HomeMy WebLinkAboutOrdinance 6734 ORDINANCE N4.----. ....._
AN ORDINANCE APPROVING AND ADOPTING ESTIMATES OF THE COST OF IMPROVE-
MENTS AND OF AMOUNTS TO BE ASSESSED FOR IMPROVEMENTS ON A PORTION OF
ALLEN-MA.DDOX CONNECTION
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE
CITY OF FORT WORTH, TEXAS; FIXING TIME AND PLACE FOR HEARING TO THE
OWNERS OF ABUTTING PROPERTY AND TO ALL OTHERS INTERESTED; DIRECTING
THE CITY SECRETARY TO GIVE NOTICE OF SUCH HEARING; AND DIRECTING THE
CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE
CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY COUNCIL AND BY FILLING
THE COMPLETE ORDINANCE IN THE APPROPRIATE ORDINANCE RECORDS OF THE
CITY; AND PROVIDING AN EFFECTIVE DATE.
WHEREAS, the City Council of the City of Fort Worth, Texas,, has heretofore ordered that each of the
hereinafter described portions of streets, avenues and public places in the City of Fort Worth, Texas, be im-
proved by raising, grading and filling same and by constructing thereon the following, to-wit:
UNIT 1: ALLEN-MA.DDOX CONNECTION From 135W to T & P Railroad, known and
designated as Unit 1, Project No. 061-
21304-4553, Phase V Echo, a seven-inch
thick hot-mix asphaltic concrete pavement
on a six-inch thick lime stabilized sub-
grade with seven-inch high concrete curb
and eighteen-inch wide concrete gutter,
four-foot wide concrete sidewalk and six-
inch thick concrete driveways where speci-
fied. The finished roadway will be sixty
feet wide from 1 35W to Stewart Street and
forty-four feet wide from Stewart Street to
T & P Railroad.
UNIT 2: ALLEN-MA.DDOX AVENUE CONNECTION From T & P Railroad to Riverside Drive, known
and designated as Unit 2, Project No. 061-21304-
4553, Phase V Echo, retaining existing seven-
inch thick hot-mix asphaltic concrete pavement
on a forty-four foot roadway, and by realign-
ing and reconstructing existing seven-inch -
high concrete curb and eighteen-inch wide
concrete gutter, four-foot wide concrete side-
walks and six-inch thick concrete driveways
where specified.
together with concrete curbs, gutters, driveways and incidentals to such i mprov eme tits
on proper grade and line where same are not already so constructed, together with storm
sewers and drains and other necessary incidentals and appurtenances; all of said im-
provements to be constructed as and where showin on the Plans and in st,rict accordance
with the Plans and Specifications therefor; contract therefore has been maide arx]
entered into with TEXAS BITULITHIC COMPANY
and
WHEREAS, the City Council of the City of Fort Worth, Texas, has caused the Public
Works Director to prepare and file estimates of the cost of such improvements and
estimates of the amount per front foot proposed to be assessed against abutting property
and the owners thereof, and such estimates have been examined, NOW., THEREFORE,
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT:
I.
Such estimates be, and they are hereby adopted and approved.
IT.
It is 1-iereby found and determined that the cost of improvements an portion of
streets, avenues, and public places hereinafter described, with the amoiant or amounts
per front foot proposed to be assessed for such improvements against at)utting pro-
perty and the owners thereof, are as follows, to-wit:
UNIT 1: ALLEN-MADDOX CONNECTION From 135W to T & P Railroad, known
and designated as Unit 1, Project No.
061-21304-4553, Phase V Echo.
The estimated cost of improvements is $_.� , the estimated amount
__
....................and T".................
per front foot to be assessed against abutting property the owne.�rs tl"aereof for
concrete curb and gutter is $ .80 __; the estimated amount per fronL foot to
be assessed against abutting property and the owners thereof for paveknent is $- -0-
the estimated amount per front foot to be assessed against abutting property the
owners thereof for four-foot wide concrete sidewallc is $_, .92
the estimated
amount per square "essed against abutting property and the owners thereof for
six-inch thick concrete driveway is $ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the owners
ther,,'�of is $ 1.72 �rete ciriveway construction
_, plus the cost incurred for conc
where specified.
