Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Contract 59008-PM1-U
CSC No. 59008-PM1 FORT WORTH PROJECT MANUAL FOR THE CONSTRUCTION OF The Mont IPRC Record No. IPRC22-0200 City Project No. 104498 FID No. 30114-0200431-104498-E07685 File No. W-2915 X File No. X-27583 Mattie Parker David Cooke Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Prepared for The City of Fort Worth February, 2023 143438 . Engineer: David Nelson Salcedo Group Inc OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Developer: Trey Neville Moot Property Holdings, LLC 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page of 6 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions Last Revised 00 1 1 13 k. ii c.:or. ti Weam 03/20/2020 00 21 13- 1:v ra&d:ury to DiddeFs 012/)/2925 00-41--00 P-i-d-Feffn - 01/92/2N 1 00 42 43 Proposal Form Unit Price 05/22/2019 00.13 13 Bid Bond 01/92/2011 00-4.5-11 Bidefs-Poesvvii 1/4-:.'i 91/92/20! I 00 45 12 Prequalification Statement 09/01/2015 00 45 1-3 Bidder P-n retifsak !! licc.,on 03/99/2929 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 1 00 45 40 J;a+tipi &: Gag 08/2420-1-8 I 00 52 43 Agreement 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 � Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 I Maintenance Bond 01/31/2012 00-72-90 e: /oc l ^_ror dtE-i:.na - 111 / 1 g/2917 00- 3 000 pert. ria:ditians 07/01/2011- 00 73 10 Standard City Conditions of the Construction Contract for Developer 01/10/2013 Awarded Projects Division 01- General Requirements Last Revised 01 11 00 Summary of Work 12/20/2012__ 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 01 31 20 Project Meetings _ 07/01/2011 01 32 33 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 50 00 Temporary Facilities and Controls 07/01/2011 01 55 26 Street Use Permit and Modifications to Traffic Control 07/01/2011 01 57 13 Storm Water Pollution Prevention Plan _ 07/0I/2011 01 60 00 1 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data _ 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS —DEVELOPER AWARDED PROJECTS CPN 104498 Revised March 20, 2020 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 6 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 104498 Revised March 20.2020 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 6 Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httn: //£ortworthtexas. eov/tow/contractors/ or httus: //auus.fortworthtexas. rznvfPro i ectReso urces/ Division 02 02 41 13 0241 14 02 41 15 Division 03 103 30 00 1033413 1 03 34 16 t 03 80 00 Division 26 29 -00 26 05 la 126 05 33 126 05 43 I260550 Division 31 3440-00 31 23 16 31 23 23 31 3-1-2.5-00 30 3-147-00 - Existing Conditions Seleet31 Sc Demolition T11ili'1 Rsmcr.•rJA' rl2egnrAit Fla i ig 11G„royal - Concrete Cast -in -Place Concrete Controlled Low Strength Material (CLSM) Concrete Base Material for Trench Repair Modifications to Existing Concrete Structures Last Revised 12/2e/7C'12 L2/2Q/2912 02/02/2016 I 12/20/2012 - Electrical Common Wn k C�.ix1 i for Siltvsrreal Dan:mita: fa: Syatzva a✓JVOGNI a:r B :Meg t ic,ai ✓,stsans S%ao:r or. 1 Dui urr' Rca wvc7sfnr Elazets ✓ stwas Camr ric:.tiowl'Aukl Duo C3nririt Division 32 - 32-0147 32 01 18 32 01 29 32 11 23 132 11 29 1 32 11 33 I 32 11 37 1321216 132 12 73 1321313 132 13-30 32 13 73 32 14 16 Earthwork S 1o. Cl ~iz~z 1_k4J.tl tick Err.Avetic;) geprow Sons .xlLorr IEs c ca:an Jel SoaKineFa-gentral GahloHs Pdpeata sxterior Improvements mot Aapi k Pustufbpsir Temporary Asphalt Paving Repair Concrete Paving Repair Flexible Base Courses Lime Treated Base Coin ses Cement Treated Base Courses Liquid Treated Sail Stabilizer Aapiiik EkTia:g 1a; r�lt P-AfkA C : Shirr;. Concrete Paving C3n et�S d:r.-ial a, De-my/all a,71 pia Fra3 Ramps, Concrete Paving Joint Sealants mink Unit Pns it , 12/20/2012 12/20/2012 12/20/2012 11/22/2913 12/29/22 L7 12/2r/ 12 I 024264146 1 12/39/2e12 01ail/2e12 21/2 /2 12 _ 01/2.S12013 `/'9/ 6t2 `I/X/2i11•2 L2/2 /29L2 12/2e/2e12 I 12/20/2012 1 12/20/2012 1 12/20/2012 12/2fl/zoi2 12/20/2012 08/21/2015 W29/20_l" 12/2S'/7012 12/20/2012 06/06/201$ 12/20/2012 12/2V/3912 CITY OF FORT WORTH Montserrat Commercial ,pevelop eenl STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 104498 Revised March 20, 2020 I 32 16 13 Concrete Curb and Gutters and Valley Gutters 32 17 26 PayetnorA 1'ifewIrAr t 32 17 26 32-3443 000010 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 6 10/05/2016 11/12I3012 12/29/2CL2 13in/3,713 06/95/2018 12/20/2012 12 39/3012 12/29/2M 3-3I-26 W r: 1=zhrc a.rd'C4tcc 32 31 29 «VY. SIMED -d Ca .D 13232 13 :�: v,-N-..axN\. Retaining Wa11:, 1 32 91 19 Topsoil Placement and Finishing of Parkways 1 32 02 13 Warn '.»gh11.K, 1 32 93 43 Tr cc and C1, *13s Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 1 33 01 31 Closed Circuit Television (CCTV) Inspection 03/03/2016 1 33 03 10 E7i,Trxr2 c::"A`i ;* ,fr Iirxvg: , Sowar ✓iatenz 4-2,4201204-2 334440 JointnndL 1rhdikuo io i on 12/20/20i 2 1 33 04- CM01E3+ Creira1 T St►Az /M/2912 33 04 12 31+[► i..rir.,x: fl.r. de Ctkarr Plat:M2E ✓?3!c i l/20/291:2 33-04 30 Tcrnpom7WJ1'2tef-SeFyiees 97191/29L 1 33 -04-40 Clzor Wstx Makes J.1%/3"K 33 04 50 Cleaning of Sewer Maims 12/20/2012 33 05 10 Utility Trench Excavation, Embedment. and Backfill 12/12/2016 133-05 12 Water L& L - ing 12129/2912 1 33 05 13 Frame, Cover and Grade Rings - Cast Iron 01/22/2016 1 33 05 13.10 Frame, Cover and Grade Rings - Composite 01/22/2016 33-0544 AdjuMin); Manholes, Inlatc, VL17 c Pr✓Prz, rrr Ot."�✓. S r �es-to L7!79/ \°t" Crude 1 33-05-1-6 Ci orcta \Wit% 12/2Q/2912 1 33 05 17 C1133e3 C Zlara 12/29/2912 33 05 20 /1war E. mg 1/201301 33 05 24 ,/ 5i 41 ZX a?+y 12 9/291.1 33 05 22 5c33I Ca►'c ie 11 /2Q1,2 33 05 23 YAM T�� 12/29/2QL7 33 05 24 ,tatcsujan i rrxier Piprr::r Cre_klg or `Ca-\-na1 liAli Ik -te 06/19/2013 33-05-24 tC t( ,k L of n L2/29/2912 33 05 30 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pine 11/16/2018 33 11 13 EertwAID pr ► P c, Nwasv , Sv1 Ci1?e I'l 12/2Q/291.2 33 11 14 Buried Sterol 2r'zr Fittings -1-2,120/2012 33-.1-2-1-0 Water-S i a 1 ;INA lc 3 lath !l/11/2V 17 33 12 11 Large Water Meters 42424112,012 3340 Resiiie a S.vAg G`a Valv3 N/20/2013 3312 21 AWW"1A RAkr..r Sa.. B a\ fey V;1r _2/29/'0_l2 33 12 25 Connection to Existing Water Mains 02/06/2013 334-240 C._._ Ng Val-_-_-: Au 'A Potaklc W.vsy S•7rtzrAs i 2/20/2012 33 12 10 Fire Hydrants i\/9a'3911 CITY OF FORT WORTH Montserrat rorru, eni 1 Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 104498 Revised March 20, 2020 1334244 I331260 33 31 12 33-31--13 33 31 15 33 3120 33 24 33-3-1--23 33 31 23 33 31 50 33 31 70 33 39 10 33 39 20 33 39 30 33 39 40 33 39 60 33-4444 33 41 11 33 41 12 33 46 00 33-46-91 f 33--4.6-83 33-49--10 lsa-o-a0 I 33 40 40 00as10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 6 VW."ar Sia:v:10 Sicta.37.3 Fiarita d ]Ic 2ff'7.-t:. AanxrikOr ✓a�a? �� P��� Firr PIN') Fi zl x P r_nTvrco 1✓. Cia'htjv S rk S.`'Pxam High Dea:kr/ Pz✓1•,vlri/kria (11.DPE) Pips fur Sliratt~: / Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe (i" ICJ Pvrfik CCa''Ay arida,I S;.rr:r Ripe SAtta: Sc77. S1k;,1igZng algtary En1.xxiriant Sanitary Sewer Service Connections and Service Line Cc :ktic°yMJar. NI Valve far £ ii i / £31/11: Cast -in -Place Concrete Manholes Precast Concrete Manholes Waster iatz Aztat Clicria.r WW2) Epoxy Liners for Sanitary Sewer Structures P4iff:fu of Carr` tt S`om Sr i✓ P-ipeAGulverts Pweir/ lIclya YiNre. ,I.1 'PE) '_ r3 fir C F1 -1 �� �i �,. L?'rlslrttricac (SRPE) Pipe El3Liniew Slat S•�rr DraiB& �czah INAirz Ci, t at -°'ntll! vomAr[it t1/4- -22arc F -an 1 o , k'.a:s Ste_w._ Dni_7,1-0 3ed Wir.,; 11G Division 34 - Transportation 34-41--10 Tie S'R,th ?�! t 19.01 Attaehment A rizeraia: ✓Jzi 3'1 4'_ 19/32 h:t p C onvoRer Ea S +tim 41 LO.0? Marl:.:iwt C Sai tvcrr S ifs,":a:r 34 41 11 Temporary :C In r 1a 34 41 13 .%%.1.7/1.-wz r:R.&.%\a Signals 34-41 15 1136. .,rclez ftsciZ.. FkeArvg Pi✓ 34 41 16 Patiurnt:,'?r:a 34 41 20 '_ A=.. .11Is-:.'Inttizr_ ..Nricriai,w 21 ita rEJ 113:::g v.`�t ✓! t' 20..02 Frrrrr y LED Rock ay L'':-minairc.; 21 1: 30.02 LC fias wrf .'ices 34-44-30 i� : S W.a 34-44--50 Maio Fikx. 071ea Cable 344143 "ltiak. Ca:1tr-al 12/20/2912 OFb_9/Z7" 12/ 2CW. 1a30/3v` 17110/2i;17 06/19/2013 12/39/Z7'. 3 12/2W3Q 12 12/22/22l2 04/26/2013 12/22/2012 12/20/2012 12/20/2012 12/20/112 12/2QJ29!2 12/20/2012 Q7/QI/2QI 12/20/20'.3 11/12/201 12t 0/ 912 I _ 77/Q1/3Q11 07/01/2011 1 12/22/221 - Q7/Q 1/2 1 ! 1Q/1''2v E `'li J39IS 02/201 a 01/2012 11/22/2I17 I2/29/2R12 ti/.1V2(1M 111/22/2912 12/29/2Q L2 95/11/371i 9€/I €1221 F 11/12/2')1/ Q2/2i/2i15 14/33/3913 CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CM 104498 Revised March 20. 2020 Appendix GO 4.9I CC CO2 GOC94 CC 4.06 GO 5JJ5 D CCe/i7 GC..99 i.i: GR-01 60 00 00 00 10 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 6of6 AvaRoN1it)' of La. -)de •golmi`cpnsn arid Pkritied CArtatrIC lirrix-go LTA I � ►/:: r Erati.^an gent Coal yr: S Minc'ky arij Mrial Owned ai E1 +prim Come Wag.:i EkNo ai Grr'.hi1it%t✓ I�IB.: tazo:rrinrii.■rr Product Requirements END OF SECTION CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 104998 Revised March 20, 2020 00 42 43 DAP - $i13 PROPOSAL Page Iof5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project item Information Bidder's Proposal Bid list Item) Description Specification f Unit of Bid Quantity Unit Price I Bid Value Na Section No. 4 Measure JAT I: 1 3312.0117 : CONNECT TO EXISTING 84 STUBOUT WATER IMPAp �li�E� T5 EA 1 $1,500.00 $1,500.00 2 3311.0161 : 6" PVC WATER PIPE 33 11 12 LF 10 $85.00 $850.00 3 3311.0261 : 8" PVC WATER PIPE 33 11 12 LF 35 $90.00 $3,150.00 4 3305.0109 : TRENCH SAFETY 33 05 10 LF 45 $25.00 $1,125.00 5 3312.0001 : STANDARD FIRE HYDRANT 33 12 40 EA 1 36,000.00 $6,000.00 6 0241.1118 : 8" PVC PRESSURE WATER PLUG 02 41 14 EA 1 $250.00 $250.00 7 3312.2003 : 1" Water Service (Irrigation) 33 12 10 EA 1 $3,20.00 $3,20.00 8 3312.2203 : 2" Water Service (Domestic) 33 12 10 EA 1 $6,000.00 $6,000.00 9 3312,4004 8" x 6" TAPPING SLEEVE & VALVE 33 12 25 EA 1 $6,200.00 $6,200.00 10 3471 A003 TAFFIC CONTROL 34 71 13 EA 1 $550.00 $550.00 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 TOTA _ UNIT I: WATER IMPROVEMENTS $28,825.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version Dias 22,2019 Moniserrar COmmefLi al Doselopinee [ CPN: 104400 UNIT PRICE BID Bidtist Item) No. 2 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item information Description Specification I Unit o£ Section No. Measure (UNIT II: SANITARY SEWER 3339.1002 : STANDARD 4' DIAMETER DROP MANHOLE 3331.4108 : 5" SDR-26 PVC WASTEWATER PIPE (8'-10' DEEP) 3 3339.0001 : EPOSY MANHOLE LINER 4 3301.0001 : PRE -CCTV INSPECTIQN 5 33301.0002 : POST -CCTV INSPECTION 6 3301.0101 : MANHOLE VACUUM TESTING 7 3305.0109 : TRENCH SAFETY 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 IMPROVEMENTS 33 39 10 33 39 20 33 31 20 LF 33 39 60 VF 33 01 31 LF 33 01 31 LF 33 01 30 EA 33 05 10 LF EA 904243 DAP -BID PROPOSAL Page 2015 Bidder's Application Bidder's Proposal Bid Quantity Unit Price Rid Value 1 12 10.5 12 12 1 12 TOTAL IJN1T IL: SANITARY SEWER IMPROVEMENTS CffY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 2Z, 2019 $9,500.00 $9,500.00 $94.00 $800.00 $20.00 $20.00 $500.00 $25.00 $1.128.00 $8,400.00 $240.00 $240.00 $500.00 $300.00 $20,308.00 Montserrat Commercial Development CPN: 104498 a04243 DAP- BID PROPOSAL Page 1of5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Ridlist Ileml No. Project liem Information Bidder's Proposal Description Specification Unit of Bid Quantity Unit Price I Bid Value Section No, Measure Bid Summary TOTAL UNIT I: WATER IMPROVEMVMENTS TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS Total Construction Bid This Bid is submitted by the entity named below: UNIT I & TI BIIfDDEL Film.1 ..a In !•Thal !',HlM1r i net U1q, t.t 1 Ir IOU'S liivrr 04%. I\ "6I1.1 BY: TITLE: DATE: Charles D. Allen Vice President 2/27/2023 $28,825,00 $20,308.00 $49,133.00 Contractor agrees to complete WORK for FINAL ACCEPTANCE within working days after the date when the CONTRACT commences to run as provided in the General Conditions. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Fem. Veftion May 22. 2019 Monm:rot Commercial Development CPN. IR44q$ 004243 DAP- DID PROPOSAL Page 4ors SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item information Bidder's Pmposal Bidlist Item Description Specittcauon Unit Of Bid Quantity Unit Price Bid Value No. Section No. Measwe UNIT Ell: PAVING 1 3213.0301 : 4" Sidewalk Pavement 32 13 20 SF 2480 $6.50 $16,120.00 2 3213.0403 : 8" Concrete Driveway 32 13 13 SY 68 $109.15 $7,422.20 3 3213.0103 : 8" Concrete Pavement 32 13 13 SY 285 $109.15 $31,107.75 4 0241.1300 : Remove Curb & Gutter 02 41 15 LF 250 $10.00 52,500.00 5 3216.0101 : 6" Concrete Curb & Gutter 32 16 13 LF 240 $40.00 $9,600.00 6 3213.0506 : Barrier Free Ramp, Type P-1 32 13 20 EA 6 $550.00 $3.300.00 7 3211.0123 : 8" Flexible Base, Type A, GR-2 32 11 23 SY 353 $26.50 $9,354.50 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 TOTAL UNIT ill: PAVING $79,404.45 Mammal Commercial Development CPN:104498 90 42 43 DAP - BID PROPOSAL PkoSvf5 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application liiidlist Item) No. Project Item Information Description UNIT 111 PAVING This Bid is submitted by the entity named below: Specification Section No. Bid Summary UNIT 1U BIDDER: RV: Bidder's Proposal Unit of I Bid Quantity Unit Price Bid Value Measure Total Coastruetion Bidi DATE: TPA 7/13 $79,404.45 $79,404.45 Contractor agrees to complete WORK for FINAL ACCEPTANCE within working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION CITY OP FORT WORTH STANDARD CONSTRUCTION SPECITICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Verson May 22. 2012 Mon[smat Camm rcid la:Nevem! CM- I94498 00 45 12 - I PREQUALIFICATION STATEMENT Page 1 of I 1 SECTION 00 45 12 2 PREQUALIFICATION STATEMENT 3 Each Bidder for a City procurement is required to complete the information below by 4 identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the 5 major work type(s) listed. 6 Major Work Contractor/Subcontractor Company Name Prequalification Type Expiration Date Water Tejas Commercial Construction, LLC 1 Wastewater Tejas Commercial Construction, LLC Paving Pennington Concrete 7 8 9 The undersigned hereby certifies that the contractors and/or subcontractors described in 10 the table above are currently prequalified for the work types listed. 11 12 BIDDER: 13 14 Leland Penningknn Inc„ DEA Pennington Concrete By: Leland Pennington 15 Company (Please Print) 16 17 13350 Euless St Signature��� 18 Address 19 20 Fort Worth, TX 76040 Title: President 21 City/State/Zip (Please Print) 22 23 24 25 26 Date: 3-27-2023 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised September 30, 2021 Maalserral Co,nmercia! Development CPN: 104498 Paving Pennington Concrete 004512- I PREQUAL1F1CATION STATEMENT Pegc 1 of i 1 SECTION 00 4512 2 PREQUALIFTCATION STATEMENT 3 Each Bidder for a City procurement is required to complete the information below by 4 identifying the prequaiified contractors and/or subcontractors whom they intend to utilize for the 5 major work type(s) listed. 6 Major Work Type Water Contractor/Subcontractor Company Name Tejas Commercial Construction, LLC Prequalification Expiration Date 1 b" anc under tor, Kebab new development, 3/32/24 Wastewater Tejas Commercial Construction, LLC 15" and under for new t velopment. Rehab 3/31/24 7 8 9 The undersigned hereby certifies that the contractors and/or subcontractors described in 10 the table above are currently prequalified for the work types listed. 11 12 BIDDER: 13 14 Tejas Commercial Construction. LLC By: Charles D. Allen 15 Company (Please Print) 16 17 P.O. Box I0395 Signature: PA P.•�: ��r�- ---r I8 Address 19 211 R iver Slabs_ TX 76114 Title: Vice President 21 City/State/Zip (Please Print) 22 23 24 25 26 Date: 3/27/2023 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised Scptcmbcr 30, 2021 AfonIserrat Commercial Development CPN_• 104498 1 2 004526- CONTRACTOR COMPLIANCE WITH WORKERS COMPENSATION LAW Page 1 of t SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for all of its employees employed on City 5 Project No. I04498. Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 8 9 CONTRACTOR; 10 1 1 Leland Pennington Inc.. DBA Pennington_ Concrete By: Leland Pennington 12 Company (Please Print) 13 14 13350 Euless St Signature 15 Address 16 17 Fort Worth. TX 76040 Title: President 18 City/State/Zip (Please Print) 19 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT § 24 25 BEFORE,M; the undersigned authority, on this day personally appeared 26 Lt.( )(i.V\Vt4�� - 1• , , known to me to be the person whose name is 27 subscribed to the foregoih'g instrument, and acknowledged to me that he/she executed the same as 28 the act and deed of for the purposes and 29 consideration therein expressed and in the capacity therein stated. 30 31 N UNDER MY HAND AND SEAL OF OFFICE this 32 3(t \ , 20 33 34 35 : oolnip i! ^e�d. MARSHA SMITHEY 36 ' x `t; _Notary Public, State of Texas Comm. Expires 04-27-2026 37 Notary ID 11158848 38 END OF SECTION 39 D-7 day of Notary Ftblic in atlyd for the' State of Texas CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 Montserrat Commercial Development CPN. 104498 004526-I CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of SECTION 40 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW 3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it 4 provides worker's compensation insurance coverage for al[ of its employees employed on City 5 Project No. 104498. Contractor further certifies that, pursuant to Texas Labor Code, Section 6 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with 7 worker's compensation coverage. 9 CONTRACTOR: 10 1I�;_.���rnr�r•t._1 _�.,si4 LL-. By: ►;g.+1t 12 Company (PIease Print) 13 14 PO RV). /4e, Signature- 15 Address 16 - 17 i.r,++� dead AA '7J� 7 '//Y Title: ix City/State/Zip ` (Please Print) I9 20 21 THE STATE OF TEXAS § 22 23 COUNTY OF TARRANT 24- 25 26 28 29 30 31 32 33 34 35 36 37 38 39 BEFORE ME, the undersigned authority, on this day personally appeared r_ i-, + r ! t s I' lir ,-, . known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to roe that he/she executed the same as the act and deed of mac. 0.• ��=a`, LGC for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE ibis i ` day of ROJO - , = SLRie of Texas •r; 1-s2-2R23 Notary Public in and for the END OF SECTION crrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Rcviscd April2. 2014 r— tate of Texas Mnurserra+ Commercial Development CPN- l0449h 005243. 1 Developer Awarded Project Agreement Page 1 of 4 l SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on WOW Z'3,i43 is made by and between the Developer, 4 (Insert Full Legal Name. of Developer), authorized to do business in Texas ("Developer') , and 5 07 I� e�If�i N &TO Tr3ar r= 'tihAl�i, J r"I CILI , authorized to do 6 business in Texas, acting by and through its duly authorized representative, ("Contractor'), 7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article I. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 11 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 Montserrat Commercial Development 16 IPRC22-0200. CPN.-104498 JI-27583. W-2915. FID:30114-0200431-104498-E07685 17 Article 3. CONTRACT TIME 18 3.1 Tirne is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within 45 calendar days after the date 23 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 24 City Conditions of the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that Developer 27 will suffer financial loss if the Work is not completed within the times specified in 28 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 29 the Standard City Conditions of the Construction Contract for Developer Awarded 30 Projects, The Contractor also recognizes the delays, expense and difficulties involved in 31 proving in a Iegal proceeding the actual loss suffered by the Developer if the Work is not 32 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 33 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 34 Developer One Thousand Dollars ($1, 000.00) for each day that expires after the time 35 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 36 Acceptance. CITY OF FORT WORTH M❑niserrae Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPA 101498 Revised June 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 4 37 Article 4. CONTRACT PRICE 38 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 39 Documents an amount in current funds of,2'v Txys) 3 Ur- Dollars 40 ($ � � 1 9014 • tic ). p..e rta cri> Pia t-rr Artr> 41 Article 5. CONTRACT DOCUMENTS 42 5.1 CONTENTS: 43 A. The Contract Documents which comprise the entire agreement between Developer and 44 Contractor concerning the Work consist of the fallowing: 45 1. This Agreement. 46 2. Attachments to this Agreement: 47 a. Bid Form (As provided by Developer) 48 1) Proposal Form (DAP Version) 49 2) Prequalification Statement 50 3) State and Federal documents (project specific) 51 b. Insurance ACORD Farms) 52 c. Payment Bond (DAP Version) 53 d. Performance Bond (DAP Version) 54 e. Maintenance Bond (DAP Version) 55 f. Power of Attorney for the Bonds 56 g. Worker's Compensation Affidavit 57 h. MBE and/or SBE Commitment Form (If required) 58 3. Standard City General Conditions of the Construction Contract for Developer 59 Awarded Projects. 60 4. Supplementary Conditions. 6I 5. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings. 65 7. Addenda. 66 8. Documentation submitted by Contractor prior to Notice of Award. 67 9. The following which may be delivered or issued after the Effective Date of the 68 Agreement and, if issued, become an incorporated part of the Contract Documents: 69 a. Notice to Proceed. 70 b. Field Orders. 71 c. Change Orders. 72 d. Letter of Final Acceptance. 73 74 CITY OF FORT WORTH Montserrat Conrmetrtal Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN 104498 Revised Jane 16. 2016 OD5243-3 Developer Awarded Project Agreement Pap 3of4 75 Article 6. INDEMNIFICATION 76 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 77 expense, the city, its officers, servants and employees, from and against any and all 78 claims arising out of, or alleged to arise out of, the work and services to be performed 79 by the contractor, its officers, agents, employees. subcontractors, licenses or invitees 80 under this contract. This indemnification provision is specifically intended to operate 81 and he effective even if it is alleged or proven that all or some of the damages being 82 sought were caused. in whole or in part. by anv act. omission or negligence of the city. 83 This indemnity provision is intended to include, without limitation, indemnity for 84 costs, expenses and legal fees incurred by the city in defending against such claims and 85 causes of actions. 86 87 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 88 the city, its officers, servants and employees, from and against any and all loss, damage 89 or destruction of property of the city, arising out of, or alleged to arise out of, the work 90 and services to be performed by the contractor, its officers, agents, employees, 91 subcontractors, licensees or invitees under this contract. This indeninificatlon 92 provision is snecifically intended to operate and be effective even if it is alleged or 93 proven that all or some of the damages being sought were caused. in whole or in part, 94 by anv act. omission or negligence of the city. 95 96 Article 7. MISCELLANEOUS 97 7.1 Terms. 98 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 99 the Construction Contract for Developer Awarded Projects. 100 7.2 Assignment of Contract. 101 This Agreement, including all of the Contract Documents may not be assigned by the 102 Contractor without the advanced express written consent of the Developer. 103 7.3 Successors and Assigns. 104 Developer and Contractor each binds itself, its partners, successors, assigns and Legal 105 representatives to the other party hereto, in respect to all covenants, agreements and 106 obligations contained in the Contract Documents. 107 7.4 Severability. 108 Any provision or part of the Contract Documents held to be unconstitutional, void or 109 unenforceable by a court of competent jurisdiction shall be deemed stricken. and all 110 remaining provisions shall continue to be valid and binding upon DEVELOPER and 111 CONTRACTOR. 112 7,5 Governing Law and Venue. 113 This Agreement, including all of the Contract Documents is performable in the State of 114 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 115 Northern District of Texas. Fort Worth Division. CITY OF FORT WORTH Montserrat Commettiial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN: 104498 Revised June 16, 2016 OD 52 43 - 4 Developer Awarded Project Agreement Page 4of4 116 117 7.6 Authority to Sign. I I 8 Contractor shall attach evidence of authority to sign Agreement, if other than duly 119 authorized signatory of the Contractor. 120 121 [N WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 122 counterparts. 123 124 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 125 126 Date Date Contractor: Developer: Leland Pennington Inc., DBA Pennington Concrete tgnature) Leland Pennington (Printed Name) (Printed Name) 6??-i C'' ° L 7 fi b: - lf/F-YS1 Title: President Company Name: Address: 13350 Euless SL Fon Worth. TX 76040 Title: VA,p+tj Company name: (Nto iertcy tpit"OirJ[�: t.G Address: C.-elq749 I'),tLirJW41t7 City/State/Zip: j City/State/Zip:-f vuU(U }4. 3-27-2023 3 jft t�1 IZ 0 T-3 CITY OF FORT WORTH Mwefverroi Cw amercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS -- DEVELOPER AWARDED PROJECTS CPA1. 104498 Revised June 16,2015 t005243-1 ❑evelopes Awarded Project Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 THIS AGREEMENT, authorized on MM iI Z.0 '3 is made by and between the Developer, 4 (Insert Full Legal Name of Developer). authorized to do business in Texas ("Developer') , and 5 —'l'eW S Ct % fe%KG At— ,riX4 Qex1Lat..) I.L , authorized to do 6 business in Texas, acting by and through its duly authorized representative. ("Contractor"). 7 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 8 follows: 9 Article I. WORK 10 Contractor shall complete all Work as specified or indicated in the Contract Documents for the E1 Project identified herein. 12 Article 2. PROJECT 13 The project for which the Work under the Contract Documents may be the whole or only a part is 14 generally described as follows: 15 Montserrat Commercial Development 16 IPRC22-0200. CPN.• 104498. X-27583. W-2915, Fl 30114-000431-1►04498-E07685 17 Article 3. CONTRACT TIME 18 3, I Time is of the essence. 19 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 20 Documents are of the essence to this Contract. 21 3.2 Final Acceptance. 22 The Work will be complete for Final Acceptance within 45 calendar days after the date 23 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 24 City Conditions of the Construction Contract for Developer Awarded Projects. 25 3.3 Liquidated damages 26 Contractor recognizes that time is of the essence of this Agreement and that Developer 27 will suffer financial loss if the Work is not completed within the times specified in 28 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 29 the Standard City Conditions of the Construction Contract for Developer Awarded 30 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 31 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 32 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 33 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 34 Developer One Thousand Dollars ($1, 000. O01 for each day that expires after the time 35 specified in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 36 Acceptance. CITY OF FORT WORTH ,4foricserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - !DEVELOPER AWARDED PROJECTS CPA':104498 Revised June 16, 2016 d[15243-2 Developer Awarded PrnJect Agreement Page 2 of 4 37 Article 4. CONTRACT PRICE 38 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 39 Documents an amount in current funds of rtrl-ti I,J#? iliwoArtb iltlipci p Dollars 40 ($ LI A 1 TS ) . 1H't4+ j--Y1f2Er -4- N v hoe, 41 Article 5. CONTRACT DOCUMENTS 42 5.1 CONTENTS: 43 A. The Contract Documents which comprise the entire agreement between Developer and 44 Contractor concerning the Work consist of the following: 45 1. This Agreement. 46 2, Attachments to this Agreement: 47 a. Bid Form (As provided by Developer) 48 1) Proposal Form (DAP Version) 49 2) Prequalification Statement 50 3) State and Federal documents (project specific) 51 b. Insurance ACORD Farms) 52 c. Payment Bond (DAP Version) 53 d. Performance Bond (DAP Version) 54 e. Maintenance Bond (DAP Version) 55 f. Power of Attorney for the Bonds 56 g. Worker's Compensation Affidavit 57 h. MBE and/or SBE Commitment Form (If required) 58 3. Standard City General Conditions of the Construction Contract for Developer 59 Awarded Projects. 60 4. Supplementary Conditions. 61 5. Specifications specifically made a part of the Contract Documents by attachment 62 or, if not attached, as incorporated by reference and described in the Table of 63 Contents of the Project's Contract Documents. 64 6. Drawings. 65 7. Addenda. 66 8. Documentation submitted by Contractor prior to Notice of Award. 67 9. The following which may be delivered or issued after the Effective Date of the 68 Agreement and, if issued, become an incorporated part of the Contract Documents: 69 a. Notice to Proceed. 70 b, Field Orders. 71 c. Change Orders. 72 d. Letter of Final Acceptance. 73 74 CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CPN:104498 Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 of 4 75 Article 6. INDEMNIFICATION 76 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 77 expense, the city, its officers, servants and employees, from and against any and all 78 claims arising out ef, or alleged to arise out of, the work and services to be performed 79 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 80 under this contract. This indemnification provision is specifically intended to onerate 81 and be effective even if it is alleged or proven that all or some of the damages being 82 sought were caused. in whole or in part, by anv act. omission or negligence of the city. 83 This indemnity provision is intended to include, without limitation, indemnity for 84 costs, expenses and legal fees incurred by the city in defending against such claims and 85 causes of actions. 86 87 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 88 the city, its officers, servants and employees, from and against any and all loss, damage 89 or destruction of property of the city, arising out of, or alleged to arise out of, the work 90 and services to be performed by the contractor, its officers, agents, employees, 91 subcontractors, licensees or invitees under this contract. This indemnification 92 provision is specifically intended to overate and be effective even if it is alleged or 93 proven that all or some of the damages being sought were caused. in whole or in part. 94 by any act. omission or negligence of the city. 95 96 Article 7. MISCELLANEOUS 97 7.1 Terms. 98 Terms used In this Agreement are defined in Article 1 of the Standard City Conditions of 99 the Construction Contract for Developer Awarded Projects, 100 7.2 Assignment of Contract. 101 This Agreement, including ail of the Contract Documents may not be assigned by the 102 Contractor without the advanced express written consent of the Developer. 103 7.3 Successors and Assigns. 104 Developer and Contractor each binds itself, its partners, successors, assigns and Iegal 105 representatives to the other party hereto, in respect to all covenants, agreements and 106 obligations contained in the Contract Documents. 107 7.4 Severability. 108 Any provision or part of the Contract Documents held to be unconstitutional, void or 109 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 110 remaining provisions shall continue to be valid and binding upon DEVELOPER and 111 CONTRACTOR. 112 7.5 Governing Law and Venue. 113 This Agreement, including all of the Contract Documents is performable in the State of 114 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 115 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS CAN. 104498 Revised .tune 16. 2016 005243-4 *Developer Awarded Project Agreement Page 4of4 116 117 7.6 Authority to Sign. 118 Contractor shall attach evidence of authority to sign Agreement, if other than duly 1 L9 authorized signatory of the Contractor. 120 121 IN WITNESS WBEREOF, Developer and Contractor have executed this Agreement in multiple 122 counterparts. I23 i24 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 125 126 Contractor: Developer_ , / Teias Commercial Construction. LLC " 2»eit N [� (oId! s Z ' By: e."44.-":". :t (Signature) Charles D. Allen (Printed Name) Title: Vice President Company Name: Tejas Commercial Const. Address: P t7 Rely 10195 -River 0A10 TX 76l 14 {Si (L\,\\„\A (Printed Name) Title: AA 1 &t?r — Company name: INNot- i 1i 12-1�'G'Rn 1 }ta 0)1146S Address: L/ 1(, {cl r. ■ Al w c, - Cily/State/Zip: 76114 City/State/Zip: Tr ink li a-rk -7 fr 1 a Iy 3/27/2023 3 / 7 C+ I- zn Date Date CLC CITY OF FORT WORTH Montserrat Cnrnmercia1 Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CM 104498 Revised June 16, 2016 A � D CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 4/3/2023 PRODUCER INSURICA 700 Highlander Boulevard, Suite 340 Arlington TX 76015 INSURED Tejas Commercial Construction, LLC PO Box 10395 River Oaks TX 76114-0395 COVERAGES THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). CONTACT NAME: Tamsy M/ Taylor -Murray PHONE (A/C. No. Ext): 817-287-3239 E-MAIL ADDRESS: Tamsy.Murray@INSURICA.com INSURER(S) AFFORDING COVERAGE NAIC # INSURERA: Monroe Guaranty Insurance Company 32506 INSURERB: FCCI Insurance Company 10178 INSURER C : INSURER D : INSURER E : INSURER F : CERTIFICATE NUMBER: 1466265035 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) A X COMMERCIAL GENERAL LIABILITY CPP 100033279 11/8/2022 11/8/2023 EACH OCCURRENCE CLAIMS -MADE OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: POLICY X PRO- JECT X LOC OTHER: A AUTOMOBILE LIABILITY CA100033281 11/8/2022 11/8/2023 X ANY AUTO OWNED SCHEDULED AUTOS ONLY AUTOS HIRED X NON -OWNED AUTOS ONLY AUTOS ONLY X B X UMBRELLA LIAB EXCESS LIAB OCCUR CLAIMS -MADE DED RETENT ON $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANYPROPRI ETOR/PARTNER/EXECUTIV E OFFICER/MEMBEREXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below A Equipment Installation Floater Y/N Y N/A U M B 100033280 WC0100063027 CPP 100033279 11/8/2022 11/8/2023 11/8/2022 11/8/2023 DAMAGE TO RENTED PREMISES (Ea occurrence) MED EXP (Any one person) PERSONAL & ADV INJURY GENERAL AGGREGATE PRODUCTS - COMP/OP AGG COMBINED SINGLE LIMIT (Ea accident) BODILY INJURY (Per person) BODILY INJURY (Per accident) PROPERTY DAMAGE (Per accident) EACH OCCURRENCE AGGREGATE $ 1,000,000 $ 100,000 $ 5,000 $ 1,000,000 $ 2,000,000 $ 2,000,000 $ 1,000,000 $ 2,000,000 $ 2,000,000 X PER OTH- STATUTE ER E.L. EACH ACCIDENT $ 1,000,000 E.L. DISEASE - EA EMPLOYEE $ 1,000,000 E.L. DISEASE - POLICY LIMIT $ 1,000,000 11/8/2022 11/8/2023 Scheduled Equipment Blanket-Job-Stie Deductible $774,440 $875,020 $1,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) General Liability has a Blanket Additional Insured Including Primary and Non -Contributory, where required by written contract per form CGL084 (10 13), Blanket Waiver of Subrogation, where Required by written contract (Policy Form CGL088 01-15) and Blanket 30 Day Notice of Cancellation (Form #IL 060 07-13 and IL011 01-15). Automobile Liability has Blanket Additional Insured, where required by written contract per (Form #CAU058 01-15) Blanket Waiver of Subrogation, where Required by written contract (Form #CAU058 01-15), Primary and Non -Contributory Additional Insured, where required by written contract (Form #CAU082 01-15) and Blanket 30 Day Notice of Cancellation (Form #IL 060 07-13 and IL011 01-15). See Attached... CERTIFICATE HOLDER CANCELLATION 30 City of Fort Worth 200 Texas St. Fort Worth TX 76102 TEJACOM01 C FA X No): 817-261-1120 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE Cam, If' © 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD THIS CERTIFICATE SUPERSEDES PREVIOUSLY ISSUED CERTIFICATE AGENCY CUSTOMER ID: TEJACOMO1C LOC #: AC`C)RL7� AGENCY INSURICA POLICY NUMBER CARRIER ADDITIONAL REMARKS SCHEDULE NAIC CODE NAMED INSURED Tejas Commercial Construction, LLC PO Box 10395 River Oaks TX 76114-0395 EFFECTIVE DATE: Page 1 of 1 ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: CERTIFICATE OF LIABILITY INSURANCE Workers' Compensation Includes Blanket Waiver of Subrogation, where required by written contract (Form #WC 42 03 04B) and Blanket 30 Day Notice of Cancellation, where required by written contract (Form #42 06 01) Umbrella is Follow Form Phillip Rojo and Charles Allen are Excluded on Workers' Compensation Copy of Forms available upon request — please send your request with copy of certificate to Tamsy.Murray@Insurica.Com For the CFW Project 104498: Montserrat Commercial Development The City of Fort Worth, its officers, employees, and servants are additional insureds for general liability and automoblile liability primary and non contributory basis. Waiver of Subrogation in favor of the City of Fort Worth applies as respects workers' compensation coverage. ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD ACORD® CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY) 04/03/2023 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Insurors of Texas 225 South Fifth Street Waco TX 76701 INSURED Leland Pennington, Inc., DBA: Pennington Concrete 13350 Euless Street Euless TX 76040 CONTACT Commercial Lines NAME: PHONE (254) 759-3701 A/C No. Ext): -MAIL CL@insurorsoftexas.com ADDRESS: (A/CFAx, No): () 254 750-8135 INSURER(S) AFFORDING COVERAGE NAIC # INSURERA: Navigators Specialty Insurance Company 36056 INSURER B : Clear Blue Insurance Company 28860 INSURER C : Evanston Ins Co INSURER D : Texas Mutual Ins Company INSURER E : INSURER F : COVERAGES CERTIFICATE NUMBER: Master 22/23(new) REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADDL SUER POLICY EFF POLICY EXP TYPE OF INSURANCE LTR INSD WVD POLICY NUMBER (MM/DD/YYYY) (MM/DD/YYYY) X COMMERCIAL GENERAL LIABILITY A B CLAIMS -MADE X OCCUR GEN'L AGGREGATE LIMIT APPLIES PER: PRO- JECT POLICY X OTHER: AUTOMOBILE LIABILITY ANY AUTO - OWNED AUTOS ONLY X HIRED AUTOS ONLY UMBRELLA LIAB C X - EXCESS LIAR DED I I RETENTION $ WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below X X LOC SCHEDULED AUTOS NON -OWNED AUTOS ONLY X OCCUR CLAIMS -MADE Y/N HO22CGLZOCKBZIC 10/31/2022 10/31/2023 AQ1YTX004257-02 MKLV4EUL103978 N/A 0001309033 10/31/2022 10/31/2023 07/06/2022 07/06/2023 07/01/2022 07/01/2023 LIMITS EACH OCCURRENCE DAMAGE TO RENTED PREMISES (Ea occurrence) MED EXP (Any one person) PERSONAL & ADV INJURY GENERAL AGGREGATE PRODUCTS - COMP/OPAGG COMBINED SINGLE LIMIT (Ea accident) BODILY INJURY (Per person) BODILY INJURY (Per accident) PROPERTY DAMAGE (Per accident) PIP -Basic EACH OCCURRENCE AGGREGATE XIPER STATUTE I EERH E.L. EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE E.L. DISEASE - POLICY LIMIT DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) The General Liability & Auto policies include blanket automatic additional insured, 30DNOC & waiver of subrogation endorsements that provides the status to the certificate holder only when there is a written contract between the named insured and the certificate holder that requires such status. The Workers Compensation policy includes a blanket automatic endorsement that provides waiver of subrogation status to the certificate holder only when there is a written contract between the named insured & the certificate holder that requires such status. Umbrella policy follows form on underlying coverage. The General Liability Policy contains a special endorsement with the Primary & Non -Contributory wording to the certificate holder only when there is a written contract between the named insured and the certificate holder that requires such status. Blanket 30 Day Notice of Cancellation attached. CERTIFICATE HOLDER CANCELLATION City of Fort Worth 1000 Throckmorton St. Fort Worth TX 76102 22945 1,000,000 50,000 5,000 1,000,000 2,000,000 2,000,000 1,000,000 2,500 5,000,000 5,000,000 $ 1,000,000 $ 1,000,000 $ 1,000,000 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD AGENCY CUSTOMER ID: 00020298 LOC #: AmRL AGENCY Insurors of Texas POLICY NUMBER CARRIER ADDITIONAL REMARKS SCHEDULE NAIC CODE NAMED INSURED Leland Pennington, Inc., DBA: Pennington Concrete EFFECTIVE DATE: ADDITIONAL REMARKS THIS ADDITIONAL REMARKS FORM IS A SCHEDULE TO ACORD FORM, FORM NUMBER: 25 FORM TITLE: Certificate of Liability Insurance: Notes Project Name: Montserrat Commercial Development Project Number: 104498 Certificate holder extened to include: The City of Fort Worth, its officers, employees and servants Page of ACORD 101 (2008/01) © 2008 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Clear Blue Insurance Company ADDITIONAL INSURED ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM GARAGE COVERAGE FORM THIS ENDORSEMENT, EFFECTIVE ON 10/31/2021 AT 12:01 A.M. STANDARD TIME, FORMS A PART OF POLICY NUMBER AQ1YTX004257-01 OF Clear Blue Insurance Company ISSUED TO Leland Pennington Inc DBA Pennington Concrete IT IS UNDERSTOOD AND AGREED THAT THE FOLLOWING IS ADDED AS AN ADDITIONAL INSURED HEREUNDER BUT ONLY AS RESPECTS LIABILITY ARISING OUT OF THE OPERATIONS OF THE NAMED INSURED, AND THAT THE INCLUSION OF SUCH ADDITIONAL INSURED SHALL NOT SERVE TO INCREASE THE COMPANY'S LIMIT OF LIABILITY AS SPECIFIED IN THE DECLARATIONS OF THIS POLICY. THIS ENDORSEMENT APPLIES TO ADDITIONAL INSUREDS ADDED, AS REQUIRED BY WRITTEN CONTRACT, PRIOR TO THE OCCURRENCE OF ANY LOSSES. BLANKET AS REQUIRED BY WRITTEN CONTRACT $100.00 FULLY EARNED FLAT CHARGE Q ADLIN-B 08 14 Clear Blue Insurance Company WAIVER OF SUBROGATION ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM TRUCKERS COVERAGE FORM GARAGE COVERAGE FORM THIS ENDORSEMENT, EFFECTIVE ON 10/31/2021 AT 12:01 A.M., STANDARD TIME, FORMS A PART OF POLICY NUMBER AQ1YTX004257-01 OF Clear Blue Insurance Company ISSUED TO Leland Pennington Inc DBA Pennington Concrete IT IS AGREED THAT THE COMPANY RECOGNIZES THE VALIDITY OF ANY WAIVER OF SUBROGATION WHICH MIGHT ARISE BY REASON OF ANY PAYMENT UNDER THIS POLICY IN CONNECTION WITH THE OPERATION OF ANY INSURED AUTOMOBILE, IF SUCH WAIVER WAS EXECUTED BY NAMED INSURED, AS REQUIRED BY WRITTEN CONTRACT, IN WRITING PRIOR TO THE OCCURRENCE OF ANY LOSS. BLANKET AS REQUIRED BY WRITTEN CONTRACT $100.00 FULLY EARNED FLAT CHARGE Q WAIVER-B 08 14 POLICY NUMBER: AQIYTX004257-01 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. THIRTY DAY NOTICE OF CANCELLATION This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. This endorsement changes the policy effective on the inception date of the policy unless another date is indicated below. Endorsement Effective: 10/31/2021 Countersigned By: Named Insured: Leland Pennington Inc DBA Pennington Concrete &47 (Authorized Representative) IT IS HEREBY AGREED AND UNDERSTOOD THAT A THIRTY (30) DAYS NOTICE OF CANCELLATION WILL APPLY, EXCEPT FOR NON-PAYMENT OF PREMIUM, THEN A TEN (10) DAYS NOTICE OF CANCELLATION WILL APPLY. PER LIST PROVIDED TO US BY YOU OR ON YOUR BEHALF AND MADE A PART OF THIS POLICY. Q 30DNOC 09 15 Includes copyrighted material of the Insurance Services Office, Inc., with its permission. ±xasMutuJ WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND EMPLOYERS LIABILITY POLICY WC420304B Insured copy TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. () Specific Waiver Name of person or organization (X) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: ALL TEXAS OPERATIONS 3. Premium: The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Included, see Information Page This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement, effective on 7/1/22 at 12:01 a.m. standard time, forms a part of: Policy no. 0001309033 of Texas Mutual Insurance Company effective on 7/1/22 Issued to: LELAND PENNINGTON INC DBA: PENNINGTON CONCRETE This is not a bill NCCI Carrier Code: 29939 Authorized representative PO Box 12058, Austin, TX 78711-2058 1 of 1 texasmutual.com I (800) 859-5995 I Fax (800) 359-0650 7/8/22 WC 42 03 04 B COMMERCIAL GENERAL LIABILITY CG20010413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance Condition and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and (2) You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured. CG20010413 © Insurance Services Office, Inc., 2012 Page 1 of 1 COMMERCIAL GENERAL LIABILITY POLICY NUMBER: CG 24 04 05 09 WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Person Or Organization: Any person or organization when you and such person or organization have agreed in writing in a contract or agreement that you will waive any right of recovery against such person or organization. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV - Conditions: We waive any right of recovery we may have against the person or organization shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or "your work" done under a contract with that person or organization and included in the "products - completed operations hazard". This waiver applies only to the person or organization shown in the Schedule above. CG 24 04 05 09 © Insurance Services Office, Inc., 2008 Page 1 of 1 POLICY NUMBER: COMMERCIAL GENERAL LIABILITY CG20100413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location(s) Of Covered Operations Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG20100413 © Insurance Services Office, Inc., 2012 Page 1 of 2 C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. Page 2 of 2 © Insurance Services Office, Inc., 2012 CG 20 10 04 13 POLICY NUMBER: COMMERCIAL GENERAL LIABILITY CG20370413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location And Description Of Completed Operations Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 37 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 1 COMMERCIAL GENERAL LIABILITY NPC 7150711 ADDITIONAL INSURED or "CERTIFICATE" HOLDER NOTICE OF CANCELLATION -BLANKET THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: ALL COVERAGE FORMS If you are required by written contract to provide Notice of Cancellation (for reasons other than non- payment of premium or deductible reimbursement) to any additional insured or "certificate" holder under this policy, we agree to provide such Notice stating when, no less than 30 days from the date of mailing, such cancellation shall take effect. You agree that as a condition precedent to us providing such notice, you will provide us with a complete list of such additional insureds or "certificate" holders including appropriate designees and complete mailing addresses. Such list shall be provided no less than 7 days from the date it is electronically requested. Such list shall be in a format acceptable to us. If notice is mailed, proof of mailing is sufficient proof of notice. For purpose of this endorsement, "certificate" shall mean a certificate of insurance issued as evidence of this insurance. NPC 715 07 11 Page 1 of 1 Bond No. CE12519500165 1 4 THE STATE OF TEXAS 5 6 COUNTY OF TARRANT 006213-1 PERiri-1RM.ANCE BOND Page 1 42 SECTION 00 62 13 PERFORMANCE BOND KNOW ALL BY THESE PRESENTS: 7 That we, MONT PROPERTY HOLDNGS LLC . known as 8 "Principal" herein and PHILADELPHLA INDEMNITY INSURANCE COMPANY . a corporate 9 surety(sureties- if more than one) duly authorized to do business in the State of Texas, known as 10 `'Surety" herein (whether one or more). are held and firmly hound unto the Developer_ Mont 11 Property Holdings, LLC, authorized to do business in Texas (-Developer") and the City of Fort 12 Worth, a Texas municipal corporation (-'City"), in the penal THREE sum of,rryy pprryy 13 ONE HUNDRED TWENTY -FIGHT THOUSAND RUE HUNDRED EIGHTY a NG�100 Dollars ($ 128,583 OO 'ki*" }- 14 lawful money of the United States, to be paid in Fort Worth, Tan -ant County, Texas for the 15 payment of which sum well and truly to be made jointly unto the Developer and the City as dual 16 obligees, we bind ourselves, our heirs, executors. administrators, successors and assigns, jointly 17 and severally, firmly by these presents. 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth by and through a Community Facilities 20 Agreement, CFA Number 22-0197:and 2l WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 22 the 2 8 .dav of MARCH , 20 2 3, which Contract is hereby referred to and made a 23 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 24 and other accessories defined by law, in the prosecution of the Work, including any Change 25 Orders. as provided for in said Contract designated as Montserrat Commercial Development. 26 NOW. THEREFORE, the condition of this obligation is such that if the said Principal 27 shall faithfully perform it obligations under the Contract and shall in all respects duly and 28 faithfully perform the Work, including Change Orders, under the Contract. according to the plans, 29 specifications, and contract documents therein referred to. and as well during any period of 30 extension of the Contract that may be granted on the part of the Developer and/or City, then this 31 obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT wY tR'I'F( s'rg1mA RD CITY CONNT flNS — DEVELOPER AWARDED PROJECTS S Revised Jassuary 31. 2012 $ourrerrar Commercial L.'i'elaprne,ii CPV- f04408 006213-2 PERFORMANCE BOND Page 2 of 2 PROVIDED FURTHER, that Wan), legal action be filed on this Bond, venue shall lie in 2 Tarrant County. Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. 4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 5 Texas Government Code, as amended_ and all liabilities on this bond shall be determined in 6 accordance with the provisions of said statue. 7 UN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED 8 this instrument by duly authorized agents and officers on this the 29 day of 9 MARCH 7 0 23 10 ]! 12 13 14 15 16 ATTEST: 17 18 19 (Principal) Secretary 20 21 22 73 24 '75 Witness as to Principal 26 27 78 PRINCIPAL: MONT PROPERTY HOLDINGS LLC BY Signature EDWIN K. NEVILLE III, MEMBER Name and Title Address: 2112 HIDDEN CREEK FORT WORTH, TX 76107 817-966-1513 SURETY: PHILADELPHIA INDEMNITY INSURANCE COMANY 331 BY: I itare 32 33 34 35 36 37 38 39 40 iuiess as 10 Surety 41 42 43 *Note: if signed by an officer of the Surety Company, them must be on file a certified extract 44 from the by-laws showing that this person has authority to sign such obligation. If 45 Surety's physical address is different from its mailing address. both must be provided. 46 47 The date of the bond shall not be prior to the date the Contract is awarded. TAYLER OWEN, ATTORNEY. IN FACT Name and Title Address: ONE BALA PLAZA, SUITE 100 BALA CYNWYD PA 19004-0950 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 3 I. 2012 Telephone Number: 972-239-2663 .1Jousorrat Commercial Development CPV: 104498 SECTION 00 62 14 2 PAYMENT BOND 3 4 THE STATE OF TEXAS 5 6 COUNTY OF TARRANT 006211-1 PAYMENT BOND Page 1 of 2 Bond No. CE12519500165 KNOW ALL BY THESE PRESENTS: 7 That we, MONT PROPERTY HOLDINGS LLC known as 8 "Principal" herein, and PHILADELPFiIA INDEMNITY INSURANCE COMPANY ,a 9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of i0 Texas. known as "Surety" herein (whether one or more), are held and firmly bound unto the I 1 Developer, Mont Property Holdings; LLC, authorized to do business in Texas -(Developer"). and 12 the City of Fort Worth. a Texas municipal corporation ("City"'). in the penal sum i ONE HUNRRFD TWENTY-EIGHT THOUSAND FIVE HUNDRED EIGHTY THREE & NOI1OQ.o Hats ($ 125, 583.00'"*****t 1, 14 lawful money of the United States. to be paid in Fort Worth, Tarrant County. Texas, for the 15 payment of which sum well and truly be made jointly unto the Developer and the City as dual 16 obligees, we bind ourselves. our heirs, executors, administrators, successors and assigns, jointly 17 and severally. firmly by these presents: 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth, by and through a Community Facilities 20 Agreement, CFA Number 22-0197 :and 1 WHEREAS, Principal has entered into a certain written Contract with Developer, 23 awarded the _28 day of MARru , 20 23 which Contract is hereby 23 refelTed to and made a part hereof for all purposes as if fully set forth Therein, to furnish all 24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 25 Work as provided for in said Contract and designated as Montserrat Commercial Development.. 26 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 27 Principal shall pay all manic-3 owing to any Sand all) payment bond beneficiary (as defined in 28 Chapter 2253 of the Texas Government Code. as amended) in the prosecution of the Work under 29 the Contract. then this ❑bligation shall be and become null and void: otherwise to remain in full 30 force and effect. CITY OF FORT WORTH STANDARD CITY CONDITIONS —DEVELOPER. AWARDED PROJECTS Revised January 31 2012 1lafrrser+u► Commercral Uevt.lnpwnern CP1C-104498 00 62 14 - 2 PAYMENT BOND Page 2 of2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code. as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 29 day of 6 MARCH 70 23 7 8 9 Note: If signed by an officer of the Surety; there must be on file a certified extract froin the 10 bylaws showing that this person has authority to sign such obligation. If Surety's physical I I address is different from its mailing address. both must be provided. 12 13 The date of the bond shall not be prior to the date the Contract is awarded, ATTEST: (Principal) Secretary Witness as to Principal PRINCIPAL: MONT PROPERTY HOLDINGS LLC BY: Signature EDWIN K. NEVILLE III, MEMBER Naine and Title Address: 2112 HIDDEN CREEK FORT WORTH, TX 76107 817-966-1513 SURETY: PHILADEttP1- nA INDEMNITY INSURANCE COMPANY ATTEST: BY: Signs (Surety) Secretary fitness as to Surety TAYLER OWEN. ATTORNEY i!%f f--'CT Name and Title Address: ONE BALA PLAZA, SUITE 100 BALA CYNWYD PA 190O4-0950 Telephone N u m ber: 9T2-239-26e3 14 END OF SECTION C1TY' OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised .fanuar- 31. 2012 11orrrser•rar Commercial Development CF'v 104.198 3 4 THE STATE OF TEXAS 5 6 COUNTY OF TARRANT Bond No. CE12519500165 0(16219-1 MAINTENANCE BOND Page I uF_ SECTION 00 62 19 A4AMNTENANCE BOND KNOW ALL BY THESE PRESENTS: 7 That we MONT PROPERTY HOLDINGS LLC known as 8 '`Principal" herein and PHILADELPHIA INDEMNITY INSURANCE COMPANY , a corporate surety 9 (sureties, if more than one) duly authorized to do business in the State of Texas, known as 10 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, Mont l l Property Holdings, LLD. authorized to do business in Texas (`'Developer") and the City of Fort 17 Worth. a Texas municipal corporation ('`City''), in the sum 7 O E HUNDRED TWENTY-EIGHT THOUSAND FIVE HUNDRED EIGHTY THREE & N 1Dollars (S $, 583. DO* �* �� �` �"� 14 law-Fui money of the United States. to be paid in Fort Worth. Tarrant County, Texas. for payment 15 of which suns well and truly be made jointly unto the Developer and the City as dual obligees and 16 their successors. we bind ourselves, our heirs, executors, administrators. successors and assigns, 17 jointly and severally, firmly by these presents. 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities ?1 Agreement. CFA Number 22-0197 :and 22 WHFREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the 28 day of MARCH 2ol 23, which Contract is 24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all .5 materials, equipment labor and other accessories as defined by law. in the prosecution of the 36 Work, including any Work resulting from a duly authorized Change Order (collectively herein. 77 the "Work") as provided for in said Contract and designated as Montserrat Commercial D8 Development; and 29 30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in € accordance with the plans. specifications and Contract Documents that the Work is and will 32 remain free front defects in materials or workmanship for and during the period of two (2) years 33 after the date of Final Acceptance of the Work by the City ("Maintenance Period""); and 34 CITY OF FORT WORTH 5 L.ANDARD CITY CONDIT[ONS — DEVELOPER AWARDED PROJECTS Revised January 3 l _ 2012 1 faoriserrar Cnrrrrtwrtwul Ik*wlopnrery CPA!! /Ra l9R 0062 19-2 MAIM-ENANCE BOND Pace 2 of 3 1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE. the condition of this obligation is such that if Principal shall 6 remedy any defective Work. for which timely notice was provided by Developer or City, to a 7 completion satisfactory to the City, then this obligation shall become null and void: otherwise to 8 remain in full force and effect. 9 10 PROVIDED. HOWEVER, if Principal shall fail so to repair or reconstruct any timely I 1 noticed defective Work, it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond; and 14 15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 72 23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 3I.2012 k lowserrat Cowmerrla/ Development CP:V; lrra-I9R 0062 19.3 MAINTENANCE BOND Page 3 or3 1 IN WITNESS WHEREOF. the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 2 9 day of MARCH 3 20 23 4 5 6 7 8 9 10 11 t2 13 14 15 16 17 18 19 20 21 22 23 25 26 27 28 79 30 31 32 33 34 35 36 37 38 39 40 41 42 ATTEST: (Principal) Secretary Wimess as to Principal ATTEST: (Surety) Secretary Witness as to Surety *Note: PRINCIPAL: MONT PROPERTY HOLDINGS LLC BY: Signature EDWIN K. NEVILLE III, MEMBER Name and Title Address: 2112 HIDDEN CREEK FORT WORTH, TX 76107 817-966-1513 SURETY- PHILADELPI-I A INDEMNITY INSI•1RANGE.COMPAN BY: TAYLER 'WEN. ATTORNEY IN FACT Name and Title Address: ONE BALA PLAZA, SUITE 100 BALA CYNWYD PA 19004-0950 Telephone Number: 972-239-2663 If signed by an officer of the Surety Company, there must he on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its 'nailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded_ Cfl'i OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revisal January 3I- 2012 tlnntserrai Commercial Det'claptnent CP.1'.• 704.198 Band Na. CE12519500155 PHILADELPHIA INDEMNITY INSURANCE COMPANY One Bala Plaza, Suite 100 Bala Cynwyd, PA 19004-0950 Power of Attorney KNOW ALL PERSONS BY THESE PRESENTS: That PHILADELPHIA INDEMNITY INSURANCE COMPANY (the Company), a corporation organized and existing under the laws of the Commonwealth of Pennsylvania, does hereby constitute and appoint, Michael N. Rudbere. Tavier Owen. Jill Allen Schirrn and/or Massimo Schirru, its true and lawful Attorney -in -fact with full authority to execute on its behalf bonds, undertakings, recogrrizances and other contracts of indemnity and writings obligatory in the nature thereof, issued in the course of its business and to bind the Company thereby, in an amount not to exceed S50.000.000. This Power of Attorney is granted and is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of PHILADELPHIA INDEMNITY INSURANCE COMPANY on the 146 of November, 2016. RESOLVED: That the Board of Directors hereby authorizes the President or any Vice President of the Company, (1) Appoint Attorney(s) in Fact and authorize the Attorney(s) in Feet to execute on behalf of the Company bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof and to attach the seal of the Company thereto; and (2) to remove, at any time, any such Attorney -in -Fact and revoke the authority given. And, be it FURTHER RESOLVED: That the signatures of such officers and the seal of the Company may be affixed to any such Power of Attorney or certificate relating thereto by facsimile, and any such Power of Attorney so executed and certified by facsimile signatures and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond or undertaking to which it is attached. IN TESTIMONY WHEREOF, PHILADELPHIA INDEMNITY INSURANCE COMPANY HAS CAUSED THIS INSTRUMENT TO BE SIGNED AND ITS CORPORATE SEALTO BE AFFIXED BY ITS AUTHORIZED OFFICE THIS 5TH DAY OF MARCH, 2021. (Seal) Joh! Mouth, President & CEO Philadelphia Indemnity Insurance Company On this 3u day of March, 2021 before inc came the individual who executed the preceding instrument, to me personally known, and being by me duly sworn said that he is the therein described and authorized officer of the PHILADELPHIA INDEMNITY INSURANCE COMPANY; that the seal affixed to said instrument is the Corporate seal of said Company: that the said Corporate Seal and his signature were duly affixed. Cpmmcnwsalth of Pennsylvania - Notary Seal Vanessa Mckenzie, Notary Public A1onlgnmeryCounty My commissI on expile5 November 3. 2624 Cemm i s sign number 1366334 huemGr. Pennsyrre s 49sacimn Of Nelehes Notary Public: residing at: Bala Cynwyd, PA My commission expires: November 3, 2024 I, Edward Sayago, Corporate Secretary of PHILADELPHIA INDEMNITY INSURANCE COMPANY, do hereby certify that the foregoing resolution of the Board of Directors and the Power of Attorney issued pursuant thereto on the 5'" day March, 2021 are true and correct and arc still in full force and effect. I do further certify that John Glomb. who executed the Power of Attorney as President, was on the date of execution of the attached Power of Attorney the duly elected President of PHILADELPHIA INDEMNITY INSURANCE COMPANY. In Testimony Whereof have subscribed my name and affixed the facsimile seal of each Company this 2 9 day of MARCH, 2023 Edward Sayago, Corporate Secretary PHILADELPHIA INDEMNITY INSURANCE COMPANY STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 — Definitions and Terminology 1 1.01 Defined Terms 1 1.02 Terminology 5 Article 2 — Preliminary Matters 6 2.01 Before Starting Construction 6 2.02 Preconstruction Conference 6 2.03 Public Meeting 6 Article 3 — Contract Documents and Amending 6 3.01 Reference Standards 6 3.02 Amending and Supplementing Contract Documents 6 Article 4 — Bonds and Insurance 7 4.01 Licensed Sureties and Insurers 7 4.02 Performance, Payment, and Maintenance Bonds 7 4.03 Certificates of Insurance 7 4.04 Contractor's Insurance 9 4.05 Acceptance of Bonds and Insurance; Option to Replace 12 Article 5 — Contractor's Responsibilities 12 5.01 Supervision and Superintendent 12 5.02 Labor; Working Hours 13 5.03 Services, Materials, and Equipment 13 5.04 Project Schedule 14 5.05 Substitutes and "Or -Equals" 14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) 16 5.07 Concerning Subcontractors, Suppliers, and Others 16 5.08 Wage Rates 18 5.09 Patent Fees and Royalties 19 5.10 Laws and Regulations 19 5.11 Use of Site and Other Areas 19 5.12 Record Documents 20 5.13 Safety and Protection 21 5.14 Safety Representative 21 5.15 Hazard Communication Programs 22 5.16 Submittals 22 5.17 Contractor's General Warranty and Guarantee 23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 5.18 Indemnification 24 5.19 Delegation of Professional Design Services 24 5.20 Right to Audit: 25 5.21 Nondiscrimination 25 Article 6 - Other Work at the Site 26 6.01 Related Work at Site 26 Article 7 - City's Responsibilities 26 7.01 Inspections, Tests, and Approvals 26 7.02 Limitations on City's Responsibilities 26 7.03 Compliance with Safety Program 27 Article 8 - City's Observation Status During Construction 27 8.01 City's Project Representative 27 8.02 Authorized Variations in Work 27 8.03 Rejecting Defective Work 27 8.04 Determinations for Work Performed 28 Article 9 - Changes in the Work 9.01 Authorized Changes in the Work 9.02 Notification to Surety Article 10 - 10.01 10.02 10.03 Article 11- 11.01 11.02 11.03 11.04 11.05 11.06 11.07 11.08 Article 12 - 12.01 12.02 12.03 12.04 28 28 28 Change of Contract Price; Change of Contract Time 28 Change of Contract Price 28 Change of Contract Time 28 Delays 28 Tests and Inspections; Correction, Removal or Acceptance of Defective Work 29 Notice of Defects 29 Access to Work 29 Tests and Inspections 29 Uncovering Work 30 City May Stop the Work 30 Correction or Removal of Defective Work 30 Correction Period 30 City May Correct Defective Work 31 Completion 32 Contractor's Warranty of Title 32 Partial Utilization 32 Final Inspection 32 Final Acceptance 33 Article 13 - Suspension of Work 33 13.01 City May Suspend Work 33 Article 14 - Miscellaneous 34 14.01 Giving Notice 34 CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 14.02 Computation of Times 34 14.03 Cumulative Remedies 34 14.04 Survival of Obligations 35 14.05 Headings 35 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf 7. Community Facilities Agreement (CFA) —A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement c. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions m. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings p. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9:00 a.m. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p.m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.B through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: None 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: None b. Each Occurrence:: None 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals" A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 01 25 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.B. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. El Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. ® Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnifi, and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor peiiiut any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.B. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 007310-30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. City will forward all invoices for retests to Developer/Contractor. 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 007310-31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 007310-32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 007310-33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 007310-34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given if: 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 007310-35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 011100-1 DAP SUMMARY OF WORK 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK Page 1 of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Work Covered by Contract Documents 19 1. Work is to include furnishing all labor, materials, and equipment, and performing 20 all Work necessary for this construction project as detailed in the Drawings and 21 Specifications. 22 B. Subsidiary Work 23 1. Any and all Work specifically governed by documentary requirements for the 24 project, such as conditions imposed by the Drawings or Contract Documents in 25 which no specific item for bid has been provided for in the Proposal and the item is 26 not a typical unit bid item included on the standard bid item list, then the item shall 27 be considered as a subsidiary item of Work, the cost of which shall be included in 28 the price bid in the Proposal for various bid items. 29 C. Use of Premises 30 1. Coordinate uses of premises under direction of the City. 31 2. Assume full responsibility for protection and safekeeping of materials and 32 equipment stored on the Site. 33 3. Use and occupy only portions of the public streets and alleys, or other public places 34 or other rights -of -way as provided for in the ordinances of the City, as shown in the 35 Contract Documents, or as may be specifically authorized in writing by the City. 36 a. A reasonable amount of tools, materials, and equipment for construction 37 purposes may be stored in such space, but no more than is necessary to avoid 38 delay in the construction operations. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Revised December 20, 2012 Montserrat Commercial Development CPN 104498 011100-2 DAP SUMMARY OF WORK Page 2 of 3 1 b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Revised December 20, 2012 Montserrat Commercial Development CPN 104498 011100-3 DAP SUMMARY OF WORK 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects Revised December 20, 2012 Page 3 of 3 Montserrat Commercial Development CPN 104498 012500-1 DAP SUBSTITUTION PROCEDURES 1 2 3 PART 1 - GENERAL SECTION 01 25 00 SUBSTITUTION PROCEDURES Page 1 of 4 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or -equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1 — General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. No 22 separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution - General 26 1. Within 30 days after award of Contract (unless noted otherwise), the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors, trade names, or catalog 31 numbers. 32 a. When this method of specifying is used, it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names, or catalog numbers, provided said products are "or -equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or -equals are unavailable due to strike, discontinued production of products 39 meeting specified requirements, or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, if a reduction in cost or time results, it will 46 be documented by Change Order. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 1 4. Substitution will be rejected if: 2 a. Submittal is not through the Contractor with his stamp of approval 3 b. Request is not made in accordance with this Specification Section 4 c. In the Developer's opinion, acceptance will require substantial revision of the 5 original design 6 d. In the City's or Developer's opinion, substitution will not perform adequately 7 the function consistent with the design intent 8 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 9 1.7 CLOSEOUT SUBMITTALS [NOT USED] 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 A. In making request for substitution or in using an approved product, the Contractor 13 represents that the Contractor: 14 1. Has investigated proposed product, and has determined that it is adequate or 15 superior in all respects to that specified, and that it will perform function for which it 16 is intended 17 2. Will provide same guarantee for substitute item as for product specified 18 3. Will coordinate installation of accepted substitution into Work, to include building 19 modifications if necessary, making such changes as may be required for Work to be 20 complete in all respects 21 4. Waives all claims for additional costs related to substitution which subsequently 22 arise 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 29 30 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 1 EXHIBIT A 2 REQUEST FOR SUBSTITUTION FORM: 3 4 TO: 5 PROJECT: DATE: 6 We hereby submit for your consideration the following product instead of the specified item for 7 the above project: 8 SECTION PARAGRAPH SPECIFIED ITEM 9 10 11 Proposed Substitution: 12 Reason for Substitution: 13 Include complete information on changes to Drawings and/or Specifications which proposed 14 substitution will require for its proper installation. 15 16 Fill in Blanks Below: 17 A. Will the undersigned contractor pay for changes to the building design, including engineering 18 and detailing costs caused by the requested substitution? 19 20 21 B. What effect does substitution have on other trades? 22 23 24 C. Differences between proposed substitution and specified item? 25 26 27 D. Differences in product cost or product delivery time? 28 29 30 E. Manufacturer's guarantees of the proposed and specified items are: 31 32 Equal Better (explain on attachment) 33 The undersigned states that the function, appearance and quality are equivalent or superior to the 34 specified item. 35 Submitted By: For Use by City 36 37 Signature Recommended Recommended 38 as noted 39 40 Firm Not recommended Received late 41 Address By 42 Date 43 Date Remarks 44 Telephone 45 46 For Use by City: 47 48 Approved Rejected 49 City Date CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 013119-1 DAP PRECONSTRUCTION MEETING 1 2 3 PART 1 - GENERAL SECTION 01 31 19 PRECONSTRUCTION MEETING Page 1 of 3 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. No construction schedule required unless requested by the City. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor, subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded, tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the delivery of the 28 distribution package to the City. 29 a. The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting, prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Developer and Consultant 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may desire 38 to invite or the City may request CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 013119-2 DAP PRECONSTRUCTION MEETING Page 2 of 3 1 e. Other City representatives 2 f. Others as appropriate 3 4. Preliminary Agenda may include: 4 a. Introduction of Project Personnel 5 b. General Description of Project 6 c. Status of right-of-way, utility clearances, easements or other pertinent permits 7 d. Contractor's work plan and schedule 8 e. Contract Time 9 f. Notice to Proceed 10 g. Construction Staking 11 h. Progress Payments 12 i. Extra Work and Change Order Procedures 13 j. Field Orders 14 k. Disposal Site Letter for Waste Material 15 1. Insurance Renewals 16 m. Payroll Certification 17 n. Material Certifications and Quality Control Testing 18 o. Public Safety and Convenience 19 P. Documentation of Pre -Construction Conditions 20 q. Weekend Work Notification 21 r. Legal Holidays 22 s. Trench Safety Plans 23 t. Confined Space Entry Standards 24 u. Coordination with the City's representative for operations of existing water 25 systems 26 v. Storm Water Pollution Prevention Plan 27 w. Coordination with other Contractors 28 x. Early Warning System 29 y. Contractor Evaluation 30 z. Special Conditions applicable to the project 31 aa. Damages Claims 32 bb. Submittal Procedures 33 cc. Substitution Procedures 34 dd. Correspondence Routing 35 ee. Record Drawings 36 ff. Temporary construction facilities 37 gg. MBE/SBE procedures 38 hh. Final Acceptance 39 ii. Final Payment 40 jj. Questions or Comments CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 013120-1 DAP PROJECT MEETINGS 1 2 3 PART 1 - GENERAL SECTION 01 3120 PROJECT MEETINGS Page 1 of 3 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for project meetings throughout the construction period to enable orderly 7 review of the progress of the Work and to provide for systematic discussion of 8 potential problems 9 B. Deviations this City of Fort Worth Standard Specification 10 1. None. 11 C. Related Specification Sections include, but are not necessarily limited to: 12 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 13 2. Division 1 — General Requirements 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Coordination 21 1. Schedule, attend and administer as specified, periodic progress meetings, and 22 specially called meetings throughout progress of the Work. 23 2. Representatives of Contractor, subcontractors and suppliers attending meetings 24 shall be qualified and authorized to act on behalf of the entity each represents. 25 3. Meetings administered by City may be tape recorded. 26 a. If recorded, tapes will be used to prepare minutes and retained by City for 27 future reference. 28 4. Meetings, in addition to those specified in this Section, may be held when requested 29 by the City, Engineer or Contractor. 30 B. Pre -Construction Neighborhood Meeting 31 1. After the execution of the Agreement, but before construction is allowed to begin, 32 attend 1 Public Meeting with affected residents to: 33 a. Present projected schedule, including construction start date 34 b. Answer any construction related questions 35 2. Meeting Location 36 a. Location of meeting to be determined by the City. 37 3. Attendees 38 a. Contractor CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised July 1, 2011 013120-2 DAP PROJECT MEETINGS Page 2 of 3 1 b. Project Representative 2 c. Other City representatives 3 4. Meeting Schedule 4 a. In general, the neighborhood meeting will occur within the 2 weeks following 5 the pre -construction conference. 6 b. In no case will construction be allowed to begin until this meeting is held. 7 C. Progress Meetings 8 1. Formal project coordination meetings will be held periodically. Meetings will be 9 scheduled and administered by Project Representative. 10 2. Additional progress meetings to discuss specific topics will be conducted on an as- 11 needed basis. Such additional meetings shall include, but not be limited to: 12 a. Coordinating shutdowns 13 b. Installation of piping and equipment 14 c. Coordination between other construction projects 15 d. Resolution of construction issues 16 e. Equipment approval 17 3. The Project Representative will preside at progress meetings, prepare the notes of 18 the meeting and distribute copies of the same to all participants who so request by 19 fully completing the attendance form to be circulated at the beginning of each 20 meeting. 21 4. Attendance shall include: 22 a. Contractor's project manager 23 b. Contractor's superintendent 24 c. Any subcontractor or supplier representatives whom the Contractor may desire 25 to invite or the City may request 26 d. Engineer's representatives 27 e. City's representatives 28 f. Others, as requested by the Project Representative 29 5. Preliminary Agenda may include: 30 a. Review of Work progress since previous meeting 31 b. Field observations, problems, conflicts 32 c. Items which impede construction schedule 33 d. Review of off -site fabrication, delivery schedules 34 e. Review of construction interfacing and sequencing requirements with other 35 construction contracts 36 f. Corrective measures and procedures to regain projected schedule 37 g. Revisions to construction schedule 38 h. Progress, schedule, during succeeding Work period 39 i. Coordination of schedules 40 j. Review submittal schedules 41 k. Maintenance of quality standards 42 1. Pending changes and substitutions 43 m. Review proposed changes for: 44 1) Effect on construction schedule and on completion date 45 2) Effect on other contracts of the Project 46 n. Review Record Documents 47 o. Review monthly pay request 48 p. Review status of Requests for Information CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised July 1, 2011 013120-3 DAP PROJECT MEETINGS Page 3 of 3 1 6. Meeting Schedule 2 a. Progress meetings will be held periodically as determined by the Project 3 Representative. 4 1) Additional meetings may be held at the request of the: 5 a) City 6 b) Engineer 7 c) Contractor 8 7. Meeting Location 9 a. The City will establish a meeting location. 10 1) To the extent practicable, meetings will be held at the Site. 11 1.5 SUBMITTALS [NOT USED] 12 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 13 1.7 CLOSEOUT SUBMITTALS [NOT USED] 14 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 15 1.9 QUALITY ASSURANCE [NOT USED] 16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 17 1.11 FIELD [SITE] CONDITIONS [NOT USED] 18 1.12 WARRANTY [NOT USED] 19 PART 2 - PRODUCTS [NOT USED] 20 PART 3 - EXECUTION [NOT USED] 21 22 23 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised July 1, 2011 013233-1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 01 32 33 PRECONSTRUCTION VIDEO 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. Though not mandatory, it is highly recommended on infill developer projects. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 013233-2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 1 PART 3 - EXECUTION [NOT USED] 2 END OF SECTION 3 4 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 013300-1 DAP SUBMITTALS 1 2 3 PART 1 - GENERAL SECTION 01 33 00 DAP SUBMITTALS Page 1 of 8 4 1.1 SUMMARY 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work -related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities, or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including, but not limited to: 32 a) Disapproval and resubmittal (if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 g) Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 01 33 00 - 2 DAP SUBMITTALS Page 2 of 8 1 d. Make submittals promptly in accordance with approved schedule, and in such 2 sequence as to cause no delay in the Work or in the work of any other 3 contractor. 4 B. Submittal Numbering 5 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- 6 reference identification numbering system in the following manner 7 a. Use the first 6 digits of the applicable Specification Section Number. 8 b. For the next 2 digits number use numbers 01-99 to sequentially number each 9 initial separate item or drawing submitted under each specific Section number. 10 c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. 11 A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical 12 submittal number would be as follows: 13 14 03 30 00-08-B 15 16 1) 03 30 00 is the Specification Section for Concrete 17 2) 08 is the eighth initial submittal under this Specification Section 18 3) B is the third submission (second resubmission) of that particular shop 19 drawing 20 C. Contractor Certification 21 1. Review shop drawings, product data and samples, including those by 22 subcontractors, prior to submission to determine and verify the following: 23 a. Field measurements 24 b. Field construction criteria 25 c. Catalog numbers and similar data 26 d. Conformance with the Contract Documents 27 2. Provide each shop drawing, sample and product data submitted by the Contractor 28 with a Certification Statement affixed including: 29 a. The Contractor's Company name 30 b. Signature of submittal reviewer 31 c. Certification Statement 32 1) "By this submittal, I hereby represent that I have determined and verified 33 field measurements, field construction criteria, materials, dimensions, 34 catalog numbers and similar data and I have checked and coordinated each 35 item with other applicable approved shop drawings." 36 D. Submittal Format 37 1. Fold shop drawings larger than 8 'h inches x 11 inches to 8 'h inches x l l inches. 38 2. Bind shop drawings and product data sheets together. 39 3. Order 40 a. Cover Sheet 41 1) Description of Packet 42 2) Contractor Certification 43 b. List of items / Table of Contents 44 c. Product Data /Shop Drawings/Samples /Calculations 45 E. Submittal Content 46 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 01 33 00 - 3 DAP SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of: 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes, but is not necessarily limited to: 17 a. Custom -prepared data such as fabrication and erection/installation (working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing -in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 01 33 00 - 4 DAP SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational -range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare -parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections, include, but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed, materials purchased or on -site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work, materials, fabrication, and installations in conformance 26 with approved shop drawings, applicable samples, and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site, or another external FTP site approved by the 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) If Contractor requires more than 1 hard copy of Shop Drawings 38 returned, Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 01 33 00 - 5 DAP SUBMITTALS Page 5 of 8 1 a. Shop Drawings 2 1) Distributed to the City 3 2) Copies 4 a) 8 copies for mechanical submittals 5 b) 7 copies for all other submittals 6 c) If Contractor requires more than 3 copies of Shop Drawings returned, 7 Contractor shall submit more than the number of copies listed above. 8 b. Product Data 9 1) Distributed to the City 10 2) Copies 11 a) 4 copies 12 c. Samples 13 1) Distributed to the Project Representative 14 2) Copies 15 a) Submit the number stated in the respective Specification Sections. 16 3. Distribute reproductions of approved shop drawings and copies of approved 17 product data and samples, where required, to the job site file and elsewhere as 18 directed by the City. 19 a. Provide number of copies as directed by the City but not exceeding the number 20 previously specified. 21 K. Submittal Review 22 1. The review of shop drawings, data and samples will be for general conformance 23 with the design concept and Contract Documents. This is not to be construed as: 24 a. Permitting any departure from the Contract requirements 25 b. Relieving the Contractor of responsibility for any errors, including details, 26 dimensions, and materials 27 c. Approving departures from details furnished by the City, except as otherwise 28 provided herein 29 2. The review and approval of shop drawings, samples or product data by the City 30 does not relieve the Contractor from his/her responsibility with regard to the 31 fulfillment of the terms of the Contract. 32 a. All risks of error and omission are assumed by the Contractor, and the City will 33 have no responsibility therefore. 34 3. The Contractor remains responsible for details and accuracy, for coordinating the 35 Work with all other associated work and trades, for selecting fabrication processes, 36 for techniques of assembly and for performing Work in a safe manner 37 4. If the shop drawings, data or samples as submitted describe variations and show a 38 departure from the Contract requirements which City fords to be in the interest of 39 the City and to be so minor as not to involve a change in Contract Price or time for 40 performance, the City may return the reviewed drawings without noting an 41 exception. 42 5. Submittals will be returned to the Contractor under 1 of the following codes: 43 a. Code 1 44 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or 45 comments on the submittal. 46 a) When returned under this code the Contractor may release the 47 equipment and/or material for manufacture. 48 b. Code 2 CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 01 33 00 - 6 DAP SUBMITTALS Page 6 of 8 1 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of 2 the notations and comments IS NOT required by the Contractor. 3 a) The Contractor may release the equipment or material for manufacture; 4 however, all notations and comments must be incorporated into the 5 final product. 6 c. Code 3 7 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is 8 assigned when notations and comments are extensive enough to require a 9 resubmittal of the package. 10 a) The Contractor may release the equipment or material for manufacture; 11 however, all notations and comments must be incorporated into the 12 final product. 13 b) This resubmittal is to address all comments, omissions and 14 non -conforming items that were noted. 15 c) Resubmittal is to be received by the City within 15 Calendar Days of 16 the date of the City's transmittal requiring the resubmittal. 17 d. Code 4 18 1) "NOT APPROVED" is assigned when the submittal does not meet the 19 intent of the Contract Documents. 20 a) The Contractor must resubmit the entire package revised to bring the 21 submittal into conformance 22 b) It may be necessary to resubmit using a different manufacturer/vendor 23 to meet the Contract Documents. 24 6. Resubmittals 25 a. Handled in the same manner as first submittals 26 1) Corrections other than requested by the City 27 2) Marked with revision triangle or other similar method 28 a) At Contractor's risk if not marked 29 b. Submittals for each item will be reviewed no more than twice at the City's 30 expense. 31 1) All subsequent reviews will be performed at times convenient to the City 32 and at the Contractor's expense, based on the City's or City 33 Representative's then prevailing rates. 34 2) Provide Contractor reimbursement to the City within 30 Calendar Days for 35 all such fees invoiced by the City. 36 c. The need for more than 1 resubmission or any other delay in obtaining City's 37 review of submittals, will not entitle the Contractor to an extension of Contract 38 Time. 39 7. Partial Submittals 40 a. City reserves the right to not review submittals deemed partial, at the City's 41 discretion. 42 b. Submittals deemed by the City to be not complete will be returned to the 43 Contractor, and will be considered "Not Approved" until resubmitted. 44 c. The City may at its option provide a list or mark the submittal directing the 45 Contractor to the areas that are incomplete. 46 8. If the Contractor considers any correction indicated on the shop drawings to 47 constitute a change to the Contract Documents, then written notice must be 48 provided thereof to the Developer at least 7 Calendar Days prior to release for 49 manufacture. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 01 33 00 - 7 DAP SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information (RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Sufficient information shall be attached to permit a written response without further 21 information. 22 23 24 25 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 1 PART 2 - PRODUCTS [NOT USED] 2 PART 3 - EXECUTION [NOT USED] 3 END OF SECTION 5 Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 013513-1 DAP SPECIAL PROJECT PROCEDURES 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 01 3513 SPECIAL PROJECT PROCEDURES Page 1 of 7 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Depai linent of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. Water Depai liuent Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1 — General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 25 1.2 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this Specification refer to the current reference 28 standard published at the time of the latest revision date logged at the end of this 29 Specification, unless a date is specifically cited. 30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 31 High Voltage Overhead Lines. 32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 33 Specification 34 1.3 ADMINISTRATIVE REQUIREMENTS 35 A. Coordination with the Texas Depailiuent of Transportation 36 1. When work in the right-of-way which is under the jurisdiction of the Texas 37 Department of Transportation (TxDOT): 38 a. Notify the Texas Department of Transportation prior to commencing any work 39 therein in accordance with the provisions of the permit CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August, 30, 2013 013513-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 1 b. All work performed in the TxDOT right-of-way shall be performed in 2 compliance with and subject to approval from the Texas Department of 3 Transportation 4 B. Work near High Voltage Lines 5 1. Regulatory Requirements 6 a. All Work near High Voltage Lines (more than 600 volts measured between 7 conductors or between a conductor and the ground) shall be in accordance with 8 Health and Safety Code, Title 9, Subtitle A, Chapter 752. 9 2. Warning sign 10 a. Provide sign of sufficient size meeting all OSHA requirements. 11 3. Equipment operating within 10 feet of high voltage lines will require the following 12 safety features 13 a. Insulating cage -type of guard about the boom or arm 14 b. Insulator links on the lift hook connections for back hoes or dippers 15 c. Equipment must meet the safety requirements as set forth by OSHA and the 16 safety requirements of the owner of the high voltage lines 17 4. Work within 6 feet of high voltage electric lines 18 a. Notification shall be given to: 19 1) The power company (example: ONCOR) 20 a) Maintain an accurate log of all such calls to power company and record 21 action taken in each case. 22 b. Coordination with power company 23 1) After notification coordinate with the power company to: 24 a) Erect temporary mechanical barriers, de -energize the lines, or raise or 25 lower the lines 26 c. No personnel may work within 6 feet of a high voltage line before the above 27 requirements have been met. 28 C. Confined Space Entry Program 29 1. Provide and follow approved Confined Space Entry Program in accordance with 30 OSHA requirements. 31 2. Confined Spaces include: 32 a. Manholes 33 b. All other confined spaces in accordance with OSHA's Permit Required for 34 Confined Spaces 35 D. Use of Explosives, Drop Weight, Etc. 36 1. When Contract Documents permit on the project the following will apply: 37 a. Public Notification 38 1) Submit notice to City and proof of adequate insurance coverage, 24 hours 39 prior to commencing. 40 2) Minimum 24 hour public notification in accordance with Section 01 31 13 41 E. Water Department Coordination 42 1. During the construction of this project, it will be necessary to deactivate, for a 43 period of time, existing lines. The Contractor shall be required to coordinate with 44 the Water Department to determine the best times for deactivating and activating 45 those lines. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August, 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 2. Coordinate any event that will require connecting to or the operation of an existing 2 City water line system with the City's representative. 3 a. Coordination shall be in accordance with Section 33 12 25. 4 b. If needed, obtain a hydrant water meter from the Water Department for use 5 during the life of named project. 6 c. In the event that a water valve on an existing live system be turned off and on 7 to accommodate the construction of the project is required, coordinate this 8 activity through the appropriate City representative. 9 1) Do not operate water line valves of existing water system. 10 a) Failure to comply will render the Contractor in violation of Texas Penal 11 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 12 will be prosecuted to the full extent of the law. 1 3 b) In addition, the Contractor will assume all liabilities and 14 responsibilities as a result of these actions. 15 F. Public Notification Prior to Beginning Construction 16 1. Prior to beginning construction on any block in the project, on a block by block 17 basis, prepare and deliver a notice or flyer of the pending construction to the front 18 door of each residence or business that will be impacted by construction. The notice 19 shall be prepared as follows: 20 a. Post notice or flyer 7 days prior to beginning any construction activity on each 21 block in the project area. 22 1) Prepare flyer on the Contractor's letterhead and include the following 23 information: 24 a) Name of Project 25 b) City Project No (CPN) 26 c) Scope of Project (i.e. type of construction activity) 27 d) Actual construction duration within the block 28 e) Name of the contractor's foreman and phone number 29 f) Name of the City's inspector and phone number 30 g) City's after-hours phone number 31 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 32 A. 33 3) Submit schedule showing the construction start and finish time for each 34 block of the project to the inspector. 35 4) Deliver flyer to the City Inspector for review prior to distribution. 36 b. No construction will be allowed to begin on any block until the flyer is 37 delivered to all residents of the block. 38 G. Public Notification of Temporary Water Service Interruption during Construction 39 1. In the event it becomes necessary to temporarily shut down water service to 40 residents or businesses during construction, prepare and deliver a notice or flyer of 41 the pending interruption to the front door of each affected resident. 42 2. Prepared notice as follows: 43 a. The notification or flyer shall be posted 24 hours prior to the temporary 44 interruption. 45 b. Prepare flyer on the contractor's letterhead and include the following 46 information: 47 1) Name of the project 48 2) City Project Number CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August, 30, 2013 01 35 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 1 3) Date of the interruption of service 2 4) Period the interruption will take place 3 5) Name of the contractor's foreman and phone number 4 6) Name of the City's inspector and phone number 5 c. A sample of the temporary water service interruption notification is attached as 6 Exhibit B. 7 d. Deliver a copy of the temporary interruption notification to the City inspector 8 for review prior to being distributed. 9 e. No interruption of water service can occur until the flyer has been delivered to 10 all affected residents and businesses. 11 f. Electronic versions of the sample flyers can be obtained from the Project 12 Construction Inspector. 13 H. Coordination with United States Army Corps of Engineers (USACE) 14 1. At locations in the Project where construction activities occur in areas where 15 USACE permits are required, meet all requirements set forth in each designated 16 permit. 17 I. Coordination within Railroad Permit Areas 18 1. At locations in the project where construction activities occur in areas where 19 railroad permits are required, meet all requirements set forth in each designated 20 railroad permit. This includes, but is not limited to, provisions for: 21 a. Flagmen 22 b. Inspectors 23 c. Safety training 24 d. Additional insurance 25 e. Insurance certificates 26 f. Other employees required to protect the right-of-way and property of the 27 Railroad Company from damage arising out of and/or from the construction of 28 the project. Proper utility clearance procedures shall be used in accordance 29 with the permit guidelines. 30 2. Obtain any supplemental information needed to comply with the railroad's 31 requirements. 32 J. Dust Control 33 1. Use acceptable measures to control dust at the Site. 34 a. If water is used to control dust, capture and properly dispose of waste water. 35 b. If wet saw cutting is performed, capture and properly dispose of slurry. 36 K. Employee Parking 37 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August, 30, 2013 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 11 END OF SECTION 12 13 Revision Log DATE NAME SUMMARY OF CHANGE 1.3.B — Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August, 30, 2013 01 35 13 - 6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 1 EXHIBIT A 2 (To be printed on Contractor's Letterhead) 3 4 5 6 Date: 7 8 CPN No.: 9 Project Name: 10 Mapsco Location: 11 Limits of Construction: 12 13 14 QF CQNST1VCTIQN 15 16 17 THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT 18 WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR 19 PROPERTY. 20 21 CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE 22 OF THIS NOTICE. 23 24 IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER 25 ISSUE, PLEASE CALL: 26 27 28 Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> 29 30 OR 31 32 Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> 33 34 AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 35 36 37 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August, 30, 2013 013513-7 DAP SPECIAL PROJECT PROCEDURES 1 EXHIBIT B Date: FORT WORTH DOE NO. XXXX Project Name: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, CONTRACTOR Page 7 of 7 CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August, 30, 2013 014523-1 DAP TESTING AND INSPECTION SERVICES 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 01 45 23 TESTING AND INSPECTION SERVICES Page 1 of 2 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another form of distribution approved 38 by the City. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 014523-2 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution (if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 29 30 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised August 30, 2013 015000-1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 1 2 SECTION 01 50 00 TEMPORARY FACILITIES AND CONTROLS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1 — General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised JULY 1, 2011 015000-2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 1 d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 1) Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off -site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised JULY 1, 2011 015000-3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on -call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS [NOT USED] 17 PART 3 - EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE -INSTALLATION 26 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION 7 8 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised JULY 1, 2011 015526-1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 1 2 SECTION 01 55 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1 — General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings, prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) Allow minimum 10 working days for review of proposed Traffic Control. 35 B. Street Use Permit 36 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 37 a. To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transportation and Public Works Department. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN:104498 Revised July 1, 2011 015526-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 1) Allow a minimum of 5 working days for permit review. 2 2) Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C. Modification to Approved Traffic Control 5 1. Prior to installation traffic control: 6 a. Submit revised traffic control plans to City Department Transportation and 7 Public Works Department. 8 1) Revise Traffic Control plans in accordance with Section 34 71 13. 9 2) Allow minimum 5 working days for review of revised Traffic Control. 10 3) It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit, such that construction is not delayed. 12 D. Removal of Street Sign 13 1. If it is determined that a street sign must be removed for construction, then contact 14 City Transportation and Public Works Department, Signs and Markings Division to 15 remove the sign. 16 E. Temporary Signage 17 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 19 Devices (MUTCD). 20 2. Install temporary sign before the removal of permanent sign. 21 3. When construction is complete, to the extent that the permanent sign can be 22 reinstalled, contact the City Transportation and Public Works Department, Signs 23 and Markings Division, to reinstall the permanent sign. 24 F. Traffic Control Standards 25 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 - PRODUCTS [NOT USED] 35 PART 3 - EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN:104498 Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN:104498 Revised July 1, 2011 015713-1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 6 SECTION 01 57 13 STORM WATER POLLUTION PREVENTION A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1 — General Requirements 13 3. Section 31 25 00 — Erosion and Sediment Control 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 31 25 00. 21 1.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 1.4 ADMINISTRATIVE REQUIREMENTS 35 A. General 36 1. Contractor is responsible for resolution and payment of any fines issued associated 37 with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised July 1, 2011 015713-2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 1 B. Construction Activities resulting in: 2 1. Less than 1 acre of disturbance 3 a. Provide erosion and sediment control in accordance with Section 31 25 00 and 4 Drawings. 5 2. 1 to less than 5 acres of disturbance 6 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 7 Permit is required 8 b. Complete SWPPP in accordance with TCEQ requirements 9 1) TCEQ Small Construction Site Notice Required under general permit 10 TXR150000 11 a) Sign and post at job site 12 b) Prior to Preconstruction Meeting, send 1 copy to City Department of 13 Transportation and Public Works, Environmental Division, (817) 392- 14 6088. 15 2) Provide erosion and sediment control in accordance with: 16 a) Section 31 25 00 17 b) The Drawings 18 c) TXR150000 General Permit 19 d) SWPPP 20 e) TCEQ requirements 21 3. 5 acres or more of Disturbance 22 a. Texas Pollutant Discharge Elimination System (TPDES) General Construction 23 Permit is required 24 b. Complete SWPPP in accordance with TCEQ requirements 25 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee 26 a) Sign and post at job site 27 b) Send copy to City Department of Transportation and Public Works, 28 Environmental Division, (817) 392-6088. 29 2) TCEQ Notice of Change required if making changes or updates to NOI 30 3) Provide erosion and sediment control in accordance with: 31 a) Section 31 25 00 32 b) The Drawings 33 c) TXR150000 General Permit 34 d) SWPPP 35 e) TCEQ requirements 36 4) Once the project has been completed and all the closeout requirements of 37 TCEQ have been met a TCEQ Notice of Termination can be submitted. 38 a) Send copy to City Department of Transportation and Public Works, 39 Environmental Division, (817) 392-6088. 40 1.5 SUBMITTALS 41 A. SWPPP 42 1. Submit in accordance with Section 01 33 00, except as stated herein. 43 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 44 as follows: 45 1) 1 copy to the City Project Manager 46 a) City Project Manager will forward to the City Department of 47 Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised July 1, 2011 015713-3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 1 B. Modified SWPPP 2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 3 in accordance with Section 01 33 00. 4 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 5 1.7 CLOSEOUT SUBMITTALS [NOT USED] 6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 7 1.9 QUALITY ASSURANCE [NOT USED] 8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 9 1.11 FIELD [SITE] CONDITIONS [NOT USED] 10 1.12 WARRANTY [NOT USED] 11 PART 2 - PRODUCTS [NOT USED] 12 PART 3 - EXECUTION [NOT USED] 13 14 15 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised July 1, 2011 1 2 3 PART 1 - GENERAL SECTION 01 60 00 PRODUCT REQUIREMENTS 016000-1 DAP PRODUCT REQUIREMENTS Page 1 of 2 4 1.1 SUMMARY 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is located on Buzzsaw as follows: 16 1. Resources\02 - Construction Documents\Standard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List, not all 26 products from that manufacturer are approved for use, including but not limited to, that 27 manufacturer's standard product. 28 E. See Section 01 33 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 016000-2 DAP PRODUCT REQUIREMENTS Page 2 of 2 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 8 Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 1 2 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 01 66 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments 11 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. 13 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division 1 — General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 016600-2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 ERECTION [NOT USED] 9 3.5 REPAIR / RESTORATION [NOT USED] 10 3.6 RE -INSTALLATION [NOT USED] 11 3.7 FIELD [oil] SITE QUALITY CONTROL 12 A. Tests and Inspections 13 1. Inspect all products or equipment delivered to the site prior to unloading. 14 B. Non -Conforming Work 15 1. Reject all products or equipment that are damaged, used or in any other way 16 unsatisfactory for use on the project. 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION 22 A. Protect all products or equipment in accordance with manufacturer's written directions. 23 B. Store products or equipment in location to avoid physical damage to items while in 24 storage. 25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by 26 the manufacturer. 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION 30 CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017000-1 DAP MOBILIZATION AND REMOBILIZATION 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 01 70 00 MOBILIZATION AND REMOBILIZATION Page 1 of 4 5 A. Section Includes: 6 1. Mobilization and Demobilization 7 a. Mobilization 8 1) Transportation of Contractor's personnel, equipment, and operating supplies 9 to the Site 10 2) Establishment of necessary general facilities for the Contractor's operation 11 at the Site 12 3) Premiums paid for performance and payment bonds 13 4) Transportation of Contractor's personnel, equipment, and operating supplies 14 to another location within the designated Site 15 5) Relocation of necessary general facilities for the Contractor's operation 16 from 1 location to another location on the Site. 17 b. Demobilization 18 1) Transportation of Contractor's personnel, equipment, and operating supplies 19 away from the Site including disassembly 20 2) Site Clean-up 21 3) Removal of all buildings and/or other facilities assembled at the Site for this 22 Contract 23 c. Mobilization and Demobilization do not include activities for specific items of 24 work that are for which payment is provided elsewhere in the contract. 25 2. Remobilization 26 a. Remobilization for Suspension of Work specifically required in the Contract 27 Documents or as required by City includes: 28 1) Demobilization 29 a) Transportation of Contractor's personnel, equipment, and operating 30 supplies from the Site including disassembly or temporarily securing 31 equipment, supplies, and other facilities as designated by the Contract 32 Documents necessary to suspend the Work. 33 b) Site Clean-up as designated in the Contract Documents 34 2) Remobilization 35 a) Transportation of Contractor's personnel, equipment, and operating 36 supplies to the Site necessary to resume the Work. 37 b) Establishment of necessary general facilities for the Contractor's 38 operation at the Site necessary to resume the Work. 39 3) No Payments will be made for: 40 a) Mobilization and Demobilization from one location to another on the 41 Site in the normal progress of performing the Work. 42 b) Stand-by or idle time 43 c) Lost profits 44 3. Mobilizations and Demobilization for Miscellaneous Projects 45 a. Mobilization and Demobilization CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017000-2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 1) Mobilization shall consist of the activities and cost on a Work Order basis 2 necessary for: 3 a) Transportation of Contractor's personnel, equipment, and operating 4 supplies to the Site for the issued Work Order. 5 b) Establishment of necessary general facilities for the Contractor's 6 operation at the Site for the issued Work Order 7 2) Demobilization shall consist of the activities and cost necessary for: 8 a) Transportation of Contractor's personnel, equipment, and operating 9 supplies from the Site including disassembly for each issued Work 10 Order 11 b) Site Clean-up for each issued Work Order 12 c) Removal of all buildings or other facilities assembled at the Site for 13 each Work Oder 14 b. Mobilization and Demobilization do not include activities for specific items of 15 work for which payment is provided elsewhere in the contract. 16 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 17 a. A Mobilization for Miscellaneous Projects when directed by the City and the 18 mobilization occurs within 24 hours of the issuance of the Work Order. 19 B. Deviations from this City of Fort Worth Standard Specification 20 1. None. 21 C. Related Specification Sections include, but are not necessarily limited to: 22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 23 2. Division 1 — General Requirements 24 1.2 PRICE AND PAYMENT PROCEDURES 25 A. Measurement and Payment 26 1. Mobilization and Demobilization 27 a. Measure 28 1) This Item is considered subsidiary to the various Items bid. 29 b. Payment 30 1) The work performed and materials furnished in accordance with this Item 31 are subsidiary to the various Items bid and no other compensation will be 32 allowed. 33 2. Remobilization for suspension of Work as specifically required in the Contract 34 Documents 35 a. Measurement 36 1) Measurement for this Item shall be per each remobilization performed. 37 b. Payment 38 1) The work performed and materials furnished in accordance with this Item 39 and measured as provided under "Measurement" will be paid for at the unit 40 price per each "Specified Remobilization" in accordance with Contract 41 Documents. 42 c. The price shall include: 43 1) Demobilization as described in Section 1.1.A.2.a.1) 44 2) Remobilization as described in Section 1.1.A.2.a.2) 45 d. No payments will be made for standby, idle time, or lost profits associated this 46 Item. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017000-3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 3. Remobilization for suspension of Work as required by City 2 a. Measurement and Payment 3 1) This shall be submitted as a Contract Claim in accordance with Article 10 4 of Section 00 72 00. 5 2) No payments will be made for standby, idle time, or lost profits associated 6 with this Item. 7 4. Mobilizations and Demobilizations for Miscellaneous Projects 8 a. Measurement 9 1) Measurement for this Item shall be for each Mobilization and 10 Demobilization required by the Contract Documents 11 b. Payment 12 1) The Work performed and materials furnished in accordance with this Item 13 and measured as provided under "Measurement" will be paid for at the unit 14 price per each "Work Order Mobilization" in accordance with Contract 15 Documents. Demobilization shall be considered subsidiary to mobilization 16 and shall not be paid for separately. 17 c. The price shall include: 18 1) Mobilization as described in Section 1.1.A.3.a.1) 19 2) Demobilization as described in Section 1.1.A.3.a.2) 20 d. No payments will be made for standby, idle time, or lost profits associated this 21 Item. 22 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 23 a. Measurement 24 1) Measurement for this Item shall be for each Mobilization and 25 Demobilization required by the Contract Documents 26 b. Payment 27 1) The Work performed and materials furnished in accordance with this Item 28 and measured as provided under "Measurement" will be paid for at the unit 29 price per each "Work Order Emergency Mobilization" in accordance with 30 Contract Documents. Demobilization shall be considered subsidiary to 31 mobilization and shall not be paid for separately. 32 c. The price shall include 33 1) Mobilization as described in Section 1.1.A.4.a) 34 2) Demobilization as described in Section 1.1.A.3.a.2) 35 d. No payments will be made for standby, idle time, or lost profits associated this 36 Item. 37 1.3 REFERENCES [NOT USED] 38 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 39 1.5 SUBMITTALS [NOT USED] 40 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 41 1.7 CLOSEOUT SUBMITTALS [NOT USED] 42 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 43 1.9 QUALITY ASSURANCE [NOT USED] 44 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION [NOT USED] 5 END OF SECTION 6 7 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY 017123-1 DAP CONSTRUCTION STAKING AND SURVEY Page 1 of 4 SECTION 01 71 23 CONSTRUCTION STAKING AND SURVEY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will 27 be allowed. 28 1.3 REFERENCES [NOT USED] 29 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 30 1.5 SUBMITTALS 31 A. Submittals, if required, shall be in accordance with Section 01 33 00. 32 B. All submittals shall be approved by the City prior to delivery. 33 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 34 A. Certificates 35 1. Provide certificate certifying that elevations and locations of improvements are in 36 conformance or non-conformance with requirements of the Contract Documents. 37 a. Certificate must be sealed by a registered professional land surveyor in the 38 State of Texas. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN" 104498 Revised April 7, 2014 017123-2 DAP CONSTRUCTION STAKING AND SURVEY Page 2 of 4 B. Field Quality Control Submittals 2 1. Documentation verifying accuracy of field engineering work. 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Construction Staking 7 1. Construction staking will be performed by the City. 8 2. Coordination 9 a. Contact City's Project Representative at least 2 weeks in advance for 10 scheduling of Construction Staking. 11 b. It is the Contractor's responsibility to coordinate staking such that construction 12 activities are not delayed or negatively impacted. 13 3. General 14 a. Contractor is responsible for preserving and maintaining stakes furnished by 15 City. 16 b. If in the opinion of the City, a sufficient number of stakes or markings have 17 been lost, destroyed or disturbed, by Contractor's neglect, such that the 18 contracted Work cannot take place, then the Contractor will be required to pay 19 the City for new staking with a 25 percent markup. The cost for staking will be 20 deducted from the payment due to the Contractor for the Project. 21 B. Construction Survey 22 1. Construction Survey will be performed by the City. 23 2. Coordination 24 a. Contractor to verify that control data established in the design survey remains 25 intact. 26 b. Coordinate with the City prior to field investigation to determine which 27 horizontal and vertical control data will be required for construction survey. 28 c. It is the Contractor's responsibility to coordinate Construction Survey such that 29 construction activities are not delayed or negatively impacted. 30 d. Notify City if any control data needs to be restored or replaced due to damage 31 caused during construction operations. 32 1) City shall perform replacements and/or restorations. 33 3. General 34 a. Construction survey will be performed in order to maintain complete and 35 accurate logs of control and survey work as it progresses for Project Records. 36 b. The Contractor will need to ensure coordination is maintained with the City to 37 perform construction survey to obtain construction features, including but not 38 limited to the following: 39 1) All Utility Lines 40 a) Rim and flowline elevations and coordinates for each manhole or 41 junction structure 42 2) Water Lines 43 a) Top of pipe elevations and coordinates for waterlines at the following 44 locations: 45 (1) Every 250 linear feet CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN" 104498 Revised April 7, 2014 017123-3 DAP CONSTRUCTION STAKING AND SURVEY Page 3 of 4 1 (2) Horizontal and vertical points of inflection, curvature, etc. (All 2 Fittings) 3 (3) Cathodic protection test stations 4 (4) Sampling stations 5 (5) Meter boxes/vaults (All sizes) 6 (6) Fire lines 7 (7) Fire hydrants 8 (8) Gate valves 9 (9) Plugs, stubouts, dead-end lines 10 (10) Air Release valves (Manhole rim and vent pipe) 11 (11) Blow off valves (Manhole rim and valve lid) 12 (12) Pressure plane valves 13 (13) Cleaning wyes 14 (14) Casing pipe (each end) 15 b) Storm Sewer 16 (1) Top of pipe elevations and coordinates at the following locations: 17 (a) Every 250 linear feet 18 (b) Horizontal and vertical points of inflection, curvature, etc. 19 c) Sanitary Sewer 20 (1) Top of pipe elevations and coordinates for sanitary sewer lines at 21 the following locations: 22 (a) Every 250 linear feet 23 (b) Horizontal and vertical points of inflection, curvature, etc. 24 (c) Cleanouts 25 c. Construction survey will be performed in order to maintain complete and 26 accurate logs of control and survey work associated with meeting or exceeding 27 the line and grade required by these Specifications. 28 d. The Contractor will need to ensure coordination is maintained with the City to 29 perform construction survey and to verify control data, including but not 30 limited to the following: 31 1) Established benchmarks and control points provided for the Contractor's 32 use are accurate 33 2) Benchmarks were used to furnish and maintain all reference lines and 34 grades for tunneling 35 3) Lines and grades were used to establish the location of the pipe 36 4) Submit to the City copies of field notes used to establish all lines and 37 grades and allow the City to check guidance system setup prior to 38 beginning each tunneling drive. 39 5) Provide access for the City to verify the guidance system and the line and 40 grade of the carrier pipe on a daily basis. 41 6) The Contractor remains fully responsible for the accuracy of the work and 42 the correction of it, as required. 43 7) Monitor line and grade continuously during construction. 44 8) Record deviation with respect to design line and grade once at each pipe 45 joint and submit daily records to City. 46 9) If the installation does not meet the specified tolerances, immediately notify 47 the City and correct the installation in accordance with the Contract 48 Documents. 49 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN" 104498 Revised April 7, 2014 01 71 23 - 4 DAP CONSTRUCTION STAKING AND SURVEY Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 APPLICATION 9 3.5 REPAIR / RESTORATION [NOT USED] 10 3.6 RE -INSTALLATION [NOT USED] 11 3.7 FIELD [oR] SITE QUALITY CONTROL 12 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 13 City in accordance with this Specification. 14 B. Do not change or relocate stakes or control data without approval from the City. 15 3.8 SYSTEM STARTUP [NOT USED] 16 3.9 ADJUSTING [NOT USED] 17 3.10 CLEANING [NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION [NOT USED] 20 3.13 MAINTENANCE [NOT USED] 21 3.14 ATTACHMENTS [NOT USED] 22 END OF SECTION 23 24 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN" 104498 Revised April 7, 2014 017423-1 DAP CLEANING Page 1 of 4 1 SECTION 01 74 23 2 CLEANING 3 PART 1 - GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1 — General Requirements 13 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE, AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017423-2 DAP CLEANING Page 2 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS 4 2.1 OWNER -FURNISHED [oR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3. For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3 - EXECUTION 14 3.1 INSTALLERS [NOT USED] 15 3.2 EXAMINATION [NOT USED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION [NOT USED] 18 3.5 REPAIR / RESTORATION [NOT USED] 19 3.6 RE -INSTALLATION [NOT USED] 20 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING 24 A. General 25 1. Prevent accumulation of wastes that create hazardous conditions. 26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017423-3 DAP CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn on -site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of 11 personnel in existing facility operations. 12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 19 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airborne or transported by flowing water during the storm. 21 C. Exterior (Site or Right of Way) Final Cleaning 22 1. Remove trash and debris containers from site. 23 a. Re -seed areas disturbed by location of trash and debris containers in accordance 24 with Section 32 92 13. 25 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object 26 that may hinder or disrupt the flow of traffic along the roadway. 27 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, 28 junction boxes and inlets. 29 4. If no longer required for maintenance of erosion facilities, and upon approval by 30 City, remove erosion control from site. 31 5. Clean signs, lights, signals, etc. 32 3.11 CLOSEOUT ACTIVITIES [NOT USED] 33 3.12 PROTECTION [NOT USED] 34 3.13 MAINTENANCE [NOT USED] 35 3.14 ATTACHMENTS [NOT USED] 36 37 38 39 40 CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 01 74 23 - 4 DAP CLEANING Page 4 of 4 1 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 01 7719 CLOSEOUT REQUIREMENTS 017719-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1 — General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 CLOSEOUT PROCEDURE 9 A. Prior to requesting Final Inspection, submit: 10 1. Project Record Documents in accordance with Section 01 78 39 11 2. Operation and Maintenance Data, if required, in accordance with Section 01 78 23 12 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 13 01 74 23. 