Loading...
HomeMy WebLinkAboutContract 59187-PM1CSC No. 59187-PM1 04/26/23, FORTWORTH. CONTRACT FOR THE CONSTRUCTION OF Chisholm Trail Ranch Section 3 Phase IB Water, Sanitary Sewer, Storm Sewer, Pavement & Street Light Improvements IPRC22-0095 City Project No. 104064 FID No. 30114-0200431-104064-EO7685 File No. W-2823 X-27357 Mattie Parker David Cooke Mayor City Manager Chris Harder. Director, Water Department Lauren L. Prieur Director, Transportation and Public Works Department Prepared for The City of Fort Worth January 2023 LA14 LJA ENGINEERING TEXAS REGISTRATION F-1386 6060 North Central Expressway Suite 400 Dallas, TX 75206 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 5 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions nn�3 kwit ie t Bidders nn�3 irs+..,,etiors t Last Revised 03/20/2020 004100 00 42 43 0043 3 Bidde s Bid Form Proposal Form Unit Price Bid Bon 03/20/2020 040:2,12014 05/22/2019 0402,12014 0045 11 Bidders Pr-eg alifieation's Prequalification Statement nn /nvTr02i2014 09/01/2015 0045 12 nno0 45 13 Bidder- v-o,,,,. lifi .a4iE r kWipa"i n 03 in v 00 45 26 Contractor Compliance with Workers' Compensation Law a„siness 04/02/2014 nQi 00 4540 00 52 43 M iner-ity Enterprise Goal Agreement a 06/16/2016 00 61 25 Certificate of Insurance 07/01/2011 00 62 13 Performance Bond 01/31/2012 00 62 14 Payment Bond 01/31/2012 00 62 19 Maintenance Bond 01/31/2012 i ii i ii 00 72 00 00 73 00 Generai Conditions Supplementary Conditions T 07/01/2011 0073 10 Standard City Conditions of the Construction Contract for Developer 01/10/2013 Awarded Projects Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 Preconstruction Meeting 08/30/2013 013120 � Pro_�ot�Ieeti�gs mini ,120 in 01 32 33 Preconstruction Video 08/30/2013 01 33 00 Submittals 08/30/2013 01 3= 13 Spoolal. Rlojeet Pr-,,eedt e 09/ � 01 45 23 Testing and Inspection Services 03/20/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH Chisholm Trail Ranch Phase IB STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 104064 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: htto://fortworthtexas.gov/tow/contractors/ or httos:Haoos.fortworthtexas.2ov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition rUt liyy no...ey linbaa 12/20/2012 02 41 14 0241 15 r nepA Paving Removal 12i�tz 02/02/2016 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 0334 13 Controlled Low Strength Material (CLSM) 12/20/2012 03 34 16 Concrete Base Material for Trench Repair 12/20/2012 03 80 00 Modifications to Existing Concrete Structures 12/20/2012 Division 26 - Electrical 26 05 00 Common Work Results for Electrical 11/22/2013 2605 10 Demolition for Electrical Systems 12/20/2012 26 05 33 Raceways and Boxes for Electrical Systems 12/20/2012 26 05 43 Underground Ducts and Raceways for Electrical Systems 07/01/2011 26 05 50 Communications Multi -Duct Conduit 02/26/2016 Division 31 - Earthwork 31 1000 Site Clearing 12/20/2012 3123 16 Unclassified Excavation 01/28/2013 B E)FFO 0, �8 l �r 1 i� �'ZIT:S ants 01i -3 31 25 00 Erosion and Sediment Control 12/20/2012 31 37 00 Riprap 12/20/2012 Division 32 - Exterior Improvements 3201 18 Temporary Asphalt Paving Repair 12/20/2012 32 0l 29 �-z-vr�� Z7�3 r t nop ;,. .��'�'�'\'�0 �:mg�ccpssa i i�iz 1'f/'f�-201QW2 32 1129 Flexible Base Gatifses Lime Treated Base Courses 12/20/2012 32 1133 Cement Treated Base Courses 12/20/2012 11 2,z Liquid tod fail Deal/lizaaf 08i21,L2015 32 12 16 Asphalt Paving 12/20/2012 32 1273 Asphalt Paving Crack Sealants 12/20/2012 CITY OF FORT WORTH Chisholm Trail Ranch Phase IB STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 104064 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 5 32 13 13 Concrete Paving 12/20/2012 32 1320 Concrete Sidewalks, Driveways and Barrier Free Ramps 06/05/2018 32 1373 Concrete Paving Joint Sealants 12/20/2012 32 16 13 Concrete Curb and Gutters and Valley Gutters 10/05/2016 32 1723 Pavement Markings 11/22/2013 32 1725 37� 37�0 Gufb A dl-ioo Lkvntrng (`1,ai Fences *a Gates Wire Fences Ga4e 1 1 iO4 ,1201 3� 1 ) 7 0Q i2l'2 z Z7�9 32 32-13 and WeedFo, ees and Gates C..f�.t in Plata !`.,ne-ete Retaining Walls 1242z 96,10542018 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 32 93 43 Trees and Shrubs 12/20/2012 Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 33 01 31 Closed Circuit Television (CCTV) Inspection 03/03/2016 33o3 lo Bypa&3 iMmering f Existing Sewer- Syste 11 �'�12 3304 10 n� Joint Bonding and Electrical Isolation raagnesi 12/20/2012 33 33 04-30 33 04 40 , Anode de Cathodic Preteet r Syste v, Tom pe -ai-zy Water- - Set -vie Cleaning and Acceptance Testing of Water Mains 12i�ii 0710T 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 3305 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 3305 12 Water Line Lowering 12/20/2012 3305 13 Frame, Cover and Grade Rings — Cast Iron 01/22/2016 3305 13.10 Frame, Cover and Grade Rings — Composite 01/22/2016 3305 14 Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to 12/20/2012 Grade 3305 17 3 2�0Auger-1 Concrete Collars 12/20/2012 3-3-A�-2� 22�z T unr�.l T � � � Stool Casing -Pipe 2izQ0'Q0 Q 12�Q 17�7Q0'Q0Q 33�3 33 0524 Hand T,wmoli*g Irez2knlia , r.,f Pipe i Casing Tunnel Liner- D14e 17�7zzr20/2012 06/lvvr19/2013 of fie,- or- 33 05 26 Utility Markers/Locators 12/20/2012 33 05 30 Location of Existing Utilities 12/20/2012 33 11 05 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 33 1 1 1 3 Cmno'�l" to Lso, a Pipe, Bar- xx7,-.,..pe , Steel Cylinder- Type 1'f /'f z 33 1 1 1 1 Burie Steel -Pipe and Fittings 1')�7zzr�O/2012 33 1210 Water Services 1-inch to 2-inch 02/14/2017 ?,-3 1211 r , fge W ref Metefs 1 � i�iz 33 1220 Resilient Seated Gate Valve 12/20/2012 CITY OF FORT WORTH Chisholm Trail Ranch Phase IB STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 104064 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 5 33 1225 Connection to Existing Water Mains 02/06/2013 33 1230 Combination Air Valve Assemblies for Potable Water Systems 12/20/2012 33 1240 Fire Hydrants 01/03/2014 33 1250 Water Sample Stations 12/20/2012 33 31 17 33 31 13 Cur-ed i Ulaee Pipe (CIPPI s-ngkozC R.'.' C/.alarj' Sewers 12Q0/2017 rtrcvrcmz 22� High Density Polyethylene (14PPE) Ripe fo Sanitary 1 f/' z 33 31 20 Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 06/19/2013 �� ..., Uol:,�.,1 Chloride (PVC) rlese Pr r_.. Profile ayit--Sani�&T e� 1242042012 Pipe �z 333122 Sanitary Sews.- �* rJ4114g z 12QOr/201- 33 3 i 23 Sanitafy Sewor Piro EnAlargemet 17/'fzzrz0/2 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 33 31 70 Camkr at�.m ^:,.mar Eannitarr,' Sewe,. L..,-..o Ai1.,� i2Q0/20i2 3339 10 Cast -in -Place Concrete Manholes 12/20/2012 33 39 20 �v Precast Concrete Manholes 12/20/2012 rrrzvrzvaz 22�no 33 39 60 Wastewater- neeess Chamber- (WAG) Epoxy Liners for Sanitary Sewer Structures 17�7zz90/2 i , 12/20/2012 3341 10 Reinforced Concrete Storm Sewer Pipe/Culverts 07/01/2011 33 41 11 High Density P lyehyle«e 7 nr n ��� .1 � 1�/tF �,`�'� �Ll 1�90,120,2 r�-avravzz 33 41 12 Reinfer-eed Pol. ethle e F;P..PE) Pirc 11,113,12015 117/7�n0L 33 4600 S4d ttinage 070 1201 1 33-46 02 Tfeacl: D (ino 07i0n 3349 10 Cast -in -Place Manholes and Junction Boxes 12/20/2012 33 49 20 Curb and Drop Inlets 12/20/2012 33 49 40 Storm Drainage Headwalls and Wingwalls 07/01/2011 Division 34 - Transportation 2/1 11 13 Removing Tr-affie Signals 12 i�12 34 41 5 Reet ulc& Rarnd Flashing Beaeo 11,''�i3 34 41 20 Roadway Illumination Assemblies 12/20/2012 34 41 20.01 Arterial LED Roadway Luminaires 06/15/2015 z n n�02 Ffee.. ay LED n ,,., dw n6 no c�1�5 34 41 20.03 Residential LED Roadway Luminaires 06/15/2015 34 41 30 Aluminum Signs 11/12/2013 34 41 50 Single -Mode Fiber Optic Cable 02/26/2016 3471 13 Traffic Control 11/22/2013 CITY OF FORT WORTH Chisholm Trail Ranch Phase IB STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 104064 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 5 Appendix GG 4.01 Wailaylity 4 GC-4.02 Subsurface and Physical Conditions GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH Chisholm Trail Ranch Phase IB STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS CPN 104064 Revised March 20, 2020 CONATSER (WATER, SEWER, STORM, & PAVING) CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 Chisholm Trail Ranch Section 3 - Phase 113 CPN 104064 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Project Item Information Paving and Utilities DAP - BID PROPOSAL Page I of 7 Bidder's Application Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT I: WATER IMPROVEMENTS 1 3311.0261 8" PVC Water Pipe 3311 12 LF 2258 $50.00 $112,900.00 2 3305.0109 Trench Safety 33 05 10 LF 2258 $2.00 $4,516.00 3 3311.0001 Ductile Iron Water Fittings w/ Restraint 3311 11 TON 0.75 $7,000.00 $5,250.00 4 3312.0001 Fire Hydrant 33 12 40 EA 5 $5,000.00 $25,000.00 5 3312.2003 1" Water Service 331210 EA 57 $1,150.00 $65,550.00 6 3312.3003 8" Gate Valve 33 12 20 EA 9 $1,450.00 $13,050.00 7 3312.0117 Connection to Existing 4"-12" Water Main 33 12 25 EA 3 $1,500.00 $4,500.00 8 3305.0003 8" Waterline Lowering 33 05 12 EA 4 $2,000.00 $8,000.00 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TOTAL UNIT I: WATE 2 IMPROVEMENTS $238,766.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 20221220 00 42 43_Bid Proposal_DAP.xls Chisholm Trail Ranch Section 3 - Phase 113 CPN 104064 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Project Item Information Paving and Utilities DAP - BID PROPOSAL Page 2 of 7 Bidder's Application Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. Measure Quantity UNIT II: SANITARY SEWER IMPROVEMENT 1 3301.0002 Post -CCTV Inspection 3301 31 LF 2581 $3.00 $7,743.00 2 3301.0101 Manhole Vacuum Testing 3301 30 EA 7 $150.00 $1,050.00 3 3331.4115 8" Sewer Pipe (SDR-26, ASTM D3034) 3331 20 LF 2401 $66.00 $158,466.00 4 3331.4116 8" Sewer Pipe, CSS Backfill 3331 20 LF 180 $76.00 $13,680.00 5 3305.0109 Trench Safety 3305 10 LF 2581 $2.00 $5,162.00 6 3339.1001 4' Manhole 33 39 10, EA 6 33 39 20 $5,200.00 $31,200.00 7 3339.0001 Epoxy Manhole Liner 33 39 60 VF 19 $445.00 $8,455.00 8 3331.3101 4" Sewer Service 3331 50 EA 61 $900.00 $54,900.00 9 3305.0113 Trench Water Stops 33 05 15 EA 5 $300.00 $1,500.00 3339.1003 4' Extra Depth Manhole 33 39 10, 10 33 39 20 VF 25 $225.00 $5,625.00 11 3339.1002 4' Drop Manhole 33 39 10, EA 33 39 20 1 $6,000.00 $6,000.00 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $293,781.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 20221220 00 42 43_Bid Proposal_DAP.xls Chisholm Trail Ranch Section 3 - Phase 113 CPN 104064 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 Project Item Information Description 3349.5001 10' Curb Inlet 3341.0201 21" RCP, Class III 3341.0205 24" RCP, Class III 3341.0208 27" RCP, Class III 3341.0309 36" RCP, Class III 3341.0404 42" RCP, Class III 3341.0409 48" RCP, Class III 3305.0109 Trench Safety 3349.0001 4' Storm Junction Box 3349.0002 5' Storm Junction Box 3349.7001 4' Drop Inlet 3349.7002 5' Drop Inlet 3349.5003 20' Curb Inlet Specification Unit of Section No. Measure UNIT III: DRAINAGE IMPROVE BENTS 33 49 20 EA 3341 10 LF 3341 10 LF 3341 10 LF 3341 10 LF 3341 10 LF 3341 10 LF 33 05 10 LF 33 49 10 EA 33 49 10 EA 33 49 20 EA 33 49 20 EA 33 49 20 EA Paving and Utilities DAP - BID PROPOSAL Page 3 of 7 Bidder's Application Bidder's Proposal Bid Unit Price Bid Value Quantity 8 $3,800.00 $30,400.00 262 $72.00 $18,864.00 746 $77.00 $57,442.00 280 $98.00 $27,440.00 354 $120.00 $42,480.00 354 $150.00 $53,100.00 556 $195.00 $108,420.00 2552 $2.00 $5,104.00 7 $6,500.00 $45,500.00 3 $7,500.00 $22,500.00 1 $6,000.00 $6,000.00 1 $7,000.00 $7,000.00 2 $6,000.00 $12,000.00 TOTAL UNIT III: DRAINAGE IMPROVEMENTS $436,250.00 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 20221220 00 42 43_Bid Proposal_DAP.xls Chisholm Trail Ranch Section 3 - Phase 1B CPN 104064 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Paving and Utilities DAP - BID PROPOSAL Page 4 of 7 Bidder's Application Project Item Infomiation Bidder's Proposal Bidlist Item Description Specification Unit of Bid Unit Price Bid Value No. Section No. I Measure Quantity UNIT IV: PAVING IMPROVEMENTS 1 3213.0101 6" Reinforced Conc Pvmt 32 13 13 SY 9554 $54.50 $520,693.00 2 3211.0501 6" Lime Treatment 3211 29 SY 10174 $3.50 $35,609.00 3 3291.0100 Topsoil 3291 19 CY 34 $30.00 $1,020.00 4 3292.0100 Block Sod Placement 32 92 13 SY 67 $8.00 $536.00 5 3213.0301 4" Conc Sidewalk 32 13 20 SF 1633 $4.50 $7,348.50 6 9999.0011 Type III Barricade 00 00 00 EA 2 $1,000.00 $2,000.00 7 3137.0102 Large Stone Riprap, dry 31 3700 SY 33 $125.00 $4,125.00 8 3211.0400 Hydrated Lime (30#/SY per Geotech) 3211 29 TN 155 $225.00 $34,875.00 9 3213.0506 Barrier Free Ramp, Type P-1 32 13 20 EA 10 $2,000.00 $20,000.00 9999.0012 Furnish/install Alum Sig Ground Mount 00 00 00 10 City Standard - R1-1 Stop Sign EA 5 $750.00 $3,750.00 9999.0013 Furnish/install Alum Sig Ground Mount 00 00 00 11 City Standard - Street Name Blade Pair EA 10 $300.00 $3,000.00 12 9999.0014 Remove Barricade & Connect to Existing 00 00 00 EA 3 $1,800.00 $5,400.00 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 TOTAL UNIT IV: PAVING IMPROVEMENTS $638,356.50 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 20221220 00 42 43_Bid Proposal_DAP.xls Chishohn Trail Ranch Section 3 - Phase 1B CPN 104064 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Paving and Utilities DAP - BID PROPOSAL Page 7 of 7 Bidder's Application Project Item Inforrnation Bidder's Proposal Bidlist Item Specification Unit of Bid Description Unit Price Bid Value No Section No. Measure Quantity Bid Summary UNIT I: WATER IMPROVEMENTS $�3 UNIT It: SANITARY SEWER IMPROVEMENTS .766C:gQ $ j 8 UNIT III: DRAINAGE IMPROVEMENTS $436,250.00 UNIT IV: PAVING IMPROVEMENTS $638,358.50 UNIT V: STREET LIGHTING IMPROVEMENTS UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS Total Construction Bid $1,607,153.50 This Bid is submitted by the entity named below: BIDDER: Conaster Construction TX, L.P. 5327 Wichita Street Ft. Worth TX 76119 BY: Brock Huggins TITLE: President DATE: Contractor agrees to complete WORK for FINAL ACCEPTANCE within I00 working days after the date when the CONTRACT commences to run as provided in the General Conditions. END OF SECTION Crl'Y OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2D19 20221220 00 42 43_Did Pmposal_DAF.xIs 00 45 12 DAP PREQUA.LIFTCATION STATEMENT Page 1 of 1 SECTION 00 4512 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work T, ;,e" box rovide the complete ma'or work tie and actual description as :,rovided b,, the Water De; -artment for water and sewer and TPW for pavinM. Major Work Type Concrete Con/Recon Unlimited Water and Wastewater New Development, Rehabilitation, and Redevelopment Open Cut (all sizes) Contractor/Subcontractor Company Name Conatser Construction TX, L.P. Conatser Construction TX, L.P. Prequalification Expiration Date 12/01/24 10/31/23 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Conatser Construction TX, L.P. 5327 WICHITA STREET FT. WORTH, TX 76119 BY: Brock Huggins Agnature) TITLE: President DATE: END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS 00 45 12Prequalifimtlon 5tatemen[_DAP.doc Form Version September 1, 2015 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION' LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 104064. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Conatser Construction TX. L.P. Company 5327 Wichita Street Address Ft. Worth TX 76119 City/State/Zip THE STATE OF TEXAS § COUNTY OF TARRANT § By: Brock Hul<cias (Please Print) Signature: Title: President (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared Brock Hueeins . known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of President for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of A V-* I , 20'Z i0 ft, KATHERINE ROSE J NOTARY PUBLIC i�*�; . �;.�`x; 1139 � Notary Public in and for the State of Texas '',L'r'c Comm. ,_ . it-302025 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 00 52 43 - 1 Developer Awarded Project Agreement Page I of 4 1 SECTION 00 52 43 2 AGREEMENT. 3 4 THIS AGREEMENT, authorized on 4/17/23 is made by and between the Developer, 5 Meritage Homes of Texas LLC, authorized to do business in Texas ("Developer") , and Conatser 6 Construction TX. L.P. _ authorized to do 7 business in Texas, acting by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 Die project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 Chisholm Trail Ranch Section 3 Phase 1B 17 CFA 22-0193 CPN 104064 18 FID No.30114-0200431-104064-EO7685 19 Article 3. CONTRACT TIME_ 20 3.1 Time is of the essence.. 21 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 22 Documents are of the essence to this Contract. 23 3.2 Final Acceptance. 24 The Work will be complete for Final Acceptance within 100 working days after the date 25 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 26 City Conditions of the Construction Contract for Developer Awarded Projects. 27 3.3 Liquidated damages 28 Contractor recognizes that time is of the essence of this Agreement and that Developer 29 will suffer financial loss if the Work is not completed within the times specified in 30 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 31 the Standard City Conditions of the Construction Contract for Developer Awarded 32 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 33 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 34 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 35 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 36 Developer ZERO - ($ 0 ) for each day that expires after the time specified in 37 Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised dune 16, 2016 005243-2 Developer Awarded Project Agreement Page 2 of 4 38 Article 4. CONTRACT PRICE 39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 40 Documents an amount in current funds of One Million Six Hundred Seven Thousand, One 41 Hundred and Fifty -Three and 501100 Dollars ($1,607,153.50). 42 Article 5. CONTRACT DOCUMENTS 43 5.1 CONTENTS: 44 A. The Contract Documents which comprise the entire agreement between Developer and 45 Contractor concerning the Work consist of the following: 46 1. This Agreement. 47 2. Attachments to this Agreement: 48 a. Bid Form (As provided by Developer) 49 1) Proposal Form (DAP Version) 50 2) Prequalification Statement 51 3) State and Federal documents (project specific) 52 b. Insurance ACORD Form(s) 53 c. Payment Bond (DAP Version) 54 d. Performance Bond (DAP Version) 55 e. Maintenance Bond (DAP Version) 56 f. Power of Attorney for the Bonds 57 g. Worker's Compensation Affidavit 58 h. MBE and/or SBE Commitment Form (If required) 59 3. Standard City General Conditions of the Construction Contract for Developer 60 Awarded Projects. 61 4. Supplementary Conditions, 62 5. Specifications specifically made a part of the Contract Documents by attachment 63 or, if not attached, as incorporated by reference and described in the Table of 64 Contents of the Project's Contract Documents. 65 6. Drawings. 66 7. Addenda. 67 8. Documentation submitted by Contractor prior to Notice of Award. 68 9. The following which may be delivered or issued after the Effective Date of the 69 Agreement and, if issued, become an incorporated part of the Contract Documents: 70 a. Notice to Proceed. 71 b. Field Orders. 72 c. Change Orders. 73 d. Letter of Final Acceptance. 74 75 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 4 76 Article 6. INDEMNIFICATION 77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 78 expense, the city, its officers, servants and employees, from and against any and all 79 claims arising out of, or alleged to arise out of, the work and services to be performed 80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 81 under this contract. This indemnification provision is specificallv intended to operate 82 and be effective even if it is alleged or proven that all or some of the damages beine 83 sought were caused. in whole or in: nark br, anv act, omission or neoliaence of the city. 84 This indemnity provision is intended to include, without limitation, indemnity for 85 costs, expenses and legal fees incurred by the city in defending against such claims and 86 causes of actions. 87 88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 89 the city, its officers, servants and employees, from and against any and all loss, damage 90 or destruction of property of the city, arising out of, or alleged to arise out of, the work 91 and services to be performed by the contractor, its officers, agents, employees, 92 subcontractors, licensees or invitees under this contract. This indemnification 93 provision is specificalh intended to operate and be effective even if it is alleged or 94 proven that all or some of the damages being sought were caused. in whale or in part. 95 b►r any act. omission or negligence of the cit.. 96 97 Article 7. MISCELLANEOUS 98 7.1 Terms. 99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 100 the Construction Contract for Developer Awarded Projects. 101 7.2 Assignment of Contract. 102 This Agreement, including all of the Contract Documents may not be assigned by the 103 Contractor without the advanced express written consent of the Developer. 104 7.3 Successors and Assigns. 105 Developer and Contractor each binds itself, its partners, successors, assigns and legal 106 representatives to the other party hereto, in respect to all covenants, agreements and 107 obligations contained in the Contract Documents. 108 7A Severability. 109 Any provision or part of the Contract Documents held to be unconstitutional, void or 110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all 111 remaining provisions shall continue to be valid and binding upon DEVELOPER and 112 CONTRACTOR. 113 7.5 Governing Law and Venue. 114 This Agreement, including all of the Contract Documents is performable in the State of 115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 116 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 005243-4 Developer Awarded Project Agreement Page 4 of 4 117 118 7.6 Authority to Sign. 119 Contractor shall attach evidence of authority to sign Agreement, if other than duly 120 authorized signatory of the Contractor. 121 122 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 123 counterparts. 124 125 This Agreement is effective as of the last date signed by the Parties {"Effective Date'). 126 Contractor: Conatser Construction TX, LY a B�: (Si l ure) Brock Huggins (Printed Name) Title: President Company Name: Conatser Construction TX, L.P. Address: 5327 Wichita Street Cites/State/Zip: Ft. Worth, TX 76119 4/17/23 Date 127 Developer: Merita:- a Homes o "Texas. LLC B: a re) David Au: hinbau: (Printed Name) Title: Vice President Company name: Meritage Homes of Texas, LLC Address: 8840 C• ,ress Waters Blvd. Suite 100 City/State/Zip: Dallas, TX 75019 LiA7r2 Date CrrY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 �►� Bond 40251912 0062 13 - 1 PERFORMANCE BOND Page 1 of 2 1 SECTION 00 6213 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, Conatser Construction TX, L.P. , known as "Principal" herein and g Berkley Insurance Company , a corporate surety(sureties, if more than one) duly authorized to 9 do business in the State of Texas, known as "Surety" herein (whether one or more), are held and 10 firmly bound unto the Developer, Meritage Homes of Texas LLC, authorized to do business in 11 Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the 12 penal sum of, One Million Six Hundred Severs Thousand, One Hundred and Fifty -Three and 13 501100 Dollars ($1,607,153.50), lawful money of the United States, to be paid in Fort Worth, 14 Tarrant County, Texas for the payment of which sum well and truly to be made jointly unto the 15 Developer and the City as dual obligees, we bind ourselves, our heirs, executors, administrators, 16 successors and assigns, jointly and severally, firmly by these presents. 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities 19 Agreement, CFA 22-0193 : and 20 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 21 the 17 day of April 12023 which Contract is hereby referred to and made a 22 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 23 and other accessories defined by law, in the prosecution of the Work, including any Change 24 Orders, as provided for in said Contract designated as Chisholm Trail Ranch Section 3 Phase 1B. 25 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 26 shall faithfully perform it obligations under the Contract and shall in all respects duly and 27 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 28 specifications, and contract documents therein referred to, and as well during any period of 29 extension of the Contract that may be granted on the part of the Developer and/or City, then this 30 obligation shalt be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 006213-2 PERFORMANCE BOND Page 2 of 2 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division. This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 17 day of April , 20 23 . ATTEST: (Prix clpal) Secreta , Ko_kA:,� e471—C,' Witness as to Principal ti Witness as to Surety PRINCIPAL. Conatser Construction TX. L.P. BY: Signature d Brock Huggins, President Name and Title Address: 5327 Wichita Street Ft. Worth. TX 76119 SURETY: Berkley Insurance Company BY: S gnature Sophinie Hunter, Attorney -In -Fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Telephone Number: 214-989-0000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Bond #0251912 0062 14 - 1 PAYMENTBOND Page I of 2 I SECTION 00 6214 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Conatser. Construction TX. L.P. , known as "Principal" 9 herein, and Berkley Insurance Company , a corporate 10 surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known 11 as "Surety" herein (whether one or more), are held and firmly bound unto the Developer, 12 Meritage Homes of Texas LLC, authorized to do business in Texas "(Developer"), and the City of 13 Fort Worth, a Texas municipal corporation ("City"), in the penal sum of One Million Six 14 Hundred Seven Thousand, One Hundred and Fifty -Three and 501100 Dollars ($1, 607,153.50), 15 lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the 16 payment of which sum well and truly be made jointly unto the Developer and the City as dual 17 obligees, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly 18 and severally, firmly by these presents: 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth, by and through a Community Facilities 21 Agreement, CFA 22-0193 : and 22 WHEREAS, Principal has entered into a certain written Contract with Developer, 23 awarded the 17 day of April , 20 23 , which Contract is hereby 24 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all 25 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 26 Work as provided for in said Contract and designated as Chisholm Trail Ranch Section 3 Phase 27 113. 28 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 29 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 30 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 31 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 32 force and effect. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 00 62 14 - 2 PAYMENT BOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 17 day of 6 April , 2023 7 PRINCIPAL. Conatser Construction TX L.P. ATTEST: BY: 4ure Sign Brock Hu;, L ins. President (Principal) Secreig Name and Title Address: 5327 W;chita Street -Ft. Worth_ TX 76119 Witness as to Principal SURETY: Berkley Insurance Company ATTEST: BY: _ ZrAz siLI1_ _ Signat ,re So: hinie Hunter, Attorney -In -Fact (Surety) Secretary Name and Title Address: 5005 LBJ Freeway , Suite 1500 Dallas, TX 75244 Witness as to Surety Telephone Number: 214-989-0000 8 9 Note: If signed by an officer of the Surety, there must be on file a certified extract from the 10 bylaws showing that this person has authority to sign such obligation. If Surety's physical I t address is different from its mailing address, both must be provided. 12 13 The date of the bond shall not be prior to the date the Contract is awarded. 14 END OF SECTION CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Bond #0251912 006219-1 MAINTENANCE BOND Page 1 of 3 1 SECTION 00 6219 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Conatser Construction TX: L.P. , known as "Principal" 9 herein and Berkley Insurance Company , a corporate surety (sureties, if 10 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein 11 (whether one or more), are held and firmly bound unto the Developer, Meritage Homes of Texas 12 LLC, authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas 13 municipal corporation ("City"), in the sum of One Million Six Hundred Seven Thousand, One 14 Hundred and Fifty -Three and 501100 Dollars ($1, 607,153.50), lawful money of the United 15 States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum well and truly 16 be made jointly unto the Developer and the City as dual obligees and their successors, we bind 17 ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 18 firmly by these presents. 19 20 WHEREAS, Developer and City have entered into an Agreement for the construction of 21 community facilities in the City of Fort Worth by and through a Community Facilities 22 Agreement, CFA 22-0193 ; and 23 WHEREAS, the Principal has entered into a certain written contract with the Developer 24 awarded the 17 day of April 2023 , which Contract is 25 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 26 materials, equipment labor and other accessories as defined by law, in the prosecution of the 27 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 28 the "Work") as provided for in said Contract and designated as Chisholm Trail Ranch Section 3 29 Phase 113; and 30 31 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 32 accordance with the plans, specifications and Contract Documents that the Work is and will 33 remain free from defects in materials or workmanship for and during the period of two (2) years 34 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2021 006219-2 MAINTENANCE BOND Page 2 of 3 1 2 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 3 upon receiving notice from the Developer and/or City of the need thereof at any time within the 4 Maintenance Period. 5 6 NOW THEREFORE, the condition of this obligation is such that if Principal shall 7 remedy any defective Work, for which timely notice was provided by Developer or City, to a 8 completion satisfactory to the City, then this obligation shall become null and void; otherwise to 9 remain in full force and effect. 10 11 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 12 noticed defective Work, it is agreed that the Developer or City may cause any and all such 13 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 14 by the Principal and the Surety under this Maintenance Bond; and 15 16 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 17 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 18 Worth Division; and 19 20 PROVIDED FURTHER, that this obligation shall be continuous in nature and 21 successive recoveries may be had hereon for successive breaches. 22 23 24 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2021 006219-3 MAINTENANCE BOND Page 3 of 3 1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 17 day of 3 April 2023 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 ATTEST: (Princi l) Secretary Witness as to Principal ATTEST: (Surety) Secretary Witness as to Surety PRINCIPAL: Conatser Construction TX. L.P. BY: Signaturel— Brock Huscins. President Name and Title Address: 5327 Wichita Street_ Ft. Worth. TX 76119 SURETY: Berkley Insurance Company BY: *Snat,4r6e4z Sophinie Hunter, Attorney -In -Fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas. TX 75244 Telephone Number: 214-989-0000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2021 No. BI-7280k-el POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted and appointed, and does by these presents make, constitute and appoint: Ricardo A Reyna; Don E. Cornell; Sophinte Hunter; Robbi Morales; Kelly A. Westbrook, Tina McEwan; Joshua Saunders; Tonle Petranek; or Mikaela Peppers of Aon Risk Services Southwest, Inc. of Dallas, TX its true and lawful Attorney -in -Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25, 2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attomey-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney -in -fact and revoke any power of attorney previously granted; and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WHE'MP, the Company has caused these presents to be signed and attested by its appropriate officers and its corporate seal hereunto affixed thisl 1th day of Map i 2022 {a�£F4 Attest / '' BerkIcs Insurance Company By By Je nwn r Executive Vice President & Secretary 5` li rc4 esident STATE OF CONNECTICUT ) ) ss: COUNTY OF FAI RF'IELD ) Sworn to bafore me, a Notary Public in the State of Connecticut, this 11th day of May 2022 . by Ira S. Lederman and 7cfrCy K Hafl:er who are swom to me to be the Executive Vice President !'Secretary, and t Seaior Brice President, eCompany. ut ""M EH respectively, InsurancnroTAYUM 10 t"r COMMISSIONAEXPIRES WAJT :arary l'tiblic, State of Co>anectiout CERTI nCATE 1, the undersigned, Assistant Secretary of BERI LEY 1NSUIL&NCE COMPANY, DO HEREBY CERTIFY that the foregoing is a. trus, correct and complete copy of the original Power of Attorney; that said Power of Attorney has not bees revoked or rescinded and-f�-bk authority of the Attorney -in -Fact set forth therein, who executed the bond or undertaking to which this Power of shed, is in full force and effect as of this date. 4A der my hand and seal of the Company, this day of � 1,7p Vincent P. Forte IMPORTANT NOTICE To obtain information or make a complaint: You may call Berkley Surety Group, LLC and its affiliates by telephone for information or to make a complaint: BERKLEY SURETY GROUP, LLC Please send all notices of claim on this bond to: Berkley Surety Group, LLC (866) 768-3534 412 Mount Kemble Avenue, Suite 31ON Morristown, NJ 07960 Attn: Surety Claims Department You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: http:11www.tdi.state.tx.us E-mail: Cons um e rProtecti on(6-)tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact your agent or Berkley Surety Group, LLC first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become a part or condition of the attached document and is given to comply with Texas legal and regulatory requirements. CONASTER LIGHTING Lighting DAP-BIDPROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Description I Specification Unit of Bid Unit Price Bid Value No. SectionIQo. Measure Quantity UNIT V: STREET LIGHTING IMPR VEMEN 1 _ 3441.3301 Rdwy Ilium Foundation_TY 1 - 3441 20 EA TM 13 $1,200000 $15,600,00 2 3441.3341 Rdwy Ilium TY 11 Pole - — 34 41 20 _ EA 13 $1,800.00 $23.40600.00 _ 3 Luminair 9999.0016 Type R2 e 00 00 00 EA 11 $850.00 4— T 9999.0017 Type R4 Luminaire - 00 00 00 _ EA _ 2 $950.00 �$9,350.00 $1 900,000 5 3441.1638 Furnish/Install Type 33B Arm — 34 41 20 - EA 13 $600.00 $7.800.00 6 2605.3015 2" Condt CH PVC S80 (T) - 26 05 33. Y.� LF 650 $15.00 $9_750.00 7 — - -. 9 10 11 -- - - 13- -14 15�_------- -16 17 _18 -1.8 - 20 -21 - - - - 22 23 -- - -- — w24- -- 25 -- -- ---- - - -. - - - - - - - - - _26 27 —28- - 29- _ 30 31 32--- - 33 — - 34 --- ---- - - _ 35 _-736 37 _ 99 39 - 40 _ -- -- 41 4 --43...---- - 44..._.-_- 45 TOTAL UNIT V: STREET LIGHTIN 'q IMPR0`6 EMENTS CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version Mq 22.2019 $67,800.00 2022122D 004247 Bid Proposal DAPxIs SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Iaghtmy DAP - BID PROPOSAL. Page 7 of 7 Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Unit Of Bid DescriptionSpecification Unit Price Bid Value No. No. Measure Quantity Bid Summary UNIT l: WATER Irv--Kvvetvu=-NTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS $67,800.00 UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS Total Construction Bid $67,800.00 This Bid is submitted by the entity named below: BIDDER BY: Brack Huggins Conaster Construction TX, UP 5327 Wichita Street Ft Worth TX 76119 TITLE: President DATE: Contractor agrees to complete WORK for FINAL ACCEPTANCE within 30 working days after the date when the CONTRACT commences to run as provided in the General Conditions_ END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Vwsim May 22, 2019 20221220 00 42 43 Bid Proposd DAP.As 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 00 45 12 - 1 PREQUALWICATION STATEMENT Page 1 of 1 SECTION 00 4512 PREQUALIFICATION STATEMENT Each Bidder for a City procurement is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. Major Work Contractor/Subcontractor Company Name Prequalification T% pe Ex, iration Date Roadway & Conatser Construction TX, L.P. 1/26124 Pedestrian Li. htin The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: Conatser Construction TX. L.P. Company 5327 Wichita Street Address Ft. Worth, TX 76119 City/State/Zip By: Brock Hu.: ir_s (Please Print) Signature: _w, Title: President (Please Print) Date: END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised July 1, 2011 4/17/23 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 004526-1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Page 1 of 1 SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed on City Project No. 104064. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: Conatser Construction TX. L.P. Company 5327 Wichita Street Address Ft. Worth. TX 76119 City/State/Zip THE STATE OF TEXAS COUNTY OF TARRANT By: Brock Huggins (Please Print) Signature: Title: President (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared Brock Hup;.- ins , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of President for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this day of N--i i , 20'Z5 ri;} p'• •., KATHERINE R05E !l U y { f NOTARY PUBLIC IDO 1334B7933 NotaryPublic in and for the State of Texas '9=.....• State of TO= Comm. E)p,11.30-2025 END OF SECTION CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Revised April 2, 2014 005243-1 Developer Awarded Project Agreement Page 1 of 4 1 SECTION 00 52 43 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on 4/17/23 is made by and between the Developer, 5 Meritage Homes of Texas LLC, authorized to do business in Texas ("Developer") , and Conatser 6 Construction TX, L.P. , authorized to do 7 business in Texas, acting by and through its duly authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORD 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 Chisholm Trail Ranch Section 3 Phase IB 17 CFA 22-0193 . CPN104064 18 FID No.30114-0200431.-104064-EO7685 19 Article 3. CONTRACT TIME 20 3.1 Time is of the essence. 21 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 22 Documents are of the essence to this Contract. 23 3.2 Final Acceptance. 24 The Work will be complete for Final Acceptance within 30 working days after the date 25 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 26 City Conditions of the Construction Contract for Developer Awarded Projects. 27 3.3 Liquidated damages 28 Contractor recognizes that time is of the essence of this Agreement and that Developer 29 will suffer financial loss if the Work is not completed within the times specified in 30 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 31 the Standard City Conditions of the Construction Contract for Developer Awarded 32 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 33 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 34 completed on time. Accordingly, instead of requiring any such proof , Contractor agrees 35 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 36 Developer ZERO ($ 0 ) for each day that expires after the time specified in 37 Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of Acceptance. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 00 52 43 - 2 Developer Awarded Project Agreement Page 2 of 4 38 Article 4. CONTRACT PRICE 39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 40 Documents an amount in current funds of Six -Seven Thousand, Eight Hundred and 00/100 41 Dollars ($67,800.00). 42 Article 5. CONTRACT DOCUMENTS 43 5.1 CONTENTS: 44 A. The Contract Documents which comprise the entire agreement between Developer and 45 Contractor concerning the Work consist of the following: 46 1. This Agreement. 47 2. Attachments to this Agreement: 48 a. Bid Form (As provided by Developer) 49 1) Proposal Form (DAP Version) 50 2) Prequalification Statement 51 3) State and Federal documents (project specific) 52 b. Insurance ACORD Form(s) 53 c. Payment Bond (DAP Version) 54 d. Performance Bond (DAP Version) 55 e. Maintenance Bond (DAP Version) 56 f. Power of Attorney for the Bonds 57 g. Worker's Compensation Affidavit 58 h. MBE and/or SBE Commitment Form (If required) 59 3. Standard City General Conditions of the Construction Contract for Developer 60 Awarded Projects. 61 4. Supplementary Conditions. 62 5. Specifications specifically made a part of the Contract Documents by attachment 63 or, if not attached, as incorporated by reference and described in the Table of 64 Contents of the Project's Contract Documents. 65 6. Drawings. 66 7. Addenda. 67 8. Documentation submitted by Contractor prior to Notice of Award. 68 9. The following which may be delivered or issued after the Effective Date of the 69 Agreement and, if issued, become an incorporated part of the Contract Documents: 70 a. Notice to Proceed. 71 b. Field Orders. 72 c. Change Orders. 73 d. Letter of Final Acceptance. 74 75 CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 005243-3 Developer Awarded Project Agreement Page 3 of 4 76 Article 6. INDEMNIFICATION 77 6.1 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 78 expense, the city, its officers, servants and employees, from and against any and all 79 claims arising out of, or alleged to arise out of, the work and services to be performed 80 by the contractor, its officers, agents, employees, subcontractors, licenses or invitees 81 under this contract. This indemnification provision is specificalh intended to overate 82 and be effective even if it is alleged or proven that all or some of the damaces beine 83 sought were caused. in whole or in Dart, by anv act. omission or nevh:,-encc of the cite. 84 This indemnity provision is intended to include, without limitation, indemnity for 85 costs, expenses and legal fees incurred by the city in defending against such claims and 86 causes of actions. 87 88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 89 the city, its officers, servants and employees, from and against any and all loss, damage 90 or destruction of property of the city, arising out of, or alleged to arise out of, the work 91 and services to be performed by the contractor, its officers, agents, employees, 92 subcontractors. licensees or invitees under this contract. This indemnification 93 provision is specificalIv intended to operate and be effective even if it is alleged or 94 proven that all or some of the damages beine sought were caused. in whole or in Dart- 95 b► anv act. omission or ne0h!enee of the city.. 96 97 Article 7. MISCELLANEOUS 98 7.1 Terms. 99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 100 the Construction Contract for Developer Awarded Projects. 101 7.2 Assignment of Contract. 102 This Agreement, including all of the Contract Documents may not be assigned by the 103 Contractor without the advanced express written consent of the Developer. 104 7.3 Successors and Assigns. 105 Developer and Contractor each binds itself, its partners, successors, assigns and legal 106 representatives to the other party hereto, in respect to all covenants, agreements and 107 obligations contained in the Contract Documents. 108 7.4 Severability. 109 Any provision or part of the Contract Documents held to be unconstitutional, void or 110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all ill remaining provisions shall continue to be valid and binding upon DEVELOPER and 112 CONTRACTOR. 113 7.5 Governing Law and Venue. 114 This Agreement, including all of the Contract Documents is performable in the State of 115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 116 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 005243-4 Developer Awarded Project Agreement Page 4 of 4 117 118 7.6 Authority to Sign. 119 Contractor shall attach evidence of authority to sign Agreement, if other than duly 120 authorized signatory of the Contractor. 121 122 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 123 counterparts. 124 125 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 126 Contractor: Conatser Construction TX, L.P. (Sis,4i�ture) Brock Huggins (Printed Name) Title: President Company Name: Conatser Construction TX, L.P. Address: 5327 Wichita Street Cii ,/State/Zi : Ft. Worth, TX 76119 4/17/23 Date 127 Developer: Meritae Homes of "Texas. LLC B\: _ (Si to ) David Aughinbaugh (Printed Name) Title: Vice President Company name: Meritage Homes of Texas, LLC Address: 8840 C -ress Waters Blvd, Suite 100 Cit /State/Zi:,: Dallas, TX 75019 Date CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS Revised June 16, 2016 Bond #0251913 0062 13- 1 PERFORMANCE 13OND Page 1 of 2 1 SECTION 00 6213 2 PERFORMANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 That we, .Conatser Construction TX,.L.P, known as "Principal" herein and 8 Berkley Insurance Company , a corporate surety(sureties, if more than one) duly authorized to 9 do business in the State of Texas, known as "Surety" herein (whether one or more), are held and 10 firmly bound unto the Developer, Meritage Homes of Texas LLC, authorized to do business in 11 Texas ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the 12 penal sum of, Sixty -Seven Thousand, Eight Hundred and 00/100 Dollars ($67,800.00), lawful 13 money of the United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of 14 which sum well and truly to be made jointly unto the Developer and the City as dual obligees, we 15 bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, 16 firmly by these presents. 17 WHEREAS, Developer and City have entered into an Agreement for the construction of 18 community facilities in the City of Fort Worth by and through a Community Facilities 19 Agreement, CFA 22-0193 : and 20 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded 21 the 17 day of April , 2023 , which Contract is hereby referred to and made a 22 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor 23 and other accessories defined by law, in the prosecution of the Work, including any Change 24 Orders, as provided for in said Contract designated as Chisholm Trail Ranch Section 3 Phase 113. 25 NOW, THEREFORE, the condition of this obligation is such that if the said Principal 26 shall faithfully perform it obligations under the Contract and shall in all respects duly and 27 faithfully perform the Work, including Change Orders, under the Contract, according to the plans, 28 specifications, and contract documents therein referred to, and as well during any period of 29 extension of the Contract that may be granted on the part of the Developer and/or City, then this 30 obligation shall be and become null and void, otherwise to remain in full force and effect. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 006213-2 PERFORMANCE BOND Page 2 of 2 I PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 3 Worth Division. 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue. IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 17 day of April , 2023 PRINCIPAL: Conatser Construction TX. L.P. ATTEST: (Princ pal Secretary Witness as to Principal Witness as to Surety BY: Signature 00 Brock Huia;ins, President Name and Title Address: 5327 Wichita Street Ft. Worth, TX 76119 SURETY: Berkley Insurance Company Y BY:,�} u ? Si ature Sophinie Hunter, Attomey-In-Fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Telephone Number: 214-989-0000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Bond #0251913 00 62 14 - 1 PAYMENT BOND Page 1 of 2 1 SECTION 00 6214 2 PAYMENT BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we, Conatser Construction TX. L.P. , known as "Principal"9 herein, and Berkley Insurance Company , a corporate 10 surety ( or sureties if more than one), duly authorized to do business in the State of Texas, known as 11 "Surety" herein (whether one or more), are held and firmly bound unto the Developer, 12 Meritage Homes of Texas LLC, authorized to do business in Texas "(Developer"), and the City of 13 Fort Worth, a Texas municipal corporation ("City"), in the penal sum of Sixty -Seven Thousand, 14 Eight Hundred and 00/100 Dollars ($67,800.00). lawful money of the United States, to be paid in 15 Fort Worth, Tarrant County, Texas, for the payment of which sum well and truly be made jointly 16 unto the Developer and the City as dual obligees, we bind ourselves, our heirs, executors, 17 administrators, successors and assigns, jointly and severally, firmly by these presents: 18 WHEREAS, Developer and City have entered into an Agreement for the construction of 19 community facilities in the City of Fort Worth, by and through a Community Facilities 20 Agreement, CFA 22-0193 ; and 21 WHEREAS, Principal has entered into a certain written Contract with Developer, 22 awarded the 17 day of April , 2023 which Contract is hereby 23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all 24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the 25 Work as provided for in said Contract and designated as Chisholm Trail Ranch Phase Section 3 26 113. 27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if 28 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in 29 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under 30 the Contract, then this obligation shall be and become null and void; otherwise to remain in full 31 force and effect. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 006214-2 PAYMENTBOND Page 2 of 2 1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the 2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in 3 accordance with the provisions of said statute. 4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED 5 this instrument by duly authorized agents and officers on this the 17 day of 6 ADM .2023 . PI 8 9 10 11 12 13 14 ATTEST: (Principal) Secretary 6 Witness as to Principal ATTEST: (Surety) Secretary Witness as to Surety PRINCIPAL: Conatser Construction TX L.P BY: „�, - Slgnature Brock Hu-;,. ins. President Name and Title Address: 5327 Wichita Street Ft. Worth. TX 76119 SURETY. Berkley Insurance Company BY: _. Signat,:re Sophinie Hunter, Attorney -in -Fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Telephone Number: 214-989-0000 Note: If signed by an officer of the Surety, there must be on file a certified extract from the bylaws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. END OF SECTION CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2012 Bond #0251913 0062 19 - 1 MAINTENANCE BOND Page 1 of 3 1 SECTION 00 6219 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we Conatser Construction TX. L.P. , known as "Principal" 9 herein and Berkley Insurance Company , a corporate surety (sureties, if 10 more than one) duly authorized to do business in the State of Texas, known as "Surety" herein 11 (whether one or more), are held and firmly bound unto the Developer, Meritage Homes of Texas 12 LLC, authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas 13 municipal corporation ("City"), in the sum of Sixty -,Seven Thousand, Eight Hundred and 00/100 14 Dollars ($67, 800.00), lawful money of the United States, to be paid in Fort Worth, Tarrant 15 County, Texas, for payment of which sum well and truly be made jointly unto the Developer and 16 the City as dual obligees and their successors, we bind ourselves, our heirs, executors, 17 administrators, successors and assigns, jointly and severally, firmly by these presents. 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA 22-0193 : and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the 17 day of April . 2023 , which Contract is 24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 25 materials, equipment labor and other accessories as defined by law, in the prosecution of the 26 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 27 the "Work") as provided for in said Contract and designated as Chisholm Trail Ranch Section 3 28 Phase 1B; and 29 30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 31 accordance with the plans, specifications and Contract Documents that the Work is and will 32 remain free from defects in materials or workmanship for and during the period of two (2) years 33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 34 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2021 006219-2 MAINTENANCE BOND Page 2 of 3 1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 2 upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE, the condition of this obligation is such that if Principal shall 6 remedy any defective Work, for which timely notice was provided by Developer or City, to a 7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to a remain in full force and effect. 9 10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely 1 I noticed defective Work, it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond; and 14 15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 21 22 23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2021 006219-3 MAINTENANCE BOND Page 3 of 3 i IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 instrument by duly authorized agents and officers on this the 17 day of 3 April 2023 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 ATTEST: (Print ecretary Witness as to Principal ATTEST: (Surety) Secre ` Witness as to Surety PRINCIPAL: Conatser Construction TX. L.P. BY: Signature 00 Brock Huvcins, President Name and Title Address: 5327 Wichita Street Ft. Worth. TX 76119 SURETY: Berkley Insurance Company y IGi�th BY: Si nature Sophinie Hunter, Attorney -In -Fact Name and Title Address: 5005 LBJ Freeway, Suite 1500 Dallas, TX 75244 Telephone Number: 214-989-0000 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised January 31, 2021 No. BI-7280k el POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON, DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware, having its principal office in Greenwich, CT, has made, constituted and appointed, and does by these presents make, constitute and appoint: Ricardo J. Reyna; Don E. Cornell, Sophinie Hunter, Robbi Morales; Kelly A. Westbrook; 77na McEwan; Joshua Saunders; Tonle Petranek; or Mikaela Peppers of Aon Risk Services Southwest, Ina of Dallas, TX its true and lawful Attorney -in -Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed Fifty Million and 00/100 U.S. Dollars (U.S.$50,000,000.00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by, the laws of the State of Delaware, without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following resolutions which were duly and validly adopted at a meeting of the Board of Directors ofthe Company held on January 25, 2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney -in -fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such attorney -in -fact and revoke any power of attorney previously granted; and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds, undertakings, recognizances, or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the manner and to the extent therein stated; and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney -in -fact named; and further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligation of the Company; and such signature and seal when so used shall have the same force and effect as though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company, notwithstanding the fact that they may have ceased to be such at the time when such instruments shall be issued. IN WITNESS WHEREOF, the Company has caused these presents to, be signed and attested by its appropriate officers and its corporate seal hereunto affixed thist 1th day of May l2022 'SVRwv Attest Berkle = Insurance Company By , , " L 1 L9 is're 7e }tt�� a tawA�`` Executive Vice President & Secretary se - 1resident STATE OF CO.' NECTICUT ) ) ss: COUNTY OF FADZFIELD ) Swam to before me, a Notary Public in the State of Connecticut, this 11th day of Ma.y _ 2022 by Ira S. Lederman and Jeffrey M, Rafter who are sworn to me to be the Executive Vice President �Secretxry, and trA Senior irce President, respectively, ofBorkie Insurance Co an . warlin c nun,oeaxet ' P Yy y mP Y NOTARY TICUT �%,`t�, � �tr ran. s a iR� ` �Y Vublic, State of Cosyaecticut CERT 1171CATE I, the undersigned, Assistant Secretary of BERKLEY INSURANCE COMPANY, DO BEREBY CERTIFY that the foregoing is a true, correct and complete copy of the original Power of Attorney, ;hat said Power of Attorney has not been revoked or rescisaded noel t'aat t authority of the Attorney -in -Fact set forth therein, who executed the bond or undeztaking to which this Power of titeA p�ched, is in full force and effect as ofthis date. �; �•yy �n " `�.,der my hand and seal of the Company, this • day of w 49 41 Vincent P. Forte - ...�-- IMPORTANT NOTICE To obtain information or make a complaint: You may call Berkley Surety Group, LLC and its affiliates by telephone for information or to make a complaint: BERKLEY SURETY GROUP, LLC Please send all notices of claim on this bond to: Berkley Surety Group, LLC (866) 768-3534 412 Mount Kemble Avenue, Suite 31ON Morristown, NJ 07960 Attn: Surety Claims Department You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httc1://www.tdi.state.tx.us E-mail: ConsumerProtection c)tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact your agent or Berkley Surety Group, LLC first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become a part or condition of the attached document and is given to comply with Texas legal and regulatory requirements. STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Article 1 — Definitions and Terminology.......... 1.01 Defined Terms ............................... 1.02 Terminology .................................. Article 2 — Preliminary Matters ....................... 2.01 Before Starting Construction...... 2.02 Preconstruction Conference........ 2.03 Public Meeting ............................ Page .............................................1 .............................................1 ............................................. 5 ....................................................... 6 ....................................................... 6 ....................................................... 6 ....................................................... 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection.................................................................................................................. 21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs.............................................................................................22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 5.18 Indemnification ............................................ 5.19 Delegation of Professional Design Services 5.20 Right to Audit: ............................................. 5.21 Nondiscrimination ........................................ Article 6 - Other Work at the Site....... 6.01 Related Work at Site ....... Article 7 - City's Responsibilities ............................................ 7.01 Inspections, Tests, and Approvals ....................... 7.02 Limitations on City's Responsibilities ................ 7.03 Compliance with Safety Program ........................ Article 8 - City's Observation Status During Construction....... 8.01 City's Project Representative ................................. 8.02 Authorized Variations in Work .............................. 8.03 Rejecting Defective Work ...................................... 8.04 Determinations for Work Performed ...................... Article 9 - Changes in the Work ...................... 9.01 Authorized Changes in the Work 9.02 Notification to Surety ................... Article 10 - Change of Contract Price; Change of Contract Time 10.01 Change of Contract Price ........................................... 10.02 Change of Contract Time ........................................... 10.03 Delays......................................................................... Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ............ 11.01 Notice of Defects.............................................................................................................. 11.02 Access to Work................................................................................................................. 11.03 Tests and Inspections........................................................................................................ 11.04 Uncovering Work............................................................................................................. 11.05 City May Stop the Work................................................................................................... 11.06 Correction or Removal of Defective Work...................................................................... 11.07 Correction Period.............................................................................................................. 11.08 City May Correct Defective Work................................................................................... Article 12 - Completion .......................................... 12.01 Contractor's Warranty of Title ........... 12.02 Partial Utilization ................................ 12.03 Final Inspection ................................... 12.04 Final Acceptance ................................. Article 13 - Suspension of Work ..................................... 13.01 City May Suspend Work ............................. Article 14 - Miscellaneous ......................................... 14.01 Giving Notice ......................................... CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 24 24 25 25 26 26 26 26 26 27 a a ... 29 ... 29 ... 29 ... 29 ... 30 ... 30 ... 30 ... 30 ... 31 ................................. 32 ................................. 32 ................................. 32 ................................. 32 ................................. 33 ............................................................. 33 ............................................................. 33 34 34 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 14.02 Computation of Times................................................................................................................ 34 14.03 Cumulative Remedies................................................................................................................. 34 14.04 Survival of Obligations............................................................................................................... 35 14.05 Headings......................................................................................................................................35 CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions in. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of apart of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either parry or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits of: a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: NONE Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: NONE Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence:: NONE Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. c. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: 1. for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) ® Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. ® Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 1 lth day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. Developer/Contractor. City will forward all invoices for retests to 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 113 CPN 104064 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1 B CPN 104064 011100-1 DAP SUMMARY OF WORK SECTION 01 11 00 SUMMARY OF WORK PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Summary of Work to be performed in accordance with the Contract Documents B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 2. Division 1 - General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 CH I S H OLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 11 00 - 2 DAP SUMMARY OF WORK Page 2 of 3 b. Excavated and waste materials shall be stored in such a way as not to interfere with the use of spaces that may be designated to be left free and unobstructed and so as not to inconvenience occupants of adjacent property. c. If the street is occupied by railroad tracks, the Work shall be carried on in such manner as not to interfere with the operation of the railroad. 1) All Work shall be in accordance with railroad requirements set forth in Division 0 as well as the railroad permit. D. Work within Easements 1. Do not enter upon private property for any purpose without having previously obtained permission from the owner of such property. 2. Do not store equipment or material on private property unless and until the specified approval of the property owner has been secured in writing by the Contractor and a copy furnished to the City. 3. Unless specifically provided otherwise, clear all rights -of -way or easements of obstructions which must be removed to make possible proper prosecution of the Work as a part of the project construction operations. 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, lawns, fences, culverts, curbing, and all other types of structures or improvements, to all water, sewer, and gas lines, to all conduits, overhead pole lines, or appurtenances thereof, including the construction of temporary fences and to all other public or private property adjacent to the Work. 5. Notify the proper representatives of the owners or occupants of the public or private lands of interest in lands which might be affected by the Work. a. Such notice shall be made at least 48 hours in advance of the beginning of the Work. b. Notices shall be applicable to both public and private utility companies and any corporation, company, individual, or other, either as owners or occupants, whose land or interest in land might be affected by the Work. c. Be responsible for all damage or injury to property of any character resulting from any act, omission, neglect, or misconduct in the manner or method or execution of the Work, or at any time due to defective work, material, or equipment. 6. Fence a. Restore all fences encountered and removed during construction of the Project to the original or a better than original condition. b. Erect temporary fencing in place of the fencing removed whenever the Work is not in progress and when the site is vacated overnight, and/or at all times to provide site security. c. The cost for all fence work within easements, including removal, temporary closures and replacement, shall be subsidiary to the various items bid in the project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 CH I S H OLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 11 00 - 3 DAP SUMMARY OF WORK Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects [Insert Project Number] Revised December 20, 2012 CH I S H OLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 012500-1 DAP SUBSTITUTION PROCEDURES SECTION 0125 00 SUBSTITUTION PROCEDURES PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 4 The procedure for requesting the approval of substitution of a product that is not equivalent to a product which is specified by descriptive or performance criteria or defined by reference to 1 or more of the following: a. Name of manufacturer b. Name of vendor c. Trade name d. Catalog number 2. Substitutions are not "or -equals". B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Request for Substitution - General 1. Within 30 days after award of Contract (unless noted otherwise), the City will consider formal requests from Contractor for substitution of products in place of those specified. 2. Certain types of equipment and kinds of material are described in Specifications by means of references to names of manufacturers and vendors, trade names, or catalog numbers. a. When this method of specifying is used, it is not intended to exclude from consideration other products bearing other manufacturer's or vendor's names, trade names, or catalog numbers, provided said products are "or -equals," as determined by City. 3. Other types of equipment and kinds of material may be acceptable substitutions under the following conditions: a. Or -equals are unavailable due to strike, discontinued production of products meeting specified requirements, or other factors beyond control of Contractor; or, CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 b. Contractor proposes a cost and/or time reduction incentive to the City. 1.5 SUBMITTALS A. See Request for Substitution Form (attached) B. Procedure for Requesting Substitution 1. Substitution shall be considered only: a. After award of Contract b. Under the conditions stated herein 2. Submit 3 copies of each written request for substitution, including: a. Documentation 1) Complete data substantiating compliance of proposed substitution with Contract Documents 2) Data relating to changes in construction schedule, when a reduction is proposed 3) Data relating to changes in cost b. For products 1) Product identification a) Manufacturer's name b) Telephone number and representative contact name c) Specification Section or Drawing reference of originally specified product, including discrete name or tag number assigned to original product in the Contract Documents 2) Manufacturer's literature clearly marked to show compliance of proposed product with Contract Documents 3) Itemized comparison of original and proposed product addressing product characteristics including, but not necessarily limited to: a) Size b) Composition or materials of construction c) Weight d) Electrical or mechanical requirements 4) Product experience a) Location of past projects utilizing product b) Name and telephone number of persons associated with referenced projects knowledgeable concerning proposed product c) Available field data and reports associated with proposed product 5) Samples a) Provide at request of City. b) Samples become the property of the City. c. For construction methods: 1) Detailed description of proposed method 2) Illustration drawings C. Approval or Rejection 1. Written approval or rejection of substitution given by the City 2. City reserves the right to require proposed product to comply with color and pattern of specified product if necessary to secure design intent. 3. In the event the substitution is approved, if a reduction in cost or time results, it will be documented by Change Order. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 4. Substitution will be rejected if: a. Submittal is not through the Contractor with his stamp of approval b. Request is not made in accordance with this Specification Section c. In the Developer's opinion, acceptance will require substantial revision of the original design d. In the City's or Developer's opinion, substitution will not perform adequately the function consistent with the design intent 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. In making request for substitution or in using an approved product, the Contractor represents that the Contractor: 1. Has investigated proposed product, and has determined that it is adequate or superior in all respects to that specified, and that it will perform function for which it is intended 2. Will provide same guarantee for substitute item as for product specified 3. Will coordinate installation of accepted substitution into Work, to include building modifications if necessary, making such changes as may be required for Work to be complete in all respects 4. Waives all claims for additional costs related to substitution which subsequently arise 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature Recommended as noted Firm Not recommended Address By Date Date Remarks Telephone For Use by City: Approved Rejected City Date Recommended Received late CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013119-1 DAP PRECONSTRUCTION MEETING SECTION 01 31 19 PRECONSTRUCTION MEETING PART1- GENERAL 1.1 SUMMARY A. Section Includes: Page 1 of 3 1. Provisions for the preconstruction meeting to be held prior to the start of Work to clarify construction contract administration procedures B. Deviations from this City of Fort Worth Standard Specification 1. No construction schedule required unless requested by the City. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Attend preconstruction meeting. 2. Representatives of Contractor, subcontractors and suppliers attending meetings shall be qualified and authorized to act on behalf of the entity each represents. 3. Meeting administered by City may be tape recorded. a. If recorded, tapes will be used to prepare minutes and retained by City for future reference. B. Preconstruction Meeting 1. A preconstruction meeting will be held within 14 days after the delivery of the distribution package to the City. a. The meeting will be scheduled and administered by the City. 2. The Project Representative will preside at the meeting, prepare the notes of the meeting and distribute copies of same to all participants who so request by fully completing the attendance form to be circulated at the beginning of the meeting. 3. Attendance shall include: a. Developer and Consultant b. Contractor's project manager c. Contractor's superintendent d. Any subcontractor or supplier representatives whom the Contractor may desire to invite or the City may request CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013119-3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013233-1 DAP PRECONSTRUCTION VIDEO Page 1 of 2 SECTION 0132 33 PRECONSTRUCTION VIDEO PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative and procedural requirements for: a. Preconstruction Videos B. Deviations from this City of Fort Worth Standard Specification 1. Though not mandatory, it is highly recommended on infill developer projects. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Preconstruction Video 1. Produce a preconstruction video of the site/alignment, including all areas in the vicinity of and to be affected by construction. a. Provide digital copy of video upon request by the City. 2. Retain a copy of the preconstruction video until the end of the maintenance surety period. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO PART 3 - EXECUTION [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE Page 2 of 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 SECTION 0133 00 DAP SUBMITTALS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 013300-1 DAP SUBMITTALS Page 1 of 8 General methods and requirements of submissions applicable to the following Work -related submittals: a. Shop Drawings b. Product Data (including Standard Product List submittals) c. Samples d. Mock Ups B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Coordination 1. Notify the City in writing, at the time of submittal, of any deviations in the submittals from the requirements of the Contract Documents. 2. Coordination of Submittal Times a. Prepare, prioritize and transmit each submittal sufficiently in advance of performing the related Work or other applicable activities, or within the time specified in the individual Work Sections, of the Specifications. b. Contractor is responsible such that the installation will not be delayed by processing times including, but not limited to: a) Disapproval and resubmittal (if required) b) Coordination with other submittals c) Testing d) Purchasing e) Fabrication f) Delivery g) Similar sequenced activities c. No extension of time will be authorized because of the Contractor's failure to transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 '/2 inches x 11 inches to 8 '/2 inches x 11 inches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013300-3 DAP SUBMITTALS Page 3 of 8 2. The Project title and number 3. Contractor identification 4. The names of: a. Contractor b. Supplier c. Manufacturer 5. Identification of the product, with the Specification Section number, page and paragraph(s) 6. Field dimensions, clearly identified as such 7. Relation to adjacent or critical features of the Work or materials 8. Applicable standards, such as ASTM or Federal Specification numbers 9. Identification by highlighting of deviations from Contract Documents 10. Identification by highlighting of revisions on resubmittals 11. An 8-inch x 3-inch blank space for Contractor and City stamps F. Shop Drawings 1. As specified in individual Work Sections includes, but is not necessarily limited to: a. Custom -prepared data such as fabrication and erection/installation (working) drawings b. Scheduled information c. Setting diagrams d. Actual shopwork manufacturing instructions e. Custom templates f. Special wiring diagrams g. Coordination drawings h. Individual system or equipment inspection and test reports including: 1) Performance curves and certifications i. As applicable to the Work 2. Details a. Relation of the various parts to the main members and lines of the structure b. Where correct fabrication of the Work depends upon field measurements 1) Provide such measurements and note on the drawings prior to submitting for approval. G. Product Data 1. For submittals of product data for products included on the City's Standard Product List, clearly identify each item selected for use on the Project. 2. For submittals of product data for products not included on the City's Standard Product List, submittal data may include, but is not necessarily limited to: a. Standard prepared data for manufactured products (sometimes referred to as catalog data) 1) Such as the manufacturer's product specification and installation instructions 2) Availability of colors and patterns 3) Manufacturer's printed statements of compliances and applicability 4) Roughing -in diagrams and templates 5) Catalog cuts 6) Product photographs CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013300-4 DAP SUBMITTALS Page 4 of 8 7) Standard wiring diagrams 8) Printed performance curves and operational -range diagrams 9) Production or quality control inspection and test reports and certifications 10) Mill reports 11) Product operating and maintenance instructions and recommended spare -parts listing and printed product warranties 12) As applicable to the Work H. Samples As specified in individual Sections, include, but are not necessarily limited to: a. Physical examples of the Work such as: 1) Sections of manufactured or fabricated Work 2) Small cuts or containers of materials 3) Complete units of repetitively used products color/texture/pattern swatches and range sets 4) Specimens for coordination of visual effect 5) Graphic symbols and units of Work to be used by the City for independent inspection and testing, as applicable to the Work I. Do not start Work requiring a shop drawing, sample or product data nor any material to be fabricated or installed prior to the approval or qualified approval of such item. 1. Fabrication performed, materials purchased or on -site construction accomplished which does not conform to approved shop drawings and data is at the Contractor's risk. 2. The City will not be liable for any expense or delay due to corrections or remedies required to accomplish conformity. 3. Complete project Work, materials, fabrication, and installations in conformance with approved shop drawings, applicable samples, and product data. J. Submittal Distribution Electronic Distribution a. Confirm development of Project directory for electronic submittals to be uploaded to City's Buzzsaw site, or another external FTP site approved by the City. b. Shop Drawings 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals b) If Contractor requires more than 1 hard copy of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. c. Product Data 1) Upload submittal to designated project directory and notify appropriate City representatives via email of submittal posting. 2) Hard Copies a) 3 copies for all submittals d. Samples 1) Distributed to the Project Representative 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013300-6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013300-7 DAP SUBMITTALS Page 7 of 8 9. When the shop drawings have been completed to the satisfaction of the City, the Contractor may carry out the construction in accordance therewith and no further changes therein except upon written instructions from the City. 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days following receipt of submittal by the City. L. Mock ups 1. Mock Up units as specified in individual Sections, include, but are not necessarily limited to, complete units of the standard of acceptance for that type of Work to be used on the Project. Remove at the completion of the Work or when directed. M. Qualifications 1. If specifically required in other Sections of these Specifications, submit a P.E. Certification for each item required. N. Request for Information (RFI) 1. Contractor Request for additional information a. Clarification or interpretation of the contract documents b. When the Contractor believes there is a conflict between Contract Documents c. When the Contractor believes there is a conflict between the Drawings and Specifications 1) Identify the conflict and request clarification 2. Sufficient information shall be attached to permit a written response without further information. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 013300-8 DAP SUBMITTALS Page 8 of 8 PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 10401XI] 01KI X40 I Mei Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised August 30, 2013 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 1 of 2 SECTION 0145 23 TESTING AND INSPECTION SERVICES PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Testing and inspection services procedures and coordination B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. a. Contractor is responsible for performing, coordinating, and payment of all Quality Control testing. b. City is responsible for performing and payment for first set of Quality Assurance testing. 1) If the first Quality Assurance test performed by the City fails, the Contractor is responsible for payment of subsequent Quality Assurance testing until a passing test occurs. a) Final acceptance will not be issued by City until all required payments for testing by Contractor have been paid in full. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Testing 1. Complete testing in accordance with the Contract Documents. 2. Coordination a. When testing is required to be performed by the City, notify City, sufficiently in advance, when testing is needed. b. When testing is required to be completed by the Contractor, notify City, sufficiently in advance, that testing will be performed. 3. Distribution of Testing Reports a. Electronic Distribution 1) Confirm development of Project directory for electronic submittals to be uploaded to the City's document management system, or another form of distribution approved by the City. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 45 23 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 2) Upload test reports to designated project directory and notify appropriate City representatives via email of submittal posting. 3) Hard Copies a) 1 copy for all submittals submitted to the Project Representative b. Hard Copy Distribution (if required in lieu of electronic distribution) 1) Tests performed by City a) Distribute 1 hard copy to the Contractor 2) Tests performed by the Contractor a) Distribute 3 hard copies to City's Project Representative 4. Provide City's Project Representative with trip tickets for each delivered load of Concrete or Lime material including the following information: a. Name of pit b. Date of delivery c. Material delivered B. Inspection 1. Inspection or lack of inspection does not relieve the Contractor from obligation to perform work in accordance with the Contract Documents. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 03/20/2020 D.V. Magaiia Removed reference to Buzzsaw and noted that electronic submittals be uploaded through the City's document management system. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 015000-1 DAP TEMPORARY FACILITIES AND CONTROLS Page 1 of 4 SECTION 0150 00 TEMPORARY FACILITIES AND CONTROLS PART1- GENERAL 1.1 SUMMARY A. Section Includes: Provide temporary facilities and controls needed for the Work including, but not necessarily limited to: a. Temporary utilities b. Sanitary facilities c. Storage Sheds and Buildings d. Dust control e. Temporary fencing of the construction site B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Temporary Utilities 1. Obtaining Temporary Service a. Make arrangements with utility service companies for temporary services. b. Abide by rules and regulations of utility service companies or authorities having jurisdiction. c. Be responsible for utility service costs until Work is approved for Final Acceptance. 1) Included are fuel, power, light, heat and other utility services necessary for execution, completion, testing and initial operation of Work. 2. Water a. Contractor to provide water required for and in connection with Work to be performed and for specified tests of piping, equipment, devices or other use as required for the completion of the Work. b. Provide and maintain adequate supply of potable water for domestic consumption by Contractor personnel and City's Project Representatives. c. Coordination 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 50 00 - 2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 d. Contractor Payment for Construction Water 1) Obtain construction water meter from City for payment as billed by City's established rates. 3. Electricity and Lighting a. Provide and pay for electric powered service as required for Work, including testing of Work. 1) Provide power for lighting, operation of equipment, or other use. b. Electric power service includes temporary power service or generator to maintain operations during scheduled shutdown. 4. Telephone a. Provide emergency telephone service at Site for use by Contractor personnel and others performing work or furnishing services at Site. 5. Temporary Heat and Ventilation a. Provide temporary heat as necessary for protection or completion of Work. b. Provide temporary heat and ventilation to assure safe working conditions. B. Sanitary Facilities 1. Provide and maintain sanitary facilities for persons on Site. a. Comply with regulations of State and local departments of health. 2. Enforce use of sanitary facilities by construction personnel at job site. a. Enclose and anchor sanitary facilities. b. No discharge will be allowed from these facilities. c. Collect and store sewage and waste so as not to cause nuisance or health problem. d. Haul sewage and waste off -site at no less than weekly intervals and properly dispose in accordance with applicable regulation. 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 4. Remove facilities at completion of Project C. Storage Sheds and Buildings 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor above ground level for materials and equipment susceptible to weather damage. 2. Storage of materials not susceptible to weather damage may be on blocks off ground. 3. Store materials in a neat and orderly manner. a. Place materials and equipment to permit easy access for identification, inspection and inventory. 4. Equip building with lockable doors and lighting, and provide electrical service for equipment space heaters and heating or ventilation as necessary to provide storage environments acceptable to specified manufacturers. 5. Fill and grade site for temporary structures to provide drainage away from temporary and existing buildings. 6. Remove building from site prior to Final Acceptance. D. Temporary Fencing Provide and maintain for the duration or construction when required in contract documents E. Dust Control CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 50 00 - 3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1. Contractor is responsible for maintaining dust control through the duration of the project. a. Contractor remains on -call at all times b. Must respond in a timely manner F. Temporary Protection of Construction 1. Contractor or subcontractors are responsible for protecting Work from damage due to weather. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 INSTALLATION A. Temporary Facilities 1. Maintain all temporary facilities for duration of construction activities as needed. 3.5 [REPAIR] / [RESTORATION] 3.6 RE -INSTALLATION 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES A. Temporary Facilities CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1. Remove all temporary facilities and restore area after completion of the Work, to a condition equal to or better than prior to start of Work. 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised JULY 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 015526-1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 1 of 3 SECTION 0155 26 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Administrative procedures for: a. Street Use Permit b. Modification of approved traffic control c. Removal of Street Signs B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 34 71 13 — Traffic Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES A. Reference Standards 1. Reference standards cited in this specification refer to the current reference standard published at the time of the latest revision date logged at the end of this specification, unless a date is specifically cited. 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 1.4 ADMINISTRATIVE REQUIREMENTS A. Traffic Control 1. General a. When traffic control plans are included in the Drawings, provide Traffic Control in accordance with Drawings and Section 34 71 13. b. When traffic control plans are not included in the Drawings, prepare traffic control plans in accordance with Section 34 71 13 and submit to City for review. 1) Allow minimum 10 working days for review of proposed Traffic Control. B. Street Use Permit 1. Prior to installation of Traffic Control, a City Street Use Permit is required. a. To obtain Street Use Permit, submit Traffic Control Plans to City Transportation and Public Works Department. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 015526-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1) Allow a minimum of 5 working days for permit review. 2) Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. C. Modification to Approved Traffic Control Prior to installation traffic control: a. Submit revised traffic control plans to City Department Transportation and Public Works Department. 1) Revise Traffic Control plans in accordance with Section 34 71 13. 2) Allow minimum 5 working days for review of revised Traffic Control. 3) It is the Contractor's responsibility to coordinate review of Traffic Control plans for Street Use Permit, such that construction is not delayed. D. Removal of Street Sign 1. If it is determined that a street sign must be removed for construction, then contact City Transportation and Public Works Department, Signs and Markings Division to remove the sign. E. Temporary Signage 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting requirements of the latest edition of the Texas Manual on Uniform Traffic Control Devices (MUTCD). 2. Install temporary sign before the removal of permanent sign. 3. When construction is complete, to the extent that the permanent sign can be reinstalled, contact the City Transportation and Public Works Department, Signs and Markings Division, to reinstall the permanent sign. F. Traffic Control Standards 1. Traffic Control Standards can be found on the City's Buzzsaw website. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 015713-1 DAP STORM WATER POLLUTION PREVENTION Page 1 of 3 SECTION 0157 13 STORM WATER POLLUTION PREVENTION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Procedures for Storm Water Pollution Prevention Plans B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 3125 00 — Erosion and Sediment Control 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Construction Activities resulting in less than 1 acre of disturbance a. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 2. Construction Activities resulting in greater than 1 acre of disturbance a. Measurement and Payment shall be in accordance with Section 3125 00. 1.3 REFERENCES A. Abbreviations and Acronyms 1. Notice of Intent: NOI 2. Notice of Termination: NOT 3. Storm Water Pollution Prevention Plan: SWPPP 4. Texas Commission on Environmental Quality: TCEQ 5. Notice of Change: NOC A. Reference Standards 1. Reference standards cited in this Specification refer to the current reference standard published at the time of the latest revision date logged at the end of this Specification, unless a date is specifically cited. 2. Integrated Storm Management (iSWM) Technical Manual for Construction Controls 1.4 ADMINISTRATIVE REQUIREMENTS A. General 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 1.5 SUBMITTALS A. SWPPP Submit in accordance with Section 0133 00, except as stated herein. a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City as follows: 1) 1 copy to the City Project Manager a) City Project Manager will forward to the City Department of Transportation and Public Works, Environmental Division for review CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 0157 13 -3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 B. Modified SWPPP 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City in accordance with Section 0133 00. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME END OF SECTION Revision Log SUMMARY OF CHANGE CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised July 1, 2011 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 SECTION 0160 00 PRODUCT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 01 60 00 DAP PRODUCT REQUIREMENTS Page 1 of 2 1. References for Product Requirements and City Standard Products List B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A list of City approved products for use is available through the City's website at: httDs://apps.fortworthtexas.2ov/ProiectResources/ and following the directory path: 02 - Construction Documents\Standard Products List A. Only products specifically included on City's Standard Product List in these Contract Documents shall be allowed for use on the Project. 1. Any subsequently approved products will only be allowed for use upon specific approval by the City. B. Any specific product requirements in the Contract Documents supersede similar products included on the City's Standard Product List. 1. The City reserves the right to not allow products to be used for certain projects even though the product is listed on the City's Standard Product List. C. Although a specific product is included on City's Standard Product List, not all products from that manufacturer are approved for use, including but not limited to, that manufacturer's standard product. D. See Section 0133 00 for submittal requirements of Product Data included on City's Standard Product List. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 60 00 DAP PRODUCT REQUIREMENTS Page 2 of 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that the City approved products list is accessible through the City's website. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised March 20, 2020 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 016600-1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 1 of 4 SECTION 0166 00 PRODUCT STORAGE AND HANDLING REQUIREMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Scheduling of product delivery 2. Packaging of products for delivery 3. Protection of products against damage from: a. Handling b. Exposure to elements or harsh environments B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY AND HANDLING A. Delivery Requirements 1. Schedule delivery of products or equipment as required to allow timely installation and to avoid prolonged storage. 2. Provide appropriate personnel and equipment to receive deliveries. 3. Delivery trucks will not be permitted to wait extended periods of time on the Site for personnel or equipment to receive the delivery. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 66 00 - 2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 4. Deliver products or equipment in manufacturer's original unbroken cartons or other containers designed and constructed to protect the contents from physical or environmental damage. 5. Clearly and fully mark and identify as to manufacturer, item and installation location. 6. Provide manufacturer's instructions for storage and handling. B. Handling Requirements 1. Handle products or equipment in accordance with these Contract Documents and manufacturer's recommendations and instructions. C. Storage Requirements 1. Store materials in accordance with manufacturer's recommendations and requirements of these Specifications. 2. Make necessary provisions for safe storage of materials and equipment. a. Place loose soil materials and materials to be incorporated into Work to prevent damage to any part of Work or existing facilities and to maintain free access at all times to all parts of Work and to utility service company installations in vicinity of Work. 3. Keep materials and equipment neatly and compactly stored in locations that will cause minimum inconvenience to other contractors, public travel, adjoining owners, tenants and occupants. a. Arrange storage to provide easy access for inspection. 4. Restrict storage to areas available on construction site for storage of material and equipment as shown on Drawings, or approved by City's Project Representative. 5. Provide off -site storage and protection when on -site storage is not adequate. a. Provide addresses of and access to off -site storage locations for inspection by City's Project Representative. 6. Do not use lawns, grass plots or other private property for storage purposes without written permission of owner or other person in possession or control of premises. 7. Store in manufacturers' unopened containers. 8. Neatly, safely and compactly stack materials delivered and stored along line of Work to avoid inconvenience and damage to property owners and general public and maintain at least 3 feet from fire hydrant. 9. Keep public and private driveways and street crossings open. 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to satisfaction of City's Project Representative. a. Total length which materials may be distributed along route of construction at one time is 1,000 linear feet, unless otherwise approved in writing by City's Project Representative. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 ERECTION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL A. Tests and Inspections 1. Inspect all products or equipment delivered to the site prior to unloading. B. Non -Conforming Work 1. Reject all products or equipment that are damaged, used or in any other way unsatisfactory for use on the project. 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION A. Protect all products or equipment in accordance with manufacturer's written directions. B. Store products or equipment in location to avoid physical damage to items while in storage. C. Protect equipment from exposure to elements and keep thoroughly dry if required by the manufacturer. 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 017000-1 DAP MOBILIZATION AND REMOBILIZATION Page 1 of 4 SECTION 0170 00 MOBILIZATION AND REMOBILIZATION PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects a. Mobilization and Demobilization CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 70 00 - 2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1) Mobilization shall consist of the activities and cost on a Work Order basis necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site for the issued Work Order. b) Establishment of necessary general facilities for the Contractor's operation at the Site for the issued Work Order 2) Demobilization shall consist of the activities and cost necessary for: a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly for each issued Work Order b) Site Clean-up for each issued Work Order c) Removal of all buildings or other facilities assembled at the Site for each Work Oder b. Mobilization and Demobilization do not include activities for specific items of work for which payment is provided elsewhere in the contract. 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects a. A Mobilization for Miscellaneous Projects when directed by the City and the mobilization occurs within 24 hours of the issuance of the Work Order. B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Mobilization and Demobilization a. Measure 1) This Item is considered subsidiary to the various Items bid. b. Payment 1) The work performed and materials furnished in accordance with this Item are subsidiary to the various Items bid and no other compensation will be allowed. 2. Remobilization for suspension of Work as specifically required in the Contract Documents a. Measurement 1) Measurement for this Item shall be per each remobilization performed. b. Payment 1) The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Specified Remobilization" in accordance with Contract Documents. c. The price shall include: 1) Demobilization as described in Section 1.1.A.2.a.1) 2) Remobilization as described in Section 1.1.A.2.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 70 00 - 3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 Remobilization for suspension of Work as required by City a. Measurement and Payment 1) This shall be submitted as a Contract Claim in accordance with Article 10 of Section 00 72 00. 2) No payments will be made for standby, idle time, or lost profits associated with this Item. 4. Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include: 1) Mobilization as described in Section I.I.A.3.a.1) 2) Demobilization as described in Section 1.1.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. Emergency Mobilizations and Demobilizations for Miscellaneous Projects a. Measurement 1) Measurement for this Item shall be for each Mobilization and Demobilization required by the Contract Documents b. Payment 1) The Work performed and materials furnished in accordance with this Item and measured as provided under "Measurement" will be paid for at the unit price per each "Work Order Emergency Mobilization" in accordance with Contract Documents. Demobilization shall be considered subsidiary to mobilization and shall not be paid for separately. c. The price shall include 1) Mobilization as described in Section 1.1.A.4.a) 2) Demobilization as described in Section 1.I.A.3.a.2) d. No payments will be made for standby, idle time, or lost profits associated this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS [NOT USED] 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 SECTION 0174 23 CLEANING PART1- GENERAL 1.1 SUMMARY 017423-1 DAP CLEANING Page 1 of 4 A. Section Includes: 1. Intermediate and final cleaning for Work not including special cleaning of closed systems specified elsewhere B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Scheduling 1. Schedule cleaning operations so that dust and other contaminants disturbed by cleaning process will not fall on newly painted surfaces. 2. Schedule final cleaning upon completion of Work and immediately prior to final inspection. 1.5 SUBMITTALS [NOT USED] 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE [NOT USED] 1.10 STORAGE, AND HANDLING A. Storage and Handling Requirements 1. Store cleaning products and cleaning wastes in containers specifically designed for those materials. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 74 23 - 2 DAP CLEANING Page 2 of 4 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 2.2 MATERIALS A. Cleaning Agents 1. Compatible with surface being cleaned 2. New and uncontaminated 3. For manufactured surfaces a. Material recommended by manufacturer 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 APPLICATION [NOT USED] 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING A. General 1. Prevent accumulation of wastes that create hazardous conditions. 2. Conduct cleaning and disposal operations to comply with laws and safety orders of governing authorities. 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in storm or sanitary drains or sewers. 4. Dispose of degradable debris at an approved solid waste disposal site. 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 74 23 - 3 DAP CLEANING Page 3 of 4 6. Handle materials in a controlled manner with as few handlings as possible. 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with this project. 8. Remove all signs of temporary construction and activities incidental to construction of required permanent Work. 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to have the cleaning completed at the expense of the Contractor. 10. Do not burn on -site. B. Intermediate Cleaning during Construction 1. Keep Work areas clean so as not to hinder health, safety or convenience of personnel in existing facility operations. 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 3. Confine construction debris daily in strategically located container(s): a. Cover to prevent blowing by wind b. Store debris away from construction or operational activities c. Haul from site at a minimum of once per week 4. Vacuum clean interior areas when ready to receive finish painting. a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which may become airborne or transported by flowing water during the storm. C. Exterior (Site or Right of Way) Final Cleaning 1. Remove trash and debris containers from site. a. Re -seed areas disturbed by location of trash and debris containers in accordance with Section 32 92 13. 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object that may hinder or disrupt the flow of traffic along the roadway. 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, junction boxes and inlets. 4. If no longer required for maintenance of erosion facilities, and upon approval by City, remove erosion control from site. 5. Clean signs, lights, signals, etc. 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application 01 74 23 - 4 DAP CLEANING Page 4 of 4 CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 SECTION 0177 19 CLOSEOUT REQUIREMENTS PART1- GENERAL 1.1 SUMMARY 017719-1 DAP CLOSEOUT REQUIREMENTS Page 1 of 3 A. Section Includes: 1. The procedure for closing out a contract B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Guarantees, Bonds and Affidavits 1. No application for final payment will be accepted until all guarantees, bonds, certificates, licenses and affidavits required for Work or equipment as specified are satisfactorily filed with the City. B. Release of Liens or Claims 1. No application for final payment will be accepted until satisfactory evidence of release of liens has been submitted to the City. 1.5 SUBMITTALS A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses f. Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment D. Notice of Project Completion CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) £ Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 017823-1 DAP OPERATION AND MAINTENANCE DATA Page 1 of 5 SECTION 0178 23 OPERATION AND MAINTENANCE DATA PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Product data and related information appropriate for City's maintenance and operation of products furnished under Contract 2. Such products may include, but are not limited to: a. Traffic Controllers b. Irrigation Controllers (to be operated by the City) c. Butterfly Valves B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS A. Schedule 1. Submit manuals in final form to the City within 30 calendar days of product shipment to the project site. 1.5 SUBMITTALS A. Submittals shall be in accordance with Section 0133 00. All submittals shall be approved by the City prior to delivery. 1.6 INFORMATIONAL SUBMITTALS A. Submittal Form 1. Prepare data in form of an instructional manual for use by City personnel. 2. Format a. Size: 8 '/2 inches x 11 inches b. Paper 1) 40 pound minimum, white, for typed pages 2) Holes reinforced with plastic, cloth or metal c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer It. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Provide operation and maintenance data by personnel with the following criteria: 1. Trained and experienced in maintenance and operation of described products 2. Skilled as technical writer to the extent required to communicate essential data 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 78 23 - 5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART 2 - PRODUCTS [NOT USED] PART 3 - EXECUTION [NOT USED] DATE NAME 8/31/2012 D. Johnson 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE 1.5.A.1 — title of section removed Revised for DAP Application CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 017839-1 DAP PROJECT RECORD DOCUMENTS Page 1 of 4 SECTION 0178 39 PROJECT RECORD DOCUMENTS PART1- GENERAL 1.1 SUMMARY A. Section Includes: 1. Work associated with the documenting the project and recording changes to project documents, including: a. Record Drawings b. Water Meter Service Reports c. Sanitary Sewer Service Reports d. Large Water Meter Reports B. Deviations from this City of Fort Worth Standard Specification 1. None. C. Related Specification Sections include, but are not necessarily limited to: 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 2. Division 1 — General Requirements 1.2 PRICE AND PAYMENT PROCEDURES A. Measurement and Payment 1. Work associated with this Item is considered subsidiary to the various Items bid. No separate payment will be allowed for this Item. 1.3 REFERENCES [NOT USED] 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 1.5 SUBMITTALS A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to City's Project Representative. 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 1.7 CLOSEOUT SUBMITTALS [NOT USED] 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 1.9 QUALITY ASSURANCE A. Accuracy of Records 1. Thoroughly coordinate changes within the Record Documents, making adequate and proper entries on each page of Specifications and each sheet of Drawings and other Documents where such entry is required to show the change properly. 2. Accuracy of records shall be such that future search for items shown in the Contract Documents may rely reasonably on information obtained from the approved Project Record Documents. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 78 39 - 2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 3. To facilitate accuracy of records, make entries within 24 hours after receipt of information that the change has occurred. 4. Provide factual information regarding all aspects of the Work, both concealed and visible, to enable future modification of the Work to proceed without lengthy and expensive site measurement, investigation and examination. 1.10 STORAGE AND HANDLING A. Storage and Handling Requirements 1. Maintain the job set of Record Documents completely protected from deterioration and from loss and damage until completion of the Work and transfer of all recorded data to the final Project Record Documents. 