Loading...
HomeMy WebLinkAboutContract 58317-CO1R (2)CSC No. 58317-1201 )FORT T WO RT H �- Change Order Request Project Namo Sanitary Sewer Rehabilitalion, Contract 113, Part 4 City Sec No. 50317 Project No.(9) 56011210G(ro430N004301b7400101001700 M&C 22 0730 City Pro, No, 102705 Projecl Sanity Sower Rehabilitation Contract 113, Part 4 Descriplion ry Contractor Woody Conlraclors, Inc. Change Order II l� Data: 4I512023 City Project Mgr.1 Dena Johnson City Inspector I Kevin Jackson Phone Number 817.392.7866 Phone Number: (602) 320.7823 Dept. Original Contract Amount Extras to Dale Credits to Dale Pending Change Orders (in M&C Process) Contract Cost to Dale Orlg. Funds Available for Change Orders Remaining funds Available for this CO Additional Funding (If necessary) Conti Il I Water I SevierI I I TOIaIS I (CalandarDaya) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.27/6 $2,246,351.2 Change Order No. 1 will provide compensation for the following: a During sanitary sewer Installation on Hulen Street, a previously unknown sewer service line from an apartment complex was encountered necessitating the Installation of a cut -In manhole, an additional sanitary sewer manhole and the extension of the B-Inch sewer pipe In order to maintain sewer service to the complex. a In order to eliminate conflict at a location where a project sanitary sewer main was encountered encased In concrete and connected to a storm draln Inlet, It is necessary to conduct exploratory excavation to determine the limits of the conflict. Due to the close proximity of an unstable power pole to a manhole that Is scheduled for replacement, It Is necessary to Install a shaft to successfully replace the manhole and stabilize the pole in order to prevent It from toppling over. It Is also necessary to replace about 10 feet of the sanitary sewer main that connects to the manhole by other than open cut Installation. Is understood and agreod that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and In full (both time and money) for all costs arising out of, or Incidental to, the above Change Order. Conlraclor's Conipany Name Contractor Name Contractor Signature Dale Woody Conlraclors, Inc, Troy Woody Inspector Project Manager Data 16�o9_ 4/10/23 Dimctor Water Dept) c (,ollslr elloTi S[ visor JPW Dept) Dale SenlorAsslslanl CII Allomo Ass e a l el Man er Date Apr 13, 2023 Council Action If required) M&C Numbor Nlq M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WCDRTHI City of Fort Worth Change Order Additions Project Name Sanitary Sevier Rehabllitallon, Conlracl 113, Part 4 1 City Sec No, 56317 Project No.(s) 56002106004301000430157400101001760 DOE No. 22-07 City Pro, No, 102705 Project Description Sanitary Sewer Rehabilltalion Conlracl 113, Part 4 Contractor I Woody Contractors, Inc, Change Orderu 0 Dale; 1 415/2023 City Project Mgr. I Dena Johnson City Inspector F Kevin Jackson ADDITIONS _ LSC t I_I'I _- —_ _-- ---� 3 _ DEPT -_G1ty Unit _Unit Cost_ Total 6" Sevier Pipe Sewer 19.0 LF $119.00 $2,261.00 10 4' Manhole Sewer 1.0 EA $6,630.00 $5.630.00 11 4' Extra Depth Manhole Sevier 2.0 VF $292.00 $584.00 13 Manhole Vacuum Testing Sewer 2.0 EA $200,00 $400.00 15 Concrete Collar Sewer 2.0 EA $560.00 $1,100.00 42 Cut -in 4' Manhole Sewer 1.0 EA $8,000.00 $8,000.00 43 Remove 10f1 Inlet Sewer 1.0 EA $2,200.00 $2,200.00 44 Install 10ft Standard Inlet Sewer 1.0 EA $12,100.00 $12,100.00 45 Exploratory Excavation Sewer 2.0 EA $2,200.00 $4,400.00 46 Major Manhole Adjustment Sewer 1.0 EA $4,400.00 $4,400.00 47 Vertical Shaft for Existing MA. Removal Sevier 10.0 VF $1,925.00 $19,250.00 40 ©OTC Repair 1Oft of Sewer Main Sewer 1.0 LS $9,350.00 $9,350.00 Water Sewer $69,675.00 Paving Addilions Sub Total $G9,675.00 Page 1 of 1 `. V( 1Cc r r City of fort Worth Change Order Deletions Project Name Sanitary Sewer Rehabilitation, Contract 113, Part 4 City Sec No 58317 Project No,(s) 50002106004301000430157400101001700 DOE No. 22-0738City Pro. No. 102705 Project Description Sanitary Sewer Rehabilitation Contract 113, Part 4 Contractor Woody Contractors, Inc. Change 0rder It Date 415/2023 City Project Mgr. Dena Johnson City Inspector I(evin Jackson DELETIONS Page 1 of 1 vrevious Chango Orders 7 F) k -Ir 7� Totai 4/5/2023 Sanitary Sewer Rehabilitation, Contract 113, Part 4 CSC: 58317 CPN:102785 Change Order 2 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager, By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements, ,Delia Joh/Ison Signature Dena Johnson Name of Employee Project Manager Title 400vvn4b o� FORT o00 0 0c o a° -a pad ATTEST: pvo g=d oo oo0000 U�nuna4� Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX