HomeMy WebLinkAboutContract 54491-CO3CSC No. 54491-CO3
FOR_ _ TWQRTH. City of Fort Worth
Change Order Request
Project Name 2020 Neighborhood Safety Contract City Sec # 54491
Client Project #(s) Various - On -Call Contract
Project TPW Transportation Management and Neighbhorhood Safety Contract for traffic signal and transportation related construction.
Description
Contractor EARTC Change Order # 3 Date 2/22/2023
City Project Mgr. Clint Hoover City Inspector Clint Hoover
Dept. I TPW I I I I Totals I Contract Time
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 25.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $5,625,000.00
Changer Order No. 3 will add additional pay items and adjust existing pay items for inflation. Staff has compared the unit prices which are being proposed by the
contractor to other similar items and accepts the unit costs. The difference in pricing can be justified by the current market pricing which is fluctuating on a
monthly basis due to price escalation and inflation. The City finds that the prices that are being proposed by the contractor are fair and reasonable.
The average pricing was compiled from similar items from the Texas Department of Transportation Average Low Bid Unit Prices effective July 2022.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's CompanyName Contractor Name Contract Si nature
Date
EARTC Carlos Reyes
3/28/2023
Inspector/Inspection Su ervisor
Date
Project and Contract Compliance Manage.
Date
Clint Hoover
Clint Hoover
Program Manager
Date
Senior Capital Project Officer
Date
Clint Hoover 6v*—
Rajnish Gupta
Assistant Director (Dept)
Martin Phillips " 4"
Date
Director, Contractinq Departm
Lauren Prieur �Y
Date
Assistant City Attorney
ate
JAssistant City Manager
Date
Doug Black A
William Johnson
Council Action if required)
ATTEST: A
Jannette Goodall, City Secretary
M&C Number 1 20-0529 M&C Date Approved 8/11/2020
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
Change Order Additions
Project Name 2020 Neighborhood Safety Contract City Sec# 54491
Client Project# Various -On-Call Contract
Contractor EARTC PM Clint Hoover Inspector Clint Hoover
Change Order Submittal# 0 Date 2I27J2023
ADDITIONS
ITEM
DESCRIPTION
DEPT
Oty
Unit
Unit Cost
Total
1
Railroad Flagmen
TPW
1
WD
1,824.00
2
Remove Sidewalk
TPW
1
SF
20.00
3
Remove ADA Ramp
TPW
1
EA
2,000.00
4
Remove Concrete Pvmt
TPW
1
SY
62.00
5
Remove Asphalt Pvmt
TPW
1
SY
64.00
6
Remove Concrete Curb & Gutter
TPW
1
LF
35.00
7
Remove light fixture
TPW
1
EA
500.00
8
Remove Sign Panel and Post
TPW
1
EA
350.00
9
Remove Conduit
TPW
1
LF
12.00
10
Remove Ground Boxes
TPW
1
EA
456.00
11
Remove Down Guy W/Guard
TPW
1
EA
122.00
12
Instl Down Guy and Anchor W/Guy
TPW
1
EA
380.00
13
Remove Down Guy and Anchor W/Guy
TPW
1
EA
122.00
14
Remove Span Cable Assm
TPW
1
LF
2.00
15
Remove Timber Poles
TPW
1
EA
3,500.00
16
Relocate Metro Street Name Sign
TPW
1
EA
1,500.00
17
Remove Metro Street Name Sign
TPW
1
EA
500.00
18
Install Back Plate on Existing Signal Head (City Furnished)
TPW
1
EA
76.00
19
Furnish/Install Dead End for STL Span Wire (1/4")
TPW
1
EA
152.00
20
Furnish/Install Dead End for STLSpan Wire (5/16")
TPW
1
EA
152.00
21
Furnish/Install Dead End for STLSpan Wire (3/8")
TPW
1
EA
152.00
22
Install Dead End for STLSpan Wire (1/4") (City Furnished)
TPW
1
EA
76.00
23
Install Dead End for STLSpan Wire (5/16") (City Furnished)
TPW
1
EA
76.00
24
Install Dead End for STLSpan Wire (3/8") (City Furnished)
TPW
1
EA
76.00
25
Install/Reinstall Screw -In Foundation (City Furnished)
TPW
1
EA
2,000.00
26
Furnish/Install Terminations (3M R/Y Wire Nut)
TPW
1
EA
76.00
27
Furnish/Install PED Pole Base Only W/Ground Lug
TPW
1
EA
608.00
28
Furnish/Install LED Single Indication (Color & or Color W/Arrow)(R or Y or G)
TPW
1
EA
228.00
29
Install PED Pole Base Only W/Ground Lug (City Furnished)
TPW
1
EA
380.00
30
Furnish/Install LED Lighting Fixture (137 watt ATB2 Cobra Head)
TPW
1
EA
1,500.00
31
Proofing of intersection (Conduits, cables and ground boxes)
TPW
1
LS
1,520.00
32
Furnish/Install Elec Sery Pedesta l
TPW
1
EA
9,500.00
33
Furnish/Install Conduit 11/4" Conch: PVC Schedule 80 (T)
TPW
1
LF
30.00
34
Furnish/Install Conduit 11/4" Condit PVC Schedule 80 (B)
TPW
1
LF
30.00
35
Furnish/Install Conduit 11/4" Conch: RM (Riser)
TPW
1
LF
20.00
36
Furnish/Install Conduit -Schedule 80 PVC 1-1/4 Inch for Riser with Hardware and Conductor
TPW
1
EA
1,000.00
37
Furnish/Install Conduit -Schedule 80 PVC 1-1/2 Inch Open Cut
TPW
1
LF
30.00
38
Furnish/Install Conduit 2" Condit RM (T)
TPW
1
LF
30.00
39
Furnish/Install Conduit 2" Conch RM (Riser)
TPW
1
LF
23.00
40
Furnish/Install Conduit 2" Condit PVC Schedule 80 (T)
TPW
1
LF
35.00
41
Furnish/Install Conduit 2" Condt PVC Schedule 80 (B)
TPW
1
LF
40.00
42
Furnish/Install Conduit 3" Condit RM (T)
TPW
1
LF
35.00
43
Furnish/Install Conduit -Schedule 80 PVC 2 Inch for Riser with Hardware and Conductor
TPW
1
LF
20.00
44
Furnish/Install Conduit 3" Condit RM (Riser)
TPW
1
LF
30.00
45
Furnish/Install Conduit 3" Condit PVC Schedule 80 (T)
TPW
1
LF
40.00
46
Furnish/Install Conduit 3" Condit PVC Schedule 80 (B)
TPW
1
LF
60.00
47
Furnish/Install Conduit 4" Condt PVC Schedule 80 (T)
TPW
1
LF
40.00
48
Furnish/Install Conduit 4" Condit PVC Schedule 80 (B)
TPW
1
LF
50.00
49
Furnish/Install Conduit -Schedule 80 PVC 31nch Open Cut
TPW
1
LF
40.00
50
Concrete Pavement 8"
TPW
1
SY
180.00
51
Concrete Sidewalk 4"
TPW
1
SF
25.00
52
Barrier Free Ramp, Type R-1
TPW
1
EA
4,500.00
53
Barrier Free Ramp, Type U-1
TPW
1
EA
5,500.00
54
Barrier Free Ramp, Type M-1
TPW
1
EA
4,500.00
55
Barrier Free Ramp, Type M-2
TPW
1
EA
4,500.00
56
Barrier Free Ramp, Type M-3
TPW
1
EA
4,500.00
57
Barrier Free Ramp, Type P-1
TPW
1
EA
4,500.00
58
Barrier Free Ramp, Type P-2
TPW
1
EA
4,500.00
59
Barrier Free Ramp, Type C-1
TPW
1
EA
4,500.00
60
Barrier Free Ramp, Type C-2
TPW
1
EA
5,500.00
61
Barrier Free Ramp, Type C-3
TPW
1
EA
4,500.00
62
Concrete Curb and Gutter 6"
TPW
1
LF
70.00
63
Exploratory Excavation of Existing Utilities
TPW
1
EA
456.00
64
Miscellaneous Structure Adjustment
TPW
1
EA
2,500.00
65
Furnish/Install 4-Sect Signal Head Assembly
TPW
1
EA
2,500.00
66
Furnish/Install 3 Sect Head w/ bimodal lens
TPW
1
EA
2,000.00
67
Remove LED bimodal Lens
TPW
1
EA
76.00
68
Install LED bimodal Lens
TPW
1
EA
152.00
69
Furnish/Install 3 Sect Head Assembly
TPW
1
EA
2,000.00
70
Furnish/Install 5-Sect Signal Head Assembly (Vertical or Dog -House)
TPW
1
EA
3,000.00
71
Relocate Signal Head
TPW
1
EA
2,050.00
72
Furnish/Install Ped Signal Head Assembly
TPW
1
EA
988.00
73
Furnish/Install Ped Sig Head Retrofit
TPW
1
EA
1,000.00
74
Furnish/Install 2" Ped Push Button Station W/ Sign
TPW
1
EA
750.00
75
Furnish/Install Audible Ped Pushbutton Station
TPW
1
EA
1,915.00
76
Furnish/Install BBU System EXT Mounted
TPW
1
EA
14,000.00
77
Furnish/Install Zinc internal BBU System
TPW
1
EA
14,000.00
78
Furnish/Install Model 711 Preemption Detector
TPW
1
EA
2,800.00
79
Furnish/Install Model 722 Preemption Detector
TPW
1
EA
3,185.00
80
Furnish/Install Preemption Cable
TPW
1
LF
3.50
81
Furnish/Install Radar Presence Detection Device
TPW
1
EA
21,500.00
82
Furnish/Install Radar Advance Detection Device
TPW
1
EA
21,500.00
83
Furnish/Install Hybrid Detection System
TPW
1
APR
12,500.00
84
Furnish/Install Radar Cable
TPW
1
LF
5.00
85
Furnish/Install Hybrid Detection Cable
TPW
1
APR
0.00
86
Furnish/Install Loop Detector Cable Saw cut
TPW
1
LF
29.00
87
Furnish/Install RG-11 COAX Detector Cable
TPW
1
LF
5.00
88
Furnish/Install 2/C 12 AWG Multi -Conductor Cable
TPW
1
LF
3.30
89
Furnish/Install 4/C 14 AWG Multi -Conductor Cable
TPW
1
LF
3.45
Change Order Additions Page 1 of 4
90
Furnish/Install 5/C 14 AWG Multi -Conductor Cable
TPW
1
LF
4.00
91
Furnish/Install 7/C 14 AWG Multi -Conductor Cable
TPW
1
LF
4.50
92
Furnish/Install 8/C 14 AWG Multi -Conductor Cable
TPW
1
LF
4.65
93
Furnish/Install IO/C 14 AWG Multi -Conductor Cable
TPW
1
LF
5.50
94
Furnish/Install 20/C 14 AWG Multi -Conductor Cable
TPW
1
LF
7.75
95
Furnish/Install 16/C 14 AWG Multi -Conductor Cable
TPW
1
LF
6.00
96
Furnish/Install 6/C 16 AWG Multi -Conductor Cable
TPW
1
LF
3.50
97
Furnish/Install 8/C 16 AWG Multi -Conductor Cable
TPW
1
LF
3.75
98
Furnish/Install 12/C 14 AWG Multi -Conductor Cable
TPW
1
LF
4.65
99
Furnish/Install 6/C 14 AWG Multi -Conductor Cable
TPW
1
LF
4.30
100
Furnish/Install 9/C 14 AWG Multi -Conductor Cable
TPW
1
LF
5.00
101
Furnish/Install 3/C 14 AWG Multi -Conductor Cable
TPW
1
LF
3.25
102
Furnish/Install 4/C 14 AWG Loop Lead In Cable
TPW
1
LF
4.00
103
Furnish/Install 9 Conductor#14
TPW
1
LF
5.00
104
Furnish/Install 9 Conductor#20
TPW
1
LF
5.00
105
Furnish/Install NO 4 Triplex OH insulated Elec Condr
TPW
1
LF
6.00
106
Furnish/Install NO 6 Duplex OH insulated Elec Condr
TPW
1
LF
4.05
107
Furnish/Install NO 6 Triplex OH insulated Elec Condr
TPW
1
LF
5.00
108
Furnish/Install Ground Box Type B
TPW
1
EA
1,500.00
109
Furnish/Install Ground Box Type B, w/ Apron
TPW
1
EA
1,700.00
110
Furnish/Install Ground Box, Type D, w/ Apron
TPW
1
EA
2,000.00
111
Furnish/Install 5' Pedestrian Push Button Pole
TPW
1
EA
2,600.00
112
Furnish/Install 10' - 14' Ped Pale Assembly
TPW
1
EA
1,700.00
113
Furnish/Install PED Pole Base Only W/Ground Lug
TPW
1
EA
608.00
114
Furnish/Install 10'-14" Alum Pole Only
TPW
1
EA
456.00
115
Furnish/Install 10' -14' Ped Pole Assembly
TPW
1
EA
1,700.00
116
Powder Coat Sig Pole and MA 16'- 36'
TPW
1
EA
117
Powder Coat Sig Pole and MA 40' - 48'
TPW
1
EA
118
Powder Coat Sig Pole and MA 52' - 60'
TPW
1
EA
119
Powder Coat Ped Pole
TPW
1
EA
120
Powder Coat Ped Pushbutton Pole
TPW
1
EA
121
Furnish/Install Type 41 Signal Pole
TPW
1
EA
14,050.00
122
Furnish/Install Type 42 Signal Pale
TPW
1
EA
12,720.00
123
Furnish/Install Type 43 Signal Pole
TPW
1
EA
14,370.00
124
Furnish/Install Type 44 Signal Pale
TPW
1
EA
13,320.00
125
Furnish/Install Type 45 Signal Pole
TPW
1
EA
19,980.00
126
Furnish/Install Type 46 Signal Pale
TPW
1
EA
18,470.00
127
Furnish/Install Mast Arm 16'-36'
TPW
1
EA
4,950.00
128
Furnish/Install Mast Arm 40'-48'
TPW
1
EA
6,480.00
129
Furnish/Install Mast Arm 52'-60'
TPW
1
EA
11,000.00
130
Install 16 ft Mast Arm
TPW
1
EA
1,500.0(1
131
Install 2O ft Mast Arm
TPW
1
EA
1,500.00
132
Install 24 ft Mast Arm
TPW
1
EA
1,500.0(1
133
Install 28 ft Mast Arm
TPW
1
EA
1,500.00
134
Install 32 ft Mast Arm
TPW
1
EA
1,500.0(1
135
Install 36 ft Mast Arm
TPW
1
EA
1,500.00
136
Install 40 ft Mast Arm
TPW
1
EA
1,500.0(1
137
Install 44 ft Mast Arm
TPW
1
EA
1,500.00
138
Install 48 ft Mast Arm
TPW
1
EA
1,500.0(1
139
Install 52 ft Mast Arm
TPW
1
EA
1,500.00
140
Install 56 ft Mast Arm
TPW
1
EA
1,500.0(1
141
Install 6O ft Mast Arm
TPW
1
EA
1,500.00
142
Furnish/Install TY 1 Signal Foundation
TPW
1
EA
2,000.00
143
Furnish/Install TY 3 Signal Foundation
TPW
1
EA
6,460.00
144
Furnish/Install FEBN-81-81-BA (TXDOT Non -Fused Breakaway Connectors)
TPW
1
EA
228.00
145
Remove Foundation 2' Below Grade
TPW
1
EA
2,000.00
146
Furnish/Install TY 4 Signal Foundation
TPW
1
EA
7,600.00
147
Furnish/Install TY 5 Signal Foundation
TPW
1
EA
8,892.00
148
Furnish/Install Signal- Screw in Base Foundation
TPW
1
EA
5,000.00
149
Furnish/Install Signal Cabinet Foundation
TPW
1
EA
5,244.00
150
Furnish/Install Signal Cabinet Foundation with pedestal electrical service
TPW
1
EA
12,500.00
151
Furnish/Install Signal Cabinet I BBU Foundation
TPW
1
EA
4,560.00
152
Furnish/Install Controller & Cabinet, Pole MINT
TPW
1
EA
22,750.00
153
Furnish/Install Controller & Cabinet, Ground MNT
TPW
1
EA
40,000.00
154
Furnish/Install Non -Metered Pole Mounted Contactor
TPW
1
EA
8,000.00
155
Furnish/Install 120-240 Volt Single Phase Metered Pedestal
TPW
1
EA
7,600.00
156
Furnish/Install 240-480 Volt Single Phase Tran socket Metered Pedestal
TPW
1
EA
9,880.00
157
Install LED Lighting Fixture
TPW
1
EA
304.00
158
Furnish/Install LED Lighting Fixture for luminaire
TPW
1
EA
1,500.00
159
Furnish/Install 40' Wood Light Pole
TPW
1
EA
2,500.00
160
Furnish/Install 8' Wood Light Pole Arm
TPW
1
EA
950.00
161
Furnish/Install 35' Wood Light Pole
TPW
1
EA
2,500.00
162
Furnish/Install 30' Wood Light Pole
TPW
1
EA
2,000.00
163
Furnish/Install Alum Sign Ground Mount City Std
TPW
1
EA
1,000.00
164
Furnish/Install Alum Sign Ex.Pole Mount
TPW
1
EA
500.00
165
Install Alum Sign Mast Arm Mount
TPW
1
EA
456.00
166
Install Alum Sign Ground Mount
TPW
1
EA
304.00
167
Install Alum Sign Ex Pole Mount
TPW
1
EA
304.00
168
Remove and locate Sign Panel
TPW
1
EA
532.00
169
Install Sign Panel
TPW
1
EA
304.00
170
Span Wire (3/16")
TPW
1
LF
5.00
171
Span Wire (1/4")
TPW
1
LF
5.00
172
Span Wire (5/16")
TPW
1
LF
5.00
173
Span Wire (3/8")
TPW
1
LF
5.00
174
Furnish/Install TxDOT Type 3 Curb Ramp
TPW
1
EA
4,940.00
175
Remove Conductor
TPW
1
EA
38.00
176
Furnish/Install Back Plate on Existing Signal Head
TPW
1
EA
550.00
177
Remove Luminaire Arm
TPW
1
EA
500.00
178
Install 8' Woad Light Pale Arm
TPW
1
EA
400.00
179
Furnish/Install Breakaway Anchor Supports
TPW
1
EA
304.00
180
Install Type 41 Signal Pole
TPW
1
EA
2,500.00
181
Install Type 42 Signal Pole
TPW
1
EA
2,500.00
182
Install Type 43 Signal Pole
TPW
1
EA
2,500.00
183
Install Type 44 Signal Pole