2. In the event of loss of recorded data, use means necessary to again secure the data to the City's approval. a. In such case, provide replacements to the standards originally required by the Contract Documents. 1.11 FIELD [SITE] CONDITIONS [NOT USED] 1.12 WARRANTY [NOT USED] PART2- PRODUCTS 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 2.2 RECORD DOCUMENTS A. Job set 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no charge to the Contractor, 1 complete set of all Documents comprising the Contract. B. Final Record Documents 1. At a time nearing the completion of the Work and prior to Final Inspection, provide the City 1 complete set of all Final Record Drawings in the Contract. 2.3 ACCESSORIES [NOT USED] 2.4 SOURCE QUALITY CONTROL [NOT USED] PART 3 - EXECUTION 3.1 INSTALLERS [NOT USED] 3.2 EXAMINATION [NOT USED] 3.3 PREPARATION [NOT USED] 3.4 MAINTENANCE DOCUMENTS A. Maintenance of Job Set 1. Immediately upon receipt of the job set, identify each of the Documents with the title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 2. Preservation a. Considering the Contract completion time, the probable number of occasions upon which the job set must be taken out for new entries and for examination, and the conditions under which these activities will be performed, devise a suitable method for protecting the job set. b. Do not use the job set for any purpose except entry of new data and for review by the City, until start of transfer of data to final Project Record Documents. c. Maintain the job set at the site of work. 3. Coordination with Construction Survey a. At a minimum clearly mark any deviations from Contract Documents associated with installation of the infrastructure. 4. Making entries on Drawings a. Record any deviations from Contract Documents. b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the change by graphic line and note as required. c. Date all entries. d. Call attention to the entry by a "cloud" drawn around the area or areas affected. e. In the event of overlapping changes, use different colors for the overlapping changes. Conversion of schematic layouts a. In some cases on the Drawings, arrangements of conduits, circuits, piping, ducts, and similar items, are shown schematically and are not intended to portray precise physical layout. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) However, design of future modifications of the facility may require accurate information as to the final physical layout of items which are shown only schematically on the Drawings. b. Show on the job set of Record Drawings, by dimension accurate to within 1 inch, the centerline of each run of items. 1) Final physical arrangement is determined by the Contractor, subject to the City's approval. 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in ceiling plenum", "exposed", and the like). 3) Make all identification sufficiently descriptive that it may be related reliably to the Specifications. c. The City may waive the requirements for conversion of schematic layouts where, in the City's judgment, conversion serves no useful purpose. However, do not rely upon waivers being issued except as specifically issued in writing by the City. B. Final Project Record Documents Transfer of data to Drawings a. Carefully transfer change data shown on the job set of Record Drawings to the corresponding final documents, coordinating the changes as required. b. Clearly indicate at each affected detail and other Drawing a full description of changes made during construction, and the actual location of items. c. Call attention to each entry by drawing a "cloud" around the area or areas affected. CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP Application CITY OF FORT WORTH [Insert Project Name] STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS [Insert Project Number] Revised April 7, 2014 CHISHOLM TRAIL RANCH SECTION 3-PHASE 1B CPN 104064 GC-4.02 Subsurface and Physical Conditions Page 1 of 1 GC-4.02 SUBSURFACE AND PHYSICAL CONDITIONS Chisholm Trail Ranch Section 3 Phase 1A CPN 103826 GEOTECHNICAL EXPLORATION CHISHOLM TRAIL RANCH SECTION 3 - PHASES IA, 111, AND 2 NWC of Brewer Boulevard and Stewart Feltz Road Fort Worth, Texas ALPHA Report No. W212453 January 26, 2022 Prepared for: MERITAGE HOMES OF TEXAS, LLC 8840 Cypress Waters Boulevard, Suite 100 Dallas, Texas 75019 Attention: Mr. Robert Hall Prepared By: ALPN A #XTESTING WHERE 1T ALL BEGINS ALPHA/♦X I TESTING WHERE IT ALL BEGINS January 26, 2022 Geotechnical Construction Materials Environmental TBPE Firm No. 813 Meritage Homes of Texas, LLC 8840 Cypress Waters Boulevard, Suite 100 Dallas, Texas 75019 Attention: Mr. Robert Hall 5058 Brush Creek Road Tel: 817-496-5600 Fort Worth, Texas 76119 Fax: 817-496-5608 www.alphatesting.com Re: Geotechnical Exploration Chisholm Trail Ranch Section 3 - Phases 1A, 1B, and 2 NWC of Brewer Boulevard and Stewart Feltz Road Fort Worth, Texas ALPHA Report No. W212453 Attached is the report of the geotechnical exploration performed for the project referenced above. This study was authorized by Mr. Robert Hall and Mr. Steven Cook with Authorization Agreement Contract No. 77337776 dated on August 19, 2021 and performed in accordance with ALPHA Proposal No. 85839 dated August 11, 2021. Please note; some areas of the site with deep cuts are excluded from this study until deeper borings can be drilled to verify the underlying stratum. These areas are delineated on the Boring Location Plan, Figures ]A and 1 B. This report contains results of field explorations and laboratory testing and an engineering interpretation of these with respect to available project characteristics. The results and analyses were used to develop recommendations to aid design and construction of residential foundations. ALPHA TESTING, LLC appreciates the opportunity to be of service on this project. If we can be of further assistance, such as providing materials testing services during construction, please contact our office. Sincerely, ALPHA TESTING, LLC Karina Cohuo Geotechnical Project Manager KC/GSF-BJH/en Copies: (1-PDF) Client e" S OF 7-�'A X, BRIAN J. HOYT 118748 January 26, 2022 Brian J. Hoyt, P.E. Regional Manager TABLE OF CONTENTS ALPHA REPORT NO. W212453 1.0 PURPOSE AND SCOPE.................................................................................................... 1 2.0 PROJECT CHARACTERISTICS...................................................................................... 1 3,0 FIELD EXPLORATION.................................................................................................... 2 4.0 LABORATORY TESTS.................................................................................................... 2 5,0 GENERAL SUBSURFACE CONDITIONS...................................................................... 2 6,0 DESIGN RECOMMENDATIONS.................................................................................... 3 6.1 Existing Fill and Backfilled pond........................................................................... 3 6.2 Slab -on -Grade Foundations.................................................................................... 4 6.2.1 Subgrade Improvement Using Moisture Conditioning in ZonesIII, IV, and V.................................................................................... 6 6.3 Post -Tensioning Institute, Design of Post -Tensioned Slab -on -Grade .................... 7 6.4 Independent Drilled Piers Associated with Slab Foundations in DeepFill Areas....................................................................................................... 7 6.4.1 Straight -Shaft Piers..................................................................................... 8 6.4.2 Helical Piers................................................................................................ 8 6.5 Drainage and Other Considerations........................................................................ 9 7.0 GENERAL CONSTRUCTION PROCEDURES AND GUIDELINES ........................... 10 7.1 Site Preparation and Grading................................................................................ 11 7.2 Foundation Excavations........................................................................................ 12 7.3 Fill Compaction.................................................................................................... 13 7.4 Utilities..................................................................................................................14 7.5 Groundwater......................................................................................................... 14 $.0 LIMITATIONS.................................................................................................................15 APPENDIX A-1 Methods of Field Exploration Boring Location Plan — Figures IA and 1 B B-1 Methods of Laboratory Testing Logs of Borings Key to Soil Symbols and Classifications ALPHA Report No. W212453 1.0 PURPOSE AND SCOPE The purpose of this geotechnical exploration is for ALPHA TESTING, LLC (ALPHA) to evaluate for Meritage Homes of Texas, LLC (Client) some of the physical and engineering properties of subsurface materials at selected locations on the subject site with respect to formulation of geotechnical design parameters for the subject construction. The field exploration was accomplished by securing subsurface samples from widely spaced test borings performed across the project site. Engineering analyses were performed from results of the field exploration and laboratory tests performed on representative samples. In addition, results of a Preliminary Geotechnical Exploration performed at the site (Alpha Report No. W 192432 dated July 8, 2020) were reviewed and incorporated into this current study. Also included are general comments pertaining to reasonably anticipated construction problems and recommendations concerning earthwork and quality control testing during construction. This information can be used to evaluate subsurface conditions and to aid in ascertaining construction meets project specifications. Recommendations provided in this report were developed from information obtained in test borings depicting subsurface conditions only at the specific boring locations and at the particular time designated on the logs. Subsurface conditions at other locations may differ from those observed at the boring locations, and subsurface conditions at boring locations may vary at different times of the year. The scope of work may not fully define the variability of subsurface materials and conditions that are present on the site. The nature and extent of variations between borings may not become evident until construction. If significant variations then appear evident, our office should be contacted to re-evaluate our recommendations after performing on -site observations and possibly other tests 2,0 PROJECT CHARACTERISTICS It is proposed to develop a residential subdivision (Chisholm Trail Ranch Section 3 - Phases IA, I and 2) on a tract of land located on the northwest corner of Brewer Boulevard and Stewart Feltz Road in Fort Worth, Texas. A site plan illustrating the subject site is provided as Figures lA and 1B, the Boring Location Plan, in the Appendix. At the time the field exploration was performed, the site consisted of a vacant tract of land with some scattered trees. A creek crosses the southern portion of the property, generally oriented in the east -west direction. Review of historical images available from Google Earth® indicates a pond in the southeast corner of the site, in the vicinity of Borings 99 and 100 was backfilled. Also, an existing structure was demolished in the vicinity of Borings 4 and 10. No other information regarding previous development of the site was provides to us. Grading plans prepared by LJA Engineering, Inc. (LJA Project ID: NT680-0082, Phase 1A Sheets 45 through 48 and 54 through 58, Phase 1B Sheets 43 and 44, and Phase 2 Sheets 49 through 53 dated October 2021) indicate the site slopes down towards the northwest about 35 ft (approximate elevation 860 ft to 825 ft). These grading plans also indicate cuts and fills of up to 18 ft will be required to achieve final grade in the building pad areas. 1 ALPHA Report No. W212453 Present plans provide for the construction of new residential buildings. The new structures are expected to create light loads to be carried by the foundations. We understand the new structures will be supported using post -tensioned slab -on -grade foundations designed for potential seasonal movements of 41/2 inches or less. No below grade slabs are planned. 10 FIELD EXPLORATION Subsurface conditions on the site were explored by drilling a total of 116 test borings. Fifty-eight (58) borings were drilled to a depth of about 15 ft and fifty-eight (58) borings were drilled to a depth of about 20 ft. The borings were drilled in general accordance with ASTM Standard D 420 using standard rotary drilling equipment. The approximate location of each test boring is shown on the Boring Location Plan, Figures 1A and 113, enclosed in the Appendix. Details of drilling and sampling operations are briefly summarized in Methods of Field Exploration, Section A-1 of the Appendix. Subsurface types encountered during the field exploration are presented on the Log of Boring sheets (boring logs) included in the Appendix. The boring logs contain our Field Technician's and Engineer's interpretation of conditions believed to exist between actual samples retrieved. Therefore, the boring logs contain both factual and interpretive information. Lines delineating subsurface strata on the boring logs are approximate and the actual transition between strata may be gradual. 4,0 LABORATORY TESTS Selected samples of the subsurface materials were tested in the laboratory to evaluate their engineering properties as a basis in providing recommendations for residential foundation design and earthwork construction. A brief description of testing procedures used in the laboratory can be found in Methods of Laboratory Testing, Section B-1 of the Appendix. Individual test results are presented on the Log of Boring sheets in the Appendix. 5.0 GENERAL SUBSURFACE CONDITIONS Based on geological atlas maps available from the Bureau of Economic Geology, published by the University of Texas at Austin, the project site lies at the mapped interface of the undivided Washita Group formation and the undivided Grayson Marl and Main Street Limestone formation. These formations generally consist of interbedded limestone and marl (limey shale). Residual soils associated with these formations generally consist of clay soils with moderate to very high shrink/swell potential. Subsurface stratigraphy at geological interfaces can be highly variable as evidenced on the boring logs. Subsurface conditions encountered in about one-half of the borings generally consisted of clay, calcareous clay, and shaly clay to depths of about 1 ft to 18 ft below the ground surface underlain by limestone extending to the termination depth of the borings (15 ft to 20 ft). Subsurface conditions encountered in the remaining borings generally consisted of clay, calcareous clay, and shaly clay extending to the termination depth of the borings (15 ft to 20 ft). Subsurface conditions encountered in Borings 13, 53, 89, 90, 101, 105, and 106 generally consisted of clay and shaly clay to depths of about 2 ft to 5 ft below the ground surface underlain by limestone extending to depths of about 12 ft to 18 ft. Shale was then encountered extending to the termination depth of the borings (15 ft to 20 ft). Subsurface conditions encountered in Borings 17, 42, 49, 57, 58, and PA ALPHA Report No. W212453 116 generally consisted of limestone to depths of about 6 ft to 18 ft below the ground surface underlain by clay and/or shaly clay extending to the termination depth of the borings (15 ft to 20 ft). Layers of limestone about 2 ft to 15 ft thick were encountered between the clay layers in Borings 2, 7, 10, 11, 15, 16, 19, 23, 24, 26, 29, 31, 33, 36, 37, 39, 45, 47, 51, 59, 60, 63, 65, 67, 68, 73, 74, 75, 75, 77, 79, 82, 91, 94, 95, 100, 102, 103, 105, 107, 110, and 113 at depths of about I ft to 18 ft below the ground surface. The upper 1 ft and 6 ft of clay encountered in Borings 19 and 28, respectively were classified as fill material. More detailed stratigraphic information is presented on the attached Log of Boring sheets. Most of the materials encountered in the borings are considered relatively impermeable and are anticipated to have a relatively slow response to water movement. Therefore, several days of observation would be required to evaluate actual groundwater levels within the depths explored. Also, the groundwater level at the subject site is anticipated to fluctuate seasonally depending on the amount of rainfall, prevailing weather conditions, and subsurface drainage characteristics. Free groundwater was not encountered in the borings. However, it is common to encounter seasonal groundwater in fill material, from natural fractures within the clayey matrix, at the soil/rock (limestone and shale) interface or from fractures in the rock (limestone and shale), particularly during or after periods of precipitation. If more detailed groundwater information is required, monitoring wells or piezometers can be installed. Further details concerning subsurface materials and conditions encountered can be obtained from the boring logs provided in the Appendix. 6.0 DESIGN RECOMMENDATIONS The following design recommendations were developed on the basis of the previously described Project Characteristics (Section 2.0) and General Subsurface Conditions (Section 5.0). Should the project criteria change, our office should conduct a review to determine if modifications to the recommendations are required. Further, it is recommended our office be provided with a copy of the final building plans and specifications for review prior to construction. The following design recommendations were evaluated based on final grades as indicated on the referenced grading plans and discussed in Section 2.0. Cutting and filling on the site other than depicted on the referenced grading plans can alter the recommended foundation design parameters. Therefore, it is recommended our office be contacted before performing other cutting and filling on site to verify appropriate design parameters are utilized for final foundation design. Also, our office should be provided with final grading plans to verify our recommendations. 6.1 Existinu Fill and Backfilled pond As discussed in Section 5.0, existing fill was encountered to depths of about 1 ft and 6 ft below the existing ground surface in Borings 19 and 28, respectively. Also, as discussed in Section 2.0, historical aerial images available from Google Earth® indicate a pond was backfilled in the vicinity of Borings 99 and 100. If fill compaction records are not available for this backfill or any other fill possibly on the site, it should be considered as uncontrolled fill. Uncontrolled fill is generally not considered suitable for support of foundations due to the risk of under -compacted zones resulting in failures of weak soil ALPHA Report No. W212453 and/or indeterminate levels of settlement. Any existing uncontrolled fill should be removed from the building pad area and replaced with engineered fill as recommended in Section 6.2 or Section 7.3 as applicable. The excavated materials may be suitable for reuse as engineered fill provided they are free of organics, boulders, rubble, and other debris. Sorting and/or processing of limestone fragments encountered in the fill may be required if the fill is re -used. The lateral extent, depth and nature of the existing fill are not known. Test pits could be performed prior to construction to verify the presence, lateral extent, depth, and nature of the existing fill materials. ALPHA would be pleased to provide this service if desired Associated creeks to the previously filled pond were also observed at the site. It could be planned to construct residences in the areas of the creeks. The creeks should be demucked and any soft, organic soils or otherwise unsuitable materials should be removed to expose a firm subgrade prior to backfilling. The depths of the ponds are not known. Even if fill is properly compacted, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when backfilling creeks and ponds. As discussed in Section 2.0, it appears structures may have been demolished on the site near Borings 4 and 10. Any soil disturbed due to removal of structures or foundations should be re - compacted in accordance with recommendations provided in Section 6.2 or Section 7.3 as applicable. All foundation elements of the existing structures should be removed or cut off at least 1 ft below finished grade or 1 ft below the new structural elements, whichever is deeper. All abandoned utility lines should be either removed or positively sealed to prevent possible water seepage into subgrade soils. 6.2 Slab -on -Grade Foundations Slab -on -grade foundations should be designed with exterior and interior grade beams adequate to provide sufficient rigidity to the foundation system. A net allowable bearing pressure of 1.5 kips per sq ft should be used for all grade beams bearing on undisturbed cuts in native soils, on general fill placed as recommended in Section 7.3, on moisture improved soil placed as recommended in Section 6.2.1 or on limestone. Grade beams should bear a minimum depth of 12 inches below final grade and should have a minimum width of 10 inches considering the recommended bearing capacity. To reduce cracking as normal movements occur in foundation soils, all grade beams and slab foundations should be adequately reinforced with steel (conventional reinforcing steel and/or post - tensioned reinforcement). It is common to experience some minor cosmetic distress to structures with slab -on -grade foundation systems due to normal ground movements. A properly designed and constructed moisture barrier should be placed between the slabs and subgrade soils to retard moisture migration through the slabs. Conditions encountered in the test borings, the planned cut/fill within the building pads and results of the laboratory tests reveal variations in highly expansive clay thickness and expansive properties across the site. Such variations in clay thickness and expansive properties will directly affect design parameters used for slab -on -grade foundations. Therefore, lots with apparently common average clay thickness, similar expansive clay properties and similar corresponding estimated potential movements have been grouped into Zones I through V and delineated on the Boring Location Plan, Figures IA and 1B. 4 ALPHA Report No. W212453 Subgrade improvement in the respective Zones (see Figures 1A and 113) should be performed using the information summarized in Table A. TABLE A Estimates of Potential Seasonal Movements and Required Subgrade Improvement ZONE ESTIMATED POTENTIAL IMPROVEMENT REQUIRED TO REDUCE MOVEMENT, INCHES MOVEMENTS TO 4% INCHES I Up to 41/2 II Up to41/21 III Up to about 6 IV Up to about 8 V More than 8 No Improvement Required Cover General Fill with Plastic Sheeting' 4 ft of Moisture Conditioning 8 ft of Moisture Conditioning 10 ft of Moisture Conditioning ' Plastic sheeting (6 to 8 mil thickness) should be placed immediately after grading with general fill for long-term maintenance of the moisture content of the general fill and underlying native soil. This sheeting should be placed 8 to 12 inches below final grade and should also extend at least 5 ft beyond the perimeter of the building pad. Potential movements could be about 6 inches in Zone II if plastic sheeting is not placed as recommended. Potential seasonal movements were estimated using results from absorption swell tests, in general accordance with methods outlined by the Texas Department of Transportation (TxDOT) Test Method Tex-124-E and engineering judgment and experience. Estimated movements were calculated assuming the moisture content of the in -situ soil within the normal zone of seasonal moisture content change varies between a "dry" condition and a "wet" condition as defined by Tex-124-E. Also, it was assumed a 1 psi surcharge load from the floor slab acts on the subgrade soils. Movements exceeding our estimates could occur if positive drainage of surface water is not maintained or if soils are subject to an outside water source, such as leakage from a utility line or subsurface moisture migration from off -site locations. Potential seasonal movements were estimated assuming fill material used to raise the grade will consist of onsite or similar material with a plasticity index of 50 or less. If the plasticity index of material used to raise the grade is higher than 50, potential movements could be higher than our estimates. Potential movements estimated for slab foundations in Zones III, IV, and V (see Figures lA and 113 for delineation of Zones) are considered outside normal design tolerances. Movement of slab foundations in Zones III, IV, and V could be reduced to not more than 41/2 inches if the upper 4 ft to 10 ft of soil below final grade, as summarized in Table A, are moisture conditioned and then covered with an impermeable plastic barrier (polyethylene sheeting). Moisture conditioning recommendations are provided in Section 6.2.1. In choosing moisture conditioning as a method of slab movement reduction, the Client is accepting some post construction movement of slabs (about 41/2 inches). Therefore, the Client understands and acknowledges that in the geographical region covered by this report, a potential movement of 41/2 inches is considered a reasonable compromise between foundation design and construction ALPHA Report No. W212453 cost and the amount of allowable movement of the foundation. Please note, improvement of the existing soils using moisture conditioning with plastic sheeting is intended only for the designated building pad areas plus S ft beyond the building pad limits, and not the entire residential lot. Accordingly, planned residences must be exclusively constructed within I ft of the placed plastic barrier and within the building pad designated on the reference project grading plans. The purpose of the plastic sheeting is to maintain the moisture of the underlying soils relatively the same from the time the plastic sheeting is placed through the time the foundation is placed. This plastic sheeting is not intended as a moisture barrier component for the actual foundation. Any such requirements should be addressed by the designer of the foundation, and should be followed by the builder. Prior to building on the improved designated building pad area, a surveyor should verify the lateral extent of the plastic sheeting and to confirm that no portion of the new residences will extend beyond the limits of the designated building pad. If any part of the slab footprint extends beyond the designated building pad, ALPHA should be contacted for additional design recommendations. 6.2.1 Suberade Improvement Usine Moisture Conditioning in Zones III, IV, and V Estimated potential movements of slab foundations in Zones III, IV, and V could be reduced to about 41/2 inches by moisture -conditioning the uppermost 4 ft to 10 ft of soil below final grade as recommended in Table A. Limestone could be encountered within the recommended depth of moisture conditioning, particularly near zone boundaries. In some cases, over -excavation of shallow and relatively thin (less than 3 ft thick) limestone layers could be required. However, if limestone is at least 3 ft thick, sufficiently strong and is present over the entire extents of the building pad; it is not required to over -excavate limestone to install moisture conditioned soils. Test pits should be performed to verify the nature of limestone prior to terminating moisture conditioning at depths shallower than recommended. ALPHA should be retained to observe the test pits. Moisture -conditioning consists of over -excavating (where necessary) and/or filling with on -site soil that is compacted at a "target" moisture content at least 5 percentage points above the material's optimum moisture content as determined by the standard Proctor method (ASTM D 698). The moisture -conditioned soil should be compacted to a dry density between 93 and 98 percent of standard Proctor maximum dry density. Moisture - conditioning with on -site soil should extend throughout the entire building pad area and at least 5 ft beyond the perimeter of the designated building pad (as indicated on the referenced project grading plans). Following completion of moisture -conditioning and placement of the plastic sheeting, estimated movements in Zones III, IV, and V should not exceed about 41/2 inches. The purpose of moisture -conditioning is to reduce the free swell of the moisture - conditioned soils to 1 percent or less. Additional laboratory tests (i.e., standard Proctors, absorption swell tests, etc.) should be conducted during construction to verify that the "target" moisture content for moisture -conditioning (estimated at 5 percentage points above the material's optimum moisture content as defined by ASTM D 698) is sufficient to reduce the free swell potential of the processed soil to 1 percent or less. G7 ALPHA Report No. W212453 Moisture conditioning should be observed and tested on a full time basis by a representative of ALPHA to verify the moisture conditioned clays are placed with the proper lift thickness, moisture content, and density. 6.3 Post -Tensioning Institute, Design of Post -Tensioned Slab -on -Grade Table B contains information for design of the post -tensioned, slab -on -grade foundations. Design parameters were evaluated based on the conditions encountered in the borings and using information and correlations published by PTI Third Edition and VOLFLO 1.5 computer program provided by Geostructural Tool Kit, Inc. (GTI). TABLE B PTI Design Parameters Potential Seasonal Movement = 4% inches In Zone I and after subgrade improvement in Zones II through V as recommended in Section 6.2 Edge Moisture Distance (em), ft Differential Soil Movement (ym), inches Edge Lift Center Lift 4.3 8.5 2.2 (swell) 1.6 (Shrink) 6.4 Independent Drilled Piers Associated with Slab Foundations in Deep Fill Areas Significant thicknesses of fill (18 ft) are planned for slab foundations in Lot 40 of Block P in the vicinity of Boring 102. For the building pad with planned fills of 17 ft or greater, a system of independent drilled piers should be constructed below the slab -on -grade foundations to reduce the potential for long-term settlements. The referenced lot is delineated on the Boring Location Plan, Figures I and 1B, with heavy black outline. Please Note: Due to the difference in potential movement between the piers and the slab -on -grade foundation, piers should be independent and not structurally connected to the slab -on -grade foundation. In addition, the structural engineer should appropriately design the slab -on -grade to consider the possibility portions of the slab are supported only by the piers in the event the on -site soils shrink/settle and pull away from the slab. Post Tension Institute (PTI) design parameters provided in Section 6.3 of this report are valid only for slab -on -grade systems fully supported on soil and do not take into consideration any portion of the slab or grade beams being fully or partially suspended on piers due to shrinkage or swelling of on -site soils. Differential movements can also occur between the pier supported foundations and connecting flatwork and utilities. This should be considered when designing foundations and connections. Alternating layers of clay, shaly clay, limestone, and/or shale extended to the 15 ft termination depth of Borings 101 and 102. Due to the extreme variation in subsurface conditions and to the depth to rock over relatively short distances, we recommend test piers be performed in front and behind the building pad prior to construction to verify subsurface conditions at the lot and constructability of drilled straight -shaft piers. Recommendations for straight shaft piers and helical piers are provided in Sections 6.4.1 and 6.4.2. 7 ALPHA Report No. W212453 6.4.1 Straight -Shaft Piers Limestone encountered in the borings was hard to very hard. Drilled pier contractors planning to install straight shaft piers should make provisions for core barrels and/or rock teeth to penetrate hard limestone. Drilled piers bearing at least 2 ft into limestone can be dimensioned using a net allowable bearing pressure of 5 ksf and skin friction (in compression) of 2 ksf. Uplift resistance can be computed using a net allowable skin friction value of 1.6 ksf. The upper 2 ft limestone should be neglected in computing skin friction. The allowable bearing pressure value has a factor of safety of 3 considering general bearing capacity failure and the skin friction values have a factor of safety of at least 2. Normal elastic settlement of piers under loading is estimated at less than about 1 inch. Theses recommended parameters for end bearing and skin friction are based on our expectation that drilled piers could extend through limestone and bear in underlying clay layers based on conditions encountered in Boring 102. Straight shaft piers should be sufficiently embedded into the limestone (and the underlying clay layers) and should be designed with full length reinforcing steel to resist the uplift pressure (soil -to -pier adhesion) due to potential soil swell along the shaft from post construction heave and other uplift forces applied by structural loadings. The magnitude of uplift adhesion due to soil swell along the pier shaft cannot be defined accurately and can vary according to the actual in -place moisture content of the soils during construction. Soil uplift adhesion is approximated to act uniformly over the portion of the pier shaft in contact with clayey soils to a maximum depth of 12 ft below the ground surface. An uplift adhesion of 1.0 kip per sq ft can be used for the portion of the pier shaft bearing against moisture conditioned soils and an uplift adhesion of 1.4 kips per sq ft can be used for the pier shaft bearing against general fill below the Moisture conditioned soils. An uplift adhesion of 2.2 kip per sq ft can be used for the portion of the pier shaft bearing against native, undisturbed soils. 6.4.2 Helical Piers It could be desirable to use helical piers in lieu of drilled piers. Helical piers are a manufactured foundation element consisting of a centralized steel shaft and one or more helical bearing plates. The helical plates are formed with a uniform -pitch screw thread, and the pier is installed by rotating it into the ground to the desired depth or refusal. The helical plate(s) provides end bearing resistance due to gravity loads and uplift resistance due to swelling of high shrink -swell active clays such as encountered at the boring locations. Helical piers should bear at a minimum depth of 20 ft below the ground surface in native clay or on limestone. Helical piers should not bear in fill material. All helixes should be situated at a depth of at least 20 ft below final grade. Vertical spacing between helixes along the shaft should be least three (3) helix diameters, based on the largest adjacent helix. The minimum helix diameter must be sized to prevent the bearing soils from being over- stressed and to develop sufficient uplift capacity to overcome the potential uplift forces acting on the pier. The helix portion should be at least three (3) times the width of the shaft. The minimum clear spacing between edges of adjacent piers should be at least two 8 ALPHA Report No. W212453 (2) helix diameters (based on the larger helix). Normal elastic settlement of helical piers under loading is estimated at less than about 1 inch. Load capacity of helical piers bearing in native clays or on limestone at a depth of at least 20 ft below the ground surface can be calculated by summing the allowable end bearing pressure of 6 kips per sq ft applied to the lowermost helix. Based on conditions encountered in Boring 102, we expect a pier with a single helix will be required as the limestone situated at a depth of 2 ft below existing grade will not permit penetrations required for the minimum embedment of overlying helixes. Each helical pier should be designed to resist the uplift pressure (soil -to -pier adhesion) due to potential soil swell along the shaft from post construction heave and other uplift forces applied by structural loadings. The magnitude of uplift adhesion due to soil swell along the helical pier shaft cannot be defined accurately and can vary according to the actual in - place moisture content of the soils during construction. Soil uplift adhesion is approximated to act uniformly over the portion of the pier shaft in contact with clayey soils to a maximum depth of 12 ft below the ground surface. An uplift adhesion of 1.0 kip per sq ft can be used for the portion of the pier shaft bearing against moisture conditioned soils and an uplift adhesion of 1.4 kips per sq ft can be used for the pier shaft bearing against general fill below the Moisture conditioned soils. From our experience, helical piers are frequently designed and installed by specialty contractors. Helical piers should be designed by a professional engineer and should be installed per the manufacturer's requirements. Helical piers should be load tested to verify the pier is capable of supporting the design load. Load tests can also be utilized to maximize the foundation load, thereby reducing the number of piers. We recommend performing at least one helical pier load test. ALPHA would be pleased to assist in design, implementation, and evaluation of a pier load test if desired. 