Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 58109-PM1
CSC No. 58109-PM1 FORT WORTH PROJECT MANUAL FOR THE CONSTRUCTION OF PAVING, WATER, SANITARY SEWER, STORM DRAIN AND STREET LIGHT IMPROVEMENTS TO SERVE CIBOLO HILLS PHASE 4 JULY 2022 FID NO. 30114-0200431-103688-E07685 FILE NO. W-2801 "X" NO. 27087 CITY PROJECT NO. 103688 Mattie Parker David Cooke Mayor City Manager Christopher P. Harder, P.E. Director, Water Department William Johnson, P.E. City Engineer, Transportation and Public Works Department The City of Fort Worth PREPARED BY PELOTON LAND SOLUTIONS 11000 FRISCO ST, SUITE 400 FRISCO, TX 75033 469-213-1800 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 00 10- 1 TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS Page 1 of 4 1 SECTION 00 00 10 2 TABLE OF CONTENTS 3 DEVELOPER AWARDED PROJECTS 4 5 Division 00 - General Conditions 6 00 11 13 Invitation to Bidders 7 00 21 13 1rrrhu�i�orrz _EKs 8 00 41 00 Bid Form 9 00 42 43 Proposal Form Unit Price 10 00 13 13 Bid Bond 11 00 15 11 Bidders Prequalification's 12 00 45 12 Prequalification Statement 13 00 15 13 Bidder Prequalification Application 14 00 45 26 Contractor Compliance with Workers' Compensation Law 15 0015 40 Minority B;xaii'i Enterprise Goal 16 00 52 43 Agreement 17 00 61 25 Certificate of Insurance 18 00 62 13 Performance Bond 19 00 62 14 Payment Bond 20 00 62 19 Maintenance Bond 21 00 72 00 General Conditions 22 00 73 00 &applcmentary Conditions 23 00 73 10 Standard City Conditions of the Construction Contract for Developer Awarded 24 Projects 25 26 Division 01- General Requirements 27 01 11 00 Summary of Work 28 01 25 00 Substitution Procedures 29 01 31 19 Preconstruction Meeting 30 01 31 20 Project Meetings 31 01 32 16 Go-rztruotion Progress Schedule 32 01 32 33 Preconstruction Video 33 01 33 00 Submittals 34 01 35 13 Special Project Procedures 35 01 45 23 Testing and Inspection Services 36 01 50 00 Temporary Facilities and Controls 37 01 55 26 Street Use Permit and Modifications to Traffic Control 38 01 57 13 Storm Water Pollution Prevention Plan 39 01 58 13 Temporary Project Signage 40 01 60 00 Product Requirements 41 01 66 00 Product Storage and Handling Requirements 42 01 70 00 Mobilization and Remobilization 43 01 71 23 Construction Staking 44 01 74 23 Cleaning 45 01 77 19 Closeout Requirements 46 01 78 23 Operation and Maintenance Data 47 01 78 39 Project Record Documents 48 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised April 12, 2022 Cibolo Hills Phase 4 City Project No. 103688 00 00 10- 2 TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS Page 2 of 4 1 Technical Specifications which have been modified by the Engineer specifically for this 2 Project; hard copies are included in the Project's Contract Documents 3 4 None 5 6 Technical Specifications listed below are included for this Project by reference and can be 7 viewed/downloaded from the City's Buzzsaw site at: 8 9 htps://proiectpoint.buzzsaw.com/client/fortworthgov/Resources/02%20- 10 %20Construction%20Documents/Specifications 11 12 Division 02 - Existing Conditions 13 02 41 13 Selective Site Demolition 14 02 41 14 Utility Removal/Abandonment 15 02 41 15 Paving Removal 16 17 Division 03 - Concrete 18 03 30 00 Cast -In -Place Concrete 19 03 34 13 Controlled Low Strength Material (CLSM) 20 03 31 1 E Concrete Base Material for Trench Repair 21 03 80 00 Modifications to Exiair.g-CmAree Ffieuvturea 22 23 Division 26 - Electrical 24 26 05 00 Common Work Results for Electrical 25 26 05 10 Demolition for Electrical Systems 26 26 05 33 Raceway and Boxes for Electrical Systems 27 26 05 43 Underground Ducts and Raceways for Electrical Systems 28 29 Division 31- Earthwork 30 31 10 00 Site Clearing 31 31 23 16 Unclassified Excavation 32 31 23 23 Borrow 33 31 24 0J E. a n it:, 34 31 25 00 Erosion and Sediment Control 35 31 36 00 Gabions 36 31 37 00 Riprap 37 38 Division 32 - Exterior Improvements 39 32 01 17 Permanent Asphalt Paving Repair 40 32 01 1S Tsmp'ai , a t Puing Repair 41 32 01 29 Concrete Paving Repair 42 32 11 23 Flexible Basc Courses 43 32 11 29 Lime Treated Base Courses 44 32 11 33 Cement Treated Base Courses 45 32 12 16 AL,h1J.t 46 32 12 73 Asphalt Paving Crack Sealants 47 32 13 13 Concrete Paving 48 32 13 20 Concrete Sidewalks, Driveways and Barrier Free Ramps 49 32 13 73 Concrete Paving Joint Sealants 50 32 14 1 E Ehick Unit Paving CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised April 12, 2022 Cibolo Hills Phase 4 City Project No. 103688 00 00 10- 3 TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS 1 32 16 13 Concrete Curb and Gutters and Valley Gutters 2 32 17 23 Pavement Markings 3 32 32 13 Gl air: L k- Feres and Gates 4 32 31 2€ Wire Fences and Gates 5 32 32 29 Weed Fe -ad Gates 6 32 32 13 Cast -in -Place Concrete Retaining Walls 7 32 91 19 Topsoil Placement and Finishing of Parkways 8 32 92 13 Hydro -Mulching, Seeding, and Sodding 9 32 93 43 Trees and Shrubs 10 11 Division 33 - Utilities 12 33 01 30 Sewer and Manhole Testing 13 33 01 31 Closed Circuit Television (CCTV) Inspection 14 33 03 10 Byass 1ktmp ng of Existing Sewer Systems 15 33 04 10 Joint -Bonding and Electrici Ts 1ution 16 33 0111 Corrosion Control Test Stations 17 391 12 Magnesium Anode Cathodic Protection System 18 33 01 30 Tanporary Water Services 19 33 04 40 Cleaning and Acceptance Testing of Water Mains 20 33 05 10 Utility Trench Excavation, Embedment, and Backfill 21 33 05 12 Water Line Lowering 22 33 05 13 Frame, Cover and Grade Rings 23 33 05 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to Grade 24 33 05 16 Concrete Water Vaults 25 33 05 17 Concrete Collars 26 33 05 20 Auger Boring 27 3 95 21 TurgxA liner Plate 28 33 05 22 Steel