Loading...
HomeMy WebLinkAboutOrdinance 6541 ORDINANCE NO.- - AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE CtOST OF IMPROVE- MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF FAST ALLEN AVENUE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE B COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE CITY; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Council of the City of Fort Worth, Texas, has heretofore ordered that each of the hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im- proved by raising, grading and filling same and by constructing thereon the following, to-wit: UNIT 1: EAST ALLEN AVENUE From a line 33' west of the east property line of Lot 14, Block 44; Hyde Highland Park. Addition, known and designated as Unit 1, Project No. 061-21304-4553, a one and one- half inch thick hot-mix asphaltic concrete surface course on existing concrete base and by reconstructing existing seven-inch high concrete curb and two-foot wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified, on a twenty-six foot roadway. UNIT 2: EAST ALLEN AVENUE From the west property line of Lot 8, Block 44, Hyde Highland Park Addition to the west property line of Lot 14, Block 55, Hyde Highland Park Addition, known and designated as Unit 2, Project No. 061-21304-4553, a one and one-half inch thick hot-mix asphaltic concrete surface course on existing concrete base and by reconstructing existing seven- inch high concrete curb and two-foot wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete drive- ways where specified, on a twenty-six foot roadway. �a�rlrllly�;..; together with concrete curbs, gutters, driveways and incidentals to such improvements on proper grade and line where same are not already so constructed, together with storm sewers and drains and other necessary incidentals and appurtenances; all of said im- provements to be constructed as and where shown on the Plans and in strict accordance with the Plans and Specifications therefor; contract therefore has been made and entered into with AUSTIN ROAD COMPANY and WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public Works Director to prepare and file estimates of the cost of such improvements and estimates of the amount per front foot proposed to be assessed against abutting property and the owners thereof, and such estimates have been examined, NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I Such estimates be, and they are hereby adopted and approved. II. It is hereby found and determined that the cost of improvements on each portion of streets, avenues, and public places hereinafter described, with the amount or amounts per front foot proposed to be assessed for such improvements against abutting pro- perty and the owners thereof, are as follows, to-wit: UNIT 1: EAST ALLEN AVENUE From a line 33' west of the east property line of Lot 14, Block 44, Hyde Highland Park Add., known and designated as Unit 1., Project No. o61-213o4-4553• The estimated cost of improvements is $ 13,764.25 _,____; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.17 ..—; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is .79 the estimated amount per square foot to be assessed against abutting property and the owners thereof for six-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.96 plus the cost incurred for concrete driveway construction where specified. ? A hearing be given and held by and before the City Council of the City of Fort Worth, Texas , to all owning or claiming any property abutting upon said portions of highways, streets, avenues and public places, as well as to all owning or claiming any interest in any such property. Such hearing shall be given and held on the 27th 1 day of September , 19 71 , at 9:30 in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and the City Secretary is hereby directed to give or I cause to be given notice ,of the time and place of such hearing and of. other 'matters and facts in accordance with the terms and provisions of an Act passed at the First Called Session of the Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts of said Session,. now being known as Article 1105b of Vernon's Texas Civil Statutes as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1, emergency effective May- 12, 1967. Such notice shall be by advertisement -inserted at least three (3) times in a newspaper published in the City of Fort Worth, Texas, the first publication to be made at least twenty-one (21) days before the date of said hearing. Said notice shall comply with and be in accordance with the terms and provisions of said Act as amended. The City Secretary is further directed to give or cause to be given personal notice of the time and place of such hearing to all owning or claiming any property abutting on said portions of highways, streets, avenues and public places, as well as to all owning or claiming Any interest in any such property. Such personal notice shall be in writing and shall be given or caused to be given by the City Secretary by depositing such written notice in the United . States. Mail at least fourteen (14) days before the , date of the