HomeMy WebLinkAboutIR 0686INFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 23-0686
To the Mayor and Members of the City Council
April 18, 2023
Page 1 of 4
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
This Informal Report is in response to the City Council's request to receive a monthly update on
development activity within the City and the measures staff are using to improve the
development process. Staff also generates a monthly report to keep the Council informed of the
volume of development activity, process improvements and staff's performance in implementing
changes and improving the delivery of plan review and permits. This activity report consists of
metrics associated with building permits, infrastructure, stormwater development, and water
development plan review. It provides updates on continuous development process improvement
efforts. The monthly Development Activity Report is attached for your use and information. The
following highlights are for the month of March 2023:
March 2023 Highlights
Building Permits
Permits
Mar 2023*
Feb 2023
Mar 2022
Change
Change
New Commercial Permits Issued
97
82
18%
82
18%
New Multifamily Permits Issued (1)
14
1
1300%
80
-85%
New Detached Multifamily Permits
1
34
-97%
70
-99%
Issued (2)
New Residential Dwelling Permits
486
289
68%
888
-45%
Issued (3)
Total New Permits Issued (4)
596
406
47%
1120
-47%
Total Commercial Valuation
$190M
$240M
°
-21 /°
$198M
-4%
(incl. new, remodels & additions)
New Commercial Permit Apps
76
40
90%
81
-6%
Received (5)
New Multi -family & Detached
43
20
115%
20
115%
Multi -family Apps Received(5)
New Residential Dwelling Apps
621
364
71%
1047
-41%
Received (5)
Data as of April 1, 2023
(1) Includes apartments and Commercial Townhouse apartments
(2) Includes detached multifamily (i.e. single family for rent) properties- Data tracked as of Jan 2022
(3) Includes duplexes, townhomes on a single lot, single family and single family model homes (excludes Pool/Spa and Non -
Dwelling Strucures)
(4) Excludes New Non -Dwelling Structures and Pool/Spa
(5) New Commercial, New Multi -family & Detached Multi -family and New Residential Dwelling applications received only includes
new building permit applications
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 23-0686
To the Mayor and Members of the City Council
April 18, 2023
Page 2 of 4
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
Development Support Services
• The Overall Customer Service Satisfaction was 85% for either Very Positive or Somewhat
Positive for March 2023, based on 60 out of 71 responses. This is down from 87% for either
Very Positive or Somewhat Positive for February 2023, based on 58 out of 67 responses.
Out of 71 respondents only 22 people provided feedback. Majority of the feedback was
centered around improving the ACA and fortworthtexas.gov websites to make it easier to
navigate, helpful and more accurate. Refer to Chart A and Chart B, below.
• In March 2023, no customers responded to the Inspection team customer service survey.
• Chart A shows survey responses for March 2023.
Chart A How would you rate the quality of your customer service experience?
100.00% 84.50% 90.00%
80.00 %
60.00 %
40.00 %
20.00%
0.00%
Very Positive + Somewhat
Positive
March 2023
1.41% 0.00% 4.23% 0.00% 9.86%0.00%
Neutral Somewhat Negative Very Negative
■ City of Fort Worth Customers ■ CFW Goal
• Chart B shows commercial vs residential survey responses for March 2023.
Chart B Overall, how would you rate the quality of your customer service experience?
