Loading...
HomeMy WebLinkAboutOrdinance 7140 ORDINANCE NO. ORDINANCE ACCEPTING IMPROVEMENTS ON A PORTION OF POrNSETTA DRIVE AND PORTIONS OF SUNDRY OTHER STREETS, AVENUES AND PUBLIC PLACES IN THE CITY OF FORT WORTH, TEXAS, DECLARING THE CONTRACT WITH AUSTIN ROAD COMPANY FOR THE CONSTRUCTION OF SAID IMPROVEMENTS FULLY COMPLETED AND PERFORMED; DIRECTING THE ISSUANCE., EXECUTION AND DELIVERY OF CERTIFICATES IN EVIDENCE OF SPECIAL ASSESSMENTS LEVIED AFTER GIVING EFFECT TO SUNDRY CREDITS HEREIN AUTHORIZED AND ALLOWED AGAINST SOME OF SAID ASSESSMENTS; DIRECTING THE CITY SECRETARY TO ENGROSS AND ENROLL THIS ORDINANCE BY COPYING THE CAPTION OF SANE IN THE MINUTE BOOK OF THE CITY COUNCIL OF FORT WORTH, TEXAS, AND BY FILING THE COMPLETE ORDINANCE IN APPROPRIATE ORDINANCE RECORDS OF SAID CITY,, AND PROVIDING AN EFFECTIVE DATE, WHEREAS; the City of Fort Worth, Texas, has heretofore entered into a contract with A a n Road Co,; any , for the making and construction of certain street improvements on the hereinafter described portions of streets, avenues and public places in said City, to-Wit-. UNIT 1: POINSETTA DRIVE From Ts'[�ell Road to levee, known and designated as Project No. 104-24000-237, Unit 1. 'UNTO 2: ANA1,TUAC AVENUE From Brocks Lane to Meandering Road, known and des igriated as Project No. 104-24000-237, Unit 2. DELETED BY COUNCIL ACTION UNIT 3: OAK FOREST DRIVE From the s. property line of Lot 5, Block X, Sunset Acres Addition to 50' north, known and designated as Project No. 104-24000-237, 1Unit 3. UNIT 4: KAREN STREE,r From Highway 80 to W. Elizabeth ]'mane, known and designated as Project No. 3,04-24000-237, Unit 4. UNIT 5: DOREEN AVEIM Froai Karen Street to Clwerry. Lane, krmwia and desig- nated as Project No. 104-24000-237, Unit 5. DELETED BY COUNCIL ACTION UNIT 6: W. ELIZABETH LANE From Karen Street to Cherry Lane, known and designated as Project No. 104-24000-237, Unit 6. UNIT 7: Bl,?,Y(,',E STREET From Montgomer i to Gendy Street, known and designated as Project No. 104-24()00-237, Unit 7. DELETED BY COUNCIL AC"'TION. WHEREAS, by sundry proceedings heretofore passed by the City Council of the City of Fort Worth, Texas, including Ordinance No. 6996 , a portion of the cost of said improvements was levied and assessed against the respective properties abutting on each of the above described portions of streets, avenues,,and. public places and against the real and true owners thereof; and, WHEREAS, the City Council of the City of Fort Worth, Texas, has, upon review, found and determined that, in some instances, in order to effect substantial ,justice and equality, it is desirable and necessary to grant and issue certain credits against some one or more of the assessments levied by Ordinance No. 6996 , and WHEREAS, the street improvements hereinabove mentioned have been completed upon each of the portions of streets, avenues and public places hereinabove described, and have been inspected and found to be in complete accordance with the contract therefor; NOW, THEREFORE, BE IT ORDAINED BY THE '.CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS, THAT: I, The improvements on each of the portions of streets, avenues and public places hereinabove described be, and they are hereby, accepted; .and the contract with reference thereto be, and it is hereby, found and declared fully completed and performed. II. The Mayor, be, and he is hereby, directed to issue and execute in the name of the City, certificates in evidence of the special assessments levied against abutting property and the owner thereof for such improvements, and the City Secretary is directed to attest same and impress thereon the corporate seal of the City, all in accordance with the proceedings relating to such improvements and assessments. The certificates shall be numbered, shall describe the property against which the assessment has been levied, shall, where known, -state the name or names of the true owners of the respective parcels of pro- perty assessed and shall be issued in an amount equal to the difference between the principal amount of the assessment and the amounts of any credit issued thereon. The numbers of the certificates, with the property descriptions to be shown on 'the respective certificates, together with the names of the owners of said property, the principal amount of the assessment, the respective credits, if any which are hereby authorized, granted and allowed against the principal amount of some one or more of the assessments heretofore levied, and the principal amount for which each certificate is to be issued after giving effect to such credit, if any, are hereby enumerated and itemized as follows: III. When each of the certificates has been duly executed as hereinabove provided, same shall be delivered to the Tax Assessor-Collector as part payment of the contract price. IV, The City Secretary is hereby directed to engross and enroll this ordinance by copying the caption of same in the Minute Book of the City Council of Fort Worth, Texas, and by filing the complete ordinance in the appropriate Ordinance Records of said City. V. This ordinance shall take effect and be in full force and effect from and after the date of its passage. PASSED AND APPROVED THIS �d ay of �° �rLC�r 1�I , 19! . APPROVED AS TO FORM AND LEGALITY; a 0�4 I" I�fl�rsrmurnrr, City Attorney �'� PROJECT NO. 104-24000-237, UNIT 1: POINSETTA DRIVE FROM ISBELL RU- D TO LEVEE, to be improved by constructing a five-inch thick hot-mix asphaltic concrete pavement on a five-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZQTTNG F11014TAGE RATE PiMOUNT ASSESSMENT NORTH SIDE BROOKS IDE ANWEX Beginning at the northeast corner of Isbell Road and Poinsetta Drive E. D. Crow & Wm. King S152.5-1 9 109.7' Pavement $9.33 $1,023.50 250 Roberts Gut-off Coum. 931 Curb & Gutter 3.41 317.13 76114 194 Sq. Ft. Driveway 1.17 226.98 $131567.61 T. B. Whitfield 2 9 100' Pavement $3.09 $ 309.00 4424 Poinsetta Dr. Res. 1.001 curb & Gutter 3.41 341.00 00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 Mrs. Horacio Garza 3 9 100' Pavement $3.09 $ 309.00 4421 Poinsetta Drive Res. 1001 Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 749.45 Bertie Roberson 4 9 100' Pavement $3.09 $ 309.00 515 Isbell Road Res. 1,00' Curb & Gutter 3.41 341.00 76114 85 S'q. Ft. Driveway 1.17 99.45 $ 749.45 James W. Hennesseey, Jr. 5-A 9 50' Pavement $3.09 $ 154.50 4408 Poinsetta Drive Res. 501 Curb & Gutter 3.41 170.50 76114 