TPW
1
EA
2,500.00
184
Install Type 45 Signal Pole
TPW
1
EA
2,500.00
185
Install Type 46 Signal Pole
TPW
1
EA
2,500.00
186
Remove ground mounted cabinet
TPW
1
EA
760.00
187
Remove pole mounted cabinet
TPW
1
EA
2,000.00
188
Furnish/Install traffic related sign (other than Metro sign)
TPW
1
EA
750.00
189
Remove traffic related sign (other than Metro sign)
TPW
1
EA
300.00
Change Order Additions Page 2 of 4
190
Concrete Sidewalk Curb 9"
TPW
1
LF
90.00
191
Install Retaining wall (higher than 9-inch)
TPW
1
CY
1,520.00
192
Install railroad black out sign
TPW
1
EA
912.00
193
Police support per officer (3 hour)
TPW
1
HR
304.00
194
Furnish/Install 4-inch Aluminum extension pole for PTZ camera
TPW
1
EA
646.00
195
Install Fish -Eye Detection System (Grid Smart, Mio Vision or similar)
TPW
1
EA
836.00
196
Furnish/Install Install Fish -Eye Detection System (Grid Smart, Mio Vision or similar)
TPW
1
EA
45,600.00
197
Remove cable
TPW
1
LF
5.00
198
Swap communication device (Modem, PTZ)
TPW
1
EA
2,500.00
199
Salvage Traffic Signal
TPW
1
Ea
15,000.00
200
Dispose full traffic signal
TPW
1
EA
15,000.00
201
Dispose partial traffic signal - percentage to be approved by engineer
TPW
1
EA
4,000.00
202
Install metro signs on mast arm or on cantilever (City furnish)
TPW
1
EA
1,000.00
203
Furnish/Install cantilever arm
TPW
1
EA
3,000.00
204
Signal Cabinet Foundation - 350i
TPW
1
EA
4,940.00
205
Install traffic signal head
TPW
1
EA
608.00
206
Install Ped Push button
TPW
1
EA
122.00
207
Install signal cable in existing conduit
TPW
1
LF
5.00
208
Install microwave radar or video detector
TPW
1
EA
1,368.00
209
Install traffic monitoring camera
TPW
1
EA
1,368.00
210
Install traffic sign on span wire
TPW
1
EA
608.00
211
Install blank -out sign
TPW
1
EA
912.00
212
Install traffic sign ground mounted on TXDOT breakaway post
TPW
1
EA
608.00
213
Furnish/Install signal foundation anchor bolts (set of 4)
TPW
1
EA Set
2,280.00
214
Furnish/install CATSe cable
TPW
1
LF
4.00
215
Furnish/Install Hybrid Detection Cable
TPW
1
LF
6.00
216
Furnish/Install Powder coat black signal pole WITH Luminaire and mast arm 16'-36' assembly
TPW
1
EA
12,920.00
217
Furnish/Install Powder coat black signal pole WITHOUT Luminaire and mast arm 16'-36' assembly
TPW
1
EA
12,464.00
218
Furnish/Install Powder coat black signal pole WITH Luminaire and mast arm 40'-48' assembly
TPW
1
EA
15,428.00
219
Furnish/Install Powder coat black signal pole WITHOUT Luminaire and mast arm 40'-48' assembly
TPW
1
EA
14,668.00
220
Furnish/Install Powder coat black signal pole with Luminaire and mast arm 52'-60' assembly
TPW
1
EA
22,800.00
221
Furnish/Install Powder coat black signal pole without Luminaire and mast arm 52'-60' assembly
TPW
1
EA
22,800.00
222
Furnish/Install Powder coat black Ped pole 5-foot Assembly
TPW
1
EA
1,824.00
223
Furnish/Install Powder coat black Ped pole 15-foot Assembly
TPW
1
EA
2,128.00
224
Provide Equipment and Operator for 3rd Party
TPW
1
HR
760.00
225
Provide Equipment and Operator
TPW
1
HR
608.00
226
Replace 6" Concrete Driveway
TPW
1
SF
40.00
227
Unclassified Excavation
TPW
1
CY
228.00
228
Miscellaneous Structure Adjustment (inflation)
TPW
1
EA
2,500.00
229
Concrete Sidewalk 5"
TPW
1
SF
30.00
230
Concrete Driveway 6"
TPW
1
SF
40.00
231
Concrete Driveway 7"
