Loading...
HomeMy WebLinkAboutContract 55026-CO1CSC No. 55026-CO1 FORT VV0iwFiI City of Fort Worth Change Order Request Project Name: 1 FM 156 from US 81/287 to Watauga Road Water Improvements City Sec No.: 1 55026 Project No.(s):l 660161060043011016821001780 DOE No. N/A CityProj.No,:l 101682 Project Description, Water main relocations at E. Bailey Boswell, Harmon Rd,, Heritage Trace, and Copper Crossing for TXDOTs project on FM 156 Contractor; William J, Schultz, Inc, dba Circle C Construction Co. Change Order # Date 1 4/24/2023 City Project Mgr.1 John R. Kasavich City Inspector, I Shane Behn Phone Number: 817-392-8480 Phone Number: 817-392-8371 Dept, Water Totals Contract Time (Calendar days Original Contract Amount $2,746,775.00 $2,746,775,00 280 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $2,746,775.00 $2,746,775,00 280 Amount of Proposed Change Order $12,725.00 12,725.00 1150 Original Funds Available for Change Orders $137,339.00 1 1 1 $137 Remaining Funds Available for this CO Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.46% MAXALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST + 25%) $3,433,468.75 ORDER Change Order No. 1 provides compensation for the following: The installlion of 1,000 liner feet of temporary water lines to construction trailers along with the delivery of 75 packs of water and 3 portable toilets to the Federal Mint building in order to maintain water service when the 24-Inch water main at Harmon Road is shut down to accommodate a tie-in. • Emergency move in to conduct valve adjustments at Bailey Boswell Road and Western Center to accommodate TXDOT's paving operations. Additional traffic control on the project. Major manhole adjustments and valve box adjustments on FM 156 Staff concurs with the contractor's request of an additional 150 calendar days for this change order and for delays resulting from having to wait while TXDOT conducted improvements on Harmon Road and Bailey Boswell Road, OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX and agreed that the acceptance of this Change Order by the contractor constitutes an in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. and represents payment Contractors .Company Name Conlractor,Name Contractor SIginature _ Dato William l Schultz, Inc. dba Chle C ConstructionGo. Teri Skelly 3 Ins a or. _ _ Date Project Manager Date Gtor afar De t Date Con tructlon Su pervlsor (Water Dept) Date T,'S• Apr 26, 2023 *-,25-;.3 Senior Assistant City Attorney Date Asslstant-City Manager Date (Ao 6,N23 7z 0T) Apr 26, 2023 Apr 28, 2023 Council Action Of Required) M&C Number N/A M&C Date Approved RT WORTH City of Fort Worth Change Order Additions Project Name FM 156 from US 81/287 to Watauga Road Water Improvements City Sec No.: 55026 Project No.(s): 5601610600430/101682/001780 DOE No. N/A City Proj. No.: 101682 Project Description Water main relocations at E. Bailey Boswell, Harmon Rd., Heritage Trace, and Copper Crossing for TXDOTs project on FM 156 Contractor William J. Schultz, Inc. dba Circle C Construction Co. Change Order:= Date: 4124/2023 City Project Mgr. John R. Kasavich City Inspector FShane Behn ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 51 Traffic Control Water 6.00 EA $3,500.00 $21,000.00 53 Manhole Adjustment, Major Water 7.00 EA $3,500.00 $24,500.00 55 Valve Box Adjustment Water 10.00 EA $1,200.00 $12,000.00 58 Emergency Temporary Water Main for 24-inch water at Harmon Water 1,000.00 LF $12.00 $12,000.00 59 Additional Traffic Control for 24-inch water at Harmon Water 1.00 EA $3,500.00 $3,500.00 60 75 Packs of Water for Distribution at Mint Building Water 75.00 EA $5.00 $375.00 61 3 Temporary Bathrooms for Mint Building Water 3.00 EA $450.00 $1,350,00 62 Paving Emergency Move -In for vault adjustment at Bailey Boswell Water 1.00 EA $9,500.00 $9,500.00 63 Paving Emergency Move -In for vault adjustment at Western Center Water 1.00 EA $4,000.00 $4,000.00 64 Remove Existing Blow -Off Cone, pour flat lop, plug valve at Bailey Boswell Water 1.00 EA $4,500.00 $4,500.00 Water $92,725,00 1$92,725.00-1 Additions Sub Total age 4 UI '1 PonT'WOR-fm City of Fort Worth Change Order Deletions Project Name FM 156 from US 811287 to Watauga Road Water Improvements Project No.(s): 66016/0600430/1016821001780 DOE No, N/A Project Description City Sec No.: City Proj, No Water main relocations at E, Bailey Boswell, Harmon Rd., Heritage Trace, and Copper Crossing for TXDOTs project on FM 156 Contractor William J, Schultz, Inc, dba Circle C Construction Co. Change Order F-1-1 Date 1 4/24/2023 City Project Mgr. John R. Kasavich City Inspector: Shane Behn DELETIONS 55026 101682 Previous Change Orders Page 4 of 4 4/26/2023 FM 156 from US 81/287 to Watauga Road Water Improvements CSC: 55026 CPN: 101682 Change Order 1 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature 12 ��j kvuL John R. Kasavich Name of Employee Engineering Manager Title �,d4vopq�� o v FORT�09�d G~g o�id ATTEST: $vo o=a° °°°° ° g da a N a� nEXA?oOp Jannette Goodall City Secretary OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX