HomeMy WebLinkAboutContract 58614-CO1CSC No. 58614-COI
FORT WORTH.
City of Fort Worth
Change Order Request
Project Name 2022 Traffic Signal and Street Lighting Improvements Unit Price Construction Contract
City Sec # 58614
Client Project #(s) Various Projects
Project Description Unit Price Construction Contract for Traffic Signal and Street Lighting Improvements Projects
Contractor Bean Electric, Inc. Change Order # 1 Date 4/3/2023
City Project Mgr. Iskal Shrestha P.E. City Inspector N/A
Contract Time
Dept. TPW Totals (CD)
Original Contract Amount $3,000,000.00 $3,000,000.00
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date 1 $3,000,000.00 $3,000,000.00
Amount of Proposed Chanqe Order 1 $71.566.65 1 $71.566.65
Original Funds Available for Change Orders $0.00
Remaining Funds Available for this CO $0.00
Additional Funding (if necessary) $71,566.65 $71,566.65
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.39%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $3,750,000.00
USTIFICATION (REASONS) FOR CHANGE ORDER
Additional bid items are needed but were not included in the original unit price contract. The items being added are needed for the construction of the temporary signal at the
intersection of Bonds Ranch Road and Wagley Robertson Road (CPN 103278), Intersection Improvements at Crowley and Sycamore (CPN 101016), and the Paschal
Street Light Project (CPN 103408). The City of Fort Worth has compared the unit prices which are being proposed by the contractor to other similar items and accepts the
unit costs.
Traffic signal items in this change order have been compared with recently executed City contracts (CSCN 58453 and CSCN58368). See the attachment for the bid
tabulation for the recently bid traffic signal projects to compare costs with the change order items. The Furnish/Install Fish -Eye Detection System in the attached bid
tabulation for the recent project/contract is the same item as the Movision Camera in this change order. The City PM was able to negotiate the prices of some of the items
and successfully lowered the prices. The difference in pricing can be justified by the current market pricing which fluctuates every month due to price escalations and
inflation. The City finds that the contractor's proposed prices are fair and reasonable. For TxDOT bid items in this change order, the average pricing was compiled from
similar items from the Texas Department of Transportation Average Low Bid Unit Prices. See the attachment for the detail about the price comparison. Typically, TxDOT's
bid quantity for its projects is higher than City's projects. The bid price proposed by the contractor is directly proportional to the bid quantity. It is typically normal for the bid
price to be higher for smaller quantities if compared with the same items with higher quantities. Keeping this in mind, the price proposed by the contractor is justifiable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Company Name Contractor (Name) Contract Signature
Date
Bean Electric, Inc. Roy Bean a
�ea�ao.s.oz3,.
Apr 6, 2023
Inspector/Inspec
Date
Project and Contract Compliance Manager
Date
14AZ
, 1S-1-(An, 6,202314:22 con
Apr 6, 2023
EMU
r
Date
Apr 10, 2023
�Q-�—
111,111, All a°.ee111,12 O111i111*
Apr 12, 2023
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Apr 12, 2023
Apr 12, 2023
Assistant City Attorney
Date
Assistant City Manager
Date
I IT
Apr 12, 2023
Apr 12, 2023
ouncil Action (if required)
iOBTnnC
ATTEST:
8
Jannette Goodall, City Secretary pQ°aaaaXAg44'p
baavoa
M&C Number I NA M&C Date Approved NA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
v--- Change Order Additions
Project Name 2022 Traffic Signal and Street Lighting Improvements Unit Price Construction Contract City Sec # 58614
Client Project # Various Projects
Contractor Bean Electric, Inc. PM Iskal Shrestha P.E. Inspector N/A
Change Order Submittal # Date 4/3I2023
ADDITIONS
ty
Unit
Unit Cost
Total
736
FURNISH AND INSTALL TRF SIG PL AM (S)STR(TY B) TXDOT SPEC 686
TPW
1
EA
$9,250.06
737
FURNISH AND INSTALL TRF SIG PL AM (S)STR(TY B)LUM TXDOT SPEC 686
TPW
1
EA
10.545.00
738
FURNISH AND INSTALL MIOVISION DETECTION SYSTEM
TPW
1
EA
735.375.00
739
FURNISH AND INSTALL POLE MOUNTED CONTROLLER CABINET ASS,
TPW
1
EA
15,230.00
740
3217.XXXX 6" DOT PVMT MARKING HAS W)
TPW
1
LF
2.20
741
3217.XXXX 18" SLID PVMT MARKING HAE (W)
TPW
1
LF
$10.50
742
3217.XXXX 18" SLID PVMT MARKING HAE (Y)
TPW
1
LF
10.50
743
FURNISH AND INSTALL CROSSWALK- PREFORMED THERMOPLASTIC (W) 24"
(SLID) WITH (B) 6" (SLID)
TPW
1
LF
$48.50
$48.50
744
0666 6042 REFL PAV MRK TY W 2" LD 00 ,
TPW
1
LF
8.00
745
0666 6167 REFL PAV MRK TY II W 4" BRK,
TPW
1
LF
50
746
0666 6170 REFL PAV MRK TY II W 4" L
TPW
1
LF
1.50
747
0666 6174 REFL PAV MRK TY II W 6" L
TPW
1
LF
$1.75
740666
6181 REFL PAV MRK TY II W 8" L
TPW
1
LF
5
749
6 6205 REFL PAV MRK TY II Y 4" BR ,
TPW
1
LF
5
750
0666 6207 REFL PAV MRK TY II Y 4" L
TPW
1
LF
50
75
0677 6002 ELM EXT PAV MRK & MARK
TPW
1
LF
75
752
0677 6006 ELIM EXT PAV MRK & M
TPW
1
LF
5.00
753
0678 6002 PAV SURF PREP FOR MRK 6"
TPW
1
LF
95
754
19999.0042 REMOVAL OF EXISTING LIGHT POLE ARM FROM EXI ITN P LE
TPW
i1
EA
88.00
TPW
$71,566.65
Sub Total Additions
1 7 ,566.65
Change Order Additions Page 2 of 5
FoRRTH City of Fort worth
Change Order Deletions
Project Name 2022 Traffic Signal and Street Lighting Improvements Unit Price Construction Contract City Sec # 58614
Client Project # Various Projects
Contracto Bean Electric, Inc. PM Iskal Shrestha P.E. Inspector NIA
Change Order Submittal # F- Date 4/3/2023
DELETIONS
y Unt UnitCost o a
TPW 0.00
Sub TotalDeletions
Change Order Deletions Page 3 of 5
M/SBE for this Change Order
Previous Change Orders
CO # DATE AMOUNT
Total $0.00
CSCN#58453
00 42 43
BID PROPOSAL
Page 1 of 1
SECTION3 CSCN#58368 —
PROPOSALALFORFORM
UNIT PRICE BID Bidde 's Applic lion
Project Item Information
ENGINEER
yUNEX
DURABLE
EARTC
ESTIMATE
SPECIALTIES
Bidlist
Specification
Unit of
Bid
Item No.
Description
Section No.
Measure
Quantity
Unit Price
Unit Price
Unit Price
Unit Price
105
3441.1017 Fumish/Install Fish -Eye Detection System
3441 10
EA
$20,000.00
$8,100.00
$37,705.00
$9,991.00
$31,000.00
$13,000.00
$30,500.00
$16,415.00
261
9999.0043 Furnish/Install TRF SIGN PL AM (S)STR (All Types) LUM
686
EA
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS TRAFFIC SIGNAL MODS AND UPGRADES AT VAR LOCATIONS THROUGHOUT THE CITY
Form Revised 20120120 UNIT PRICE CONTRACT. VAR PROJECT NUMBERS
Filters:
Adjust filters to refine your analysis of bid item average
Use City Filter:
Standard Specification
costs.
NO
.
Code
Multiple values
BID ITEM
BID ITEM DESCRIPTION
UNITOF
Min. Bid Item
Max. Bid Item
Avg. Unit Price
in. Unit Price
MEASURE
Qty
Qty
Bid Item
Multiple values
666-6042
REFL PAV MRK TY I(W)12"(SLD)(100MIL)
LF
30.0
30,000.0
$4.11
$0.5E
Actual Let Date Range
4/1/202212:00:00 AM..
