Loading...
HomeMy WebLinkAboutContract 44157-CO1 (2)City of Fort Worth Change Order Request �f�VY ���R�TARY , , �����r�acr a�. �-� � �I l, � � � - t� � Change Order No. Date TPW ProJect No. Fundfng (FAC) 1 (One) 11/12/2013 GG04-539120- 0246000 Facility and Project Description City Secretary Contract No. WILL ROGERS AUDITORIUM LIGHTING SYSTEM 44157 ORIGINAL CONTRACT AMOUNT ................................................................ $ 572,900.00 EXTRASTO DATE ..................................................................... $ 0 CREDITS TO DATE .................................................................... � 0 i CONTRACT COST TO DATE .................................................................................................. AMOUNT OF PROPOSED CHANGE ORDER ............................................................................ REVISED CONTRACT AMOUN7 ............................................................................................. ORIGINAL FUNDS AVAILABLE FOR CHANGE ORDERS ............................................................ REMAINING FUNDS AVAILABLE FOR CHANGE ORDERS ......................................................... ADDITIONAL FUNDING (IF NECESSARY) ................................................................................ IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Miscellaneous ChanC �s required by site conditions as per the attached PCR 's PCR # 1- revise light instrument package from Altman to Selecon. (Deduct) PCR # 2- change of location of front of house electrical panel. Add PCR # 3- change out the 10 gage wire to 12 gage wire for weight requirements. Add ------------------------------------------------------------------------------------------------------- (Total Deduct) It is imderstood a��d ngreed that the acceptance of this Change Order by the contractor emistitutes an accord and satisfaction and represcnts payment in full (both time and money) for all costs arising out of, or incidental to, tlte above Change Order Contractor's Name EQ A. WILSON, INC Orlglnal Conlract Tlme Addltlonel Approved Tlme To Date Approved Contracl Tlme To Date Addltional Time For Thls Change Order 273 cd 0 273 cd 0 Contract �D A. WILSON, INC �'^' � Date, � C��tructl9n I�anpger /� Date $ 572,900.00 $ (13,124.64) $��,'���� $ 75,100.00 $ 88,124.64 0 $ (16,697.00) $ 1,399.18 $ 2,173.18 $ (13,124.64) i /� �/1 1��'ir U �orcauon l.�-� � P Date Councfl Actio� ❑ Approved i�, l� - I �> ❑ Other . D(stributiorr - /� � File �'A� ��„�„���, ,4i �Q�strUcllqrt�� ager � roJect Mana�e �`+��� �1�;,��tracid���.�;c� d / ��`� ����tT�`d, �u'�K nall _ -- -- � - -� � C � I V � D P10�1 2 � �0"i3 R�8 �i �� ?/_Y_ / � ��'�� )' �- � j � `��-- � P. Goaazal�s, As�t, Ci�y Secret�t' TPW Facllities Management Division Change Order Form (3/20/12) f Required) ] Disapproved y��%` � l� �� ����� � �� � o� � �� �° � 00 � � a ��o�000 ���'� ��� `l�'� 11/1�1/ %� CONSTRUCTION COST ESTIMATE A/E � CONTRACTOR ❑ Ed A. Wilson, Inc. P.O. Box 11423 Fort Worth, Texas 76110 TPW 2012-05 # 44157 ED A. WILSON, INC. Contract No. 1 of 1 sheet of ��� PCR #1 Change Request 08/19/2013 Date DESCRIPTION Revise Lighting per the breakdown attched. A new completion datE labeling and delivery is contingent upon date of acceptance. �UMMARY ❑ At an increase in the contract price of $0.00 (broken down in itemized detail below) ❑ At no change in the contract price � At a reduction in contract price of $16,697.00 (broken down in itemized detail below) � With an extension of ???? days to the period of performance Cost Detail a. Direct Labor b. Insurance c. Materials and equipment (attach supporting detailed estimate) d. Deduct offsetting debit or credit for materials, labor and equipment attach supporting detailed estimate) e. Overhead 10% f. Profit 10% g. Employment taxes under FICA and FUTA h. Subcontracts Contractor's Commission on Total of Subcontracts Total increase or decrease of price Cost of bond TOTAL Subtotal 1.50% �� $0.00 16,697 $0.00 16,697 Subcontract Total ($16.697. Bar•hizun Liglit 2225 �. Beltiine Road - Suite 309 Ca1•raJlton, T3i 75006 Ph; (972) 41t-9930 Fas: (972)A16-9924 To; �d A, Wislon Inc Gary Langston f�e: 817-AR9-0705 u or Etna11: ic�an �sEon c� edat�iison.eom �cntiore: Fo��t Woi�th, TX �ru�s: Net 30, WAC or prepay Quote good for 30 days �liverg�: 1-2 weeks ARO DB: Fi�eigi�t Estimated Pre-pay and Add i��ne �jt ; Cs�t:��o. 27escription ���������,��� r, �� } Pi•o;ecr r�r�.►ne: Sales Person: Quotation Number: bate: Shrl� la: RJill Rogers Memorial Center Foi�t Worth, TX Fis�iure Refurn Scott F 8p61 Unit Exfended T. YtETC.TR�iEU AI1T1bTAN C'IATURES AND ACC]E�S�RiES strl� totnl: -�3,098.U0 l.fi r�ltman 3 ccil slcv c�>c 2.0 -& sltycyc3 3 Section Slcy Cyc 3.0 24 8-CF Color Frame 7-112" x 7-ll2" A.0 -8 SC-3b-BIC Black Safety Cable with Spring Ciip 5.0 -& yoke Yolce G.0 -24 �2-138GM 20A Tviate, 2P&G connector (instailed) 7.0 -24 FFT t OOUW Lamp 8.0 -24 8-CF Color Frame 7-1 t2° x 7-U2" 9.f1 -& SIOHD G•Clamp 10.0 -& S3�2P-10436-02 Golo�tran T-Handle ll.tl -6 FFT 1004W Lamp - spares 12. � I Restock Fee Manufactw�er ResfocIcing Fee 13.0 1 Rettum Freight Retiu•n I'reight to Manufacti�rer 14.0 1 Hazidliug Handiiug in azid oui ZI. i2�TUR.,'�'CT3 E;TC ���;b �'iA:'i'�71�E5 A�ND ACCESSCDRT.IES � srrb Polnl: ��$43,DQb.OD 14,0 LED Cyclorama Li�hts I5.0 -20 SELVR42 Vivid-R 42" L�D i`ixtw•e 16.0 -80 SELLXX 2' Lens to comprise one each ve�ticul and Iiorizontai assembly J7.0 -20 S�LTRU Selador'I"iunion ICit ]�i.0 0 SDATA6 DMX Cable: 6' - t�`��si6,ia l� L, ,:����, C`�neii t!�� .�ecu� r;e;� 19.� 0 �TbVOFER Stage Pin Two fei� � t�;��t��r�z �L��he ta��, C'���,���,, ir�; s��,t?zi�i7�c�� 20.0 1 Freight Freight from Manufacttuer vn origiaal shipment 21.0 1 Restock Fee Manufacttu�er Restockiug Fee 22.0 1 Rettu�n rreight Rettu�n Freight to Mactufachu�er 23.0 1 Handling Handling in and oitt 29.0 25.0 Barbizon Light af the Rockies, lnc, 9 of 2 www,barbizon.com � ; a��>>�zfln z,isi�t 2225 E. Bcltline Road - 5uite 349 Cari•oilton, TX 75006 Ph; (972)416-9930 Tax; (972) d1�-9924 �� �� , � ��� �� � ��° #'� ���� `�� ��° r� �� � Projecf Name: Sales Person: Quotation Numher: Date: —_ ____ FiXture Retal'n I Scott Baker 80613scU 8 /1 612 01 3 TI�. AllDI`I'IOiVAL SELECO� LED FIXTURGa ANTJ ACCESSORIFS strh totrrl: p �Z9,�407.Q0� 26.0 Selecon PLCYC 