hearing, postage prepaid, in envelopes addressed to all persons owning or claiming any interest in the respective properties abutting the high- ways, streets, avenues and public places or portions thereof to be improved, as the names bf such persons are shown on the current rendered tax rolls of the City of Fort Worth and at the addresses so shown, or if the name of such respective owners do not appear on such rendered tax rolls, then address to such owners as their names are shown on the current unrendered tax rolls of the City of Fort Worth at the addresses shown thereon. In those cases in which an owner of property abutting a highway, street, avenue or public place or portion or portions there- of which is to be .improved is listed as "unknown" on the then current City of Fort Worth tax rolls) or the name of an owner is shown on the City of Fort Worth tax rolls .but no address for such owner is shown,'* no notice need be mailed. In those cases where the owner is shown to be an estate, the mailed notice may be addressed to such estate. In this connection, the City Secretary shall prepare and file or cause to be prepared ,'and filed with these proceedings a list of the- properties to be assessed., the names of those persons owning or claiming any interest in said properties to whom the notice was mailed, together with the last known addresses determined as aforesaid of the respective owners and those per-s sons owning or claiming any interest in said property. The City Secretary shall certify that each of the parties in said list whose address is shown on the then current rendered or unrendered tax rolls of the City of Fort Worth was mailed a copy ,of the notice of hearing and shall further certify the date or dates.on which said notice was mailed. A copy of each notice shall be attached to such certificate. The certificate of the City Secretary will be con- clusive evidence of the facts therein recited. IV. The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council and by filing the complete ordinance in the appropriate Ordinance Records of this City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. Passed and approved this day of 197/ APPROVED AS TO FORM AND LEGALITY: 1ty ttorney UNIT 2: EAST ALLEN AVENUE From the west property line of Lot 8, Block 441 Hyde Highland Park Add. to the west property line of Lot 14, Block 55, Hyde Highland Park Add.,known and designated as Unit 2, Project No. 061-21304-4553- The estimated cost of improvements is $ 29,182.60 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $_ 1.17 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ -79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ •28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.96 plus the cost incurred for concrete driveway con- struction where specified. UNIT 3: EAST ALLEN AVENUE From the -west property line of Lot 14, Block 55, Hyde Highland Park Addition to a line 101 west of the east property line of Lot 19, Block 56, Hyde Highland Park Add., known and designated as Unit 2, Project No. 061-21304-4553 The estimated cost of improvements is $ 26,513.52 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1-83 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 4: EAST ALLEN AVENUE From a line 101 east of the west property line CUL-DE-SAC AT DELAWARE of Lot 19, Block 56, Hyde Highland Park Add., to 1301 east, known and designated as Unit 4, Project No. 061-21304-4553• The estimated cost of improvements is $ 5,053.68 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0-0; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 footaide concrete sidewalk is $ -79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1-83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 5: EAST EIMWOOD AVENUE 'FromAhe west line of Mississippi Aveenue to a line IPI east of the west property line of Lot 19, Block 57, Hyde Highland Park Add., known and designated as Unit 5, Project No. 061-21304-4553. The estimated cost of improvements is $ 89,642-87 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1-17 ; the estimated amount per front foot to. be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ 7.28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.96 plus the cost incurred for concrete driveway con- struction where specified. UNIT 6: EAST EIMOD AVENUE From a line 12' east of the west property line CUL-DE-SAC AT DELAWARE of Lot 19, Block 57, Hyde Highland Park Addition to 1281 east, known and designated as Unit 6., Project No. 061-21304-4553• The estimated cost of improvements is $ _3,788.68 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 footwide concrete sidewalk is $ -79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1-83 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 7: EAST JEFFERSON AVENUE From the west line of Missisikippi Avenue to the east property line of Lot 14, Block 53, Hyde Highland Park Add., known and designated as Unit 7, Project No. 061-213o4-4553• The estimated cost of improvements is $ 52,195.54 ,'.o4the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.17; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 fog—t wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.96 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 8: FAST JEFFERSON AVENUE From•the west property line of Lot 34, Block 58, Hyde Highland Park Add. to a line 251 east of the west property line of Lot 19, Block 58, Hyde High- land Park Add., known and designated as Unit 8, Project No. 061-21304-4553• The estimated cost of improvements is $---20.285-71 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ _O_; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 fobt wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 9: EAST JEFFERSON AVENUE From a line 25' east of the west property line GUI,DE-SAC AT DELAWARE of Lot 19, Block 58, Hyde Highland Park Add. to 1041 east, known and designated as Unit 9, Project No. 061-21304-4553• The estimated cost of improvements is $ 3,172.79 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ •79 • 9 the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 10: EAST RICHMOND AVENUE From the west line of Mississippi Avenue to the west property line of Lot 26, Block 52, Hyde Highland Park Add., known and designated as Unit 10, Project No. 061-21304-4553• The estimated cost of improvements is $ 36,881-58 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.01 '; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $-0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.80 plus the cost incurred for concrete driveway con- struction where specified. UNIT 11: EAST RICHMOND AVENUE From the west property line of Lot 26, Block 52, Hyde Highland Park Add. to the east property line of Ldt 14, Block 52, Hyde Highland Park Addition, known ?,nd designated as unit 11, Project No. 061- The estimated cost of improvements is �1314-45534 616.27 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.01 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0-; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $* 1.80 plus the cost incurred for concrete driveway con- struction where specified. UNIT 12: EAST RICHMOND AVENUE From the east property line of Lot 14, Block 52, Hyde Highland Park Addition to the T & P Railroad, known and designated as Unit 12, Project No. o61-21304-4553 The estimated cost of improvements is $ 23,457.12 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 13: EAST RICHMOND AVENUE From the T & P Railroad to 901 east, known and designated as Unit 13, Project No. 061-21304-4553• The estimated cost of improvements is $ 1,982.70 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $_.79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 14: EAST BALTIMORE AVENUE From the west line of Mississippi Ave I nue 'to the east property line of Lot 16., Block 48, Hyde Highland Park Addition, known and designated as Unit 14) Project No. 061-21304-4553• The estimated cost of improvements is $ 27,227.10 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.17 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $- 1.96 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 15: EAST BALTIMORE AVENUE From the east property line of Lot 16, Block 48, Hyde Highland Park Addition to the west property line of Lot 25, Block 60, Hyde Highland Park Add., known and designated as Unit 15, Project No. 061- 21304-4553• The estimated cost of improvements is $ 23,193-78 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $-0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 16: EAST BALTIMORE AVENUE From the west property line of loot 25, Block 60, Hyde Highland Park Addition to a point 81 west of the east property line of Lot 15, Block 60, Hyde Highland Park Addition, known and designated as Unit 16,Project No.061-21304-4553- The estimated cost of improvements is $ 6,9015.80 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.17 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $,, 74- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.90 plus the cost incurred for concrete driveway con- struction where specified. UNIT 17: EAST BALTIMORE AVENUE ' Froni-a line 81 west of the west property I line of GUIDE-SAC AT DELAWARE Lot 14, Block 60, Hyde Highland Park Add. to 105' east, known and designated as Unit 17, Project No 061-21304-4553- The estimated cost of improvements is $ ,3.2572.09 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $- 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $. •79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ .28 , per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1-83 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 18: MISSISSIPPI AVENUE From East Baltimore Avenue to East Richmond .venue, known and designated as Unit 18, Project No. 061-21304-4553• The estimated cost of improvements is $ 7,039-18 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 19: MISSISSIPPI AVENUE From East Richmond Avenue to East Jefferson Avenue, known and designated as Unit 19, Project N6. 061-21304-4553• The estimated cost of improvements is $ 6,760.78 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 20: MISSISSIPPI AVENUE From East Jefferson Avenue to East Elmwood Avenue, known and designated as Unit 20, Project No. 061 21304-4553/. The estimated cost of improvements is $ - 6,009141 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $_O_ the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $- 1.83 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 21: MISSISSIPPI AVENUE From East Elmwood Avenue to East Allen Avenue, known and designated as Unit 21, Project N6. 061-213o4-4553• The estimated cost of improvements is $ 6,361.90 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04, the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1-83 1-$3plus the cost incurred for concrete driveway con- struction where specified. UNIT 22: MISSISSIPPI AVENUE From East Allen Avenue to East Maddox Avenue, known and designated as Unit 22, Project No. o61-213o4-4553• The estimated cost of improvements is $ 6,509.47 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ -79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 23: BEVERLY AVENUE From East Baltimore Avenue to East Richmond Ave., known and designated as Unit 23, Project No. o61-213o4-4553. The estimated cost of improvements is s61879-73 _; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $- 1.o4 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ -79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $_ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $- 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 24�' BEVERLY AVENUE From East Richmond to East Jefferson Avenue, known and designated as Unit 24, Project No. o61-213o4-4553. The estimated cost of improvements is $ 6,622.50 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1W ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0-; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ -79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ •28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 25: BEVERLY AVENUE From East Jefferson Avenue to East Elmwood Avenue, known and designated as Unit 25, Project NO. o61-213o4-4553. The estimated cost of improvements is $ 6)732.88 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1-83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 26: BEVERLY AVENUE From East Elmwood Avenue to East Allen Avenue, known and designated as Unit 26, Project No/ o61-213o4-4553• The estimated cost of improvements is $ 5,963.43 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 - the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ -79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 27: BEVERLY AVENUE From East Allen Avenue to East Maddox Avenue, known and designated as Unit 27., Project No. o61-21304-4553. The estimated cost of improvements is $ 7,203-57 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ _O_; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ -79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ •�O per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 143 plus the cost incurred for concrete driveway con- struction where specified. UNIT 28- YINA AVENUE From East Baltimone Avenue to East Richmond Avenue, known and designated as Unit 28, Project No. 061-21304-4553• The estimated cost of improvements 'is $ 6,896.95 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. .............. ...... UNIT 29: YLft4A AVENUE From East Richmond Avenue to East Elmwood Avenue, known and designated as Unit 29, Project No. o61-213o4-4553. The estimated cost of improvements is $_ 16,4o9.80 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ I.o4 the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ -79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ _28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $—' 1.83 , plus the cost incurred for concrete driveway con- struction where specified. UNIT 30: YLIMA AVENUE From East Elmwood Avenue to East Allen Avenue, known and designated as Unit 30, Project No. o61-213o4-4553. The estimated cost of improvements is $ 7,301-03 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $_1*04 . the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ -0- the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ .79 ; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ *28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 31: YWA AVENUE From East Allen Avenue to Eabt Maddox Avenue, known and designated as Unit 31, Project NO. 061-213o4-4553- The estimated cost of improvements is $ 9,025.17 the estimated amount per front foot to be assessed against abutting property and the owners thereof for concrete curb and gutter is $ 1.04 ; the estimated amount per front foot to be assessed against abutting property and the owners thereof for pavement is $ _0_; the estimated amount per front foot to be assessed against abutting property and the owners thereof for 4 foot wide concrete sidewalk is $ -79; the estimated amount per square foot to be assessed against abutting property and the owners thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total estimated amount per front foot to be assessed against abutting property and the owners thereof is $ 1.83 plus the cost incurred for concrete driveway con- struction where specified. UNIT 3: EAST ALLEN AVENUE From the west property line of Lot 14, Block 55, 'Hyde Highland Park Addition to a line 