HomeMy WebLinkAboutContract 55356-FP1-FP1 FORT WORTH. City Secretary Contract No. 55356 Date Received 4/6/2023 UVI NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Watersbend South Phase 3B City Project No.: 102847 Improvement Type(s): x❑ Paving ❑ Drainage ❑ Street Lights ❑ Traffic Signals Original Contract Price: $817,220.45 Amount of Approved Change Order(s): Revised Contract Amount: Total Cost of Work Complete: $817,220.45 Chad San Juan(Apr 6,202308:57 CDT) Contractor VP - Contract Administration Title Glen Thurman, Inc. Company Name Jesse avis (Apr 6, 023 09:01 CDT) Project Inspector Project Manager 9lL.,lr. Rebecca Diane Owen (Apr 6, 202310:28 CDT) CFA Manager Lauren Prieur (Apr 6, 202310:50 CDT) TPW Director William Johnson (Ap 6. 202314,24 CDT) Asst. City Manager Apr 6, 2023 Date Apr 6, 2023 Date Apr 6, 2023 Date Apr 6, 2023 Date Apr 6, 2023 Date Apr 6, 2023 Date OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 1 of 2 Notice of Project Completion Project Name: Watersbend South Phase 3B City Project No.: 102847 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑ Yes ❑x N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 135 WD Days Charged: 430 Work Start Date: 4/5/2021 Work Complete Date: 3/31/2023 Completed number of Soil Lab Test: 512 Completed number of Water Test: 27 Page 2of2 FoRTWoRTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name WATERBEND SOUTH PHASE 3 B Contract Limits Project Type PAVING IMPROVEMENTS City Project Numbers 102847 DOE Number 2847 Estimate Number 1 Payment Number 1 For Period Ending 3/31/2023 WD City Secretary Contract Number Contract Time 13WD Contract Date Days Charged to Date 430 Project Manager NA Contract is 100.00 Complete Contractor GLEN THURMAN, INC 3212 PIONEER RD BALCH SPRINGS, TX 75180 Inspectors M.GLOVER / J.DAVIS Tuesday, April 4, 2023 Page 1 of 4 City Project Numbers 102847 DOE Number 2847 Contract Name WATERBEND SOUTH PHASE 3 B Estimate Number I Contract Limits Payment Number 1 Project Type PAVING IMPROVEMENTS For Period Ending 3/31/2023 Project Funding PAVING Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 HYDRATED LIME@ 42 ILBS/SY (COLLECTOR) 145 TN $160.00 $23,200.00 145 $23,200.00 2 HYDRATED LIME @32 LBS/S.Y. ( 183 TN $160.00 $29,280.00 183 $29,280.00 RESIDENTIAL) 3 6" LIME TREATED SUBGRADE (RESIDENTIAL) 11399 SY $3.35 $38,186.65 11399 $38,186.65 4 8" LIME TREATED SUBGRADE(COLLECTOR) 6904 SY $3.60 $24,854.40 6904 $24,854.40 5 6" CONCRETE PAVEMENT (RESIDENTIAL) 10674 SY $33.20 $354,376.80 10674 $354,376.80 6 8" CONCRETE PAVEMENT (COLLECTOR) 6558 SY $35.45 $232,481.10 6558 $232,481.10 7 Y CONCRETE SIDEWALK 3723 SF $5.50 $20,476.50 3723 $20,476.50 8 6' CONCRETE SIDEWALK 9280 SF $5.50 $51,040.00 9280 $51,040.00 9 R-1 RAMP 4 EA $2,200.00 $8,800.00 4 $8,800.00 10 P-1 RAMP 8 EA $1,800.00 $14,400.00 8 $14,400.00 11 CONNECT TO EXISITING PAVEMENT 8 EA $300.00 $2,400.00 8 $2,400.00 12 REMOVE END OF ROAD BARRICADE 8 EA $450.00 $3,600.00 8 $3,600.00 13 Rl-1 STP SIGN 9 EA $125.00 $1,125.00 9 $1,125.00 14 ST MARKER BLADE 36 EA $250.00 $9,000.00 36 $9,000.00 15 TRAFFIC CONTROL 2 MO $2,000.00 $4,000.00 2 $4,000.00 Sub -Total of Previous Unit $817,220.45 $817,220.45 --------------------------- Tuesday, April 4, 2023 Page 2 of 4 City Project Numbers 102847 Contract Name WATERBEND SOUTH PHASE 3 B Contract Limits Project Type PAVING IMPROVEMENTS Project Funding Contract Information Summary Original Contract Amount Change Orders Total Contract Price DOE Number 2847 Estimate Number 1 Payment Number 1 For Period Ending 3/31/2023 $817,220.45 $817,220.45 Total Cost of Work Completed $817,220.45 Less % Retained $0.00 Net Earned $817,220.45 Earned This Period $817,220.45 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $817,220.45 Tuesday, April 4, 2023 Page 3 of 4 City Project Numbers 102847 Contract Name WATERBEND SOUTH PHASE 3 B Contract Limits Project Type PAVING IMPROVEMENTS Project Funding Project Manager NA Inspectors M.GLOVER / J.DAVIS Contractor GLEN THURMAN, INC 3212 PIONEER RD BALCH SPRINGS, TX 75180 DOE Number 2847 Estimate Number 1 Payment Number 1 For Period Ending 3/31/2023 City Secretary Contract Number Contract Date Contract Time 135 WD Days Charged to Date 430 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $817,220.45 Less % Retained $0.00 Net Earned $817,220.45 Earned This Period $817,220.45 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $817,220.45 Tuesday, April 4, 2023 Page 4 of 4 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS March 31, 2023 Glen Thurman, Inc. P.O. Box 850842 Mesquite, Tx 75185 RE: Acceptance Letter Project Name: Watersbend South Phase 3B Project Type: Paving City Project No.: 102847 To Whom It May Concern: On March 23, 2023 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on March 31, 2023. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 31, 2023, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7872. Sincerely, yB Patal PC_ Yogesh Patel, Project Manager Cc: Jesse Davis, Inspector Mike Glover, Inspection Supervisor Randy Horton, Senior Inspector Victor Tornero, Program Manager Goodwin and Marshall, Consultant Glen Thurman Construction, Contractor Forestar, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 CONTRACTOR'S AFFIDAVIT OF FINAL PAYMENT THE STATE OF TEXAS § § KNOW ALL MEN BY THESE PRESENTS; COUNTY OF DALLAS BEFORE ME, the undersigned authority, on this day Chad San Juan after being by me duly sworn, deposes, Vice President a personally appeared ("Affidant"), who, says that he is (corporation, partnership, trade name) of Dallas County, State of Texas (the "Contractor"), which said Contractor was awarded the contract dated day of , 200 for the construction Of Paving Improvements at Watersbend South, Phase 36 (the "Work"), for a total consideration of $817,220.45 Dollars to be paid to the said Contractor (the "Contract"), and that Affidant has full power of authority to make this affidavit. and Texas That Forestar (USA) Real Estate Group, Inc. (the "Owner's has approved the final pay estimate on said Work, and that the said Contractor has fully satisfied and paid any and all claims that may be covered by Chapter 53 of the Texas Property Code and Article 5160 of the Revised Civil Statutes of the State of Texas, or any other applicable statutes or charter provisions, and that all just bills for labor and materials have been paid and discharged by said Contractor insofar as they pertain to the work in question. That in addition to any funds which may have been previously paid by the Owner, the Contractor hereby accepts the amount of $81,722.05 Dollars as FULL AND FINAL PAYMENT under the aforementioned Contract, and hereby waives and releases any right Affidant and/or the Contractor may have to pursue claims of any nature against the Owner arising out of or in any manner connected with the performance of the Work and/or the Contract, including but not limited to claims of third parties that supplied material and/or labor for the Work for or through the Contractor ("Subcontractors"), as well as claims for delay, additional compensation or for recovery of liquidated damages which may have been withheld by the Owner. The Contractor shall defend, hold harmless and indemnify the Owner from any such claims of such Subcontractors. The Contractor further releases the Owner from any claim or liability arising from any act or neglect of the Owner related to or connected with the Contract. This affidavit is given pursuant to the final payment provisions of the Contract, and shall not be deemed to alter or modify the terms and provisions of said Contract. N T U N, INC. By: (Affidant) Chad San Juan (PrintedName) SUBSCRIBED AND SWORN TO BEFORE ME, this the day of XDt :QO of Seal (Notary Public in and for the State of Texas) Traci A. Meek (Printed Name of Notary) Notary Public, State of Texas ID# 10546144 My commission expires: 9�oF1. My Commission Expires 06106)2024 CONTRACTOR'S AFFIDAVIT OF FINAL PAYMENT CONSENT OF SURETY COMPANY TO FINAL PAYMENT Conforms with the American Institute of Architects, AIA Document G707 PROJECT: (name, address)Watersberd South Phase 3 Fort Worth, TX TO (Owner) OWNER ❑ ARCHITECT ❑ CONTRACTOR ❑ SURETY ❑ OTHER Bond No 9369954 FORESTAR (USA) REAL ESTATE GROUP INC. AND ARCHITECT'S PROJECT NO: OFA No. 20-0088 ITHR CITY OF FORT WORTH CONTRACT FOR: 2221 E. Lamar Blvd„ Suite 790 Pavlrg Facilities for Watersbend South Phase 39 Arlington TX 76006 CONTRACT DATE: CONTRACTOR: GLENN THURMAN, INC. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) COLONIAL AMERICAN CASUALTY AND SURETY COMPANY 1299 Zurich Way Schaumburg IL 60196 , SURETY COMPANY on bond of (here insert name and address of Contractor) GLENN THURMAN, INC. P.O. Box 850842 Mesquite TX 75185-0842 , CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address cf Owner) FORESTAR (USA) REAL ESTATE GROUP INC. AND THE CITY OF FORT WORTH 2221 E. Lamar Blvd., Suite 790 Arlington TX 76006 , OWNER, as set forth in the said Surety Company's bond, IN WITNESS, WHEREOF, the Surety Company has hereunto set its hand this 26th day of January, 2023 COLONIAL AMERICAN CASUALTY AND SURETY COMPANY Surety Company Attest; I✓� (Seal): Signature of Authorized Representative Robbi Morales Attorney iin_Fact Title NOTE; This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS, Current Edition ONEPAGE ZURICH AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITYAND DEPOSIT COMPANY OF MARYLAND POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That the ZURICH AMERICAN INSURANCE COMPANY, a corporation of the State of New YoA_ the COLONIAL AMERICAN CASUALTY AND SURETY COMPANY, a corporation of the State of Illinois, and the FIDELITY AND DEPOSIT COMPANY OF MARYLAND a corporation of the State 01' Illinois (herein collectively called the "Cotnpanies"). by Robert D. Murray, Vice President, in pursuance of authority granted by Article V, Section 8. of the By -Laws of said Companies, which are set forth on the reverse side hereof and are hereby certified to be in full force and effect on the date hereof, do hereby nominate, consthutc, and appoint Ricardo J. REYNA, Tina MCEWAN, Don E, CORNELL, Josliva SAUNDERS, Robbi MORALES, Sophinie HUNTER, Kelly A. WESTBROOK, Tonle PETIUM EK, Mikaeln PEPPERS of Dallas, Texas, EACH, its true and lawful agent and Attorney -in - Fact, to make. execute, seal and deliver, for, and on its behalf as surety, and as its act and deed: any and till bonds and undertalings, and the execution of such bonds or undertakings ill pursuance of these presents, sJtail lie as binding upon said Companies, as frilly and amply, to all intents and purposes, as if they had been duly executed and acknowledged by the regularly elected officers of the ZURICH AMERICAN INSURANCE COMPANY at its office in New York, New York„ the regularly elected officers of the COLONIAL AMERiCAN CASUALTY AND SURETY COMPANY at its office in Owings Mills, Maryland„ and the regularly elected officers of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND at its office in Owings Mills. Maryland., in their own proper persons. The said Vice President does herchy certify that tite extract set forth on the reverse side hereof is a- true copy of Article V, Section 8, of the By -Laws of said Companies, and is now in force. IN WITNESS WHEREOF. the said Vice -President has hereunto subscribed his/her names and alfb:ed the Corporate Seals of the said ZURICH AMERICAN INSURANCE COMPANY, COLONIAL AMERiCAN CASUALTY AND SURETY COMPANY, and FiDELiTN' AND DEPOSIT COMPANY OF AARYLAND, this I I th day of May. A.D. 2021. aww, ATTEST: ZURICII AMERICAN INSURANCE COMPANY COLONIAL AMERICAN CASUALTY AND SURETY COMPANY FIDELITY AND DEPOSIT COMPANY OF M ARYI,,AND 8v: Robert D. Murray Vice President Bv: /)atvrt L Brown secretmir State of Maryland County of Baltimore On this 1 I th day of Miry, A.D. 2021. before the subscriber, a Notary Public of the Slate of Maryland, duly commissioned and qualified, Robert D. Murray, Vice President and Dawn E, Brown, Secretary of the Companies, to me personally known to be the individuals and officers described in and w-ho executed the preceding instrument, and acknowledged the execution of mine, and being by me du]y sworn, deposeth and saith, that he/she is the said officer of the Company aforesaid, and that the seals affixed to the preceding instrument are the Corporate Seals ofsaid Companies, and that the said Corporate Seals and the signature as such officer were ditty affixed and subscribed to the said instrument by the authority and direction Df the said Corporatiaazs. IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal the day and year first above written. Constance A. Duttn, Notary Public My Commission Expires: July 9, 2023 .authenticity of this bond cktn be confirmed at or 410-999-9700