A hearing be given and held by and before the City Council of the City
of Fort Worth, Texas, to all owning or claiming any property abutting upon said
portions of highways, streets, avenues and public places, as well as to all
owning or claiming any interest in any such property. Such hearing shall be
given and held on the 3th day of OCTOBER 2 19 72 , at 9:30 A.M.
in the Council Chamber in the City Hall in the City of Fort Worth, Texas, and
the City Secretary is hereby directed to give or cause to be given notice ,of the
time and place of such hearing and of other matters and facts in accordance with
the terms and provisions of an Act passed at the First Called Session of the
Fortieth Legislature of the State of Texas, and known as Chapter 106 of the Acts
of said Session, now being known as Article 1105b of Vernon's Texas Civil Statutes
as amended by Acts 1967, 60th Legislature, Page 365, Chapter 176, Section 1,
emergency effective May- 12, 1967. Such notice, shall be. by advertisement inserted
at least three (3) times in a newspaper published in the -City of Fort Worth,
Texas, the first publication to be made at least twenty-one (21) days before
the date of said hearing; Said notice shall comply with and be in accordance with
the terms and provisions of said Act as amended. The City Secretary is further
directed to give or cause to be given personal notice of the time and place of
such hearing to all owning or claiming any property abutting on said portions of
highways, streets, avenues and public places, as well as to all owning or claiming
any interest in any such property. Such personal notice shall be in writing and
shall be given or caused to be given by the City Secretary by depositing such
written notice in the United .States Mail at least fourteen (14) days before the
date of the hearing, postage prepaid, in envelopes addressed to all persons
owning or claiming any interest in the respective properties abutting the high-
ways, streets, avenues and public places or portions thereof to be improved, as
the names bf such persons are shown on the current rendered tax rolls of the City
of Fort Worth and at the addresses so shown, or if the name of such respective
owners do not appear on such rendered tax rolls, then address to .such owners as
their names are shown on the current unrendered tax rolls of I the City of Fort Worth
at the addresses shown thereon. In those cases in which an owner of property
abutting a highway, street, avenue or public place or portion or portions there-
of which is to be .improved is listed as "unknown" on the then, current City of
Fort Worth tax rolls, or the name of an owner is shown on the City of Fort Worth
tax rolls .but no address for such owner is shown,' no notice need be mailed. In
those cases where the owner is shown to be an estate, the mailed notice may be
addressed to such estate. In this connection, the City Secretary shall prepare
and file or cause to be prepared and filed with these proceedings a list of the-
properties to be assessed, the names of those persons owning or claiming any
interest in said properties to whom the notice was mailed, together with the last
known addresses determined as aforesaid of the respective owners and those perk
sons owning or claiming any interest in said property.
The City Secretary shall certify that each of the parties in said list whose
address is shown on the then current rendered or unre'ndered tax rolls of the City
of Fort Worth was mailed a copy .of the notice of hearing and shall further certify
the date or dates . on which said notice was mailed. A copy of each notice shall be
attached to such certificate, The certificate of the City Secretary will be con-
clusive evidence of the facts therein recited.
s
IV.
The City Secretary is hereby directed to engross and enroll this ordinance
by copying the caption of same in the Minute Book of the City Council and by
filing the complete ordinance in the appropriate Ordinance Records of this City.
V.
This ordinance shall take effect and be in full force and effect from and
after the date of its passage.
Passed and approved this_ ' day of �� 19 12—
APPROVED AS TO FORM AND LEGALITY:
City Attorney
UNIT 2: ALLEN-MADDOX AVENUE CONNECTION From T & P Railroad to Riverside Drive,
known and designated as Unit 2, Project
No. 061-21304-4553, Phase V Echo.
The estimated cost of improvements is $ 2,539.63 ; the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is .80 the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ -0-
the estimated amount per front foot to be assessed against abutting property and
the owners thereof forfour-foot wide concrete sidewalk is $ .92 the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $_ .28 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 1.72 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 3: MILANO AVENUE From the south property line of Lot 14,
Block 36, Lakeview Addition to 125' north,
known and designated as Unit 3, Project No.
