Loading...
HomeMy WebLinkAboutOrdinance 6345 ORDINANCE NO. —� ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF gWTQPJ AND PORTIONS OF SUNDRY OTHER STREETS, AVENUE§ AND PUBLIC PLACES DECLARING THE CONTRACT WITH CONSTRUCTION . FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPRO- PRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Fort Worth, 'Texas, has heretofore entered into a contract with &UgTIN ROAD nompA W(��,�I CQNRT nCHPAN�or the making and construction of certain street improvements on the hereinafter described portions of streets, avenges and public places in .said City, to-wit- 1. GRAFTON STREET From East Lancaster to Bomar Avenue, known and designated as Unit 1, Project No. 104-24000-188. 2. PURSELLEY STREET From I.H. 820 Service Road to Morris Avenue, kaown.a ad designated as Unit 2, Project No. 104-24000-188. 3. VINSON STREET From Lloyd Avenue to Edgewood Terrace, known and designated as Unit 31 Project No. 104-24000-1888. 4. LANGSTON STREET From Katy Street to East Rosedale Avenue, known and designated as Unit 4, Project No. 104-24000-188. 5. EFFIE STREET From Willie Street to Calumet Street, [mown and designated as Unit 5, Project No. 104-24000-188. 6. WILLIE STREET From 150' West of Dillard Street to Birdell Street, known and designated as Unit 6, Project No. 104-24000-188. WHEREAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No. 6166 a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenue s­and public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. — 6166 . and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I. The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; .and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the asses'sment has been levied, shall, where known, state� the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of thecertificates, with the property descriptions to be shown on'the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows,. When each of the certifiactes has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS k day of 19 APPROVED AS TO FORM AND LEGALITY: 6^;"..'r '0�0011101 P00 City Attorney '91 PROJECT NO. 104-24000-188, UNIT 1: GRAFTON STREET FROM EAST LANCASTER TO BOMAR AVENUE, to be improved with seven-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete, gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT 'THE NORTHWEST CORNER OF EAST LANCASTER AND GRAFTON STREET WEST SIDE OF STREET INTERURBAN ADDITION (THIRD FILING) M. L. Stroud, Jr. 16 22 130' Pavement $7.76 $1,008.80 Box 328 Ind. 130' Curb & Gutter 3.'20 416.00 Waco, Texas $1,424.80 M. L. Stroud, Jr. 15 22 150' Pavement $7.76 $1,164.00 Box 328 Ind. 150' Curb & Gutter 3.20 480.00 Waco, Texas $1,644.00 BOMAR STREET INTERSECTS EAST SIDE OF STREET F. 0. & A. E. Wilemon et al c/o Marvin F. Poer & Co. 201 W. Commerce 1 7 1501 Pavement $7.76 $1,164.00 Ind. 150' Curb & Gutter 3.20 480.00 Dallas, Texas 75208 $1,644.00 W. R. Childress, Jr. 20 7 130' Pavement $7.76 $1,008.80 P. 0. Box 7337 Ind. 130' Curb & Gutter 3.20 416.00 55 Sq. Ft. Driveway .85 46.75 $1,471.55 COST TO PROPERTY OWNERS - ASSESSMENT $6,184.35 COST TO CITY OF FORT WORTH 2,292.78 TOTAL ESTIMATED CONSTRUCTION COST UNIT NO. 1 $8,477. 13 PROJECT"NO, 104-24000-188, UNIT 2: PURSELLE'Y 'STREET FROM I,H. 820 SERVICE ROAD TO M I 6RRI S AVENUE. .to be improved with six-inch thick asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch ,high .concrete curbs and two-foot wide concrete gutters, so that the finished' roadway will be thirty feet wide and by constructing six- inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT SOUTH LINE OF LOT 22, W. B. MONCRIEF ADDITION TO NORTH LINE OF LOT 28, W. B. MONCRIEF ADDITION WEST SIDE OF STREET, W. B. MONCRIEF ADDITION Wm. E. McConnell, Jr. 22 . 60' Adjusted to 2500 Purselley Res. 13' Pavement $2.42 $ 31.46 $ 31-.-46 Teddy C. Anthony 23 60 ' Pavement $2.42 $145.20 242Q Purselley Res. $ 145.20 Tannie W. Brandon 24 60' Pavement $2.42 $145.20 2416 Purselley Res. $ 145.20 Jerry Holdridge 25 60' Pavement $2.42 $145.20 $ 145.20 2412 Purselley Res. Jesse D. Tucker 26 60' Pavement $2.42 $145.20 $ 145.20 2408 Purselley Res. Jack C. Brittain 27 Res. 60' Pavement $2.42 $14 1 5.20 $ 145. 20 6400 Nell 76119 .R. T. McDaniel 28 601 Pavement $2.42 $145.20 145.20 2400 Purselley Res. MORRIS AVENUE INTERSECTS NAST SIDE OF STREET I. cARODINE SURVEY Texas Electric Service Tract 1-E 269.23' Adjusted to Company Res. 2131 Pavement $2.42 $515.46 P.O. Box 970 2131 Curb & Gutter 2.98 634.74 ;g�O-2O COST TO PROPERTY OWNERS - ASSESSMENT $ 2,052.86 9,350.14 COST TO CITY OF FORT IWD RTH TOTAL ESTU%T= CONSTRUCTION COST UNIT No. 2 2 , a PROJECT NO. 104-24000-188, UNIT 3; VINSON STREET FROM LLOYD AVENUE TO EDGEWOOD TERRACE, to be Triproved with six-inch thick of-m x asp altic concrete pavement on a six-inch Tick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways, where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST CORNER OF LLOYD AVENUE AND VISON STREET NORTH SIDE OF STREET MURRAY HILL ADDITION James E. Tyler S. 1/2 2/23 1591 Side Lot Credit Adjusted to 5317 Hampshire Blvd. of Lotsl, Res. 100' Pavement $2.42 $242.00 North 2, & 3 1001 Curb 6 Cutter 2.98 298.00 85 Sq. Ft. Drive- way .85 72.25 $612.25 Mable L. Fitch 4 2/23 531 Pavement $2.42 $128.26 4615 Vinson Res. S31 Gutter Only 1.49 78.97 $207.23 David G. Latham S.1/2 of 2/23 1631 Side Lot Adjusted to 656 Edgewood Terrace Lots 5, Res. 1001 Pavement $2.42 $242.00 G, 5 7 100' Gutter Only 1.49 149.00 $391.00 EDGEWOOD TERRACE INTERSELI'S SOUTH SIDE OF STREET A. R. Adkisen X 22 192.61 Side Lot Adjusted to ' 700 So. Edgewood Ter. PCs. 1001 Pavement $2.42 $242.00 100' Gutter Only 1.49 149.00 $391.00 John E. Southard 1-C 22 SS' Pavement $2.42 $133.10 Corporation Court Fes. 551 Gutter Only 1.49 81.95 Building $21S.05 3 PROJECT NO. 104-24000-188, UNIT 4: LANGSTON STREET FROM KATY STREET TO EAST ROSEDALE AVENUE, to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT THE NORTHWEST CORNER OF KATY STREET AND LANGSTON STREET WEST SIDE OF STREET J. L. GASSOWAY ADDITION Joe Smith 12 52' Pavement $2.42 $125.84 1517 Langston Res. 52' Curb & Gutter 2.98 154.96 $ 280.80 Clarence Mayon 11 62' Pavement $2.42 $150.04 300 S. Carver Res. 62' Curb & Gutter 2.98 184.76 Midland, Texas 85 Sq. Ft. Driveway .85 72.25 $ 407.05 John L. Morris 10 52' Pavement $2.42 $125.84 4809 Avenue H Res. 52' Curb & Gutter 2.98 154.96 $ 280.80 Moates & Graham 9 52' Pavement $2.42 $125.84 200 Houston Res. 52' Curb & Gutter 2.98 154.96 $ 280.80 Mrs. Pearl Jones 8 52' Pavement $2.42 $125.84 1516 Langston Res. 52' Curb & Gutter 2.98 154.96 85 Sq. Ft. Driveway .85 72.25 $ 353.05 City of Fort Worth 7 52' No Assessment Res. Arthur Turpin 6 & 5 104' Pavement $2.42 $251.68 5509 Houghton Res. 104' Curb & Gutter 2.98 309.92 $ 561.60 Wm. Burnett 4 & 3 104' Pavement $2.42 $251.68 1428 Stafford Drive Res. 104' Curb & Gutter 2.98 309.92 85 Sq. Ft. Driveway .85 72.25 $ 633.85 5 CONT'D. PROJECT NO. 104-24000-188, UNIT 4; LANGSTON STREET FROM KATY STREET TO EAST RGSEDALE AVENUE. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET J. L. GASSOWAY ADDITION Mrs, Bennice Humphrey and2 & 1 104' Pavement $2.42 $251.68 Vesterline McDonald Res. 104' Curb & Gutter 2.98 309.92 5510 Rocky Ridge Rd. $ 561.60 Dallas, Texas, 75241 OVER A,ITD SPRATLING ADDITION Sam H. Reed 10 50'Pavement $2.42 $121.00 Box 314 Res. 50' Curb & Gutter 2.98 149.00 Everman, Texas 107 Sq. Ft. Driveway.85 90.95 $ 360.95 L. C. McCuren 9 50' Pavement $2.42 $121.00 1409 E. Richmond Res. 50' Curb & gutter 2.98 149.00 96 Sq. Ft. Driveway.85 81.60 $ 351.60 C. F. Gilchrist F 50' Pavement $2.42 $121.00 319 W. T. Waggoner Bldg. Res. 50' Curb & Gutter 2.98 149.00 96 Sq. Ft, Driveway.85 81.60 $ 351.60 Mrs. Monnie Minot E 50' Pavement $2.42 $121.00 1447 W. 51st Place Res. 50' Curb & Gutter 2.98 149.00 Los Angeles, Calif 90062 $ 270.00 Lillie Mare Morris D 50' Pavement $2.42 $121.00 71450 Langston Res. 50' Curb & Gutter 2.98 149.00 $ 270.00 AVENUE "G" INTERSECTS Ella Mae White C 50' Pavement $2.42 $121.00 1416 Langston Res. 50' Curb & Gutter 2.98 149,00 $ 270.00 Marion Walls B 50' Pavement $2.42 $121.00 1412 Langston Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway.85 72.25 $ 342.25 6 CONT'D. PROJECT NO, 104-24000-188, UNIT 4: LANGSTON STREET FROM KATY STREET TO EAST ROSEDALE AVENUE. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET OVER AND SPRATLING ADDITION Ella McGee A 50' Pavement $2.42 $121.00 1408 Langston Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $ 342.25 Isaac Bryant 2 50' Pavement $2.42 $121.00 1316 Langston Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $ 342.25 Joe A. Gomez 1 50' Pavement $2.42 $121.00 c/o C. F. Gilchrist Est. Res. 50' Curb & Gutter 2.98 149.00 319 W. T. Waggoner Bldg. 85 Sq. Ft. Driveway .85 72.25 $ 342.25 Mrs. D. L. Toby Tract 4-B 150' Pavement $7.18 $1,077.00 2608 Boyd Comm. 150' Curb & Gutter 2.98 447.00 $1,524.00 EAST ROSEDALE AVENUE INTERSECTS EAST SIDE OF STREET G. W. COONROD SURVEY Ben Rubin and Sons, Inc. Tract 5 718.5' Pavement $7.18 $5,158.83 3704 Autumn Drive Comm. 718.5' Curb & Gutter2.98 2,141.13 $7,299.96 COWAN STREET INTERSECTS J. L. GASSOWAY ADDITION Ethylene C. Cavanah W. � of 84' Pavement $2.42 $203.28 1501 Langston 23 Res. 84' Curb & Gutter 2.98 250.32 $ 453.60 Donald C. Cavanah 22 52' Pavement $2.42 $125.84 1501 Langston Res. 52' Curb & Gutter 2.98 154.96 $ 280.80 Clytis Morris 21 520 Pavement $2.42 $125.84 4804 Avenue G Xe--5. 52' Curb & Gutter 2.98 85 Sq. Ft. Driveway .65 353.05 7 CONT'D, PROJECT NO. 104-24000-188, UNIT 4: LANGSTON STREET FROM KATY STREET TO EAST ROSEDALE AVENUE. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET J. L. GASSOWAY ADDITION Pauline Hill Porter 20 & 104' Pavement $2.42 $251.68 1511 Langston 19 Res. 104' Curb & Gutter 2.98 309.92 85 Sq. Ft. Driveway .85 72.25 $633.85 Guessena Hill Filgo 18 & 104' Pavement $2.42 $251.68 1511 Langston 17 Res. 104' Curb & Gutter 2.98 309.92 $561.60 A. J. Herndon 16 & 104' Pavement $2.42 $251.68 6619 Lockheed 15 Res. 104' Curb & Gutter 2.98 309.92 Dallas, Texas $561.60 Milton Hill. 14 & 104' Pavement $2.42 $251.68 1531 Langston 13 Res. 104' Curb & Gutter 2.98 309.92 171 Sq. Ft. Driveway .85 145.35 $706.95 COST TO PROPERTY OWNERS - ASSESSMENT $18,978.11 COST TO CITY OF FORT WORTH 15,471. 17 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 4 $34,449.28 8 PROJECT. NO. 104-24000-188, UNIT 5: EFFIE STREET FROM WILLIE STREET TO CALUMET STREET,. to be improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement stabilized subgrade, seven-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHWEST CORNER OF WILLIE STREET AND EFFIE STREET WEST SIDE OF STREET STALLCUP 1st ADDITION W. C. Ellis 6 14 65' Pavement $2.42 $157.30 4910 Willie Res. 65' Curb & Gutter 2.98 193.70 $ 351.00 Hilda L. Horton 5 14 65' Pavement $2.42 $157.30 1707 Haysworth Avenue Res. 65' Curb & Gutter 2.98 193.70 Los Angeles, Calif. $ 351.00 90035 DAN DULANEY SURVEY Clifford McCoy Tract 25 55.5' Pavement $2.42 $134.31 2001 Danner Res. 55.5' Curb & Gutter2.98 165.39 85 Sq. Ft. Driveway .85 72.25 $ 371.95 Grant Peoples Tract 24-A 105.5' Pavement $2.42 $255.31 2411 Scott Street and 23 105.5' Curb & Gutter2.98 314.39 Dallas, Texas Res. 85 Sq. Ft. Driveway .85 72.25 $ 641.95 Willie Murray Tract 22 61' Pavement $2.42 $147.62 4750 Ramey Res. 61' Curb & Gutter 2.98 181.78 $ 329.40 GOINS SUBDIVISION Charles Barnes B 55.5' Pavement $2.42 $134.31 909 Ross Trail Res. 55.5' Curb & Gutter2.98 165.39 Arlington, Texas 85 Sq. Ft. Driveway .85 72.25 $ 371.95 B. A. Barnes A 55.5' Pavement $2.42 $134.31 1504 W. Abram Res. 55.5' Curb & Gutter2.98 165.39 Arlington, Texas 85 Sq. Ft. Driveway .85 72.25 $ 371.95 9 CONT'D. "PROJECT NO. 104-24000-188, UNIT 5: $FFIE STREET FROM WILLIE STREET TO CALUMET STREET BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE OF STREET DAN DULANEY SURVEY D. A. Dansby Tract 20 111' Pavement $2.42 $268.62 1712 Effie Res. 111' Curb & Gutter 2.98 330.78 116 Sq. Ft. Driveway .85 98.60 $ 698.00 Moates and Graham Tract 18 87.5' Pavement $2.42 $211.75 200 Houston Street Res. 87.5' Curb & Gutter2.98 260.75 $ 472.50 KATY STREET INTERSECTS Wesley Walker and Tract 12 95' Pavement $2.42 $229.90 Denzil Lee Walker Res. 95' Curb & Gutter 2.98 283.10 4517 Quail Lane $ 513.00 JOHNNIE PULLIAM SUBDIVISION Greater Canaan 5 101' Pavement $2.42 $244.42 Baptist Church Res. 101' Curb & Gutter 2.98 300.98 c/o Rev. L. E. Lawson $ 545.40 4813 Fitzhugh CALUMET STREET INTERSECTS EAST SIDE OF STREET STALLCUP'S 1st ADDITION Elizabeth Walker 1 3 74' Pavement $2.42 $179.08 4648 Lois Res. 74' Curb & Gutter 2.98 220.52 $ 399.60 Willie Prince 2 3 50' Pavement $2.42 $121.00 P.O. Box 983 Res. 50' Curb & Gutter 2.98 149.00 13158 Del Sur St. 85 Sq. Ft. Driveway .85 72.25 San Fernando, Calif. $ 342.25 Frank Petty 3 3 50' Pavement $2.42 $121.00 1609 Effie Street Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $ 342.25 10 CONT'D PROJECT NO. 104-24000-188, UNIT 5) EFFIE STREET FROM WILLIE STREET TO CALUMET STREET BLOCK OWNER LOT ZONING FONTAGE RATE AMOUNT ASSESSMENT EAST SIDE OF STREET STALLCUPIS lst ADDITION L. A. Alexander 4 3 50' Pavement $2.42 $121.00 1613 Effie Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $342.25 Bennie J. Butler 5 3 50' Pavement $2.42 $121.00 1701 Effie Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $342.25 Tom Cook Scott, Jr. 6 3 50' Pavement $2.42 $121.00 1707 Effie Street Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $342.25 Clarence Russell 7 3 50' Pavement $2.42 $121.00 6020 Truman Drive Res. 50' Curb & Gutter 2.98 149.00 76112 85 Sq. Ft. Driveway .85 72.25 $342-25 City of Fort Worth W. 85; of 3 1151 No Assessment Lots & 9-Te-s. $ - 0 - KATY STREET INTERSECTS Georgia Thomas 1 4 45' Pavement $2.42 $108.90 1801 Effie Street Res, 45' Curb & Gutter 2.98 134.10 85 Sq. Ft. Driveway .85 72.25 $315.25 Jame Womack 2 4 50' Pavement $2.42 $121.00 1805 Effie Street Res. 50" Curb & Gutter 2.98 149.00 85 Sqo Ft. Driveway .85 72.25 $342.25 F. M. Coleman 3 4 50' Pavement $2.42 $121.00 1811 Effie Res. 50' Curb & Gutter 2.98 149.00 85 Sq. Ft. Driveway .85 72.25 $342.25 CONT'D. PROJECT NO. 104-24000-188, UNIT 5: EFFIE STREET FROM WILLIE STREET TO CALUMET STREET BLOCK OWNER LOT ZONING 'FRONTAGE RATE AMOUNT ASSESSMENT , EAST SIDE OF STREET STALLCUP'S 1st ADDITION Estate of Sallie Ward 4 4 501 Pavement $2.42 $121.00 Address Unknown Res. 50' Curb & Gutter 2.98 85 Sq. Ft. Driveway.85 72.25 $342.25 Marvin R. Richardson 5 4 50' Pavement $2.42 $121.00 1817 Effie Street Res. 50' Curb & Gutter 2.99 149.00 85 Sq. Ft. Driveway.85 72.25 $342.25 Mamie Polk 6 4 500 Pavement $2.42 $121.00 2216 Coleman Res. 50' Curb & Gutter 2.98 149.00 $270.00 William Burnett 7 & 8 4 100' Pavement $2.42 $242.00 1428 Stafford Drive Res. 100' Curb & Gutter 2.98 298.00 1540.00 COST TO PROPERTY OWNERS ASSESSMENT $99965.45 COST TO CITY OF FORT WORTH 16,809.42 TOTAL ESTIMATED CONSTRUCTION COST UNIT 5 26,774.87 12 PROJECT NO. 104-24000-188, UNIT 8: PAVING SKIP ON-SOUTH SIDE OF MT. VERNON AVENUE BETWEEN ,SANBORN STREET AND TORONTO STREET, beginning at west line of Lot 7, Block 54,, and ending at east line of Lot 8, Block 54, to be improved by constructing four-foot wide concrete sidewalks and a six inch thick hot-mix asphaltic concrete pavement on a six-inch lime stabilized subgrade with eight-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT EAST LINE OF LOT 8, BLOCK 54 SOUTH SIDE OF STREET SYCAMORE HEIGHTS ADDITION Thelma Belew 8 54 50' Sidewalk $2.76 $138.00 2924 Mt . Vernon Avenue comm. 138.00 Thelma Belew 7 54 — 50' Owner Occupied 2924 Mt. Vernon Avenue comm. 50' Pavement $5. 70 $285.00 50' Curb & Gutter 3.32 166.00 50' Sidewalk 2. 76 138.00 589.00 COST TO PROPERTY OWNERS - ASSESSMENT $ 727.00 COST TO THE CITY OF FORT WORTH 871.03 TOTAL ESTIMATED CONSTRUCTION COST UNIT 8 $1,598.03. 17 PROJECT NO, 104-24000-188, UNIT 9: PAVING SHIP ON SOUTH SIDE OF MT. VERNON AVENUE BETWEEN 'CHICAGO AVENUE AND NEWARK AVENUE, beginning at the west line of Lot 5, Block 9, and ending at east line of Lot 6, Block 9, to be improved by replacing existing three- foot wide sidewalk and to improve that portion abutting Lot 5, Block 9, by constructing a six-inch thick hot-mix asphaltic concrete pavement on a six-inch lime stabilized subgrade, eight-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT WEST LINE OF LOT 5, BLOCK 9 - MT. VERNON AVENUE SOUTH. SIDE OF STREET TURNER SUBDIVISION Louis M. Pipkin 6 9 — 50' Sidewalk Adjusted to No assessment 2528 N. Edgewood Res. 0' (Existing facility replaced at no cost) $ -0- Louis M. Pipkin 5 �9� 50' Sidewalk Adjusted to' 2528 N. Edgewood Res. 0' (Existing facility replaced at no cost) 50' Pavement $2.08 $104.00 50' Curb & Gutter 3.32 166.00 270.00 __ _ COST TO PROPERTY OWNERS - ASSESSMENT $ 270.00 COST TO CITY OF FORT WORTH 1,240.02 TOTAL ESTIMATED CONSTRUCTION COST - UNIT 9 1 510.02 18 PROJECT NO. 104-24000-188, UNIT 11: PAVING SKIP ON EAST SIDE OF TANDY AVENUE BETWEEN PURINGTON AVENUE AND MEADOWBROOK DRIVE, improving all property abutting on the west side of Lot 9, Block 8, with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick lime stabilized subgrade, eight-inch high concrete curbs and two-foot wide concrete gutters, so that the finished roadway will be thirty feet wide and by constructing six-inch thick concrete driveways and four-foot wide concrete sidewalks where specified. BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT BEGINNING AT NORTHEAST CORNER OF PURINGTON AVENUE AND TANDY AVENUE EAST SIDE OF STREET TANDY ADDITION J. C. Stevenson 6 8 1921 Side Lot Adjusted to 3403 Purington Res. 100' Pavement $2.08 $208.00 100' Curb & Gutter 3.32 332.00 181' Sidewalk 2.76 499.56 151 Sq. Ft. Driveway .85 128.35 �1,167.9 COST TO PROPERTY OWNERS - ASSESSMENT $1,167.91 COST TO CITY OF FORT WORTH 3,658.23 TOTAL ESTIMATED CONSTRUCTION COST UNIT 11 20 7.- .FORT WORTH AVENUE From I.H. 820 to Rosser Avenue, kn own and designated as Unit 7, Project No. 104-24000-188. The making and constructed of street improve- ments in this unit only as set out and des- cribed in Ordinance No. 6152, dated August 25, 1969, when it was determined by the City Council to delete this unit from the contract as provided in Section 10, Article 1105b, of the Revised Civil Statue of Texas as amended, with Benefit Hearing set for September 22, 1969. 8. MT. VERNON AVENUE Paving skip on south side of Mt. Vernon Avenue between Sanborn Street and Toronto Street, from the west line of Lot 7, Block 54 to the east line of Lot 8, Block 54, Sycamore Addition, known and designated as Unit 8, Project No. 104-24000-188. 9. MT. VERNON AVENUE Paving skip on south side of Mt. Vernon Avenue between Chicago Avenue and Newark Avenue, from the west line of Lot 5, Block 9 to the east line of Lot 6, Block 9, Turner Subdivision, known and designated as Unit 9, Project No. 104-24000-188. — 10. PURINGTON AVENUE Paving skip on north side of Purington Avenue between Tandy Avenue and Sanderson Avenue, from the west line of Lot E-7, Block 8 to the east line of Lot 8, Block 8, Tandy Addition known and designated as Unit 10, Project ;o. 104-24000-188. 11. TANDY AVENUE Paving skip on east side of Tandy Avenue between Purington Avenue and Meadowbrook Drive, from the west line of Lot 9, Block 8 to the east line of Lot 9, Block 8, Tandy Addition, known and designated as Unit 11, Project No. 104-24000-188. 12. ROSSER AVENUE From Spur 303 to 50' north of Fort Worth Avenue, known and designated as Unit 12, Project No. 104-24000-188. The making and construction of street improvements in this unit only as set out and described in Ordinance 6152, dated August 25, 1969,when it was determined by the City Council to delete this unit from the contract as provided in Section 10, Article 1105b, of the Revised Civil Statue of Texas as amended, with Benefit Hearing set for September 22, 1969. o f Fort Worth., Texas Mayor and Council Communication a*a 14 DATE REFERS 9 SUBJECT: Final Payment - Assessment PAGE i FP,-733 Paring at 1.2 Locations � n the as Side GRAHAM I or Final !City Council action on the project described below is requested Project Description Name: Assessment Paving at 12 Locations on the Past Side Contractor: Austin load Company and Worth Construction Company Contract Awarded; August 23, 1969 ( --1545) Work Order issued: January 9, 1970 Work Order Effective: January 19, 1970 Date of Final Inspection and Approval: June 5, 1970 Time Bid: 145 Working Days Time Used: 70 Working , ys Project Cost and Financing. Original Bid Prices $163,668.90 Adjusted Bid Prices $144,711.90 (Units 7 and 12 deleted upon award of contract 8/26769) Less: Gunge Order No. i 6,318.0 0 (M&C G-14 30, 9/22/69) - Deletion of sidewalks on Units 3 and 6 Revised Bid Prices 1..38,393.90 Final Contract Costs .128,890. Partial Payments Previously Bade: 6 Amouat $115,425.31 Final Payment Dues $ 13,465.43 Payment to be made :groin Project Account Number 104-24000-188 Deviation from Bid Prices An der-run of $9,503.16 occurred due to the fact that 1,800 linear ;feet of 6 inch metal, subdrai.n listed in the contract docu- ments for use on Units l through 6 was not required, At a bid price of $2.75 per linear foot, tl is was a savings of $14,950..00. The r,emaining $4,553.16 of the under-run occurred due to minor variations between quantities estimated in the contrant documents and quantities measured and used at the job site. wjp DATE REFERENCE SUBJECT: Final Payment - Assessment PAGE NUMBER Paving at 12 Locations on the East Side 8/10/70 FP-733 -2 or Compliance with Specifications During testing on this project, 35 corings were made with the following results: Unit 1, Grafton Street (2 cores) Exceeds Even with Below Specs but Below Specs iRtSL_ Within Tolerance Tolerance Paving 2 0 0 0 Sub-grade 0 2 0 0 On 'Unit I the average thickness of the hot mix asphaltic concrete paving is 7.62 inches compared to the seven inches specified, and the average thickness of the stabilized sub-grade, is six inabes as was specified,. Units 2 through 11 (33 cores) Exceeds Even with Below Specs but Below Specs Specs Within Tolerance Tolerance Paving 16 9 8 0 Sub-grade 7 26 0 0 On units 2 through 11, the average thickness of the hot mix asphaltic concrete paving is 6.11 inches compared, to the six inches specified and the average thickness of the stabilized sub-grade is 6.03 inches compared to the six inches specified. Tests made during construction show that materials used were in compliance with specifications. Recomiendation It is reconmiended that the project described above be accepted as complete by the adoption of an ordinance and that final payment of $13,465.43 be author- ized to Austin Road Company and 'Worth Construction Company. HDM/mh SUBMITTED BY: DISPOSITION BY COUNCIL: PROCESSED BY" I.P-40P, 2E,11 - 00� (DE,�S�''ER IB E) P-ROV ITY SEEC�RITARIY DATE CITY MANAGER