Bidder Rank
666-6167
REFL PAV MRKTY II (W) 4" (BRK)
LF
60.0
182,584.0
$0.48
$O.OE
Law Bidder
District
666-6170
REFL PAV MRKTY 11 (W) 4" (SLD)
LF
9.0
3,622,642.0
$0.95
$O.OE_
All
County
666-6174
REFL PAV MRKTY 11 (W) 6" (SLD)
LF
3,020.0
2,531,466.0
$0.30
$0.11
All
Project Classification
All
666-6181
REFL PAV MRKTY II (W)18" (SLD)
LF
32.0
718.0
$4.80
$1.7E
Vendors
(Select to Exclude)
666-6205
REFL PAV MRKTY II (Y) 4" (BRK)
LF
55.0
500,000.0
$0.72
$0.05
All
666-6207
REFL PAV MRKTY I I (Y) 4" (SLD)
LF
16.0
2,888,957.0
$0.61
$0.05
677-6002
ELIM EXT PAV MRK&MRKS(6")
LF
25.0
1,535,500.0
$0.86
$0.15
677-6006
ELIM EXT PAV MRK & MRKS (18")
LF
42.0
794.0
$6.11
$1.2E
678-6002
PAV SURF PREP FOR MRK(6")
LF
50.0
1,887,972.0
$0.23
$0.0E
$10.80
$3.80
$15.00
$0.95
$11.75
$15.00
$6.00
$5.90
$22.00
$5.00
Data Date: 3/16/20231:20:42 PM
. dev. of Unit Median Unit
Price Price
$1.69
$0.66
$2.18
$0.16
$3.47
$1.90
30-93
$0.90
$5.99
$4.00
$0.25
$0.25
$0.26
$3.50
$0.25
$0.25
$0.63
$3.75
THIS DATA IS EXPORTED FROM TXDOT BID ITEM AVERAGES DASHBOARD
TO COMPARE THE CONTRACTOR'S PROPOSAL ON TXDOT ITEMS (CO#1).
THE ACTUAL LET DATE RANGE FOR THIS DATA IS FROM LAST 12 MONTHS.
Filters:
Adjust filters to refine your analysis of bid item average
Use City Filter:
Data Date: 3/16/2023120:42 PM
Standard Specification
costs.
NO
Code
686
BID ITEM
BID ITEM DESCRIPTION
UNITOF
Min. Bid Item Max. Bid Item Avg. Unit Price
Min. Unit Price
Max. Unit Price Std. dev. of Unit
Median Unit
MEASURE
City City
Price
Price
Bid Item
Multiple values
686-6007
INSTRF SIG PLAM (5)STR(TY B)
FA
1.0 9.0
$6,408.78
$5,600.00
$8,500.00
$906.97
$6,253.00
Actual Let Date Range
4/1/202212:00:00 AM..
Bidder Rank
686-6008
INS TRF SIG PL AM(S)STR(TY B)LUM
EA
1.0 9.0
$8,204.50
$6,475.00
$12,000.00
$1,547.32
$8,145.00
Low Bidder
District
All
County
All
Project Classification
All
Vendors
(Select to Exclude)
All
THIS DATA IS EXPORTED FROM TXDOT BID ITEM AVERAGES
DASHBOARD TO COMPARE THE CONTRACTOR'S PROPOSAL ON
TXDOT ITEMS (CO#1). THE ACTUAL LET DATE RANGE FOR THIS
DATA IS FROM LAST 12 MONTHS.
Shrestha, Iskal
From:
Cody Turner <cturner@beanelectrical.com>
Sent:
Monday, March 27, 2023 12:20 PM
To:
Shrestha, Iskal
Cc:
Chip Bean; Allen, Chad A; Lopez, Raul
Subject:
RE: CSCN#58614
Attachments:
COFW - ISKAL CO#1.pdf
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Iskal,
Please see attached. On the 2 striping #'s I had made a mistake, so this should get
it. On the cabinet I had a controller factored in so I removed that.
Let me know if this gets it and if you need anything else.
Thanks
Cody Turner
Traffic Signal Project Manager
821 E. Enon
Everman, Tx. 76140
817-995-6780 Cell/Primary
817-561-7400 Ext. 111
817-561-7403 fax
ELECTRICAL
INC
TECL17979
Regulated by The Texas Department of Licensing and Regulations, P.O. Box 12157, Austin, Texas 78711, 1 800 803 9202,
512 463 6599, website www.license.state.tx.us/complaints.
From: Shrestha, Iskal <Iskal.Shrestha@fortworthtexas.gov>
Sent: Monday, March 27, 2023 8:52 AM
To: Cody Turner <cturner@beanelectrical.com>
Cc: Chip Bean <cbean@beanelectrical.com>; Allen, Chad A<Chad.Allen@fortworthtexas.gov>; Lopez, Raul
< Raul. Lopez Roura@fortworthtexas.gov>
Subject: RE: CSCN#58614
Good morning Cody and Chip,
What is the status of my request for Scheule of Value (SOV) with material, labor, and profit and overhead costs as a
separate column for these three TxDOT items listed in my email below? The proposal for these TxDOT items submitted
by you on March 16 is extremely high compared to the TxDOT.
I have projects waiting for this Change Order (CO#1) to get executed to issue the Task Order. Please provide the
requested information as soon as possible.
Thanks,
Iskal Shrestha
From: Cody Turner [mailto:cturner@beanelectrical.comj
Sent: Thursday, March 16, 2023 6:09 PM
To: Shrestha, Iskal <Iskal.Shrestha@fortworthtexas.gov>
Cc: Chip Bean <cbean@beanelectrical.com>; Radovich, Bradley M <Bradley.Radovich@fortworthtexas.gov>
Subject: Re: CSCN#58614
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Iskal,
Let me revisit this in the morning.
I'll be in touch.
Thanks
Sent from my iPhone
On Mar 16, 2023, at 5:48 PM, Shrestha, Iskal <Iskal.Shrestha@fortworthtexas.gov> wrote:
Cody, The price for the following items appears very high and would be difficult to justify when routing a
change order.
1. 0666 6042 REFL PAV MRK TY I (W) 12" (SLD) (100MIL)
2. 0666 6181 REFL PAV MRK TY II (W) 18" (SLD)
3. FURNISH AND INSTALL POLE -MOUNTED CONTROLLER CABINET ASSEMBLY.
Is it possible to revisit the price proposal? The price you propose for pole mounted controller cabinet is
only for the cabinet, correct?
Would you please send me the schedule of value (SOV) with labor, material, and profit/overhead as a
separate column for the above three change order items?
Thanks,
Iskal Shrestha, P.E., PMP°
City of Fort Worth ITPW I Sr. Project Manager
200 Texas Street
Fort Worth, TX 76102
0: 817-392-7254 1 C: 817-395-4013
iskal.shrestha@fortworthtexas. gov
Iskal Shrestha
From: Cody Turner [mailto:cturner@beanelectrical.com]
Sent: Thursday, March 16, 2023 2:05 PM
To: Shrestha, Iskal <Iskal.Shrestha@fortworthtexas.gov>; Chip Bean <cbean@beanelectrical.com>
Cc: Radovich, Bradley M <Bradley.Radovich@fortworthtexas.gov>
Subject: RE: CSCN#58614
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open
attachments unless you recognize the sender and know the content is safe.
You bet. Please see below. This was originally sent to Ivan. Let me know
if you have any questions or concerns. Thanks
<image001.png>
Cody Turner
Traffic Signal Project Manager
821 E. Enon
Everman, Tx. 76140
817-995-6780 Cell/Primary
817-561-7400 Ext. 111
817-561-7403 fax
3
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2022 Traffic Signal and Street Lighting
Improvements Unit Price Construction
Contract — Change Order #1
M&C: N/A CPN: Various CSO: 58614 DOC#: 1
Date: 03/28/2023
To:
Name
Department
Initials
Date Out
1.
Roy E Bean II
Bean Electrical, Inc.
s R
Apr 6, 2023
2.
Alexandra Ripley
TPW - Review-
Apr 4, 2023
3.
Iskal Shrestha
TPW - Signature
!s
Apr 6, 2023
4.
Chad Allen
TPW - Signature
Apr 10, 2023
5.
Raul Lopez
TPW - Review
Apr 11, 2023
6.
Lissette Acevedo
TPW - signature
Apr 12, 2023
7.
Michael Owen
TPW - signature
Apr 12, 2023
8.
Lauren Prieur
TPW - signature
Apr 12, 2023
9.
Doug Black
Legal - signature
alwb
Apr 12, 2023
10.
William Johnson
CMO - signature
Apr 12, 2023
11.
Jannette Goodall
CSO - signature
ss�
Apr 13, 2023
12.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any
and all City Departments requesting City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
David will review and take the next steps.
NEEDS TO BE NOTARIZED: DYES NNo
RUSH: DYES NNo SAME DAY: DYES NNo NEXT DAY: DYES ❑No
ROUTING TO CSO: EYES ❑No
Action Required:
❑ As Requested
❑ For Your Information
E Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(&,,FortWorthTexas.gov at ext. 7233 for pick up when completed.
Thank you!