Casing Pipe 29 33 05 23 Hand Tunneling 30 33 05 24 Installation of Carrier Pipe in Casing or Tunnel Liner Plate 31 33 05 26 Utility Markers/Locators 32 33 05 30 Ear2oratory Excavation Sa- Emicing Utilities 33 33 11 10 Ductile Iron Pipe 34 33 11 11 Ductile Iron Fittings 35 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 36 33 11 13 Concrete Pressurc Pipc, Bar Wrapped, Steel Cylinder Type 37 33 11 11 Buried Steal Npa c d Fittinga 38 33 12 10 Water Services 1-inch to 2-inch 39 33 12 11 Largo, Water Meters 40 33 12 20 Resilient Seated Gate Valve 41 33 12 :K1 AWWA Rutz Seated Butterfly Valves 42 33 12 25 Connection to Existing Water Mains 43 33 12 30 G x Mnation Air Valve Assemblies ff PotaS Water Systems 44 33 12 40 Dry -Barrel Fire Hydrants 45 33 12 50 Water Sample Stations 46 33 12 60 Blow off Valves 47 33 3,�J 12 Cured in Place Pipe (CIPP) 48 33 31 13 Reinforced Pipc for Gravity Eanitrr; Sewers 49 33 3�J 15 LDPE Pipe For Sanitary Scwcrs (Gravity and Force Mains) 50 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised April 12, 2022 Page 3 of 4 Cibolo Hills Phase 4 City Project No. 103688 00 00 10- 4 TABLE OF CONTENTS FOR DEVELOPER AWARDED PROJECTS 1 > 21 Polyvinyl Chloride (PVC) Closed Profile Gravity Fianitary Sewer Pipc 2 33 32 22 EatXtiy Sewer Elr 3 33 32 23 EatXry Sewer Pipe Elargemcnt 4 33 31 50 Sanitary Sewer Service Connections and Service Line 5 33 31 70 Gombinati:x: Air Valve for Sanitary Sewer Force Mains 6 33 39 10 Cast -in -Place Concrete Manholes 7 33 39 20 Precast Concrete Manholes 8 33 39 30 Fiberglass Manholes 9 33 39 40 Wastewater Access Chamber (WAC) 10 33 39 60 Epoxy Liners for Sanitary Sewer Structures 11 33 4110 Reinforced Concrete Storm Sewer Pipe/Culverts 12 33 11 11 RDPE Ftorm Sewer Pipe 13 33 46 00 Fiat drainage 14 33 16 01 FAotted StGxm Drain° 15 33 46 02 Tronh Dvthrr 16 33 49 10 Cast -in -Place Manholes and Junction Boxes 17 33 49 20 Curb and Drop Inlets 18 33 49 40 Storm Drainage Headwalls and Wingwalls 19 20 Division 34 - Transportation 21 31 11 10 Traffic Signals 22 34 11 13 Removing Traffic Signals 23 34 41 20 Roadway Illumination Assemblies 24 34 41 30 Aluminum Signs 25 34 71 13 Traffic Control 26 27 Appendix 28 GC 1.0! Availability of Lands 29 GC 4.02 Subizarface and Pkyoica1 Conditions 30 GiC 4.04 U x1crground Facilities 31 GC 1.06 Fkzudaxo Exyironmental Condition at Site 32 GC 6.06 D Minority and Womcn Owned Busincss Enterprise Compliance 33 GC-6.07 Wage Rates 34 GC-6.09 Permits and Utilities 35 GC 6.21 Nondiscrimination 36 GR-01 60 00 Product Requirements 37 38 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised April 12, 2022 Page 4 of 4 Cibolo Hills Phase 4 City Project No. 103688 SECTION 00 41 00 — PROPOSAL DEVELOPER AWARDED CONTRACTS This proposal must not be removed from this book of Contract Documents. TO: MERITAGE HOMES PROPOSAL FOR: PAVING, WATER, SANITARY SEWER, DRAINAGE, AND STREET LIGHT IMPROVEMENTS PROJECT NAME: CIBOLO HILLS FILE NO. W-2801 CITY PROJECT NO. 103688 Includes the furnishing of all materials, equipment and labor for the installation of median openings, left turn lane, water & sanitary sewer improvements and all necessary appurtenances and incidental work to provide a complete and serviceable project designated as: PAVING. UTILITY AND STREET LIGHT IMPROVEMENTS TO SERVE CIBOLO HILLS PHASE 4 Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder, having thoroughly examined the Contract Documents, including plans, special contract documents, the Technical Specifications listed in this contract, the site of the project and understanding the amount of work to be done, and the prevailing conditions, hereby proposes to do all the work, furnish all labor, equipment and material except as specified to be furnished by the City, which is necessary to fully complete the work as provided in the Plans and Contract Documents and subject to the inspection and approval of the Director of the Department of Transportation & Public Works of the City of Fort Worth, Texas; and binds himself upon acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment Bond, Maintenance Bond, and such other bonds, if any, as may be required by the Contract Documents for the performing and completing of the said work. Contractor proposes to do the work within the time stated and for the following sums: Furnish and install, including all appurtenant work, complete in place, the following items: Page 1 of 3 PART B - PROPOSAL (Cont.) After acceptance of this Proposal, the undersigned will execute the formal contract and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents, for the faithful performance of the Contract. The attached bid security, if required, is to become the property of the Developer. The successful bidder shall be required to perform the work in accord with these contract documents and the technical specifications available in the City of Fort Worth's Buzzsaw site and incorporated herein and made a part hereof for all purposes. The undersigned assures that its employees and applicants for employment and those of any labor organization, subcontractors, or employment agency in either furnishing or referring employee applicants to the undersigned are not discriminated against as prohibited by the terms of City Ordinance No. 7278 as amended by City Ordinance No. 7400. Page 2 of 3 The Bidder agrees to begin construction within ( ) working days after issue of the work order, and to complete the contract within () working days after beginning construction as set forth in the written work order to be furnished by the Owner. I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration on preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 3 (Initials) Addendum No. 2 (Initials) Addendum No. 4 (Initials) Respectfully submitted, Conat ser CcnsP-t cfi on TX , L . P. Name of Contractor By: P�f�C rk lgains (Printed Name) Title: Wi d Cr f Company Name: Conci6er ConRtYUCth <Of' i ix: Address: W CVhtal �WtV1icvthtTx -ALA IG Email: Telephone: SS{ 1 - 5� - 1-N3 Page 3 of 3 SECTION 0042 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Sidlist Specificetlon Section; Unit of Bid Unit PriceBld Value Item No. Description No. I Measure Quantity . IJ1IT II WATER IMPA>VE31 f' _ - 1 3311.0241 8' Water Pipe 33 11 12 LF 7250 2 3312.20031" Water Service 331210 EA 185 ,-_ 3 3312.2203 2" Water Service 34 12 10 FA 1 4 3312.3003 8' Gate Valve & Box 33 12 20 FA 30 _ _ _ 5 _ - 3311.0242 8' Water Pipe, CSS Backfill 34 11 12 LF 435 - 6 _ 3312.0117 Connect to Existing 8' Water Main 33 12 25 EA 5 , .7 - 3311.0441 12' Water Pipe 33 11 10, 33 11 12 LF 1775 6 3312.300512' Gate Valve & Box 33 12 20 FA 7 9 3312.0117 Conned to Existing 12' Water Main 33 12 25 EA 1 _ 10`, 3305.0003 El" Waterline Lowering 33 05 12 FA 10 - 11- 0241.1118 4-12" Pressure Plug 0241 14 EA 4 - 12 3312.0001 Fire Hydrant 33 12 40 EA 20 19 3311.0001 Ductile Iron Fittings 3311 11 TN 8.5 -1-4_1_ 3311.0001 Ductile Iron Fittings 33 11 11 TN 2 15 3305.0109 Trench Safety 33 05 10 LF 9025 _ -19 3312.0108 Conn. To Exst 24" W.M. (24X12 Tapping Sleeve & Valve) 33 12 25 FA 1 17 9999.0027 8"X12" Reducer 00 00 00 EA 1 20 _46 2 3 4 _ 5 13 544.00 $319,000.00 $1,050,00 5173,250.00 $2,400.00 $2,400.00 $1,350.00 $40,500.00 $54.00 $23,490.00 31,000.00 $5,000.00 374.00 $131,350.00 32,800.00 319,600.00 $2,500.00 32,500.00 51,500.00 $15,000.00 $1,250.00 $5,000.00 34,500.00 $90,000.00 $5,500.00 $491,750.00 $5,000.00 $10,000.00 $1.00 39,025.00 $6,500.00 36,500.00 $1,000.00 $1,000.00 TOTALUi T_f: WpATOR IMPRc/VLMENT$ 3900,365.00 UNIT I: SANITARY S_ EWER lypiir OEME�ITS LF 6855 $54.00 $370,170.00 3331.4115 8' Sewer Pipe (SDR-26) SS 51 3339.1001 4' Manhole 33 39 20 EA 29 $4,800.00 $139,200.00 3331.4116 6" Sewer Pipe, CSS Backfill 33 31 20 LF 435 354.00 $27,840.00 3301.0002 Post -CCTV Inspection 33 01 31 LF 6855 $3.00 $20,555.00 3339.0001 Epoxy Manhole Liner 33 39 80 VF 154 $435.00 $66,990.00 3301.0101 Manhole Vacuum Testing 33 01 30 EA 37 $150.00 55,550.00 3331.3101 4" Sewer Service 33 31 50 EA 105 $750.00 $123,750.00 9999.0020 Conned t0 Existing 16" SS 33 31 20 EA 1 $2,500.00 $2,500.00 3305.0113 Trench Water Stops 33 05 15 EA 37 $250.00 59,250.00 3305.0109 Trench Safety 33 05 10 LF 6855 $2.00 $13,710.00 3339.1101 5' Manhole 33 39 10, 33 39 20 EA 7 36,000.00 42000 3339.1102 5' Drop Manhole 33 39 10, 33 39 20 EA 1 57,000.00 $7,000.00 9999.0019 Conned to Existing 8" SS 33 31 20 EA 1 $1,500.00 $1,500.00': UNIT III: DRAIN_A4E PRQ� alirHASE 4] 1 '3341.0201 21" RCP, Class III ., .. ._ _. LF _ _ 439 _.. 2 3341.0205 24' RCP, Class III 33 41 10 _ _ , LF , __ 2218 3 3341.0302 30" RCP, Class III 33 41 10 _ _ __ LF 1713 .r.4.___41.0._ _ __. I ._____._.. 4 3341.0309 38' RCP, Class III 33 41 10 _ _ LF .$2 5 334104.09 48" RCP,,Class III __ 33 41 10 LF 172 _ .. -. 33 _ 8_ 49.50011'Curbinlet. __.__ ___ 3 __. _ _.. . ______ EA .,._12 7 3349.500215' CuA2 Inlet 33 49 20 EA 8 8 3349.500320'Curbinlet __ _ ___,334920 EA .. __9 -` __9 9999.0028 3' Storm Junction Box__ .,. 33 49 10 , . _ _ EA 1 0 3349A01 4St 0' onn Junction _ _ _ Box 33 49 10 -- - - ___ 11 3349 0002 5' Storm Junction Boz _ _ ___ __ __ _ _ _ _. _. 33 49 10 _ i _ EA _. _ 12- .49. 33100530" Flared Headwall, 1 Pipe 33 49 40 _ EA T 1, 13 ' 3349.1003 24" Flared Headwall, 1 pipe ._ 33 49 40 -,_ EA _ 1 14 3137.0101 Concrete Rip Rap __. 31 37_00 ___ _ _._ .__ . SY _ _ _ __ 70 15 3365:61.9 Trench Safety 330510 LF _ 4572 18 TOTAL. UNIT it: bRAINAGE IMPROVEMENTS PHASE 41 CITY OP FORT WORTII STANDARD CONSTRUCTION 6PFGmCATION DOMILIENTS- DEVELOPER AWARDED PROJECTS T V.Pi,ebpn.MC 1.1013 5830.025.0d $85.00 __ 328,53590 $70.00 3153,120..00 $65.00 ;145605.00 3110.00 __ $3,520.00 3180.00 930,960.00 33,400.00 _94D 600.00 $4,400.00 _ 535,200.00 $5,400.00 348,600.00 $4,500.00 54,500.00 $5,500.00 __ 360,500:00 58,500.00 $13.000.00 93,500.00 33,500.03 $3,000.00 $3,000.00 $105.00 �.57,350.00 81.00 LL _ 94,572,00 $584,762.00 22A70600 .2 0_BOI rropwl ooP c .k Plue...55 UNIT PRICE BID Bidllst Item No. SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item information Description _1 3213.0101 6" Cone Pavement —1- - 2 _ 3213.0102 T Cone Pavement 3 3211.05016" Lime Treatment — 4 3213.0302 5', 4" Cone., Sidewalk- 5 — 3213A303 B' 4" Sidexalk (Collector) _ 8 3211.0400 Hydrated lime (32#1SY) 7 3213.0501 B/F Ramps, Type R-1 6 3471.0001 Tragic Control 9 9999.0013 Street Sion 10 8999.0028 Stop eign (ERdOdes 11 9899.0030 Regulatory SignAssemlies(Installed on Galvanized Poat) 12 9999.rrica0014 Connect to Existing Street Header 13 _ 9999.0015 Remove End ofRoed 9ade _ 14 9999 0011 End of Road Bemicade [Specification Section' No, VNITW PAVING IMP OVEMEJJTS 32 13 13 321313 32 11 29 32 13 20 _ 321320 321129- -- _ - - 32 13 20- - - 34 71 13 34 41 30 34 41 30 4 344130y-- Unll of I Bid Measure Quantity SY 23,510 SY _ , 6,571 SY _ _ 33,223 SF 11,890 16,650 TONS_ 531 EA 24 LS 1 EA J15 —15 15 EA _ 5 EA 5 32 13 13 _ y 0241 13 _ _ _ 34 41 30 1' )YAL UNIT )V: Mellen IMPROVEMENTS Bid Summary UNIT I: WATER IMPROVEMENTS UNIT 11: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS (PHASE 4) UNIT IV: PAVING IMPROVEMENTS This Bid is sabmined by the entity named below: IDDER: C, Y ci ser COnst-ruc.