100.00% 85.37% 82.76 ° °0.00%
80.00 %
60.00 %
40.00 %
20.00% 0.00% 3.45% 0.00% 4.88% 3.45% 0.00% 9.76% 10.34%0.00%
0.00% 111
Very Positive + Somewhat Neutral Somewhat Negative Very Negative
Positive
March 2023 ■ City of Fort Worth Customers (Com.) ■ City of Fort Worth Customers (Res) ■ CFW Goal
ISSUED BY THE CITY MANAGER
FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 23-0686
To the Mayor and Members of the City Council
April 18, 2023
Page 3 of 4
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
X-Team Buildina Plan Review
X-Team Activity
Mar 23*
Feb 23
Change
Mar 2022
Change
X-Team Applications
19
12
58%
21
-10%
Conferences Held
1 9
7
29%
13
-31 %
Building Permits Issued
1 14
17
-18%
9
56%
Data as of April 1, 2023
X-Team Activity Totals
YTD 2023
CY 2022
CY'19-'21
Aggregate
Total
X-Team Applications
40
183
139
362
Conferences Held
25
136
68
229
Building Permits Issued
44
573
228
845
• As of April 1, 2023, there were 143 pending X-Team building permits.
Building Plan Review
• On April 1, 2023, the review times to first comment for Building Plans Review were as follows:
Days to first review Commercial Plans
Days to first review Residential Plans
Department -wide Building Permit Review
Actual 10 Days Goal 7 Days
Actual 5 Days Goal 7 Days
• For March 2023, the average departmental review times to first comment were as follows:
Days to first review Commercial Plans
Days to first review Residential Plans
Average 3 Days Goal 7 Days
Average 1 Days Goal 7 Days
ISSUED BY THE CITY MANAGER
FORT WORTH, TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS
No. 23-0686
To the Mayor and Members of the City Council
April 18, 2023
Page 4 of 4
SUBJECT: MONTHLY DEVELOPMENT ACTIVITY REPORT
Development Activitv Armlications
Type
Mar 2023*
Feb 2023
Mo - Mo
Change
Building Permits**
1799
1131
59%
Infrastructure Plans
77
62
24%
Community Facility Agreement
14
7
100%
Platted Lots (Residential & Non -Residential)
184
269
-46%
Plats
47
30
57%
Zoning /Site Plans
19
20
-5%
Data as orApnl 1, 2U23
** Incl: New Commercial & Residential, Comm/Res Remodel, Comm/Res Accessory, Comm/Res Addition, Occupancy Change of
Use. etc.
Business Process Improvement — Certificate of Occupancy Process
DSD has completed 21 out of the 31 total CO BPI recommendations. Seventeen (17)
recommendations were due by September 30, 2022. Of these 17, 14 have been completed and
3 are 95% complete. There are 14 recommendations due by April 30, 2023. Of these 14, 7 are
complete, 2 are 95% complete, 3 are 20% complete, and 2 are 10% complete.
Business Process Improvement — Pre-Platting/Platting Process
DSD has completed 7 out of the 13 total Pre -Plat/ Platting BPI recommendations. Eleven (11)
recommendations are due by March 31, 2023. Of these 11, 6 are complete, 3 are 95%
complete, 1 is 70% complete, and 1 is 50% complete. There are 2 recommendations due by
September 30, 2023. Of these 2, 1 is complete and the other recommendation is 95% complete.
Please contact D.J. Harrell, Development Services Director, at 817-392-8032 or
Dalton. Harrel l(a-)fortworthtexas.gov if you have any questions, concerns or comments.
David Cooke
City Manager
ISSUED BY THE CITY MANAGER
FORT WORTH, TEXAS
FORT WORTH.
Development
Activity Report
INSIDE THIS EDITION
I V I%AI VI 1 LmvLmv
BuildingPermits.......................................................................2
CFA and Platting...................................................................10
Infrastructure.........................................................................11
Traffic & Stormwater..............................................................14
Stormwater............................................................................15
Water.....................................................................................16
Development Process Improvement......................................17
Building Permit Comparison
25,000
19,537
20,000
18,455
16,349
14,717
14 573
E 15,000
13,467
10, 576
11,131
11,320
0 10,000
5,000
3,289
0
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
YTD
2023
■ Multi -Family
349
376
349
803
487
421
451
552
624
788
107
■Residential
8,115
8,471
8,792
9,522
10,562
11,687
11,523
13,920
15,552
15,998
2,741
■Commercial
2,112
2,284
2,179
2,528
2,418
2,609
2,599
1,877
2,279
2,751
441
Jan -
Mar 2022
•0
:•
Decrease
All data is in calendar year
New Single
-Family
Permits
1000
900
800
700
600
U) 500
E 400
a�
a 300
0
�* 200
100
0
-
Jan
Feb
Mar
Apr May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
■ 2021
601
480
510
655 849
906
499
331
415
752
656
475
■ 2022
537
606
835
535 550
570
636
725
720
405
480
250
■ 2023
193
278
478
Development Activity Report
2
New Multi -Family (MF) and Detached Multi -Family (DMF) Permits
400
350
300
250
E 200
n
150
0
100
50
IL
0
_1.
Jan
Feb Mar
Apr
2021 MF
1
7 39
13
■2021 DMF
2
7 72
0
■2022 MF
8
44 80
372
■2022 DMF
35
38 70
33
02023 MF
8
3 14
02023 DMF
11
34 1
1
1
1
_
i �mm
_ _AL_
. �
_
' ' -
1_I
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
20
7
18
4
12
5
13
19
232
2
8
2
0
4
0
0
9
64
11
11
1
7
3
14
1
4
0
4
78
221
1
212
New Multi -Family (MF) and Detached Multi -Family (DMF) Valuation
$250.0
$200.0
c $150.0
0
$100.0
$50.0
Jan Feb Mar Apr May Jun Jul Aug
2021 MF $0.4 $62.8 $50.5 $28.1 $160.1 $91.7 $17.6 $2.7
■2021 DMF $0.7 $0.7 $7.5 $- $26.7 $0.2 $2.3 $0.8
■2022 MF $16.1 $31.5 $59.4 $127.4 $37.3 $86.1 $212.3 $81.3
■2022 DMF $2.9 $1.9 $4.6 $3.5 $- $2.0 $- $0.2
■2023 MF $68.0 $1.5 $45.1
■2023 DMF $5.5 $12.5 $0.7
Sep
Oct
Nov
Dec
$27.4
$2.3
$45.6
$55.1
$-
$0.4
$-
$-
$4.5
$39.6
$32.0
$41.2
$9.2
$22.1
$7.0
$46.3
Development Activity Report
3
New Private Development, Non -Residential Commercial Permits*
140
120
100
80
E
a�
a 60
0
40
20
0
--
--
Jan
Feb
Mar
■ 2021
86
54
131
■ 2022
98
101
73
■ 2023
58
79
95
Apr May
50 83
59 45
Jun
96
50
Jul Aug
61 126
65 101
Sep
53
97
Oct
76
71
L _
Nov Dec
113 73
50 92
" Excludes all New Multi -family (MF) and Detached Multi -family (DMF), Education, Institutional and Townhouse Apartments,
additions and remodels.
New Private Development, Non -Residential Commercial Permit Valuation*
200
180
160
140
c 120
0
100
80
60
40
20
0 —
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■ 2021 $137 $84 $108 $118 $57 $160 $74 $113 $56 $170 $133 $77
■ 2022 $188 $107 $113 $170 $103 $28 $69 $111 $18 $165 $52 $77
■ 2023 $67 $180 $127
*Excludes all New Multi -family (MF) and Detached Multi -family (DMF), Education, Institutional and
Townhouse Apartments, additions and remodels.
Development Activity Report
4
New Non -Residential Commercial Permits*
160
140
120
100
U)
F 80
a
o 60
40
20
0
—--
--- —
Jan
Feb
Mar Apr May Jun Jul Aug Sep Oct Nov Dec
■ 2021
86
50
134 52 86 98 61 131 53 80 113 74
■ 2022
98
102
76 83 60 54 67 104 100 73 60 92
■ 2023
60
80
95
" Excludes New Multi -family (MF) and Detached Multi -family (DMF), New Townhouse Apartments, additions and remodels. Includes
Education and Institutional.
New Non -Residential Commercial Permit Valuations*
$450
$400
$350
$300
u, $250
c
0
$200
$150
$100
$50
$0 Jan Feb Mar Apr
■ 2021 $137 $96 $134 $169
■ 2022 $188 $107 $114 $170
■ 2023 $71 $182 $84
11
May
$73
$387
Jun
$160
$32
i
Jul
$74
$100
Id
Aug Sep
$195 $56
$181 $72
Oct
$188
$244
Nov
$133
$52
Dec
$81
$77
" Excludes New Multi -family (MF) and Detached Multi -family (DMF), New Townhouse Apartments, additions and remodels.
Includes Education and Institutional. All data is in calendar year.
Development Activity Report
5
Total Commercial Valuation*
$600
$500
$400
U)
.2 $300
$200
$100
$0-- --- -- — —
1 2 3 4 5 6 7 8 9 10 11 12
■ 2021 $187 $223 $276 $270 $299 $462 $192 $285 $119 $259 $273 $151
■ 2022 $304 $173 $198 $377 $496 $208 $441 $337 $162 $340 $312 $334
■ 2023 $200 $240 $190
" Data includes new, additions, and remodel permits for all commercial types including MF, DMF, Education and Institutional. All
data is in calendaryear.
Permit Valuation Comparison
Prev.
Difference
Prev.
Diff. Y-Y
Month
Month
M-M
Year
%
Year to
Date CY22
vs CY23
CategoryCurrent
200
-357
1029
New SF
478
278
835
949
1978
Permits
72%
-43%
-52%
$47.8M
-$55.7M
$175.5M
New SF
$97.5M
$49.7M
$153.2M
$188.1 M
$363.6M
$ Value
96%
-36%
-48%
New
-7
-122
253
Total
110
117
232
306
559
Comm
Permits
-6%
-53%
-45%
New
-$67.9M
$49.5M
$58AM
Total
$128.2M
$196.1 M
$177.7M
$469.1 M
$527.5M
Comm $
Value
-35%
-28%
-11 %
Development Activity Report
0
Large Commercial Projects*
Address
Council
District
Project Name
Work Description
Valuation
3451 Heritage Trace
4
H.E.B. Alliance Corp.
New Commercial Construction of Retail
$40,684,304
Pkwy
#801
Store
4830 & 4908 E
5
Hughes' House Phase 1
New Commercial Bldgs 1 & 2, 156 Total
$25,764,000
Rosedale St
Units, Fitness Area, Mgmt Space, Clubhous
4101 N Fwy, 2900
2
Blazing Trail
New Commercial Construction
$22,843,264
Mark IV Pkwy & 4049
Office/Warehouse Bldgs. 3, 4 & 5
North Fwy
1701 Commerce St
9
Sheraton Fort Worth -
Commercial Remodel of the 1st & 2nd
$18,100,000
Public Areas
Floor of Hotel
6 Various Addresses
8
Palladium East Berry
New Commercial Construction of
$17,500,000
Apartments Bldgs 2, 4 — 8, 210 Total Units
11000 S Fwy
6
McPherson Boulevard
New Commercial Construction of New
$17,100,000
Development
Shell Warehouse Bldg.
6730 NW Loop 820
7
True - Home 2 Suites
New Commercial Construction of 4 Story
$12,700,000
SR WB
Hotel
Hotel with 150 Total Units
100 Energy Way
9
Liebeck Group, LLC
Commercial Remodel of the 20th Floor
$5,382,000
15301 North link Dr
7
Pegasus Logistics
Commercial Remodel of Existing
$4,216,738
Office/Warehouse
3801 NE Loop 820
4
Assured Self Storage
New Commercial Construction of 4 Story
$4,000,000
Fwy
Mini Storage With Office
1400 8th Ave
9
BSW GME Phase 4
Commercial Remodel of Existing Garage
$3,661,196
Renovation
205 N Vacek St
9
Tarrant Area Food Bank
Commercial Remodel of Tarrant Area
$3,500,000
Ag Hub
Food Bank
5000 Village Creek
5
Libbey
Commercial Remodel of Structural Rack
$3,245,000
Rd
in Warehouse
6249 Altamesa Blvd
6
Fossil Creek Retail
New Commercial Construction of Pre-
$2,800,000
Shell
Engineered Retail Shell Bldg. &
Associated Flat Work
15200 Trinity Blvd
5
Refresco FTW
Commercial Remodel of Existing Bottling
$2,286,000
Alteration
Company Space
2201 Stonemont Way
Omni Cable
Commercial Remodel of Interior Finish
$2,200,000
out of Warehouse bldg., 1 Total Unit
814 W wilier Blvd
5
Cornerstone Assistance
Change of Use with Remodel of Vacant
$2,000,000
Network New Life
bldg. With 21 Total Units
Center 2
8901 Brewer Blvd
6
Avanta Chisholm Trail
New Commercial Construction of
$1,800,033
Clubhouse for Multifamily Development
12640 S Fwy
6
Burlington
Commercial Remodel of Interior &
$1,640,000
Exterior Spaces, Offices & Restrooms
2525 NE 28th St
2
Holland Vaquero Car
New Commercial Construction of Car
$1,100,000
Wash Partners, LP
Wash
3008 Marquita Dr
3
Marquita Holding LLC
New Commercial Construction of Pre-
$1,031,250
Engineered Metal bldg.
1530 Rio Grande Ave
9
RPGA Design Group
Change of Use with Remodel of an
$1,005,000
Office
Existing 3 Story Building
* Excludes Institutional and Educational Uses
Development Activity Report
Development Activity Report
I'At:W rXt:b1Ut:I1LIQ1 ref IIIIL rIt:dL IVIdIJ
0 1.25 2.5 5 7_5 10
Miles
Lepkid
l # Resental 9u:tlng PcMamh 2C•23 - Ety UmiL%
J • Restltlental 8 Ing Penner March 2C•23.aher GMenar0 yLrnts
— Mnlry Rr.w
T 7-73MnKipal LAW, L-slnds IMLIDs7
1 Arca �n ETJ L n7rr 13r MOPMt IAgr a nl
GY 23 March R*WdanLlal PYrmMs Pw. Eq. Mlki
Ljd - 5
M-16
M113-16
MIS -20
11103 -25
QnFwC3TYLMIT
*7
Development Activity Report
9
CFA Project Overview
$40.0
$35.0
$30.0
$25.0
c
$20.0
$15.0
$10.0
$5.0
$
ILL
Jan
Feb
Mar Apr
■ 2021
$7.3
$21.4
$21.1 $6.3
■ 2022
$16.5
$30.5
$29.3 $27.5
■ 2023
$16.4
$12.4
$21.7
All data is in calendar year
Platted Lots Overview
1800
1600
�, 1400
0
1200
io 1000
n
0 800
E 600
z 400
200
0
Jan
Feb
Mar
Apr
■ '21 Res
549
148
711
460
■ 21 Non-R
29
20
15
24
■ '22 Res
1551
947
99
840
■ '22 Non-R
27
121
9
19
■ '23 Res
380
248
165
■ '23 Non-R
5
21
19
All data is in calendar year
May
$16.9
$1.7
May
88
18
925
27
1 0June
$23.6
$24.5
June
1078
19
511
112
July
$14.7
$28.4
July
1218
8
819
33
Aug
$22.3
$13.8
Aug
918
14
204
12
I i i I
Sept Oct Nov Dec
$20.4 $14.7 $13.0 $14.2
$34.8 $7.7 $16.9 $14.1
Sept
167
6
1483
58
Oct
370
7
858
18
Nov
6
6
586
21
Dec
849
11
945
44
Development Activity Report 10
Infrastructure
Cycles Complete
52
54
52
52
13
Total Projects
181
153
173
240
46
Avg. Project Total Per Cycle
3.5
2.8
3.3
4.6
3.5
Total Accepted Projects
143
136
132
166
35
Plan Rev. & Ret w/n 14 days
94%
99%
98%
84%
85%
"All data is in calendar year
IPRC Quarterly Details*
1PRC Quarterly Report
Q1 2022
Q2 2022
Q3 2022
Q-
Cycles Complete
13
13
13
13
13
Total Projects
66
57
54
60
46
Avg. Projects Per Cycle
5.1
4.4
4.2
4.6
3.5
Avg. Accepted Projects Per Cycle
3.7
3.1
3.0
2.0
2.7
Plan Rev. & Ret w/n 14 days
100%
72%
80%
83%
85%
"All data is in calendar year
Public Infrastructure Residential Projects
$30.0
$25.0
$20.0
U)
o $15.0
$10.0
$5.0
$
Jan
Feb
Mar
Apr May Jun Jul Aug
Sep Oct Nov Dec
■ 2021
$2.6
$19.5
$16.3
$0.4 $18.3 $22.9 $12.0 $13.4
$19.3 $4.3 $13.0 $4.5
■ 2022
$16.5
$24.3
$25.3
$27.2 $0.3 $13.0 $18.2 $12.1
$27.6 $2.3 $14.7 $12.4
■ 2023
$14.1
$9.6
$16.3
All data is in calendar year
Development Activity Report 11
Public Infrastructure Commercial Projects
$4.5
$4.0
$3.5
$3.0
U)
o $2.5
$2.0
$1.5
$1.0
$0.5
$
Jan
Feb
Mar
Apr
■ 2021
$-
$0.2
$1.7
$0.8
■ 2022
$-
$3.9
$1.5
$0.1
■ 2023
$1.3
$0.2
$3.8
All data is in calendar vear
11 1 . L L -1
May Jun Jul Aug Sep Oct
$0.8 $0.2 $0.1 $1.5 $0.7 $0.1
$1.2 $0.5 $- $0.5 $0.1 $1.4
Public Infrastructure Industrial Projects
$10.0
$9.0
$8.0
$7.0
c $6.0
0
$5.0
$4.0
$3.0
$2.0
rt
$1.0
Jan
Feb
Mar Apr
■ 2021
$4.3
$1.2
$2.2 $3.3
■ 2022
$-
$-
$0.1 $-
■ 2023
$1.0
$0.1
$0.9
All data is in calendar year
May
$0.1
Jun
$8.6
Jul
$0.6
$3.7
Aug
$4.0
$0.3
Sep
$5.7
Oct
$5.4
$2.4
Nov
$0.2
Nov
$0.1
$0.9
L
Dec
$1.0
$0.1
Dec
$0.4
$0.2
Development Activity Report
12
Public Infrastructure Multi -Family Projects
$9.0
$8.0
$7.0
$6.0
c $5.0
0
$4.0
$3.0
$2.0
$1.0
$_
■ _
Jan
Feb
Mar Apr
■ 2021
$0.4
$0.4
$0.3 $0.8
■ 2022
$-
$2.4
$0.2 $-
■ 2023
$0.1
$1.8
$_
All data is in calendar year
May Jun Jul Aug
Sep Oct
$0.2 $- $2.0 $2.9
$- $5.0
$0.2 $1.8 $4.3 $0.9
$1.4 $_
Public Infrastructure Institutional Projects
$2.5
$2.0
0 $1.5
c
0
2 $1.0
$0.5
$_
■
■
■
Jan
Feb
Mar
Apr
May
■ 2021
$-
$-
$-
$-
$-
■ 2022
$-
$-
$-
$0.2
$0.1
■ 2023
$-
$0.6
$0.8
All data is in calendar year
11-
1
Jun Jul
Aug
Sep
$- $- $0.4
$0.3
$0.6 $2.3 $0.0
$-
M
Oct
$0.1
1
Dec
$7.7