85 Sq. Ft. Driveway 1.17 99.45 $ 424.45 1. PROJECT NO. 104-24000-237, UNIT 1: POINSETTA DRIVE FROM ISBELL ROAD TO LEVEE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BROOKSIDE ANNEX A. J. Buechel, Jr. 5-B 9 50' Pavement $3.09 $ 154.50 601 Harrisdale Res. 50' Curb & Gutter 3.41 170.50 76114 $325.00 A. J. Buechel, Jr. 6 9 100' Pavement $3.09 $ 309.00 601 Harrisdale Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $749.45 Mrs. Maggie Vickery 7 9 100' Pavement $3.09 $ 309.00 4318 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 170 Sq. Ft. Driveway 1.17 198.90 $848.90 Jack Laird 8 9 100' Pavement $3.09 $ 309.00 617 Oaklawn Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $749.45 Charles E. Gideon 9 9 100' Pavement $3.09 $ 309.00 4300 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $650.00 Michigan Avenue intersects 2. PROJECT NO. 104-24000-237, UNIT l: POINSETTA DRIVE FROM ISBELL ROAD TO LEVEE, Continued: BLOCK aNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BROOKSIDE ANNEX Earlyne Henderson 1 8 100' Pavement $3.09 $309.00 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $749.45 Pete Standridge 2 8 100' Pavement $3.09 $309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 280 Sq. Ft. Driveway 1.17 327.60 $977 .60 Pete Standridge 3 8 100' Pavement $3.09 $309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $650.00 Geanie Roberson 4-A 8 50' Pavement $3.09 $154.50 4115 Terrace St. Res. 50' Curb & Gutter 3.41 170.50 Amarillo, Texas 79109 85 Sq. Ft. Driveway 1.17 99.45 $424.45 Alfred S. Mauldin 4-B 8 50' Pavement $3.09 $154.50 4218 Poinsetta Dr. Res. 50' Curb & Gutter 3.41 170.50 76114 85 Sq. Ft. Driveway 1.17 99.45 $424.45 Mrs. C. G. Langston 5 8 100' Pavement $3.09 $309.00 4216 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $749.45 3. PROJECT NO. 104-24000-237, UNIT 1: POINSETTA DRIVE FROM ISBELL ROAD TO LEVEE, Continued: BLOCK OWNER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT NORTH SIDE BROOKSIDE ANNEX Mrs. Lois Phillips Hill 6 8 100' Pavement $3.09 $309.00 4124 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 170 Sq. Ft. Driveway 1.17 198.90 $848.90 C. W. Kimbrough 7 8 100.25' Pavement $3.09 $309.00 4120 Poinsetta Dr. Res. 100.25' Curb & Gutter 3.41 341.85 76114 140 Sq. Ft. Driveway 1.17 163.80 $814.65 Opal Yeager 8 8 132.54' Adjusted to c/o First Nat'l Bank Res. 92 ' Pavement $3.09 $284.28 Trust Dept. 92' Curb & Gutter 3.41 313.72 P.O. Box 701 $598.00 Abilene, Texas 79604 SOUTH SIDE Pete C. Standridge 15 7 132.54' Adjusted to 4224 Poinsetta Dr. Res. 92' Pavement $3.09 $284.28 76114 92 ' Curb & Gutter 3.41 313.72 $598.00 Pete C. Standridge 16 7 100.25' Pavement $3.09 $309.77 4224 Poinsetta Dr. Res. 100.25' Curb & Gutter 3.41 341.85 76114 85 Sq. Ft. Driveway 1.17 99.45 $751.07 Pete C. Standridge 17 7 100' Pavement $3.09 $309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $650.00 4. PROJECT NO. 104-24000-237, UNIT 1: POINSE'rLk DRIVE F'R(V, , ISBELL 'RMD TO LEVEE,, Continued: BLOCK (hW.R LOT ZONING FRONT .G RATE AMOUNT ASSESSMENT SOUTH SIDE BROOKS IDE ANNEX Pete C. Standridge 18 7 100' Pavement $3.09 $309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $650.00 Pete C. Standridge 19 7 100' Pavement $3.09 $309.00 4224 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $650.00 City of Fort Worth 20 7 1,00, No Assessment Res. City of Fort Worth 21 7 100, No Assessment Res. 1001 Raymond E. Milligan 22 7 100' Pavement �3.09 $309.00 4245 Poinsetta Res. 1001 Curb & Gutter 3.41 341.00 76114 $650.00 Michigan Avenue intersects S. B. Walker 10 6 100' Pavement $3.09 $309.00 4309 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 $650.00 5. PROJECT NO. 104-24000-2371. UNIT 1: POI NSETTA, DRIVE, FR(ki ISBELL ROAD TO LEVEE, Continued: BLOCK AMR LOT ZONING FRONT&GE RATE AMOUNT ASSESS NT SOUTH SIDE 13110OKSIDE ANNEX S. B. Walker 11 & Eta of 6 150' Paverivant $3.09 $463.50 4309 Poinsetta Dr. 12 Res. 1501 curb & Gutter 3.41 511.50 76114 $975.00 L. J. Austin & W of 12 6 50' Pavement $3.09 $154.50 B.B. Middlebrook Res. 501 Curb & Gutter 3.41 170.50 2210 W. 7th Street 85 Sq. Ft. Driveway 1.17 99.45 76107 $424.1+5 M. 0. Lawyer 13-B 6 50' Pavement $3.09 $154.50 608 Isbell Road Res'. 5�0' Curb & Cutter 3.41 170.50 76114 140 Sq. Ft. Driveway 1.17 163.80 $488.80 Dale Williams 13-A 6 50' Pavement $3.09 $154.50 4403 Poinsetta Dr. Res.' 50' Curb & Gutter 3.41 170.50 76114 85 Sq. Ft. Driveway 1.17 99.45 $424.45 D. R. Milligan 14 6 100' Pavement $3.09 $309.00 4245 Poinsetta Dr. Res. 100' Curl) & Gutter 3.41 341.00 76114 140 sq. Ft. Driveway 1.17 163.80 $813.80 Mrs. Horacio Garza 15 6 100' Pavement $3.09 $309.00 4421 Poinsetta Dr. Res. 100' Curb & Gutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $749.45 6. PROJECT NO. 104-24000-237, UNIT 1: POINSEMA DRIVE FR C14 ISBELL MAD TO LEVEE, Continued: BLOCK OWNER LOT &MING XRONTAGE RATE AMOUNT ASSESSMENT SOUTH SIDE BROOKS IDE ANNEX Mrs. Horatio Garza 16 6 100' Pavement $3.09 $309.00 4421 Poinsetta Dr. -1 ze—. 100' Curb & Cutter 3.41 341.00 76114 85 Sq. Ft. Driveway 1.17 99.45 $749.45 Floyd H. Eagan 17-A & 17-B 6 100' Pavement $3.09 $309.00 4320 Quail Trail Res. 100' Curb & Gutter 3.41 341.00 76114 85 S . Ft. Driveway 1.17 99.45 $749.45 Mrs. G. H. Bettes 18-A 6 0%,raer occui!,ii,pied 4429 Poinsetta Dr. C olmn. 109.5' Pavement $6.21 $680.00 76114 93' Curb & Gutter 3.41 317.13 $997.13 TOTAL COST TO PROPERTY OWNERS (UNIT 1). .... ... .. . .. 0$2 4,7 7 1-2 1 TOTAL COST TO CITY O,F FORT WORTH (UNIT 1) . . .. ....... $55,038.60 TOTAL CONSTRUCTION CWT (UNIT 1). .. ... . ... .... ... ... $79,809.81 7. PROJECT NO. 104-24000-237, UNIT 3: (AK FOREST DRIVE FRUI SOUTH PROPERTY LINE OF LOT 5, BLOC X. SUNSET ACRES ADDITION TO 50 FEET NORTH, to be improvey constructing a six-inch hot-mix asphaltic concrete pavement on a seven-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a thirty foot roadway. BLOCK M4NER LOT ZONING FRONTAGE RATE AMOUNT ASSESSMENT WEST SIDE SUNSET ACRES ADDITION Jack W. Boulton 21-A U 35' Pavement $2.79 $ 97.65 975 Roaring Springs Rd. Res. $97.65 76114 McDonnell Bros., Inc. 5 X 50' Pavement $2.79 $139.50 5608 River Oaks Blvd. Res. 50' Curb & Gutter 3.71 185.50 76114 $325.00 TOTAL COST TO PROPERTY CUM= (UNIT 3). .. .... .. ... ... $ 422 .65 TOTAL COST TO CITY OF FORT WORTH MIT 3). . .. .. .. .. .. $2,280.0(7) TOTAL CONSTRUCTION COST (UNIT 3) .. . .... .. ... .. . .... .. $2,702.65 13. PROJECT NO. 104-24000-237, UNIT 4: YAREN SUZET FRCH HIGHWAY 80 TO WEST ELIZABETH LANE, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a seven- inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen-inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK 01-TNER LOT Z MUG, FROUPAGE RATE AmOUNT ASSESSMENT WEST SIDE BMADM,0011 ADDITIO14 Beginning at the NW intersection of Highway 80 and Karen Street. Germany's Nursery M-R 3 187.8' Pavement $14.42 $2,708.08 528 Athenia Drive Comm. 187.8' Curb & Gutter 3.35 629.13 76114 116 Sq. Ft. Driveway 1.17 135.72 $3,472.93 J. P. Germany, Sr. 14 3 150.8' Pavement $14.42 $2,174.54 528 Athenia Drive Apt. 150.8' Curb & Gutter 3.35 505.18 76114 $2,679.72 West Elizabeth Lane intersects EAST SIDE ALTA ME ADDITION Vantage Properties, Inc. 1 35 369.47' Pavement $14.42 $5,327.76 8383 Stemmons Freeway Comm. 379.47' Curb & Gutter 3.35 1,237.72 Dallas, Texas 543 Sq. Ft. Driveway 1.17 635.31 75247 $7,200.79 TOTAL COST TO PROPERTY OWITERS (MTIT 4)... ... .. . .. .. .. $13,353.44 TOTAL COST TO CITY OF FORT WORTH (UNIT 4).. .. ... .... . $ 6,904.30 TOTAL CONSTRUCTION COST (UNIT 4) .... . .. *... .. .. .0 .. .. $20,257.74 14. PROJECT NO. 104-24000-237, UNIT 6: WEST ELIZABETH LANE FROM KkREN STREET TO CHERRY L&tM, to be improved by constructing a six-inch thick hot-mix asphaltic concrete pavement on a seven-inch thick lime stabilized subgrade with seven-inch high concrete curb and eighteen- inch wide concrete gutter on a forty foot roadway. Six-inch thick concrete driveways will be constructed where specified. BLOCK OWNER LOT ZONING FRONTAGE IV TE AMOUNT ASSESSMENT NORTH SIDE BR(ADbIGOR ADDITION Beginning at the NE corner of Karen Street and West Elizabeth Lane. Lewis R. Wilson 17 4 60' PaveDu�nt $14.42 $ 865.20 P.O. Box 12546 Apt. 601 Curb & Gutter 3.35 201.00 76116 $1,066.20 Lew-Leo 16 4 60' Pavement $14.42 $ 865.20 P.O. Box 12546 .Apt. 601 Curb & Gutter 3.35 201.00 76116 $1,066.20 Leon M. Wilson 15 4 60' Pavement $14.42 $ 865.20 P.O. Box 12546 Apt. 601 curb & Gutter 3.35 201.00 76116 $1,066.20 Lewis Wilson, Jr. 13 & 14 4 120' Pavement $14.42 $'1,730.40 P.O. Box 12546 CF 1201 Curl) & Gutter 3.35 402.00 76116 310 Sq. Ft. Driveway 1.17 362.70 $2,495.10 Richard D. Stroud 12 4 60' Pavement $14.42 $ 865.20 Rt. 1, Box 134-W Apt. 601 Curb & Gutter 3.35 201.00 Azle, Texas $1,066.20 18. PROJECT NO. 104-24000-237, UNIT 6: WEST ELIZABETH LANE FRCM KAREN STREET TO CHERRY UQqE, Continued: BLOCK OWNER LOT ZONING FRQUAGE RATE AMOUNT ASSESSI&NT NORTH SIDE BRCADMOOR ADDITION G. N. Adcock & 11 4 60' Pavement $14.42 $ 865.20 Bruce R. Farley Apt. 60' Curb & Gutter 3.35 201.00 Sea Coast Trust Deed Co. $ 1,066.20 1521 W. Hotel Circle San Diego, Calif. 92108 City of Fort Worth 10 4 141.6' No Assessment Cherry Lane intersects _SOUTH SIDE ALTA MFRE ADDITION Vantage Properties, Inc. 1 35 551.32' Pavement $14.42 $7,950.03 8383 Stemmons Freeway Comm. 551.32' Curb & Gutter 3.35 1,846.92 Dallas, Texas 271 Sq. Ft. Driveway 1.17 317.07 $10,114.02 TOTAL COST TO PROPERTY (MNEMS (UNTT 6) . . ... . ....... $13,353.44 TOTAL C(XzoT TO CITY OF FORT WORTH (UNIT 6). ... ... ... $ 6,904.30 TOTAL CONSTRUCTION COST (UNIT 6).... ....... .. ..0..* $20,257.74 AIM UNITS: TOTAL COST TO pry OPE1,M1 OWNTpS .. ... 00.4000..... .....