10' west of the east property line of Lot 19, Block 56, Hyde Highland Park Addition, known and designated as Unit 3, Project No. 061- 21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base, and by recon- structing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified, on a twenty-six foot roadway. UNIT 4: EAST ALLEN AVENUE From a line 10' east of the west property line CUL-DE-SAC AT DELAWARE of Lot 19, Block 56, Hyde Highland Park Addition to 130' east, known and designated as Unit 4, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified. UNIT 5: EAST ELMWOOD AVENUE From the west line of Mississippi Avenue to a line 12' east of the west property line of Lot 19, Block 57, Hyde Highland Park Addition, known and designated as Unit 5, Project No. 061-21304-4553, a one and one-half inch thick hot-mix asphaltic concrete surface course on existing concrete base and by reconstructing seven-inch high concrete curb and two-foot wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a twenty-six foot roadway. UNIT 6: EAST ELMWOOD AVENUE From a line 12' east of the west property line of Lot 19, Block 57, Hyde Highland Park Addition, to 1,28' east, known and designated as Unit 6, Project No. 061-21304-4553, a two-inch thick Hoot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter and four-foot wide conrete sidewalk where specified. UNIT 7: EAST JEFFERSON AVENUE From the west line of Mississippi Avenue to the east property line of Lot 14, Block 53, Hyde Highland Park Addition, known and desig- nated as Unit 7, Project No. 061-21304-4553, a one and one-half inch thick hot-mix asphaltic concrete surface course on existing concrete base and by reconstructing existing seven-inch high concrete curb and two-foot wide concrete gutter, four-foot wide concrete sidewalk and six-inch th'ick concrete driveways where specified on a twenty-six foot roadway. UNIT 8: EAST JEFFERSON AVENUE From the west property line of Lot 34, Block 58, Hyde Highland Park Addition to a line 25' east, of the west property line of Lot 1.9, Block 58, Hyde Highland Park Addition, known and designated as Unit 8, Project No. 061-21304- 4553, a two-inch th-1-ck hot-mix asphAltic con- crete surface course on a six-inch thick cement stabilized gravel base, and by recon- structing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a twenty- six foot roadway. UNIT 9: EAST JEFFE16ON AVENUE, Froi,,i!i a line 25' east of the west property, line CUL-DE-SAC AT DELAWARE of Lot 19, Bloclf,. 58, Hyde Highland Park Addition to 104' east, known and designated as Unit 9, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on ,a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified. UNIT 1.0: EAST RTCH."MOND AVEIRTE From the west line of Mississippi Avenue to the west-, property line of Lot 26, Block 52, Hyde Highland Park Addition, known and desig- nated 99 Unit 10, Project No. 061-21304-4553, a one and one-half inch thick hot-mix asphaltic concrete, surface course on existing concrete base arid by reconstructing existing seven-inch high concrete curb and eight efam-i tic,It wide concrete gutter, four-foot wide concrete sidewalk and six-incb thick concrete driveways where specifted on a thirty foot roadway. UNIT 11: EAST RICHMOND AVENUE From the west property line of Lot 26, Block 52, Hyde Highland Park Addition to the east property line of Lot 14, Block 52, Hyde High- land Park Addition, known and designated as Unit 11, Project No. 061-21304-4553, a one and one-half inch thick hot-mix asphaltic concrete surface course on existing concrete base and by reconstructing existing seven- incl-i high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete drive- ways where specified on a thirty-foot roadway. UNIT 12: EAST RICHMOND AVENUE From the east property line of Lot 14, Block 52, Hyde Highland Park Addition to the west line of T & P Railroad, known and designated as Unit 12, Project No. 061-21304-4553, a two- inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete side- walk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 13: EAST RICHMOND AVENUE From r & P Railroad to 90' east, known ai'id designated as Unit 13, Project No. 061- 21304-4553, a two-inch thick hot-mix asphal- tic concrete surface course on a six-inch thick cement stabilized gravel base, and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter and six-inch thick concrete driveways where specified on a twenty-six foot roadway. UNIT 14: EAST BALTIMORE AVEIM From the west line of Mississippi Avenue to the east property line of Lot 16, Block 48, H' yde Highland Park Addition, known and desig- nated as Unit 14, Project No. 061-21304-4553, a ones and one-half inch thick hot-mix asphaltic concrete surface course on existing concrete base and by reconstructing seven-inch high concrete curb and two-foot wide concrete gutter, four-,foot wide concrete sidewalk and six-inch thick concrete-, driveways where specified on a twenty-six foot roadway. UNIT 15; EAST BALTIHORE AVENUE From the east property line of Lot 16, Block 48, Hyde Highland Park Addition to the west property line of Lot 25, Block 60, Hyde High- land Park Addition, known and designated as Unit 15, Project No, 061-21304-4553, a two- inch thick hot-mix asphaltic concrete surface course on an six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four• foot wide concrete sidewalk and six-inch thick concrete drive- ways where specified on a twenty-six foot roadway. UNIT 16: EAST ,BALTIHORE AVENUE From the west property line of Lot 25, Block 60, Hyde Highland Park Addition to a point 8' west of the east property line of Lot 15, Block 60, Hyde Highland Park Addition, hnown and designated as Unit 16, Project No. 061.- 21304-4553, by constructing seven-inch high concrete curb and two-foot wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways Were specified, and by reconstructing existing asphalt pavement and crushed stone base where necessary, on a twenty-six foot roadway. UNIT 17: EAST BALTIMORE AVENUE From a line 8' west of the west property line of Lot 41, Block 60, Hyde Highland Park Addition to 105" east, known and designated as Unit 17 , Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen- inch wide ettcrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete drive- ways where specified. UNIT 18: MISSISSIPPI AVENUE From East Baltimore Avenue to East Richmond Avenue, known and designated as Unit 18, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 19: MISSISSIPPI AVENUE From East Richmond Avenue to East Jefferson Avenue, known and designated as Unit 19, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide conrete sidewalk and six-inch thick. concrete driveways where specified on a thirty foot roadway. UNIT 20: MISSISSIPPI AVENUE From East Jefferson Avenue to East Elmwood Avenue, known and designated as Unit 20, Project No. 061-21304-4553., a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 21: MISSISSIPPI AVENUE From East Elmwood Avenue to East Allen Avenue, known and designated as Unit 21, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four- foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 22: MISSISSIPPI AVENUE From East Allen Avenue to East Maddox Avenue, known and designated as Unit 2, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter,.' four-foot wide concrete sidewalk and six- inch thick concrete driveways where specified on a thirty foot roadway. .............. ............. UNIT 23: BEVERLY AVENUE From East Baltimore Avenue to East Richmond Avenue, known and designated as Unit 23, Pro- ject No. 061-21304-4553, a two-inch thick hot- mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six• inch thick concrete driveways where specified on a thirty foot roadway. UNIT 24: BEVERLY AVENUE From East Richmond Avenue to East Jefferson Avenue, known and designated as Unit 24, Project No. 061-21304-4553, a two-inch thiS hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch "wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 25: BEVERLY AVEIME From East Jefferson Avenue to East Elarwood Avenue, known and designated as Unit 25, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 26: BEVERLY AVENUE From East Elmwood Avenue to East Allen Avenue, known and designated as Unit 26, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 27 : BEVERLY AVENUE From East Allen Avenue to East Maddox Avenue, known and designated as Unit 27, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six- inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 28: YUMA AVENUE From East Baltimore Avenue to East Richmond Avenue, known and designated as Unit 28, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabili- zed gravel base and by reconstructing seven- inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide con- crete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 29: YU11A AVENUE From East Richmond Avenue to East Elurwood Avenue, known and designated as Unit 29, Project No. 061-21304-4554, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabilized gravel base and by reconstructing seven-inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 30: YUMA AVENUE From East Elmwood Avenue to East Allen Avenue, known and designated as Unit 30, Project No. 061-21304-4553, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabiliz- ed gravel base and by reconstructing seven- inch high concrete curb and eighteen-inch wide concrete gutter, four-foot wide con- crete sidewalk and six-inch thick concrete driveways where specified on a thirty foot roadway. UNIT 31: YUMA AVENUE From East Allen Avenue to East Maddox Avenue, known and designated as Unit 31., 'Project No. 061-21304-45,53, a two-inch thick hot-mix asphaltic concrete surface course on a six-inch thick cement stabili- zed gravel Base and by reconstructing seven-inch high concrete curb and eighteen- !,.rich wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick con- crete driveways where specified on a thirty foot roadway. uh"IN City of Fort Worth, ` exas m `1 Mayor and Council Communication DATE REFERENCE SUBJEcr. Award of Contract - Assessment PACE Numsept Ravin in Neighborhood Im rovement Pro- �8/30/7'1 0-2064 gram 8cho Area - Phase 1 Council action is requested on the project described below. Pro ect Description Nature of Work: Street Paving on Neighborhood Improvement Program ( cho