6.5 Drainage and Other Considerations Adequate drainage should be provided to reduce seasonal variations in the moisture content of foundation soils. All pavement and sidewalks within 5 ft of the residences should be sloped away from the structures to prevent ponding of water around the foundations. Final grades within 5 ft of the structures should be adjusted to slope away from the structures at a minimum slope of 2 percent. Maintaining positive surface drainage throughout the life of the structures is essential. In areas with pavement or sidewalks adjacent to the new residences, a positive seal must be maintained between the structure and the pavement or sidewalk to minimize seepage of water into the underlying supporting soils. Post -construction movement of pavement and flatwork is common. Normal maintenance should include inspection of all joints in paving and sidewalks, etc. as well as resealing where necessary. Several factors relate to civil and architectural design and/or maintenance, which can significantly affect future movements of the foundation and floor slab systems: 9 ALPHA Report No. W212453 • Preferably, a complete system of gutters and downspouts should carry runoff water a minimum of 5 ft from the completed structures. • Large trees and shrubs should not be allowed closer to the foundation than a horizontal distance equal to roughly one-half of their mature height due to their significant moisture demand upon maturing. • Moisture conditions should be maintained "constant" around the edge of the slab. Ponding of water in planters, in unpaved areas, and around joints in paving and sidewalks can cause slab movements beyond those predicted in this report. • Planter box structures placed adjacent to building should be provided with a means to assure concentrations of water are not available to the subsoil stratigraphy. • Architectural design of the floor slabs should avoid additional features such as wing walls as extensions of the slab. • The root systems from existing trees at this site will have dried and desiccated the surrounding clay soils, resulting in soil with near -maximum swell potential. Clay soils surrounding tree root mats in areas to be covered with grade slabs (including but not limited to foundations, driveways, patios and sidewalks) should be removed to a minimum depth of 1 ft below the root ball and compacted in -place with moisture and density control as described in Section 7.3. Trench backfill for utilities should be properly placed and compacted as outlined in Section 7.4 and in accordance with requirements of local City standards. Since granular bedding backfill is used for most utility lines, the backfilled trench should not become a conduit and allow access for surface or subsurface water to travel toward the new structures. Concrete cut-off collars or clay plugs should be provided where utility lines cross building lines to prevent water from traveling in the trench backfill and entering beneath the structure. 7.0 GENERAL CONSTRUCTION PROCEDURES AND GUIDELINES Variations in subsurface conditions could be encountered during construction. To permit correlation between test boring data and actual subsurface conditions encountered during construction, it is recommended a registered Professional Engineering firm be retained to observe construction procedures and materials. Some construction problems, particularly degree or magnitude, cannot be reasonably anticipated until the course of construction. The recommendations offered in the following paragraphs are intended not to limit or preclude other conceivable solutions, but rather to provide our observations based on our experience and understanding of the project characteristics and subsurface conditions encountered in the borings. 10 ALPHA Report No. W212453 7.1 Site Preparation and Grading Limestone was encountered within 4 ft of the ground surface in several of the borings and will likely be encountered during general excavation and grading at this site. From our experience, this limestone can be hard and difficult to excavate. Rock excavation methods (including, but not limited to rock teeth, rippers, jack hammers, or sawcutting) may be required to remove the limestone. Crushing equipment may be required to process this limestone if it is desired to use this material as compacted fill on the site. The contractor selected should have experience with excavation in hard limestone. Existing fill was encountered to depths of about 1 ft and 6 ft below the existing ground surface in Borings 19 and 28, respectively. Although not encountered in the borings, existing fill materials can also contain organics, boulders, rubble, and other debris which could be encountered during site grading and general excavation. The earthwork and excavation contracts should contain provision for removal of unsuitable materials in the existing fill. Test pit excavations performed prior to construction can be used to evaluate the depth, extent and composition of existing fill at this site. ALPHA would be pleased to provide this service if desired. All areas supporting slab foundations, flatwork or areas to receive new fill should be properly prepared. • After completion of the necessary stripping, clearing, and excavating and prior to placing any required fill, the exposed subgrade should be carefully evaluated by probing and testing. Any undesirable material (organic material, wet, soft, or loose soil) still in place should be removed. • The exposed subgrade should be further evaluated by proof -rolling with a heavy pneumatic tired roller, loaded dump truck or similar equipment weighing approximately 10 tons to check for pockets of soft or loose material hidden beneath a thin crust of possibly better soil. • Proof -rolling procedures should be observed routinely by a Professional Engineer or his designated representative. Any undesirable material (organic material, wet, soft, or loose soil) exposed from the proof roll should be removed and replaced with well -compacted material as outlined in Section 7.3. • Prior to placement of any fill, the exposed subgrade should then be scarified to a minimum depth of 6 inches and recompacted as outlined in Section 7.3. If fill is to be placed on existing slopes (natural or constructed) steeper than six horizontal to one vertical (6:1), the fill materials should be benched into the existing slopes in such a manner as to provide a minimum bench width of five (5) ft. This should provide a good contact between the existing soils and new fill materials, reduce potential sliding planes, and allow relatively horizontal lift placements. Even if fill is properly compacted as recommended in Section 7.3, fills in excess of about 10 ft are still subject to settlements over time of up to about 1 to 2 percent of the total fill thickness. This should be considered when planning or placing deep fills. 11 ALPHA Report No. W212453 Slope stability analysis of embankments (natural or constructed) and global stability analysis for retaining walls was not within the scope of this study. The contractor is responsible for designing any excavation slopes, temporary sheeting or shoring. Design of these structures should include any imposed surface surcharges. Construction site safety is the sole responsibility of the contractor, who shall also be solely responsible for the means, methods and sequencing of construction operations. The contractor should also be aware that slope height, slope inclination or excavation depths (including utility trench excavations) should in no case exceed those specified in local, state and/or federal safety regulations, such as OSHA Health and Safety Standard for Excavations, 29 CFR Part 1926, or successor regulations. Stockpiles should be place well away from the edge of the excavation and their heights should be controlled so they do not surcharge the sides of the excavation. Surface drainage should be carefully controlled to prevent flow of water over the slopes and/or into the excavations. Construction slopes should be closely observed for signs of mass movement, including tension cracks near the crest or bulging at the toe. If potential stability problems are observed, a geotechnical engineer should be contacted immediately. Shoring, bracing or underpinning required for the project (if any) should be designed by a professional engineer registered in the State of Texas. Due to the nature of the clay soils found near the surface at the borings, traffic of heavy equipment (including heavy compaction equipment) may create pumping and general deterioration of shallow soils. Therefore, some construction difficulties should be anticipated during periods when these soils are saturated. 7.2 Foundation Excavations All foundation excavations should be monitored to verify foundations bear on suitable material. The bearing stratum exposed in the base of all foundation excavations should be protected against any detrimental change in conditions. Surface runoff water should be drained away from excavations and not allowed to collect. All concrete for foundations should be placed as soon as practical after the excavation is made. Piers should be excavated and concrete placed the same day. Prolonged exposure of the bearing surface to air or water will result in changes in strength and compressibility of the bearing stratum. Therefore, if delays occur, straight -shaft piers should be slightly enlarged and deepened or a new (deeper) design penetration made to provide a fresh bearing surface. Grade beams excavations should be cleaned and slightly deepened. All pier shafts should be at least 1-ft in diameter to facilitate clean -out of the base and proper monitoring. Concrete placed in pier holes should be directed through a tremie, hopper, or equivalent. Placement of concrete should be vertical through the center of the shaft without hitting the sides of the pier or reinforcement to reduce the possibility of segregation of aggregates. Concrete placed in piers should have a minimum slump of 5 inches (but not greater than 7 inches) to avoid potential honey -combing. Observations during pier drilling should include, but not necessarily be limited to, the following items: 12 ALPHA Report No. W212453 • Verification of proper bearing strata and consistency of subsurface stratification with regard to boring logs, • Confirmation the minimum required penetration into the bearing strata is achieved, • Complete removal of cuttings from bottom of pier holes, • Proper handling of any observed water seepage and sloughing of subsurface materials, • No more than 2 inches of standing water should be permitted in the bottom of pier holes prior to placing concrete, and • Verification of pier diameter and steel reinforcement. Groundwater was not encountered in the borings. However, groundwater seepage could be encountered during pier installation. The risk of encountering this seepage is increased during or after periods of precipitation. Temporary casing may be useful for controlling groundwater seepage that could occur in the clayey soils in straight shaft pier excavations. As casing is extracted, care should be taken to maintain a positive head of plastic concrete and minimize the potential for intrusion of water seepage. It is recommended a separate bid item be provided for casing on the contractors' bid schedule. ALPHA should be contacted for further review and evaluation if groundwater seepage and/or underream collapse occurs during pier installation. Limestone encountered in the borings was hard to very hard. Drilled pier contractors planning to install straight shaft piers should make provisions for core barrels and/or rock teeth to penetrate hard limestone. 7.3 Fill Compaction The following are recommendations pertaining to general fill compaction. Moisture conditioned soil should conform to the recommendations provided in Section 6.2. Clay soils with a plasticity index equal to or greater than 25 should be compacted to a dry density between 93 and 98 percent of standard Proctor maximum dry density (ASTM D 698). The compacted moisture content of the clays during placement should be within the range of 2 to 6 percentage points above optimum. Clay soils with a plasticity index less than 25 should be compacted to a dry density of at least 95 percent of standard Proctor maximum dry density (ASTM D 698) and within the range of 1 percentage point below to 3 percentage points above the material's optimum moisture content. Clayey materials used as fill should be processed and the largest particle or clod should be less than 6 inches prior to compaction. 13 ALPHA Report No. W212453 Processed limestone used as fill should be compacted to at least 95 percent of standard Proctor maximum dry density. The compacted moisture content of the processed limestone is not considered crucial to proper performance. However, if the material's moisture content during placement is within 3 percentage points of optimum, the compactive effort required to achieve the minimum compaction criteria may be minimized. Individual rock pieces larger than 6 inches in dimension should not be used as fill. However, if rock fill is utilized within 3 ft below the bottom of floor slabs, the maximum allowable size of individual rock pieces should be reduced to 3 inches. Processed limestone used as fill should incorporate sufficient fines to prevent the presence of voids around larger diameter rock pieces. A gradation of at least 40 percent passing a standard No. 4 sieve is recommended. Where mass fills are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D-698) and within 2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as outlined herein. Compaction should be accomplished by placing fill in about 8-inch thick loose lifts and compacting each lift to at least the specified minimum dry density. Field density and moisture content tests should be performed on each lift. 7.4 Utilities Where utility lines are deeper than 10 ft, the fill/backfill below 10 ft should be compacted to at least 100 percent of standard Proctor maximum dry density (ASTM D 698) and within —2 to +2 percentage points of the material's optimum moisture content. The portion of the fill/backfill shallower than 10 ft should be compacted as previously outlined. Density tests should be performed on each lift (maximum 12-inch thick) and should be performed as the trench is being backfilled. Even if fill is properly compacted, fills in excess of about 10 ft are still subject to settlements over time of up to about I to 2 percent of the total fill thickness. This should be considered when designing pavement over utility lines and/or other areas with deep fill. If utility trenches or other excavations extend to or beyond a depth of 5 ft below construction grade, the contractor or others shall be required to develop an excavation safety plan to protect personnel entering the excavation or excavation vicinity. The collection of specific geotechnical data and the development of such a plan, which could include designs for sloping and benching or various types of temporary shoring, is beyond the scope of this study. Any such designs and safety plans shall be developed in accordance with current OSHA guidelines and other applicable industry standards. 7.5 Groundwater Groundwater was not encountered in the borings. However, from our experience, shallow groundwater seepage could be encountered from the subsurface stratigraphy in excavations for pavement, utilities and other general excavations at this site. The risk of seepage increases with depth of excavation and during or after periods of precipitation. Standard sump pits and pumping may be adequate to control seepage on a local basis. 14 ALPHA Report No. W212453 In any areas where cuts are made, attention should be given to possible seasonal water seepage that could occur through natural cracks and fissures in the newly exposed stratigraphy. Also, the risk of seepage is increased where limestone is exposed in excavations and slopes or is near final grade. In these areas subsurface drains may be required to intercept seasonal groundwater seepage. The need for these or other dewatering devices should be carefully addressed during construction. Our office could be contacted to visually observe final grades to evaluate the need for such drains. 8.0 LIMITATIONS Professional services provided in this geotechnical exploration were performed, findings obtained, and recommendations prepared in accordance with generally accepted geotechnical engineering principles and practices. The scope of services provided herein does not include an environmental assessment of the site or investigation for the presence or absence of hazardous materials in the soil, surface water or groundwater. ALPHA, upon written request, can be retained to provide these services. ALPHA is not responsible for conclusions, opinions or recommendations made by others based on this data. Information contained in this report is intended for the exclusive use of the Client (and their designated design representatives), and is related solely to design of the specific structures outlined in Section 2.0. No party other than the Client (and their designated design representatives) shall use or rely upon this report in any manner whatsoever unless such party shall have obtained ALPHA's written acceptance of such intended use. Any such third party using this report after obtaining ALPHA's written acceptance shall be bound by the limitations and limitations of liability contained herein, including ALPHA's liability being limited to the fee paid to it for this report. Recommendations presented in this report should not be used for design of any other structures except those specifically described in this report. In all areas of this report in which ALPHA may provide additional services if requested to do so in writing, it is presumed that such requests have not been made if not evidenced by a written document accepted by ALPHA. Further, subsurface conditions can change with passage of time. Recommendations contained herein are not considered applicable for an extended period of time after the completion date of this report. It is recommended our office be contacted for a review of the contents of this report for construction commencing more than one (1) year after completion of this report. Non- compliance with any of these requirements by the Client or anyone else shall release ALPHA from any liability resulting from the use of, or reliance upon, this report. Recommendations provided in this report are based on our understanding of information provided by the Client about characteristics of the project. If the Client notes any deviation from the facts about project characteristics, our office should be contacted immediately since this may materially alter the recommendations. Further, ALPHA is not responsible for damages resulting from workmanship of designers or contractors. It is recommended the Owner retain qualified personnel, such as a Geotechnical Engineering firm, to verify construction is performed in accordance with plans and specifications. 15 #t\ APPENDIX ALPHA Report No. W212453 A-1 METHODS OF FIELD EXPLORATION Using standard rotary drilling equipment, a total of 116 test borings were performed for this geotechnical exploration. The approximate locations of the borings are shown on the Boring Location Plan, Figures IA and 1B. The test boring locations were staked using a handheld GPS unit or by pacing/taping and estimating right angles from landmarks which could be identified in the field and as shown on the site plan provided during this study. The locations of test borings shown on the Boring Location Plan are considered accurate only to the degree implied by the methods used to define them. Relatively undisturbed samples of the cohesive subsurface materials were obtained by hydraulically pressing 3-inch O.D. thin -wall sampling tubes into the underlying soils at selected depths (ASTM D 1587). These samples were removed from the sampling tubes in the field and evaluated visually. One representative portion of each sample was sealed in a plastic bag for use in future visual evaluation and possible testing in the laboratory. The Texas Cone Penetration (TCP) test was completed in the field to determine the apparent in - place strength characteristics of the rock type materials. A 3-inch diameter steel cone driven by a 170-pound hammer dropped 24 inches is the basis for TxDOT strength correlations. Depending on the resistance (strength) of the materials, either the number of blows of the hammer required to provide 12 inches of penetration, or the inches of penetration of the cone due to 100 blows of the hammer are recorded on the field log and are shown on the Log of Boring sheets as "TX Cone" (reference TxDOT Test Method TEX 132-E, as modified). Logs of the borings are included in the Appendix. The logs show visual descriptions of subsurface strata encountered using the Unified Soil Classification System. Sampling information, pertinent field data, and field observations are also included. Samples not consumed by testing will be retained in our laboratory for at least 14 days and then discarded unless the Client requests otherwise. B-1 I ' +�. � —� ' rN P-1 II B-3 B-4 1 —+� rater.. B-s I B-8 B-9 B-10 0 IVY �����. �'� p , B-11 B-13 j•r B-14 �B-1 �3-17��� {` ' 12 i� IV IT �. P-2 / P-3 /� rr fi B-1 R IVB-19 B-2o � . � % .� r � 'Ti P4�� B-23`'�-- B-30 r B-27B-28 B-29 / / B-2 , III � % C. `` - /^ B-35 ;B-36f i B-37 w B-31� IV '" B-32 III III _ B-38 P-5 B-40-41' ;� B-42� B-43B-44 P-6 / B-47 B-48 B-49 B-51 .' B-52 �% B—Sc B-5 b. T B-59 ° B-60� s p� B-57 B-65 r APPROXIMATE PRELIMINARY • GEOTECHNICAL EXPLORATION A L R H A T E T I �l BORING LOCATION (W192432) CHISHOLM TRAIL RANCH SECTION 3 APPROXIMATE BORING LOCATION PHASES IA, 1B AND 2 F= ZONE NWC OF BREWER BOULEVARD AND WHERE 17 ALL BESINS ZONE IV STEWART FELTZ ROAD m ZONE II FORT WORTH, TEXAS FIGURE 1A ZONE III ZONE Y ALPHA PROJECT NO. W212453 BORING LOCATION PLAN L..jLOT REQUIRES DRILLED PIERS AREAS EXCLUDEDFROM CURRENT B , STUDY UNTIL DEEPER BORINGS ARE DRILLED III B-39� II �� L-T✓ I- � � I B-461 B-53 I B-55 P-7 B-54 Y_ I _ _ I B-62LN, B-63 IV Y B-6 1 B-66 I B-68 B-67 B-110;—I I I ^ B-78 I I w I B-85 Q J_9 -8S t . J. -97 D-yo I 3 B-103 B-104 I I w - B-114F B-115 B-116- B-113 V STEWART FELTZ ROAD GEOTECHNICAL EXPLORATION A L R H A'kT E ST I N G CHISHOLM TRAIL RANCH SECTION 3 # PHASES 1A, 113 AND 2 NWC OF BREWER BOULEVARD AND WHERE I T 1L L L B E f3 I M S STEWART FELTZ ROAD FORT WORTH, TEXAS FIGURE 1B ALPHA PROJECT NO. W212453 BORING LOCATION PLAN APPROXIMATE PRELIMINARY BORING LOCATION (W192432) APPROXIMATE BORING LOCATION ZONEI ZONEIV ZONE II ZONE V ZONE III LOT REQUIRES DRILLED PIERS . AREAS EXCLUDED FROM CURRENT STUDY UNTIL DEEPER BORINGS ARE DRILLED ALPHA Report No. W212453 B-1 METHODS OF LABORATORY TESTING Representative samples were evaluated and classified by a qualified member of the Geotechnical Division and the boring logs were edited as necessary. To aid in classifying the subsurface materials and to determine the general engineering characteristics, natural moisture content tests (ASTM D 2216) and Atterberg-limit tests (ASTM D 4318) were performed on selected samples. In addition, unconfined compressive strength tests (ASTM D 2166) and pocket -penetrometer tests were conducted on selected soil samples to evaluate the soil shear strength. Results of these laboratory tests are provided on the Log of Boring sheets. In addition to the Atterberg-limit tests, the expansive properties of the clayey soils were further analyzed by absorption swell tests in general accordance with ASTM D 4546. The swell test is performed by placing a selected sample in a consolidation machine and applying either the approximate current or expected overburden pressure and then allowing the sample to absorb water. When the sample exhibits very little tendency for further expansion, the height increase is recorded and the percent free swell and total moisture gain calculated. Results of these laboratory tests are provided on the Log of Boring sheets. ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 1 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W192432 www.alphatestiiig.com Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Chisholm Trail Ranch - Section 3 Surface Elevation: 6/19/2020 End Date: 6/19/2020 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Dark Brown CLAY _10- 15 20 Tan LIMESTONE with clay seams and layers Tan and Gray SHALY CLAY TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> r >> E JC, oa?i)o f "aL In O O-� aO C E a)- dN U) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 20 4.5+ 23 83 26 57 2.0 4.0 13 13.0 20.0 175 7 4.75" 4.5 27 61 21 40 4.5+ 24 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 0 0 5058 Brush Creek Rd. BORING NO.: 2 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W192432 www.alphatestiiig.com Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Chisholm Trail Ranch - Section 3 Surface Elevation: 6/19/2020 End Date: 6/19/2020 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS QOn Rods (ft): NONE ZAfter Drilling (ft): DRY NFAfter Hours (ft): MATERIAL DESCRIPTION Brown CLAY Tan CLAY T Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� `- a O C E E dN U) aoi ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 8 35 17 18 1.0 54 4.5+ 8 35 19 16 53 8 9.0 100/ 1" 3.5" 17 .5 100/ 11 20.0 , 1.25" 5058 Brush Creek Rd. BORING NO.: 3 ALPHA Phone»4 ��'� sheet 1 1 ^TESTING 656 of Fax: 817-496-5608 PROJECT NO.: W192432 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Project: Chisholm Trail Ranch - Section 3 Surface Elevation: Start Date: 6/19/2020 End Date: 6/19/2020 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 170 / 24 GROUND WATER OBSERVATIONS �•� E 0) w NONE V On Rods (ft): o T ;� U� C.N a) '� _ E a o ZAfter Drilling (ft): DRY n 'oW o a v a, aN .5 After_ Hours (ft): o—�° a m a) U` p � 3 o 0 a� cn of X ci = o o o Q U) HL a ZCU o MATERIAL DESCRIPTION Brown CLAY with limestone fragments . 4.5+ 12 Light Brown CLAY Tan and Gray SHALY CLAY Tan LIMESTONE with clay seams and layers Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT 2.0 8.0 3.5 10 56 18 38 0.8 4.5+ 2.9 115 17 4.5+ 14 4.5+ 22 58 20 38 2.7 14.0 4.5+ 18 100/ 42 1.25" 16.0 100/ 20.0 , 0.75" 11 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 4 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W192432 www.alphatestiiig.com Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Chisholm Trail Ranch - Section 3 Surface Elevation: 6/22/2020 End Date: 6/22/2020 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 10 _15 Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F > .>a> E J aYU C,oN f c Oo J_ aO E N 7O—� a i U) i U x ci OU) o O Z •� CU J co a n cn (0 Ha c D a_. 4.5+ 11 57 20 37 1.0 100/ 8.25" 100/ 1.50" 6 100/ 1" 100/ 0.75" 17.0 100/ 20.0 L 1.50" ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 5J sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W192432 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Project: Chisholm Trail Ranch - Section 3 Surface Elevation: Start Date: 6/19/2020 End Date: 6/19/2020 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Dark Brown CLAY 5 Tan LIMESTONE with clay seams and layers Tan CLAY 10 Tan Weathered LIMESTONE with clay seams and layers Tan and Gray SHALY CLAY 15 20 TEST BORING TERMINATED AT 20 FT 6.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, rno> 7 � .>a> E J �oNa)U� f "aL cC Oo J_ YcU Ea) dN 7OoO a i U) ai ofx 0 ci OU) o O Z •� CU J mo a n cn (0 Ha d c D a_4.5+ 22 4.5+ 19 75 23 52 1.7 4.5+ 16 12 8.0 3.0 15 41 16 25 10.0 12.0 4.25 28 67 22 45 0.1 20.0 4.5+ 23 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 6 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W192432 www.alphatestiiig.com Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Chisholm Trail Ranch - Section 3 Surface Elevation: 6/19/2020 End Date: 6/19/2020 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Brown CLAY with calcareous deposits Tan LIMESTONE with clay seams and layers 5 10 _15 Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F > .>a> E J aYU C,oN f c Oo J_ aO E N 7O—� a i U) i U x ci OU) o O Z •� CU J co a n cn (0 Ha c D a_. 4.5+ 6 45 19 26 1.0 5.25" 125 5 100/ 7 4.50" 100/ 1.25" 17.0 11.1 00/ 10 20.0 L ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: % Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W192432 www.alphatestiiig.com Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Chisholm Trail Ranch - Section 3 Surface Elevation: 6/19/2020 End Date: 6/19/2020 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Dark Brown CLAY Light Brown CLAY Tan LIMESTONE with clay seams and layers Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> r >> E JC, oa?i)o f "aL In O O-� aO C E a)- dN U) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5 20 4.5 22 74 22 52 4.0 3.0 23 47 18 29 0.3 5.0 100/ 4.50" 11 100/ 4.50" 14.0 100/ 2.7575" 100/ 10 20.0 , 1.25" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 8 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W192432 www.alphatestiiig.com Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Chisholm Trail Ranch - Section 3 Surface Elevation: 6/19/2020 End Date: 6/19/2020 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE with clay seams and layers _10— 15 20 Brown SHALY CLAY TEST BORING TERMINATED AT 20 FT 20.0 Hammer Drop (lbs / in): 170 / 24 a o -6•9 Et X Q o U)C�:F o u, rn> .°' oN �� U� r� >a> u�i E_ J a �� ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) E a) U- 0 E N U) ofxci oU) o o E a m �a a c Z D a 9 125 17 5.25" 71 100/ 9.50" 4.5+ 22 68 25 43 2.7 4.5+ 23 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 9 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W192432 www.alphatestiiig.com Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Chisholm Trail Ranch - Section 3 Surface Elevation: 6/19/2020 End Date: 6/19/2020 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Tan LIMESTONE with clay seams and layers 5 10 _15 / Gray SHALY CLAY 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> r >> E JC, oa?i)o f "aL In O O-� aO C E�- dN �v U) ofx U ci OU) o o O Z •� J m a n cn (0 Ha d c D a_. 4.5+ 14 62 21 41 1.0 100/ 4.75" 100/ 2.50" 100/ 2.25" 100/ 5" 17.0 100/ 4.5+ 11 62 21 41 20.0 , 8.25' ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 10 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W192432 www.alphatestiiig.com Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Chisholm Trail Ranch - Section 3 Surface Elevation: 6/19/2020 End Date: 6/19/2020 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION / Dark Brown CLAY Tan LIMESTONE with clay seams and layers _5 Tan CLAY j j Tan LIMESTONE with clay seams and layers _10_ Tan and Gray SHALY CLAY 15 Tan LIMESTONE with clay seams and layers Gray SHALY CLAY 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> r >> E JC, oa?i)o f "aL In O O-� aO C E�- dN �v U) ofx U ci OU) o o O Z •� J m a n cn (0 Ha d c D a_. 4.5+ 26 80 28 52 1.0 100/ 4.25" 100/ 66 4.50" 6.0 . 4.5 18 48 19 29 0.5 9.0 46 11.0 4.5+ 27 15.0 17.0 4.5+ 24 67 23 44 20.0 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 11 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W192432 www.alphatestiiig.com Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Chisholm Trail Ranch - Section 3 Surface Elevation: 6/19/2020 End Date: 6/19/2020 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Brown CLAY Tan LIMESTONE with clay seams and layers Tan and Gray SHALY CLAY Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, rno > In J_ J E E �oNaa)U "aL f �op-� do cc dR r VE a) a m Ycv o3 n (n U) ofxci oU) o o E a m � a a c Z D o- 3.75 8.7 110 21 75 25 50 2.0 17" 12 56 17 12.0 71 3.5 27 67 23 44 0.4 18.0 Gray SHALY CLAY 4.5+ 22 59 21 38 0.0 20.0 TEST BORING TERMINATED AT 20 FT ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 12 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W192432 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Project: Chisholm Trail Ranch - Section 3 Surface Elevation: Start Date: 6/29/2020 End Date: 6/29/2020 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Light Brown CLAY - with limestone fragments below 4 ft Tan LIMESTONE with clay seams and layers Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� o0 ?� c° Y a) of "aL c� @o > �a C O J Y - a) E O� `- o O C E E dN U) aa) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 21 4.5+ 2.5 115 16 4.5 6.0 100/ 1.25" 12.0 100/ 100/ 20.0 , 0.75" 19 42 20 22 0.3 10 12 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 13 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W192432 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC - DFW Location: Fort Worth, Texas Project: Chisholm Trail Ranch - Section 3 Surface Elevation: Start Date: 6/29/2020 End Date: 6/29/2020 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: g 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 2.0 Light Brown CLAY - with limestone fragments from 2 ft to 4 ft 11.0 Tan LIMESTONE with clay seams and layers Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 22 77 28 49 1 5" 1. 100/ 20.0 , 1.25" TEST BORING TERMINATED AT 20 FT 3.5 20 4.25 23 4.5+ 16 49 18 31 1.9 4.5+ 21 8 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 1 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 10 _15— _20 Tan LIMESTONE with clay seams and layers Gray LIMESTONE with shale seams TEST BORING TERMINATION AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 2 c aN U 3 rn U E V- 0 c 0 U) i xci o� o o E a m � a a Z D o- 4.0 24 68 23 45 2.0 100/ 1.25" 100/ 2.25" 16.0 100/ 20.0 , 0.25" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 2 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 5 10 _15 20 Tan LIMESTONE with clay seams and layers Tan CLAY with calcareous deposits and limestone fragments Tan and Gray SHALY CLAY Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) oN �� o u, U� rn> 7� .°' E_ J a o n ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �— o O C E E aN v U 7 in U ?i U) i U x ci O� o O Z •� J m a n (0 Ha d D a_4.5+ 26 2.0 4.0 8.0 12.0 100/ 15.0 , 1.5" 4.5+ 9 40 17 23 4.5+ 9 4.5+ 11.4 100 25 60 23 37 2.0 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 3 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Brown CLAY 5 Tan LIMESTONE with clay seams and layers _10 _15_ Gray LIMESTONE with shale seams 20 TEST BORING TERMINATION AT 20 FT Hammer Drop (lbs / in): 170 / 24 a o Q o U o E> .>a� a) E _7 J o f cC In Oo YU O—oO E a) dN U in ?i- U) a) ofx U ci OU) o O Z •� CU J a (0 Ha d c D a_4.5+ 24 6.0 1 5" 1. 6 100/1.1 18.0 100/ 20.0 66 1.25" 4.5+ 14 62 19 43 4.5+ 17 1.3 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 4 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with rock fragments 5 10 J 15 20 Brown CLAY with limestone fragments Reddish Brown SHALY CLAY TEST BORING TERMINATED AT 15 FT 4.0 8.0 15.0 Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 31 11 4.5+ 9 47 16 31 4.5 4.5+ 8 4.5+ 19 70 23 47 4.9 4.5+ 17 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 5 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: g 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 5 10 _15_ _20 Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 20 FT 4.0 12.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •� CU J a (0 Ha d c D a_4.5+ 19 100/ 0.75" 100/ 20.0 , 2.75" 4.5+ 23 63 24 39 4.5+ 15 4.5+ 17.5 120 14 37 18 19 0.0 4.5+ 12 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 6 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 5.0 Tan LIMESTONE with clay seams and layers Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 8 6 100/ 1" 100/ 15.0 , 0.5" TEST BORING TERMINATED AT 15 FT 4.5+ 11 4.5+ 13 68 21 47 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: % Sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 5 10 15 _20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o N a) o u, U� rn> 7� .°' >a> E_ J c o n �� o0 ?� c° Y a) of "aL c� @o > �a C O J Y - E O� `- o O C E E dN 0- U 7 a in U ?i U) aoi ofx U ci OU) o o O Z •� J m a n cn (0 Ha d c D a_4.5+ 22 4.0 Tan LIMESTONE with clay seams and layers , 100/ 0.75" Tan and Gray CLAY with calcareous deposits Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 20 FT 8.0 14.0 100/ 20.0 , 0.75" 4.5+ 18 73 26 47 4.5+ 18 43 21 22 0.5 4.5+ 26 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 8 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Brown CLAY 5.0 Tan LIMESTONE with clay seams and layers Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 22 6 100/ 1" 100/ 15.0 , 0.75" TEST BORING TERMINATED AT 15 FT 4.5+ 12 54 21 33 4.5+ 16 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 9 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 4.0 Reddish Brown SHALY CLAY 20.0 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 11 4.5+ 12 61 20 41 4.5+ 17 4.5+ 19 68 23 45 4.7 4.5+ 21 4.5+ 19 4.5+ 20 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 10 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan CALCAREOUS CLAY 5 Tan LIMESTONE with clay seams and layers 10 Brown and Gray SHALY CLAY _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a o u, rn> .°' �� oN ?� �� Y O U� "aL r� >a> > u�i C E_ J J a o - n o0 c° of O c� C @o dN �a v O Y a) E aa) O� U �- o E E OU) o O •� m n U) ofx ci Ha c Z D J a (0 a_13 d 11 4.0 4.5+ 9 46 18 28 6.0 100/ 5.25" 12.0 4.5+ 16 15.0 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 0 0 10 15 _20 5058 Brush Creek Rd. BORING NO.: 11 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS QOn Rods (ft): NONE ZAfter Drilling (ft): DRY NFAfter Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers Brown and Gray SHALY CLAY Gray LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> r >> E JC, oa?i)o f "aL In O O-� oO C E a)- dN v U) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_1.0 t BE 16.0 20.0 , 100/ 1.5" 100/ 0.5" 4.5+ 23 67 25 42 1.2 4.5+ 24 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 12 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 10 _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) ofx U ci OU) o O Z •� CU J m a n (0 Ha c D a_. 4.5+ 26 1.0 100/ 1" 100/ 15.0 , 3' ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 13 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5_ _10 _15 Gray SHALE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o� O� `- o O C E E dN U) a�i ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 26 4.5+ 15 60 21 39 4.0 100/ 66 1" 100/ 1" 100/ 0.75" 16.0 1400/ 20.0 , ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 14 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Brown CLAY 10 J 15 20 Brown and Gray SHALY CLAY TEST BORING TERMINATED AT 15 FT 6.0 15.0 Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 29 4.5+ 19 4.5+ 18 65 21 44 4.8 4.5+ 16 4.5+ 18 68 23 45 4.5 4.5+ 19 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 15 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers Brown and Gray SHALY CLAY TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 o c dcv U n v 3 E V- 0 c 0 U) i xci o� o o E a m � a a Z D a_ 4.5+ 31 2.0 12.0 20.0 100/ 3.75" 100/ 1.75" 4.5+ 26 78 27 51 4.5+ 22 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 16 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Brown CLAY with gravel Tan LIMESTONE with clay seams and layers 5 _10_ Reddish Brown SHALY CLAY 15/ TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o� O� �- o O C E E dN v U) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_1.0 t 10 100/ 1" 100/ 3.5" 12.0 4.5+ 22 15.0 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 17 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE with clay seams and layers 16.0 Reddish Brown CLAY 20.0 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a O u, rn> .°' E_ a �� oN ?� �� Y O U� "aL r� >a> > u�i C J J o - n o0 c° O� of O c� C @o dN �a v O Y a) E aa) ofx U �- ci o E E OU) o O •� J m a n (0 U) Ha c Z D a_I d u I I 100/ 1.5" 4.5+ ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 18 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Dark Brown CLAY 10 15 20 Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o� O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 26 6.0 Tan LIMESTONE with clay seams and layers 100/ 6.25" 100/ 15.0 ).625' TEST BORING TERMINATED AT 15 FT 4.5+ 22 3.75 4.3 108 24 82 27 55 0.9 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 19 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Dark Brown CLAY with gravel - FILL _ Tan LIMESTONE with clay seams and layers _5 Tan and Gray CLAY with calcareous deposits and limestone fragments Reddish Brown and Gray SHALY CLAY 10 15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o� O� o O C E� dN �v U) a�i ofx U`- ci OU) o o O Z •� CU J m a n cn (0 Ha c D a_4.5+ 0 29 1.0 1 " 4 6.0 8.0 20.0 4.5+ 11 52 19 33 4.5+ 22 4.5+ 16 4.5+ 14 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 20 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments _10— _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 o c dcv U n v 3 E V- 0 c c U) i xci o� o o E a m � a a Z D o- 4.5+ 18 2.0 100/ ).875875' u 100/ 15.0 , 1.25" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 21 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments _10— _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 o c dcv U n v 3 E V- 0 c c U) i xci o� o o E a m � a a Z D o- 4.5+ 9 2.0 100/ 0.5" u 100/ 15.0 , 1.25" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 22 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments _10— _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 o c dcv U n v 3 E V- 0 c c U) i xci o� o o E a m � a a Z D o- 4.5+ 20 2.0 u 100/ 0.75" 100/ 15.0 , ALPHA ^TESTING 5058 Brush Creek Rd. Phon »_Texas 56 ��'� BORING NO.: 23 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 3.0 Tan LIMESTONE with clay seams and layers 12.0 Brown and Gray SHALY CLAY 16.0 Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 24 79 27 52 4.5+ 22 u 47 100/ 20.0 , 4.5+ 24 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 24 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 Tan and Gray CLAY with calcareous deposits 10 Tan LIMESTONE with clay seams and layers _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �— o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_. 4.5+ 18 1.0 100/ 2.5" 6.0 4.5+ 16 57 19 38 2.5 4.5+ 21 12.0 100/ 15.0 , ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 25 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Dark Brown CLAY Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� o� ?� c° Y a) of "aL c� @o > �a C O J Y - a) E O� `- o O C E E dN 0- U 7 a in U ?i U) aoi i U x ci OU) o o O Z •� CU J m a n cn (0 Ha d c D a_4.5+ 33 5 _ 6.0 Brown CLAY with limestone fragments and calcareous deposits _10� Tan LIMESTONE with clay seams and layers _15_ Gray LIMESTONE with shale seams _20 TEST BORING TERMINATION AT 20 FT 12.0 100/ 1.25" 16.0 20.0 L 1.2 100/ 4.5+ 21 4.5+ 22 76 27 49 5.2 4.5+ 6.4 118 10 4.5+ 9 37 15 22 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 26 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Brown CLAY with calcareous deposits and limestone 5 fragments Tan LIMESTONE with clay seams and layers _10 Tan CLAY _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o� O� �— o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 32 4.5+ 22 67 23 44 4.0 4.5+ 20 65 22 43 6.0 1 5" 1. 12.0 4.5+ 16 15.0 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 27 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Brown CLAY with calcareous deposits and limestone fragments _10_ _15— _20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� ?� c° Y a) of "aL c� @o > �a C O J Y - a) E o0 O� `- o O C E E dN 0- U 7 a in U ?i U) aa) ofx U ci OU) o o O Z •� CU J m a n cn (0 Ha d c D a_4.25 24 6.0 Tan and Gray CLAY with calcareous deposits 7.0 Tan LIMESTONE with clay seams and layers Gray LIMESTONE with shale seams TEST BORING TERMINATION AT 20 FT 1 5" 1. 16.0 100/ 20.0 , 1.25" 4.5+ 14 4.5+ 14 50 21 29 4.5+ 18 45 22 23 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 28 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Dark Brown, Brown, and Light Brown CLAY with gravel - FILL 5 10 J 15 20 Tan and Gray SHALY CLAY TEST BORING TERMINATED AT 15 FT 6.0 15.0 Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 19 4.5+ 8 35 14 21 4.5+ 9 4.25 23 4.5+ 3.2 107 21 66 26 40 4.5+ 21 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 29 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY Tan LIMESTONE with clay seams and layers 5 _10_ Tan and Gray SHALY CLAY 15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) ofx U ci OU) o O Z •� CU J m a n (0 Ha c D a_. 4.5+ 30 1.0 12.0 20.0 u 12" 4.5+ 16 53 18 35 4.5+ 22 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 30 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments _10— _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 o c dcv U n v 3 E V- 0 c c U) i xci o� o o E a m � a a Z D o- 4.5+ 16 2.0 100/ 1.25" u 100/ 15.0 k $ ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 31 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers Tan and Gray CLAY with calcareous deposits Gray LIMESTONE with shale seams TEST BORING TERMINATION AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 o c dcv U n v 3 E V- 0 c c U) i xci o� o o E a m � a a Z D o_ 4.5+ 21 70 23 47 2.0 1" 4 6.0 4.25 25 4.0 1.3 103 22 73 24 49 12.0 u 100/ 20.0 k 5058 Brush Creek Rd. BORING NO.: 32 ALPHA Phon »_Texas ��'� sheet 1 1 ^TESTING 56 of Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 170 / 24 GROUND WATER OBSERVATIONS �•� E 0) w QOn Rods (ft): NONE o T �5 a`) U� r'.m _ E E a o - � ZAfter Drilling (ft): DRY n 'ow o a a, aN v NFAfter Hours (ft): o-�° a� V - a p � 3 as cn o Ha d o j� Z D j a a_MATERIAL DESCRIPTION Dark Brown CLAY — / 4.0 31 — 4.5+ 21 — 5 4.5+ 21 82 27 55 _ 6.0 Tan CLAY with calcareous deposits and limestone — � fragments 4.5+ 14 43 17 26 8.0 Tan LIMESTONE with clay seams and layers 100/ — 10 5.5" , 100/ _15 15.0 , 0.5" TEST BORING TERMINATED AT 15 FT 20 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 33 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 _10 Tan and Gray CLAY 15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� `- o O C E E dN U) a�i ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 29 4.5+ 19 67 23 44 4.0 12.0 20.0 100/ 1.5" 4.5+ 22 68 24 44 4.5+ 24 5058 Brush Creek Rd. BORING NO.: 34 ALPHA ^TESTING Phon s»_Texas 6 56 ��'� sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 170 / 24 GROUND WATER OBSERVATIONS o �•� E _ 0) > L �5 `) U� r'.m E E QNONE a a o � On Rods (ft): - ZAfter Drilling (ft): DRY n 'ow o-�° a o a, aN p a v 3 o NFAfter Hours (ft): a� V - o � as cn Ha d j� Z D j a a_MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments 4.5+ 32 4.5+ 18 66 23 43 4.0 — � Light Brown CLAY with calcareous deposits and 5 limestone fragments — � 4.5+ 17 4.5+ 14 35 16 19 j 4.5+ 34 10 10.0 Tan LIMESTONE with clay seams and layers 100/ _15 15.0 , 2.25" TEST BORING TERMINATED AT 15 FT 20 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 35 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 10 J 15 _20 Light Brown CLAY with calcareous deposits Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, rno> 7 � .>u> E J aYU �oNa)U� f "aL cC Oo J_ oO E a) dN 7O—� a i U) ofx U ci OU) o O Z •� CU J m a n cn (0 Ha d c D a_4.5+ 19 4.0 20 4.5+ 18 79 27 52 6.0 18.0 100/ 20.0 66 0.75" 4.5+ 16 4.5+ 20 59 22 37 4.5+ 26 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 36 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 10 - J 15 20 Tan LIMESTONE with clay seams and layers Light Brown CLAY with calcareous deposits TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 2 c aN U 3 rn U E V- 0 c c U) i xci o� o o E a m � a a Z D o_ 4.0 27 84 28 56 2.0 6.0 15.0 100/ 7.5" 4.0 15 4.5+ 20 65 22 43 4.0 26 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 37 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5 _10_ _15 Reddish Brown and Gray SHALY CLAY _20 TEST BORING TERMINATED AT 20 FT 3.0 16.0 20.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 32 4.5+ 15 69 23 46 u 100/ 1.5" 63 4.5+ 22 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 38 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �— o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 33 4.5+ 22 69 26 43 4.0 Tan and Gray CLAY with calcareous deposits and limestone fragments 4.5+ 14 28 18 10 6.0 Tan LIMESTONE with clay seams and layers 6 100/ 1" 100/ 15.0 , 0.5" TEST BORING TERMINATED AT 15 FT ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 39 Sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 5.0 Tan LIMESTONE with clay seams and layers 8.0 Tan and Gray CLAY with calcareous deposits 12.0 Tan LIMESTONE with clay seams and layers 18.0 Gray LIMESTONE with shale seams Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, UZ= rn> E >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •� CU J a (0 Ha d c D a_4.5+ 24 6 100/1.1 100/ 20.0 66 1.5" TEST BORING TERMINATED AT 20 FT 4.5+ 18 64 23 41 4.5+ 18 4.0 0.9 105 20 67 22 45 ALPHA ^TESTING 5058 Brush Creek Rd. Phon »_Texas 56 ��'� BORING NO.: 40 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 10 _15 20 Tan and Gray SHALY CLAY Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 24 6.0 12.0 15.0 , 100/ 0.75" 4.5+ 15 4.5+ 16 64 22 42 4.4 4.5+ 23 4.5+ 3.5 116 12 49 19 30 0.5 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Meritaqe Homes of Texas, LLC Project: Chisholm Trail Ranch Section 3, Phase Start Date: 10/11/2021 End Date: Drilling Method: CONTINUOUS FLIGHT AU 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY 0CL After Hours (ft): MATERIAL DESCRIPTION Dark Brown and Light Brown CLAY with limestone fragments jj i' Tan CLAY with calcareous deposits 5 Reddish Brown CLAY 10 15 20 TEST BORING TERMINATED AT 20 FT 5058 Brush Creek Rd. BORING NO.: 41 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www. alphatesting. com Location: Fort Worth, Texas s 1A, 1B, and 2 Surface Elevation: 10/11 /2021 West: GER North: Hammer Drop (Ibs / in): 170 / 24 Q o U)C�:F E'— o u, rn> E_ E a >�• o occ Q E o v UO @NE ac?in)n aiU-oO E a) O oNo Oof Ho 'n cix a �ZC CU D a_d 4.5+- 12 49 18 31 4.0 4.5+ 11 50 18 32 6.0 20.0 4.5+ 19 70 24 46 6.0 4.5+ 20 4.5+ 22 4.5+ 19 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 42 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE with clay seams and layers 5 10 Reddish Brown CLAY 15/ TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 170 / 24 Q o U)C�:F a O u, rn> .°' �� oN ?� �� Y O U� "aL r� >a> > u�i C E_ J J a o - n o0 c° of O c� C @o dN �a O U 7 in Y a) U ?i O� U— o E E OU) o O �v •� a co n v) U) ofx ci Ha d c Z D CU J a (0 a_I 6 100/ 1" 47 12.0 4.0 23 15.0 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 43 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 10 _15 Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, rn> .°' o N a� a) U E u>a> E_ J c o �� ?� Y N In "aL > C J Y n o� c° of c� @o �a p� o c dR U rn v 3 E V- 0 E N o 0� a m n (n U) of xci oU) o o E a m � a a c Z D o- 4.5+ 9 2.0 100/ 66 1" 100/ 5" 16.0 100/ 20.0 L 1.5" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 44 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 10 _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) ofx U ci OU) o O Z •� CU J m a n (0 Ha c D a_. 4.5+ 27 1.0 u 6 100/ 1" 100/ 15.0 , 1.75" ALPHA ^TESTING 5058 Brush Creek Rd. Phon »_Texas 56 ��'� BORING NO.: 45 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 6.0 / Tan CALCAREOUS CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _10 Tan and Gray CLAY with limestone fragments 15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 18 8.0 13" 12.0 20.0 4.5+ 18 4.5+ 20 80 25 55 3.1 4.5+ 6 47 17 30 4.5+ 22 72 24 48 4.5+ 19 ALPHA ^TESTING 5058 Brush Creek Rd. Phon »_Texas 56 ��'� BORING NO.: 46 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Dark Brown CLAY 5 10 15 20 Tan CLAY with calcareous deposits and limestone fragments Tan and Gray SHALY CLAY with calcareous deposits Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 19 65 22 43 2.0 8.0 12.0 15.0 , 100/ 1.5" 4.5+ 8 4.5+ 10 48 17 31 2.1 4.5+ 16 4.0 24 73 25 48 1.6 5058 Brush Creek Rd. BORING NO.: 47 Pha6ALPHA 5 Sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 170 / 24 GROUND WATER OBSERVATIONS o �•� E _ 0) > L �5 `) U� r'.g .� E E Q18 a a o � On Rods (ft): - ZAfter Drilling (ft): DRY n 'ow o-�° a o a, aN p a v 3 o NFAfter Hours (ft): a� V - o � as cn Ha d j� Z D j a a_MATERIAL DESCRIPTION Brown CLAY with calcareous deposits and limestone fragments — 4.5+ 19 4.5+ 11 52 24 28 _ 3.0 Tan LIMESTONE with clay seams and layers —5 — , 100/ 10 2.25" — , 100/ 15 6" S_Z 18.0 Gray SHALY CLAY — 4.5+ 22 20 20.0 TEST BORING TERMINATED AT 20 FT ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 48 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments _10— _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 o c dcv U n v 3 E V- 0 c c U) i xci o� o o E a m � a a Z D o- 4.5+ 30 2.0 100/ 1.25" 10 10" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 49 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE with clay seams and layers 18.0 Reddish Brown and Gray SHALY CLAY 20.0 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a O u, rn> .°' E_ a �� oN ?� �� Y O U� "aL r� >a> > u�i C J J o - n o0 c° of O c� C @o dN �a v O Y a) E aa) O� U �- o E E OU) o O •� m n U) ofx ci Ha d c Z D J a (0 a_I u 100/ 0.5" 53 4.5+ 23 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 50 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 10 _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a O u, rn> .°' �� oN ?� �� Y O U� "aL r� >a> > u�i C E_ J J a o - n o� c° of O c� C @o dN �a v O Y a) E O� U �- o E E OU) o O •� m n U) ofx ci Ha c Z D CU J a (0 a_1.0 d E 12 100/ 1.125125' u 100/ 15.0 , 2.75" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 51 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5 _10_ _15 Reddish Brown and Gray SHALY CLAY _20 TEST BORING TERMINATED AT 20 FT 3.0 16.0 20.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 19 4.5+ 11 51 20 31 u 100/ 0.5" 100/ 2.25" 4.5+ 22 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 52 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments _10_ _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �- o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 25 4.5+ 18 69 25 44 4.0 100/ 0.5" u 100/ 15.0 , 2.25" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 53 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 _10 _15 Gray SHALE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� `- o O C E E dN U) a�i ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 22 4.5+ 16 68 22 46 4.0 100/ 2.0" 53 16.0 100/ 20.0 , 1.5" ALPHA ^TESTING 5058 Brush Creek Rd. Phon »_Texas 56 ��'� BORING NO.: 54 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Light Brown GRAVELLY CLAY Brown and Gray CLAY with calcareous deposits Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 19 4.0 6.0 8.0 100/ 0.5" 100/ 15.0 , 4.25" 4.5+ 15 68 24 44 4.5+ 7 4.5+ 14 36 17 19 0.0 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 55 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5 10 15 _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o N a� a) o u, U rn> E .°' u>a> E_ J c o n �� o� ?� c° Y O of "aL c� In @o > �a C O J Y - E O� `- o O C E E dN 0- U 7 a in U ?i U) aoi ofx U ci OU) o o O Z •� J m a n cn (0 Ha d c D a_4.5+ 23 62 24 38 2.0 1 5" 1. 20.0 L 58 5058 Brush Creek Rd. BORING NO.: 56 ALPHA Phon »_Texas ��'� sheet 1 1 ^TESTING 56 of Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 170 / 24 GROUND WATER OBSERVATIONS �•� E 0) w QOn Rods (ft): NONE o T �5 a`) U� r'.m _ E E a - o � ZAfter Drilling (ft): DRY n 'ow o a a, aN v NFAfter Hours (ft): o-�° a� V - a p � as 3 cn o Ha d o j� Z D j a a_MATERIAL DESCRIPTION / Brown CLAY with limestone fragments - 4.5+ 23 _ 2.0 Brown CLAY with calcareous deposits and limestone fragments - 4.5+ 13 - 5 4.5+ 18 68 21 47 3.3 - 4.5+ 21 - - 4.5+ 20 10 _ 12.0 Brown and Gray SHALY CLAY - - 4.5+ 18 15 15.0 TEST BORING TERMINATED AT 15 FT 20 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 57 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE with clay seams and layers 10 15 J 20 Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a O u, rn> E Z= "aL r In >> JC, - oa?i)o f C dN O a) O—oO U E a) OU) o O •� U) ofx ci Ha d c Z D J a (0 a_I 1 5" 1. 8.0 Reddish Brown and Gray CLAY with limestone . fragments 4.5+ 1.5 104 22 67 23 44 TEST BORING TERMINATED AT 20 FT 20.0 4.5+ 21 4.5+ 22 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 58 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE with clay seams and layers 10 15 20 8.0 Light Brown and Gray CLAY with limestone fragments 12.0 Reddish Brown and Gray SHALY CLAY 15.0 TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a O u, rn> .°' E_ a �� oN ?� �� Y O U� "aL r� >a> > u�i C J J o - n o0 c° O� of O c� C @o dN �a v O Y a) E aa) ofx U �- ci o E E OU) o O •� J m a n (0 U) Ha d c Z D a_I 100/ 0.75" 4.5+ 22 64 23 41 2.0 4.5+ 19 61 20 41 5058 Brush Creek Rd. BORING NO.: 59 ALPHA Phone»4 ��'� Sheet 1 1 ^TESTING 656 of Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 170 / 24 GROUND WATER OBSERVATIONS �•� E 0) w QOn Rods (ft): NONE o T �5 a`) U� r'.m _ E E a o - � ZAfter Drilling (ft): DRY n 'ow o a a, aN v NFAfter Hours (ft): o-�° a� V - a p � 3 as cn o Ha d o j� Z D j a a_MATERIAL DESCRIPTION / Dark Brown CLAY with limestone fragments — 3.75 29 78 27 51 _ 2.0 Tan CALCAREOUS CLAY with limestone fragments — 4.5+ 10 —5 4.5+ 8 42 17 25 _ 6.0 Tan LIMESTONE with clay seams and layers 100/ — 10 3.5" , 12.0 _ Reddish Brown CLAY — — 4.5+ 22 71 25 46 15 — — 4.5+ 23 20 20.0 TEST BORING TERMINATED AT 20 FT ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 60 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 10 15 20 Tan LIMESTONE with clay seams and layers Tan CLAY with calcareous deposits and limestone fragments Reddish Brown SHALY CLAY TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) o u, rn> .°' oN �� U� 7� E_ J a ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) 0 o c dcv U n v 3 E V- 0 c c U) i xci o� o o E a m � a a Z D a_ 4.5+ 21 60 21 39 2.0 100/ 2.5" 8.0 4.0 18 53 19 34 1.6 12.0 4.5+ 25 15.0 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 61 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 10 15 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 30 4.5+ 20 4.5+ 16 65 22 43 0.4 6.0 Tan CALCAREOUS CLAY 4.5+ 16 57 19 38 9.0 4.5+ 22 Gray LIMESTONE with shale seams , 100/ 1.5" TEST BORING TERMINATED AT 20 FT 100/ 20.0 hL 3" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 62 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan CALCAREOUS CLAY _5� Tan LIMESTONE with clay seams and layers 10 _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.0 27 74 25 49 1.00 4.5+ 9 4.5+ 12 40 17 23 6.0 100/ 2.75" 100/ 15.0 66 5„ ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 63 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Brown CLAY Tan LIMESTONE with clay seams and layers Reddish Brown and Gray SHALY CLAY 5 10 15 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a O u, rn> .°' E_ a �� oN ?� �� Y O U� "aL r� >a> > u�i C J J o - n o� c° O� of O c� C @o dN �a O Y a) E a�i ofx U`- ci o E� OU) o o O �v •� J m a n cn (0 U) Ha c Z D CU a_. 4.5+ 24 1.0 4.0 20.0 4.5+ 18 4.5+ 1.3 103 23 74 25 49 4.4 4.5+ 22 4.5+ 25 4.5+ 25 ALPHA ^TESTING 5058 Brush Creek Rd. Phon »_Texas 56 ��'� BORING NO.: 64 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 5 10 J 15 20 Tan CALCAREOUS CLAY Reddish Brown and Gray SHALY CLAY TEST BORING TERMINATED AT 15 FT 2.0 8.0 15.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 18 69 22 47 4.5+ 8 4.5+ 9 4.5+ 11 33 14 19 0.0 4.5+ 23 71 25 46 4.5+ 22 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 0 0 5058 Brush Creek Rd. BORING NO.: 65 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS QOn Rods (ft): NONE ZAfter Drilling (ft): DRY NFAfter Hours (ft): MATERIAL DESCRIPTION Brown CLAY Tan LIMESTONE with clay seams and layers Brown CLAY with calcareous deposits Tan and Gray SHALY CLAY TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a o u, rn> Z= "aL r In >> E JC, oa?i)o O—� f C dN O ofx U ci oO E a)- OU) o O •� J a (0 U) Ha c Z D CU a_. 2.0 31 1.0 3.0 4.0 20.0 4.5+ 4.5+ 4.5+ 4.5+ 4.5+ 4.5+ 17 60 18 42 22 24 21 67 23 44 26 24 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 66 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: GROUND WATER OBSERVATIONS 0) V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Dark Brown and Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 29 4.5+ 22 72 24 48 4.5+ 21 5.0 100/ 3.0" 46 15.0 , ALPHA N rTESTING WHERE IT ALL BEGINS Client: Meritaqe Homes of Texas, LLC Project: Chisholm Trail Ranch Section 3, Phase Start Date: 10/11/2021 End Date: Drilling Method: CONTINUOUS FLIGHT AU GROUND WATER OBSERVATIONS 0) V On Rods (ft): NONE w VAfter Drilling (ft): DRY After Hours (ft): 0CL MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers Tan CLAY with calcareous deposits 5 Tan and Gray SHALY CLAY — Tan LIMESTONE with clay seams and layers 10 _15 Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT 5058 Brush Creek Rd. BORING NO.: 67 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www. alphatesting. com Location: Fort Worth, Texas s 1A, 1B, and 2 Surface Elevation: 10/11 /2021 West: GER North: Hammer Drop (Ibs / in): 170 / 24 Q o U)C�:F E'— o u, rn> "a-5 N > C E_ E a o J - o n o� c° Q E of O c� @o �a O C aN Y a) O� E aoi U`- o E a) O� o O •C 'n o x ci Ha d Z D CU J a (0 d 23 67 23 44 2.0 4.0 4.5+ 12 4.5+ 15 60 23 37 8.0 4.0 1.4 98 27 73 25 48 9.0 100 1.0" 16.0 100/ 20.0 L 0.5" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 68 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan CALCAREOUS CLAY Tan LIMESTONE with clay seams and layers 5 _10 Tan and Gray SHALY CLAY 15/ TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a o -6•9 Et X Q o U)C�:F o u, rn> .°' oN �� U� r� >a> u�i E_ J a �� ?� Y N "aL > C J Y n o0 c° of c� @o �a ° a) E U- 0 E N U) of xci oU) o o E a m � a a c Z D a_ 4.5+ 23 65 25 40 2.0 4.5+ 10 45 21 24 4.0 100/ 4.25" 50 12.0 4.5+ 27 15.0 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 69 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: Start Date: 10/11/2021 End Date: 10/11/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 5 10 15 20 4.0 Brown and Gray SHALY CLAY Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 12 4.5+ 14 64 22 42 4.5+ 18 4.5+ 21 60 24 36 3.6 8.0 Brown CLAY with limestone fragments 4.5+ 18 57 21 36 9.0 Tan LIMESTONE with clay seams and layers , 100/ 0.25" TEST BORING TERMINATED AT 20 FT 100/ 20.0 hL 1.25" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 70 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3, Phases 1A, 1B, and 2 Surface Elevation: 10/11/2021 End Date: 10/11/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 2.0 Light Brown CALCAREOUS CLAY 4.0 Reddish Brown and Gray SHALY CLAY 15.( TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •C J m a n (0 Ha a-c D a_ 4.5+ 12 40 20 20 4.5+ 14 4.5+ 19 4.25 24 70 23 47 2.1 4.5+ 23 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 71 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 10/1/2021 End Date: 10/1/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 6.0 Reddish Brown CLAY Light Brown SHALY CLAY Gray LIMESTONE with shale seams Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •C J a (0 H a a-c D a_ 100/ 20.0 k TEST BORING TERMINATED AT 20 FT 4.5+ 4.5+ 4.5+ 4.5+ 4.5+ 13 61 20 41 23 23 65 24 41 1.9 19 55 20 35 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 72 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/30/2021 End Date: 9/30/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 5 _10_ _15 20 Light Brown CALCAREOUS CLAY Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT 4.0 6.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 20 100/ 2.25" 100/ 15.0 , 4.5+ 17 62 21 41 4.5+ 10 43 23 20 5058 Brush Creek Rd. BORING NO.: 73 ALPHA Phone»4 ��'� sheet 1 1 ^TESTING 656 of Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 10/5/2021 End Date: 10/5/2021 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 170 / 24 GROUND WATER OBSERVATIONS �•� E 0) w QOn Rods (ft): NONE o T �5 a`) U� r'.m _ E E a o — � ZAfter Drilling (ft): DRY n 'ow o a v a, aN NFAfter Hours (ft): a� o—�° V - a p � 3 as cn o Ha o j� Z D j a a_MATERIAL d DESCRIPTION Brown CLAY — / 4.5+ 22 70 25 45 _ 2.0 Tan LIMESTONE with clay seams and layers 13 — 5 — , �� " 10 12.0 _ Tan and Gray CLAY with calcareous deposits — — 4.5+ 21 62 24 38 15 _ 16.0 Gray LIMESTONE with shale seams 100/ _20 20.0 , 2.25" TEST BORING TERMINATED AT 20 FT ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 74 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/5/2021 End Date: 10/5/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers Hammer Drop (lbs / in): 170 / 24 a Q o U) oN �� o u, U� rn> 7� .°' E_ J a o n ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �- o O C E E aN v U 7 in U ?i U) i U x ci O� o O Z •� J m a n (0 Ha d D a_4.5+ 21 2.0 4.0 Brown CLAY 4.5+ 10 53 17 36 4.3 6.0 Tan LIMESTONE with clay seams and layers 100/ 1.25" 100/ 15.0 , 0.5" TEST BORING TERMINATED AT 15 FT ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 75 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 10/6/2021 End Date: 10/6/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0 0 GROUND WATER OBSERVATIONS QOn Rods (ft): NONE ZAfter Drilling (ft): DRY NFAfter Hours (ft): MATERIAL DESCRIPTION Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers Tan CALCAREOUS CLAY Tan LIMESTONE with clay seams and layers Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a o u, rn> .°' �� oN ?� �� Y O U� "aL E� >a> > u�i C E_ J J a o - n o0 c° of O c� C @o dN �a O Y a) E a�i O� U `- o E E OU) o O •� U) ofx ci Ha c Z D CU J a (0 a_. 4.5+ 26 1.0 4.0 4.5+ 11 39 18 21 8.0 100/ 2.5" 12/ 4.5+ 13 18.0 Brown and Gray CLAY 4.5+ 20 20.0 TEST BORING TERMINATED AT 20 FT ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 76 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/1/2021 End Date: 10/1/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 5 _10_ _15 20 Tan CALCAREOUS CLAY Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT 2.0 6.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 17 58 24 34 100/ 1125 .125' 100/ 15.0 , 0.75" 4.5+ 9 4.5+ 13 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Meritaqe Homes of Texas, LLC Project: Chisholm Trail Ranch Section 3 - Phas Start Date: 10/1/2021 End Date: Drilling Method: CONTINUOUS FLIGHT AU 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 5 Tan CALCAREOUS CLAY _10 _20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 20 FT 5058 Brush Creek Rd. BORING NO.: 77 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Location: Fort Worth, Texas es 1A, 1B, and 2 Surface Elevation: 10/1 /2021 West: GER North: Hammer Drop (Ibs / in): 170 / 24 E'— Q o U)C�:F o u, rn> E_ E a o Q E "aL N > C J Y n o0 c° of c� @o �a ° a) co o c dcv U n v 3 E a) U- 0 E N 'n of xci o� o o E a m � a a Z D o- 4.5+ 13 4.5+ 11 60 23 37 4.0 100/ 3" 6.0 4.0 17 4.5+ 13 29 16 13 12.0 u 20.0 62, ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 78 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/30/2021 End Date: 9/30/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 5 _10_ _15 20 Tan CLAY with calcareous deposits Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT 4.0 6.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 15 13" 60 15.0 , 4.5+ 13 72 23 49 4.5+ 13 39 20 19 1.2 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 79 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/5/2021 End Date: 10/5/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments _5_ 10 15 20 Tan LIMESTONE with clay seams and layers Tan and Gray CLAY with limestone fragments Hammer Drop (lbs / in): 170 / 24 a Q o U) oN �� o u, U� rn> 7� .°' E_ J a o n o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� `- o O C E aN U 7 in U ?i U) aoi i U x ci O� o O Z •� J a (0 Ha d D a_4.5+ 17 2.0 100/ 2.5" 8.0 3.5 19 50 18 32 0.5 4.5+ 0.9 104 21 18.0 Reddish Brown CLAY 4.5+ 20 20.0 TEST BORING TERMINATED AT 20 FT ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 80 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/4/2021 End Date: 10/4/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments _10- _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U) oN �� o u, U� rn> 7� .°' E_ J a o n o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E aN v U 7 in U ?i U) i U x ci O� o O Z •� J m a n (0 Ha d D a_4.5+ 18 2.0 1 5" 1. 100/ 15.0 , 1.25" ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 81 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 10/5/2021 End Date: 10/5/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Tan and Gray CALCAREOUS CLAY j _5� j Tan and Gray SHALY CLAY with calcareous deposits 10 Tan LIMESTONE with clay seams and layers _15_ Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, rno> 7 � .>a> E J �oNa)U� f "aL cC Oo J_ YcU E a) dN 7O—oO a i U) ai ofx U ci OU) o O Z •� CU J mo a n cn (0 Ha d c D a_4.0 24 73 24 49 2.0 6.0 12.0 16.0 100/ 20.0 L 0.75" 4.5+ 7 31 19 12 4.5+ 10 4.5+ 19 4.5+ 21 53 23 30 3.6 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 82 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/5/2021 End Date: 10/5/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5 Light Brown CLAY with calcareous deposits and limestone fragments 10� j/ Tan and Gray SHALY CLAY 15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �— o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 21 2.0 1 1.5" 8.0 7 4.5+ 16 37 18 19 12.0 4.5+ 23 72 23 49 15.0 ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 83 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 10/1/2021 End Date: 10/1/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 5 Tan CLAY with calcareous deposits and limestone fragments _10� -1 ` Reddish Brown and Gray SHALY CLAY 15 Tan LIMESTONE with clay seams and layers Gray LIMESTONE with shale seams 20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O-oO Eo U) ai i U x ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 23 12.0 1 15.0 18.0 20.0 , 100/ 0.5" 4.5+ 15 4.5+ 19 82 25 57 3.3 4.5+ 15 4.5+ 12 35 17 18 4.5+ 25 ALPHA ^TESTING 5058 Brush Creek Rd. Phon »_Texas 56 ��'� BORING NO.: 84 Sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 9/30/2021 End Date: 9/30/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 5 10 _15 20 Tan CLAY with calcareous deposits and limestone fragments Tan and Gray CALCAREOUS CLAY Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 17 4.0 8.0 12.0 15.0 , 100/ 7" 4.5+ 13 63 23 40 4.5+ 9 4.0 15 42 16 26 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 85 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/30/2021 End Date: 9/30/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL Hours (ft): 0NFAfter MATERIAL DESCRIPTION Brown CLAY with calcareous deposits and limestone fragments 10 15 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o� O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 13 6.0 Tan LIMESTONE with clay seams and layers 100/ 0.75" 100/ 15.0 L 1.5" TEST BORING TERMINATED AT 15 FT 4.5+ 8 4.5+ 11 57 18 39 6.1 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 86 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/4/2021 End Date: 10/4/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5_ 10 Gray LIMESTONE with shale seams _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 18 4.5+ 12 62 20 42 4.0 100/ 0.5" 12.0 100/ 15.0 , 2.25" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 87 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/4/2021 End Date: 10/4/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 10 15 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 19 6.0 Tan LIMESTONE with clay seams and layers 100/ 0.75" 100/ 15.0 L 1.25" TEST BORING TERMINATED AT 15 FT 4.5+ 17 4.5+ 20 79 24 55 2.9 ALPHA ^TESTING 5058 Brush Creek Rd. Phon »_Texas 56 ��'� BORING NO.: 88 Sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 10/4/2021 End Date: 10/4/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: g 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown with limestone fragments 5 _10_ _15 20 Brown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT 4.0 8.0 Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> E� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 22 100/ 0.75" 100/ 15.0 , 1.25" 4.5+ 19 71 23 48 4.5+ 17 4.5+ 16 47 19 28 0.0 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 89 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/30/2021 End Date: 9/30/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Brown CLAY with calcareous deposits _5 Tan LIMESTONE with clay seams and layers 10 _15 Gray SHALE i _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 13 5.0 u 18.0 1" 4 100/ 20.0 66 0.5" 4.5+ 10 4.5+ 8 45 17 28 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 90 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/4/2021 End Date: 10/4/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Tan CLAY with calcareous deposits and limestone fragments Tan LIMESTONE with clay seams and layers 5 10 Gray SHALE _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� o u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 22 2.0 4.5+ 8 34 15 19 4.0 100/ 66 1" Q u 12.0 100/ 15.0 , 2.25" ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 91 Sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 10/4/2021 End Date: 10/4/2021 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: 0 0 Hammer Drop (Ibs / in): 170 / 24 GROUND WATER OBSERVATIONS o �•� E a� 0) QOn Rods (ft): NONE Lp o 3 Y Uoas > rn E a o ZAfter Drilling (ft): DRY n_ 'ow o a, aN a v After_ Hours (ft): o—�° V a � p 3 - (f) Ha d o C� O Z D j a MATERIAL DESCRIPTION Dark Brown CLAY 4.5+ 24 81 26 55 2.0 Brown CLAY with calcareous deposits and limestone fragments 4.5+ 11 53 20 33 4.0 Tan LIMESTONE with clay seams and layers 18.0 Brown CLAY 20.0 TEST BORING TERMINATED AT 20 FT 100/ 2.25" 12/ 4.5+ 18 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 92 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/4/2021 End Date: 10/4/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 10 J 15 20 Hammer Drop (lbs / in): EE' — °' t � axi Q o U)� O u, rn> �) .