$ 5(,,487 �42 TOTAL COST TO CITY OF 1"'ORT WORTH . . . . . . . . . . . . . . . . .$ 70,856.43 TOTAL CONS TRIX"T ION COSI'. .o ...­ Ifto . ' . . . . . .. . . . . . . . . .$1-2'7 X343.85 City of Fort Wo7rth, Texas dAt Mayor and Council Communication DATE REFERENCE SU87ECTaFinal Pa amen;— ss s me Paving PACE NUMBER SpxPOW 2/2.4, 7.5 FP-1068 even 1o�ations on the West Side Project , _._ . v .. ... . l Council action, on the Project described below is requested. Project Description Name: Assessment Paving at Seven Locations on the West Side, Project Numbers 104-24010-2372 and 109-1'5000-5142 Contractor: Austin Road Company Contract Awarded: April 8, 1974 (M&C C-2775) Work Order Issued: July 9, 1974 Work Order Effective: July 22, 1974 Work Began: May 22, 1974 Date of Final Inspection and approval: December 31, 1874 Working Time Bid; 103 Working Days, Working Time Used: 76 Working Hays Project Cost and_11n2RS11& Original Bid Price: $242,17:1.79 Change Order No. 1 + 8,100..00 (M&C 2804) Change Order ) o. 2 - $120,011..26 ( 1C 2408) Revised Bid Price: $127,262.00 Final Contract Cost: $120,867.13 Partial Payments Previously Nave: 8, Amount: $111,480.42 Final Payment Due: $ 12,086.71 Sufficient funds are available for the final payment to 'be made from Project lumbers 104-24000-237 and 109,-15000-5142. Deviation from Bid Price: The final cantract cost of this project is $3,395,40 or 2.6 under the revised bid Price. The major portion of the savings resulted because it was not necessary 'to construct subdrain,s as anticipated, Also minor variations between quantities estimated in the contract documents and quantities measured and used at the job si+.te contributed to the savings. Compliance with Specifications Tests made during construction show materials used and required thicknesses were in compliance with contract specifications for the paving portion of the contract. The contract also included the adjustment of the raga water line from Lake Worth in Michigan Avenue to clear, construction of the storm drain. This water line is used during the spring through .Call months and is empty the balance of the year, After completion, of the adjustments the DATE REFERENCE SUEUICTFinal Payment-Assessment ent Paving at PACE NUMBER Seven Locations on the West Side Project � 2/2" /75 FP-1068 Numbers 104-24000-2372 72 and 109-15000-514e � � of water line leaked and :further wore was done on joints by the contractor during the time when the line was empty. "tests for leafs cannot be made until the lire is pot back into service this spring. The contractor has agreed to grade any necessary :repairs, if the line leaks when put 'back into service. Due to this condition It is proposed that final payment be approved and that the contractor be paid all monies due. Final payment and adoption of the ordinance is necessary in order that assessment billings can be made for the paving portion of the contract as soon as possible. Recommendations It is recommended that the project described be accepted by the adoption of an ordinance and that final payient of $12,386.71 be authorized to ostin° Toad Company. NL:lm SUBMITTED BY: DISPOSIT Y COUNCIL SS BY IO kPF R 13 OT ER (DESCRIBE) w _..�..._.... .. CITY SECRETARY ...w...,. _...__ DnTE. CITY MANAGER "10&