1 27,0 4 SEYT.CYC1-03-GR 131ack PL Cyc Luminaire includes C-Clamp and Powerc�n ia NEMA �-15 C'ra•aunded Eclison 28.0 4 MEGACLAMP Includes Mega Clamp 29.0 4 SAFETY Inoludes Safety Cable 30.0 1 G S�PLCYCI Black PL Cyc Luminaire includes GClamp 3t.0 16 MEC'rACLAMP Inoludes A�tega Clamp 32.0 16 SAFETY includes Safet�� GaUle 33A 16 POWERCUN 5' PowerCon Male to PowerCon Female jiunper 34.0 35.0 1 Freight Freight froru Mamifacfm•er 36.0 3�•� '•` Sparefi�arnes a�ad Colorb•an Gclamps Not ineluded inith S�lecatt Fixnrre.s. 38.0 * B'a�•bizaz�`s siai�dcn•d inszn•ai�ce nppTies, eertifrcales avcrdlable upcit� rer�tre,rt. 39.Q * flpplicable inx is rrot iriclafded in fltis gtrr�tatin�t, 40.0 � See rt�tivw.barhizon.com fot• terms and corrditians, 41 �0 ^ 7'Izi,r qtfotntion rs »ol a col�tr�ct. 42. D 43,l� '� Tlarrnl� Yo�r fnr tlte Oppa�tarri�j� to Qrrote! CIiAi�iGE ORUER T4TAL GRCiL'P�II� T'R�TGT-�T BC?PdDIh'G TA74ES TO'I'A.L: -o-15,647.00 I:�ICLUD�B Not includtd Not fz�cluded -$l 6,b5'7:OQ �arbizan f_ight of the Roclt+es, lno. 2 of 2 www.barbrzon.com CONSTRUCTION COST ESTIMAT� °d A. Wilson, Inc, '.O. Box 11423 =ort Worth, Texas 76110 TPW 2012-06 # 44157 ED A. WILSON, INC. Cantract No. DESCRIPTION Change lacatian for fron# of house control panel adjacent to existing panei and includenew face electrical per atfached quotes from Barbizon and Ail Fair Electric, �� o CONTRAC70R ❑ 1of1 sheet of CO #2 Change Request 8/19l2013 Date e and SUMMARY � At an increase in the contraci price of $1,399.9 8 C] At no change in the contract price (� At a reduction in contract price of (broken down in itemized detail below) � With an e�ension of 5 days to the period of performance Cost Detail a. Direct labor $100.00 b. Insurance $19.46 c. Materials and equipment (attach supporting detailed estimate) $0.00 d. peduct offsetting debit or credit for materials, labor and equipment attach supporting detailed estimate) $O.dO e. Overhead 10% f. Profit 90% g. Employment taxes under F1CA and FUTA h. Subcontracts Subtotal 119.46 >11.95 >11.95 >12.82 Contractor's Commission on Total of Subcontracts Total increase or decrease of price Cost of bond TOTAL SubconiractTotal $1,130.00 �o°io $113.Q0 $1,399.18 1.50°/a �{�.�� $1,399.18 B�rbizon Lighk 2225 P,�Re�tline Road - Suite 309 Garrollfon, TX 75006 Pli: (972} 41G-9930 I�ak: (972) 416-9924 Qrtoted '!'o: Ed A, Wislon IllC Alba: Gaiy Langston Te1ep&o�:e: $ l 7-489-0705 I�n.ror•Et�rriil: c;l�tn«sionic�eda�ntilsan.com Lncatiote: Foi1 �Vat�th, TX Ter-urs: Net 30, WAC or prepay Quote good for 30 days Delinerv: 1�2 v,�eeks t1R0 F013: Frei�hi Allowad . �� ��� � ; ' ��; ��� s�; � � � J � ;'a a" S E Project �tanie: Sales Pcrson: Quotation NwnUer: Date; to: «itl Rogers Memnrial Center Fort ti��ortl�; TX CRP 1 � 8 Scott Btiltei R0G13scb R7G12013 I�ine Q� Cat.11'o. Description Unit �ttended T. CY7S'T'C?IVC EN .6`rRA�T�D I+4GEA'Le�T� � I'LD1AI,: $291AO l.Q FTC En2raved �'aceblate 2.0 1 CRP10R Ctrstom �n�raved Faceplate to replace CRP14$ ��. �F��,C�� � 3. D Services Pro��ided Bt� Barbizon 4.0 '' Prol�icie hvo dimensional submittat �•a�viugs for o�vueis approval. S.0 '" Provide coordination bat�veen, oumer, u•chitect, aud otl�er h•ades. 6.0 � Placc electronics fi•am existing faceplate into ne�v faceplate. 