 *k �% N G1 0 O m W m 0 Z CD N O N O / ((} > ° ( 2{ \\\7 \ } \00 _ }/ /\\ , _\ #� 9e £w ,_«,�-,», \}{\�}\}[ (§ k Est/{®/(\ yo \\ ;22>®2 ; f; m (�E �\ ( # %() ) 0 / 7 }0 , _ f ee0 ID \ / J£ J \ n E \ § \ k ( / 2 ° g k « \ n >ƒ.0�E _ » -0 0% . °§\gym \c°»mf q ID) » 2 2 can {>� 0 rL S ; _ § ; Q g / o m a 2a § _ EL 0 \ k§co j § � e� _ com, 0: � , } e § m ( [ \ . d ` # # # m m / J I-J �J f \ {\ k § _ 0 @t k \� /\$ / f2 MAYOR AND COUNCIL COMMUNICATION MAP City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, February 28, 2023 REFERENCE NO.: **M&C 23-0186 LOG NAME: 60WSSC20WSMEAl-HDR SUBJECT: (CD 5 / Future CD 5) Authorize Execution of Amendment No. 1 in the Amount of $130,514.00 to an Engineering Agreement with HDR Inc. for the Water and Sanitary Sewer Contract 2020 WSM-E, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of Amendment No. 1 in the amount of $130,514.00, to City Secretary Contract No. 57419, an engineering agreement with HDR Engineering, Inc. for the Water and Sanitary Sewer Contract 2020 WSM-E project for a revised contract amount of $484,172.00; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $130,514.00, transferred from available funds within the Water and Sewer Fund, for the purpose of funding the Water and Sanitary Sewer Contract 2020 WSM-E project (City Project No. 103360) and to effect a portion of Water's contribution to the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: On March 8, 2022 Mayor and Council Communication (M&C) 22-0183, the City Council authorized an engineering agreement in the amount of $353,658.00 with HDR Engineering, Inc. (City Secretary Contract No. 57419) for the Water and Sanitary Sewer Contract 2020 WSM-E project. Amendment No. 1 will provide for additional survey and design for the replacement of the deteriorated water and sanitary sewer mains on the following streets located in the immediate vicinity of the project: Street From To Scope of Work Major Street Beaty Street Craig Street Water/Sewer Street Beaty S Milam Street Warren Lane Sewer Easement Between Milam Street and Mims Street Beaty Street Van -Na tta Lane Sewer FanNatta Lane Milam Street Mims Street Water It is the practice of the Water Department to appropriate its CIP plan throughout the fiscal year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows: 60WSSC95A3-2MA Capital Revised Fund Project FY2023 CIP Authority Budget Change FY2023 Name Name Appropriations (Increase/Decrease) Budget Water Fund and 56002 - Sanitary W&S Sewer $0.00 This M&C $130,514.00 $130,514.00 Capital Contract Projects 2020 WSM-E Funding is budgeted in the Transfer to Water/Sewer account of the Water and Sewer operating budget for the purpose of funding the Water and Sanitary Sewer Contract 2020 WSM-E project within the Water & Sewer Capital Projects Fund. Appropriations for Sanitary Sewer Rehabilitation project are as depicted below: Fund Existing AppropriationsFAPP Aditional ropriations Project F Total* W&S Capital Projects - Fund 56002 $518,133.00 $130,514.00 $648,647.00 Project Total F $518,133.00 $130,514.00 $648,647.00 *Numbers rounded for presentation purposes. Business Equity: HDR Engineering, Inc. is in compliance with the City's Business Equity Ordinance by committing to 13 percent Business Equity participation on this project (Amendment 1). The City's Business Equity goal on this project is 10 percent. This project is located in COUNCIL DISTRICT 5/FUTURE COUNCIL DISTRICT 5. FISCAL INFORMATION I CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the Water and Sanitary Sewer Contract 2020 WSM- E project. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs),: TO Fund Department ccount Project Program Activity Budget Reference # mount ID ID Year (Chartfield 2) FROM Fund Department ccoun Project Program ctivity Budget Reference # mount': ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Abolfazl Zakersalehi (8695) ATTACHMENTS 1. 60WSSC20WSMEAl-HDR Compliance Memo.pdf (CFW Internal) 2. 60WSSC20WSMEA1-HDR FID Table (WCF 01.04.23).xlsx (CFW Internal) 3. 60WSSC20WSMEA1-HDR Form 1295.pdf (CFW Internal) 4. 60WSSC20WSMEAl-HDR funds availability pdf (CFW Internal) 5. 60WSSC20WSMEA1-HDR MAP.pdf (Public) 6. 60WSSC20WSMEA1-HDR SAM.pdf (CFW Internal) 7.ORD.APP60WSSC20WSMEAI-HDR 56002 AO23(r2).docx (Public) 8. PBS CPN 103360.pdf (Public)