Area Phase as follows: Road Width R.O.Q. Type of Unit Street Limits Feet Feet 1IMpLovement 1. F. Allen Ave. 0u1-0e-Sac to 26 60 Resurface Beverly Ave. R. Allen Ave. Beverly Ave. to 26 60 Resurface "puma Ave. 3 E. Allen Ave. "puma Ave. to 26 60 Reconstruction Delaware St. E. Allen Ave. 0u.l-De-Sac at 80 1,00 Reconstruction Delaware St. E. Elmwood Ave. Mississippi to 26 60 Resurface Delaware .St. 6 R. Elmwood Ave. ul-De-Sac at 80 100 deconstruction Delaware St. R. Jefferson Ave. Mississippi to 26 60 Resurface Yuma Ave. 8 E. Jefferson Ave. Yuma Ave. to 26 60 Reconstruction Delaware St. 9 R. Jefferson Ave. ul-De-Sac at 80 100 Reconstruction Delaware St. 10 R. Richmond Ave. Mississippi to 30 60 Resurface Beverly Ave. l ," E. Richmond Ave. Beverly Ave. to 30 60 Resurface Yuma Ave. 12 E. Richmond Ave. "puma to T & R 30 60 Reconstruction Railroad � ~ / 1 � DATE REFERENCE NUMBER ',g rovemen t- j PAGE Road Width R.O.W. Type of Unit Street Limits Feet Feet Improvement 13 E. Ridhmond Ave. T & P Railroad to 30 60 Reconstruction S. Riverside Dr. 14, E. Baltimore Ave., Mississippi to 26 6O Resurface Beverly Ave. 15 E. Baltimore Ave. Beverly Ave. to 26 60 Reconstruction Yuma Ave. 16, E. Baltimore Ave. Yuma Ave. to 26 60 Existing Surface Delaware St. to Remain 17 E. Baltimore Ave. Cul-De-Sac at 80 100 Reconstruction Delaware St. 18 Mississippt Ave. Baltimore to 30 80 Reconstruction Richmond 19 'Mississippi Ave. Richmond to 30 60 Reconstruction Jefferson Ave. 20 Mississippi Ave. Jefferson to 30 80 Reconstruction Elmwood 21 Mississippi Ave. Elmwood to 30 80 Reconstruction E. Allen 22 Mississippi Ave. E. Allen to 30 80 Reconstruction E. Maddox 23 Beverly Ave. Baltimore to 30 60 Reconstruction Richmond 24 Beverly Ave. �ichmond to 30 60 Reconstruction 25 Beverly Ave. Jefferson to 30 60 Reconstruction Elmwood 26 Beverly Ave. Elmwood to 30 60 Reconstruction E. Allen 27 Beverly Ave. E. Allen to 30 60 Reconstruction 28 Yuma Ave. Baltimore to 30 60 Reconstruction Richmond 29 Yuma Ave. Ricbmond to 30 60 Reconstruction Umwood DATE 0,16EFEREMCE susiren Award of Contract - Assessment PAGE N MSER Pav,in in Neighborhood Improvement Pro 4, 8/30/71 C-2064 gram �Echo Area - Phase I) Of Road Width R.O.W. Type of 'Unit Street 14mits Feet Feet Improvement 30 Yuma Ave. Elmwood to 30 60 Reconstruction E. Allen 31 Yuma Ave. E. Allen to 30 60 Reconstruction, Maddox This project was initiated as a result of the Neighborhood Improvement Program - "ECHO". Units to be reconstructed will be improved with a two-inch thick hot- mix asphaltic concrete surface course, on a six-inch thick cement/lipe stabilized gravel base, 'Units to be ressirfaced will be Improved with a one and one-half inch thick hot-Tnix asphaltic concrete surface course on the existing concrete base. All units will. be complete with seven-inch high concrete curb and two-foot wide concrete gutter, four-foot wide concrete sidewalk and six-inch thick con- crete driveways where specified. Submission of Bi�ft The following 'bids have been received: Bidder Arnount Bid Austin Road Company $454,711.75 Texas Bitulithic Company 482,491.25 Glade, Inc. 485,605.43 The following contractors obtained plans but did not bid on the project: L. Grivies and Co. , Inc. Dalworth Construction Tom Norton, Inc. James 0. Jenkins, Inc. Bids Received: July 29, 1.971 Working Days Allotted: 180 Project Cost and FinAnSi Lnj Based on the low bid, approximately $13,447.19 will be assessed against abut- ting property owners. 11wo-thirds of the total project cost of approximately $486,73,6, is reimbursable, except �for ineligible items of $22,324.45, by the Department of 11ousing and Urban Development. The proposed assessments are for one-third of the cost of curb, gutter and sidewalks, where none presently exist. Sufficient funds are available in Project Account No. 061-21304-4553, Neighbor- hood Improvement Area "ECHO", to finance City's cost of construction, inspection engineering, salaries and miscellaneous expenses. ~ . _ DATE REFERENCE SUOJEM Award of Contract - Assessment PAGE NUMBER Paving in Neighborhood Improvement Pro- 4 8/30/71 C-2064 Recommendations It is recommended that: 1) The following Bond Fund Transfer be approved: Amount From To Reason $13,447.19 Unspecified N.I.P. Echo To provide for property owners' 042-09724-901 042-10424-402 share of construction cost 2) An ordinance be adopted: a) Declaring the necessity for ordering the improvements; b) Making the provisions for levying the assessments; c) Directing the Public Works Department to prepare estimates of costs and amounts to be assessed; d) Awarding the contract to Austin Road Company in the amount of $454,71,1.75; e) Making appropriation to cover the indebtedness thereby incurred for improvements of the project named above. 3) An ordinance 'be adopted: a) Approving the estimates of cost and amounts to be assessed; and, b) Setting September 27, 1971, as the date for the Benefit Hearing. RN'L/je Attachments: "A" - Location Map "B" - Res,=6 "C" - Engineers' Preliminary Rolls SUBMI7790 By. BY DISPOSITION 'COUNCIL. PROCSS$EO I �Y APPROVED Q OTHER (DESCRIBE) S=RETARY DATE -17 "57 CITY MANAGER $"ties V1444 Of 3"aflit 104riall