14 C. Final Inspection 15 1. After final cleaning, provide notice to the City Project Representative that the Work 16 is completed. 17 a. The City will make an initial Final Inspection with the Contractor present. 18 b. Upon completion of this inspection, the City will notify the Contractor, in 19 writing within 10 business days, of any particulars in which this inspection 20 reveals that the Work is defective or incomplete. 21 2. Upon receiving written notice from the City, immediately undertake the Work 22 required to remedy deficiencies and complete the Work to the satisfaction of the 23 City. 24 3. Upon completion of Work associated with the items listed in the City's written 25 notice, inform the City, that the required Work has been completed. Upon receipt 26 of this notice, the City, in the presence of the Contractor, will make a subsequent 27 Final Inspection of the project. 28 4. Provide all special accessories required to place each item of equipment in full 29 operation. These special accessory items include, but are not limited to: 30 a. Specified spare parts 31 b. Adequate oil and grease as required for the first lubrication of the equipment 32 c. Initial fill up of all chemical tanks and fuel tanks 33 d. Light bulbs 34 e. Fuses 35 f. Vault keys 36 g. Handwheels 37 h. Other expendable items as required for initial start-up and operation of all 38 equipment 39 D. Notice of Project Completion CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 1 2 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). 3 E. Supporting Documentation 4 1. Coordinate with the City Project Representative to complete the following 5 additional forms: 6 a. Final Payment Request 7 b. Statement of Contract Time 8 c. Affidavit of Payment and Release of Liens 9 d. Consent of Surety to Final Payment 10 e. Pipe Report (if required) 11 f. Contractor's Evaluation of City 12 g. Performance Evaluation of Contractor 13 F. Letter of Final Acceptance 14 1. Upon review and acceptance of Notice of Project Completion and Supporting 15 Documentation, in accordance with General Conditions, City will issue Letter of 16 Final Acceptance and release the Final Payment Request for payment. 17 3.5 REPAIR / RESTORATION [NOT USED] 18 3.6 RE -INSTALLATION [NOT USED] 19 3.7 FIELD [oR] SITE QUALITY CONTROL [NOT USED] 20 3.8 SYSTEM STARTUP [NOT USED] 21 3.9 ADJUSTING [NOT USED] 22 3.10 CLEANING [NOT USED] 23 3.11 CLOSEOUT ACTIVITIES [NOT USED] 24 3.12 PROTECTION [NOT USED] 25 3.13 MAINTENANCE [NOT USED] 26 3.14 ATTACHMENTS [NOT USED] 27 END OF SECTION 28 29 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA 1 2 3 PART 1 - GENERAL SECTION 01 78 23 OPERATION AND MAINTENANCE DATA Page 1 of 5 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include, but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers (to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8 1/2 inches x 11 inches 34 b. Paper 35 1) 40 pound minimum, white, for typed pages 36 2) Holes reinforced with plastic, cloth or metal 37 c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017823-2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 1 d. Drawings 2 1) Provide reinforced punched binder tab, bind in with text 3 2) Reduce larger drawings and fold to size of text pages. 4 e. Provide fly -leaf for each separate product, or each piece of operating 5 equipment. 6 1) Provide typed description of product, and major component parts of 7 equipment. 8 2) Provide indexed tabs. 9 f. Cover 10 1) Identify each volume with typed or printed title "OPERATING AND 11 MAINTENANCE INSTRUCTIONS". 12 2) List: 13 a) Title of Project 14 b) Identity of separate structure as applicable 15 c) Identity of general subject matter covered in the manual 16 3. Binders 17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers 18 b. When multiple binders are used, correlate the data into related consistent 19 groupings. 20 4. If available, provide an electronic form of the O&M Manual. 21 B. Manual Content 22 1. Neatly typewritten table of contents for each volume, arranged in systematic order 23 a. Contractor, name of responsible principal, address and telephone number 24 b. A list of each product required to be included, indexed to content of the volume 25 c. List, with each product: 26 1) The name, address and telephone number of the subcontractor or installer 27 2) A list of each product required to be included, indexed to content of the 28 volume 29 3) Identify area of responsibility of each 30 4) Local source of supply for parts and replacement 31 d. Identify each product by product name and other identifying symbols as set 32 forth in Contract Documents. 33 2. Product Data 34 a. Include only those sheets which are pertinent to the specific product. 35 b. Annotate each sheet to: 36 1) Clearly identify specific product or part installed 37 2) Clearly identify data applicable to installation 38 3) Delete references to inapplicable information 39 3. Drawings 40 a. Supplement product data with drawings as necessary to clearly illustrate: 41 1) Relations of component parts of equipment and systems 42 2) Control and flow diagrams 43 b. Coordinate drawings with information in Project Record Documents to assure 44 correct illustration of completed installation. 45 c. Do not use Project Record Drawings as maintenance drawings. 46 4. Written text, as required to supplement product data for the particular installation: 47 a. Organize in consistent format under separate headings for different procedures. 48 b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017823-3 DAP OPERATION AND MAINTENANCE DATA 1 5. Copy of each warranty, bond and service contract issued 2 a. Provide information sheet for City personnel giving: 3 1) Proper procedures in event of failure 4 2) Instances which might affect validity of warranties or bonds 5 6 C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. Page 3 of 5 7 2. Content, for architectural products, applied materials and finishes: 8 a. Manufacturer's data, giving full information on products 9 1) Catalog number, size, composition 10 2) Color and texture designations 11 3) Information required for reordering special manufactured products 12 b. Instructions for care and maintenance 13 1) Manufacturer's recommendation for types of cleaning agents and methods 14 2) Cautions against cleaning agents and methods which are detrimental to 15 product 16 3) Recommended schedule for cleaning and maintenance 17 3. Content, for moisture protection and weather exposure products: 18 a. Manufacturer's data, giving full information on products 19 1) Applicable standards 20 2) Chemical composition 21 3) Details of installation 22 b. Instructions for inspection, maintenance and repair 23 D. Manual for Equipment and Systems 24 1. Submit 5 copies of complete manual in fmal form. 25 2. Content, for each unit of equipment and system, as appropriate: 26 a. Description of unit and component parts 27 1) Function, normal operating characteristics and limiting conditions 28 2) Performance curves, engineering data and tests 29 3) Complete nomenclature and commercial number of replaceable parts 30 b. Operating procedures 31 1) Start-up, break-in, routine and normal operating instructions 32 2) Regulation, control, stopping, shut -down and emergency instructions 33 3) Summer and winter operating instructions 34 4) Special operating instructions 35 c. Maintenance procedures 36 1) Routine operations 37 2) Guide to "trouble shooting" 38 3) Disassembly, repair and reassembly 39 4) Alignment, adjusting and checking 40 d. Servicing and lubrication schedule 41 1) List of lubricants required 42 e. Manufacturer's printed operating and maintenance instructions 43 f. Description of sequence of operation by control manufacturer 44 1) Predicted life of parts subject to wear 45 2) Items recommended to be stocked as spare parts 46 g. As installed control diagrams by controls manufacturer 47 h. Each contractor's coordination drawings 48 1) As installed color coded piping diagrams CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 1 i. Charts of valve tag numbers, with location and function of each valve 2 j. List of original manufacturer's spare parts, manufacturer's current prices, and 3 recommended quantities to be maintained in storage 4 k. Other data as required under pertinent Sections of Specifications 5 3. Content, for each electric and electronic system, as appropriate: 6 a. Description of system and component parts 7 1) Function, normal operating characteristics, and limiting conditions 8 2) Performance curves, engineering data and tests 9 3) Complete nomenclature and commercial number of replaceable parts 10 b. Circuit directories of panelboards 11 1) Electrical service 12 2) Controls 13 3) Communications 14 c. As installed color coded wiring diagrams 15 d. Operating procedures 16 1) Routine and normal operating instructions 17 2) Sequences required 18 3) Special operating instructions 19 e. Maintenance procedures 20 1) Routine operations 21 2) Guide to "trouble shooting" 22 3) Disassembly, repair and reassembly 23 4) Adjustment and checking 24 f. Manufacturer's printed operating and maintenance instructions 25 g. List of original manufacturer's spare parts, manufacturer's current prices, and 26 recommended quantities to be maintained in storage 27 h. Other data as required under pertinent Sections of Specifications 28 4. Prepare and include additional data when the need for such data becomes apparent 29 during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017823-5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 8 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017839-1 DAP PROJECT RECORD DOCUMENTS 1 2 3 PART 1 - GENERAL 4 1.1 SUMMARY SECTION 01 78 39 PROJECT RECORD DOCUMENTS Page 1 of 4 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1 — General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017839-2 DAP PROJECT RECORD DOCUMENTS 1 2 Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 - PRODUCTS 18 2.1 OWNER -FURNISHED [oR] OWNER -SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time, the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum clearly mark any deviations from Contract Documents 11 associated with installation of the infrastructure. 12 4. Making entries on Drawings 13 a. Record any deviations from Contract Documents. 14 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 15 change by graphic line and note as required. 16 c. Date all entries. 17 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 18 e. In the event of overlapping changes, use different colors for the overlapping 19 changes. 20 5. Conversion of schematic layouts 21 a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 22 ducts, and similar items, are shown schematically and are not intended to 23 portray precise physical layout. 24 1) Final physical arrangement is determined by the Contractor, subject to the 25 City's approval. 26 2) However, design of future modifications of the facility may require 27 accurate information as to the final physical layout of items which are 28 shown only schematically on the Drawings. 29 b. Show on the job set of Record Drawings, by dimension accurate to within 1 30 inch, the centerline of each run of items. 31 1) Final physical arrangement is determined by the Contractor, subject to the 32 City's approval. 33 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 34 ceiling plenum", "exposed", and the like). 35 3) Make all identification sufficiently descriptive that it may be related 36 reliably to the Specifications. 37 c. The City may waive the requirements for conversion of schematic layouts 38 where, in the City's judgment, conversion serves no useful purpose. However, 39 do not rely upon waivers being issued except as specifically issued in writing 40 by the City. 41 B. Final Project Record Documents 42 1. Transfer of data to Drawings 43 a. Carefully transfer change data shown on the job set of Record Drawings to the 44 corresponding final documents, coordinating the changes as required. 45 b. Clearly indicate at each affected detail and other Drawing a full description of 46 changes made during construction, and the actual location of items. 47 c. Call attention to each entry by drawing a "cloud" around the area or areas 48 affected. CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 1 d. Make changes neatly, consistently and with the proper media to assure 2 longevity and clear reproduction. 3 2. Transfer of data to other Documents 4 a. If the Documents, other than Drawings, have been kept clean during progress of 5 the Work, and if entries thereon have been orderly to the approval of the City, 6 the job set of those Documents, other than Drawings, will be accepted as final 7 Record Documents. 8 b. If any such Document is not so approved by the City, secure a new copy of that 9 Document from the City at the City's usual charge for reproduction and 10 handling, and carefully transfer the change data to the new copy to the approval 11 of the City. 12 3.5 REPAIR / RESTORATION [NOT USED] 13 3.6 RE -INSTALLATION [NOT USED] 14 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 15 3.8 SYSTEM STARTUP [NOT USED] 16 3.9 ADJUSTING [NOT USED] 17 3.10 CLEANING [NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION [NOT USED] 20 3.13 MAINTENANCE [NOT USED] 21 3.14 ATTACHMENTS [NOT USED] 22 END OF SECTION 23 24 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH Montserrat Commercial Development STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN: 104498 Revised April 7, 2014 APPENDIX FORT WORTH.. Note: All water or sewer ai•elar er than 15 Inch diameter shall be a CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST roved for use b the Water De ertmen .pproval Spec No. Classsifteation \laltufacturcr Water & Sewet - Manholes & Bases/Components 33-39-10 f Rev Nail 97/23197 33 05 13 lkehenenrdroohlic Waterston Asahi Ko¢ro]CK. 04/265)5 33 05 13 0e/26n00 33 05 13 MOW 33 0513 3113/05 330513 Offer Joint Mr4' Diem. MH Profile Gasket ter 4' Diem. MH. HDPE Manhole Adiu9ntmr Pins Manhole External Wraro Hamm Concrete liadad-v Pass -Seel Ga&e Core, Iadlech. Inc COMM -CPS L Water & Sewer - Maoholea & Rrse5IFiller�l ass 33-39-13 f11W131 /305 �- 126/99 33 39 13 'literalestr Manhole 08/333 39 13 Fibrralesa Manhole 0324/18 08174/18 08134/18 08/24/18 10/11/06 72503 01/31/ 6 11/07/10 07/19/11 08/7U1] 10/14/13 06i41/17 09/16/19 10/07/21 03,Yi&W 04f2N01 Water & Sewer - M a & Rases/Frames R: i30513 I Manhok Frame. and Covers Fluid Cm1aurmeat Inn L.F. Maw( a l.eme Updated: 03/07/21121 on roects•-d1kbasis. S oalheddin"m. be •aired for some •i•• National Spec Model No. Add, 171trs.3en1 P-2111 °maim Net 35.0048-002 250-4G Gasket HDPE Ad.:eaten( Rime WranidSnl Manhole Eocauaflenon Ststem Cnvera/VeRtanrular 33155.13 (Rev 2/3/16) I Wnaan then Works. Bass & HISS Fwndro Wu ter & Sewer- Manholes & Bases/Frames & Capers aTtand>ird (Round) 33-05-13 (Rev 2/3/16) 33 05 13 Western Iran Wail Baas& Ham Foundry I 13 0513 McKinley rrrn Wok Inc 33 05 13 Neenah Fomdry 33 0513 Neenah hawk 33 05 13 Neenah Fomrhv 33 05 13 Neenah Foaa&v 33 05 13 Simms Dammam main 33 0513 Stem Capmatice 33 0513 Pent -A -Moulin 33 0513 Neenah Canine 33 05 13 Powerseel 33 0513 Saint -Gahm Pipelines (Parmt.•resoa) 33 05 13 Fast Jordan Iron Woks 33 45 13 Siam. Cortaane. 33 0513 Saar Pine Prodons 33 0513 Aaacast Manhole Frames and Caws Manhak Frames and Coves MenMu Frames and Coatis Manhole Frames and Covers hlnnhole Frames and Covers Manhole Frames and Coons Manhole Frames and Coven Manhole Frames and Cows Manhole Frames and Covers Manhole Frames and Cows Manhole Frames and Corns Ganash Manhole Frames and Cores 30' Dia. Mlii Rum and Court 30' Diu MH Rene end Curer 34' Dia- 3A1Rin¢ and Cmc 30' Dia. ME! Rine and Cora 33 0513 30' 11i4. MH Rine sad Omar ![hood & Lodrablel 34 05 13 30' lea. Mai FINK and Cram II-ljo d, & Maable) C1 330513 34 0513 30' Dia. MH Ring and Cover 30' Dia. MH Rine and Cover East Sedan Iran Works SIP Industries Composite Aexsa Product. LP. 1+ Trumbull Manufaeuram Houma 1001 30024 A24 AM R.1272 R- 165-L140lneed) NF 1274 R-1743-LM0410ad1 Mkt-144N MFF143N CF1S-3iD AS11.4 132240W1.14120792 ASTM C.443/C-361 ASTM 3733 ASTM A411 & AAs3110 1Y1306 ASTM A48 a AASli0O M306 ASTM A48 & AASHiOM306 ASTM A48 & AASHTD M306 Unwed Dunk Um Manhole A.4CMA536 RE32-REFS V1432-2 sad V1483 Desi¢na AASIE1U M306-04 h3H165tFWN&MI-116542 MI.112F1'WSS-DC 220100 Hens Boast with Oe%d Rine 30' ERGO XL Assembly - nitbCamLook/MPICIT-Casket AS0HTOM1R5&ASTM A536 2280132") ASTM A 48 CAP-ONE-30-P1W. CorrPasrc wl tuck 0(05rma 32'(30') Frame and Caw Waite & Sewer - Moab*n & Bases/Frames & Covers/Water Tivht & Pres-tern Tkpht33-05-13 (Rev 2/31161 3305 13 Manhole Frames and C.c. Par-A-Mmsrm Paton Mt 330513' 13 0513 33 05 13 33 0513 330513 Manhole Frames and Colas Manhole Frames and Cotes Manhole Frames and Covers Manhole Frames and Covers Manhole Framed and Covers Neenah Carona Wr0em Iron WorksBaas& Hay- Fumdrs McKinley arm Works Accucast ISIPkSeram0ore !admen. Private l-td. Water & Sewer- Manholes & Bases/Precast Concrete (Rev 1/8/131 Elvdro Conduit Coco 0921/96 05A8/18 10/27/06 0N09/10 09/06119 10/7/21 109721 1aO7/21 03R7/23 03fi7723 33 39 10 33 34 10 33 3910 33 3910 13 3910 33 3910 33 39 211 32 3920 31 3920 33 39 20 333930 33 39 20 • 0423/W 4,20131 5/12/03 0813OQ6 Manhole, Promo Co ode Manhole. Prowl Co nete Manhole. Precaa Concrete Manhole, Precast Canada Manhole, Precast Cmerdr Manhole. Precast IReimfrnned PohmalCmrrere Manhole. Patois Corneae Manhole. Precast Comsat Manhole. Precast IRemforoed Poisoner) Concrete Manhole. Precast illvtrid] P0Smer & PVC Manhole. Peso Commie Manhole Pn a (Ronforc of Puhma1 Concrete Manhole Poorest 1Reofawd Poh,mx) Concrete Wall concrete Pine Co. Inc ConoreeProdueThe Turner Carman Meanie 1Yews eve US Comwvle Pipe haters Piro 00d Precast Fauna Pim and Pram¢ Armaoc4: Preal Systems Ameri.Tex Piste and Pendants P3 Mmes. Rockllard+m Amnaeh USA & Sewer - Manholes & Bases/Rehab ScstemslCr raendliour Et-14 Manhole Rehab S.-'—. Ouaaax Et-14 Manhole Rehab Sara Standard Cement Manial. lne El-14 Maim* Rebel" Weems APIM Penneform E1-14 Manhole Rehab SVa® Strma Caoomv El. 14 Manhole Rehab Swaim )Line) Treace Linker System General Concrete Rea FlaKrate T4Lnaloctea 300-24P WPA24AM RC-2I00 300.24-23.75 Ring and Cover SPL hem 649 48' LD. Manhole u732' Cate 48'. 50' F-D MAanda vet 32' Cam 48' 1 D. Manhole aJ 24' Cone Rantoul Pohmer Concrete 60' & 72' ID. Manhole wf32' Core 48' 1D. Manhole w/32- Core 48' & fi0' 1.D. Manhole af32' Cate 48' & 60" 1-D Mohdc W /32' Cane 48' & 60' 1.0. Manhole w132- Cote 48' & 60' 1.D. Manhole wi32' Crave Mo o-P4. oolrPlne AVM A48 ASTM A 48 ASTM C 478 ASTM C-4l3 ASTM C 478 ASTM C 478 ASTM C 478 ASTM C-76 ASTM C-76 Asia! C--77 ASTM C-478; ASTM C.923. ASTM Ca43 &diner MSP Strain Seal MS1A Rehab Sy0en M1E repair dodo[ in ato iofi5matien Vinyl Polonaise Relater ?mho ASTM D5813 Size SSMH Traffic end him -traffic area Nun -traffic arts Nun -traffic area 24'.x40' WD 24' Diet 24' Die 24' Diet 24' Diet 30' Die. 30' olio. 24' diet. 24' dia. 24" Dia_ 30' Dia 30' [eta. 30' Dia 30- Dia 30- Die 30' Dia 30' Dia. 30' Di. 30' Dia. 24' Dia 24' Dia 24' Dia 24' Di. 24'I3i. 24' nil- 48' 48' 48' wr32' cone eV. 60' 48- Diem w 24' Rine 48' to 72' 60' &72' 48' 48'&60' 48' & 60' Non Trauma Amp Mine. llic • From Original Standard Products list 1 FORT WORTH: Note: /0! water or sewer , i . e la r-' r than 15 inch diameter shall be a Appru3al Spec _\o. (Isi,.ific:ttivn CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST roved for use by the Water De rtrneat on a Manufacturer __Pinter & Sewer - Mar holes & Bases/ReI1allitilialrirementalm 0512 /96 F.I-14 Manhole Rehab Sstems n12114,01 ( 01/31/05 I 8r282006 Coati, 0o Carooae moration(Ene ia) Coalman fa Corroalan Protection Co®gs for Carosim Protection >a IU. 03/19/18 33 39 20 Camilla For Corrasmn aaeeaimtExsaiorl ERTECH Chasenen Warren Ensummemal She min Williams Water & Sew r- Manhole Inserts - Field Ouerelions !''e Only /Rev 2/3/16) 33 65 13 Manhole Inset lima Entatrium 33 05 t3 Menhok insert Snub Wmoa Packaeme • 33 45 13 Manhole Insect 14ofow-INbtt 09/23/9d 33 65 13 Manhole /west Soatharste n Porkies & Sea0s. Inc 0921196 33 53 13 Manhole inset Swdraestem Packing & Seals. Inc. Water & Sewer - Pine Casing Sneers 33-05-24 {07/O1/131 11A74002 Steel Band Casing Spacers 0212/93 Sunless Steel Casing Spacer 04/22/87 Casing Space 09/L4110 Stemless Steel Casing Sp&oc 02/14110 Coated Sleet Casio Spacers 05/10/11 &melee Sad Casing Spacer 03/19/18 03/19/18 03/29122 Casing Spaces C sag Spacers 33 05 13 Caw Spat= &ter & Sewer - Pfra ff: rt➢le iron 33-11-I0f118l131 08/24/18 08/24/10 • • 33 II 10 3111 10 33 11 10 33 11 10 33 11 10 Ductile Ira Pine Lamle iron Pic Dumle Iran Pipe Thank Iran Pipe Dnctiie Imo Pipe (Water & Srwer - Utilitc Line Marker f08/24l20I81 tnncm 12/14434 04/14/05 el21/06 Sewer -Coati ewarEpt 3 a9-60 f011011l131 Earn* Leine Sstem Foam kirmo System Ulterior Ductile Ism Pier Coating Coatinm Fa Corrcam Proration Commas for Cormsire Protection 'Sewer - Coslj9c/Pokurethane Sewer - Combination Air Valves 0525/18 33-31-70 Air Rdcam Valera • • • 7,21/97 03/22710 04/09/21 03/07/23 .u14at5 46559/10 Sewer: Piraes/Cnaerete EI.08 EI-04 E1.04 BI-04 Canto- Pine. Reinforced Gee Pine. Rsinfirml Cum. Pioc Reinforced Cone Pico R.on0aad Advanced Products and Symms, Inc Advanced Paodcas and System& Inc Cascade Waterworks Mendfacuttxng Lipdipe Seal end Insuiaatr Pipeline seal sad lnsulatcr Posse cal BWM RWM CCl Pipeline Systems oritrwpipe Products. Cn Amahm Noah. Ire& Pine Co. Ameri® /3,041e Iron Pipe Co. U.S. Pipe cad Femmdy Co- MCWane Cast Iran Pipe Ca Smaremsen. Inc Pnech Technical Coatincs Warm Chesteriot warren Emummectal AR3. USA. Inn Wall Crewels Pine Co. Inc._ I-hdro Conduit Conoaotim Hamm Cmuoese Products Cmtade Pipe & Produus Co. Inc. Sewer - Pine Eplarssnent System (Method133-31-23 f01(1 PIM S34em j PEM Crrptratian Mdpopell Systems Ma ar Construction TRS Systems I Treachless Replacement System Sewer - PinefFiberelam Reinforced/ 33-3i-13(118/131 33 31 13 33 31 13 33 31 13 33 31 13 cal Cast Fiberalais tFRPI Fihaalus Pine )FRPi GIn,-Fiber Rein Pad Pawner Pipe (FRP) Flhe[41ea Pipe/FRP) P'iorsiPolvmer Pine. 'Polymer Moaned Cmadc Pine EI-9 Rainfrroed lily„e. Crnvde Pipe I (Sewer - Pines/F fRPE 33-31-23(1/8/131 Notes Pine USA. Inc. Amara nwmrxm Pine Comm Future Ptoe Industries Amila3t USA US Cmtomlc Pipe rojects cllkbasisS dalbeddin \Iodcl No. Sues Wa0 PoEncmlmne Comtism Scrim 20230 end 2100 (Mpharic Emir) A 791,SHE. S1. S2 S-301 eedM-303 .......pta.n„wy awl -re. ctsc, �vr tirade (AsPbaric Emolsioa) Made to Cyder-- Plastic Made to Order - Pla,eie Made to Orrin - Plastic LireSiner- Stamiss Steel Tab./.nk-5tainlass Steel Cohn Sal Spacers, Model 51 Suedes Steel Spacer. Model SST — - Casing Spaces Stainless Surd Caning Span Cneded Sam/ C. Spacers 4310 Powercbod: 3S12 Gang 3l.(Stainless Steel) F13-12 Casing Spacer (Cooed ['whim Sties) for Nmgessare Pipe and Graved Casing CSC12, CSS12 aav Bell --Tim Ductile loan Plivrecpr, pmaicon Fa Ike Pier{Bell Npir American Flex Ring 66,saisaof Lott) Seam —Gerd 21011S E tech 2030 and 2106 Saxes ProLecao401 Are 791. St113. 51. S2 S-301 and M-301 D025LTPQ24Cm,pndre Body Class DI TAG. SPI. loam 477 Pohdinlent Pdivtthvkne Polite/iv/erg lobes Pere Mon-Prec nci Bandstand RPMP Pine Th®pspn Pine (Fltswtdel F*a4r0ug FRP Meyer Poircae RPe Reinforced Polymer Coomme Pipe IT/3 be aired for some .atiomil Spec ASTM D6394)790 Acid liesistmee Test ASTM D 1248 AS1MD 1246 ASTM D i246 AWWA C150. C151 AWWA C150. C151 AWWA C110, CISI AWWA C360, nisi AWWA CI50, CI51 LA Camay N210-1.33 ASFM B-117 Acid Resiste m Teat ASTM C 7G ASTM C 76 ASTM C 76 ASTM C 76 Paul Corp. Pu«m Was, 2 1.1. l l0 3m. Tons Calrev. Canada AS1M D326203764 ASTM 0326UD3754 ASTM D32624)3754 Updated: 03/07/2023 Sire Structures Onh' Sewer Applications Seas Aroliestiaxis s++auna 11 Stmem. O,A For 24' dia. Fur 24' dia. For 24' dia. Fur 24' dia. Fe( 2A' din Up to4a' Unto Sri' Up to48' 3' dins 24' 4' ihru 30' 4' t0ry 30' 3upilc Iola Pine 0nh- 5eprr AiiMicaswns Sears Applinalata 2' Approved Renard! APoaxd Previmasly Avamvd Preview* ASTM D3262. ASTMD3681 ASiM11416t. AWWA M45 ASTM C33, A276, Pan ASTM C-76 • Fran Original Standard Products List 2 FORT WORTH: Nate: All water or sewer la me r7 1pprov al Spec \o. 12/02/11 1022/14 er than 15 Inch diameter shall be Classsificaliun WSPIAerlaty 038ahvlme rine 1k2hdeadne onlvethvlene Dine 1-Eghdonsin' Poly ihrlene pine 1-U114alaly notred iene nine CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST raved far use b the Water De • artment an a Sewer - Pines/PVC !Prglitre .Fwer) 3 -11-12 (4/1II3 i 33-11-12 IDR- 4 P C Pipe 33-11-12 I1DR-14 PVC Pressure Pipe �er-Pi�-Pi PYC+33-2120(7/11131 ' 3331.20 PVC Seine Pine 1223197' 33-31-20 PVC Sewer Pipe • 33.31.2D PVC Sewer Pine 01/18/18 11/11/9S 09/11/12 0SX1N05 04127/O6 3119/201S 3/1A'2018 3f29/2019 1u21r1020 10/i12020 10/21/2020 05/03/99 052996 I1E03193 12/04/00 06/09A3 33-31-20 33 31-20 33-31-20 33-31-20 33-31-20 33-31-20 33-31-20 333126 33 31 20 33 31 20 333120 33 31 20 33 31 20 PVC Sewer Pine PVC Sewn Pine PVC SomEr Pico PVC So..a Nita PVC Solid Well Pipe PVC Shaer Finiola PVC Sire Fittings PVC Sesv Pip: PVC Sewer Pine Cla#cred Finings (PVC) PVC Sew. Pip: PVC Sewer Piro PVC Sewer Pipe Sewer - Pipes I herb/CIPP 33 31-12 (01118l13) CSund m Place Pipe Cured m Place Pine Carea in PI.. Pipe Sewer - Pinerlliph2b/Feld & Fern} Fold and Form Pine Fold eel Far Pine Fold and Form Pipe Fold and Form Pine Fold and Form Nee 09/2691 09/2691 11110 10 1140110 051tell! `Sober - Piues&Cueu Profile Lar0C Diameter E1f10-2 EI[10-2 E100-2 (E100-2) (E100-2) PVC Satre Pine- Ribbed PVC Sewer Pipe, PAW PVC Sews Pip, Ribbed Pdgpmvrie 10 (PM Sewer Pipe, Doebte Wall Pd.mocvl (PM Senor Pipe- Trask Well Sled Reinfiac t Po/vet/Mem Pine �ianufactnrer PhillipR Driimonine. Inc _ Pic co Inc. Polly Pine Inc C3R Hatton CmdniVPmdine Slaloms PipelifeJetsires01 Royal Building PYVSr10L4 J-1uf Menrd'aarnina Co,. i>K £1M Emile) Diamond Plastics Conrornion !Amgen Whin Pine Vin.fweb PVC Pine Dimond P] aiw Cuorratiao J-M Menufacturbui Co. kee (1M Eagle) D.Pi de 1a Stream axis Corpora :en Hama Plastic Trends, lne(Wee[luke) Picelife lea Stream Pkoclife id Stream (1P1C Products. lie NAPCOIWealake) SandasonPipe Cap. NAPCO(WesUakel 1nsindam 7c.vt Inc National Rowan:eh Cnorn Reviokis Inenaliner Teaontlnv (Ulmer USA Cullen Pine &semrc Ir.- In-and Technologies. line. Amalwn Poe @ Piastres. Ire I511066er Miller Pmelme Cum Lamson Vvlm Pine E inesice Teclneiomes. lie 11nma E-CL Ce nrrany Advanced Drainage Systems [ADS) Ad•'eneo1 Drainage Sreenw (ADS) C®To1 Cma4rumice Prod ois reject s•ecihcbasis 5 • dal beddln tiludei Nu - °encore Ductile Polreen krre Pion McConnell Plot Ealat2anall PVC Pressure Pipe Royal Seel PVC Pressure Pipe SDR-26 SDR-26 omen: sewr "5' Gratin Sewn -Pine 5DR 26/35 PS 115146 SDR-26 and SDI- 15 SDR 26135 PS I I5/46 SDR-26 and SDR-35 Gasket Fittings Gasken d ?yes.... Maio Finings SDl115 SDR 26 8DR26 SDR 26 3DR 26 50R 26/35 PS 115146 Netimd Liner. ESP3) kern ilEZ7 Inlmer Technology ln66d son "NoPlpe 111valiner PVC A4ov Pipdiner EX Melhed Carlin Vvlm HC, Closed Profile Pine. ulawRib Oren Profile Sew. Pipe SeniTite 13PDuu3le Wall (Corruamcdl SaniTne HP Trunk Wall Pine IIpdeted: 03107/2023 ma be re ulred for some pipes. National Spec ASTM D 1248 ASTM D 12Ja ASTMD 1248 ASTMD 1248 AV/WA CXO ANWA C900 ASTM D )034 ASTM D 3024 ASTMF 789 ASTM 103034 ASTM P 679 ASTMF 679 AST14 Fd79 ASTM F-679 ASTM D-3034. D-1784, etc ASTM D 3034 ASTM F679 ASTM D3034 AS"k M 03034/F-679 ASTMD3034 ASTM D363 4 ASTM F-679 ASTM 6 1216 ASTM 1•-$2160,5813 ASTMF 1216 ASTM F-1504 ASfM F4304. 11371. 1867 ASTM F•1504. F-1947 ASTM F 679 ASTMF 679 AS1MF 2736 ASIM F 2761 ASTM F 2562 Size 4' Wu 12" 4' [Intl 12' 4' -15' 4' then l5' 4' Oyu 15' 4' ihn115' 18' to 27' IS - 28' I8' IS' to48' 4' -15' IS'- 24' 4'- 15' 4'- 15' 4'• 15' 4'- 15' 18 -36' Delon Prrpmre Only uo ro I8' throne. l8' mar iS to48' 24"-30' 30' to E0' 24' to 7r ' From Original Standard Prodods List 3 01//2/93 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Note: Altwater orsewer .1.eJar :•rthan 15Inch diameter shall bea..roved for use b the Water De.artlttentona .lppru3al Spec No. Clnssxiliit':rlion Water - Anourleoancrx 33-12-10 (07/01/131 01718•18 O 8 2602 07/23712 03A77/23 I0T27/87 10/27/87 5RS2018 5251201B 33-12-10 33-12-10 33-12-10 Dm16ie Strut, Saddle Double Siren Saddle Double Strap Scrvire Saddle DarbkSam Service Saddle .7, ab Slrtra-Ball Mac Ve}m Curb Stow -Roll Meier Valves 33-12-10 f.3nb Slope -Bali Meter Vak.® 33-12-10 3ab Simer-Ball McaT Veher Sr252018 33-12-10 'Serb Smr.- Sall Meta Valves 5r2512018 33-12-10 Curb Stmx-Ball Meta Vohs 5/232018 33-12-10 Curb Stuns -Ball Meer Valves 5125/2018 33-12-10 -"'orb Sawa -Ball Meier Va1var 0126/00 0/521/12 o3/29l22 05/10e1I 02/29/12 02/29112 O 7129/12 O 5,10111 t2oated Termina Saddle pith Double SS Svaos 13- 12-25 iambSkew (Coated Steel) 33.12.25 Sanome Sleeve (Canal or Stainless ,ta.pmir Slene [Staiolesi Steel) 13-12-25 famine Sleeve (Coated &eel) 33-12-25 Terrine Sleeve (Staadne SnsB 33.12--25 Tevoma Slea:se 1Slainlew Steed Joint Reno Clime Pluto Mesa 13e a1C001505i1.Lid PIm.o Meta Ba c W rCo9mmve Lid Plastic Meer Son «AC®oaare Lid Concrete Mete liar Concrete Meer Bac Cullom< Meer Bo. Water -Bents. Null and Gaskets 33-11-05101/0B/131 Water - Cambinatipts Air Rel3.11-70 (01/08,113) EI-ti C aOO Air IZem Valve E1-11 Et-11 Coarbinetiaa Air Release Valve Comiiamioo Au Release Vahe Water - Dry Barrel Fire Hydrants 33-12-40 (01/15t14) 10/01/S7 E•1.12 Drr Band Fire Minot 03/31/83 E-1-12 Dry Barrel Fire Hsdrmr 09/30'87 E-1-12 Dry Bartel Foie Hvdran E-1-E2 Lim Barrel Fin 14+draat 61p24188 E-I-12 Dre Bartel Fire Minns E-1-12 Dry Baird F Modem/ 09R4/87 E-1-12 3Jry Barrel Fin Hydrant 10/14/S7 - E-1-12 Drs Basel Fire Hydrant 01/17.16 B142 l7ry Barrel Fro13 frees 10Ax387 E-1-12 Dr, Bard Fire Helrans 09716/87 E-1-12 Dr: Barrel Fire Hydrant 03(12/I6 33-12-40 <Drr Barrel Frye Hydrant I 02/05/93 E101-5 raaaaa Cll.�k Meta Mimetic Drive Vertical Turilne :Manufacturer Romae Smith Blair Mueller Common Puwetaeai Mepmald McDmudd Ford Meta Bac Ca- Inc Fad Meta Bac Co., lee. Food Meer Box Co.. Inc, Mueller CO..1,rd Mueller Co. Ltd. Mueller Co. Ltd JCM Inkhorn: Inc JCM Industries. Inc. JCM Industries, lac Pout -wand R®ec Ranee Ream Pm:Ker al DEW Maim Inc. DEW Mastics Inc 1)F'W Plastics Inc. Bata &Nan Bet & Ham Bore &Ham GA Musa., Inc Mal betel, Maaufarnuina Ca 4'a}+e and Primer Cap. Amerrean-Dariinu Valve Ameican Darling Valve Claw Carom -mica American AVK Cannon,: UM' Ca rn-aurn }TT l;.ceaadv Valve M&H Valve Company Mueller Company Mueller Cac.can. ll.S Flue &Rawl, American Flow Camel lAFC) EJ 3Eest 7ad4a. ltna Werka. Am. Camp®v Hersey Updated: 03/07/2023 ro'ects+-cefic basis.5 dalbeddin: m. be •.uirad for some.i.- s. Natiuml iI Spec :Model No. 202NS Mon Coated 9317 Nv-lou Coaled Double &rev Saddle DR213 O.artdc (-SS) &ran DI Saddle 3450AS. Earl Cue stm. 176L Stan Steinke 6100M,61O43MT & 610Mf 46036 4604B. 616014.6100T3-4end 6101M I13600-7NL. FBI600-7-NL, FV23-777-W-NL E?2-77NL FB600bNL, FB160016NL, FV23-656-W- t� L22-66NL A'E600-4-NL. FBE600-4-NL. S1 I-444-WR- N41322e44-WR-HL L2S 44NL 8-250003.1-2427731-3, B-20200N-3, FF 15000N .1i-1552N 1314227631 0-2500034.13-2020331-3, 8-2427714-3.31- 15000N 1414276N.14I 5525N 15530N r406 Double Band 5S Saddle 412 Taooina Sleeve FSS 415Tamina Skew 3490AS (Fleneel & 3490-43 EIS 423 SST Stainless Sled SST aB 514inleas Steel 3232 Bell Jam Ronan -Clamp DFW37C-12-IFPAFF1W DFVJ39C-12-1FPAFFIW DF W65C-14-IFPAF F31V CM637-B12 111E LID-9 C MB-E 8-D rat 14 361'-I D-9 CM1365965 1527 LID-9 Empire An and Vac.arm Valve, Model 935 Crispin Au and Va rnmr Valves, Model No APCO El43C, p745C and 0147C Drswina Nos. 90-18600. 94-I R560 Shop Drrtina Net 94-18791 Shoo Drawing Net D-19895 Model 2700 Maximo 020435. D20436. 520506 Shoo Dranio Na D-130783FW Shen OraW7nt No. 13476 Snap Drawings Na 6461 A-423 Centurion A-123 Sew. Cesar pion 200 Shop Draviina No 960250 Wideman Pacer WB67 WacceMaacr 5CD250 Maid 1000 Detector CIna3. Valr>: Meunier Drive Vertical AWWA 0300 AWWA C800 NSF ANSE 372 AWWA C800 AWWA C800 AWWA C800 AWWA C800, ANSI, 61. ANSIMSF 372 AWWA (,BOO. ANSE 61. APL411F/F 372 ANANSF 372 AWWA C-223 AWWA C-223 AWWA C-223 AWWA C-223 AWWA C-2.73 ASTMA 1.26 Cla®A, ASTMA AWWA C-502 AWWA C-502 AWWA C-502 AWWA C-502 AWWA C-502 AWWA C-502 AWWA C-302 AWWA C-502 AWWA C-502 AWWA C-502 AWWA C-502 AWWA C550 AWWA C701. Ci0< I Site SVC. up (024' Pipe 1-2'SVC, uv so24"Pine SVC, up to 24' Pipe 3/4' and l' IX' and 2' 2' 1.1/2' 2' I.12• 1'-2" Taus to tip w 127 Horo:HP u112' Cut Gamete Pipe Oak 4'-8' end 16' 11 a to 42• vd24' Om Dpm24' w/12' Out Uo to 30' w/12' Out 4'to30' Clam 'A' 4' - 10' 3/4--6' • From Original Standard Products list 4 FORT WORTH,. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water orswer I 1- _ r than 151nch diameter shall be : .roved for use 11 the Water De ppra5:4k Spar \n. I:IFlufncturer ent on a ro'ext s en 'fie basis.5 teal beddin may be-.ulred for some 1 "...141i0n111 Spec.Spec. .- Model \u. title 5/25/2018 -Piter8/'VC''Treasure Water/ 33-31-70 101/08/131 33-11-12 PVC Pressure Pine 331I12 33 11 12 33 11 12 PVC Prasmrc Pia PVC Pressure (tire PVC Parsee (tine 33 11 12 PVC Pressure Pice 17-062018 33 1112 PVC Pn--mvc Pipe I2/62018 9162019 9/62919 Wf✓3019 9/6/2019 33 11 12 73 11 12 33 I 12 331112 33 11 12 PVC Prrasme Pipe PVC Pressure Pipe PVC ?maitre Pipe PVC Presque Pipe PVC Pressure Pipe Viovhech PVC Pipe Piradife la Stream Piudife Jet Stream Diamond Plastics Cormratim Tamara Plastics Comedian J-M Menefeaunag Ca, MerVI 'a 1M Eagle J-M Manufacturing Co. lac d/b'a JM Eagle Uddersmand Solutions Inc. NAPCO(Wenlake) 13APCO(Wesdake) Sanderam Pipe Cap. Water -Pioesfitprvppq/Q' F v/nectilr Iron Fiitinaf 33_1 t-11/01/08i131 0723N2 EI-07 Du0tic Iron hemp.h-- Saar Age -Products, Inc • • OW11/98 EG/26/14 05,1af98 O 5/14/98 MOWN 02291t2 02/29/12 Oa05/04 0)A1N19 0805104 08/10/98 IN12/10 08/16,06 11/07/16 /1/07/16 03/19/18 03/19/18 03/19/18 E1-07 Eh-07 E1-07 E1-07 E1-07 E3-24 E1-07 33-11-11 33-11-11 EI-07 33-11-11 £1.07 E1-07 E1-24 E3-07 33-11.11 33-11.11 37-11-11 33-1141 33-11-11 Ductile km Finings Ductile Iron Fittings Ductile Iran Fin Mal MI risemos Duc1Be ken Jinni &anima PVC Jam Restraints /kwile Ism 3unt Rants Dumik ]ran Pine Mechanical Joint Restraint PVC Pine Mechanical Joint Restraint Merharneal Joint ROosir Glatcds5PVC1 Mechanical Joint Reimer GlaadsPVC1 Mxhmianl Jam Retainer GIand6IPVC7 M! Finiaa 4DEP) Interior Restrained lam Burton Mechanical Jowl Fillings Mechanical Joint Retainer Chas Mechanical Jain( Reimer /haws Mechanical Jam Readers Closets Mechanical ioml Retainer Glands M echanstst boob Ro4oiner Clads CniOa Pipe Products. Ca McW®rlryler Find Union Ikilitia Division Soma. Co. Aaara_s Ford Meta Env Cofttni-F1anse Fad Meg Bane Co./Uoi-Flaaae One Bolt Ina 133AA hen. Inc LEAP. km. lac %emu Co. Sigma Co. Sigma, Co. SWIM. CO 5 & B Techneial Products SIP ladurrriaf Se rempare) Star Pine Predicts. log. Star Pine Products. lee SIP 1-.u. st miSarmnoorel SIP Industries(5rempael 319 Indosvres(Strampme) Water- Pineevalves & FAtioos/Resilient Seated Gate Valve' 33-12-20 005/13/151 Resilient Wedged Gala Valve , on Anav-rem Flow Control 12/13A2 Resilient Wedna Gate Valve American Flew Cco7d 08/31/99 Resilient Wedge Gale Valve _ American Flaw Control 05/18/99 Resi)iat Wend= Gate Valve AmriamFlaw Control 102m0 E1-26 Rest/ion Wolac Co. Valve American Flow Central O 8/65/04 Resilient Wcaree Dec Valve Amman Flan' Gnird 05t23451 EI-26 Rcailimt Wedac Gag Valve American AVK Catmarw 01124/02 E1-26 Resilient Wedge Gale VINO American AVK Ciammay • E1-26 Resilient Seated Gate Valve Kancdv • E1-26 Resilient Seared Gate Valve Ml&14 • El-26 Resilient Seated Gate Volvo M ienr Co. 11e08/99 Realism Wedge Gate Valve Mueller Co. 01/23fi3 Resilient Waist Gate Valve Mueller Co_ 05/13105 Resilient Wedge Gate Valve Mueller Co. 01/31/06 Resilient Wedge Gate ',glee Moeller Co. 0I/2888 EI-26 Resilient Wed. Gee Valve Clow Vahe Co. 1004/94 Resilient Wage Gate Valve Claw Valve CP. 1 t/08/99 E1-26 6o Bent Weller Gate Vdvc Clow Vahee Ca 11/29/04 Resilient Wale: Gate Valve Ciao Valve Co. 11/30/12 05l08I91 1026▪ 06 08/24/18 Resilient Wedg Gate Wee E1-26 Resilient Seated Bale Valve E I-26 Resilient Seated Gaze Valve 33-12-20 Resilient Sated Gate Valve Macs Gate Valve Clow Valve Co, Socckham Valves & Fittings U,S A /and Fandov Cu. El (past Iron Winks) MtatNrm 2R14 1)R14 (R18 DR 14 DR /8 DR 14 DR IX (R14 Fusible PVC DIM DR14 (R14 Medwniml .k,rnl Fittings Mechanical hunt Flyy arm MexhlaniaaJame Fittings .SS0 Clans 359 Mechanical Taint Fi et SSB CIaw 351 Class 350 C-153 M1 Finings Urn -Flange Series 1400 Uni-Flange Series 1500 CiroWLesk One Bnlr Restrained lobs Fitting Megshig Series 1700 (for D1 Pipe) Megalug Sales 2000 Om PVC Pipe) Sigma One4.dc SI.C4 - 91.0 k0 Sigma Gne-Lnk SLCS4 - SLC512 Sigma One -Lek SLCE &ma One -Lek Tar nF Bulldog Synem ( Diamond Ink 21 & TM M4eclumlal flint Fiuiegs PVC Stung ip Saia4000 DIP Sergrip Smias 30:0 EZ Grip Joint Restraint (EZD) Black For D/P EZ Grip Joint Restraint AID) Red for C900 DRI4 PVC Pipe wrp JULII A...r a.a,t+:.a+lattar ate wt.,! ASTM D1784 AWWA C900 AWWA C900 AW WA C900 AWWA C900 AWWA C900-16 UL 1 '/35 ANSI/NSF 61 FM 1632 AWWAC900 AW WA C900 AWWA C900 AWWAC900 AWWA C153& CI 10 AWWAC 110 AWWAC 153,C110,C111 AWWAC 153.0 110.0 112 AWWA C153 AWWAC11.I/C153 AWWA C111/C453 AWWA CIIl/C116FC153 AWWAC111/C116/C153 AWWA CII UCI161C153 AWWA CIII/C153 AWWA CI11/CI53 AWWA CI II/C 153 AWWA CI 53 ASTM F-I624 AWWA C153 ASTM A536 AWWA C 111 ASTM A536 AWWA C111 ASTMA536 AWWA C111 ASTM A536 AWWA CI I ASTM A536 AWWA C I11 Series 2500 Drawing 494-2&247 Saris 2530 sad Serifs 2536 AWWA C515 Series 2520&2524 (SD94-20255) AWWAC515 Scrim 2316 (5D 94-202471 AWWAC515 Senn 2500(D:w le km) AWWA C515 42' sod 48' AFC 2500 AWWA C515 American AVK Resilient Seeded GV AWWA C509 Series A2361(SD6647) AWWA 1n515 Series A2360lea 18'-24' (SO 67991 AWWA CS 15 Mueller 30" & 36'. C-515 AWWA WA C515 Mueller 42' & 48', C-515 AWWA C515 AWWA C509 16• RSOV (SD 13-20995) AWWA C515 Clow RW Vo€vo(SDE•21652) AWWA CSI5 Clow 30' & 36• C-515 AWWA C515 Clem Valve Model 2638 AWWA C515 AWWA C 509, A?LA 420- rem, a truate1250. reau:eeirras SPL 474 62 Fla.Mtsrcr sea Vdae A Deco 5.45Z A W WAVAh1S1 C 115/An21.15 4'-12• 4"-12- 16.24' 4•-12- 16•-24" 4'-28' 16'-24' a.-8' i6• -24' 4•-12' 4'- i2• 4•-13- 4'in36 4' to 24' 4' In 12' 4' to42' eta 24' 4• to10• 4' to 12• 12'lo7A' 4.-24. 4• to12' 4' M 24' 3"-48- 4--12- 16-24' 16' 30' and 36 20• and 24' 16• 4'to Ir 42" and 48' 4' to 12• 20" and smaller a - 12' a - 4' - 12' 16' 24' and mallet 30' mid 36 42'and 48' 4' - 16' 24' and smaller 30' and 36 (Nag 3) 24' b48' 3) a- - 3"to 16' 4'us16 • From Original Standard Products List FORT WORTH, CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer .,- la r r than 15 inch diameter shall be . !. -d for use by the Water Department on a nro. . -. n`flc basis. • - cial bed& t ay i - c dr f pi • • • 1/I1/99 06/12/03 04/06/07 03/19/IR 05/1N05 05/12/05 05/12A75 03107/23 10/21/20 04/0921 04/09r21 Water - ' dvm & Fittiue?/Rubber Seatral Butte E1-30 Rubber Seated Butterfly Valve E1-30 Rubber SeatedEuaafv Valve E1-30 Rubber Sewed Butta1b Valve Et-30 Velmatm American Butterfly Valve E1-30 Rubber Seated Butterfly Valve 33 12 21 Rubber Seated Bunerth• Valve Water - Pelvetil lone E *tc.N-t 1-10 tNl nil E1-13 Polyethylene EOcamtmt E1-13 Polvah%lene Enasaent E1-13 Fob/ethylene tncavneat 33-11-I1 }biretta/lent Easement 3gter - Samo1 p2 Statio0( 33 12 50 lwater Sampling Station Water - Automatic Flach_er Automated Flushing S\stan Automated Flushing System Automated Flushing System Valve 33-12-21 (07/10/141 - —_ Timis Prau Co. Muller Co. Derma Valles Co. VaImwie Valve and Manufadam2 Can M&H Valve G. A. Industries (Golden Andaman) AWWA C-504 AWWA C-504 AWWA C-504 Valmatic American BuaaBv Vann. AWWA C-504 M&H Sole 4500 & 1450 AWWA C-504 AWWA C5O4 Butterty Valve AWWA C-504 Flexed Par -basting Fulton Enterprises AVa'WA C105 Mumtain 57atea Plarucs (MSP) and AEP Ind Standard Hardware AWWA C105 AEP Industnes 0uilatmna by Cowman Bolt & Gasbat AWWA C I05 iwrthtoun Products lnc. PE Ernuvmtmc for DIP AWWA C 105 Eeliose 'Number &&. I2-mch Depth of I3un• Mueller Kupferk Foundry rnomany Kupfak Foundry Company HG2-A-IN--2-PVC.0I B-I.PLG(Pamanrntl Eclipse09300wc Eclipse 99700 (Portable) As shown Is epee. 3312 50 24' 1 24'and smaller ' 24' and laraee 1 UP to 34' diameter 24'to45 1 30'-54- 1 &mil LLD B mil LLD &and LLD &mil LLD 1 1 1 i1 1 • From Original Standard Products List 6 FORT WORTH CITY OF FORT WORTH TRANSPORTATiON/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 04/0I/2023 %ipi• iul Spry NO, I. Ia.ailication Cotacrele 9/9/2022 -03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 919/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 033000 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 3000 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 03 34 16 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 3000 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 Mix Design Mix Desifai Mix Design Mix Design Mix Desiies Mix Design Mix Design Mix Design Mix De* Mix Design Mix Design Mix Design Mix Desitm Mix Design Mix Design Mix Des o Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Destpri Mix Design Mix Design Mix DesOn Mix Design Mix Design Mix Design Mix Design Mix Design Mix Des Mix Design Mix Design Mix Design Mix Desi�tn Mix Design Mix Desiign Mix Desr Mix Desoo Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design y Lniulacnn rr American Concrete Company American Concrete Company American Concrete Company American Concrete Company Argos Argos Argos Argos Argos Argos os Argos Argos Argos Argos Argos Argos os Argos Argos Argos Argos Afg°3 Big D Concrete Big D Concrete Big,Jown Concrete Big Town Concrete Bunco Texas Bianco Texas Bunco Texas Bumco Texas Burnco Texas Bumco Texas Branco Texas Bianco Texas Bumoo Texas Birrxw Texas Bianco Texas Carder Concrete Carder Concrete Carder Concrete Carder Concrete Carder Concrete Carder Concrete Carder Concrete Carder Concrete Charley's Concrete Charley's Concrete Charley's Concrete Charley's Concrete Charley's Concrete Charley's Concrete Charley's Concrete Charley's Concrete Charley's Concrete Charley's Concrete Charley's Concrete Charley's Concrete Chisholm Trail Redi Mix City Concrete Company NI,, ki \ 30CAF029 3000 psi Concrete for Sidewalks & ADA ramp OIJAF382 1000 psi Concrete Base Material for Trench Repair 40C13F065 4000 eV Concrete for Manholes & Utility Structures 45CAF076 4500 oft Concrete for Hand Placed Paving D10000001737 4500 psi Concrete for Hand Placed Paving D10000001791 4500 psi Concrete for Hand Placed Paving D10000001793 4500 psi Concrete for Hand Placed Palm D10000001 103 4500 psi Concrete for Hand Placed Paving D10000002107 4500 psi Concrete For Hand Placed Paving D10000001273 4500 psi Concrete for Hand Placed Paving DI0000001617 3600 psi Concrete for Machine Placed Paving D10000008381 4500 psi Concrete for HES Paving DI0000009857 50ppsi Flowable Fill - CLSM D10000001055 3060 psi Concrete for Inlets, Junction Boxes, Manholes, amine! Liners, Sidewalks, Driveways, Curb & Gutter DI000001043S 3000 psi Concrete for Sidewalks, Curbs D 1000001565S 3000 psi Concrete for Curbs, Curb & Gutters. Sidewalks, Driveways, ADA Ramps D1000001615 3600 psi Concrete for Inlets, Boxes, Encasement, Bloch D10000001061 3600 psi Concrete fax rule Boxe Encasement, Bloc D10000001083S 4006 psi Concrete for Valve lets, Structures, Heodwalls, Thrust Blocking D I 0000001083 4000 psi Concrete for Valve Pads, Inlets. Structures, Headwalls, Thrust Blocking D10000001685 4000 psi Concrete for Valve Pads D10000005751 750 Psi Concrete Base for Trench Repsir D100000016814000 psi Concrete for Headwalls. Retaining Walls, Box Culverts, Valley Gutters 7SKGRT 3000 psi Concrete for Grouting t4500AE 4500 psi Concrete for High Early Strength Paving 452065-1 4500 psi hand placed palm 450065-1 4500psi hand placed ppppvp 45U500BG 4560at psi Concrete hiix for Hand Placed Paving, Storm Structures 40U553BG 4000 psi Concrete Mix for Machine Placed Paving 55U120AG 4000 psi Concrete Mix for Hijgh Early Strength Paving 30U100AG 3000 pa, Concrete Mix for Pipe Collars, Wets, Theist Blocks, Sidewalks, ADA Ramps 30UI OIAG 3000 psi Concrete Mix fax F(atwork 30U500BG 3000 psisiConcrete Mix for Blocking, Driveways, Curb & Gutters, Sidewalks, ADA Ramps 40U500BG 4000 psi Concrete Mix for Stone Drain Stnuceures, Driveways. Screen Walls 36U500BG 3600 psi Concrete Mix far Ligkting and TraiJ•ic Signal Foundations 08Y450BA 800 psi Concrete Mix for Base for Trench Repair 01 Y690BF 100 Concrete Mix fax Plowable Fill I OYH50BF 1000ppsi Concrete Base Material for Trench Repair FWCC602021 4500 psi concrete for Hand Placed Paving FWCCS52091 3600 psi for Machine Placed Paving FWCC602091 3600 psi for Machine Placed Paving FWCC359101 Plowable Fill - CLSM FWFF237501 Plowable Fill - CLSM FWCC602001 4000 psi Concrete for Storm Drain Structures, Manholes, Headwalls, Retaining Walls, Valley Gutters, Drive Approaches FWCC502021 3500 psi concrete for Sidewalks, Driveway Ramp Curb & Gutter FWCCS02001 3000 psi fax Sidewalks, Driveways, Romps, it Cnater, Firework 4142 3600 psi Concrete for Curb Wets, Junction Boxes 4518 4000 psi Concrete for Headwalls Wingsvails 5167 3600 psi Concrete Mix for Machine Placed Paviap 4609 4500 psi Concrete Mix for Hand Placed Paving, Manholes 6103 4500 psi Concrete Mix for Hand Plucod Paving, Manholes 4502 3000 psi Concrete Mix for Sidewalks 3759 3000 psi Concrete Mix for Sidewalks 1502 150 pfi Concrete for Plowable Fill-CLSM 1518 150 Ps. Concrete for Plowable Fi1ICLSM 5642 4000 psi Concrete for Storm Drain Structures 6595 5000 pep Concrete Mix for H Fatly � Paving 6589 4500 ii Concrete Mix for Hi arty Paving C13020AE Wd00 psi Concrete for Driveways. Curb & Gutter 11-350-FF 50-150 psi Concrete for Plowable Fill-CLSM N.iliueul ]per FORT WORTH CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 04/01/2023 %pprni at spec \n. f Lu.I I]c.ninn 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 Concrete (Costieuedl 033000 03 30 00 033000 033000 033000 03 30 00 033000 03 30 00 11/16/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 34 13 9/9/2022 03 34 13 9/9/2022 03 34 13 9/9/2022 03 34 13 9/9/2022 03 30 00 9/9/2022 033000 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 033000 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9P2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 1 I /14/2022 32 13 13 9/9/2022 33 13 13 919/2022 341313 9/9/2022 35 13 13 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 1/18/2023 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 CO 9/9/2022 03 30 00 9/912022 03 30 00 9/9/2022 03 30 00 9/912022 03 30 00 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 Mix Design Mix Design Mix Deiloo Mix Design Mix Design Mix Design Mix Design Mix Design MiK Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Desip Mix Design Mix Design Mix Design Mix Desrgn Mix Design Mix Design Mix Design Mix Design Mix Design Mix Desnfgn Mix Design Mix Dela) Mix Design Mix Design Mix Desjipn Mix Design Mix Despi Mix Design Mix Desipta Mix Desr Mix Desup Mix Design Mix Design Mix Design Mix Design Mix Des* Mix Desk Mix Design Mix Desin Mix Design Mix Design Mix Den Mix Design Mix Design Mix Design Mix Design Mix Desifin Mix Design Mix Delia.' mix Deep] Mix Design Mix Design Mix Design 51.1n1L,cluni City Concrete Company Cy Concrete Compmry Crty Concrete Company Cup Concrete Company City Concrete Company Op Concrete Company City Concrete Company City Concrete Company City Concrete Company Cow Town Redi Mnx Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Rani Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Rani Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Caw Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Roth Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix Cow Town Redi Mix GCH Concrete Services GCH Concrete Services GCH Concrete Services Ingram Concrete & Aggregates Ingram Concrete & Aggregates Ingram Concrete & Aggregates Ingram Concrete & Aggregates Ingram Concrete & Aggregates Ingram Concrete & Aggregates Ingram Concrete & Aggregates Ingram Concrete & Aggregates Ingram Concrete & Aggregates Ingram Concrete & Aggregates Holcim - SOP, Inc. Holcim - SOR. Inc. t1.1111.1 N,,. 