HomeMy WebLinkAboutOrdinance 7034 ORDINANCE NO.
ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF BEATY STREET
AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES
IN THE CITY OF FORT WORTH, TEXAS, DECLARING THE CONTRACT WITH
FIRST PAVING CORPORATION FOR THE CONSTRUCTION OF
SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE
ISSUANCE, EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF
SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS
HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS;
DIRECTING TIM CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE
BY COPYING THE CAPTION OF SAME IN THE MINUTE BOOK OF THE CITY
COUNCIL OF FORT WORTH, TEXAS, A14D BY FILING THE COMPLETE ORDINANCE
IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY; AND PROVIDING AN
EFFECTIVE DATE,
WHEREAS, the City of Fort Worth, Texas, has heretofore entered into a contract
with FIRST PAVING CORPORATIOD1 , for the making and construction of
certain street improvements on the hereinafter described portions of streets, avenues and
public places in said City, to-wit:
UNIT 1: BEATY STREET From 40' west of Warren Lane to 20' east
of Muse Street, known and designated as
Unit I., Project No. 104-24000-232.
UNIT 2: MUSE STREET From Beaty Street to 240' north, known
and designated as Unit 2, Project N6.
104-24000-232.
UNIT 3: WARREN LANE From Beaty Street to Norma Street, known
and designated as Unit 3, Project No.
104-24000-232.
WHEREAS, by sundry proceedings heretofore passed by the City Council of the
City .of Fort Worth, T exas, including Ordinance No. 6811 , a portion of the cost of
said improvements was levied and assessed against the respective properties abutting
on each of the above described portions of streets, avenues,�.and public places and against
the real and true owners thereof; and,
WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review,
found and determined that, in some instances, in order to effect substantial justice
and equality, it is desirable and necessary to grant and issue certain credits against
some one or more of the assessments levied by Ordinance No. 6811 and
WHEREAS, the street improvements hereinabove mentioned have been completed
upon each of the portions of streets, avenues and public places hereinabove described,
and have been inspected and found to be in complete accordance with the contract therefor;
NOW, THEREFORE,
BE IT ORDAINED BY THE ZITY COUNCIL OF THE CITY OF FORT WORTH,
TEXAS, THAT:
I.
The improvements on each of the portions of streets, avenues and public
places hereinabove described be, and they are hereby, accepted; and the contract with
reference thereto be, and it is hereby, found and declared fully completed and performed.
II.
The Mayor, be, and he is hereby, directed to issue and execute in the name
cl the City, certificates in evidence of the special assessments levied against abutting
property and the owner thereof for such improvements, and the City Secretary is directed
to attest same and impress thereon the corporate seal of the City, all in accordance with
the proceedings relating to such improvements and assessments. The certificates shall be
numbered, shall describe the property against which the assessment has been levied, shall,
where known, ,state the name or names of the' true owners of the respective parcels of pro-
perty assessed and shall be issued in an amount equal to the difference between the
principal amount of the assessment and the amounts of any credit issued thereon. The
numbers of the certificates, with the property descriptions to be shown on the respective
certificates, together with the names of the owners of said property, the principal amount
of the assessment, the respective credits, if any which are hereby authorized, granted and
allowed against the principal amount of some one or more of the assessments heretofore
levied, and the principal amount for which each certificate is to be issued after giving
effect to such credit, if any, are hereby enumerated and itemized as follows:
III.
When each of the certificates has been duly executed as hereinabove provided,
same shall be delivered to the Tax Assessor-Collector as part payment of the contract
price.
IV.
The City Secretary is hereby directed to engross and enroll this ordinance by
copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas,
and by filing the complete ordinance in the appropriate Ordinance Records of said City.
V.
This ordinance shall take effect and be in full force and effect from and after
the date of its passage. !! /
PASSED AND APPROVED THIS .day of CJl/��/ , 19 9,z-z .
APPROVED AS TO FORM AND LEGALITY:
0�07L
i Ga►'' r
City Attorney
PROJECT NO. 104-24000-232,UNIT I: BEATY STREET FROM 40' WEST OF WARREN LANE TO 20' EAST OF
MUSE STREET; to be improved with six-inch thick hot-mix asphaltic concrete pavement on a
six-inch thick cement stabilized subgrade, seven-inch high concrete curb and eighteen-inch
wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will be
constructed where specified.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENTS
Beginning at a point 40' west of the intersection of Beaty Street and Warren Lane.
NORTH SIDE J. W. HAYNES SURVEY
Fort Worth Independent Tract 6-C 34' Pavement 3.74 $127. 16
School District Res. 34' Curb & gutter 2.76 93.84
3210 W. Lancaster $ 221.00
76107
WARREN LANE INTERSECTS EAST GREEN HILL ADDITION
American Savings Assn. 1 16 170' Side Lot adjusted to
1616 Commerce St. Res. 100' Pavement 3.74 $374400
Dallas, Texas 100' Curb & gutter 2.76 276.00
650.00
American Savings Assn, 30 16 131.5' Side Lot adjusted to
1616 Commerce St. Res. 100' Pavement 3.74 $374.00
Dallas, Texas 100' Curb & gutter 2.76 276.00
650.00
MUSE STREET INTERSECTS
SOUTH SIDE HYDE JENNINGS SUB.
Mrs, Pauline C. Knoy 2 27 170' Pavement 3.74 $635.80
Rt. 4, Box 7 Res. 170' Curb & gutter 2.76. 469.20
Fort Worth, Texas 85 Sq. Ft. Driveway 1.48 125.80
1,230.80
PROJECT NO, 104-24000-232_p UNrr I WEA.rY STRFET- C'ONTTlqlTD
BLOCK
CUNER LOT ZONT14C FRONTAGE RATE AMOUNT ASSESSMENT
SOUTH SIDE HYDE jEtfilINCS SUBDIVISTOR
Mrs. Pauline C. Knoy 3 --27 240' Pavement 3.74 $897.60
Rt. 4, Box 7 Res. 240' Curb & gutter 2.76 662.40
Fort Worth, Texas $1,560.00
761.1.2
TOTAL COST TO PROPERTY OWNERS UNIT I. . . . . . . . . . $ 4,311.80
TOTAL COST TO CITY OF FORT WORTH UNIT 1. . . . . . . . $ 9,883.81
TOTAL CONSTRUCTION COST UNIT I. . . . . . . . . . . . . . . . . $14,195.61
PROJECT NO. 104-24000-232, UNIT II: MUSE STREET FROM BEATY STREET TO 240, NORTH,_ to be
improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement
stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter on
a thirty foot roadway, and by constructing seven-inch high concrete curb and eighteen-inch
wide concrete gutter on the west side only for an additional 424.41' north.
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMEW
Beginning at the intersection of Muse and Beaty Streets.
WEST SIDE EAST GREEN HILL ADDITION
American Savings Assn. 30 16 72.65' Pavement 3.74 $271.71
1616 Commerce St. Res. 72.65' Curb & gutter 2.76 200.51
Dallas, Texas $ 472.22
American Savings Assn. 29 16 60' Pavement 3.74 $224.40
1616 Commerce St. Res. 60' Curb & gutter 2.76 165.60
Dallas, Texas $ 390.00
American Savings Assn. 28 16 60' Pavement 3.74 $224.40
1616 Commerce St. Res. 60' Curb & gutter 2.76 165.60
Dallas, Texas $390.00
American Savings Assn. 27 16 37' Pavement 3.74 $138,38
1616 Commerce St. Res. 60' Curb & gutter 2.76 165.60
Dallas, Texas $ 303.98
American Savings Assn. 26 16 60' Curb & gutter 2.76 $165.60
1616 Commerce St. Res. $ 165.60
Dallas, Texas
PROJECT NO. 104-24000-232, UNIT II: MUSE STREET CONTINUED
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMEN"r
WEST SIDE EAST GREEN HILL ADDITION
American Savings Assn. 25 16 60' Curb & gutter 2.76 $165.60
1616 Commerce Street Res. $165.60
Dallas, Texas
American Savings Assn. 24 16 60' Curb & gutter 2.76 $165.60
1616 Commerce Street Res. $ 165.60
Dallas, Texas
American Savings Assn. 23 16 601 Curb & gutter 2.76 $165.60
1616 Commerce Street Res. $ 165.60
Dallas, Texas
American Savings Assn. 22 16 60' Curb & gutter 2.76 $165.60
1616 Commerce Street Res. $ 165.60
Dallas, Texas
American Savings Assn. 21 16 60' Curb & gutter 2.76 $165.60
1616 Commerce Street Res. $ 165.60
Dallas, Texas
American Savings Assn. 20 16 40' Curb & gutter 2.76 $110.40
1616 Commerce Street Res. $ 110.40
Dallas, Texas
PROJECT NU, 104-24000-23?2 WIT 2: MUSE STREET CONTINUED
BLOCK
OWNER L 1 ZO'NI'NG FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE A. S. McGEE SUBDIVISION
C. D. Mowdy I-A A 235' side lot adjusted to
Rt. 4, Box 6 Res. 135' Pavement 3.74 $504.90
Fort Worth, Texas 135' Curb & gutter 2.76 372.60
76112 $ 877.50
TOTAL COST TO PROPERTY OWNERS UNIT 2: . . . . . . . . . . $39537.70
TOTAL COST TO CITY OF FORT WORTH ITNIT 2. . . . . . . . $4,589.71
TOTAL CONSTRUCTION COST UNIT 2.. . . . . . . . . . . . . . . . $8,127.41
n f
PROJECT NO. 104-24000-232, UNIT III: WARREN LANE FROM BEATY STREET TO NORMA STREET,to be
improved with six-inch thick hot-mix asphaltic concrete pavement on a six-inch thick cement
stabilized subgrade, seven-inch high concrete curb and eighteen-inch wide concrete gutter
on a thirty-six foot roadway,
BLOCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSM�N'T
Beginning at the intersection of Warren Lane and Beaty Street.
WEST SIDE J. W. HAYNES SURVEY
Fort Worth Independent Tract 6-C 975' Pavement 3.74 $3,646.50
School District Res. 975' Curb & gutter 2.76 2,691.00
3210 W. Lancaster $6,337,50
76107
NORMA STREET INTERSECTS
EAST SIDE EAST GREENHILL ADDITION
American Savings Assn. 13 16 120' Side Lot adjusted to
1616 Commerce St Res. 100' Pavement 3074 $ 374,00
Dallas, Texas 100' Curb & gutter 2.76 276.00
$ 650.00
American Savings Assn. 12 16 73,9' Pavement 3.74 $ 276.39
1616 Commerce St. Res. 7309' Curb & gutter 2.76 203.96
Dallas, Texas $ 480.55
American Savings Assn. 11 16 70' Pavement 3.74 $ 261.80
1616 Commerce St. Res. 70' Curb & gutter 2.76 193.20
Dallas, Texas $ 455.00
American Savings Assn. 10 16 70' Pavement 3.74 $ 261.80
1616 Commerce St. Res. 70' Curb & gutter 2.76 193020
Dallas, Texas $ 455000
PROJECT NO. 104-240009232, UNIT III: 'WARREN LANE m CONTINUED
BLOCK
OWNER LOT Zoning FRONTAGE RATE AMOUNT ASSESSIENT
EAST SIDE EAST GREEN HILL ADDITION_
American Savings Assn. 9 16 70' Pavement 3.74 $261.80
1616 Commerce St, Res. 70' Curb & gutter 2.76 193.20
Dallas, Texas 455,00
American Savings Assn. 8 16 70' Pavement 3.74 $261.80
1616 Commerce Street Res. 700 Curb & gutter 2.76 193.20
Dallas, Texas $ 455.00
American Savings Assn, 7 16 70' Pavement 3.74 $261.80
1616 Commerce St. Res. 70' Curb & gutter 2.76 193.20
Dallas, Texas $ 455°00
American Savings Assn. 6 16 70' Pavement 3°74 $261.80
1616 Commerce St. Res. 70' Curb & gutter 2.76 193.20
Dallas, Texas $ 455.00
American Savings Assn. 5 16 70' Pavement 3.74 $261.80
1616 Commerce St, Res. 70' Curb & gutter 2.76 193.20
Dallas, Texas $455.00
American Savings Assn. 4 16 70' Pavement 3.74 $261.80
1616 Commerce St. Res, 70' Curb & gutter 2.76 193.20
Dallas, Texas $ 455.00
PROJECT NO. 104-24000-232, INIT.3 WARREN LANE CONTINUED
BILCK
OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT
EAST SIDE EAST GREEN HILL ADDITION
American Savings Assn. 3 16 70' Pavement 3.74 $261.80
1616 Commerce Street Res. 70' Curb & gutter 2.76 193.20
Dallas, Texas $ 455.00
American Savings Assn. 2 16 70' Pavement 3.74 $261 .80
1616 Commerce Street Res. 70' Curb & gutter 2.76 193.20
Dallas, Texas $ 455.00
American Savings Assn. 1 16 80' Pavement 3.74 $299.20
1616 Commerce Street Res. 80' Curb & gutter 2.76 220.80
Dallas, Texas $ 520.('0
TOTAL COST TO PROPERTY OWNERS UNIT 3 . . . . . . . . . . $12,537.85
TOTAL COST TO CITY OF FORT WORTH UNIT 3. . .. . . . . $29,132.01.
TOTAL CONSTRUCTION COST UNIT 3. . . . . . . . . . . . . . .. . $41,669.86
TOTAL COST TO PROPERTY OWNERS - ASSESSMENTS (ALL UNITS) . . . .$ 20,387.35
TOTAL COST TO CITY oF Fowr WORTH (ALL UNITS INCLUDING
$47,706. 55 FOR STORM DRAIN ON MUSE STREET) . . . . .$ 91,312.08
TOTAL CONSTRUCTION COST (ALT, UNITS II CLITUING STORM DRAIN
ONMUSE S�TREET. . . . . . . .. . .. . .. . ... .. . . .... . . . . . .$111,699.43
LINE City of Fort Worth, Texas
BAILIFF Mayor and Council Communication
DATE REFERENCE SUSJECT, Final Payment - Assessment PavinE PAGE
7/8/74
NUMBER FP-1.030 and Storm Drain Construction in East
Greenhill Additior.
Final Council action on the Project described below is requested.
Project DttcriLtion
Name: Assessment Paving and Storm Drain Construction in East Greenhill Addition,
Project No. 104-24000-232
Contractor: First Paving Corporation
Contract Awarded: Karcb 5, 1973 (M&C 0-2456)
Work Order Issued: December 19, 1974
Work Order Effective,-, January 7, 1974
Work Began: March 4, 1974
Date of Final 'Inspection and Approval: March 16, 1,974
Working Time Bid- 45 + 10 Working Days
Working Time Used 45 Working Days
Project Cost and FinSRSLinj
'Original Bid, Price: $90,529.95
Change Order No. 1: $10,175.00 (M&C C-2731)
Revised, Bid Price: $100,704.95
Final Contract Cost: $101,544.93
Partial Payments Previously Made; 10 Amount: $91,390.44
Final, Payment Due: $10,1,54.49
Sufficient funds are available for the final payment to be made from Project
Number 104-24000-232.
Deviation from Bid Price: The final contract cost of this project is $839.98
over the bid price. The cost difference resulted due to minor deviation$ bet-
ween quantities estimated in the contract documents and quantities measured and
used at the Job site.
omil liance with Specifications
Tests made during construction show materials used and 'required thicknesses were
in compliance with contract specifications.
Recommendation
It is recommended that the project described be accepted by the adoption of an
ordinance and final payment of $10,154.49, be made to First Paving Corporation.
RNL:kr
SUBMITTED BY: DISPOSITI? PAOC,7�0 By
,!, BY COUNCIL' 'E'
APPROVED 0 OTHER ESCRISE)
17 f
t
CITY SECRETARY
AR L
D_ii