$1.5
11
Nov Dec
$- $0.6
$0.6 $-
Development Activity Report
13
Traffic Review Performance
Traffic (TIA) Study Review Performance*
Newly Submitted Traffic Studies
CY'22 YTD '23 Mar'23
46 20 6
Traffic Submittal Review Cycles Completed
41 20 6
Avg. Review Time in Days for Completed Traffic Submittals (City)
17.9 10.0 9.8
Avg. Traffic Study Iterations (City)**
1.3 1.3 1.8
*TIA Study data supplied only for CY'22 & CY'23
**A study can be submitted multiple times prior to the reported month before being approved
Stormwater Review Performance
Stormwater Submittal Review Cycles Completed
1,246
1,643
373
114
Avg. Review Time (days)
7.4
7.2
7.4
8.7
% completed in 10 business days or less
93.9
97.5
93.9
91.1
Avg. IPRC Review Iterations (City)
2.7
2.4
2.8
1.8
Avg. Drainage Studies Iterations (City)*
3.1
3.2
4.1
3.6
Overall Customer Satisfaction Rating (1-5 scale)
3.6
4.6
3.8
1.0
Num. of Surveys Taken
18
24
4.0
1.0
*Item tracked as a result of HB 3167
New Stormwater Submissions
:E
70
.c
c 50
0
u i 40
E
= 30
U)°
20
10
0
--
-
-
-
Jan
Feb
Mar
Apr
■ 2021
26
26
39 26
■ 2022
39
50
67 49
■ 2023
30
35
47
All data is in calendar year
May
35
40
Jun
39
55
Jul
47
48
Aug
36
46
Sep
38
40
Oct
37
34
Nov
49
43
Dec
42
38
Development Activity Report
14
Stormwater Pipeline Number of Reviews
250
200
150
a�
a�
° 100
50
0
-
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Nov
Dec
Jan
Feb
Mar
'22
'22
'22
'22
'22
'22
'22
'22
'22
'22
'23
'23
'23
■ Reviews in process
184
181
178
182
196
196
192
186
200
209
193
168
199
■ Reviews with City
76
65
55
66
67
52
67
44
34
42
37
38
66
Stormwater Pipeline Average Days for Review
:e
:�
40
°
co
30
0
20
10
1
mill]
0
Mar
Apr
May Jun
Jul Aug
Sep
Oct Nov Dec
Jan
Feb Mar
'22
'22
'22 '22
'22 '22
'22
'22 '22 '22
'23
'23 '23
■Avg. age of Reviews 4
4
4 4
4 5
3
5 5 9
6
7 5
with City (Days)
■ Avg. age of Reviews 26
28
27 25
27 29
29
29 24 30
34
38 31
with Developer (Days)
Development Activity Report
15
Water/Sewer Study Review Performance
Water Study Review Performance
Newly Submitted Water Studies
CY'22
139
YTD '23
27
Mar'23
6
Water Submittal Review Cycles Completed
258
31
15
Avg. Review Time in Days for Completed Water Submittals (City)
14.4
11.2
13.4
Avg. Water Study Iterations (City)*
2.0
1.6
1.5
StudySewer •
Newly Submitted Sewer Studies
138
25
7
Sewer Study Review Cycles Completed
266
41
19
Avg. Review Time in Days for Completed Sewer Submittals (City)
14.3
9.9
10.3
Avg. Sewer Study Iterations (City)*
1.9
1.6
1.9
* A study can be submitted multiple times prior to the reported month before being approved
Water/Sewer Studies in Process
Water Study Reviews in Process
Nov
37
DecWater
31
28
-.