30HA25113000 psi Concrete for Rip -Rap 30HA20113000 psi Concrete Mix for Blacks]& Sidewalks, Flatwork, Pads 45NG25113600 o Concrete Mix for Drilled Shafts 500025113600 psi Slum Diplaced Drilled Shall 45NA2011 4500 psi Concrete \fix for Hand Placed Paving 36LA2011 3600 psi Concrete Mix for Machine Placed Paying 36JA001 J 3600 psi Concrete Mix for Machine Placed Paving 40LA2011 4000 psi Concrete Mix for Storm Drain Structures CLNG25I13600 psi conget fft\Drilled Shaft 2503000 psi Concrete Mix for Sidewalks. Driveways. ADAs 3503000 psi Concrete Mix for Sidewalks. Driveways. ADA Linos 9 70 psi Plowable Fill - CLSM 9-5-2 70 psi Plowable Fill - CLSM 220-8 50 t Concrete Mix for Flowabk Fill - CLSM 320•8 50 psi Concrete Mix for Plowable Fill - CLSM 230-8 750 psi Concrete Base Material for Trench Repair 330-SS 756 psi Concrete Base Material for Trench Repair 353 3000 psi Concrete Mix for Sidewalks. ADA Ramps, Daveways`Curb & Gutter, Safety End Treatments,. Non-TxDOT Reiainin$Walls 253-W 3000 pfi Concrete Mix Sidewalks,ADA Ramps, Driveways, Curb & Gutter, Safety End Treatments. Non-TxDOT Retaining Walls 260 4000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls 260-1 3600 psi Concrete Mix for Headwalls 260-2 3600 pit Concrete Mix for Box Clverts. Headwalls 3604000 psi Concrete Mix for Bridge Slabs, Box Culverts, Headwalls 360-1 3600 pas Concrete Mix for Box Cndverts, Headwalls, Wingwalls 264-N 4500 psi Concrete Mix for Hand Placed Paving 3664500 psi Concrete Mix for Hand Placed Paving 265 4500 psi Concrete Mix for Hand Placed Paving 365 4500 psi Concrete Mix for Hand Placed Paving 370-NC 4500 psi Concrete for HES Pavit}y 370-INC 5000 Qsi Concrete for HES Paving 375-NC 5030 psi Concrete for HES Paving 267 4200 ps Concrete Mix for Manholes and Drainage Structures 270 5000 psi Concrete Mix for Cast -in -Place Box Culverts 370 5000 psi Concrete Mix for Cast -in -Place Box Culverts 255-2 3000 i Concrete Mix for Ink% Thrust Blocking, Concrete Encasement 257 3600 psi Concrete mix for Valley Gutters 357-M 3600 psi Concrete Mix for Machine Placed Paving 257-M 3600 psi Concrete Mix for Machine Placed Paving 260-M 4000 psi Concrete Mix for Machine Placed Paving 360-M 4000 psi Concrete Mix for Machine Placed Paving 255-LP 3000 psi Concrete Mix for Curb & Gutter 355-LP 3000 psi Concrete Mix for Curb & Gutter 255 3500 psi Concrete Mix for Flatwodc, inlet: Thirst Blocking Concrete Encasement 355 3000 psi Concrete Mix for Inlets, Thrust Blocking, Concrete Edent 365-STX 4000 psi Concrete for Brtop slabs of direct ua i1i'c culverts, approach slabs 3573600psi Concrete Mix for Valley tutters 380-NC 4500 psi Concrete for HES Paving GCH4000 4000 pi Concrete for for Sidewalks, Ramps, Headwalls, Inlets, and Storni Drain Structures GCHVS 4000 psi Concrete for Machine Placed Paving GCH4500 4500 psi Concrete Hand Placed Pavins C47PV5E5 3000 psi Concrete for Sidewalks, ADA Rmnpp 2MWR-70J23504 3000 psi Concrete for Sidewalks, ADA Ramps 2MWR-I479W5D5 3006 psi Concrete Mix for Sidewalks. ADA Ramps 2MW R-056PS5D5 4000 psi Concrete Machine Placed Paving 2MWR-I61UV5DM 4506 osi Concrete for Hand Placed Paving 2MWR-10MQS50N 4500 psi Concrete for Hand Placed Paving 16IPS5EM 4500 psi Concrete for Hand Placed Paving C47PV5E5 3000 psi Concrete Mix for Sidewalks. ADA Ramos 10LQS50N 3,\600 poi Concrete for Light Pole Bases 16IPSSEM 4300 psi Concrete Mix for Hand Placed Paving 1551 3000 pip Concrete Mix for Blocking 5177 3000 psi Concrete Mix for Sidewalks %.u1,1 11 . 1!r, FORT WORTH CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LiST AS OF 04/01/2023 thl,imnl Spec A[i l I.,.a 6,,1ai•ni Coacrete(Contioaed 9/9/2022 '03 30 00 "Mix I ' 9/9/2022 4 3000 Mix Dear 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Deslpn 9/9/2022 03 30 CO Mix Dean 12/15/2022 3 30 00 Mix Design 9/9/2022 04 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/912022 03 30 00 Mix Design 12/5/2022 4 30 00 Mix DesOin 9/9/2022 03 30 00 Mix Design 03 30 CO Mix Dey`gq 03 30 00 Mix Design 1/24/2023 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 4/9/2022 03 30 00 Mix Desk 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design q/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Desi,+tta 9/9/2022 03 30 00 Mix Design 9/9/2022 03 3000 Mix Desityn 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Desr 9/9/2022 03 3000 Mix Design 9/9/2022 03 34 13 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Desr 9/9/2022 03 30 00 Mix Desy 9/9/2022 03 30 00 Mix Desi�n 9/9/2022 03 30 00 Mix Destro) 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 11 /2/2022 3213 13 Mix Desjiop 11 /2/2022 32 13 13 Mix Desir n I1 /2/2022 32 13 13 Mix Desir 11/15/2022 33 13 13 Mix Delp 11/15/2022 34 13 13 Mix Destin 11/2/2022 3213 13 Mix Despot 11 /2/2022 32 13 13 Mix Destpn 11/2/2022 32 13 13 Mix Design 11/2/2022 3213 13 Mot Design 11/2/2022 32 13 13 Mix Deslygo 9/9/2022 03 30 00 Mix Desj i 9/9/2022 03 30 00 Mix Delp 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Design 9/9/2022 03 30 00 Mix Desjip 9/9/2022 03 30 00 Mix Design 32 13 20 Mon Design 03 30 00 Mix Desp 9/9/2022 03 30 00 Mix Design 03 30 00 Mix Design 3 3000 Mix Design \lomi hieturrr \I!,J, I \.. ',itiuu.al Ilia. -Holcim - SOft, inc. Holcim - SOLI, Inc. Holcim - SOP., Inc. Holcim - SO(1, Inc. Holcim - SO inc. Holcim - SOR, inc. Holcim - 5011, inc. Holcim - SO , inc. Holcim - SO , inc Holcim - SO inc. Holcim - SO Inc. Ljipuid Stone Llppid Stone kV Stone Martin Marietta Marlin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Manor Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martial Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Mama Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta Martin Marietta NCS Redi Mix Martin Marietta Martin Marietta ' 1261 3000 pet Concrete Mix for Sidewalks 2125 4500 pal Concrete for HES Pavio 1701 4000 past Concrete Mix for Storm brain Structures, Sanitary Sewer Manholes, Junction Box 5409 4000 psi Concrete Mix for Sidewalks, Inlets 5507 4500 Ti Concrete Mix for Hand Placed Paving 3741 100 Psi concrete for flowable fi1liCSLM 5017 200 psi Concrete for Base Material for Trench Repair 9600 3600 psi Concrete for Drill Shafts 1851 4500 N Concrete (or §liginDram Strictures, Hand Placed Paving 1822 3600 psi Concrete tor II ed Shells 1859 4000 psi Concrete for Drilled Shags C30I D 3 000 psi Coilirete for $I �s, Aa oaches, and Driveways. C361 DHk 3/,600 ijsi Concrete for L I Pole noses. C45lDHR-A 45OOpyj Concrete for S Pooling R2131014 3000 psi oncrete for Sidewalks & Ramps R2I32214 3,1000 psi Concrete for Sidewalks & Ramps 906C 3`000,51 Concrete for Sidewalks & tamps 2131214 3,0\00-0� psi Concrete for Sidewalks & Llamas l2131314 3,000 o Coicrele for Sidewalks & Ramps R2136014 3,000 psi/Concrete fyr §i0ewalp & Lips R2136214 3,000 psi Concrete Inc Sidewalks &Rnmps R2141224 4,000 psi Concrete for Sidewalks & Ramps R2141024 4,000 psi Concrete for Sidewalks & Ramps 3622A 3,600 pet Concrete for Curb Inlets 141233 3,600 p6` Concr forStark Structures, Inlets, Blocking & Encasement W25A 30 nart oocrete for Plowable Fi1UCLSM R2142233 3,600 pii' Concrete for Manholes, Wets & Headwalls R2146333 3,600 neat Concrete for Manholes, Inlets & HeadwallssConcrete Encasement R21412304,000 psi Concrete for Manholes, Inlets & Headwd , Valve Pads R2146035 4.000 psi Concrete for Manbolys, Inlets & Headwalls. Valve Pads R2146335 4,500 pm Concrete for Hand Placed Pavi y, Inlets, Storm Drain Structures R2146034 44500 'tConcrete for Manholes, Wets & Headwalls Hand Placed Paving R214123 4,CM psi Concrete for Ws ,{1,ijplQ� Headwalls R2t41231 4,000 psi Concrete for I lets, Sidew R2161070 6 000 i 3,000 (u) 24-hrs.Eg i Concrete for HES Paving D9492SFC 4,000 it Concrete for Machine Placed Paving R2t46233 4�01,1 psi Concrete for Hand Placed Paving R2146238 4.300 psi Concrete for Hand Placed Parma, Inlets, Storm Drain Structures R2146336 4,500 psi Concrete for Hand Placed Paa(Ipg R2146235 4,500yts`Concrete for Hand Placed Paving Q2141N27 4,006 ps, Concrete for Machine Placed paving Rrh2141K30 4,000 psi Concrete for Machine Placed Paving 146N36 4� p, Concrete for Hand Placed Paving R2t46K36 4,500 psi Concrete for Hand Placed Paving R2146P36 4,500 psi Concrete for Hand Placed Pavia R2t46K36 4,500psi Concrete for Hand Placed Pavtu R2I46N35 / 6_ I I sacks / 4,500 psi coperiti for Hand Place Paving_ Inlets, Manholes, Headwalls 112146K344,000 psi Canccele for inlets, Manholes, Headwalls R214IN244/,000 ps, Concrete for Sidewalks and Ramps R2141 K24 4,0001 1 Concrete for Sidewalks and Ranlyg R2146038 4,00,0,1, Concrete for Inlets, Storm Drain Structures R2146036 4,30 psi Concrete for Hand Placed Paving, Wets R2146042 4 9 Concrete for Hand Placed Palm R2146242 / t i psi Concrete for Hand Placed paving R2146236 4,500 pill Concrete for Hand Placed Paving D9493SC 4I� osi Concrete for Hand Placed Paving R2147241 4,500 psi Concrete for Hand Placed Paring R2136N 14 / 5.00 sacks / 3/000 psi concrete for Sidewalks R2146P33 / 6.01 sacks / 4.000 psj cgnc for tridee Deck NCS5020A 3000 phi Concrete Mix for Curb & Gutter. Driveways. Sidewalks 31 OLBP 3,600 pen Concrete for Retaining Walls R2141030 4,000 psi Concrete for Rimy FORT WORTH., CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 04i01/2023 Concrefe(Con limed) 3 30 00 Mix Design Martin Marietta 9/9/2022 03 3000 Mix Design NCS Redi Mix 9/9/2022 03 3000 Mix Des n NBR Ready Mix 9/9/2022 03 3000 Mix Design NBR Ready Mix 1/24/2023 03 30 00 Mix Design Rapid Redi Mix 1/24/2023 03 3000 Mix Design Rapid Redi Mix 1/18/2023 03 30 00 Mix Design Rapid Redi Mix 1/18/2023 03 30 00 Mix Design Rapid Redi Mix 1/18/2023 03 3000 Mix Desiwr Rapid Red'. Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 3413 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 133 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/29/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 919/2022 03 30 00 Mix Design Redi-Mix 9/29/2022 03 3000 Mix Design Redi-Mix 9/9/2022 03 30 CO Mix Design Redi-Mix 919/2022 03 34 13 Mix Design Redi-Mix 9/9/2022 03 34 13 Mix Desii pr Redi-Mix 9/9/2022 03 34 13 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 919/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Desjp Redi-Mix 9/9/2022 03 3000 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 30 00 Mix Design Redi-Mix 9/9/2022 03 3000 Mix Design Redi-Mix 11/2/2022 03 3000 Mix Design Redi-Mix 12/5/2022 03 3000 Mix Design Redi-Mix 12/5/2022 03 3000 Mix Design Redi-Mix 12/5/2022 03 3000 Mix Design Redi-Mix 9/9/2022 03 3413 Mix Des SRM Concrete 9/9/2022 03 34 13 Mix Design SRM Concrete 9/9/2022 03 3000 Mix Design SRAM Concrete 9/9/2022 03 30 00 Mix Design SRM Concrete 9/9/2022 03 30 00 Mix Design SRM Concrete 9/9/2022 03 3000 Mix Design SRM Concrete 9/9/2022 03 30 00 Mix Design SRM Concrete 10/10/2022 03 3000 Mix Design SRM Concrete 10/10,2022 03 3000 Mix Design SRM Concrete 9/9/2022 03 30 0D Mix Design SRM Concrete 9/9/2022 03 30 00 Mix Design SRM Concrete 2/10/2023 03 30 00 Mix Design SRM Concrete 1/13/2023 32 13 13 Mix Design SRM Concrete 9/912022 03 30 00 Mix Design Tarrant Concrete 9/9/2022 03 30 00 Mix Design Tarrant Concrete 9/9/2022 03 30 00 Mix Design Tarrant Concrete 9/9/2022 03 30 00 Mix Design Tarrant Concrete 9/9/2022 03 30 00 Mix Design Tarrant Concrete 9/9/2022 03 30 00 Mix Design Tarrant Concrete 9/9/2022 03 30 00 Mix Design Tarrant Concrete 10/10/2022 03 30 00 Mix Design Tarrant Concrete 9/9/2022 03 34 13 Mix Design Torrent Concrete 9/9/2022 03 34 13 Mix Design Tarrant Concrete R2146033 4,000 psi Concrete for Riprap NCS6020AHP 4500 psi Concrete Mix for Valley Gutters. Hand Placed Paving TX C-YY 3000 psi Concrete Mix for Curb Inlets TX C-NY 3000 psi Concrete Mix for Curb Inlets RRM6320AHP 4500 osi Concrete for Hand Placed Paving RRM5525A 3600 psi Concrete for VallyyGutters, Sidewalks, Approaches, ADA Ramps RRM6020ASS 4000 psi Concrete for Strom Drain Structures RRM5320A 3000 psi Concrete for Blocking RRM5020A 3000 psi Concrete for Curb, Gutter, Driveways, Sidewalk. Ramps DCA2ES54 3000 Concrete Mix for Rip R VOJ 11524 3000r Concrete Mix for Curb &&utter FOC 10021 215 psi Flowable Fill • CLSM 10111524 3000 psi Concrete Mix for Driveways, Sidewalks, ADA Ramps 10111504 3000 psi Concrete Mix for Sidewalks 101.11504 3,600psi Concrete Mix for Sidewalks, Curb & Gutter IOLI 1524 3600 psi Concrete Mix Manholes, Inlets, Jtmetion Boxes, Headwalls 1 RJ11524 3500 psi Concrete Mix for Thrust Blocks, Valve Pads 10121524 4000 psi Concrete Mix for Manholes 15611524 4000 psi Concrete Mix for Cast -in -Place Storm Drain Structures I OM 15E4 3600 osi Concrete Mix for Bridge substructures DCC2G5E2 3600 psi Concrete Mix for Drilled Shafts DC111 G5E2 3600 psi Underwater Drilled Shafts 156115D4 4000 psi Bridge Slabs F35238VN 100 osi Plowable Fill - CLSM F00138V M 100 psi Flowable Fill - CLSM 10/11554 3000 osi Concrete Mix for Rip -Rap POGI38K9 1000 psi Concrete Mix For Trench Repair Base Material 10K11524 3600 psi Concrete Mix for Encasement ION 11507 4500 psi (2600 psi (u) 24 firs) Concrete Mix for HES Paving , 10N11504 5000 osi (3600 psi a 2 days) Concrete Mix for HES Paving 50K11524 3600 psi Concrete Mix for Machine Placed Paving IOMI I5D4 4500 psi Concrete Mix for Hand Placed Paving. Storm Drain Structures 101v111524 4500 psi Concrete Mix for Hand Placed Paving 10M115044500 psi Concrete Mix for Hand Placed Paving 145CD5P4 4500 psi Concrete Mix for Hand Placed Paving, Storm Drain Structures 145P25P4 4500 psi Concrete for Storm Drain Stnctures (0KI 15C4 3500 psi Concrete for Thrust Blocks, Valve Pads 156115C4 4000 psi Concrete for CiP Storm Drain Structures LOU 15C4 3600 psi Concrete for Manhole, Inlet, Junction Box, Headwall 30000 3,000 psi Concrete for Sidewalks and Ramps. Curb & Gutter 40050 4,000 psi Concrete for Headwalls, Retaining Wall 35023 3,600 psi Concrete for Machine Plaood Paving 40068 3,600 psi Concrete for Machine Placed Paving 45000 4,500 psi Concrete for Hand Placed Paving 45300 4,500 psi Concrete for Hand Placed Paving 40326 4,500 (3,00 Q, 3-days) psi Concrete for HES Paving 35000 3600 psi Concrete for Sewer Manholes 35300 3600 psi Concrete for Swere Manholes 35022 3,600 psi Concrete for Junction Box 30050 3,000 psi Concrete for Sidewalks, Ramps, 'mots, Junction Boxes, Thrust Blocks, Curb and Cutter. Driveways. Barrier Ramo 50310 5,000 psli Concrete for HES Paving 45023 4.500 psi Concrete for Hand Placed Paving FW6020AHP 4500 itsi Concrete Mix for Hand Placed Paving_ FW60AHP 4500 psi Concrete Mix for Hand Placed Pevi�%% TCFW6020AHP 4500 psi Concrete Mix for Hand Placed Paving FW7520AMR 4500 (3000 psi () 3-days) psi Concrete HES Paving FW6520AMR 4500 (3000 psi (a 3-days) Rsi HES Paving FW5520AMP 3600 psi Concrete for Machine Placed Paving_ FW5320A 3000 psi Concrete Mix for Blocki 1 TCFW602SA2 4000 psi Concrete for Manholes FWFF150CLSM 50-150 psi Flowable Fill - CLSM FWFF275 50-150 psi Flowable Fill - CLSM Fo RT WORTH CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 04/01/2023 Spr,. ,. i 1:1,,111,ui,1 Contras Continued] 9/9/2022 03 30 05 I Mix Design 10/10/2022 03 30 00 Mix Design 9/9/2022 03 30 CO Mix Design 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/912022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 03 30 00 9/9/2022 919/2022 919/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/'2022 9/9/2022 11/26/2022 12/5/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 Mix Design Mix Design Mix Design Mix Design Mix Des0 Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Mix Design Asphalt Paving 32 12 16 I Mix Design 32 12 16 IMix Design 32 12 16 I Mix Design 32 12 16 IMix Design 32 12 16 IMixDesin 32 12 16 Mix Design 32 12 16 Mix Design 32 1216 Mix Design 32 1216 Mix Desi n 32 1216 Mix Dear 33 1216 Mix Design 32 12 16 Mix Design 32 1216 Mix Design 32 12 16 Mix Design 32 12 16 Mix Design 32 1216 Mix Design 32 12 16 Mix Design 32 12 16 Mix Design 32 12 16 Mot Design 32 12 16 Mix Design Detectable Warning. Surface 9/9/2022 32 13 20 DVS Pavers 9/9/2022 32 13 20 DWS - Pavers 9/9/2022 3213 20 DWS - Composite 9/9/2022 32 13 20 DWS - Composite 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9l2022 9/9/2022 Silicone Joint Sealant 32 13 73 32 13 73 32 13 73 32 13 73 Joint Sealant Joint Sealant Joint Sealant Joint Sealant Utilitx Trench Embedment Sand 33 05 10 Embedment Saixl 33 05 10 Embedment Sand 33 05 10 Embedment Sand 33 05 1.0 Embedment Sand 33 05 10 Embedment Sand �I:nw Jar wrri Tarrant Concrete Tarrant Concrete Tarrant Concrete Titan Ready Mix Tarrant Concrete Tarrant Concrete Titan Ready Mix True Grit Redi Mix True Grit Redi Mix True Grit Audi Mix Taste Grit Redi Mix True Grit Redi Mix Taste Grit Redi Mix True Grit Redi Mix Wise Redi Mix Austin Asphalt Austin Asphalt Austin Asphalt Austin Asphalt Austin Asphalt Reynolds Asphalt Reynolds Asphalt Reynolds Asphalt Sunmount Paving Sunmount Paving Sunmount Paving Surmount Paving TXBIT TXBIT TXBIT TXBIT TXBIT TXBIT TXBIT TXBIT Pine Hall Brick (Winston Salem, NC) Western Brick Co, (Houston, TX) Engineered Plastics, Inc. (Williamsville, NY) ADA Solutions (Wilmington. MA) Dow Tremco Paola Crafco Silver Creek Materials Crouch Materials F and L Dirt Movers FandLDrtMovers Tin Top Martin Marietta \I „I1..I'.,, FW6020A2 4000 psi Concrete Mix for Storm Drain Structures TCFW5020A 3000 psi Concrete for Sidewalks FW5025A 3000 psi Concrete Mix for Curb & Gutter, Driveways, Sidewalks. ADA Ramps 3020AE 3000 psi Concrete for Sidewalks CP5020A 3000 psi Concrete Mix for Curb and Gutter FW5525A2 3600 psi Concrete Mix for Sidewalks, Drive Approaches, ADA Ramp TRC4520 4500 psi Concrete for Hand Placed Paving 0250.230 3000 psi Concrete Mix for Flatwork, Curb & Gutter, Driveways, Sidewalks, ADA Ramos 270.230 5000 psi Concrete for Hand Placed Paving 0250.2301 3000 psi Concret Mix for Curb & Gutter, Driveways, Sidewalks, ADA Ramps 0260.2302 4000 psi Concrete Mix for Machine Placed Paving 0255.2301 3600 psi Concrete Mix for Machine Placed Paving 0260.2301 4500 psi Concrete Mix for Hand Placed Paving 0265.2301 4500 psi Concrete Mix for Valley Gutters. Hand Placed Paving 3678 3600 psi Concrete Mix for Lighting and Traffic Signal Foundations FT5D137965 PG64.22 Type D Fine Surface DA5D135965 PG64-22 Type D Fine Surface FT5B117965 PG64-22 Type B Fine Base FT1B139965 PG64-22 Type B Fine Base F1113117.2 PG64-22 Type B Fine Base 1901 D PG64-22 Type D Fine Surface 1112B P(364-22 Type B Fine Base 1612B PG64.22 Type B Fine Base 341DV6422 PG64-22 Type D Fine Surface 340DV6422 PG64-22 Type D Fine Surface 3076BV6422 PG62-22 Tvpe B Fine Base 341-BR4P6422ERG P(364.22 Type B Fine Base 37-211305-20 PG64-22 Type B Fine Base 44-211305-17 PG64-22 Type B Fine Base 211305 1757) PG64-22 Type B Fine Base 222475 1857) PG64-22 Type D Fine Surface 29-222475-19 PG64-22 Type D Fine Surface 1-222475-20 PG64-22 Type D Fine Surface 64-224125.18 PG70.22 Type D Fine Surface 12-222475-19 PG64-22 Type D Fine Surface Tactile Pavers Detectable Warning Pavers Armor Tile Heritage Bnck CEP Composite Paver 890SL - Cold Applied. Sgt e Component, Silicone Joint Sealant 900SL • Cold Applied, Singe Cantnnmit, Silicone Joint Sealant 300SL • Cold Applied. Single Component, Silicone Joint Sealant RoadSaver Silicone - Cold Applied Single Component, Silicone Joint Sealant Utility Embedment Sand Utility Embedment Sand Utility Embedment Sand Utility Embedment Sand Utility Embedment Sand \atiuual Spec ASTM D5893 ASTM D5893 ASTM 135893 ASTM D5893 ASTM C33 ASTM C33 ASTM C33 ASTM C33 ASTM C33 FORT WORTH CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 04/OI/2023 1ppr,ral \prr\u. (T:usilir;it1+111 vl:wut:,euu'er 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 Frame`Corer and Grade Rings - Cast Iron*. for.Srurrnvurer SA -adores 33 05 13 Manhole Frames and Covers Neena Foundry 33 05 13 Manhole Frames and Covets Neena Foundry mcdcl \n, 32" Diameter Lifnnote Water Manhole Gasketed Frame and Cover wfLondrom LORD. Model. No. NF-1743LT66 32" Diameter Litlmate Sanitary Sewer Manhole Frame and Cover w/Lonahorn LOW, Model No. NF-1743LT69 33 05 13 32" Diameter Fort Worth Sanitary Sewer Manhole Frame and Cover, Item No. NF-2280 330513 Ergo XL Assembly 32" Diameter Sanitary Sewer Manhole Frame and Cover, Model No. 0014802IL010 33 05 13 32" Diameter Liftmate Storm Sewer Junction Box and Manhole Frame and Cover w/Lonahom Loco, Modal No. NF-1743LTXX 33 05 13 24" Diameter Lifhnate Storm Sewer Inlet Manhole Frame and Cover wfLoeahorn Logo, Model No, NF-1650LT61 330513 24" Diameter MHRC 01220605a" 3305 13 32' Diameter NF-1274-T91 330513 32" Diameter NF-1743-LM (Hinged) 33 0513 32.25" Diameter NF-1930-30 33 05 13 32" Diameter NF-1743-HV 33 05 13 24" Diameter 22795T** 32" Diameter 2280ST 32.25" Diameter EJ 1033 X2/A e*No ,.4 ! nen development and new installation manhole J6Jr .rho / meet the mlydmum 30"' Ming requirement ar alxrl9ied In Ciy Specification 33 05 U. Arty xnnrller<grening ."lrrx n!!!<mly be elln+eed for evicting mwrh,drr that require replmtin<eni frame. and cmxn Manhole Frames and Covers Manhole Frames and Covers Manhole Frames and Covers Manhole Frames and Covers Manhole Frames and Covers Manhole Cover Manhole Ffnmes and Covers Manhole Frame Manhole Frames nod Covers Manhole Frames and Covers 9/9/2022 33 05 13 Manhole Frames and Covers 9/9/2022 33 05 13 Manhole Frames and Covers SIP industries RICO Noma Foundry Neena Foundry AceuCast (Gooind Steel Company, Ltd). Neena Foundry Neena Foundry Neena Foundry Neena Foundry SIP Industries SIP Industries RICO Reinforced Concrete Storm Drain Pipe/Culverts 9/9/2022 33 41 10 Precast Box Cutvens 9/9/2022 33 41 10 Concrete Pipe Wyss and fiends 9/9/2022 33 49 10 Precast Bax Culverts 9/9/2022 33 49 10 Concrete Pipe 9/9/2022 33 41 10 Concrete Pipe Forlette Forterra Rinker Materials Rinker Materials Fortcnn Pal ortl rlere Storm Drain Pipe 9/9/2022 133 41. 13 'Polypropylene Pipe (Advanced Drainage Systems, Inc. 9/9/2022 9/9/2022 9/912022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/912022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 Storm Drain Manholes and Junction Boxes 33 49 10 Stacked Manhole 33 49 10 /urtction Box 33 49 10 Junction Box 33 49 10 Junction Box 3349L0 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Manhole 33 49 l0 Manhole Connector 33 49 10 !unction Box 33 49 10 Junction Box 33 49 10 Jonction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 4910 Junction Box 33 49 10 /unction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 4910 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box 33 49 10 Junction Box Mastic OLdcastk: Otdcaste Okdcnstle Oldcaste Okkrstle Okkastle Cowlown Redi Mix Rinker Materials Trelleborn Engineered Systems Forterra Forlerre Forterra Parterre Fatten Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Thompson Pipe Group Precast Box Culverts RCP Wve and Bends Rinker Materials Reinforced Concrete Box Culvert ASTM C789, C850 Rinker Materials Reinforced Concrete Pipe Tongue and Groove Joint Pioa ASTM C76, C655 Reinforced Concrete Pine - Toouue and Groove +D48 IHP Polypropylene Storm Drain Pine Precast 4' x 4' Stacked Manhole Precast 5' x 8' Storm Junction Box Precast 4' x 4' Storm Junction Box Precast 5' x 5' Storm Junction Box Precast 6' x 6 Storm Junction Box Precast 8' x 8' Storm Junction Box Base Precast 5' x 8' Storm function Box Base _ No. 260-2 6 Sack 3600 psi Concrete for Concrete Collars Rinker Materials Reinforced 48' Diameter Spread Fooling Manhole Kor-N-Seal 106/406 Series Pioe to Manhole Connector 4' x 4' FRT-4x4-409-PRECAST-BASE 5' x 5' FRT-5x5.409-PRECAST-TOP 5' x 5' FRT-5x5.409-PRECAST-BASE 6 x 6' FRT-6x6-409-PRECAST-TOP b' x 6' FRT-6x6.409-PRECAST-BASE 4'x 4' TPG-4x4-409-PRECAST TOP 4'x 4' TPG-4x4.409-PRECAST BASE 4'x 4' TPG-4x4-412-PRECAST 4-FT RISER 5'x 5' TPG-5x5-41 0-PRECAST TOP 5'x 5' TPG-5x5-410-PRECAST BASE 5'x S' TPG-5x5-412-PRECAST 5-FT RISER 6'x B TPG-6x6-4 1 L -PRECAST TOP 6'x 6 TPG-63(6-41 L-PRECAST BASE 6'x 6' TP0-6x6-412-PRECAST 6-FT RISER 7'x T TPG-7x7-4 1 1-PRECAST TOP 7'x 7 TPG-7x7-41 t -['RECAST BASE 7'x T TPG-7x7.412-PRECAST 4-FT RISER 8'x 8' TPG-8x8.41 L-PREC AST TOP 8'x8'TPG-8x8-41I-PRECAST BASE 8'x 8' TPG-Sx8-412-PRECAST 5-PT RISER \ri•n,.,l ASTM A48 AASHTO 4306 ASTM A48 AASHTO M306 A51'M A48 AASHTO M306 ASTM A48 AASHTO M306 ASTM A48 AASHTO M306 ASTM A48 AASHTO M306 ASTM 448 AASHTO M306 ASTM A48 AASHTO 14306 ASTM C789, C850 ASTM C76, C655 ASTM C478 ASTM C476 ASTM C478 ASTM C478 ASTM C478 ASTM C476 ASTM C476 ACI 318.14 ASTM C433 ASTM C923 ASTM C913 ASTM C913 ASTM C913 ASTM C913 ASTM C9I3 ASTM C615 ASTM C615 ASTM C61S ASTM C615 ASTM C615 ASTM C615 ASTM C615 ASTMC61S ASTM C615 ASTMC6IS ASTM C6] 5 ASTM C615 ASTM C615 ASTM C615 ASTM C615 FORT WORTH CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 04/01/2023 1pprut al Spec \n. f- lassi llcat ion 19/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 9/9/2022 torm Draio urb and Drop Islets 33 49 20 Curb Inlets 33 49 20 Curb Inlets 33 49 20 Cwb Inlets 33 49 20 Curb Inlets 33 49 20 Junction Box 33 49 20 Curb Inlet 33 49 20 Curb Inlet 33 49 20 Cwb Inlet 33 49 20 Drop Inlet 33 49 20 DrokInlet 33 49 20 Dropinlet \lane, 1.uiuiki Forterra Forterra Forterra Forterra Forterra Thompson Pipe Group Thompson PmGroup Thompson Pe Group Thompson lhpkGroun Thompson P) a Group Thompson Pipe Group \��. Nal tonal NpvC 10' x 3' FRT-10x3-405-PRECAST 10' x 3' FRT-10x3-406-PRECAST 10' x 4.5' FRT-10x4-407-PRECAST 10' x 4.5' FRT-10x4-420-PRECAST 4' x 4' FRT-4x4-409-PRECAST-TOP 10' x 3' TPG-I0x3-405-PRECAST INLET 15' x 3' TPG-15x3-405-PRECAST INLET 20' x 3' TPG-20X3.405-PRECAST INLET 4' x 4' TPG-4X4-408-PRECAST INLET 5' x 5' TPG-5X5.408-PRECAST INLET 6' x 6' TPG-6X6.408-PRECAST INLET ASTM C913 ASTM C913 ASTM C913 ASTM C913 ASTM C913 ASTM C6I5 !ASTM C615 ASTM C615 TM C615 ASTM C6I5 ASTM C615