- cn 1'X , LP 53 'i WiCY _'c4S�' -e t- W© h, rtx col 1 Total Construction Bl Bidder's Application Bidders Proposal Unit Price Bid Value III+ $39.00 $916,890.00 $47.00 — 5308,837;00 53.00 589,669.00 $3.50 341,615,00 $3.50 __ $65,275.00 $215.00 _ _ $114.1655.00 $1,400.00 533,800,00 $2,500.00 _. _ 32,500.00 $250.00 $3,750.00 $500.00 $7,500.00 5750,00 $11,250.00 $20,00 $5,200.00 $500.00 _ $2,500.00 $1,000.00 $3,000.00 $1,615.751.00, ___—_ $900365..00 1$584,762,00 — 51,815,751.00 Ry: emote--tg91 n5 D Q Psi c1^ Contractor agrees to coatplete WORK for FINAL ACCEPTANCE within 160working days after the date when tht CONTRACT commences to roe as provided In the General Conditions END OF SECTION CITY OFPAT WORTN STANDARDCONSTRUCIION SPECIFICATION DOCUMENTS -DEVELOPER AWARDED PROIPA•19 Fos Vwim Srrtmbw 14011 $3,930,903.00 fl.rn05 un4U BW hapsdpAP_Cbab I'W.4.9 SECTION 00 42 43 Developer Awarded Projects • PROPOSAL FORM UNIT PRICE BID Bidder's Application Bidlist new No. Project Item Information Description UNIT V: STREET LIGHTING I(1 1 3441.3301 Rdwy Ilium Foundation TY 1,2, and 4 2 9999.0031 FumishlInsIa1t Rdway IIIum TY 11 Pole �. Bidders Proposal Speeifiection I Unit of If Bid Unit Price Bid Value Section No. Measurer Quantity I wjZ01+EulENTS +� j6 EA 34 51,200,00 i48,800.00 34 41 10 EA 34 31.600.00 554,400,00 3 3441.3050 LED Lighting Fixture (70 watt ATBO Cobra Head) 41 20 EA 34 5850.00 528,900.00 4 3441.1646 Fumio1Vlnstell Typa 33B Ann 34 41 20 EA 34 $500.00 $17,000.00 . ,_ ..._...._.._.._ --- _�._.. _ ........._ ... ... __—....- 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 48 TOTAL UNIT V: STREET LIGHTIN4 IMPROVEMENT Bid Summary UNIT V: STREET LIGHTING IMPROVEMENTS This Bid is submitted by the entity clamed below CInoI-e,rcon irtkcti 1xt-F _� /j., Iv/Uy1' a--1; -ot` ✓I'^, {��t R.V I �Va 1' s4 I t 101 I $141,100.001 $141,100.001 Total Construction Bid $141,100.001 BY: E.JI vt. t TITLE: �St 4 CIenfi 14 DATE: Contractor agrees to complete WORK for FINAL ACCEPTANCE within 60 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OF FORT WORTH STANIARDCONSTRUCTION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROTECTS Farm Venim Scplcmkr 1, 2015 00 42 43 DAP -BID PROPOSAL Psac t afi 2nd Doc Rs rim Bid Propoal DAP Cibdo Phan 4 Sneer li thuslS 004511-1 BIDDERS PREQUALIFICATIONS Page 1 of 3 1 SECTION 00 45 11 2 BIDDERS PREQUALIFICATIONS 3 4 1. Summary. All contractors are required to be prequalified by the City prior to submitting 5 bids. To be eligible to bid the contractor must submit Section 00 45 12, Prequalification 6 Statement for the work type(s) listed with their Bid. Any contractor or subcontractor who is 7 not prequalified for the work type(s) listed must submit Section 00 45 13, Bidder 8 Prequalification Application in accordance with the requirements below. 9 10 The prequalification process will establish a bid limit based on a technical evaluation and 11 financial analysis of the contractor. The information must be submitted seven (7) days prior 12 to the date of the opening of bids. For example, a contractor wishing to submit bids on 13 projects to be opened on the 7th of April must file the information by the 31 st day of March 14 in order to bid on these projects. In order to expedite and facilitate the approval of a Bidder's 15 Prequalification Application, the following must accompany the submission. 16 a. A complete set of audited or reviewed financial statements. 17 (1) Classified Balance Sheet 18 (2) Income Statement 19 (3) Statement of Cash Flows 20 (4) Statement of Retained Earnings 21 (5) Notes to the Financial Statements, if any 22 b. A certified copy of the firm's organizational documents (Corporate Charter, Articles 23 of Incorporation, Articles of Organization, Certificate of Formation, LLC 24 Regulations, Certificate of Limited Partnership Agreement). 25 c. A completed Bidder Prequalification Application. 26 (1) The firm's Texas Taxpayer Identification Number as issued by the Texas 27 Comptroller of Public Accounts. To obtain a Texas Taxpayer Identification 28 number visit the Texas Comptroller of Public Accounts online at the 29 following web address www.window.state.tx.us/taxnermit/ and fill out the 30 application to apply for your Texas tax ID. 31 (2) The firm's e-mail address and fax number. 32 (3) The firm's DUNS number as issued by Dun & Bradstreet. This number 33 is used by the City for required reporting on Federal Aid projects. The DUNS 34 number may be obtained at www.dnb.com. 35 d. Resumes reflecting the construction experience of the principles of the firm for firms 36 submitting their initial prequalification. These resumes should include the size and 37 scope of the work performed. 38 e. Other information as requested by the City. 39 40 2. Prequalification Requirements 41 a. Financial Statements Financial statement submission must be provided in 42 accordance with the following: 43 (1) The City requires that the original Financial Statement or a certified copy 44 be submitted for consideration. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Cibolo Hills Phase 4 City Project No. 103688 0045 11 -2 BIDDERS PREQUALIFICATIONS Page 2 of 3 1 (2) To be satisfactory, the financial statements must be audited or reviewed 2 by an independent, certified public accounting firm registered and in 3 good standing in any state. Current Texas statues also require that 4 accounting firms performing audits or reviews on business entities within 5 the State of Texas be properly licensed or registered with the Texas State 6 Board of Public Accountancy. 7 (3) The accounting firm should state in the audit report or review whether 8 the contractor is an individual, corporation, or limited liability company. 9 (4) Financial Statements must be presented in U.S. dollars at the current rate 10 of exchange of the Balance Sheet date. 11 (5) The City will not recognize any certified public accountant as 12 independent who is not, in fact, independent. 13 (6) The accountant's opinion on the financial statements of the contracting 14 company should state that the audit or review has been conducted in 15 accordance with auditing standards generally accepted in the United 16 States of America. This must be stated in the accounting firm's opinion. 17 It should: (1) express an unqualified opinion, or (2) express a qualified 18 opinion on the statements taken as a whole. 19 (7) The City reserves the right to require a new statement at any time. 20 (8) The financial statement must be prepared as of the last day of any month, 21 not more than one year old and must be on file with the City 16 months 22 thereafter, in accordance with Paragraph 1. 23 (9) The City will determine a contractor's bidding capacity for the purposes 24 of awarding contracts. Bidding capacity is determined by multiplying the 25 positive net working capital (working capital = current assets — current 26 liabilities) by a factor of 10. Only those statements reflecting a positive 27 net working capital position will be considered satisfactory for 28 prequalification purposes. 29 (10) In the case that a bidding date falls within the time a new financial 30 statement is being prepared, the previous statement shall be updated with 31 proper verification. 32 b. Bidder Prequalification Application. A Bidder Prequalification Application must be 33 submitted along with audited or reviewed financial statements by firms wishing to be 34 eligible to bid on all classes of construction and maintenance projects. Incomplete 35 Applications will be rejected. 36 (1) In those schedules where there is nothing to report, the notation of 37 "None" or "N/A" should be inserted. 38 (2) A minimum of five (5) references of related work must be provided. 39 (3) Submission of an equipment schedule which indicates equipment under 40 the control of the Contractor and which is related to the type of work for 41 which the Contactor is seeking prequalification. The schedule must 42 include the manufacturer, model and general common description of 43 each piece of equipment. Abbreviations or means of describing 44 equipment other than provided above will not be accepted. 45 46 3. Eligibility to Bid 47 a. The City shall be the sole judge as to a contractor's prequalification. 48 b. The City may reject, suspend, or modify any prequalification for failure by the 49 contractor to demonstrate acceptable financial ability or performance 50 c. The City will issue a letter as to the status of the prequalification approval. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Cibolo Hills Phase 4 City Project No. 103688 1 2 3 4 5 6 7 8 9 00 45 11 -3 BIDDERS PREQUALIFICATIONS Page 3 of 3 d. If a contractor has a valid prequalification letter, the contractor will be eligible to bid the prequalified work types until the expiration date stated in the letter. END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Cibolo Hills Phase 4 City Project No. 103688 00 45 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Maior Work Type" box provide the complete maior work type and actual description as provided by the Water Department for water and sewer and TPW for ravine. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Water, Sanitary Sewer, Conatser Construction Drainage Paving Street Lights Conatser Construction Conatser Construction tO/ 31 /ma. The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: ccnc tSer COWILACtiOrl L P S &'1 WiCh;ict St. FCVi- VVc(th,TX -not lc) BY: Br c 1 r S "•1414-ye--‘ (Signature) TITLE: ReSidcryr DATE: END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS Form Version September 1, 2015 00 45 12_Prequalification Statement 2015_DAP.docx 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 1 2 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. 103688. Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 9 CONTRACTOR: 10 11 CL 1 Acti'c \ TX; LP Company 1 ; CXl i-b St Address RYA- W1a/Yh , TX —1(0t taI City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT By: roc tt-Lcu 15 (Please Print) Signature: Title: �t�e51 CieYl1� (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared PrDc4 tivi I Y1 , known to me to be the person whose name is subscribed to the fofgoing instrument and acknowledged to me that he/she executed the same as the act and deed of Pre<l den t for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 5 day of Ala 91. is I- , 20 2 — ::cPpY PV9� . KATHERINE ROSE NOTARY PUBLIC ID# 133467933 State of Texas Comm. Exp. 11-30-2025 0IX. k.l1kill- Notary Public in and for the State of Texas END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Cibolo Hills Phase 4 City Project No. 103688 005243-1 Developer Awarded Project Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on is made by and between the Developer, 4 Meritage Homes.. authorized to do business in Texas ("Developer") , and 5 authorized to do business in Texas, acting by and through its duly authorized representative, 6 ("Contractor"). 7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article 1. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 CIBOLO HILLS PHASE 4 16 17 Article 3. CONTRACT TIME 18 3.1 Time is of the essence. City Project No. 103688 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within {ate} working days after the 23 date when the Contract Time commences to run as provided in Paragraph 12.04 of the 24 Standard City Conditions of the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that Developer 27 will suffer financial loss if the Work is not completed within the times specified in 28 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 29 the Standard City Conditions of the Construction Contract for Developer Awarded 30 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 31 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 32 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees 33 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 34 Developer One Thousand Dollars ($1.000.00) for each day that expires after the time 35 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 36 Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 Cibolo Hills Phase 4 City Project No. 103688 005243-2 Developer Awarded Project Agreement Page 2 of 4 37 Article 4. CONTRACT PRICE 38 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 39 Documents an amount in current funds of Dollars 40 ($`±O1DN. CO3,OO ). 41 Article 5. CONTRACT DOCUMENTS 42 5.1 CONTENTS: 43 A. The Contract Documents which comprise the entire agreement between Developer and 44 Contractor concerning the Work consist of the following: 45 1. This Agreement. 46 2. Attachments to this Agreement: 47 a. Bid Form (As provided by Developer) 48 1) Proposal Form (DAP Version) 49 2) Prequalification Statement 50 3) State and Federal documents (project specific) 51 b. Insurance ACORD Form(s) 52 c. Payment Bond (DAP Version) 53 d. Performance Bond (DAP Version) 54 e. Maintenance Bond (DAP Version) 55 f. Power of Attorney for the Bonds 56 g. Worker's Compensation Affidavit 57 h. MBE and/or SBE Commitment Form (If required) 58 3. Standard City General Conditions of the Construction Contract for Developer 59 Awarded Projects. 60 4. Supplementary Conditions. 61 5. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings. 65 7. Addenda. 66 8. Documentation submitted by Contractor prior to Notice of Award. 67 9. The following which may be delivered or issued after the Effective Date of the 68 Agreement and, if issued, become an incorporated part of the Contract Documents: 69 a. Notice to Proceed. 70 b. Field Orders. 71 c. Change Orders. 72 d. Letter of Final Acceptance. 73 74 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 Cibolo Hills Phase 4 City Project No. 103688 005243-3 Developer Awarded Project Agreement Page 3 of 4 75 Article 6. INDEMNIFICATION 76 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 77 expense, the city, its officers, servants and employees, from and against any and all 78 claims arising out of, or alleged to arise out of, the work and services to be performed 79 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 80 under this contract. This indemnification provision is specifically intended to operate 81 and be effective even if it is alleged or proven that all or some of the damages being 82 sought were caused, in whole or in part, by any act, omission or negligence of the citv. 83 This indemnity provision is intended to include, without limitation, indemnity for 84 costs, expenses and legal fees incurred by the city in defending against such claims and 85 causes of actions. 86 87 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 88 the city, its officers, servants and employees, from and against any and all loss, damage 89 or destruction of property of the city, arising out of, or alleged to arise out of, the work 90 and services to be performed by the contractor, its officers, agents, employees, 91 subcontractors, licensees or invitees under this contract. This indemnification 92 vrovision is specifically intended to overate and be effective even if it is alleged or 93 proven that all or some of the damages being sought were caused. in whole or in Dart. 94 by any act. omission or negligence of the cite. 95 96 Article 7. MISCELLANEOUS 97 7.1 Terms. 98 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 99 the Construction Contract for Developer Awarded Projects. 100 7.2 Assignment of Contract. 101 This Agreement, including all of the Contract Documents may not be assigned by the 102 Contractor without the advanced express written consent of the Developer. 103 7.3 Successors and Assigns. 104 Developer and Contractor each binds itself, its partners, successors, assigns and legal 105 representatives to the other party hereto, in respect to all covenants, agreements and 106 obligations contained in the Contract Documents. 107 7.4 Severability. 108 Any provision or part of the Contract Documents held to be unconstitutional, void or 109 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 110 remaining provisions shall continue to be valid and binding upon DEVELOPER and 111 CONTRACTOR. 112 7.5 Governing Law and Venue. 113 This Agreement, including all of the Contract Documents is performable in the State of 114 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 115 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 Cibolo Hills Phase 4 City Project No. 103688 005243-4 Developer Awarded Project Agreement Page 4 of 4 116 117 7.6 Authority to Sign. 118 Contractor shall attach evidence of authority to sign Agreement, if other than duly 119 authorized signatory of the Contractor. 120 121 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 122 counterparts. 123 124 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 125 126 Contractor: CQ'1ate'rC l Structicn Tx By: lortbf ( nature) 5-c aa i ns (Printed Name) Title: Pt e den r Cantc€r GonRiruction -f x . LP Company Name: wi L l:1 a St. Address: Fat w th —701 Iq City/State/Zip: Developer: By: (Signature) (Printed Name) Title: Meritage Homes Company Name: 8840 Cypress Waters Blvd, Suite 100 Address: Dallas, TX 75019 City/State/Zip: Date Date CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 Cibolo Hills Phase 4 City Project No. 103688 Bond No. 0247463 1 SECTION 00 62 13 2 4 THE STATE OF TEXAS 5 6 COUNTY OF TARRANT 7 8 PERFORMANCE BOND § uo62t3-� PERFORMANCE BOND Puce 1 of KNOW ALL BY THESE PRESENTS: That we. Conatser Construction TX, LP. , known as "Principal" herein and 9 Berkley Insurance Company . a corporate surety(sureties. if more than 10 one) duly authorized to do business in the State of Texas, known as "Surety- herein (tvhether one 11 or more), are held and firmly bound unto the Developer. lv1eritaize Homes, authorized to do 12 business in Texas ("Developer-) and the City of Fort Worth. a Texas municipal corporation sum 13 (-City-). in thepenal of. Four Million, Seventy Two Thousand. Three and No/100 Dollars ($ 4,072,003.00 ), 14 lawful money of the United States. to be paid in Fort Worth. Tarrant County. Texas for the 15 payment of which sum well and truly to be made jointly LIMO the Developer and the City as dual 16 obligees. we bind ourselves. our heirs, executors. administrators. successors and assigns. jointly 17 and severally. firmly by these presents. 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth by and through a Community Facilities 20 Agreement. CFA Number : and 21 WHEREAS. the Principal has entered into a certain written contract with the Developer awarded 22 the day of _ . 20 . which Contract is hereby referred to and made a 23 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 24 and other accessories defined by lays. in the prosecution of the Work, including any Change 25 Orders. as provided For in said Contract designated as Paving and Utility Improvements to Serve 26 Ciholo Hills Phase 4. 27 NOW, THEREFORE, the condition of this obligation is such that lithe said Principal 28 shall faithfully perform it obligations under the Contract and shall in all respects duly and 29 faithfully perform the Work. including Change Orders. under the Contract. according to the plans. 30 specifications. and contract documents therein referred to, and as well during any period of 31 extension of the Contract that may be granted on the part of the Developer and/or City.. then this 32 obligation shall he and become null and void. otherwise to remain in full force and effect. 33 PROVIDED FURTHER, that if any legal action be filed on this Bond. venue shall lie in 34 Tarrant County. 'Texas or the United States District Court for the Northern District of Texas. Fort 35 Worth Division. CITY OF FORT WORT/I STANDARD CITY CONDITIONSDEVELOPER AltARDED PROJLC rS Rex 'Ned Januarn 31, 2012 Ciholo 1lills Phase 4 C'it� Project Na I O36Xli 40 62 13-2 PERFORMANCE BOND Page 2 (42 This bond is made and executed in compliance with the provisions of Chapter 7253 of the 2 Texas Government Code. as amended. and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statue. 4 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the day of 6 20 7 PRINCIPAL: 8 9 Conatser Construction TX, L.P. 10 11 12 13 14 15 16 17 18 19 20 21 '-7 23 24 25 76 27 28 BY 79 30 31 32 33 34 35 36 37 38 39 40 41 42 *Note: If signed by an officer of the Surety Company. there must be on file a certified extract 43 from the by-laws showing that this person has authority to sign such obligation. If 44 Surety's physical address is different from its mailing address. both must be provided, 45 46 The date of the bond shall not be prior to the date the Contract is awarded. 47 ATTEST: BY: S ignatfifF Brock Huggins, President Name and Title Address: 5327 Wichita St. Fort Worth. TX 76119 SURETY: Berkley Insurance Company (Principal) Sec Ka.:ua) R0-a-ci Witness as to Principal itness as to Surety Signature Robbi Morales, Attorney -in -fact Name and Title Address: 5005 LBJ Freeway. Suite 1500 Dallas. TX 75244 Telephone Number: 214/989-0000 Cr1C OE FORT wpm] F STANDARD) CI FY CONDITIONS — DEVELOPER AWARDED PROJECTS ReN tsed .lanuan 31, 201_ Ctholu 1ldl, 1'Ita,c 4 City Project No 103688 Bond No. 0247463 4 THE STATE OF TEXAS a 6 COUNTY OF TARRANT 7 8 That we Conatser Construction TX, L.P. (R 62t. -1 PAYMEaT 130NI) Paee I of SECTION 00 62 14 PAYMENT BOND KNOW ALL BY THESE PRESENTS: known as "Principal" herein. and 9 Berkley Insurance Company , a corporate surety ( or 10 sureties if more than one). duly authorized to do business in the State of Texas. known as 11 "Surety herein (whether one or more). are held and firmly bound unto the Developer, Meritaae 12 Homes, authorized to do business in Texas "(Developer"). and the City of Fort Worth, a Texas Four Million Seventy Two 13 municipal corporation ("City-). in the penal sum of_ Thousand, Three and No/100 Dollars , 14 ($ 4,072,003.00 ). law ful money of the United States. to be paid in Fort Worth. 15 Tarrant County. Texas. for the payment of which sum tiyeli and truly be made jointly unto the 16 Developer and the City as dual obligees, we bind ourselves. our heirs. executors. administrators. 17 successors and assigns. jointly and severally. firmly by these presents: 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth. by and through a Community Facilities 20 Agreement, CFA Number 19-0004; and 31 WHEREAS, Principal has entered into a certain written Contract with Developer. 22 awarded the day of , 20 . which Contract is hereby 23 referred to and made a part hereof for all purposes as if fully set forth herein. to furnish all 24 materials. equipment. labor and other accessories as defined by law. in the prosecution of the 25 Work as provided for in said Contract and designated as Pavinti and Utility improvements to 26 Serve Cibolo Hills Phase 4. 27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 28 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 29 Chapter 2253 of the Texas Government Code. as amended) in the prosecution of the Work under 30 the Contract. then this obligation shall be and become null and void: otherwise to remain in full 31 force and effect. 32 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 33 Texas Government Code. as amended. and all liabilities on this bond shall he determined in 34 accordance with the provisions of said statute. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Cibolo Hills Phase 3 City Project No. 103688 0062I4-2 PAYMENT BOND Page 2 of 2 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 2 this instrument by duly authorized agents and officers on this the day of 3 .20 4 ATTEST: (Principal) Secre!. Witness as to Principal ATTEST: PRINCIPAL: Conatser Construction TX, L.P. BY Signature Brock Huggins, President Name and Title Address: 5327 Wichita St. Fort Worth, TX 76119 SURETY: Berkley Insurance Company BY: ( Signature Robbi Morales, Attorney -in -fact (Surety) Secretary. Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 fitness as to Surety Telephone Number: 214/989-0000 6 Note: If signed by an officer of the Surety. there must be on tile a certified extract from the 7 bylaws shoving that this person has authority to sign such obligation. If Surety's physical 8 address is different from its mailing address, both must be provided. 9 I 0 The date of the bond shall not be prior to the date the Contract is awarded. 11 12 13 14 15 END OF SECTION CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Cibolo Hills Phase 3 City Project No. 103688 Bond No. 0247463 01)62 19• I MAINTENANCE BOND Pagelai3 1 SECTION 00 62 19 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT 7 8 That we Conatser Construction TX, L.P. , known as "Principal" herein and 9 Berkley Insurance Company . a corporate surety (sureties. if more than 10 one) duly authorized to do business in the State of Texas. known as "Surety" herein (whether one 11 or more). are held and firmly bound unto the Developer. Meritaize Homes. authorized to do 12 business in Texas ("Developer") and the City of Fort Worth. a Texas municipal corporation 13 ("City"). in the sum of Four Million, Seventy Two Thousand, Three and No/100 Dollars 14 ($ 4,072,003.00 .), lawful money of the United States. to be paid in Fort Worth, 15 Tarrant County. Texas. for payment of which sum well and truly he made jointly unto the 16 Developer and the City as dual obligees and their successors. we bind ourselves. our heirs. 17 executors. administrators, successors and assigns. jointly and severally. firml, by these presents. 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth by and through a Community Facilities 20 Agreement. CFA Number 19-0004: and 21 WHEREAS, the Principal has entered into a certain written contract with the Developer 22 awarded the day of . 20_, which Contract is 23 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 24 materials. equipment labor and other accessories as defined by law, in the prosecution of the 25 Work. including any Work resulting from a duly authorized Change Order (collectively herein. 26 the "Work") as provided for in said Contract and designated as Pav°init and Utility Improvements 27 to Serve Cibolo Hills Phase 4: and 28 29 WHEREAS. Principal binds itself to use such materials and to so construct the Work in 30 accordance with the plans. specifications and Contract Documents that the Work is and will 31 remain free from defects in materials or workmanship for and during the period of two (2) years 32 after the date of Final Acceptance of the Work by the City ("Maintenance Period"): and 33 CITY OF FOR r tyt)RTI STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Rey stied January 31. 2012 t'thnlo 11111, Phase -I City Pr neet No 103688 006219-2 MAIa11 NANC E 130ND Paget_ 0l'3 1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE. the condition of this obligation is such that if Principal shall 6 remedy any defective Work. for which timely notice was provided by Developer or City. to a 7 completion satisfactory to the City. then this obligation shall become null and void: otherwise to 8 remain in full force and effect. 9 10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 1 1 noticed defective Work. it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond: and 14 15 PROVIDED FURTHER. that if any legal action be filed on this Bond. venue shall lie in 16 Tarrant County. Texas or the United States District Court for the Northern District of Texas. Fort 17 Worth Division: and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 1) 23 24 CiTS OF FORT WORTI 1 ? I ANDARU Err \ C ONDI 1 IONS l)1:VLLOPLR AWARDED PROJECTS Rei.rsed 3anuur31. 2012 Cibulu Hills Phase 4 Citt Proreet No 1u36l0 (hi 621•1•3 MAINTENANCE 130ND N ue3or3 1 IN WITNESS WHEREOF. the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the day of 3 ,20 4 5 6 7 8 9 BY: 10 Signat 11 12 13 14 17 16 17 18 19 Witness as to Principal 20 21 2.2 23 24 25 26 27 ,8 ATTEST' (Principal) Secrzt'f�' 29 ATTEST: Brock Huggins, President Name and Title PRINCIPAL: Conatser Construction TX, L.P. Address: 5327 Wichita St. Fort Worth, TX 76119 SURETY Berkley Insurance Company BY: .(;;7/0-e.fc.:; 2✓L.-4,Qrl ,,/ Signature Robbi Morales, Attorney -in -fact Name and Title 30 Address: 5005 LBJ Freeway, Suite 1500 31 (Surety) Secretary Dallas, TX 75244 32 33 34 r-- 35 W' Hess as to Surety Telephone Number: 214/989-0000 36 37 *Note: If signed by an officer of the Surety. Company. there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address. both must be provided. 40 41 The date of the bond shall not be prior to the date the Contract is awarded. 42 CITY OF 1 OR r Wt )R rl i SIANI)ARD CITY CON D1TRA'S— DEVELOPER AN'ARD11) PROJECTS Rev2u.1Januan 31 2012 Cibolu 11i11s Phase-1 C nh Projuot No 1036143