34
Mar
30
Water Study Reviews in Process with City
11
6
6
9
5
Water Study Reviews in Process with Owner
26
25
22
25
25
Avg. Water Study Review Completed - time with City (Days)
14.4
20.4
13.6
6.7
13.4
Avg. Water Study Review Completed - time with Owner (Days)
Sewer Study Reviews in Process
8.9
NovSewer
42
43.0
Dec-•
35
8.3
28
5.7
31
9.7
Mar
28
Sewer Study Reviews in Process with City
14
8
6
6
4
Sewer Study Reviews in Process with Owner
28
27
26
25
24
Avg. Sewer Study Review Completed - time with City (Days)
20.6
17.7
12.9
6.5
10.3
Avg. Sewer Study Review Completed - time with Owner (Days)
7.3
23.4
6.8
1.5
12.8
Development Activity Report
16
Active Development?
Task
Department/
or Eml
Staff Assigned
Accela • •
-•
Accela MAS Services
Development
Services, ITS
Development
•
Development
Update and republish process trees
Services, Water,
and TPW
ProcessBusiness
• •
Lean process evaluation of the
Development
Certificate of Occupancy Process
Services
Lean process evaluation of the
Development
Pre -Plat/ Platting process
Services
CountyTarrant
•
Update the 2008 Inter Local
Development
Agreement with Tarrant County
Services, TPW,
regarding plat approval jurisdiction in
and Legal
the City of Fort Worth's ETJ
Development
Infill Development Subdivision Project
Platting
Urban Forestry Master Plan
Urban Forestry
rocess Improvements
BMW
Status
flogy Improvements• ••
Accela MAS services began as of April 1st. DSD Accela
team has slated Accela report improvements, record
creation, and workflow enhancements for initial focus.
Collaboration for Accela improvements started the first
week of April.
• ••
Project Facilitation team is working on drafts. 4 are done
and ready to be published on the website. These will be
published as they are completed. All trees will be finished
and published on the website by April 21st.
• ••
DSD has completed 21 out of the 31 total CO BPI
recommendations. Seventeen (17) recommendations
were due by September 30, 2022. Of these 17, 14 have
been completed and 3 are 95% complete. There are 14
recommendations due by April 30, 2023. Of these 14, 7
are complete, 2 are 95% complete, 3 are 20% complete,
and 2 are 10% complete.
DSD has completed 7 out of the 13 total Pre -Plat/ Platting
BPI recommendations. Eleven (11) recommendations are
due by March 31, 2023. Of these 11, 6 are complete, 3
are 95% complete, 1 is 70% complete, and 1 is 50%
complete. There are 2 recommendations due by
September 30, 2023. Of these 2, 1 is complete and the
other recommendation is 95% complete.
'• • ••
County Staff returned the last version of the County
Subdivision Ordinance to their consultant for revisions,
and will take it to the County Commissioners for approval.
• - • ••
Consultant project team has completed the project
initiation and initial engagement task. Team held work
sessions with city DRC and Technical staff, DAC Infill
Development Subcommittee to gather information for
development of the amendment to the subdivision
ordinance.
To date staff has held four community meetings and a
public event that was attended by 37 people and resulted
in nine surveys. Next steps include the development of
recommendations and strategies. The first draft of the
master plan is due in May with the final master plan
expected in August 2023.
Development Activity Report 17
Development Services
D.J. Harrell, Director
Development Services Department
817-392-8032
Dalton. Harrell@Fortworthtexas.Gov
Building Permits
Allison Gray, Assistant Director
Development Services Department
Development Building Division
817-392-8030
Allison. Gray@Fortworthtexas.Gov
Infrastructure
Victor Tornero, Engineering Manager
Development Services Department
Infrastructure Development Division
817-392-7830
Victor.Tornero@Fortworthtexas.Gov
Stormwater
Tyson Thompson, Assistant Director
Development Services Department
Infrastructure Development Division
817-392-2120
Tyson.Thompson@Fortworthtexas.Gov
Water
Chris Harder, Director
Water Department
817-392-5020
Christopher.Harder@Fortworthtexas.Gov
Development Activity Report 18