061-21304-4553, Phase V Echo.
The estimated cost of improvements is $ 3,125.05 _; the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ .80 the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ -0-
the estimated amount per front foot to be assessed against abutting property y and
the owners thereof for four-foot wide concrete sidewalk is $ .92 ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ .28___ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 1.72 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 4: MILANO AVENUE From the north property line of Lot 14,
Block 36, Lakeview Addition to Myrtle
Street, known and designated as Unit 4,
Project No. 061-21304-4553, Phase V Echo.
The estimated cost of improvements is $ 3032.00 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ .80 the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement: is $ -0-
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for four-foot wide concrete sidewalk is $ .92 ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 1.72 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 5: MANSFIELD AVENUE From a line 20' south of the northeast pro-
perty line of Lot 7, Block 34, Lakeview Add-
ition to 120' north, known and designated as
Unit 5, Project No. 061-21304-4553, Phase V Echo.
The estimated cost of improvements is $ 3,610.18_ ; the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ .80 the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ -0-
the estimated amount per front foot to be assessed against abutting property and
the owners thereof forfour-foot wide concrete sidewalk is $ .92 ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $_ .28 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $_1.72 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 6: CUL-DE-SAC AT ALLEN AVENUE Known and designated as Unit 6, Project No.
061-21304-4553, Phase V Echo.
The estimated cost of improvements is $ 6,113.80 ; the estimated amount
per front foot to be assessed against abutting property andf the owners thereof for
concrete curb and gutter is $ .80 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ -0-
the estimated amount per front foot to be assessed against abutting property y and
the owners thereof for four-foot wide concrete sidewalk is $ •92 ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ •28___ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 1.72 —, plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 7: YUMA AVENUE From 7' north of the south property line
of Lot 22, Block 35, Lakeview Addition
to north property line of Lot 22, Block
35, Lakeview Addition, known and designat-
ed as Unit 7, Project No. 061-21304-4553,
Phase V Echo.
The estimated cost of improvements is $ 2,713.70 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ .80 the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ -0-
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for four-foot wide concrete sidewalk is $ .92 ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ .28 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 1.72 plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 8: YUMA AVENUE From north property line of Lot 22, Block 35,
Lakeview Addition to Myrtle Street, known
and designated as Unit 8, Project No. 061-
21304-4553, Phase V Echo.
The estimated cost of improvements is $ 4,161.36 the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ •80 ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $ -0-
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for four-foot wide concrete sidewalk is $ .92 the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $_ -28 per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ 1.72 plus the cost incurred for concrete driveway con-
struction where specified.
The estimated cost of improvements is $ the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ ; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $
the estimated amount per front foot to be assessed against abutting property v and
the owners thereof for wide concrete sidewalk is $ ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ —, plus the cost incurred for concrete driveway con-
struction where specified.
The estimated cost of improvements is $ the estimated amount
per front foot to be assessed against abutting property and the owners thereof for
concrete curb and gutter is $ _; the estimated amount per front foot to be
assessed against abutting property and the owners thereof for pavement is $
the estimated amount per front foot to be assessed against abutting property and
the owners thereof for wide concrete sidewalk is $ ; the estimated
amount per square foot to be assessed against abutting property and the owners
thereof for 6-inch thick concrete driveway is $ per square foot; the total
estimated amount per front foot to be assessed against abutting property and the
owners thereof is $ , plus the cost incurred for concrete driveway con-
struction where specified.
UNIT 3: MILANO AVENUE From the south property line of Lot 14, Block
36, Lakeview Addition to 125' north, known
and designated as Unit 3, Project No. 061-
21304-4553, Phase V Echo, a two-inch thick
hot-mix asphaltic concrete surface course on
a six-inch thick cement stabilized gravel
'base, with seven-inch high concrete curb
and eighteen-inch wide concrete gutter, four-
foot wide concrete sidewalk and six-inch thick
concrete driveways so that the finished roadway
will be thirty feet wide.
UNIT 4: MILANO AVENUE From the north property line of Lot 14,
Block 36, Lakeview Addition to Myrtle
Street, known and designated as Unit 4,
Project No. 061-21304-4553, Phase V Echo,
a two-inch thick hot-mix asphaltic concrete
surface course on a six-inch thick cement
stabilized gravel base, with seven-inch
high concrete curb and eighteen-inch wide
concrete gutter, four-foot wide concrete
sidewalk and six-inch thick concrete drive-
ways so that the finished roadway will be
thirty feet wide.
UNIT 5: MANSFIELD AVENUE From a line 20' south of the northeast pro-
perty line of Lot 7, Block 34, Lakeview Add-
ition to 120' north, known and designated as
Unit 5, Project No. 061-21304-4553, Phase V
Echo, a seven-inch thick hot-mix asphaltic
concrete pavement on a six-inch lime stabil-
ized subgrade with seven-inch high concrete
curb and eighteen-inch wide concrete gutter,
four-foot wide concrete sidewalk and six-inch
thick concrete driveways on a forty-foot road-
way.
UNIT 6: CUL-DE-SAC AT ALLEN AVENUE Known and designated as Unit 6, Project No.
061-21304-4553, Phase V Echo, a two-inch
thick hot-mix asphaltic concrete surface
course on a six-inci%, thick cement stabilized
gravel base, with seven-inch high concrete
curb and eighteen-inch wide concrete gutter,
four-foot wide concrete sidewalk and six-inch
thick concrete driveways where specified.
UNIT 7: YUMA AVENUE From 7' north of south property line of Lot
22, Block 35, Lakeview Addition to north
property line of Lot 22, Block 35, Lakeview
Addition, known and designated as Unit 7
Project No. 061-21304-4553, Phase V Echo,
a two-inch thick hot-mix asphaltic surface
course on a six-inch thick cement stabilized
gravel base, with seven-inch high concrete
curb and eighteen-inch wide concrete gutter,
four-foot wide concrete sidewalk and six-inch
thick concrete driveways where specified on
a thirty-foot roadway.
UNIT 8: YUMA AVENUE From north property line of Lot 22, Block 35,
Lakeview Addition to Myrtle Street, known and
designated as Unit 8, Project No. 061-21304-
4553, Phase V Echo, a two-inch thick hot-mix
asphaltic concrete surface course on a six-
inch thick cement stabilized gravel base, with
seven-inch. high concrete curb and eighteen-inc�,i
wide concrete gutter, four-foot wide concrete
sidewalk and six-inch thick concrete driveways
where specified on a thirty foot roadway.
.............................. ..........................................
u r ; City of Fort Worth, Texas
p�^y�� o r Communication
DMI REFERENCE i G . ar, of »ont r t - Assessment PAGE
NUMBER
Paving in Neighborbood Improvement 3
-110/2/72 235 _ „ ,cho &K phas .. .
Council action is requested on the isrsject, described below.
1s°2 spa t De1c1 aLj2 a„
Nature of ork Street paving on Neighborhood ,Improvsissent Pr (Echo Are �.
Phase ) as follows:
s
ROADWAY R.V% TYPE OF
UNIT STREET WIDTH FEET FEET IMPROVEMENTS
1 . Allen-Maddox Connection I 35W to 60 80 Rebuild
Stewart
Stewart to 44 60 Rebuild
Mississippi
Mississippi 44 64 Rebuild (end
to Beverly new constru-
t.io
Beverly to 44 75 Rebuild
T&P UK
2. Allen-Maddox Connection UP R.R. to 44 75 Existing
Riverside Dr. Pavement to
Remain
3. Milano Avenue Maddox to 30 50 Reconstruct
Alley North
4. Milano Avenue e of 30 50 Reconstruct
MaA4ox to Myrtle
5. Mansfield Avenue Alley N. of 40 60 Rebuild
Maddox to
120' South
Vii. Allen .Avenue Cul-de-sac ac 100 Reconstruct
312. 5' east
of Mississippi
7. Yuma Avenue Maddox to 30 50 Reconstruct
Alley North
8. Yuma Avenue Alley North 30 50 Reconstruct
of add
to Myrtle
DATE REFER!oNce SUMMUT Award of Contract - Assessment ME
NUM85 Paving in Nieghborhood Improvement 2 3
10/2/72 C-2355
.............
This project will provide improved traffic facilities on the Allsn-Maddox
Street connection between I-35W and Riverside Drive. The Allen-Maddox
Street project, in addition to tying in with the improved portion of Maddox
Avenue, provides access from the South Freeway to the of Freeway.
Q212ypent;
nmtiLE I
Streets to be rebuilt will be improved by constructing seven-inch thick hot-
mix asohaltic concrete pavement on a six-inch lime stabilized subgrade on
Allen-Maddox Connection and six-inch thick hot-mix asphaltic concrete pavement
on a six-inch lime stabilized subgrade on other rebuilt streets. Reconstructed
streets will be improved by constructing a two-inch thick hot-mix asphaltic
concrete surface course on as six-inch thick cement stabilized gravel base.
All units will include seven-inch high concrete curb and eighteen-inch wide
concrete gutter with six-inch thick concrete driveways where specified on the
plans. Four-foot wide concrete sidewalks will be provided along with necessary
storm sewer appurtenances.
Submission of Bide
"lira following bid has been received:
Bidder Amount
,*Texas Bitulithic Company $258,638.00
The following contractors obtained plans but did not bid on the project:
Austin Road Company
Ellis County Asphalt Company, Inc.
Glade, Inc.
L. Grimes and Company, Inc.
Navarro Construction Company
Southwestern Contracting Company
S.R.O. Asphalt, Inc.
*This bid is in line with previous bids received in the N.I.P. Echo Area
and approximately $47,000.00 under the engine tines t estimate.
The Department of Housing and Urban Development has stated that it is
acceptable under HUD regulations Ven only ote bid is received if the
project has been properly advertised, etc.
Bids Received: September 14, 1972
Wbrking Days Allotted: 910
21ol;Et
2J(�q Qs_ t
Cos _Aann(Ai_Fjiyacjn
Based on the low bid, approximately $3,440.76 will be assessed against Nutting
property owners to be provided for by a Bond Fund Transfer, from Revolving
Fund Unspecified. Except for ineligible items of $21,630.24, two-thirds of
DATE R ttR mwm E UmEm% and of Contract - Assessment ME
Paving in Neighborhood Improvement 3 3
10/2/72 355 k,,ho Area It VJ.. of M.
the total project cost of approximately $284,501.80 is reimbursable by the
Department of Housing and Urban Development, The proposed assessments are
for one-third of the cost of curb, gutter, driveways and sidewalks, where
none presently exist, Sufficient funds are available in Project Account
No. 061-21304-4553, Neighborhood Improvement Area "ECHO", to finance the
Cityts cost of construction, inspection engineering salaries and miscel-
laneous expenses.
Recommendations
It is recommended that
1) The following Bond Fund Transfer be approved:
Anount From To Reason
$3,440. 76 Unspecified N50, Echo To provide for property
Revolving Fund Revolving Fund ownerst share of construction
942-09724-901 042-10424-402 cost of N.I.P. , Echo, Pbase V
2) An ordinance be adopted:
a) Declaring the necessity for ordering the improvements;
b) Making 'the ptovisions for levying the assessments;
0 O Directing the Public Wbrks Department to prepare
estimates of costs and amounts to be astessed;
d) Awarding the contract to Tex Bitulithic Company
in the amount of $258,638.00;
e) Making appropriation to cover the indebtedness thereby
incurred for improvements of the project aamed above.
3) An ordinance be adopted:
a) Approving the estimates of cost and amounts to be
assessed; and,
b) Setting October 30, 1972, as the date for the Benefit
Hearing.
RNLQ
Attachments;
"A" - Location Map
"B" - Resul]16
"C" - &igineers' Preliminary Rolls
.............
SUMTTED BY- D1$P0S1r10N,8Y_'660NCW, PROCESSED BY
ga"APPROWD 0 OTHER (DESMSE)
Adopw orvusmv* no. 1,3 zonartme X***S&i
CITY SECIR&4RY
and CIA*=* No (I V 25 A WUXI DoU of DATE
CM MANAGER /d,
.. ...........