HomeMy WebLinkAboutOrdinance 6530 ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF MOBERLY STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS; DECLARING THE CONTRACT bIITH
AUSTIN ROAD COMPANY FOR THE CONSTRUCTION OF SAID
IMPROV2416NT3 FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE,
EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSES5-
MENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED
AND ALLOW-ED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY
SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAP-
TION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH,
TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE
RECOAD3 OF SAID CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with AUSTIN ROAD COMPANY for the making and construction of certain
street improvements on the hereinafter described portions of streets, avenues and public
places in said City, to-wit:
UNIT 1: MOBERLY STREET From Nell Street to Eastover Avenue, known
and designated as Unit 1, Project No. 104-
24000-217.
UNIT 2: PARKER HENDERSON ROAD Deleted
UNIT 3: ENOCH DRIVE From Vanessa Drive to 146' north of Laurie
Drive, known and designated as Unit 3,
Project No. 104-24000-217.
UNIT 4: VANESSA DRIVE From Enoch Drive to 145' east of Lanewood
Drive, known and designated as Unit 4,
Project No. 104-24000-217.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
Pity of Fort Worth, Texas, including Ordinance No. 6451 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. .6451 and
WHEREAS,, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT-.
Ia
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; ,and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
IIe
The Mayor, be, and he is hereby, directed to issue and execute in the name
of the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, state the name or names of the true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
When each of the certifiactes has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the. appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage.
PASSED AND APPROVED THIS day of 19
APPROVED AS TO FORM AND LEGALITY.,
City Attorney
PROJECT NO. 104-24000-217, UNIT 1: MOBERLY STREET FROM NELL STREET TO EASTOVER AVENUE,
to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on
a six-inch thick cement stabilized subgrade with seven-inch high concrete curb and eight-
een-inch wide concrete gutter so that the finished roadway will be thirty feet wide.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
NORTH SIDE OF STREET J. T. COUCH ADDITION
BEGINNING AT NORTHEAST CORNER OF MOBERLY AND NELL
Laura Helen Ramos 9 3 133' Adjusted to
4827 Nell Street Res. 100' Pavement $3.83 $383.00
100' Curb & Gutter 2.67 267 .00
$ 650.00
ECHO HEIGHTS ADDITION
Zella M. Blythe 11R 1 117' Adjusted to
4840 Eastover Drive Res. 100' Pavement $3.83 $383.00
100' Curb & Gutter 2.67 267 .00
$ 650.00
EASTOVER AVENUE INTERSECTS
SOUTH SIDE OF STREET
Medallion Builders, Ltd.1 1OR 117' Adjusted to
3230 Valley Forge Trail Res. 100' Pavement $3.83 $383.00
100' Curb & Gutter 2.67 267.00
$ 650.00
J. T. COUCH ADDITION
Daniel L. Hulsey 1 4 133' Adjusted to
2916 Travis Avenue Res. 100' Pavement $3.83 $383.00
100' Curb & Gutter 2.67 267.00
$ 650.00
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . $2,600.00
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . . 2,560.10
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . $5,160.10
IV
PROJECT NO. 104-24000-217, UNIT 3: ENOCH DRIVE FROM VANESSA DRIVE TO 146' NORTH OF
LAURIE DRIVE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete
pavement on a six-inch thick cement stabilized subgrade so that the finished roadway will
be thirty feet wide.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHWEST CORNER OF ENOCH DRIVE AND VANESSA DRIVE
WEST SIDE OF STREET CAROL OAKS ADDITION SECTION 3
Robert Sullins 7 & 11 240' Adjusted to
812 Park Row 8 Res. 200' Pavement $3.83 $766.00
Arlington, Texas 200' Curb & Gutter 2.67 534.00
$1,300.00
LAURIE DRIVE INTERSECTS
Robert Sullins 11 13 120' Adjusted to
812 Park Row Res. 100' Pavement $3.83 $383.00
Arlington, Texas 100' Curb & Gutter 2.67 267 .00
$ 650.00
EAST SIDE OF STREET BURTON PLACE ADDITION
Harold E. Kurtz, Jr. 389 Res. 410' Pavement $3.83 $1,570.30
1605 Clover Lane 37, 36 & 35 410' Curb & Gutter 2.67 1,094.70
$2,665.00
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . . $4,615.00
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . 4,469.68
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . . $9,084.68
...........____.......... .......... ....
