HomeMy WebLinkAboutContract 57279-CO3FORT WORTH City of Fort Worth CSC No. 57279-0O3 Change Order Request Project Name: 1 Water & Sanitary Sewer Replacement on Horne Street City Sec No.: 57279 ProjectNo.(s):1 103123 DOE No. N/A City Proj. No.: 103123 Project Description: Replacing Water & Sanitary Sewer Lines on Horne St., Carver Dr., Diaz Ave., and alleyways. Contractor: William J. Schultz, Inc. dba Circle C Construction, Co.J Change Order # Date: 3/27/2023 City Project Mgr.1 Pratima Poudyal City Inspector: I Cody Horton Phone Number: 817-392-6149 Phone Number: 817-475-6903 Dept. Unit I Water Unit II Sewer Totals Contract Time (Calendar days) Original Contract Amount $2,905,104.25 $1,519,011.95 $4,424,116.20 550 Extras to Date $0.00 $0.00 25 Credits to Date $0.50 $0.50 Pending Change Orders (in M&C Process) Contract Cost to Date $2,905,103.75 $1,519,011.95 $4,424,115.70 575 Amount of Proposed Change Order -$594.00 -$23,157.00 -$23,751.00 0 Revised Contract Amount $2,904,509.75 $1,495,854.95 $4,400,364.70 575 Original Funds Available for Change Orders $145,255.00 $75,951.00 $221,206.00 $221,206.50 Remaining Funds Available for this CO $145,255.50 $75,951.00 Additional Funding (if necessary) -0.54% CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $5,530,145.25 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 3 provides for the following: • The replacement of ductile iron pipe with PVC DR 14 (water) and 160 PSI PVC (sewer) due to the non -availability of DIP for water and sanitary sewer installation. • Message boards to inform motorists of detours and road closures. • Installation of 2" Air Release Valve (ARV) • Relay of a segment of a project sewer main due to previously unknown conflict with a gas line that was encountered during construction • Polymer Manhole Modifications It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. (,ontractor's Company Name Contractor Nam: C tractor Signature Dalo VNiuiam J. Schultz, Inc. dba Circle C ConstwMn, Co. Ted Skelly-!� - Inspector — - Date Project Mw.. er � .�_ , Date 04/17/2023 �'`4) \V D4/19/2023 Director (Water t) Date Consrructiai S:ipemisor TPW Dept) Date 121 S Apr 20, 2023 04/17/23 Senlor Assistant Ci Attonney, Date Assistant City Manage, Date Apr 21, 2023 Apr 21, 2023 � Flo Council Action (If Required) OFFICIAL RECORD M&C Number NIA M&C Date Approved CITY SECRETARY FT. WORTH, TX FORT WORTH City of Fort Worth Change Order Additions Project Name Water & Sanitary Sewer Replacement on Horne Street City Sec No.: 1 57279 Project No.(s): 103123 1 DOE No. N/A City Proj. No.: 103123 Project Description Replacing Water & Sanitary Sewer Lines on Horne St., Carver Dr., Diaz Ave., and alleyways. Contractor William J. Schultz, Inc. dba Circle C Construction, Co. Change Order: 0 Date: 3127/2023 City Project Mgr. Pratima Poudyal City Inspector F Cody Horton ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 1-3 8" PVC DR-14 Water Pipe Unit I Water 7,198.00 LF $84.00 $604,632.00 1-66 2" ARV Combination Unit I Water 1.00 EA $15,000.00 $15,000.00 1-67 Message Boards Unit I Water 12.00 WK $500.00 $6,000.00 2-1 160 PSI Pressure Rated PVC Sewer Pipe(ASTM-2241) Unit II Sewer 846.00 LF $90.00 $76,140.00 2-49 Polymer Manhole Modifications Unit 11 Sewer 3.00 EA $2,000.00 $6,000.00 2-64 Labor to Relay Sanitary Sewer Pipe with Strom Drain and Gas Line Unit II Sewer 0.75 DY $8,500.00 $6,375.00 Page :L of 3 Unit I Water $625,632.00 Unit II Sewer $88,515.00 Additions Sub Total 1 $714,147.00 FORT' VVORTH City of Fort Worth Change Order Deletions Project Name Water & Sanitary Sewer Replacement on Horne Street City Sec No.: 57279 Project No.(s): 1 103123 DOE No. N/A City Proj. No.: 103123 Project Description Replacing Water & Sanitary Sewer Lines on Horne St., Carver Dr., Diaz Ave., and alleyways. Contractor William J. Schultz, Inc. dba Circle C Construction, Co. Change Order: 1E Date 3/27/2023 City Project Mgr. Pratima Poudyal City Inspector: Cody Horton DELETIONS ITEM DESCRIPTION DEPT Qty Unit I Unit Cost ITotal 1-2 8" DIP Water Unit I Water 7,198 LF 1 $87.00 $626,226.00 2-3 8" DIP Sewer Pipe with Protecto 401 Unit II Sewer 1 846.00 LF 1 $132.00 $111,672.00 Unit I Water 1$626,226.00 Unit II Sewer 1$111,672.00 Pate 2 of 3 IDeletions Sub Total 1$737,898.00 MIWBE Breakdown for this Chanae Order MWBE Sub I Type of Service I Amount for this CO I Total 1 $0.00 Previous Change Orders co # DATE AMOUNT Total $0.00 Page 3 of 3 3/27/2023 Water & Sanitary Sewer Replacement on Horne Street CSC: 57279 CPN:103123 Change Order 3 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Pratima Poudyal, P.E. Name of Employee Project Manager Title 4Fan ORT°nnp ATTEST: dao �dA pFo o�9�d PVo aSA c�A, OpIIn nE4p5aap Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX