Loading...
HomeMy WebLinkAboutContract 52902-CO4CSC No. 52902-004 F" RT W" R,r H City of Fort Worth Change Order Request Project Name: Churchill Rd Water and Sanitary Sewer Improvements City Sec No.: 1 52902 Project No.(s):1 100888 NTP 12/2/2019 CityProj.No.:l 100888 Project Description: Installation of Water and Sanitary Sewer Improvement on Churchill Rd between White Settlement Rd and River Oaks Blvd Contractor: Flow -Line Construction, Inc. Change Order# ® Dale: 1 4/12/2023 City Project Mgr._ Lawrence Hamilton City Inspector; I Carmen Drake Phone Number: 817 392 2626 Phone Number: 817-392-8347 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Water Sewer Totals Contract Time (Calender days) $6,522,745.00 $1,614,210.00 $8,136,955.00 720 $459,672.80 $64,532.88 $524,205.68 0165 $6,982,417.80 $1,678,742.88 $8,661,160.68 885 Amount of Proposed Change Order $0.00 $218,287.50 ! $218,287.50 021 Revised Contract Amount $6,982,417.80 $1,897,030.38 Original Funds Available for Change Orders $130,455.00 $48,426.00 Remaining Funds Available for this CO $0.00 $0.00 ! Additional Funding (if necessary) $210,787.50 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $8,879,448,18 906 $178,881.00 $210,787.50 9.12% $10,171,193.75 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 4 will provide for the replacement of a deteriorated sanitary sewer main that was encountered during construction, the replacement of additional concrete collars that were removed during paving activities, additional traffic control, and the installation of an additional drop manhole. Staff recommends the addition of 21 calendar days for the change order. It is nndprOnnd and nnrPad that tha acrantanr..A. of this Champ nrder by the rnntrartor constitutes an accord and satisfaction and renresents Davment in full (both time and money) for all costs arisinq out of, or incidental to, the above Change Order. Contractor's Company Name Contractor Name 77 Conlr for -nature D to Flow -Line Construction, Inc. Eduardo Hernandez Z I Mn9nector . I Date I Pwiect Manager - /; A I _ Date I Director Waldf Dept) Date Eon tructlon Su PeNisor Water Dept) Daate Apr 21, 2023 1/ ^23 Senior Assistant City Attorney Date Assistant City Manager Date Apr24,2023 Apr 24,2023 vuun�u r�uuvn ku i-'cyuucul OFFICIAL RECORD M&C Number 23-0253 M&C Date Approved 2023 CITY SECRETARY FT. WORTH, TX F(o) P -F Wo P.-Y V 1 -;� — City of Fort Worth Change Order Additions Project Name I Churchill Rd Water and Sanitary Sewer Improvements Project No,(s): 100888 Project Installation of Water and Sanitary -Sewer on Churchill Rd bi Description Blvd. City Sec No.: 1 52902 No. 43801 City Proj, No.: 100888 While Settlement Rd and River Oaks Contractor Flow -Line Construction, Inc. 11 Change Order:® Date: 4/1212023 City Project Mgr. Lawrence Hamilton City Inspectlr Carmen Drake ADDITIONS DEPT ;Qt Unit Unit Cost Total 4 8" PVC (C900 DR18) (Sewer Pipe) Sewer 783 LF $200.00 $156,600.00 23 Concrete Collar Sewer 30 EA $750.00 $22,500.00 27 4' Drop Manhole Sewer 1 EA $10,000.00 $10,000,00 30 Traffic Control Sewer 6 EA $3,100.00 $18,600.00 53 Cement Sewer 38.50 TN $275.00 $10,587.50 I I i i i i i I i i I i I I I I I i i I I i I I i i I Page 2 of 4 I i Water Sewer $218,287.50 Additions Sub Total $218,287.50 IFc))R-F WoR-FM City of Fort Worth -� Change Order Deletions Project Name I Churchill Rd Water and Sanitary Sewer Improvements City Sec No,: 52902 Project No.(s): 100888 DOE No. D3g City Proj. No.: 100888 Project Description Installation of Water and Sanitary Sewer Improvement on Churchill Rd betw$en White Settlement Rd and River Oaks Blvd. Contractor Flow -Line Construction, Inc. Change Order; ® pate 411212023 City Project Mgr. Lawrence Hamilton City Inspector: I Carmen Drake I DELETIONS ITEM IDESCRIPTION I DEPT I Qty JUnit I Unit Cost ITotal i Page 3 of 4 1 IDeletions Sub Total I MIWBE Breakdown for this Change Ord MWBE Sub I Type of Service I ; I Amount for this CO Total 1 $0.00 Previous Change Orders Co# DATE AMOUNT Total $0.00 Page 4 of 4 .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Lawrence Hamilton Name of Employee Senior Professional Engineer Title ATTEST: Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Guy of Vor� Workh, Texas Mayor and Councfl Commuoo Uon DATE: Tuesday, April 11, 2023 LOG NAME: 60CHURCHILLROADC04-FLOWLINE REFERENCE NO.: **M&C 23-0253 SUBJECT: (CD 2 / Future CD 2 and City of River Oaks) Authorize Execution of Change Order No. 4 in the Amount of $218,287.50 to a Contract with Flow -Line Construction, Inc. for the Churchill Road Water and Sanitary Sewer Improvements for a Revised Contract Amount of $8,879,448.18, and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2023-2027 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: Authorize execution of Change Order No. 4, in the amount of $218,287.50, to City Secretary Contract No. 52902, a contract with Flow -Line Construction, Inc. for the Churchill Road Water and Sanitary Sewer Improvements project for a revised contract amount of $8,879,448.18; and Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water & Sewer Bond 2017A Fund, in the amount of $218,288.00, from available funds, for Churchill Road Water and Sanitary Sewer Improvements (City Project No.100888) to effect a portion of Water's contribution to the Fiscal Years 2023-2027 Capital Improvement Program. DISCUSSION: On September 24, 2019, Mayor and Council Communication (M&C) 19-0197 authorized a contract with Flow -Line Construction, Inc., (City Secretary Contract No. 52902) in the amount of $8,136,955.00 for the Churchill Road Water and Sanitary Sewer Improvements project. The agreement was subsequently revised by Change Order No. 1 with a net total amount of $22,705.70, administratively authorized on September 3, 2021, that provided for installation of special levee backfill material, relocation of a manhole at the levee and an additional storm water pollution prevention plan. Change Order No. 2 in the amount of $405,066.09 authorized on April 26, 2022 (M&C 22-0318) that provided for the installation of additional backfill material that was installed at the levee crossing as required by the United States Army Corps of Engineers, the installation of 8, 16, and 24-inch ductile iron pipe encasing pipes instead of 8, 16, and 24- inch PVC pipe encasing pipes as specified at the time of bid opening, additional excavation and backfill of bore pits in order to clear a gas main conflict, and additional backfill material that was necessary on the project due to unstable material that was encountered during construction and Change Order No. 3 in the amount of $96,433.89, administratively authorized September 27, 2022, that provided additional pavement quantities and the installation of additional 1-inch meters on the project. Change Order No. 4 will provide for the replacement of a deteriorated sanitary sewer main that was encountered during construction, the replacement of additional concrete collars that were removed during paving activities, additional traffic control, and the installation of an additional drop manhole. Staff has reviewed and verified the quantities for the additional work under this Change Order No. 4. It is the practice of the Water Department to appropriate its Capital Improvement Program plan throughout the fiscal year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2023-2027 Capital Improvement Program, as follows: 60CHURCHILLROADC04-FLOWLINE I Capital ProjectFFY20--23 CIP Authority Budget Revised Fund Name priations Change FY2023 Name I Budget ,I i (Increase/ ecrease)- Decrease)­-: -- --- -. Fund 56011 — 100888 — Water & Churchill $0.00 This M&C' $218,288.00 $218,288.00 Sewer RD WL & Bond SS Improv I i 2017A Funding for the Churchill Road Water and Sanitary Sewer Improvements project is depicted in the table below: Existing Additional Fund Appropriations A ro riations [project Total* W&S Capital Projects -Fund I $35,400.00 $0.00 $35,400.00 56002 ' Water and Sewer Bond 2017A- Fund $1,058,871.00 $218,288.00 $1,277,159.00 56011 W&S Water & Sewer Bond 2020A $8,903,938.00 $0.00 $81903,938.00 - Fund_56_01_7_ Project Total _ _ $9,998,209.00 $218,288.00 -- - - $10,216,497.00 _ — -- *Numbers rounded for presentation purposes. Funding is currently available in the Unspecified -All Funds project within the Water & Sewer Bond 2017A fund for the purpose of funding the Churchill RD WL & SS Improv project. Business Equity: Flow -Line Construction, Inc. agrees to maintain its initial M/WBE commitment of four percent that it made on the original contract and extend and maintain that same M/WBE commitment of four percent to all prior change orders up to and inclusive of this Change Order No. 4. Therefore, Flow - Line Construction, Inc. remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. The project is located in COUNCIL DISTRICT 2/FUTURE COUNCIL District 2 and CITY OF RIVER OAKS. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Unspecified - All Funds project within the Water & Sewer Bond 2017A Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in the Water & Sewer Bond 2017A Fund for the Churchill RD WL & SS Improv project to support the approval of the above recommendation and execution of the change order. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. FUND IDENTIFIERS (FIDs): TO - - --- ----- Fund Department �Accountj Project Program1Activity� Budget j Reference # mount ID I ID I Year I Chartfield 2 FROM _ 1 _ _ , _ --- _. p Ip _--- j ---- - _ ._� .--�-�`--- j- g---------- -yl---Year.-- _;----(Chartfield 2) ---I ----- Fund De artment Account Pro'ect Pro ramr�__ ivit Bud et Reference # Amount .- CERTIFICATIONS: Submitted for City Manager's Office by: Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Lawrence Hamilton (2626) ATTACHMENTS 1.60CHURCHILLROADC04-FLOWLINE UPDATE.pdf (CFW Internal) 2.60CHURCHILLROADC04-FLOWLINE 1295.pdf (CFW Internal) 3. 60CHURCHILLROADC04-FLOWLINE APC Form.p�jt (CFW Internal) 4.60CHURCHILLROADC04-FLOWLINE FID Table (WCF 02.24.23) sx (CFW Internal) 5. 60CHURCHILLROADC04-FLOWLINE FID Table (WCF 03.13.23) sx (CFW Internal) 6. 60CHURCHILLROADC04-FLOWLINE Map aff (Public) 7. 60CHURCHILLROADC04-FLOWLINE SAM.pdf (CFW Internal) 8.ORD.APP 60CHURCHILLROADC04-FLOWLINE 56011 A023(r2).docx (Public) 9. PBS CPN 100888.pdf (CFW Internal) I 0o so 0 o a o 0 0 cA 00 of 00 00 00 00 0) 00 co o rr N rd N N ' 00 01 00 00 «j N r N V) N i/1 V1 to i t/). N m m m m rn m 00o mm0 N N r4 N O1 Dl U O W 00 (I. Vl r, -i Z cc V 00 U CO V 00 UJ 0o W 0o W o0 D_ 0o a- 00 d 00 Z Z o Z o Z o Ul Lr) Ln Vl m �i m li m -4 rn 1-4 m 0 m 0 Ln 0 m 0 m m m m 0 0 0 0 0 0 m 0 m 0 m 0 m 0 m 0 M 0 0 0 0 0 0 0 - O I, O to O Ih O w O Ir O C:, O O O O O Ln ul V7 N ✓l ul N N N N N N 06 06 06 06