HomeMy WebLinkAboutContract 58274-A1CSC No. 58274-Al
AMENDMENT No.1
TO CITY SECRETARY CONTRACT No. 58274
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and
Associates, Inc., (ENGINEER) made and entered into City Secretary
Contract No. 58274, (the CONTRACT) which was authorized by M&C 22-0779 on
the 27th day of September, 2022 in the amount of $ 136,836.00; and
WHEREAS, the CONTRACT involves engineering services for the
following project:
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.,
CPN 104218; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement,
which amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and
incorporated herein. The cost to City for the additional design services
to be performed by Engineer totals $12,640.00. (See Attached Funding
Breakdown Sheet, Page -4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $149,476.00.
3.
All other provisions of the Contract, which are not expressly
amended herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 1 of 4
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
APPROVED:
City of Fort Worth
William Johnson (Ma 28, 2023 08:39 CDT)
William M. Johnson
Assistant City Manager
DATE: Mar 28, 2023
APPROVAL RECOMMENDED:
ENGINEER
Kimley-Horn and Associates, Inc.
balistid
Scott R. Arnold
Vice President
DATE: February 28, 2023
Lauren Prieur (Mar 19, 2023 08:11 CDT)
Lauren L. Prieur, P.E.
Director, Transportation and Public Works Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
David J. Kastendick, P.E.
Project Manager
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 2 of 4
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
APPROVED AS TO FORM AND LEGALITY:
DBlack (Mar 27, 2023 10:29 CDT)
Douglas W. Black
Sr. Assistant City Attorney
ATTEST:
Jannette Goodall
City Secretary
M&c : N/A
Date: 2/28/23
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 3 of 4
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
Department
TPW
FUNDING BREAKDOWN SHEET
City Secretary No. 58274
Amendment No. 1
Fund -Account -Center Amount
34018-0200431-5330500-104218-003830-9999-18010201
$12,640.00
Total: $12,640.00
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: November 23, 2021
Page 4 of 4
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
Kimley»>Horn
February 28, 2023
David J. Kastendick, P.E.
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
Re: CSN 58274 Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
Amendment 1
Dear Iskal:
Page 1
Kimley-Horn and Associates, Inc. ("ENGINEER") is pleased to submit this amendment letter proposal
to the City of Fort Worth ("CITY") for providing additional services consisting of bid phase services for
a new unit price paving construction contract.
Scope of Services
ENGINEER will provide the services specifically set forth in the attached Attachment A.
Schedule
ENGINEER will provide our services within a mutually agreed upon timeframe.
Compensation
Refer to the attached Attachment B for the Compensation.
We appreciate the opportunity to provide these services to you. Please contact me if you have any
questions.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
By: Scott R. Arnold, P.E.
Vice President
kimley-horn.com
801 Cherry Street, Unit 11, Suite 1300, Fort Worth, Texas 76102
817 335 6511
FORT WORTH.
ATTACHMENT "A"
Scope for Engineering Design Related Services for
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
Amendment 1
The scope set forth herein defines the work to be performed by the ENGINEER in completing
the project. Both the CITY and ENGINEER have attempted to clearly define the work to be
performed and address the needs of the Project.
OBJECTIVE
The objective of this project is to prepare a project manual and support the CITY in bidding
phase services for a new unit price construction contract for paving improvements.
WORK TO BE PERFORMED
Task 1. Bidding Phase Services
City of Fort Worth, Texas
Attachment A
PMO Release Date: 07.23.2012
Page 1 of 3
Page 1 of 3
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
FORT WORTH:,
TASK 1. BIDDING PHASE SERVICES.
ENGINEER will support the bid phase of the project as follows.
1.1. Bidding Phase Services
• The ENGINEER will attend a kick-off meeting with the CITY.
• The ENGINEER will review and revise the bid item listing used in the previous unit
price construction contract based on discussions with CITY during the kick-off
meeting.
• The ENGINEER will assemble the draft Project Manual using the CITY's latest
specifications.
• The ENGINEER will meet with the CITY to review the draft Project Manual.
• The ENGINEER will incorporate CITY comments and finalize the Project Manual.
• The ENGINEER will upload the final Project Manual to BIM.
• The ENGINEER will maintain the plan holder's list on BIM.
• The ENGINEER will attend the prebid conference in support of the CITY.
• The ENGINEER will develop and implement procedures for receiving and
answering bidders' questions and requests for additional information. The
procedures shall include a log of all significant bidders' questions and requests
and the response thereto. The log shall be housed and maintained in the project's
Buzzsaw folder titled Request for Information. The ENGINEER will provide
technical interpretation of the contract bid documents and will prepare proposed
responses to all bidder's questions and requests, in the form of addenda. The
ENGINEER shall upload all approved addenda onto Buzzsaw and mail addenda to
all plan holders.
• Attend the bid opening in support of the CITY.
• Tabulate and review all bids received for the construction project, assist the CITY
in evaluating bids, and recommend award of the contract.
• Incorporate all addenda into the contract documents and issue conformed sets.
• Prepare monthly invoices and project status reports.
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 2 of 3
Page 2 of 3
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
FORT WORTH.
ASSUMPTIONS
• The project will be bid only once and awarded to one contractor.
• Project Manuals will not be printed and made available for purchase by plan
holders and/or given to plan viewing rooms.
• Project duration is anticipated to be three (3) months.
• Preparation of new specifications is not included in this scope.
