Loading...
HomeMy WebLinkAboutContract 58322-CO1CSC No. 58322-COl FCC F:-r- W" RT H City of Fort Worth Change Order Request Project Name:1 Lake Arlington Lift Station Sanitary Sewer Gravity Mains City Sec No,: 1 58322 Project No.(s):l 560211107004301001480 NTP N/A City Proj. No.: 101311 —� Construction of a new gravity sanitary sewer main upstream of Lake Arlington Lift Station (South Line) and downstream of Project Description: Lake Arlington Force Main (North Line) Contractor: S.J. Louis Construction of Texas, Ltd Change Order II Date: 3/15/2023 City Project Mgr,J Pratima PoudyCity Inspector: I Shane Behn Phone Number: 817-392-6149 Phone Number: 817-392-2190 Dept, Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Base Bid Alternate-B Totals Contract Time (Calender days) $15,059,130.11 $1,494.410.00 $16,553,540.11 450 $15,059,130.11 $1,494,410.00 $16,553,540,11 450 Amount of Proposed Change Order $757,214.94 -$807,600.00 -$50,385.06 Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $15,816,345.05 $686,810.00 $16,503,155.05 450 $248,303.00 $248,303.00 $248,303.00 $248,303.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 -0,30% MAXALLOWABLECONTRACTAMOUNT (ORIGINAL CONTRACT COST +25%) $20,691,925.14 FOR C Change Order No.1 provides for the following: The installation of a 10 fool diameter concrete manhole in leiu of a 10 foot diameter polymer concrete manhole due to leakage and maintainability issues with polymer manholes of this size, The installation of a 5 foot diameter Type A manhole in leiu of a standard 4 foot diameter manhole in order to accomodale the connection of proposed 42-inch sewer main to an existing main. Additional fittings for the polymer manhole at station 32+64 to accomodale the new Type A manhole above for change in angle and pipe size. The deletion of pay itern quantities that are no longer needed on the project. II is understood and aoreed that the acceptance of this Channe Order by the contractor constitutes an accord and satisfaction and renresents navmenf in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name nlractor l ature Date S.J, Louis Construction of Texas, Ltd I Adam Lunsford If It Ins ectar Date Project Mana � Date �. ,� .- I 3 = L 0 2` D rector W ter Dept) Date Con_ kucl m e isor Water Dept) Da Ue Apr 6, 2023 Senior Assistant City Attorney Date Assistant City Manager Date Apr 10, 2023 a a tid Apr 10, 2023 Council Action If Required) M&C Number N/A M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Fc> Rr W(-> r •r rl City of Fort Worth Change Order Additions Project Name Lake Arlington Lift Station Sanitary Sewer Gravity Mains City Sec No.: 58322 Project No.(s): 66021/07004301001480 DOE No. N/A City Proj. No.: 101311 Project Description Construction of a new gravity sanitary sewer main upstream of Lake Arlington Lift Station (South Line) and downstream of Lake Arlington Force Main (North Line) Contractor S.J. Louis Construction of Texas, Ltd Change Order: 1--T—] Dale: 3115/2023 City Project Mgr. Pratima Poudyal �� City Inspector r Shane Behn ADDITIONS DESCRIPTION DEPT Qt Unit Unit Cost Total 56D Type A Manhole (Reinforced Polymer Concrete) Alternate-B 1.00 EA $31,900.00 $31,900.00 62 10' Dia Manhole (Concrete) Base Bid 6.00 EA $82,000.00 $492,000.00 63 10' Dia Extra Depth Manhole (Concrete) Base Bid 98.00 VF $1,000.00 $98,000.00 64 Epoxy Manhole Liner (10' Dia Chesterton or Warren Environmental Corrosion Protection Liner or Approved Equal) Base Bid 134.001 VF $1,060.00 $142,040.00 65 c i Iona itting for Mahole @ Sta. +64 (North Line)3-Miter Elbow and 42"x36" Eccentric Reducer) Base Bid 1.00 LS $25,174.94 $25,174.94 Page :L of 3 Base Bid $757,214.94 Alternate-B $31,900.00 1$789,114.94 Additions Sub Total FC) RT 'WC) RT H City of Fort Worth Change Order Deletions Project Name Lake Arlington Lift Station Sanitary Sewer Gravity Mains City Sec No.: 58322 Project No.(s): 56021/07004301001480 DOE No. N/A City Proj. No.: 001311 Project Description Construction of a new gravity sanitary sewer main upstream of Lake Arlington Lift Station (South Line) and downstream of Lake Arlington Force Main North Line Contractor S.J. Louis Construction of Texas, Ltd Change Order: m Date 311512023 City Project Mgr. Pratima Poudyal City Inspector: I Shane Behn DELETIONS Page 3 of 3 03/15/2023 CPN 101311 Lake Arlington Lift Station Sanitary Sewer Gravity Mains Change Request 1 Notes Staff has reviewed the change order price and considers it to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Pratima Poudyal, P.E. Name of Employee Project Manager Title �.�44UpIl�� o � do 0. ATTEST: $�o oxd Pia * 000 *J Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX