HomeMy WebLinkAboutContract 58322-CO1CSC No. 58322-COl
FCC F:-r- W" RT H City of Fort Worth
Change Order Request
Project Name:1 Lake Arlington Lift Station Sanitary Sewer Gravity Mains City Sec No,: 1 58322
Project No.(s):l 560211107004301001480 NTP N/A City Proj. No.: 101311 —�
Construction of a new gravity sanitary sewer main upstream of Lake Arlington Lift Station (South Line) and downstream of
Project Description: Lake Arlington Force Main (North Line)
Contractor: S.J. Louis Construction of Texas, Ltd Change Order II Date: 3/15/2023
City Project Mgr,J Pratima PoudyCity Inspector: I Shane Behn
Phone Number: 817-392-6149 Phone Number: 817-392-2190
Dept,
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Base Bid
Alternate-B
Totals
Contract Time
(Calender days)
$15,059,130.11
$1,494.410.00
$16,553,540.11
450
$15,059,130.11
$1,494,410.00
$16,553,540,11
450
Amount of Proposed Change Order
$757,214.94
-$807,600.00
-$50,385.06
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
$15,816,345.05
$686,810.00
$16,503,155.05
450
$248,303.00
$248,303.00
$248,303.00
$248,303.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 -0,30%
MAXALLOWABLECONTRACTAMOUNT (ORIGINAL CONTRACT COST +25%) $20,691,925.14
FOR C
Change Order No.1 provides for the following:
The installation of a 10 fool diameter concrete manhole in leiu of a 10 foot diameter polymer concrete manhole due to leakage and
maintainability issues with polymer manholes of this size,
The installation of a 5 foot diameter Type A manhole in leiu of a standard 4 foot diameter manhole in order to accomodale the
connection of proposed 42-inch sewer main to an existing main.
Additional fittings for the polymer manhole at station 32+64 to accomodale the new Type A manhole above for change in angle and pipe
size.
The deletion of pay itern quantities that are no longer needed on the project.
II is understood and aoreed that the acceptance of this Channe Order by the contractor constitutes an accord and satisfaction and renresents navmenf
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name
Contractor Name
nlractor l ature
Date
S.J, Louis Construction of Texas, Ltd
I Adam Lunsford
If It
Ins ectar
Date
Project Mana �
Date
�.
,� .- I 3
= L
0 2`
D rector W ter Dept)
Date
Con_ kucl m e isor Water Dept)
Da Ue
Apr 6, 2023
Senior Assistant City Attorney
Date
Assistant City Manager
Date
Apr 10, 2023
a a tid
Apr 10, 2023
Council Action If Required)
M&C Number N/A M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Fc> Rr W(-> r •r rl City of Fort Worth
Change Order Additions
Project Name Lake Arlington Lift Station Sanitary Sewer Gravity Mains City Sec No.: 58322
Project No.(s): 66021/07004301001480 DOE No. N/A City Proj. No.: 101311
Project
Description
Construction of a new gravity sanitary sewer main upstream of Lake Arlington Lift Station (South Line) and downstream of
Lake Arlington Force Main (North Line)
Contractor S.J. Louis Construction of Texas, Ltd Change Order: 1--T—] Dale: 3115/2023
City Project Mgr. Pratima Poudyal �� City Inspector r Shane Behn
ADDITIONS
DESCRIPTION
DEPT
Qt
Unit
Unit Cost
Total
56D
Type A Manhole (Reinforced Polymer Concrete)
Alternate-B
1.00
EA
$31,900.00
$31,900.00
62
10' Dia Manhole (Concrete)
Base Bid
6.00
EA
$82,000.00
$492,000.00
63
10' Dia Extra Depth Manhole (Concrete)
Base Bid
98.00
VF
$1,000.00
$98,000.00
64
Epoxy Manhole Liner (10' Dia Chesterton or Warren Environmental
Corrosion Protection Liner or Approved Equal)
Base Bid
134.001
VF
$1,060.00
$142,040.00
65
c i Iona itting for Mahole @ Sta. +64 (North Line)3-Miter
Elbow and 42"x36" Eccentric Reducer)
Base Bid
1.00
LS
$25,174.94
$25,174.94
Page :L of 3
Base Bid
$757,214.94
Alternate-B
$31,900.00
1$789,114.94
Additions Sub Total
FC) RT 'WC) RT H City of Fort Worth
Change Order Deletions
Project Name Lake Arlington Lift Station Sanitary Sewer Gravity Mains City Sec No.: 58322
Project No.(s): 56021/07004301001480 DOE No. N/A City Proj. No.: 001311
Project Description Construction of a new gravity sanitary sewer main upstream of Lake Arlington Lift Station (South Line) and
downstream of Lake Arlington Force Main North Line
Contractor S.J. Louis Construction of Texas, Ltd Change Order: m Date 311512023
City Project Mgr. Pratima Poudyal City Inspector: I Shane Behn
DELETIONS
Page 3 of 3
03/15/2023
CPN 101311
Lake Arlington Lift Station Sanitary Sewer Gravity Mains
Change Request 1 Notes
Staff has reviewed the change order price and considers it to be fair and reasonable.
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Pratima Poudyal, P.E.
Name of Employee
Project Manager