PROJECT NO. 104-24000-217, UNIT 4: VANESSA DRIVE FROM ENOCH DRIVE TO 145' EAST OF
LANEWOOD DRIVE, to be improved by constructing a six-inch thick hot-mix asphaltic
concrete pavement on a six-inch thick cement stabilized subgrade with seven-inch thick
concrete curb and eighteen-inch wide concrete gutter, so that the finished roadway will
be thirty feet wide.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
BEGINNING AT THE NORTHWEST INTERSECTION OF VANESSA DRIVE AND ENOCH DRIVE
NORTH SIDE OF STREET BURTON PLACE ADDITION
Harold E. Kurtz, Jr. 38 470' Adjusted to
1605 Clover Lane Res. 370' Pavement $3.83 $1,417 .10
370' Curb & Gutter 2.67 987.90
$2,405.00
SOUTH SIDE OF STREET CAROL OAKS ADDITION SECTION 3
Robert Sullins 15 9 120' Adjusted to
812 Park Row Res. 100' Pavement $3.83 $383.00
Arlington, Texas 100' Curb & Gutter 2.67 267'.00
$ 650.00
IANEWOOD DRIVE INTERSECTS
Robert Sullins 13 8 355' Pavement $3.83 $1,359.65
812 Park Row thru Res. 355' Curb & Gutter 2.67 947.85
Arlington, Texas 17 $2,307.50
TOTAL COST TO PROPERTY OWNERS . . . . . . . . . . . $ 5,362.50
TOTAL COST TO CITY OF FORT WORTH . . . . . . . . . . 6,135.69
TOTAL ESTIMATED CONSTRUCTION COST . . . . . . . . . $11,498.19
y City' of Fort Worth,' Texas
Mayor nd CouncilC6mmunication
n,� E possie ` ; SUBJECT: Final Payment - aaeaarnern.t PAGE
- - ' � at 4 Locations in Developer's
z 1�L-Fp � of
trn
Final Council action on the project described below Is requested:
'Project Description,
Name: Assessment Paving at 4 Locations in
Developer's Contracts Project Number
104-24000-217
Contractor; Austin ati Road Company
Contract Awarded: "ebru r 22, 1971 ( C-1921)
Word, Order laa°meal: April 1, 1971
Work, ruler Effective: April 11, 1971
Hate of Final Inspection and Approval: June 4, 1971
Working Time id: Working Days - 7 clays (deleted
Unit a 1 rkin treys
Wbrking "t":1me Used: 1.3 Working Days
e
r:o ecst Goat aarncl Financing
Original Bid Price: $44,193.09
Change Order No. 1: -16,652.20 (Deleted Unit 2, 4/5/71)
111 1 -172,2, 3/`22/71)
11e, iced Contract Price; 27,540.
Final Construction Cost: $23,402.70
Leas Coring Costs: --- $54.22
Final Contract Cost: $23,348.48
Partial Payments Previously Made: 3, mount: $20,78419
Final Payment Due: $2,559.29
Payment to e "asp e from Project Account Number 104-24000-217. Sufficient
funs are available.
Deviation from 111..1 Price: The final cost of this project is $4,192.41
under the revised contract price because of variations between quantities
estimated in the contract documents and quantities actually measured and
used at the job site, as follows:
1) the need for fewer utility adjustments for as savings of $896.40,
2") the need for 143 L.1q.� Mesa 7" curb` 18" gutter for aa. savLa s of
1.11.29,
) time need for 71 S.Y. leas 6" pavement for a savings of $201.64,
4) the need for ,59 tons less HMAC tranaitttno for as savings of $472.00,
, ) nao " metal subdra.lrn needed for a savings of $1,683.011,,
) no topsoil needed for a savings of 12711.011, as l
7) miscellaneous variations decreasing the s tber unit host items by
DATE REFER ENCE SUBJECT: Final Payment - Assessment PAGE
NUMBER Paving at 4 Locations in Developer's 2
8/9/71 FP-819 --coitzaats- - of
Compliance with Sgecifications
During testing on this project 11 iwrings were inade with the following
results:
Exceeds Even with Below Specs but Below
Specs Ssecs Within, Tolerance Tolerance
Paving 10 0 0 i
Subgrade 4 7' 0 0
On the entire project the average thickness of the HMAC paving is 6.31 inches
as compared to the 6.00 inches specified, and the average thickness of the
stabilized subgrade is 6.07 inches as compared to the 6.00 inches specified.
On 'Moberly Street (from Nell to Eastover, Unit Number 1) in the area of
the core shown below tolerance, five cores were drilled and an area some
50' in length was overlaid with I inch of additional HKAC. Tests made
during construction show that materials used were in compliance with con-
tract specifications.
Recownenda,tions
It is recommended that the project described above be accepted by the adoption
of an ordinance and that final payment of $2,559.29 be authorized to Austin
Road Company.
L:as
SUBMITTED BY: DNSPOSITIIOti,,,,,S Y"'dOUNCIL.' PRQ ESSEO y
Arr'APPROVED 0 OTHER (DESCRIBE) /F ET".,"�
CITY S ARY
r4l'
DATE
CITY MANAGER