Loading...
HomeMy WebLinkAboutContract 57394-CO3CSC No. 57394-CO3 FI. m-Wolt711, City of Fort Worth Change Order Request Project Name 1 2022 Downtown Resurfacing Project City Sec # 157394 Client Project #(s)l City Project Number 103452 Project Description Resurfacing of streets and curb ramp replacement in downtown at various locations. Contractor Peachtree Construction LTD. Change Order # 3 Date 2/27/2023 City Project Mgr. I Brendan McInnes, PE City Inspector Aaron Ybarra Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date TPW Totals Contract Time CD $5,147,570.84 $5,147,570.84 240 $156,398.00 $156,398.00 29 $77,325.00 $77,325.00 $0.00 $5,226,643.84 $5,226,643.84 269 Amount of Proposed Change Order -$74.25 -$74.25 0 Revised Contract Amount $5,226,569.59 Original Funds Available for Change Orders $79,084.00 Remaining Funds Available for this CO $11.00 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRA CT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $5,226,569.59 269 $79,084.00 $11.00 1.53% $6,434,463.55 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change order is necessary to adjust quantities on the project. Original project estimated pavement and ramp quantities and additional quantities of the items are needed to complete the project. Items are being removed that were not used to offset the project cost. Pavement markings are being placed as requested by traffic management on various street as well as TDLR inspection report. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ontractor's Com an Peachtree Construction, LTD ontractor J Barry Clark Date Apr 13, 2023 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date Apr 12, 2023 r/ Apr 12, 2023 Program Manager Date Senior Capital Project Officer Date r - Apr 13, 2023 ----1—,' Apr 13, 2023 Assistant Director (De@JWL Date Director, Contracting Department (Dept) Date l,' �OF-- Apr 14, 2023 -A—a-a- Apr 14, 2023 Assistant City Attorne Date Assistant City Manager Date PAW Apr 14, 2023 u 20z309 9Cp Apr 15, 2023 Council Action ao� Fonon M&C Number nr�°a ATTEST: pro pda Jannette Goodall, CitySecretary pau * p anynrFz 6gaga M&C Date Approved I OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX rna r TWeit t „ City of Fort Worth 7-^ Change Order Additions Project Name 2022 Downtown Resurfacing Project Icity secX 5�39d Client Proleclk City Project Number 1 D3452 Contactor Peachtree Consboclion LTD. PM Brentlan McInnes, PE Inspa"I Aaron Warta Change Order SubrAlal 4 O ale 212]I2023 ADDrrIONS 15.71 rrr - r ... -. 3213,0503 BARRIER FREE RAMP, TY PE M-1 3213,05N BARRIER FREE RAMP, �PE MI �.... � ....rrr e.. .. r- . •: �- . e :r r ...r .. a� '®:':':':' ���� 0 .. .. • .•s rrr •.- .: Change Order Additions Page 2 o1`4 TrtixrRI HH City of Fort Worth Change Order Deletions Project Name 2022 Downtown Resurfacing Project City Sec # 57394 Client Project # City Project Number 103452 Contractor Peachtree Construction LTD. PM Brendan McInnes, PE InspectorF Aaron Ybarra Change Order Submittal # O3 Date 2/27/2023 DELETIONS _(rlrlrI:AUUU1:699a:1��9:\11y�lyslCT_i.97:7y9e11:MENZYIQQQQ111w" rr r r r: r rr 00=8=- r rr Change Order Deletions Page 3 of 4 MISBE for this Change Order Previous Change Orders CO # DATE AMOUNT 1 10/5/2023 $79,083.57 2 1 /26/2023 -$11.00 Total $79,072.57 FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: 2022 Downtown Resurfacing Change Order No. 3 M&C: 22-0151 CPN: 103452 CSO: 57394 DOC#: 1 Date: To: Name Department Initials Date Out 1. Alexiz Ramirez - Bus. Support Partner TPW-copy N/A 2. J. Barry Clark - Contractor Contractor �`" Apr 13, 2023 3. Aaron Ybarra - Inspector TPW - sign AY— AY Apr 12, 2023 4. Brendan McInnes — Project Manager TPW - sign EL BLM Apr 12, 2023 5. Omar Elbagalati — Program Manger TPW - signer Apr 13, 2023 6. Leon Wilson — Interim Senior CPO TPW - sign Lu/ Apr 13, 2023 7. Michael Owen — Interim Asst. Director TPW — sign Apr 14, 2023 8. Lauren Prieur — Director TPW - sign A Apr 14, 2023 9. Doug Black Legal - sign ddwb Apr 14, 2023 10. William Johnson CMO - sign L Apr 15, 2023 11. Jannette Goodall CSO - sign 71 Apr 17, 2023 12. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts0foltwolthtexas. Aov, for pick up when completed; list "Please call Brendan �a ext # 2617 for questions. Thank you. "