°' E_ J a o n ?� c° of c� @o > �a C O J Y - a) E o0 O� �- o O C E E dN v U) ofx U ci OU) o O Z •C J m a n (0 H a (i D a_4.5+ 25 4.5+ 16 4.5+ 21 74 24 50 5.3 6.0 Tan and Gray CLAY with calcareous deposits and limestone fragments 4.5+ 13 TEST BORING TERMINATED AT 15 FT 15.0 4.5+ 16 50 18 32 4.5+ 23 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 93 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 10/4/2021 End Date: 10/4/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments _10_ _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 23 4.5+ 15 62 23 39 4.0 100/ 0.5" 100/ 15.0 , 2.25" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 94 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/30/2021 End Date: 9/30/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments _5_— X0 10 X X 1 15 20 Tan LIMESTONE with clay seams and layers Tan CLAY Tan and Gray CLAY Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, rn> E E J �oNaa)U f "aL cC In Oo J_ YcU oO E a) dN 7O-� a i U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 15 63 24 39 2.0 100/ 2.75" 6.0 4.5+ 11 38 19 19 1.6 8.0 4.5+ 23 71 24 47 12.0 100/ 15.0 , 0.75" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 95 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/30/2021 End Date: 9/30/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 5 , 10 Tan LIMESTONE with clay seams and layers Tan and Gray SHALY CLAY TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F > ) .>a> E J aYU C,oN f "aL cC Oo J_ oO E a) dN 7O—� a i U) ofx U ci OU) o O Z •� CU J m a n (0 cn Ha d c D a_4.5+ 18 4.5+ 15 4.5+ 8.1 111 17 72 25 47 5.5 6.0 100/ 5.5" 12.0 20.0 4.5+ 20 72 25 47 4.5+ 17 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 96 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/29/2021 End Date: 9/29/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments _10_ _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o0 O� �- o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 17 4.5+ 10 53 20 33 4.0 100/ 1.25" 100/ 15.0 , ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 97 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 9/29/2021 End Date: 9/29/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments Brown CALCAREOUS CLAY 5 Tan and Gray CLAY with limestone fragments _10� Tan LIMESTONE with clay seams and layers _15_ Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 22 4.0 6.0 12.0 16.0 20.0 L 100/ 0.5" 4.5+ 14 61 21 40 4.5+ 12 47 18 29 1.3 4.5+ 15 4.5+ 4.1 113 16 42 20 22 0.7 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 98 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/29/2021 End Date: 9/29/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 10 15 20 Brown and Gray CLAY with limestone fragments TEST BORING TERMINATED AT 15 FT 6.0 15.0 Hammer Drop (lbs / in): EE' — °' t � axi Q o U)� O u, rn> �) .°' E_ J a o n o0 ?� c° of c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) ofx U ci OU) o O Z •C J m a n (0 H a (i D a_4.5+ 14 4.5+ 17 4.5+ 11.2 116 16 62 20 42 4.5+ 15 4.5+ 19 47 21 26 0.1 4.5+ 26 ALPHA ^TESTING 5058 Brush Creek Rd. Phone» 4 6 56 0119 BORING NO.: 99 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 9/29/2021 End Date: 9/29/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VADark Brown CLAY with limestone fragments 5 10 15 20 Brown CLAY with calcareous deposits Brown and Gray SHALY CLAY TEST BORING TERMINATED AT 20 FT 4.0 8.0 20.0 Hammer Drop (lbs / in): EE' — °' t � axi Q o U)� o u, rn> E) .°' E_ J a o n o0 ?� c° of c� @o > �a C O J Y - a) E O� `- o O C E E dN U) a�i ofx U ci OU) o O Z •C CU J a (0 H a (i D a_4.5+ 14 4.5+ 14 56 18 38 4.5+ 15 4.5+ 7.8 103 19 59 22 37 4.5+ 20 69 22 47 4.0 24 4.5+ 23 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 100 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/29/2021 End Date: 9/29/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers 10 Brown and Gray CLAY with calcareous deposits and limestone fragments _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a o u, rn> .°' E_ a �� oN ?� �� Y O U� "aL r� >a> > u�i C J J o - n o� c° O� of O c� C @o dN �a v O Y a) E aa) ofx U �— ci o E E OU) o O •� J m a n (0 U) Ha d c Z D a_I 2.0 1 5" 1. 15" 12.0 3.0 25 15.0 5058 Brush Creek Rd. BORING NO.: 101 ALPHA Phon »_Texas ��'� sheet 1 1 ^TESTING 56 of Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 9/29/2021 End Date: 9/29/2021 West: Drilling Method: CONTINUOUS FLIGHT AUGER North: Hammer Drop (Ibs / in): 170 / 24 GROUND WATER OBSERVATIONS �•� E 0) w QOn Rods (ft): NONE o T �5 U� r- 'O _ E a o — � ZAfter Drilling (ft): DRY ,ao vow NFAfter Hours (ft): o° -- V ao N p a)no 3 o Ha j� Z D j a a_MATERIAL d DESCRIPTION Brown CLAY with calcareous deposits and limestone fragments — 4.5+ 11 — 4.5+ 13 63 19 44 4.5+ 13 _ 5 5.0 Tan LIMESTONE with clay seams and layers 100/ — 10 — , 1 14.0 _ Gray SHALE 100/ — 15 15.0 L 3" TEST BORING TERMINATED AT 15 FT 20 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 102 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/29/2021 End Date: 9/29/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 10 X X 21 X0 1 X _X 15 20 Tan LIMESTONE with clay seams and layers Tan and Gray CLAY with calcareous deposits Tan and Gray CLAY with calcareous deposits Tan and Gray SHALY CLAY TEST BORING TERMINATED AT 15 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, rn> E E J �oNaa)U f "aL cC In Oo J_ YcU oO E a) dN 7O-� a i U) ofx U ci OU) o O Z •� CU J m a n (0 Ha d c D a_4.5+ 16 71 23 48 2.0 100/ 3.25" 6.0 4.5+ 2.5 106 17 43 19 24 1.5 8.0 4.5+ 2.5 105 20 64 22 42 12.0 3.0 2.4 101 25 15.0 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 103 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/27/2021 End Date: 9/27/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5 Brown and Gray CLAY 10 15 Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a O u, rn> .°' E_ a �� oN ?� �� Y O U� "aL r� >a> > u�i C J J o - n o� c° of O c� C @o dN �a O Y a) E a�i O� U `- o E E OU) o O •� U) ofx ci Ha c Z D J a (0 a_13 d 58 21 37 2.0 1 1.5" BE 16.0 100/ 20.0 , 0.5" 4.5+ 22 63 23 40 2.1 4.5+ 19 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 104 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/27/2021 End Date: 9/27/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Dark Brown and Brown CLAY with calcareous deposits and limestone fragments _5 10 Tan LIMESTONE with clay seams and layers _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (Ibs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o� O� �— o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 20 12.0 100/ 15.0 , 2.25" 4.5+ 9 4.5+ 13 4.5+ 11 41 17 24 0.4 4.5+ 11 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 105 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/27/2021 End Date: 9/27/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments _5 Tan LIMESTONE with clay seams and layers 10 Brown CLAY with limestone fragments KOO 15 Gray SHALE _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> r >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 18 5.0 13" 12.0 16.0 100/ 20.0 , 1.75" 4.5+ 16 4.5+ 6 68 22 46 4.5+ 17 54 19 35 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 106 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/27/2021 End Date: 9/27/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan LIMESTONE with clay seams and layers _5 10 Gray SHALE _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� ?� c° Y O of "aL c� @o > �a C O J Y - a) E o� O� �- o O C E E dN v U) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 11 53 22 31 2.0 100/ 1.25" u 12.0 100/ 15.0 , 1.75" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 107 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/27/2021 End Date: 9/27/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Brown CALCAREOUS CLAY - 5 Tan LIMESTONE with clay seams and layers Tan and Gray CLAY with calcareous deposits 10 Tan LIMESTONE with clay seams and layers _15_ Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a o u, rn> E Z= "aL r In >> JC, - oa?i)o f C dN O a) O-oO U E a) OU) o O •� U) ofx ci Ha d c Z D J a (0 a_ 4.0 4.5+ 14 45 17 28 6.0 8.0 4.5+ 14 51 20 31 1.5 12.0 100/ 1.25" 16.0 100/ 20.0 L 0.5" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 108 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/27/2021 End Date: 9/27/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments _10_ _15 20 Tan LIMESTONE with clay seams and layers TEST BORING TERMINATED AT 15 FT 3.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 11 4.5+ 10 51 18 33 100/ 1.25" 100/ 1.25" ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 109 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 9/27/2021 End Date: 9/27/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O—oO C E a) dN U) a) ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 15 5 _ 6.0 Brown CLAY with calcareous deposits and limestone fragments _10� Tan LIMESTONE with clay seams and layers 15 Gray LIMESTONE with shale seams _20 TEST BORING TERMINATED AT 20 FT 12.0 1 16.0 20.0 L 100/ 0.25" 4.5+ 12 4.5+ 12 60 19 41 5.7 4.5+ 14 4.5+ 14 46 17 29 4.5+ 6 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 110 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/27/2021 End Date: 9/27/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION %/A Dark Brown CLAY 5 10 15 20 Tan LIMESTONE with clay seams and layers Tan CALCAREOUS CLAY Brown CLAY with calcareous deposits Hammer Drop (lbs / in): 170 / 24 a Q o U) oN �� o u, U� rn> 7� .°' E_ J a o n o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o 2 C E E aN v U 7 in U ?i U) i U x ci O� o O Z •� J m a n (0 Ha d D a_4.5+ 21 76 27 49 2.0 4.0 8.0 4.5+ 13 30 15 15 0.5 4.5+ 2.7 114 14 42 18 24 4.5+ 20 12.0 1 Brown SHALY CLAY 4.5+ 24 15.0 TEST BORING TERMINATED AT 15 FT ALPHA ^TESTING 5058 Brush Creek Rd. Phone»4 656 ��'� BORING NO.: 111 sheet 1 of 1 Fax: 817-496-5608 PROJECT NO.: W212453 WHERE IT ALL BEGINS www.alphatesting.com Client: Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Project: Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: Start Date: 9/24/2021 End Date: 9/24/2021 West: Drillin Method: CONTINUOUS FLIGHT AUGER North: 9 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 5 , 10 Tan CALCAREOUS CLAY Tan and Gray SHALY CLAY TEST BORING TERMINATED AT 20 FT 6.0 12.0 20.0 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, Z= rn> E >> E JC, oa?i)o f "aL In O - O-oO C E a)o dN U) ai ofx U ci OU) o O Z •� J a (0 Ha d c D a_4.5+ 17 4.5+ 18 4.5+ 17 62 19 43 4.5+ 12 4.5+ 15 36 16 20 0.4 4.5+ 2.0 102 22 71 23 48 4.5+ 21 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 112 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/24/2021 End Date: 9/24/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments Tan CALCAREOUS CLAY 5 Tan LIMESTONE with clay seams and layers 10 Gray LIMESTONE with shale seams _15 TEST BORING TERMINATED AT 15 FT 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o0 ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 17 4.0 5.0 100/ 0.75" 12.0 100/ 15.0 rk 1.25" 4.5+ 14 64 21 43 4.5+ 13 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 113 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/24/2021 End Date: 9/24/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 5 10 _15_ _20 Tan CALCAREOUS CLAY Tan LIMESTONE with clay seams and layers Tan CLAY with limestone fragments Tan LIMESTONE with clay seams and layers Gray LIMESTONE with shale seams TEST BORING TERMINATED AT 20 FT Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F o u, rn> .°' o N a) U� 7� E_ J a �� ?� Y N "aL > C J Y n o0 c° of c� @o �a p� o c dR U rn v 3 E V- 0 E N o 0� a m n (n U) of xci oU) o o E a m � a a c Z D o- 4.5+ 12 54 21 33 4.0 4.5+ 17 48 19 29 6.0 8.0 2.0 13 41 17 24 12.0 100/ 1.25" 18.0 100/ 20.0 66 1.5" ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 114 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/24/2021 End Date: 9/24/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 10 15 20 Hammer Drop (lbs / in): 170 / 24 a Q o U)C�:F oN �� O u, U� rn> r� .°' >a> u�i E_ J a o n �� o� ?� c° Y O of "aL c� @o > �a C O J Y - a) E O� �- o O C E E dN v U) aa) ofx U ci OU) o O Z •� J m a n (0 Ha d c D a_4.5+ 19 6.0 Tan LIMESTONE with clay seams and layers 100/ 2.25" 100/ 15.0 L 1.5" TEST BORING TERMINATED AT 15 FT 4.5+ 12 4.5+ 15 62 22 40 6.4 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 115 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/24/2021 End Date: 9/24/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION VABrown CLAY with limestone fragments 5 10 _ J 15 20 Brown CALCAREOUS CLAY Reddish Brown and Gray SHALY CLAY TEST BORING TERMINATED AT 20 FT 3.0 6.0 20.0 Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a O u, rn> Z= "aL r In >> E JC, - oa?i)o O—oO f C dN O a) ofx U ci E a) OU) o O •� J a (0 U) Ha d c Z D a_I 4.5+ 17 4.5+ 17 4.5+ 1.7 102 20 65 22 43 4.1 4.5+ 21 4.5+ 16 ALPHA N rTESTING WHERE IT ALL BEGINS Client: Project: Start Date: Drilling Method: 5058 Brush Creek Rd. BORING NO.: 116 Fort Worth, Texas 76119 Sheet 1 of 1 Phone: 817-496-5600 Fax: 817-496-5608 PROJECT NO.: W212453 www.alphatestiiig.com Meritaqe Homes of Texas, LLC Location: Fort Worth, Texas Chisholm Trail Ranch Section 3 - Phases 1A, 1 B, and 2 Surface Elevation: 9/24/2021 End Date: 9/24/2021 West: CONTINUOUS FLIGHT AUGER North: 0) GROUND WATER OBSERVATIONS V On Rods (ft): NONE w VAfter Drilling (ft): DRY CL 0NFAfter Hours (ft): MATERIAL DESCRIPTION Tan LIMESTONE with clay seams and layers _5_ 10 J 15 20 Reddish Brown and Gray SHALY CLAY TEST BORING TERMINATED AT 15 FT 6.0 15.0 Hammer Drop (lbs / in): 170 / 24 Q o U)C�:F a O u, rn> .°' E_ a �� oN ?� �� Y O U� "aL r� >a> > u�i C J J o - n o0 c° O� of O c� C @o dN �a O Y a) E aa) ofx U �- ci o E E OU) o O •� J a (0 U) Ha c Z D a_1 d 1.5" 4.0 23 3.5 26 73 23 50 1.1 4.0 24 A L P H A #NtTESTING KEY TO SOIL SYMBOLS WHERE IT ALL BEGINS AND CLASSIFICATIONS SOIL & ROCK SYMBOLS RELATIVE DENSITY OF COHESIONLESS SOILS (blows/ft) ® (CH), High Plasticity CLAY VERY LOOSE 0 TO 4 ® (CL), Low Plasticity CLAY LOOSE 5 TO 10 MEDIUM 11 TO 30 (SC), CLAYEY SAND DENSE 31 TO 50 VERY DENSE OVER 50 (SP), Poorly Graded SAND (SW), Well Graded SAND SHEAR STRENGTH OF COHESIVE SOILS (tsf) (SM), SILTY SAND VERY SOFT LESS THAN 0.25 SOFT 0.25 TO 0.50 IN(ML), SILT FIRM 0.50 TO 1.00 STIFF 1.00 TO 2.00 ® (MH), Elastic SILT VERY STIFF 2.00 TO 4.00 HARD OVER 4.00 19 LIMESTONE RELATIVE DEGREE OF PLASTICITY (PI) SHALE / MARL LOW 4 TO 15 SANDSTONE MEDIUM 16 TO 25 HIGH 26 TO 35 o (GP), Poorly Graded GRAVEL VERY HIGH OVER 35 (GW), Well Graded GRAVEL (GC), CLAYEY GRAVEL RELATIVE PROPORTIONS (%) W (GM), SILTY GRAVEL 4 m(OL), ORGANIC SILT TRACE 1 TO 10 LITTLE 11 TO 20 SOME 21 TO 35 (OH), ORGANIC CLAY AND 36 TO 50 15mm 1♦ N SAMPLING SYMBOLS PARTICLE SIZE IDENTIFICATION (DIAMETER) ■SHELBY TUBE (3" OD except where BOULDERS 8.0" OR LARGER noted otherwise) COBBLES 3.0" TO 8.0" SPLIT SPOON (2" OD except where COARSE GRAVEL 0.75" TO 3.0" noted otherwise) AUGER SAMPLE FINE GRAVEL COURSE SAND 5.0 mm TO 3.0" 2.0 mm TO 5.0 mm ❑ TEXAS CONE PENETRATION MEDIUM SAND FINE SAND 0.4 mm TO 5.0 mm 0.07 mm TO 0.4 mm ROCK CORE (2" ID except where SILT CLAY 0.002 mm TO 0.07 mm LESS THAN 0.002 mm noted otherwise) GR-01 60 00 Product Requirements Page 1 of 1 GR-01 60 00 PRODUCT REQUIREMENTS Chisholm Trail Ranch Section 3 Phase 1A CPN 103826 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval IModel INational Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16) ' ` 07/23/97 33 05 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 ASTM D2240/D412/1)792 04/26/00 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 04/26/00 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250-4G Gasket ASTM C-443/C-361 SS MH 1126199 33 05 13 HOPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring Traffic and Non -traffic area 5/13/05 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System er - a1V1 Tors & Bases/Fiberglass 33-39-13 (1/8/13 1/26/99 33 39 13 Fiberglass Manhole Fluid Containment, Inc. Flowti[e ASTM 3153 Non -traffic area 08/30/06 33 39 13 Fiberglass Manhole L.F. Manufacturing Non -traffic area 1 EI Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) 1 33 05 13 IMaoholc Frames and Covers Western Iron Works, Bass & Hays Foundry 1001 24"x40" WD Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) 3305 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 30024 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. A 24 AM 24" Dia. 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1272 ASTM A48 & AASHTO M306 24" Dia. 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R- 165-LM (Hinged) ASTM A48 & AASHTO M306 24" Dia. 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry NF 1274 ASTM A48 & AASHTO M306 30" Dia. 08/24/18 3305 13 Manhole Frames and Covers Neenah Foundry R-1743-LM (Hinged) ASTM A48 & AASHTO M306 30" dia. 33 05 13 Manhole Frames and Covers Sigma Corporation MH-144N 33 05 13 Manhole Frames and Covers Sigma Corporation MH-143N 33 05 13 Manhole Frames and Covers Pont-A-Mousson GTS-STD 24" dia. 33 05 13 Manhole Frames and Covers Neenah Casting 24" dia. 10/31/06 33 05 13 Manhole Frames and Covers (Hinged) Powerseal Hinged Ductile Iron Manhole ASTM A536 24" Dia. 7/25/03 3305 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) RE32-R8FS 30" Dia. 01/31/06 3305 13 30" Dia. MH Ring and Cover East Jordan Iron Works V1432-2 and V1483 Designs AASFITO M306-04 30" Dia. 11/02/10 3305 13 30" Dia. MH Ring and Cover Sigma Corporation MH165IFWN & MH16502 30" Dia 07/19/1 t 3305 13 30" Dia. MH Ring and Cover Star Pipe Products NIH32FTWSS-DC 30" Dia 08/10/11 3305 13 30" Dia. MH Ring and Cover Accucast 220700 Heavy Duty with Gasket Ring 30" Dia 30" ERGO XL Assembly 10/14/13 3305 13 30" Dia. MH Ring and Cover, (Hinged & Lockable) East Jordan Iron Works with Cam Lock/MPIC/T-Gasket ASSFITO MI 05 & ASTM A536 30" Dia 1 06/01/17 3405 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 2280 (32") ASTM A 48 30" Dia. CAP-ONE-30-FTW, Composite, w/ Lack 0111111 33 OS 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. w/o Hmg 30" Dia. 10/07/21 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing 32"(30") Frame and Cover 30" Dia. Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 (Rev 2/3/1� 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtight 24" Dia. * 3305 13 Manhole Frames and Covers Neenah Casting 24" Dia. * 3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 24" Dia. * 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 24" Dia. 03/08/00 3305 13 Manhole Frames and Covers Accucast RC-2100 ASTM A 48 24" Dia. 04/20/01 3305 13 Manhole Frames and Covers (SIP)Semmpore Industries Private Ltd. 300-24-23.75 Ring and Cover ASTM A 48 24" Dia. wer - Manholes & Bases/Precast Concrete (2ev 33 39 10 Manhole, Precast Concrete 1/8/13 Hydro Conduit Corp SPL Item 449 ASTM C 478 41" * 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. hic. ASTM C-443 48" 09/23/96 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 48" I.D. Manhole w/ 32" Cone ASTM C 478 48" w/32" cone 05/08/18 33 39 10 Manhole, Precast Concrete The Turner Company 48", 60" I.D. Manhole w/ 32" Cone ASTM C 478 48", 60" 10/27/06 33 39 10 Manhole, Precast Concrete Oldeastle Precast Inc. 48" I.D. Manhole w/ 24" Cone ASTM C 478 48" Diam w 24" Ring 06/09/10 33 39 10 Manhole, Precast (Reinforced PolymeriCo tcrete US Composite Pipe Reinforced Polymer Concrete ASTM C-76 48" to 72" 09/06/19 33 3920 Manhole, Precast Concrete Forterra Pipe and Precast 60" & 72" I.D. Manhole w/32" Cone ASTM C-76 60" & 72" 10/07/21 32 39 20 Manhole, Precast Concrete Forterra Pipe and Precast 48" I.D. Manhole w/32" Cone ASTM C-77 48" 1 10/07/21 33 3920 Manhole, Precast (Reinforced Polymer) Concrete Armorock 48" & 60" I.D. Manhole w/32" Cone 48" & 60" 10/07/21 33 3920 Manhole, Precast (Hybrid) Polymer & PVC Predl Systems 48" & 60" I.D. Manhole w/32" Cone 48" & 60" Non Traffic Areas ASTM C-478; ASTM C-923; 03/07/23 33 3920 Manhole, Precast Concrete AmeriTex Pi a and Products, LLC 48" & 10" I.D. Manhole w/32" Cone ASTM C-443 03/07/23 33 3920 IManhole, Precast (Reinforced Pol er) Concrete P3 Polymers, RockHards 48" & 60" I.D. Manhole w/32" Cone 04/28/07 IManholc, Precast (Reinforced Polymer) Concrete Amitcch USA Meyer Polycrete Pipe Eater & Sewer - Manholes & Bases/Rehab Svstems/Cementitious — EI-14 Manhole Rehab Systems Quadex 04/23/01 EI-14 Manhole Rehab Systems Standard Cement Materials, Inc. Relmer MSP E1-14 Manhole Rehab Systems AP/M Permaform 4120101 E I-14 Manhole Rehab System Strong Company Strong Seal MS2A Rehab System 5/12/03 EI-14 Manhole Rehab System (Liner) Triplex Lining System MH repair product to stop infiltration ASTM D5813 08/30/06 General Concrete Repair FlexKrete Technologies Vinyl Polyester Repair Product Mise. Use * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approv pec No./ IManufacturer Model1. National Spec Water &Sewer - an o es Bases/Rehab Svstems/NonCementitiousI mmmmw` 05/ 00/96 E1-14 Manhole Rehab Systems Sprayroa, Spray Wall Polyurethane Coating ASTM D639/D790 I 12/14/01 Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test Sewer Applications I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications » v�33 nu�pP�ooung aPi ay��e.,eaaigolloull- x `Structures 03/19/18 I 39 20� Coating for Corrosion orotection(Exterim) Sherwin Williams Grade (Asohatic Emulsion) Only I 33 05 13 Manhole Insert ME Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. I * 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. I I * 3305 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. I I 09/23/96 3305 13 Manhole Insert Scuthwestcon Packing & Seals, Inc. Lifesaver - Stainless Steel For 24" dia. I I 09/23/96 3305 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia I I 7111 ara e�Sewer - Pine Casim Spacers 33-05-24 (07/01/13) I 04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI IO2/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI I04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers I09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" I09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Cmin Spacers Up to 48" I 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" 03/19/18 Casing Spacers BWM SS-12 Casing Spacer(Stainleas Steel) 03/19/18 Casing Spacers BWM FB-12 Casing Spacer (Coated Carbon Steel) for Nonyressme Pipe and Grouted Casing 03/29/22 33 05 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 PEW I Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13) I * 33 11 10 Ductile Iron Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 3" thrn 24" OS/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Fastite Pipe (Bell Spigot) AW WA C150, C151 4" thrn 30" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 4" thin 30" * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 I Water & Sewer - Utility Line Marker (08/24/2018) I INEK I ewer - Coatinss/EDoxv 33-39-60 (01/08/13) I 02/25/02 Epoxy Lining System Sauereisen, Inc SewerGard 21 ORS LA County 9210-1.33 I 12/14/01 Epmv Lining System Ertech Technical Coatings Ertcch 2030 and 2100 Series I I 04/14/05 Interim Ductile Iron Pipe Coating Induron Protecto 401 ASTM B-117 Ductile Iron Pipe Only I I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1BB, Sl, S2 Acid Resistance Test Sewer Applications I I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications I I INNE Sewer - Coatings/Polvurethane I I Sewer - Combination Air Valves I I 05/25/18 I 33-31-70 Air Release Valve A.R.I. USA, Inc. D121LTP02(Compwite Body) 2" I I Sewer - PiDes/Concrete I I E I-04 Conc, Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 I E I-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 I IE I-04 Conc. Pipe, Reinforced Hanson Concrete Products SPL item ASTM C 76 I IE I-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 I I Sewer - Pine Enlargment Svstem (Method)33-31-23 (01/18/13). I PIM Corporation Polyethylene PIM Corp., Fiscal, Way, N.J. Approved Previously �Plmswim McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously I TRS Systems Treachless Replacement System Polyethylene Calgary, Canada Approved Previously I I Sewer- PiDe/Fibere as)x s Wnforced/33-31-13(1/8/13) I Hobas Pipe USA, Inc. Hobas Pipe (Non -Pressure) ASTM D3262/D3754 I 7/21 /97 33 31 13 Cent. Cast Fiberglass (FRP) I 03/22/10 33 31 13 Fiberglass It,. (FRP) Ameroa Bondstrand RPMP Pipe AST-.3262-3154 I 04/09/21 33 31 13 Glass -Fiber Reinforced Polviner Pipe FRP Thompson Pie Group Thompson Pipe Flowtite ASTM D3262/D3754 03/07/23 3331 13 Fiberglass Pioe (FRP) Future Pine Industries Fiberstron¢ FRP ASTM D3212. ASTM D3681. ASTM D4161. AW WA M45 Sewer - PiDe/Polvmer Pine 4/14/OS Polvmer Modified Concrete Pioe Amnech USA Mover Polycrete Pipe ASTM C33, A276, F477 8" tp 1112", Class V I06/09/10 El-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pioe ASTM C-76 I I I �PiDes/HDPE 33-31-23(1/8/13) * From Original Standard Products List FORT WORTH® Note: All water or CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST than 1S inch diameter shall be approved for use by the Water Department on a proiect specific basis. Special bedding may be required for some Updated: 03/07/2023 I ' ihdsity polyethylene pipe Phillips Dnswpipe, Inc Opticore Ductile Polyethylene Pipe ASTM D 1248 8" I * High -density polyethylene pipe �I'ii�gh_d_msitv PIexco Inc. ASTM D 1248 8" * High -density polyethylene pipe Polly Pipe, Inc. ASTMD 1248 8" polyethylene pipe CSR Hydro CondmUPipelme Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/13) 12/02/11 33-11-1� DR -Id PVC Pressure Pipe Apelife Jetstream PVC Pressure Pipe AWWA C900 4"thru 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thin 12" 33-31-20 PVC Sewer Pipe 1-M Manufacturing Co., Inc. (JM Eagle) SDR-26 ASTM D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 ASTM D 3034 4" thin 15" * 33-31-20 PVC Sewer Pipe Lamson Vylon Pipe ASTM F 789 4" thin 15" 01/18/18 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe Gravity Sewer ASTM D3034 4" thin 15" 11/11/98 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation "S" Gravity Sewer Pipe ASTM F 679 18" to 27" * 33-31-20 PVC Sewer Pipe J-M Manufacturing Co, Inc. (JM Eagle) SDR 26/35 PS 115/46 ASTM F 679 18" - 28" 09/11/12 33-31-20 PVC Sewer P�Re P,qq life Jet Stream SDR-26 and SDR-35 ASTM F-679 18" 05/06/05 33-31-20 PVC Sohd Wall Pipe Doamond Plastics Corporation SDR 26/35 PS 115/46 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 and SDR-35 Gasket Fittings ASTM D-3034, D-1784, etc 4" - 11" * 33-31-20 PVC Sewer Fittings Plastic Trends, Ina.(Westlake) Gasketed PVC Sewer Main Finings ASTM D 3034 1 3/19/2018 33 3120 PVC Sewer Pipe Pipelife Jet Stream SDR 35 ASTM F679 18"- 24" 1 3/19/2018 33 3120 PVC Sewer Pre Pipelife Jet Stream SDR 26 ASTM D3034 4"- 15" 1 3/29/2019 33 3120 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM D3034/F-679 4"- 15" 1 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlake) SDR 26 ASTM D3034 4" - 15" 1 10/22/2020 33 3120 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" 1 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlake) SDR 26/35 PS 115/46 ASTM F-679 18"- 36" * _ Cured in Place I'm In if— Texark, Inc ASTM F 1216 05/03/99 Cured in Place Pipe National Envionech Group National Liner, (SPL) Item #27 ASF-1216/D-5813 05/29/96 Cured in Place Pipe Remolds Inc/Inliner Technolgy (Inliner USA) Inliner Technology ASTM F 1216 Sewer - Pioes/Rehab/Fold & Form Fold and Form Pipe Cullum Pipe Systems, Inc. 11/03/98 Fold and Form Pipe Insimfimn Technologies, Inc. Insim "NuPIPe" ASTM F-1504 Fold and Form Pipe American Pipe & Plastics, Inc. Demo. Purpose Only 12/04/00 Fold and Form Pipe Ultralmer Ultraliner PVC Alloy Pipeliner ASTM F-1504, 1871, 1867 06/09/03 Fold and Form Pipe Miller Pipeline Corp. EX Method ASTM F-1504, F-1947 Up to 18" diameter Sewer - PiDes/ODen Prot -de Larixe Diameter i 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Lamson Vylon Pipe Carlon Vylon H.C. Closed Profile Pipe, ASTM F 679 18" to 48" 09/26/91 E100-2 PVC Sewer Pipe, Ribbed Extrusion Technologies, Inc. Ultra -Rib Open Profile Sewer Pipe ASTM F 679 18" to 48" E100-2 PVC Sewer Pipe, Ribbed Up -or ETI Company 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Double Wall Advanced Drainage Systems (ADS) SaniTite HP Double Wall (Corrugated) ASTM F 2736 24"-30" 11/10/10 (E100-2) Polypropylene (PP) Sewer Pipe, Triple Wall Advanced Drainage Systems (ADS) SamTite HP Triple Wall Pipe ASTM F 2764 30" to 60" 05/16/11 Steel Reinforced Polyethylene Pipe ConTech Construction Products Durmaxx ASTM F 2562 24" to 72" * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval Spec I on 1W Manufacturer Model1. National Spec Water - Aoour�enancesgig -10 (07/Ol/13)qM Pr Ol/18/18 33-12-10 Double Strap Saddle Romac 202NS Nylon Coated AWWA C800 1"-2"SVC,up to 24 "Pipe 08/28/02 Double Strap Saddle Smith Blair 4317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Stra Service Saddle Mueller Company DR2S Double SS Stra DI Saddle W AWWA C800 1"-2" SVC, u to 24" Pipe 03/07/23 33-12-10 Double Soup Service Saddle Powerseal 3450AS, Inc. Corp. Stop, Dbl Spur, Stainless NSF ANSI 372 1"-2" SVC, up to 24" Pipe 10/27/87 Curb Stops -Ball Meter Valves McDonald 6100M,6100MT & 610MT 3/4" and 1" 10/27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 610UM, 6100TM and 6101M 1 h" and 2" FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. -2-7-L AWWA C800 2" FB600-6-NL, FB1600-6-NL, FV23-666-W- 1111018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, L22-66NL AWWA C800 1-1/2" FB600-4-NL, FB1600-4-NL, Bt 1-444-WR- 1111018 33-12-1. Curb Stops -Ball Meter Valves Ford Meter Box Co., Inc. NL, B22444-WR-NL, L28-44NL AWWA C800 I " 13-25000N, B-24277N-3, B-20200N-3, H- AWWA C800, ANSF 61, 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 _ B-25000N, B-20200N-3, B-24277N-3,H- AWWA C800, ANSF 61, 1111.1. 33-12-1. Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 1-112" 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co., Ltd. 15530N ANSI/NSF 372 I" 01/26/00 Coated Tapping Saddle with Double SS Straps 1CM Industries, Inc. 4406 Double Band SS Saddle 1"-2" Taps on up to 12" 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steel) 1CM Industries, Inc. 412 Tapping Sleeve ESS AWWA C-223 Up to 30" w/12" Out 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steel) 1CM Industries, Inc. 415 Tapping Sleeve AWWA C-223 Concrete Pipe Only 05/10/11 Tapping Sleeve (Stainless Steel) Powerseal 3490AS (Flange) & 3490MJ 4"-8" and 16" 02/29/12 33-12-25 Tapping Sleeve (Coated Steel) Romac FTS 420 AWWA C-223 U p to 42" w/24" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST Stainless Steel AWWA C-223 Up to 24" w/12" Out 02/29/12 33-12-25 Tapping Sleeve (Stainless Steel) Romac SST III Stainless Steel AWWA C-223 Up to 30" w/12" Out 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp 4" to 30" Plastic Meter Box w/Composite Lid DFW Plastics lnc. DFW37C-12-lEPAFFTW Plastic Meter Box w/Composite Lid DFW Plastics lnc. DFW39C-12-lEPAFFTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-1EPAF FTW Class "A" Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 and Gaskets r Water - Combination Air Release 33-31-70 (01/08/13) 1 E I -I I Au Release Valve GA Industries, Inc. Empve Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A 1" &W21' * EI-11 [ourbiration ombmation Au Release Valve Multiplex Manufacturing Co. Crispin Air and Vacuum Valves, Model No. 1/2", 1" & 2" EI-11 ombination Air Release Valve Valve and Primer Corp. APCO #143C, #145C and #147C 1", 2" & 3" Water 4WRarrel Fire Hvdrant 10/Ol/87 E-1-12 Dry Barrel Fire Hydrant American -Darting Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 03/31/88 E-1-12 Dry Barrel Fire Hydrant American Darling Valve Shop Drawing No. 94-18791 AWWA C-502 09/30/87 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Shop Drawing No. D-19895 AWWA C-502 01/12/93 E-1-12 Dry Barrel Fire Hydrant American AVK Company Model 2700 AWWA C-502 08/24/88 E-1-12 Dry Barrel Fire Hydrant Clow Corporation Drawings D20435, D20436, B20506 AWWA C-502 E-1-12 Dry Barrel Fire Hydrant ITT Kennedy Valve Shop Drawing No. D-80783FW AWWA C-502 0.1.7 E-1-12 Dry Barrel Fire Hydrant M&H Valve Company Shop Drawing No. 13476 AWWA C-502 Shop Drawings No. 6461 t0/14/87 E-1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Centurion AW WA C-502 01/15/88 E1-12 Dry Barrel Fire Hydrant Mueller Company A-423 Super Centurion 200 AWWA C-502 10/09/87 E-1-12 Dry Barrel Fire Hydrant U.S. Pipe & Foundry Shop Drawing No. 960250 AWWA C-502 09/16/87 E-1-12 Dry Barrel Fire Hydrant American Flow Control (AFC) Waterous Pacer WB67 AWWA C-502 08/12/16 33-12-40 Dry Barrel Fire Hydrant EJ (East Jordan Iron Works) WaterMastu 5CD250 I 02/05/93 E101-5 Detector Check Meter Ames Company Model 1000 Detector Check Valve AWWA C550 4" - 10" 08/05/04 Magnetic Drive Vertical Turbine Hersey Magnetic Drive Vertical AWWA C701, Class 1 3/4" - 6" * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 03/07/2023 Note: All water or sewer pipe larger than 1S inch diameter shall be approved for use by the Water Department on a project specific basis. Special bedding maybe required for some pipes. Approval IModel INational Water -Pines/PVC(Pressure Waterl33-31-70(01/08/13) W MEL M` —AL I 01/18/18 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR14 ASTM D1784 V-12" I I 3/19/2018 33 11 12 PVC Pressure Pipe Pinelife Jet Stream DR14 AWWA C900 4"-12" I I 3/19/2018 3311 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" I I 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" I 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacnrring Co., Inc d/b/a JM Eagle DR 14 ANSI/NSF 61 4"-28" FM 1612 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/b/a JM Eagle DR 18 ° 16"-24" 9/6/2019 3311 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 33 11 12 PVC Pressure Pipe NAPCO(Weatlake) DR18 AWWA C900 16"-24" 9/6/2019 331112 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4"-12" 9/6/2019 3311 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" I Water - Pines/Valves & Fittings/Ductile Iron Fittings 33-11-11 (01/08/13) I 77/1/107/23/92 EI-07 Ductile Iron Fittings Star Pipe Products, Inc. Mechanical Joint Finings AW WA C153 & C110 I * EI-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittiq @ AWWA C 110 I * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Unlmes Division Mechanical Joint Finings, SSB lass 350 AWWA C 153, C 110, C III I 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Finings, SSB Class 351 AWWA C 153, C 110, C 112 I 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Finings AW WA C153 4"-12" I 05/14/98 E1-07 Ductde Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AW WA C111/C153 4" to 36" I 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1500 Circle -Lock AW WA C111/C153 4" to 24" I 11/09/04 E1-07 Ductde Iron Joint Restraints One Bolt, Inc. One Bolt Restrained Joint Fitting AWWA C111/C116/C153 4" to 12" I I 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AWWA C111/C116/C153 4" to I" I I 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, hic. Megalug Series 2000 (for PVC Pipe) AWWA C111/C116/C153 4" to 24" I I 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLC10 AW WA C111/C153 4" to 10" I I 03/06/19 33-11-11 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AW WA CI11/C153 4" to 12" I I 08/05/04 E1-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCE AW WA C111/C153 12" to 24" I I 08/10/98 E1-07 MI Fiffir IP) Sigma, Co. Sigma One-Lok SLDE AW WA C153 4" - 24" I I 10/12/10 E1-24 Interim Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" I I 08/16/06 E1-07 Mechanical Joint Fittings SIP Industries(Serampore) Mechanical Joint Fittings AW WA C153 4" to 24" I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA CI I I I I 11/07/16 33-11-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stmgrip Series 3000 ASTM A536 AW WA CI I I I EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-1141 Mechanical Joint Remmer Glands SIP Industries(Serampore) ASTM A536 AW WA CI I I 3"-48" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) DRl4 PVC Ape ASTM A536 AW WA CI I I 4"-12" 03/19/18 33-11-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) �` vuP, V11i. nn, oa„ �,.1.