DELIVERABLES
A. Addenda
B. Bid tabulations
C. Recommendation of award
D. Project Manuals (conformed)
City of Fort Worth, Texas
Attachment A
PMO Release Date: 02.06.2015
Page 3 of 3
Page 3 of 3
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
ATTACHMENT B
COMPENSATION
Design Services for
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
City Project No. 104218 — Amendment 1
Time and Materials with Rate Schedule Project
I. Compensation
A. The ENGINEER shall be compensated in an hourly amount not -to- exceed
$12,640 for personnel time, non -labor expenses, and subcontract expenses in
performing services enumerated in Attachment A as follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Category Rate for the ENGINEER's team member performing the work.
Labor Category Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries,
overhead, and profit.
Labor Category Rate
($/hour)
Senior Project Manager $280
Senior Professional $260
Project Manager $220
Professional $185
Analyst III $165
Analyst II $155
Analyst I $150
Business Support $120
Administrative $105
Intern $90
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall
be reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work
within the budget and will keep the City informed of progress toward that end so
that the budget or work effort can be adjusted if found necessary.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 1 of 4
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
B-1
ATTACHMENT B
COMPENSATION
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may
be adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by
the City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER
in performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 2 of 4
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
B-2
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility Fee Amount
Prime Consultant
Kimley-Horn and Bidding Phase Services $12,640 100%
Associates, Inc.
Proposed MBE/SBE Sub -Consultants
Non-MBE/SBE Consultants
TOTAL $12,640 100%
Project Number & Name Total Fee
Design of Sidewalk Improvements at
Campus Dr. and E. Seminary Dr. (City
Project No. 104218) — Amendment 1
$12,640
MBE/SBE Fee MBE/SBE
$0 0%
City MBE/SBE Goal = 13% Consultant Committed Goal = 13%
City of Fort Worth, Texas
Attachment B
PMO Official Release Date: 8.09.2012
Page 3 of 4
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104218
B-3
Task No.
Task Description
Senior Project
Manager/Project
Director
Senior
Professional /
Senior Project
Engineer
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
City Project No. 104218 - Amendment 1
Labor (hours)
Professional /
Project Analyst III / Analyst II /EIT Analyst I / EIT
Manager Project EIT III II I Admin
Engineer
1.0 Bidding Phase Services
1.1 Kick-off Meeting with City
1.2 Review and Revise Bid Items
1.3 Assemble Project Manual
1.4 Review Meeting with City
1.5 Address City Comments
1.6 Upload Documents to BIM
1.7 Maintain Plan Holder List
1.8 Prepare for and Attend Prebid Conference
1.9 Issue Addenda (1 each)
1.10 Attend Bid Opening
1.11 Prepare Bid Tabulation
1.12 Prepare Conformed Project Manuals for Execution (2 each)
1.13 Prepare Monthly Invoices (3 each)
1.14 Prepare Monthly Status Reports (3 each)
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
Rate $280
$260
8
0
Totals 8
$220
185
$150
$140
$135
$105
25
0
39
3
0 0
5
6
2
2
2
2
1
1
2
1
16
6
2
4
2
6
1 3
25 0 39
01
Total Labor
Cost
Subconsultant
SBE
Expense
Non-SBE
Travel
Fees
Total Expense Task Sub Total
Cost
$12,640
$280
$1,205
$3,630
$280
$1,490
$280
$370
$370
$1,210
$185
$745
$1,490
$500
$605
$12,640
$0
$o
0
$0
sol sol sol $o
$0
$12,640
$0
$280
$0
$1,205
$0
$3,630
$0
$280
$0
$1,490
$0
$280
$0
$370
$0
$370
$0
$1,210
$0
$185
$0
$745
$0
$1,490
$0
$500
$0
$0
$605
$12,640
Project Summary
Total Hours 75
Total Labor $12,640
Total Expense $0
MBE/SBE Subconsultan $0
Non-MBE/SBE Subconsultan $0
10% Sub Markup $0
MBE/SBE Participation 0.0%
Total Project Cos I $12,640
Design of Sidewalk Improvements at Campus Dr. and E. Seminary Dr.
CPN 104
1 of 1
M&C: N/A
Date: N/A
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Campus Dr & E Seminary Dr
Sidewalk Amend 1
CPN: 104218 CSO: DOC#:
To: Name
l . David Kastendick-Signature
2. Chad Allen -Review
3. Lissette Acevedo -Review
4. Michael Owen -Review
5. Lauren Prieur-Signature
6. Doug Black -Signature
7. William Johnson -Signature
8. Jannette Goodall
9. TPW Contracts
10. Misty Davila
Department
TPW
TPW
TPW
TPW
TPW
Legal
CMO
CSO
TPW
TPW
D Q.Y
CA
MMO
LLP
dwb
dwb
WJ
JSG
Initials Date Out
Mar 8, 2023
Mar 14, 2023
Mar 17, 2023
Mar 18, 2023
Mar 19, 2023
Mar 27, 2023
Mar 28, 2023
Mar 28, 2023
NOTE: Already signed by the consultant CC: Misty Monique Davila, TPW BSPAP Recon
Team, TPW Records Room,
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and
all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will
review and take the next steps.
NEEDS TO BE NOTARIZED: OYES No
RUSH: OYES No SAME DAY: DYES No NEXT DAY: DYES No
ROUTING TO CSO: ®YES No
Action Reauired:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
1
['Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContractsnuu,fortworthtexas.gov for pickup when complete. Call ext.