Loading...
HomeMy WebLinkAboutContract 46047-CO2FORT WORTH Project Name:I Project No.(s): Project Description: Contractor: City Project Mgr.I Phone Number:I City of Fort Worth Change Order Request Tulsa Way Drainage Improvements P265-607170107483 / P275-707170107483, P227- 207280107483 DOE No. 6002 CITY S .CRFYAW, CONTRACT NO... I City Sec No.: I 46047 City Proj. No.:101074 Construction of storm drain mains along Watonga Street and Camp Bowie Blvd to alleviate flooding on Tulsa Way. Installation of water, sewer and re -paving of Watonga Street were included on this project. Woody Contractors, Inc. I Change Order# I 2 I Date: Raul E. Lopez 817-392-2457 Dept. Water Original Contract Amount Revision to match appropriations on C-26983 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date !Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) $472,684.00 $39,136.47 $15,110.00 $526,930.47 $526,930.47 $25,591.02 $10,481.02 City Inspector: I Quincy Jones Phone Number:I 817-992-0873 Sewer $114,888.00 $39,136.48 $154,024.48 $45,743.00 $199,767.48 $1,246,522.95 $15,402.45 $74,006.53 $15,402.45 $74,006.53 $30,340.55 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER The change order will allow for the replacement of the severely deteriorated sanitary sewer main located immediately upstream of a project sewer main. I 9/10/2015 Contract Time (Calender days) $1,912,367.90 .270 05 $15,110.00 275 SEcRrwfRTy RtrARY OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX TPW Storm Water $1,324,795.90 -$78,272.95 $1,246,522,95 b Totals $1,927,477.90 $45,743.00 $1,973,220.90 $115,000.00 $99,890.00 $30,340.55 3.18% $2,390,459.88 Secretary It is understood and agreed that the acceptance 6 ils,y the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, Otinci ental to, the above Change Order. Contractor Na Troy Woody Inspector Assistant Direct�(Wateerr Dept M&C Number Manyf• r �g Tupervi�Pept do is 11/`1/i' %%r Assistant City,Ma uouncu Actionkef} Kequt Date Date Q Pr/I3. Z%Z N/A 1 M&C Date Approved N/A co,), Date I/ Date Date FORT WORTH City of Fort Worth Change Order Additions Project Name Project No.(s): Project Description Contractor City Project Mgr. Tulsa Way Drainage Improvements P265-607170107483 / P275-707170107483, P227-207280107483 I City Sec No.: I 46047 DOE No.I 6002 I City Proj. No.: I 01074 Construction of storm drain mains along Watonga Street and Camp Bowie Blvd to alleviate flooding on Tulsa Way. Installation of water, sewer and re -paving of Watonga Street were included on this project. Woody Contractors, Inc. 'Change Order: I 2 I Date: I 9/10/2015 Raul E. Lopez I City Inspector I Quincy Jones ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 2 8" Sewer Pipe Sewer 144,00 LF $69.00 $16,836.00 5 Remove 4" Sewer Manhole Sewer 1.00 EA $350.00 $350.00 6 Sanitary Line Grouting Sewer 0.75 CY $400.00 $300.00 10 Trench Safety Sewer 244.00 LF $1.00 $244.00 12 4" Manhole Sewer 3.00 EA $3,200.00 $9,600.00 13 Manhole Vacuum Testing Sewer 3.00 EA $150.00 $450.00 15 Pre -CCTV Inspection Sewer 244.00 LF $3.00 $732.00 16 Post -CCTV Inpection Sewer 244.00 LF $2.00 $488.00 18 Concrete Collar Sewer 3.00 EA $900.00 $2,700.00 31 5" Wide Asphalt Trench Repair Sewer 139.00 LF $57.00 $7,923.00 32 4" Sewer Services Sewer 3.00 EA $900.00 $2,700.00 33 Sewer Service Asphalt Repair Sewer 60.00 LF $57.00 $3,420.00 Page 2 of 4 (Water Sewer ITPW (Additions Sub Total $45,743.00 $45,743.00 FORT WORTH City of Fort Worth Change Order Deletions Project Name Tulsa Way Drainage Improvements P265-607170107483 / P275-707170107483, P227-207280107483 Project No.(s): Project Description Contractor City Project Mgr. ITEM DESCRIPTION City Sec No.: I 46047 6002 City Proj. No.: 01074 Construction of storm drain mains along Watonga Street and Camp Bowe Blvd to alleviate flooding on Tulsa Way. Installation of water, sewer and re -paving of Watonga Street were included on this project. DOE No. Woody Contractors, Inc. I Change Order Raul E. Lopez Date I 9/10/2015 City Inspector: I Quincy Jones DELETIONS DEPT Qty Unit Unit Cost Total Page 3 of 4 (Water Sewer ITPW (Deletions Sub Total MWBE Sub Co # MIWBE Breakdown for this Change Order Type of Service Amount for this CO Total Previous Change Orders DATE I AMOUNT Total $0.00 Page 4 of 4