�`VJ nGLL �V1 �J°✓ ASTM A536 AW WA CI11 16"-24" I �ffk/Valves & Fittings/Resilient Seated Gate Valve* 33-12-20 (05/13/15). I Resilient Wedged Gate Valve w/no Gears American Flow Control Series 2500 Drawing # 94-20247 16" I 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AWWA C515 30" and 36" I I 08/31/99 Resilient Wedge Gate Valve American Flow Control Series 2520 & 2524 (SD 94-20255) AWWA C515 20" and 24" I I 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AWWA C515 16" I I 10/24/00 E1-26 Resilient Wedge Gate Valve American Plow Control Series 2500 (Ductile Iron) AWWA C515 4" to 12" I I 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AWWA C515 42" and 48" I I 05/23/91 E1-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seeded GV AWWA C509 4" to 12" I I01/24/02 E1-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller I I * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" I I E1-26 Resilient Seated Gate Valve M&H 4" - 12" I I * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" I I 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AWWA C515 16" I I 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AWWA C515 24" and smaller I 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AW WA C515 30" and 36" I 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AW WA C515 42" and 48" I 01/28/88 EI-26 Resilient Wedge Gate Valve Clow Valve Co. AWWA C509 4" - 12" I 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AW WA C515 16" I 11/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AW WA C515 24" and smaller I 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AWWA C515 30" and 36" (Note 3) 11/30/12 Resilient We Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24" to 48" (Nora 3) 05/08/91 E1-26 Resilient Seat Gate Valve Stockham Valves & Fittings AWWA C 509, ANSI 420 - stem, 4" - 12" I E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Meinesea1250, regwremerts SPL #74 3" to 16" 11/26/16 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) EJ F1owMa uer Gat. Valve & Box.s 08/24/18 I Mateo Gate Valve Matco-Norca 225 MR AWWA/ANSI C115/An21.15 4" to 16" I * From Original Standard Products List FORT WORTH® Note: All water or CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST than 1S inch diameter shall be approved for use by the Water basis. for some Updated: 03/07/2023 I * E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AW WA C-504 24" I * E1-30 Rubber Seated ButterFly Valve Mueller Co. AW WA C-504 24"and smaller 1/11/99 E1-30 Rubber Seated Butterfly Valve De ik Valves Co. AW WA C-504 24" and larger 06/12/03 E1-30 Valmatm American Butterfly Valve Valmanc Valve and Manufacturing Com. Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" 03/19/18 33 12 21 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 30"-54" Water�ne Encasement 33-11-10 (01/08/13) 05/12/OS EI-13 Polyethylene Encasment Fl-aol Packaging Fulton Enterprises AW WA C105 8 mil LLD 05/12/05 EI-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD 05/12/05 E1-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD 09/06/19 33-11-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD Water - Samolint= Station 03/07/23 33 12 50 Iwatcr Sam lin Station I Eclipse Number 88, 12-inch Depth of Bur As shown in spec. 33 12 50 ot/21/20 Water - Automatic Flusher Automated Flushing System Mueller Hydrogaud HG2-A-IN-2-PVC-018-LPLG(Permanent) 04/09/21 Automated Flushing System Kupf le Foundry Company Eclipse #9800wc 04/09/21 Automated Flushing System Kupf le Foundry Company Eclipse 99700 (Portable) * From Original Standard Products List FORT WORTH. CITY OF FORT WORTH TRAYSPORTATFONIPUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 12/0112022 Courete W9a0Z2 03300 Mix F45igq Airlericari cow" Campany 3OCAF029 soon 115i €-oliercte for 1iidcwalk% & ADA Ramp,¢ W9+2022 03 30 n0 Mix D45ig11 Alum4ao Concreap Company 0]JAF382 JDW rp�i Concrete $a9c Maicrial for 7rench Rcpap WW2022 03 3F1 W Nlix De5ijT American Cmr" Campany 40CNFOF5 40013 pli C'0nVFCt0 tiff hianTwilcs & rlti 14 SVuciures WW2022 03 30 0 Mix 13 aign Alnellcan Caner t4 Cmnpany 415CAF074 451X psi Concrete Mr Hand Placed Paving WV2022 (13 3n 00 Mm f)C igrl ATwns RIL10nn001737 450 Or Concrete RR band PI&CO PovinR 9N9 2022 033000 Mix R) ivi Arltns D10006041791 4i00 psi CnFwrete Rx (land Placed Paving W%W22 03 30 W Mix fhylgl3 Argos 01000CM101793 450 psi Cortcsete Car IfST10 Plac4sl Pavilrg WW2022 03 30 W Mix Design Auras 1310( IM01 i0345np psi C�ncroie [or Hand Paced Pavi ig WW2022 03 30 on Mix Design ATwns RlfWMM1n2IW 450o Psi COMMe Fpt Hand Placed PP ion 9N9 2022 03 30 00 Mix D45igli Amos ()I00 Q1l 73 450o psi C!Q write for Iland Placed PavivR W%W22 03300 Mix Design Argos 1)1000mnl517 360 psi CorKiroe for Mwh4i placed Paving WW2022 03 30 W Mix Design Auras D{00tMP391 450 psi Cnncret6 CM FF.S Favi:rg WW2022 03 30 0n 144ix R45ign ATttns R{nWn009857 54 i Ftawahle Fill- CLSM 9N9 2022 03 30 QO Mix Design AT'gns R1000 010t 5 3C!Utt psi (;ngcrcle Far Inl'-Lv, IjmcEian Fl )ie% Mmho". Channel T.incr% Sidcwalka, DTivewayA, C'`ffh louder W%W22 03300 Mix 1)4 3403 AT.n3 1)4000CM11104I15 31000 psi 4'oncre1a Ioi Sidewalks, CuO1 s WW2022 03 30 W Mix Design Auras DIOKMs01 S65$ 3000 psi Concreie for C arys, C'nrh & (3ueters, SidewaEks, Rny4way" AAA RalnF6 WW2022 03 30 On r4 m R45ign ATttns R{[1{inn01iS15 36n0 i Concwte ti,r rnICES. Boxes, pn4asenlen� BIaclCinR 919+2022 03 30 00 Mix 1)e5igl, Argos RiGKIM01061 360 psi Concrete Foa !Plus, Hoxes. Falcaxertmrtt, !;l(cking W9aQ2 03 30 W Mix Resign Amos DICKKMON938 4000 psi Concrete for valve Praia, iniots. SIFMOUTC& Headwalls. Tbaust 1#lackirlg WW2022 03 30 00 Mix Resign Argos i)JOWWn1C4sf34000PsiCoamteCorvalveFads,inlets,5,4rucrlmas.H4ad"IN,ThmsrBlacking WW2022 033000 Mix Eksign Argos R1t10W 016R5 4001) psi Coocretc For Va1w fads 919+2022 03 30 00 Mix Deviv, Argos RIQOCMO$751 750 Psi Coocneie Banc for D llch Repair W9aM2 03 30 W Mix ReSigo Amos DIONINDI691 4000 psi Corwnw for Headwalls. Retaining Walls, Sax Culverts, V0414y Guttcis WW2022 03 30 00 Mix Resign Big RCpncmw 7SKGRT 3000 psi Caucrvee for GroWing WW2022 033000 Mix Eksign Mir fJ Cancrele 14500AP 4504 Psi C<wmte for High Fairly Strength Paving 919+2022 03 30 00 Mix Deviv, K%t Town ConCrov 457GG5.1 45W psi hand glaacd paving W9aM2 03 30 W Mix Dq sign Big Town Concrete 4n%6 -i 454M psi hand p1wed.`pauing WW2022 03 30 00 Mix Resjlpl Aumm Texas ASi-000 }G 4500 Psi Concmle Mix for FINnd Plaeed Pwug, Slom StmOures WW2022 033000 Mix Eksign R-nkm Texas 40U553EIG 400n psi Concrete Mix for Machine Placed Paving W9+2022 03 30 00 Mix Deviv, 911m q Texas 55U120A(j 4OI) psi ColcW,e Mix far Hi5ih Frrty 5tTungtll Paving 9NaO22 03 30 00 Mix Resign Flomw Texas 341J104AG 3404 psi Cover" MJi for Pi 4 Collars, Inlets. TbML Blocky, Sidewp;lks, ADA Ramps WW2022 033000 Mix Resign Humm Texas 30U101 AG 30 O psi CoRmLe Mix for F wont WW2022 033000 Mix Design Hunwo Texas 341J5Ml3G 3000 psi Concrete Mix f(w BlockiiiiL Driwways, Curb & Gutters, Sidewalks, ADA RUMS 9N9 2022 03 30 00 Mix Design Pilnwo Texas kOUSWBCa 40K psi Concrete Mix for Storm Drain Structures. Driveways. Screen walls 9i aOU 031000 Mix Resign Flomw Texas 36U5WHG 36K psi Concrete Mix for Ligbong and Taafc Siltnal Foundations WW2022 033000 Mix Design Rul+lca Texas 06Y45013A 900 psi Concmtc Mix for Banc Ibr Ttcneh 314pniF W9aoU 033000 Mix Resign "4mm Texas 01YO9O131' iG4fpsi Concreic Mk forFlowable Fill f5l 9i aOU 03 30 00 Mix Resign Carder CopercW F WCCON21 0 [1si C4ncP?kc for 1 rand Placed Paving 9NaO22 W 30 W Mix Resign Carder Concrete FWCC55NSI1 3600 psi For Machinc florid Paving WW2022 033000 Mix Resign Carder Concrete FWCC602091 36On i ipr Mach inePlaced p[ming WW2022 033000 Mix Eksign Carder Concrete FWCC359141 Rowgic Fill-C'l.5le1 9N9 2022 03 30 00 Mix Resign Carder CopercW FWFF237501 fipwpble Fill . CE.SM W9a022 031000 Mix Design Carder Concrete FW'CC692W1 4U€ia psi Concrete fur Storm Drain titnx4anes, Manholes, E lcadwalls, F-Imning Walls, Vallcy Gutten, Driac Approaches, Lighting & Traffic Simi Foatndeljons "+ 2032 03300 Mix VvAp1 Carder C0114rete FWCCSn2021 35trn psi concrcw for Sidewalks, l-lriv,eway9, Ramps, Curb & Gutter 9 i9+ 2 03 30 110 Mix N51691 Carder Conerete FWCC502-001 31(00 psi tar Sidewx 11�, DrmevMys, RamT,s, Curb & €cutter, Fleiwurk 9.'9+2022 n3 3n no Mix Pcsign Chodeyf5 Crmcrete 4142 3000 p9i Cor3C10C for Curb ji ICL% )LmoEon Boxes 9.+912022 03 34] n0 Mix Resign klw-ley's CMCFele 451$ 4000 psi C fmcreic For Xcadwal Is. Wingwalts "+ 2032 03300 Mix PRsigll Lh&T1Cyf5 Cone" 5167 3600 p9i Cancacic Mi5 For Nl trine Flared paving "% 2022 03 30110 Mix Dc5ign C^h3Ttey'5. Cf WFOC 4Cen9 4500 poi Cancrele Mix for Hand Placed Paving, Manhalea WW2022 03 3n no Mix Des�gn C7tarieyf5 Concrete 6]03 4500 p9i CorlcNic Mix fur Fund Placed ravpg, MginI)alc5 WW2022 03 34) n0 Mix Resign ChaTley's crime xle A5n2 30150 psi C'aucreie Mix rnr Srdewalks WW2022 03 3n nit Mlx Desl8dl [-7ra11cyf5 C..." 3759 301(10 p9i CoflCje Mix fqr Skdewall4r "% 2022 03 3n 110 Mix P96ijpl Charley'5. COPEretC 1502 150 psi Concrete tar FEnwable F R-CLSM "+ 2022 0330(10 MixDwpi Char]eyrsCnTlcrete ISI$]50P%jOypurtctor F14mmbLePiI1-C'LSM WW2022 03 30 n0 Mix Design €-laxrleyra Concrete 5642 40DO p8i Cfmcreic For Stam1 Drain SkN9hffes W9a032 033000 NI Ix Design Charley s Concrete 6595 5000 psi Cow.Ni4 Mix for High F2T9y Strrngt paving W9+2022 03 30 n0 Mix A45ig1 C'113Tleyfa Coricwe 63" 45M psi Cancmac Mix ftir High FxTly Sarngih Paving WW2022 03300 h7 ix Design Chisholm Trail RCdi :Nix C13G-4)AE 3KO p9i C'U wre tc For Drivcways, C gLrb & Clutter 919aO22 03 30 0 Mix Resign Clay Concrete Cuniparty 1 ]-350-FF 50•150 rm Concrete for plowable FIEE•CLSM FORT WORTH. CITY OF FORT WORTH TRANSPORTATFONIPUBLFC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 12/0112022 € nncrulc (€ emtinucd) "1 2022 03 3u (10 Mix 13esign City Caocrele Comporry 3OFL425113460 psi Coeomt- far Ay' -Rap ".12022 03 30 00 Mix 13mi.tm CSty Cancrele Company 30FIA20113900 psi CUnorerc Mis Per F3lrxkin Sidewalks, Hatworl4 fads 919f2022 03 30 00 Mix Dmign L Camerete CumpAnv 45NG2311.1W psi Concrete M4ia foE OEiiW 5halis "1 '2022 03 30 00 Mix bmigm LSty Concraoc Company 50 )G25113600 psi Sltary Misplaced 1)6]Jcd SFea0 "1'2022 03 30 00 Mix lksixn c7t cummle Comporry 45NA2011 4500 psi Concrc is Mix for Hand lAomd Paving "12022 03 30 00 Mix Design CSty commtc Company 361_A201 13600 psi Cnnuwrc Mix tar iiachinn Plaued Paring; 919f2022 03 30 00 Mix Dazign City Carcretc Cumpanv 36WA00113d00 psi Concrcln 41iX fur M MbiRe Plarrxl paring 91912022 03 30 00 Mix bmigm oly Carurete Cumpony 40TA2uI 14000 psi Co mle Mix for Sturm bmin Slnuturc 1VI&2022 03 30 00 Mix lksiLm City Cummie Company CLNG251136M psi ewrnrcle for Drilled Spat! "12022 03 30 00 Mix Design Cow Tnl B kedi Mix 250 3000 psi Cwxrete Mix for Sidewalks, Mriv Vs. AMA lumps 919f2022 03 30 00 Mix Dk ig;n Cenr Town Redi Mix 350 300U i Carcrete Mix f Sidewalks_ Dr vcways. ADA !tamps 9. nO22 03 34 0 Mix bmimn Cow Yawn Redi Mix 9 70 si 7'�iu•ablu Fill - CLSM 919r2022 03 34 13 Mix lksiXn Cow'fown Redi Mix 9-S f 7o psi Flowabk Fill - CL5M "12022 03 34 13 Mix Design Cow Town Rn i Mix 220-5 50 psi Comntc Mix far 1.1awahle rill - CfSM 9N9 2022 03 34 0 Mix Dk ign Cuw Tuum Redi Mix 32A-$ 50 psi Cm le Mix far Vwahlc Fii1- CL-W "t_)022 03 30 00 Mix bmigm Cow Yawn Rerdi Mix 230,E 750 i Cuncrrlc linso Material fa Trennh Rupmir 919r'2022 03 30 00 Mix Lk_Shm Cow'fown kedi Mix 33058 75 psi Conomw Basc MaFcria3 for TrcM3e kcpoir "12022 03 30 00 Mix Design Cow Tnwn kcdi Mix 353 3001) psi Concrete Mn far Sidewalks, ABA Ramps, Driveways, Carh $ Gortcr, Safety Find Treatments. Nwv:tx. O1 ketaining Walls "1 2022 03 30 OU Mix bcaivn Cow Tour kedi Mix ?53-W 3000 psi Concrete idia Sidewalks, ADA Ron s, bnvcways_ Curb & Gutter, Safixy 1=nd Trcavnmts, NcR-1xD3T Rctaining Walls 919i7022 03 3u 00 Mix tic i Cow Tuwn 1wi Mix r60 400U psi Concrete Mix far I3ridep Slafxs, Has Chlvrm 14midwal1s, L[v!b iFW anti Inifi3c Sig ml Paandarions 969t2022 03 30 DO Mix Tksign Cow Town Redi Mix 260-1 3a!) Pei CnrKMW Mix far Headwalls WW2022 033000 Mix Resign Cow Town Redi Mix ZK-2 3600 psi Concrete Mix For Bon Culverts. ltepdwal 1l in � aosi'fi�afftc Signal F"11cW10i15 919+2022 033000 Mix UesiTpi Cow Town Hcdi Mix 36O 4p00 psi Cowrete Mix for Di dRe Slats, J3o2 CuELcris. IipWwal is. LIRIri9nR &-rraFfre Signal Faundanorl,v W91bU22 03 30 00 Mix 1?esixn Cow Town.Redi Mix 360.1 3600 Psi Cooerele Mix for Box CYiiveirs. Headwalls, vvinAwalls WW2022 033000 Mix vvsifpl Cow Town Redi Mfi.t 264-N 4500psi Cuncte(e Mix far Hand Flaccd Paving WW2022 033000 Mix Resign Cow Town Redi Mt ix 366 4500 psi Concrete Mix for Hard Placed Paving W9+2022 033000 Mix Uesi81, Cow Town Hcdi Mix 26.5 4500 psi Cowrete Mix far Hand Placed Paving 9WbU22 43 3n w Mix Resign COW Town.Redi Mix 365 4500 psi Conaiete Mix [or Hand Placed Paving 9iWWU 033000 Mix Resign Cow Town Redi Mix 370-NC 4500 si C411 mu for HF F Paving W9aoU 033000 Mix Resign Cow Town Redi Mix 370-INC Vosi Concrete far HES PAVIHA 9i aOU 03 30 00 Mix Resixr Cow Town Redi Mix 375-NC 5#q j Concrete for HES Paving 9i aOU 03 30 04 Mix Resign Cow Tcnm Redi Mix 767 47AO psi Concrete Mix ra Marilwles and Drain c Sirucrua,es WW2022 033000 Mir, Resign Cow Town l0edi Mix 270 5000 psi Conerctc Mix Far Call -in -Place Box Cu ucrLs W9aoU 1033000 Mix lkaixn Cow Town Rcdi Mix 370 5040 osi Concrete Mix For Cast. in -Place Box CulveNs 9NaO22 03 30 00 Mix lksixr Cow Town Redi Mix 255.2 30NO ri Conerek J4tix For iple(s, T3lrusr Bluckin.9, Corrercte Encasenicat 9NaO22 M 30 04 Mix 1)rsign Cow Towtz.Redi Mix 257 3601} Fi'oncrc(e mix for Valky Cutlers l IT1412o22 3213 I3 Mix, Resign Cow Town l0edi Mix 357-M 36 psi C'owmte Mix For Machine Placed Paving W9a022 33 13 13 Mix Rcsixn Cow Town 130i Mix 257-M 3" psi Concrete Mix for Machin Placed Paving 9NaO22 34 13 !3 Mix Resign Cow Town Redi Mix 264-M 4%0 psi Concrele Mix ra Machine Placed Paving 9i aOU 35 13 13 Mix Resign Cow Tcnm.Redi Mix 360-M d440 i Conrele Mix Far Machine Placed Paving WW2022 033000 Mix, Resign Cow Town l0edi Mix 255-t P 300r�' ['pper etc Mix Rx Curb $huller W9aoU 033000 Mix Resign Cow Town Rvdi Mix 355-Le 3440 osi Concrete Mix For Curb &Cuner WW2022 033000 Mix Resign Cow Town Redi Mix 755 3500 psi Cowrcta Mix far FlQ(vork. lnkis. Thrust Blocking ConcnMe 5ncaac near W9aoU 013000 Mix Res fp Cow Town Redi Mix 355 3000 i Canaote Mix far lnlels. i7lFvst Rlocl i Conergte 1;ncasemept M W2022 033000 Mix Resign Cow Town Redi Mix 365..STX psi Coricrctc for Bridge slabs. top sla of direct lratTic culyerts, approach slabs WW2022 011000 Mix Res�ll Cow Town Redi Mix 357 3600 psi Concrete Mix far wallcy Gutters W2022 033000 Mix Rcslxn GC;-F C0.rcrv4" Services GCH40%4004 qsi C'pncreie fur tor Sidewalks, Ramps, Fiepdwylts, FnicFs, and S cmm main Structures WW2022 013000 Mix Res fp GC1-f Cw lvle Services 4 C'H VS 4000 ii Concrete for Machine Placed Paving 9N9 2,022 033000 Mix Resign Geli Cancrele Scn•ices i RCF!45W d5bq. Concrete Hard Ptaced Paving WW2022 0110 04 Mix Ream Ingmip Concrete & .AU;regates i:47i'VSE5 3404� i Corrcrcte for Sidewalks, ADA Ramos W2022 033000 Mix Reslg11 Ingram Conercte & Ay regaWs 2V WR-7W23504 3040 i Concrete for Sidewalks, ARA Ram W9aoU 013000 Mix Res fp Ingrain Concrete & AWegg4es 2V WR-I47QW5D5 30g4 Psi Concrete Mix roor Sidewalks. AD Ramps WW2022 033000 Mix Resign TnAram Coneta,e & Apyregaks ZvWR-056PS5D5 4" mi Concrete Machin i'laeed Payin� 9NaO22 031000 MixReSIF IngmmConcretc&.A0jvgMcs 211WR-16r1 V59M4500pslConcrvtcforFlandPlacedPavknR 9i aOU 033000 Mix Resign Inlu#in 03noOv & AWQgatC3 2V WR-I OMQ550N 4500 psi Concrete far H,5nd Plaeed Pteving W2022 013000 Mix Peden! liumin O)rwrete & Agwvra tes 16tPS5LM 4500 psi Conere(e for Hand Placed Paving WW2022 013000 helix Resin/ Li rwn Corurete & Aw4C A&Rs C47PV5E5 3000 psi Concrete Mix for Sidewalks, ADA Pattlps W9a022 033000 Mix Resr Liprem Caxrele & A00pUs 161PS5EM 4509 psi CooctvW Mix far Hand Placed Paying WW2022 03 30 CO Mix Re:sF FioJUFn - SOR Inc, 5177 3000 psi C-ramie Mix fur Sidewalks W2022 01.1000 Mix Deem FHolcim - SQiI Inc, 1261 3000 psi Coacrcte Mix far Sidewalks 9i9P2022 03 30 CO Mix Resign 1lalcim - SOR. Inc, 1551 3000 psi Conctcte Mix for Biuckmg FORT WORTH. CITY OF FORT WORTH TRANSFIORTA770NIPUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 12/0112022 C ungrrt.•SC nnt,nu W912022 4 SU SNl Mix I 'sign ltolcim - SOR, Ina. 2121 4506 psi Concrete for flPS Paving 9,912022 03 30 00 Mix Design llolcim - SOIi, Inc. 1701 4000 psi Concrete Mix for Storm Drain Structures, Sanitary SCwer.manhplCs W917022 03 30 00 Mix Design Holcim - SOR, Ina, 5409 4000 psi Concrete Mix for Sidewalks, Inlets W 2022 03 30 00 Mix Design 14oleim - SOR, laic. 5507 4500 psi Concrete Mix for Hand Placed Paving 9912022 043000 Mix Design Holcim - SOR, Ina. 5011200 psi Concrete for Base Material for Trench Repair W9f2022 03 30 00 Mix Design Holcim - SOR, Ira:. 9600 36W psi Concrete for ]hill Shafts 9NI2022 03 30 00 Mix Design Flolcim - SOR, Ina. 1951 4500 psi Concrete for Storm Drain Structures, Hand Placed Paving IV5J2022 41000 Mix Design Holcim -SOR, Ina 1922 3660 psi Concrete for Drilled Shafts 9Ni2022 C13 30 00 Mix Design Holcim-SOP,inu. 19594066P iConmtcforDrilled-iwfts W91022 03 30 00 Mix lesiim Martin Marietta R2111014 9000 psi Concrete fur Sidewalks & Rumps 9N12022 03 30 00 Mix Iksign Martin Marietta R2 t32214 A,000 psi Concrete for Sidewalks & Ramps W. 2022 013000 Mix Design Martin Marietta 179490SC 300 psi Corxretc for Sidewalks & Ramps W%'1022 03 30 00 Mix Design Martin Marietta R2131214 3,000 psi Concrete for Sidewalks Ramps 9W2022 03 30 00 Mix Design Martin Marietta R2131314 1,000 psi Concrete for Sidewalks & Ramps 9N12022 03 30 00 Mix Design Martin Marietta R2116014 3,000 psi Concrete for Sidewalks & Ramps W. 1022 03 30 00 Mix Irsign Martin Marietta R2136214 3,000 psi Concrete for Sidewalks & Ramos W9,2022 03 30 00 Mix Design Martin Marietta R2141224 4,000 psi Concrete for Sidewalks & Ramps 9N12022 03 30 00 Mix Design Martin Marietta P2141024 4,000 psi Concrete for Sidewalks & Ranyu WN 2022 03 30 00 Mix Design Martin Marietta R2t36224 _ ,AX psi Concrete for Curb Inlets 9N12022 03 30 00 Mix Design Martin Marietta P214123-1 A,600 Psi Concrete for Storrn Structures, Hets, Mucking& Un asemcnt WN 2022 03 30 00 Mix Design Martin Marietta FLOW25A 50 Psi Concrete for Ruwable FilliMM WM022 013000 Mix Design Martin Marietta R21422331,600 psi Concrete for Manholes, lnlcts & Headwalls W912022 03 30 00 Mix Design Martin Marietta P2146133 3,600 psi Concrete for Manholes, Inlets & Headwalls, Concrete Enca5rment W 2022 03 3o 00 Mix Design Mamn Marietta 1121412304,WD psi Concrete far Manholes, Inlets & Headwalls, Valve Pads %9,2022 013000 Mix Design Martin Marietta R2146035 4,000 psi Concrete for Manholes, inlets & Headwalls, Valve Pads WM022 03 30 00 Mix Design Martin Marietta R2146335 4.500 psi Concrete for Hand Placed Paving. Inlets, Storm Drain Structures 9M2022 03 30 00 Mix Dmigm Martin Marietta R2t46034 4,500 psi Concrete for Manhuks, inlets & Headwalls, Hand Placed Paving 9N12022 03 34 13 Mix Design Martin Marietta R214123 4.000 psi Cwwrcte for Inlicts, Maaholcs, HcudwagH 99,2022 03 30 00 Mix Design Martin Marietta V 141nI 4,000 psi Concrete for 1nlcls, Sidewalks 4"12022 03 30 Oo Mix Design Martin Marietta R2li5i0o 6,Uo0 f3.000 {i:: 24-hrs_f psi CumTete for HES Paving. 9912022 03 30 0u Mix Design Martin Marietta D9492S; C 4,ODU psi Concrete for Machine Placed Paving 9912o22 03 311001 Mix Design Martin Marietta R214623114,5W psi Concrete ibr Hand Placed Paving w"W2 03 30 00 Mix Design martin Marietta R2146238 4,5(tll psi Concrete for Hand Placed Paving. Inlets, Storm Drain Struc4ures %912022 U3 30 00 Mix Deaian Martin Marietta R21463364-5t117 psi Concrete for Hand Placed Paving 94f2022 03 30 00 Mix Design Macon Marietta R2146235 4,5(11) psi Concrete for Hand Placed Paving I ItV2022 �2 ]A 13 Mix Design Martin Marietta 02141N27 4,U(Ml psi Concrete for Machine Placed paving 1172 022 42 ]A 13 Mix Design Martin Marietta 021411{30 0W psi Concrete for Machine Plared Paving 11,2J21)22 42 ]A 13 Mix Design MLLrtin Marietta R2146N364,500 mi Concrete fur Hand Placed Paving 1 If15l2o22 J3 13 13 Mix Design 4lurtin Marietta R2146K164,500 psi Coneaete for Hand Placed Paving 1 If15f2022 34 11 13 Mix Design Martin Marietta K2t4036 4,5W psi Concrete for Hand Plaord Pavia¢ I Ir2i2022 32 13 13 Mix Design Martin Marietta R2146" 4,500 psi Concrete for Hand Placed Paving 11.2+2022 �2 11 13 Mix Design Martin Marietta R2146NIS 4,000 Psi Concrete for Inlets Manholes. Headwalls 1 lIV2022 }2 13 13 Mix Design Macon Marietta R21461(34 4,0UU psi Concrete for Inlets, Manhole. lfcadwalls I Ia1022 �2 13 13 Mix Design Macon Marietta R2141 N24 4,001) psi Concrete far Sidewalks and Ramps 11 t2i2022 �2 ]A 13 Mix Design '.Martin Marietta R214 ] K24 4,000 Psi Concrete far Sidewalks and Ramps W912022 03 30 00 Mix Design Macon Marietta R21461)38 4,5U0 psi Concrete for Inlets, Storm Frain Structures 9,912022 03 30 Ott Mix Design Martin Marietta R2 L46036 4,5(M) psi Concrete for 14and Placed Paving. lnlels W4 2022 03 30 UU Mix Design Martin Marietta R2 AW42 4,5(M) psi Concrete for hand Placed Paving 0912022 03 30 UU Mix Design Martin Marietta R2146242 4,50tl psi Concrete for bland Placed Paving w M022 03 3o UU Mix Design :Martin Marietta R21462364,500 psi Concrete for hand Placed Paving 9/912022 o3 3o 0U Mix Design Martin Marietta D9493SC 4,5oU psi Cnncrcic Cor Hand 1"laccd Paving 9Nl2022 0330110 Mix Design Macon Marietta R2147241 4,500 psi Concrete for hand Placed Paving 9,*2022 03 30 00 Mix Design NC'S Redi Mix NCS5020A AaW psi Concrete Mix for Curb &Clatter, Driveways. Sidewalks 9N12022 03 3o (Y Mix Design NUS Red, Mix NCS602U,UDP 4500 psi Concrete Nix for Valley Gutters, Band Placed Paving 9,912022 03 30 00 Mix Dcsiun NBR Ready N13x TX C-YY 3000 psi Concrete Mix for Curb Inlets WW2022 03 30 UU Mix Design \'BR Ready Mix TX C-NY Y)DO psi Concrete Mix IlkCurb lnlcts 91912022 03 30 00 Mix Design Redi-41ix DCA2FS54.0DW psi Concrete Mix for kip Rap 9/912022 03 30 U0 Mix Design Redi-Mix V0111524 3000 psi Cummtc Mix fprCurb & Clutter 9N12032 0334 13 Mix Design Redi.4fix FW.10021 215 psi Flowable Fill-CLS-'vT FORT WORTH. CITY OF FORT WORTH TRAYSPORTATFONIPUSLFC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 12/0112022 t imci orejC'nntinnrd1 919l2022 U i 30 0 kedi-Mix IUJ1 t524 3W psi Cancrcle Mix for Drip c ys, Sidrwal6cs, ADA Ramps 91A12022 03 30 00 Mix 13mil n Eedi-Mix IOJ11504 3000 psi Cancrete Mix for Sidewalks 9&2022 03 30 00 mix 17csign kcdi-Nix IOLI t504 3,600 psi Commbr Mix for Sidewalks, Curb & Gaucr 9W2022 1033000 Mix Design kcdi-]4ix IOL1 1524 3ti00 psi Crinuetc Mix Manholes, lnlels, Jundica Orates, Headwalls 919i'2022 03 30 00 Mix Dksixn kcdi-Nit I k3 k 1524 BOO psi Concre le Mix fur Ihrus) 13louks, i•alvc Pads %29I2022 03 30 00 Mix Dmign Redi-'Nix IOL21524 4001) psi Conc�tr Mix for Manholes ",,2022 03 30 00 Mix 17esign kcdi-Nkx 156I 1524 4000 psk Canernle Mix for Cast -in -Place Storm Drain Son lurcs W9iIO22 O3 30 00 Mix besi:gn kcdi-Mkx IOL115L'4 3G00 i CUncmm Mix tar I3ridgc substructures 919i'2022 O3 3000 Mix D siitri kcdi-44kx DCC2GSE236d , Concrc9e Mix forl)riIled Shafts %2%2022 03 30 00 Mix Design kcdi-:Mix DCIJ tG5E2 3600 psi Llndemmor Drilled Shafts 919:2022 03 30 00 Mix Design Redl-3Mix 156115D4 4000 psi $iidV9 Slabs 9W2022 03 34 E3 Mix besimn kcdi-mix F'35238VN 100 psi Fluwahle Fill - CLSIM "-'2022 03 34 13 Mix D siitri kcdi-Mi:x FOD13RVM 10O psi Flawablc Fill -CLSM 91912022 03 34 13 Mix Design kcdi-Mix 10311554 3000i CuncrrtC N4ix fur Rip-kap 9+9f2022 03 30 00 Mix Design kcdi-1•lrx M13&Kk) 100b par C'pncrcrc Mix Cor Trench kepair Base Malcrial 91912022 O3 30 00 Mix besixn kcdi-Mix IOiCt 1524 3600 psi Concrete Mix for 3•]rcancrrirnt 9 9r2022 O3 30 00 Mix Dcsixn Rcdi-Mkt ION1 1547 4506 psi (2600 psi (al 24 hrs.) Concrete Mix for 14 S Paving "12022 03 30 00 Mix Design kedi-ma IONt 1504 5000 phi I3600 psi (411 2 daysl CbMMte MIX far HGS Paving 919+2022 O3 30 00 Mix bcsitm Rcdi-Nit 50K11324 3660 psi Cc=rcre Mix for Machine Placed Paving 9W2022 03 3U 00 Mix Design RCdi-Met IOmi E51)4 4500 psi Concrete Mkt far hand Placed Pavmg• Storm drain Structures 9 9,2022 03 30 00 Mix Dcsi= kedi-Mix lumi 1524 45W psi Concrcre Mix for Hand Placed Paving 91912022 O3 30 00 Mix Design kedi-Mix IOMI )504 45CO psi L•wicrele Mix far Hand Placed Paring 919+2022 O3 30 M Mix besitm Rrdk-Mix 145CD1 P,4 4500psi Concrctc Mix for Band Placed Paviwe. Smarr Drain She urns 111212022 03 3U 00 Mix Design Rcdi-hlkx 145P25P4 45W psi Canrrete foe Sturm Drain Structures 12r512022 03 30 00 Mix Dcs[LT kedk-Mix IIJKL 15C4 35W psi Qn Ir forThmsf 131wks. Vat%m Pads 12r512022 O3 30 00 Mix Design kedi-Mix 156115C4 4UOO pal Concrete far CkP Stone Drain Structures 12'512022 O3 30 M Mix b�esit�m— Rcdi-Mix IOLI15C416W psi COncrctc far Manhole, Erde't��Junctien Hoar, Headwall 919r7022 03 34 0Mix 1�iK'� SR]'1 CumAffle 30000 3,000 pSi COncretc IbF S3dcwALS and ba,armwy L'enb & Gutter 919r2022 03 34 0 Mix DM[= S1t41 Concrete 40050 4,000 p&i Concrete for RmdualIs 419f2022 03 3U OO Mix Den& n SRNI Cancrrte 3M23 3,600 psi Concrete for Machine Placed Paving 919f2022 03 30 Ou Mix besiw SL$A Cunerete 4066g 3,60U psi Con Crete for Machine Placed Paving 9N.7022 0 31) 40 Mix Design SP-M Concrrte 45UUO 4S01U psi Concrete for band Placed Paving %9(2022 0 30 00 Mix De&i),m SW Concrete 45306 4,500 psi Concrete for 14and Placed Pavinq 419f2022 03 3U Ou Mix Dc�M sk-\d Cancrmn 40326 4,500 f3.OU kQ 3days) par Cunc.ree for HfS Paving UVW202 03 30 Ou Mix besiw SW Cancretr 35000 360U psi Concrete far Seu•r Manholes 1611w2an 0 30 UO Mix Design Sk.'m1 COMTrte 353UO 315uU psi COncrefe far Swerc Manholes w9r2022 0 30 OO Mix De&i),m Sk,4' 1 Concrete 3M22 3,600 psi Concrete for JUIR26M AUx 919f2022 03 3U OO Mix Den& n Sk41 Cancren 30050 3,1100 psi Concretc fur Sidewalks, lnkets_ 1aucrim E3oxe, Thrust E10cks 919f2022 O3 30 00 nix besiw 7aarant CUnerxle FW6O2oAkP 45UU task Concrete Mix fur Hand Placed PovinU 9NC2022 03 3U OO Mix Design 1'awant C'Uncretr FW60AHP 45W psi C-rinu xtr Mix far Hand Placed Paving w9r2022 0 30 OO Mix Iks fm Tarrant Cnncrere 1CFW602UA14P 45UU psi Concrate Mix for Rand Placed Pavir[q 919(2022 03 3U 00 M ix De&ii M I aaraid CUncrxre F W 752OA-MR 4500 1306u psi (d 3dayn) psi Con =Lc H 1=5 Paving 9,'9P2022 03 30 Ou Mix Dcsiun Tarrant Concrete FW6,520jWk 4540 0001) psi (t4 3-daysi vsi lips Paving "12022 03 30 U0 Mix Design Tarrant Cnnorete FW553UA-MP 360U psi C:Oncreio for Machine Placed Paving 9.+9)2022 03 30 OU Mix benign Tarsal Cmk tc F%Y5320A 30M psi CUncreto Mix Car 91UCkin2 "M22 03 34 13 Mix bcsien TarnniLcan rate FWFFI5GCLSM 56-150psi Ftow•ab9e FIR - CLSIbf 9,'9P2022 0334 13 Mix Dcsittn Tanaait CUn tr FWFF275 50-1I5Y01 psi Flowablc Fitt - C'L9M 9+912G22 03 30 GU Mix Design Tarrant C iM tf F W 64),-uA2 4GW psi Cwicrete IW Ix for Stmm LYrain SEructurr9 10F10f2022 03 30 Gt1 Mix Demim I and Cm wte I C'FW6025A2 4000 psi C'oarcrelc fcr .Manhokea 1OF10+2022 03 30 UU Mix bcsien I'e ra rlCUn retc 1CFW502UA 3009 psi Concrulc Cor SSdewalks 9,'917022 03 30 Ut1 Mix Dc ittn Tarant f- nc to FW5035A 30U0 psi {uncle Mix for Curb & Gulier. 1Drkvcwsys, Sidewalks, ADA Ramps 9VW2012 03 3U UU Mix Design Tarrant Canoaete CF5020A 3UUu fzvi Ca mrc Mix for Curb and C)utim W J."c2 0 30 OU Mix Design 'Ia rant (ancrere F W5525A2 3WO psi Coiicrcic :Nix for Sidewalks, Drive Appmacher, ADA Ramp %1) 1:,12 03 30 00 Mix bcai to Titan Ready Mix 3020AR 31X13 psi Concrete for Sidewalks 9111 "r2 O3 30 Ou Mix bcsimn 'Divan Ready k1i:1 TkC45204500 psi Cmcrcic for Band Placed Paving 9r11' j'2 03 30 UU Mix Design 1'rar Grit kcdi Mix 0250.23U 3UUO psi Cm rew Mix For Flalwork Curb & trader_ Driveways, ,[dcwalks, At)A Ramps ,)!") '.i32 03 30 Uu Mix bexign True (irit kcdi Mix 270210 500 psi Corsercic Car Ilnnd Pieced Paving 9+4f2022 03 30 w Mex bcxim rise (rot Redd Mix U25U_23U1 3000 psi. CORCfCt Mix far Curb & Gukter, Driveways, Sidewalks_ ABA tramps "12022 03 30 G0 Mix Design 1 rue Grit itedi Mix 02612332 4UW psi Concrete Mix for )Machine Placed N ing 91912022 03 30 OU Mix Design Trsre Cirit Rcdi Mix o255.23U1 36UG psi concmte Mkx for k4whmc Placed Paving WW2022 03100 Mix De5ign Trw rent Rcdi kiix 0261231)1 450D psi Concrete Nix #m Hapd Placed Paving FORT WORTH. CITY OF FORT WORTH TRAYSPORTATFONIPUBLIC WORKS DEPARTMENT %.q0Vwe— STANDARD PRODUCTS LIST AS OF 12/0112022 c-onerarelc on 1o3 30 00 7lx esien 1'ruc GriE PWi Mix 0Z65.2301 4500 psi Concrete WX for Valley Cutters. Hand Pluccd Paving i13 30 00 IMiK Design I'Wisr Rcdi Mix 116791600 139i Concrcic Mix for UQi htin¢ and Tmffm Signal Foundaltnns Asa_ plt Pavi>♦ r 9•'9+2022 - l6 Mix Design Austin Asphalt FT5D137965 PC64.22 Tvpo D Firm Surface 9,'9l2022 32 12 E6 Mix Design AuslinkVhalt DA5D133965 P4364.22Type D Sine Suuface 9?'V2022 32 12 l6 Mix Design Austin Asphalt FT513117%5 P064-22'Iypc H Fine Base 919+2022 32 12 €6 Mix Design Austin Asphalt F'flBi39%5 PG64.22 Type B Fine Base 9•'9+2022 32 12 k6 Mix Design Austin Asphalt FT1B117 2 PG64-22 Type B Fine Base 9,'W2022 32 12 E6 Mix 1}csig13 Rgmalds A.,Mhah 1901D PG64-22 Type. D Dine Surface 9•'92022 32 12 E6 Mix Dxia�3 Rcynalds Asphalt 1112R PG64-22 Type B Pint Base 9+9+2022 32 12 €6 Mix Design Reynolds Asphalt 16t2R PG64-22 Type B Firm Base 91,W2022 32 12 €6 Mix Ucsign Sunmount Paving 341DV6422 PG64�22Type DEar Surfsce 11+1&12022 32 12 E6 Mix Design Sunmouin Paving 340DV6422 PG64-22TVPc DFim+Surfaec 12&2D22 33 12 E6 Mix 13csi¢n Sumno-un[ Paving 3076RV6422 PG62-22TypeR EmuBw& 919+2022 3212€6 Mix Design SunnxwntPaving 34t-RRAP6422ERGPG64.22Type RFineRmar 9192022 32 12 E6 Mix Design rxur 37•2E ]3A5.20 PG64-22 type e B Fine Ba 4.+4C1022 32 12 16 Mix Des'gn TXHIT 44.211303.17 PCr64.22 Tyou B Fine BLar 9.+9+2022 32 12 E6 Mix Des:iln TXHIT 211305 (1757) PG64-22 Type R Finn Rase 919+2022 32 12 16 Mix Deli/g'n TXHIT 222475 (1857) PC64-22 Type D Fine Srafaee 9.•9+2022 32 12 t6 Mix T%sign TXHIT 29.222d75.19 PG64-22 Ttye D Fine Surface "+ 2022 32 12 16 Mix Design TXHIT 1-222475-20 PG64-22 Type D Fine Surface 9.+9P2022 3212E6 Mix Design TXHIT 64-224tM-J8PG70.22Type DfineSurface %9T2022 321216 MixDeslyn TXHIT 12r222475-J9PC'r6e-22VvpeDFineSurfu:e Iletectalile waroijg 5urf2we 919i2022 �2 1120 Dw5 - Pavers Fine ►1uil13rick twin n S&L ti NO Taerile Pav%N 419+2022 �2 13 2U uws - Parrs Wcstcm WiEk Co_ rllonSbM, TX) Ddecfable warning ravers 919+2022 321320 DWS- Cgrnrnskr Engimrered Plnsri s, Inc. rtfmgrTile tWiilliamsville,NY) 41"22 32 13 20 DWS-{:mnpgs€tt ADA'Watioms Wiiminom,MA) R itapcBrickCLPCA+mpusiacPuver Sidfflu d063K Sealant 919f2022 pow 990SL-Cold lied,SinRtaComponent, Silimrw)oin[Scalanl ASThTD3893 914f2022 32 137,3 lain[ 5ea3ant Tremco 9005E-Cold plslied, Sinyj1 Component, S€liconJain[ Sealant ALWMDSR93 9J9+2022 1321373 321373 lJoin:Scalar loin(Sealam Fedora 300SL- Cold f�pplicd,Si[ty Camyppent,Silicanclain(Sulam ASTMWg,)) W94 2022 32 1373 loint Sealant crafco Road3mter Silicone - Cold Applied, Sin010 Cotupovent, SO cone dolrtt Sea[= AM h1 R1993 Lail€tt Trench Einbedn"t Sanii WW2022 33 05�0 Finbodmenl Sond Silver Crook Mmiorials Utility Ensbudnwia Sand AWM O3 ww2022 �3 05 10 Stnbedntenl Smad croud: mencruds Utility Embedtiun1 Sand ASTE44C33 9i9fi022 �3 05 B0 ElubcdnwflL -and F and L Din Movers Utility Embedinew Sarin ASTM 03 W9P2022 33 05 t0 limbedmu:l Smud F and L Dmi. foyers Utility-Fmbedwcni Sand ASTM 03 9l9.,2022 33 05 10 Embet m t Sand Tin TOP Marten Munc€[a Utility En6rdment Sand iLiTM C33 FORT WORTH. CITY OF FORT WORTH TRANSPORTATFONIPUSLFC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 12/0112022 Firms Cover. wad Grade Rln - Caat Fran*` m SMnw�+J.nrrrS+rrrerures 919l2022 3 05 13 Man[ F amcs C❑we s CCna Foal4,r} 32" Diameter Liftmste Water Manhole Gasketed Frame and Coverwfl.rmahorn L4ao. Model No. NF-1743LT66 ".,2022 05 13 Manhole Fnrmcsnnd Coves Vcrnu r;ourdr} 32" Diameter Liftmste Smitary Sewer Manhole Frame wid Cover wALondwrn Loeo, Model No. NF-1743LTO "non 05 13 Manhole Frames and Covers srP lidiorim 32" D1,13m er Fart Worth Sanitary Sewer Manhole Frame and Cover, Rem No. NF-2280 "1 '2022 �3 05 13 Manhole Frames and Covers HU) Ergo XL Assembly 32" Diameter Saaitwv Sewer Maallole Frmw and Cover. ModO No. 00149021 Li)10 4r9r'2022 �3 05 E3 Manhole Fmniesaod Covers 'Necna Fo udry 32" Dimmer Lift[mate Sloan Sewer 7unctiun Sax sad Mmhak Franie and Cover w1Lorlahom Loan. Model No. NF-1743LTXX "12022 p 05 13 Manh❑k Fnrnres and Covers `lcrna Foundry 24" Diw*mr Liftmate Storm Sewer Inter Manhole Frwne and CAverwiLondmrrr Loss. Model No. NF-IMLT61 W9i2022 3.305 13 Manhok Frames and Coves AccnCas[ lG❑vmd Simi Cot "rky. LCU 24" ❑ianwier hr}rRC #220605*3 ASTM A48 AASHTO M306 919t-,022 �3 05 t3 mmbok Cum Verna Foundry 32" Pianw-rcr NF-]274-T91 ASTM AM AASRTO M306 919I20a2 �3 05 13 Manhole Fnunrx and Co Nemu Foundry 32" Piano-ier NF-I 743-JM iH,in¢edl ASTM A4S AAgATU M30f, 919nm �3 05 13 Manhole Fc Nernn Fomdry 32.25" Diameter NF-143o.30 ASTM A4$ AASPTO M366 919f2022 }3 05 B Mank,le Fnrmrs and Cuve . `lama Imarmdry 32" Pinnw-lcr NF-3743-FjY AS7M A48 AAKT TO W06 W9r2022 33 05 13 hionhrak Frames and Covets Srll lrxtrrslrEex 24" Vianregcr 227957** ASTM A48 A"ATO M306 9192022 33 05 l3 I4ia❑Ixrl, F :❑rres rn i C:nvca6 sm 6L10FiL1: 32" 01ameter 22W{ l ASTM A49 AAgHTO M306 WWZ022 33 05 13 Manhole l;slurs and C:urus Us v 32.25" Djallrcter F-FI039 X21A ASTM A4S AAKIT0 M3o6 Napr:.WnewdevekpreenraadPoop inwafth,NowAn 4fiAs.4meertherninhewoJ0"apruisgngairelxeadissaw4wInQVsPedfRe,vrfnxJJ0323.l4riysara1krnpemVrgrimswWa4ybe4A wdfarrxlaringrMaahalenrhrrrreglairerrnhr mrnrfrnrnexandrnvtrs. Reinforced Comereu Storm Drain PIDelCiilverts W92022 33 d I to Pretext Box Cula = Fomvra Precast Pax Clrlvcrta W92022 33 41 10 Caine Pipe Wyreg wW Beads Fonerrx I[CP Wye and $ends 9I92022 33 49 i0 Precast Box Cuhercs Rinker Maaerlek Rinker MaleriaLs keinfbmcd Concrete gm Culvert AN I'M (789, C$50 ASTM C7R9, CLW 9192022 3349 i0 CO-Kraw Pipe Rinker Mweriek kinker Malerials keinfo ed Connretc Pipe 1roncmu and Ga "Joint Pipc A5TM C76, C655 ASTM C76. C6ss 9N9 2022 33 41 t0 Co4ereie ripe Ivamm Re inforord C'nncrnte Piae - Timssw and Crn7ove+130 Pulvprrl ieloc Sloan Drntin Pipe W9r2022 I334l l� IPr,h'pi"Prl,nwI'mti' �AdvamwdDmirIDpeSystems.Inc. IHPPolwroavlerwSturm DrainPipe Storm Brain Yinuholcs and Janrliou 04mm 9NY-1022 �3 49 td S1avkii lran L14, Uldcas k P[Qrag 4' x 4' Stad44d hiarLhole ASTM C479 gNao 2 }3 49 to fnnclKm 13 x Ol kamh Precasl F x s' Stot,,, itlneli,)n Hox ANrM C479 9N."2022 �3 49 t0 function box 0ldcaslk Plvcast A' x x Storm Itln Imn Box AM M C-478 "h '2022 �3 49 10 fnrx;tion Box Oldcashla Plvcast 5' x 5' shmil AUnt'lim, Box ASI M C-478 9Ni2022 �3 49 to fnix:tim Box 0l keale PICcmt 6' x 6' Storm hwliori Box ASi M C47$ ".,2022 �3 49 10 fancnon dos 01dumtk Precast S' x S' Storm f'Amion Box Hasc AS] M C-479 919."2022 p 49 t0 function dos 014ca61k Plvcmt 5' x 8' Stgpn ftlircCl4,n Rox Ease AM C-47$ "h '2022 �3 49 to fnrx;tion Box C:uwtown Rode Mu No. 260-2 6 Sack 3600 osi COnerww for Concrete Collars Act a LX-14 9N2022 �3 49 Eo Manhole Rinkw INatcriah Riv;fer Malerials A,euilorrW 4S" Uisum Wr SDread Foc4lne Manhole ASi M C 433 "12022 �3 49 t0 M mfx,le C❑mmuor Tre3acbors F.nsineenod Svgee= Kor-N-Scai 106•406 Series Pim * 3Kanbote ConpimMi AS] M CW3 W9."2022 �3 49 10 lwwtion Box Forturn X x T FRT-4xd-4Q4-i'$EC'AST•E3AySE AM M C913 "h '2022 �3 49 10 function Box Forla 5' x S FN r-s%5-40-PRFCAST•TOP ASTM C`314 91912022 �3 49 to fnnctixm Box Forlem 5' x S FN 1 - 040-PRFCnsT•13ASF ASI M (911 9PJ12022 �3 49 10 fuwttun 13M Forlerta S' x 6' }>27-{x6.409 PiiItiCAST•TOP ASTM €,'Y 11 W9.2022 �3 49 10 function Box Fortarm 6 x 6' FR I-(,x6.4 -PRECAST-BNSF AM M Oil "J'202.2 �3 49 10 jaw1 n Box rnompaon Pipo croup s 'x 4' TPG-4H4-409-PRFJCASF TOP ASTM 0515 "12022 �3 49 10 rnnctm dos Thompson Pipe Group 6 'x VTM-4H4-409-PRP-CAST BASF ASTM 0515 919f2022 �3 49 t0 junction Box Thompson ripe: Group 4 'x 4' TPG-40-412-PRECAST 4-FT RISER ASTM 0515 9Nn)022 �3 49 W rnnL'Itan Box nccmpsan Pipe: Group 5 'x S T'PG-50-410-PRECAST TOP ASTM 0515 "1202-2 �3 49 10 function Box Thompson Pip❑ Group S 'x 5' TFIG,5x5-b10•PRFaCAST BASE ASTM 0515 "12022 �3 49 t0 rnnctm.e Bari rnampann ripe Group S 'x STPG-5x5-412-PRECAST 5-FT RMR ASTM 0515 919f2022 �3 49 to Notion Best Thompson Pipe Group 67'x 6 TM-6x6• sl t-PRECAST TOP ASTM C515 9hN2022 �3 49 to rnmtian Box nccmpsan Pipe: Group 4'x 6 T'PG-6x6-41 r-PRECAST BASE ASTM 0515 9191202-2 �349I0 function Box Thonffp nPipoGroup i5'x6TPG-60-412-PHECASI'6-FT RISER ASTMc515 "12022 �3 49 t0 rnnctm.e Bari rnampann ripe Group 7 'x TTPG-7x7-41 I-PRECAyFT TOP ASTM 0515 ",.2022 �3 49 io fnncti❑n Be% Thanrpsan Pipe Gmup 7 'x 7' TM-70-41 I-PF[ECAST BASF AS7M 0515 9Nn)022 �3 49 to fn 11::OP UM Fh❑mpsnn Pipe Group 7 'x T TPG-7x7-412-PRECAST 4.PT 1tiS$R AM M C615 "1 '2022 �3 49 Fo function Box Thompson Pipe Group S 'x 8' FP43.8x8-41 t•PEIECAST TOP ASTM C515 9PJl2022 3 49 t0 fnncti❑ee Box Thompson Pipe Grasp 9 'x 8'-FM-8x8-41 I-PI[ECAFT 3ASF; ASTM 0515 y.+9r2022 33 49 t0 fwectton Box Thonrpwn Pipe Group 8 'x 8'Tf'G-8x8-412•PRECAFF S•FT RISER ASTM C615 FORT WORTH. CITY OF FORT WORTH TRAYSPORTATFONIPUSLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 12/0112022 *Storm llraia Curt? and Drop Inlcts "1 2022 �3 49 20 curio Inlcls VOR, ra IW x 3' FRT-IW4103-PRECAST ASTM C913 91A2022 �3 49 20 C�mb 1n1els Forterra 10' x 3' FRT-10xl-s06-PRE4--kST ASTM C913 9&2022 �3 49 20 Crrh lnlds Forterra 10' x 4,3 FIZZ'-l0x4-407-PRECrLST ASTM C913 "1 1022 �3 49 20 C�6lnlds Foil r 10' x 4.S' FRT-IQV-420-PRECAST ASTM C913 "1 2022 �3 49 20 lawlan box Forte 4' x 4' FRT-dx4-409-PRECr15T-T4P ASTM C913 "12022 �3 49 20 Cur6lnlrl Thompc i Fipe Group Rr x 3' TPG• I W-405•PRECAST INLET ASTM 0515 919I21022 �3 49 20 Curio lnlrl Thompson Fipe Group I5' x 3' 7PG-15x3-005-PRECAST INLET ASTM 0515 9,912022 �3 49 20 aab irild Thompson Pipe Group 20' x 3' TPG-20X3-d05-PRECAST INLET ASTM C515 "1202,2 �3 49 20 DMP I nln Thompson Fipc Group 4' x 4'-FPG-4X4-408-PRECAST INLET ASTM C515 919aM �3 49 20 prop Inks Thompc i Fipe Group S x 5' TPG-5X3-408-PRECAST INLET ASTM 0515 919I21022 �3 49 20 prop Inkl Thompson gips Group !r' x 6' TPG-6X( 408-PRE{AST INLET ASTM 05I S