TPW
1
SF
40.00
232
Concrete Driveway 8"
TPW
1
SF
50.00
233
Concrete Median
TPW
1
SF
350.00
234
Concrete Median (MONO NOSE)
TPW
1
SF
350.00
235
Concrete Median (NOSE)
TPW
1
SF
350.00
236
Sidewalk Clean-up
TPW
1
SF
3.00
237
Site Clearing
TPW
1
SY
225.00
238
Tree Protection
TPW
1
EA
608.00
239
Furnish/Install Conduit 11/2" CONDT PVC SCH 80 (B)
TPW
1
LF
35.00
240
Furnish/Install Conduit 1 1/2" CONDT PVC SCH 80 (T)
TPW
1
LF
30.00
241
Furnish/Install 30' - 20' Ped Pole Assmbly
TPW
1
EA
3,000.00
242
Furnish/Install 30' Timber Pole
TPW
1
EA
2,000.00
243
Furnish/Install 35' Timber Pole
TPW
1
EA
2,000.00
244
Furnish/Install 40' Timber Pole
TPW
1
EA
2,500.00
245
Furnish/Install 50' Timber Pole
TPW
1
EA
3,000.00
246
Furnish/Install 4' Hand Rail on Top of Headwall
TPW
1
LF
289.00
247
Furnish/Install Block Sod Placement
TPW
1
SY
35.00
248
Furnish/Install Communication Modem (complete installation)
TPW
1
EA
2,860.00
249
Furnish/Install Elec Sery Pole Mnt
TPW
1
EA
8,470.00
250
Furnish/Install Model 712 Preemption Detector
TPW
1
EA
2,900.00
251
Furnish/Install NO 10 Insulated Elec Condr
TPW
1
LF
5.00
252
Furnish/Install NO 6 Bare Elec Condr SLD
TPW
1
LF
3.75
253
Furnish/Install NO 6Insulated Elec Condr
TPW
1
LF
4.10
254
Furnish/Install NO 8 Bare Elec Condr
TPW
1
LF
8.20
255
Furnish/Install NO 8 Insulated Elec Condr
TPW
1
LF
4.00
256
Furnish/Install Advanced Warning Flasher Assmbly (AC)
TPW
1
EA
9,800.00
257
Furnish/Install Advanced Warning Flasher Assmbly (Solar)
TPW
1
EA
11,800.00
258
Furnish/Install Pedestrian Hybrid Beacon (AC)
TPW
1
EA
8,700.00
259
Furnish/Install Pedestrian Hybrid Beacon (Solar)
TPW
1
EA
9,200.00
260
Furnish/Install Roadside Flashing Beacon Assembly (AC)
TPW
1
EA
8,700.00
261
Furnish/Install Roadside Flashing Beacon Assembly (Solar)
TPW
1
EA
9,460.00
262
Furnish/Install RRFB Assembly Double Sided (AC)
TPW
1
EA
14,740.00
263
Furnish/Install RRFB Assembly Double Sided (Solar)
TPW
1
EA
15,290.00
264
Furnish/Install RRFB Assembly Single Sided (AC)
TPW
1
EA
12,683.00
265
Furnish/Install RRFB Assembly Single Sided (Solar)
TPW
1
EA
14,080.00
266
Furnish/Install School Zone Flashing Assembly (AC)
TPW
1
EA
18,800.00
267
Furnish/Install School Zone Flashing Assembly (Solar)
TPW
1
EA
20,350.00
268
Install 120-240 Volt Signal Phase Metered Pedestal
TPW
1
EA
2,736.00
269
Install 240-480 Volt Signal Phase Transocket Metered Pedestal
TPW
1
EA
3,800.00
270
Install Audible Pedestrian Pushbutton Station
TPW
1
EA
300.00
271
Install BBU System EXT Mounted
TPW
1
EA
3,000.00
272
Install Cantilever Arm
TPW
1
EA
1,500.00
273
Install Communication Modem (complete installation)
TPW
1
EA
880.00
274
Install Advanced Warning Flasher Assmbly (AC)
TPW
1
EA
3,500.00
275
Install Advanced Warning Flasher Assmbly (Solar)
TPW
1
EA
3,500.00
276
Install Roadside Flashing Beacon Assembly (AC)
TPW
1
EA
3,500.00
277
Install Roadside Flashing Beacon Assembly (Solar)
TPW
1
EA
3,500.00
278
Install RRFB Assembly Double Sided (AC)
TPW
1
EA
3,500.00
279
Install RRFB Assembly Double Sided (Solar)
TPW
1
EA
3,500.00
280
Install RRFB Assembly Single Sided (AC)
TPW
1
EA
3,500.00
281
Install RRFB Assembly Single Sided (Solar)
TPW
1
EA
3,500.00
282
Install School Zone Flashing Assembly (AC)
TPW
1
EA
3,500.00
283
Install School Zone Flashing Assembly (Solar)
TPW
1
EA
3,500.00
284
Install Signal Cabinet, Ground MINT
TPW
1
EA
3,300.00
285
Install Signal Cabinet, Pole MNT
TPW
1
EA
3,300.00
H6
Install Strain Pole
TPW
1
EA
1,976.00
287
Install Street Light Arm
TPW
1
EA
1,500.00
288
IRemove 2" Ped Push BTN Station W/ Sign
TPW
1
EA
250.00
289
IRemove 120-240 Volt Signal Phase Metered Pedestal
TPW
1
EA
2,000.00
Change Order Additions Page 3 of 4
290
Remove 240-480 Volt Single Phase Transocket Metered Pedestal
TPW
1
EA
2,000.00
291
Remove Pedestrian Pushbutton Station
TPW
1
EA
250.00
292
Remove BBU System
TPW
1
EA
760.00
293
Remove Brick Pvmt
TPW
1
SF
50.00
294
Remove Cabinet Foundation
TPW
1
EA
2,000.00
295
Remove Cantilever Arm
TPW
1
EA
2,000.00
296
Remove Communication Modem (complete system)
TPW
1
EA
330.00
297
Remove Concrete Driveway
TPW
1
SF
20.00
298
Remove Detection Equipment(Various Types)
TPW
1
EA
500.00
299
Remove Elec Sery Pedestal
TPW
1
EA
2,000.00
300
Remove Elec Sery Pole Mnt
TPW
1
EA
660.00
301
Remove Mast Arm (Various Types)
TPW
1
EA
2,000.00
302
Remove Ped Pole (Various Types)
TPW
1
EA
2,500.00
303
Remove Ped Signal Head Assmbly
TPW
1
EA
330.00
304
Remove Pole Foundation
TPW
1
EA
2,000.00
305
Remove Preemption Equipment (Various Types)
TPW
1
EA
500.00
306
Remove Prefab PELCO Anchor Foundation (or approved equivalent)
TPW
1
EA
1,140.00
307
Remove PTZ Camera (complete system)
TPW
1
EA
500.00
308
Remove Advanced Warning Flasher Assmbly (AC)
TPW
1
EA
1,500.00
309
Remove Advanced Warning Flasher Assmbly (Solar)
TPW
1
EA
1,500.00
310
Remove Roadside Flashing Beacon Assembly (AC)
TPW
1
EA
1,500.00
311
Remove Roadside Flashing Beacon Assembly (Solar)
TPW
1
EA
1,500.00
312
Remove RRFB Assembly Double Sided (AC)
TPW
1
EA
1,500.00
313
Remove RRFB Assembly Double Sided (Solar)
TPW
1
EA
1,500.00
314
Remove RRFB Assembly Single Sided (AC)
TPW
1
EA
1,500.00
315
Remove RRFB Assembly Single Sided (Solar)
TPW
1
EA
1,500.00
316
Remove School Zone Flashing Assembly (AC)
TPW
1
EA
1,500.00
317
Remove School Zone Flashing Assembly (Solar)
TPW
1
EA
1,500.00
318
Remove Signal Cables
TPW
1
LF
5.00
319
Remove Signal Head (3-Sect, 4-Sect, or 5-Sect)
TPW
1
EA
900.00
320
Remove Signal Pole (Various Types)
TPW
1
EA
2,000.00
321
Remove Various Thickness Conc Pvmt HES
TPW
1
SF
30.00
322
Dispose of Pole and Mast Arm Assembly
TPW
1
EA
4,000.00
323
Dispose/Salvage Pole and Mast Arm Assembly
TPW
1
EA
4,000.00
324
Dispose/Salvage Traffic Signal
TPW
1
LS
15,000.0C
325
Install Preemption Equipment (Various Types)
TPW
1
EA
2,200.00
326
Miscellaneous Structure Adjustment(xxxxxx)
TPW
1
EA
2,500.00
327
05286001 COLORED TEXTURED CONIC(4")
TPW
1
SY
95.00
328
0528 6002 COLORED TEXTURED CONIC (6")
TPW
1
SY
172.00
329
05286003 COLORED TEXTURED CONIC(8")
TPW
1
SY
162.00
330
Furnish/Install Brick Pvmt
TPW
1
SF
250.00
331
Furnish/Install Metro Street Name Sign
TPW
1
EA
2,900.00
332
Furnish/Install Reconnect Conductor
TPW
1
EA
500.00
333
Install Brick Pvmt
TPW
1
SF
75.00
334
Install Metro Street Name Sign
TPW
1
EA
300.00
335
Portable Message Sign
TPW
1
WK
1,400.00
336
Prepare Conduit
TPW
1
LF
5.00
337
Remove Sign Post
TPW
1
EA
350.00
338
ITraffic Control Single Lane or Shoulder Closure per day
TPW
1
EA
6,415.00
339
End of Road Barricade
TPW
1
LF
158.00
340
lWork Order Mobilization
LS
30,001.00
TPW
0
#REF!
Sub Total Additions
Change Order Additions Page 4 of 4
FORT M-MTH City of Fort Worth
Change Order Deletions
Project Name 2020 Neighborhood Safety Contract City Sec # 54491
Client Project # Various - On -Call Contract
Contractor EARTC PM Clint Hoover Inspector Clint Hoover
Change Order Submittal # Date 212212023
Change Order Deletions Page 1 of 2
Change Order Deletions Page 2 of 2
MISBE for this Change Order
M&C Review
Page 1 of 2
CITY COUNCIL AGENDA
DATE: 8/11/2020 REFERENCE **M&C 20- LOG NAME:
NO.: 0529
CODE: G TYPE: CONSENT PUBLICHEARING:
Official site of the City of Fort Worth, Texas
FORTWORTH
r
20ON-CALL TPW &
NEIGHBORHOOD SAFETY
CONTRACT-EARTC
NO
SUBJECT: Authorize Execution of a Unit Price Contract with EAR Telecommunications, Inc. dba
EARTC in an Amount Not to Exceed $4,500,000.00 for Task Order Construction Services
for the Installation of Projects Relating to Traffic Management, Street Light
Improvements, Sidewalks and Sidewalk Ramps Along with School Zone Flashing
Beacons, with Two Renewal Options (ALL COUNCIL DISTRICTS)
RECOMMENDATION:
It is recommended that the City Council authorize the execution of a unit price contract with EAR
Telecommunications, Inc. dba EARTC in an amount not to exceed $4,500,000.00 for task order
construction services for the installation of projects relating to traffic management, street light
improvements, sidewalks and sidewalk ramps along with school zone flashing beacons, with two
options for renewal.
DISCUSSION:
This contract will provide for construction services on an as -needed (task order) basis for the
construction of projects related to traffic management, street light improvements, sidewalks and
sidewalk ramps along with school zone flashing beacons within the City limits of Fort Worth. The
contract amount is capped at $4,500,000.00. The initial contract term is one year and may be
renewed up to two (2) additional terms upon the earlier expiration of contract time or funds under the
same terms, conditions, and unit prices. The project was bid in a low bid format to determine unit
prices to be paid when task orders are issued.
Notice of bids was published in the Fort Worth Star -Telegram on April 23 and April 30, 2020. On
June 4, 2020, three companies submitted the following bids:
CONTRACTOR BID
EARTC $1,586,018.00
Siemens $1,898,281.00
Durable Specialties, Inc. $2,074,040.00
The unit prices were compared to other similar projects and were determined to be fair and
competitive. Task orders will be paid at the established unit prices.
Projects identified initially include: signal reconstruction at Sycamore School Road at Hawkwood
Trail/Wagonwheel Road; 2900 Block Hulen Street; and East Berry Street and Mississippi Avenue.
EAR Telecommunications LLC is in compliance with the City's BDE Ordinance by committing to MBE
participation on this project. The City's MBE goal on this project is 51%.
FISCAL INFO RMATIONICERTIFICATION-.
The Director of Finance certifies that funds are available in the current operating and capital budgets,
as previously appropriated, in the participating departments' Operating and Capital funds to support
http://apps.cfwnet.org/eouncit_packetlmc_rcview.asp?]D=28098&councildate=8/11/2020 8/14/2020
M&C Review
Page 2 of 2
the approval of the above recommendation and award of the contract. Prior to any expenditure being
incurred, the participating departments have the responsibility to validate the availability of funds.
rrtment Account Project Program Activity Budgc
ID I I ID I I I Year
Fund I Department I Account I Project I Program Activity Budget
ID I Year
Submitted for City Manager's Office bv: Dana Burghdoff (8018)
Orminating_Department Head: William Johnson (7801)
Additional Information Contact: Tanya Brooks (7861)
ATTACHMENTS
Map Berry St & Mississippi St. df
Map Hulen St & Arlington Heights HS Driveway.Rdf
Ma Sycamore School Rd & Hawkwood Trail Rd MaR.Rdf
nce # FAmount
field 2
7.
http://apps.efwnet.org/eouncil_packctlme review.asp?ID=28098&councildate=8/11/2020 8/14/2020
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
DOCUMENT TITLE: 2020 Neighborhood Safety Contract - Contract
54491 (Change Order 3) (Various Locations)
M&C: 20-0529 CPN: CSO: DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Clint Hoover
TPW - Signature
2.
Anna Benavides
TPW — Initial
AS
Al
3.
Rajnish Gupta
TPW - Signatures
4.
Martin Phillips
TPW — Initial
�P
5.
Lauren Prieur
TPW - Signature
6.
Doug Black
Legal — Signature
Id4bWh
7.
William Johnson
CMO - Signature
W,
8.
Melissa Brunner
CSO - Signature
9.
Jannette Goodall
CSO - Signature
IJ L
10.
Allison Tidwell
CSO - Initial
11.
I
Tabitha Giddings
I
I TPW
I
Iy
I
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES []No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractskFortWorthTexas.gov at ext. 7233 for pickup when completed.
Thank you!