7.0 8.0 9.0 10.0 11.0 Please Nofe: � P��eigTrt rhn��Es are Licle�cled 1 Z.0 � No Banr�i»g,.%ah pet•r�rlts, a• fees have been i�aclatded ir: �hi.r q:rntntloi�. 13.0 '� Barbzzon',s sicrradcrr�d in,cin�r�nce a�plie,s, certificntes availnU7e iq�an rec�uest. 14.0 *,4ppliccible tc'r� is noi inchtiled ir7 t7�is qrtotatior�, 1>.0 * See tivie�v.bm'bizon.cnm fo�' ter�rrs nnd cot2ditirn�,s. 16.0 � T7ti,s� gtrr�tatinn i,r riot u co�aFrnct. 17.0 1 B.0 � Tlranh I'nrr fm� the 0/rpnrtrrfiit�! to Qirotel TIiFATRICAL LIGHTiNG 5I'STER�1 I30ii a DII� G TA,Ja�`S TOTAL: 8arbizon tlght of fhe Roc/ties, inc. 1 of 7 Inciudeci Frefght Inciudecl itin[ included :Vor inctuaed Sr✓ww.barbf.zon.com _� , � �� ° ��� � ��� From: John Potter [john@allfairelectric.com] Sent: Monday, August 05, 2013 3:21 PM To: `Gary Langstan' �ubjecf: WRMC Auditorium CO � 1 Good afternoon Gary, Per your request and site visit, we offer the following proposa) to relacat� 1-120V 20Am� dupfex receptacle inCluding circuit and 1— 3/" conduit for lighting contral from its current position afi bacl< wall of raised platform to front of raised platfarm. It will k�e mounted adjacent to the sound system j-box that is currently in place. We exclude all speci�lty back boxes, cover plates, control wiring, contral wiring terminatians and any worl< oth�r than listed above. $i339.00 lohn Potter �II Fair Electric 817-23`I-2�tD�i Voice 817-2�7a055B Fax 'U}�s7 ,- �Ilfa'rrelectf�ic.com CONSTRUCTION COST ESTIMATE AIE � CONTRACTOR ❑ Ed A. Wilson, Inc. P.O. Box 11423 Fort Worth, Texas 76110 TPW 2012-05 # 44157 ED A. WILSON, INC. Contract No. 1 of 1 sheet of PCR #3 Change Request 11/13/2013 Date DESCRIPTION Change SO cable to 30 starnd #12 gauge. P that was taken down to help guide cable. Return SO cable to owner SUMMARY � At an increase in the contract price of $2,173.18 ❑ At no change in the contract price � At a reduction in contract price of (broken down in itemized detail below; � With an extension of o days to the period of performance Cost Detaii a. Direct Labor $ b.lnsurance $ c. Materials and equipment (attach supporting detailed estimate) d. Deduct offsetting debit or credit for materials, labor and equipment attach supporting detailed estimate) $0.00 119.46 >11.95 >11.95 >12.82 Subtotal e. Overhead 10% f. Profit 10% g. Employment taxes under FICA and FUTA h. Subcontracts Subcontract Total Contractor's Commission on Total of Subcontracts �o°�o Total increase or decrease of price Cost of bond 1.50% TOTAL 100.00 19.46 $1, 904.00 $113.00 $2,173.18 $0.00 $2,173.18 PROJECT SUMMARY SHEET (Change Order Attachment) PROJECT NAME: Will Rogers Auditorium Lighting System D.O.E. No.: N/A Attachment to Change Order No.: 1 Today's Date: 11/18/13 Original Contract Amount: Extras to Date: Credits to Date: TOTAL $ 572,900.00 $ - $ - Contract Amount to Date: Amount of Proposed Change Order: Revised Contract Amount: $ 572,900.00 $ (13,124.64) $ 559,775.36 Contingency Funds Avail. for Admin. Change Orders: $ 75,100.00 Remaining Funds Available for Change Orders: $ 88,224.64 Additional Funding (if necessary): $ -