Loading...
HomeMy WebLinkAboutContract 46047-CO3 (2)FORT WORTH City of Fort Worth Change Order Request Project Name:I Tulsa Way Drainage Improvements Project No.(s):I Project Description:) Contractor: City Project Mgr.I Phone Number:I P265-607170107483 / P275-707170107483, P227- 207280107483 DOE No. 16002 CITY SECRETARY ght-v-f,e0:3 CIRACT �.cv I City Sec No.: I 46047 City Proj. No.: I01074 Construction of storm drain mains along Watonga Street and Camp Bowie Blvd to alleviate flooding on Tulsa Way. Installation of water, sewer and re -paving of Watonga Street were included on this project. Woody Contractors, Inc. Raul E. Lopez 817-392-2457 Dept. Water Sewer Original Contract Amount Revision to match appropriations on C-26983 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $472,684.00 $39,136.47 $15,110.00 $526,930.47 $8,361.06 $535,291.53 $25,591.02 $10,481.02 Change Order # I 3 I Date: I 11/12/2015 City Inspector: I Quincy Jones Phone Number:I 817-992-0873 $114,888.00 $39,136.48 $45,743.00 $199,767.48 $199,767.48 $15,402.45 TPW Storm Water $1,324,795.90 -$78,272.95 Totals Contract Time (Calendar days) $1,912,367.90 .270 $60,853.00 05 $1,246,522.95 $1,973,220.90 275 $8,361.06 $1,246,522.95 $1,981,581.96 275 $74,006.53 $115,000.00 $74,006.53 $84,487.55 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 3,62% $2,390,459.88 JUSTIFICATION (REASONS) FOR CHANGE ORDER e: The change order will primarily provide increased pay item quantities of 1-inch water service , 8-inch water pipe, temporary pavement repair, 6-inch concrete driveway and concrete curb removal that was necessary to complete the project. The change will also allow for the deletion pay item quantities that are no longer needed on the project. RECEIVE° DEC - 9 2015 my OF FORT WORM cyrf SECRETARY bye e Kayser, City S OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX It is understood and agreed that the acceptance of this Change : er by the contractor cortitutes an accord and satisfaction and represents payment 7 Contra of Signtur rd in full (both time and money) for all costs arising out of, or incidental to, the above Change rder. Contractor's Company Name — Woody Contractors, Inc. Inspector Assjsttnftiyectoy,.Water Dlpt) ✓. L� — ,~ Contractor Name Troy Woody Date ii Date, Date.' ll— i q /5 Dater �r30 - --(�on�s�t�rTtf�'on Su ervis r (TPW Dept) /PMAit Manager tkq Date Assistant City Manager - [2,0 traheiLo_ fi T l z -q-,r _� Vouncu Action M&C Number N/A ( t rtequirea)11111111 M&C Date Approved I N/A Fc) Rr Wo R -r H City of Fort Worth Change Order Additions Project Name Tulsa Way Drainage Improvements Project No,(s): I P265-607170107483 / P275-707170107483, P227-207280107483 Project Construction of storm drain mains along Watonga Street and Camp Bowie Blvd to alleviate flooding on Tulsa Way. and re -paving of Watonga Street were included on this project. Description Installation of water, sewer Contractor Woody Contractors, Inc. City Project Mgr. Raul E. Lopez I City Sec No.: I 46047 DOE No.I 6002 I City Proj. No.: I 01074 I Change Order: ( 3 I Date: I 11/12/2015 I City Inspector I Quincy Jones ADDITIONS I ILM UtcSCKINI; UN Unit Unit Cost Total IA 24" DIP Water Water r C �J 10.00 LF $166.00 $1,660.00 4 8" DIP Water, CSS Backfill Water 10.00 LF $109.00 $1,090.00 5 8" PVC Water Pipe Water 38.00 LF $53.00 $2,014.00 13 Temporary Asphalt Paving Repair Water 202.00 LF $20.00 $4,040.00 17 Trench Safety Water 82,00 LF $0.05 $4.10 25 1" Water Service, Meter Reconnection Water 5.00 EA $375.00 $1,875.00 26 1" Water Service Water 5.00 EA $1,150.00 $5,750.00 38 Cement Water 10.50 TN $148.001$1,554.00 39 4" Conc Sidewalk Water 246.60 SF $5.30 $1,306.98 40 6" Concrete Driveway Water 285.39 SF $6.10 $1,740.88 41 7" Conc Curb and Gutter Water 81.25 LF $17.05 $1,385.31 42 Remove Sidewalk Water 246.60 SF $1.55 $382.23 43 Remove Concrete Drive Water 2,156.39 SF $1.05 $2,264.21 44 Remove Conc Curb&Gutter Water 81.25 LF $5.85 $475.31 Page 2 of 4 Water Sewer TPW Additions Sub Total $25,542.02 $25,542.02 1 oRT Wk)RTH City of Fort Worth Change Order Deletions Project Name Tulsa Way Drainage Improvements P265-607170107483 / P275-707170107483, P227-207280107483 Project No.(s): Project Description Contractor DOE No. 6002 I City Sec No.: I 46047 City Proj. No.: 01074 Construction of storm drain mains along Watonga Street and Camp Bowie Blvd to alleviate flooding on Tulsa Way. Installation of water, sewer and re -paving of Watonga Street were included on this project. Woody Contractors, Inc. I Change Order: 3 Date I 11/12/2015 City Project Mgr. j Raul E. Lopez ITEM DESCRIPTION " .. 3A 3311.0001 Ductile Iron Water Fittings 9 0241.1001 Water Line Grouting 19 3311.0001 Ductile Iron Water Fittings Less than 16" Water Main 24 3312.2004 1" Private Water Service 32 3305.0206 Imported Embedment/Backfill, Acceptable Backfill 34 Price differential (vs. 8") for 24" domestic service tapping saddles 35 0241.1700 Pavement Pulverization 36 3212.0302 2" Asphalt Type D 37 3211.0702 8" Cement Treatment 45 Paving Construction Allowance City Inspector: DELETIONS DEPT Water Water Water Water Water Water Water Water Water Water Page 3 of 4 Quincy Jones Qty Unit Unit Cost Total 1.33 Ton $3,000.00 $3,990.00 10.00 CY $200.00 $2,000.00 0.06 Ton $3,000.00 $180.00 30.00 LF $20.00 $600.00 260,00 $15,00 $3,900.00 1.00 EA $130.00 $130.00 26.25 SY $2.65 $69.56 26.25 SY $13.27 $348.34 26.25 SY $1.45 $38.06 5,925.00 EA $1.00 $5,925.00 (Water (Sewer ITPW (Deletions Sub Total $17,180.96 $17,180.96 `'IIVVBE Sab N/A MIWBE Breakdown for this Change Order Type of Service Amount for this CO Total $0.00 Previous Change Orders DATE AMOUNT Total $0.00 Page 4 of 4